HomeMy WebLinkAbout10.08.91 Planning Packet1. CALL TO ORDER 7:00 P.M.
2. APPROVE MINUTES
a. September 10, 1991
3. PUBLIC HEARINGS
4. DISCUSSIONS
5_ ADJOURN
AGENDA
PLANNING COMMISSION
REGULAR
OCTOBER 8, 1991
a. 7:00 P.M. Yard Variance for River Valley Clinic
b. 7:10 P.M. Zoning Amendment to Add Dental Laboratories to Conditional
Uses in the R -2 Medium Density District
c. 7:20 P.M. Zoning Amendment to Add Resource Recovery to Conditional
Uses in I -1 Light Industrial District
a. Preliminary Plat of Silver Springs
b. Zoning Amendment to Specifically Limit Urban Development to Areas
Served by Public Utilities
c. Schematic Plan for Akin Park Estates 2nd Addition PUD
1. CALL TO ORDER 7:00 P.M.
AGENDA REPORT
PLANNING COMMISSION
REGULAR
OCTOBER 8, 1991
2. APPROVE MINUTES
a. August 20, 1991 Special
b. September 10, 1991 Regular
3. PUBLIC HEARING 7:00 P.M. YARD VARIANCE FOR RIVER VALLEY CLINIC
The lending institution which is providing money for construction of the River
Valley Clinic addition to South Suburban Medical Center decided at some point that
the clinic building should be on a separate parcel of land even though the hospital
will continue to own it. This requirement doesn't actually change anything on
the ground but it does involve additional actions by the City Council and Planning
Commission to satisfy requirements of the City Code. The City Council has been
asked to approve a waiver of the platting ordinance at its meeting on October 7th.
The Planning Commission has been asked to grant a variance to enable zero lot line
setbacks for the hospital and clinic. A zero lot line is possible within residential
subdivisions and planned unit developments but has not been addressed for most
other uses. The clinic and hospital are both conditional uses within the R -1 Low
Density District. Both have been approved through the conditional use process
and this variance likely would have been approved also, if the request had been
made at that time.
Recommendation
Approve the request for a zero lot line setback between the hospital and clinic
structures since the spirit and intent of the ordinance will not be compromised.
4. PUBLIC HEARING 7:10 P.M. PROPOSED AMENDMENT TO THE ZONING ORDINANCE ADDING
DENTAL LABORATORIES TO CONDITIONAL USES ALLOWABLE
WITH THE R -2 MEDIUM DENSITY DISTRICT
The River Valley Clinic building on First Street has been sold to the owner of
an existing dental laboratory now located in the City of Rosemount. The clinic was in
existence at the time of the original zoning of Farmington and was, therefore, included
as a conditional use within the R -2 District rather than to be categorized as a
legal nonconforming use. The building, grounds and hours of operation of this
use appear not to have interfered with the adjoining neighborhood over the past
20 years. Similarly, the dental laboratory would be an appropriate use since the
type of operation is similar in many respects to what occurs on site at the present
time. The main difference is that the hours of operation would be extended slightly
(4:00 A.M. to 8:00 P.M.) so that the facility is available to customers on both
coasts of the continent during a typical work day. The staff has discussed deliveries,
work force, potential for expansion, and flood plain issues and is satisfied that
the change in use would not be noticeable. A question about rezoning the property
was settled by the prospect of this use being replaced at some time in the future
by a "fast food" restaurant. In essence, the conditional use process provides
both the neighborhood and the City protection that it would not have if the property
were to be rezoned. A question about the likelihood of other dental laboratories
moving to residential neighborhoods in Farmington has been discounted since few
existing buildings would be large enough to accommodate a similar facility and
a small one likely could be carried on as a home occupation anyway. It is the
Agenda Report 10/8/91 Page 2
understanding of staff that a small dental laboratory exists within the clinic
building as part of the dental office.
The purpose of this hearing is to discuss whether or not to recommend that the
City Council add dental laboratories as a conditional use within the R -2 Medium
Density District. If that recommendation is made, and the City Council agrees,
a specific conditional use request will be presented to the Planning Commission
during the November meeting.
Recommendation
Forward a recommendation to add Dental Laboratories as a Conditional Use in the
R -2 Medium Density District to the City Council.
5. PUBLIC HEARING 7:20 P.M. PROPOSED AMENDMENT TO THE ZONING ORDINANCE ADDING
RESOURCE RECOVERY TO CONDITIONAL USES ALLOWABLE
WITHIN THE I -1 INDUSTRIAL DISTRICT
This issue has been before the Planning Commission and City Council in the past
and was turned down by both bodies. The present City Council, however, has decided
that if Farmington continues in the solid waste business, any resource recovery,
for example, recycling /composting, will be carried out within the corporate limits
of Farmington. In a broader context, it should be pointed out that resource recovery
is currently a growth industry that will involve a wide range of approaches toward
solving solid waste problems. As it stands right now, Farmington could not encourage
any such use to locate within its boundaries.
The real reason for discussing resource recovery now is specific in the form of
a City owned co- composting plant which could become a reality with the help of
grants from the State of Minnesota. The purpose of this discussion is to decide
whether or not resource recovery facilities belong within the industrial district.
If so, a positive recommendation to and a favorable response from the City Council
will lead to a request involving a site somewhere within the I -1 Light Industrial
District for a Conditional Use to build a co- composting and recycling plant.
Recommendation
Forward a recommendation to add Resource Recovery as a conditional use in the I -1
Light Industrial District to the City Council.
6. DISCUSSION PRELIMINARY PLAT OF SILVER SPRINGS REQUESTED BY ROBERT STEGMAIER
AND BILL BLOCK
In essence, the developer has complied with all prior staff recommendation and
prepared engineering details based upon discussions with the City Engineer. The
City Engineer's response to the proposal is being handled in a separate memo. Comments
from the Dakota County Soil and Water Conservation District focus upon the erosion
control plan. These comments are being forwarded to the developer along with those
of the City Engineer.
The major discussion item for this meeting comes from a report to the developer
on Subsurface Soil Investigation. In it is a plan for phasing the plat into stages
of approximately 40 lots each. The enclosed map indicates this phasing which_:is
not acceptable because of the length of the temporary turn around. The City, in
the past, has accepted temporary dead end streets of up to 1000 feet, but the proposal
here is for a street twice that length. The major risk for the City is that a
minor amount of grading will be required in Phase 1 which contains all of the choice
lots the plat has to offer. It is entirely possible that the other streets will
be delayed for many years.
Agenda Report 10/8/91 Page 3
The staff would recommend a first phase of a complete loop involving 187th Street
plus English and Elgin Avenue. If this is not acceptable, a developer's agreement
must be signed and surety provided that the remaining streets shall be in place
within two years. This would give the developer time to market the lots on English
Avenue and 189th Street during the first year with the remaining streets to be
in place by November of 1993.
Recommendation
Recommend approval of the preliminary and final plat of Silver Springs to the City
Council subject to the development of an acceptable phasing plan plus the comments
from the City Engineer and Dakota County Soil and Water Conservation District.
7. DISCUSSION SCHEMATIC PLAN FOR AKIN PARK ESTATES 2ND ADDITION PUD REQUESTED
BY JON MALINSKI
The developer has decided to proceed with a second addition of Akin Park Estates
on the west side of Akin Road, north of the elementary school. He has selected
the PUD process because a church will be included within the development, along
with a potential health club /child care facility at the southeast corner of Essex
Avenue and 190th Street. This development also will be divided into phases with
a possible 1000 foot long cul -de -sac wrapped around the Akin Homestead. The difference
between this and the previous proposal is the length of the cul -de -sac and that
Essex Avenue will not be extended southward until approximately 1993 when the second
or third phase of this PUD also could be built. The major hurdle for both the
City and the developer will be in working with the County to implement realignment
of Essex Avenue and 190th Street.
Recommendation
Encourage the developer to proceed with a preliminary plat providing a site for
the church and approximately 20 single family house lots.
8. DISCUSSION ZONING AMENDMENT TO SPECIFICALLY LIMIT URBAN DEVELOPMENT TO AREAS
SERVED BY PUBLIC UTILITY SYSTEMS
See the attached memo dated October 1, 1991.
Charles Tooker
Planner
cc: file