Loading...
HomeMy WebLinkAbout12.11.90 Planning Packet1. CALL TO ORDER 2. APPROVE MINUTES 3. UPDATE AGENDA PLANNING COMMISSION REGULAR DECEMBER 11, 1990 a. Conditional Use Adult Housing on Lots 10 -13, Block 17, Original Town b. Sanibel Island Restaurant Signs c. Larry Jurgenson 5530 Upper 183rd Street 4. DISCUSSION COMPREHENSIVE PLAN DRAFT r 1. CALL TO ORDER 7:00 P.M. 2. APPROVE MINUTES NOVEMBER 13, 1990 3. UPDATE AGENDA REPORT PLANNING COMMISSION REGULAR DECEMBER 11, 1990 a. Conditional Use Adult Housing on Lots 10 -13, Block 17, Original Town of Farmington Fees have been paid for the Building Permit, Plan Check and State License. The HRA Development Contract is currently being reviewed by the Developer. A signed contract is anticipated by the HRA Director within two weeks. Permits are being held until construction begins at which time the WAC, SAC and Storm Water Management fees are also due. Funding is being secured from Premier Bank and they stipulate that interest in all 42 units shall be documented before the loan is authorized. They will release funding where half of the units have money down. The developer has 20 names of in- terested individuals before the apartments have been advertised. HRA Director Henricks has stated that construction will begin in March. b. Sanibel Island Restaurant Greg Brinkhaus The attached letter an copy of minutes was mailed on Friday. If there is a response before the meeting, staff will bring it to the meeting for informal discussion. Currently there are two faces to the sail banners, a Sanibel Island sign, a restaurant sign and a message board for large lettering. c. Larry Jurgenson 5520 Upper 183rd Street The informal discussion of a requested variance by Mr. Jurgenson held by the Planning Commission in March brought John McBrien into the office for a visit with Administrator Thompson. The entire topic was discussed by the Staff Development Committee with the City Attorney present. Attached is a letter to Mr. McBrien explaining the current status. Mr. Jurgenson has decided to proceed with a formal request and the public hearing will be set for the regular January meeting. 4. DISCUSSION COMPREHENSIVE PLAN DRAFT Comments of the Commission during the November meeting have been addressed in the attached draft. The pages are now numbered and the next step would be to prepare the document for distribution to the City Council and to the Metropolitan Council staff. Formal mapping will be necessary to get the document to the Metropolitan Council and action by the City Council will be deferred until the Council staff has prepared its response.