HomeMy WebLinkAbout02.08.16 Work Session Minutes Council Workshop Minutes
February 8,2016
Mayor Larson called the workshop to order at 6:30 p.m.
Present: Larson,Bartholomay, Bonar, Donnelly, Pitcher
Also Present: David McKnight, City Administrator;Robin Hanson, Finance Director;Adam
Kienberger, Community Development Director;Kevin Schorzman, City
Engineer; Todd Reiten, Municipal Services Director;Jen Dullum,Natural
Resources Specialist;Cynthia Muller, Executive Assistant
MOTION by Bartholomay, second by Pitcher to approve the agenda. APIF,MOTION
CARRIED.
Emerald Ash Borer Update and Plan
The emerald ash borer was found in Apple Valley in January 2016. It has not been found in
Farmington. The city ordinance has been updated and the city can remove trees on private
property if they are infected. It takes approximately five years for a tree to die once infected.
Farmington has 3100 boulevard ash trees. This does not include parks or natural areas. The cost
to remove all of them would be$800,000 to $1 million. The city could remove 200 trees per
year and a contractor would do the rest to be done by 2020. Or over 15 years,the city could
budget$61,000 per year. The cost does not include stump grinding and replanting. There would
also be equipment replacement costs. The current professional services budget is$12,000. Staff
would like to be proactive and not wait until infestation occurs.
Staff could begin work on some declining trees now. Most ash trees are in Dakota Estates and
the downtown area. There is also a treatment that can be applied to ash trees to prevent
infestation. That cost is$5 per inch diameter and needs to be done every two years. Council
would like the plan to include removal and replacement costs. If two boulevard trees are
removed on a lot,they would be replaced with one boulevard tree as a way to save cost. The
current policy is if we cut down a boulevard tree,we do not replace it. We need to start putting
money away now for this project. There needs to be public education and staff should reach out
to newspaper reporters to provide some of this education. Staff will prepare a plan for removal
and replacement. A survey of age of tree, condition and number of trees per lot will not be done
as the tree age does not matter with infestation. Council is more interested in tree replacement
numbers and costs.
Clean Water Minnesota—Metro WaterShed Partners Membership
Metro WaterShed produces materials for storm water outreach. The city used to contribute to
them. They are revamping their program with an editorial campaign calendar. It will include
Facebook,tweets,professional photos, newsletter articles for each season and will provide a
consistent message. There are 70 partners in the group. Staff has been providing in-kind
services to use their materials, but now Metro WaterShed is asking for memberships. There are
funds in the storm water fund. This new program will also provide a tracking program showing
Council Workshop Minutes
February 8,2016
Page 2
how many of our residents are reading their messages. A fall clean-up program is also offered
metro wide. Metro WaterShed manages the database. Cost is$1,000 to join. Staff is asking for
funding for one year. If we do not participate,the social media messages would not appear in
Farmington. Council would also like to know the dues for various other organizations the city
belongs to. As the dues do not come out of the general fund, some councilmembers were in
favor of it. Public education and outreach has to be done because of our MS4 permit. A
consistent message across the metro makes the outreach more effective. Council agreed staff
should bring the request to a Council meeting.
Downtown Redevelopment Plan Task Force Update
A presentation was given on the progress of the downtown redevelopment plan by Jeff Miller of
Hoisington Koegler. Based on comments received,there may be changes to land use and zoning
in the downtown area. The final plan will be presented to Council the end of March. Comments
from open houses have been that the current mix of restaurants and bars does not attract families,
casual gathering places are limited,no coffee shops, outdoor seating is limited, need improved
connections with trails and sidewalks, lack of public gathering space,buildings on highway 50
do not reflect the historic character of downtown, downtown is off the beaten path for residents
to the north,not enough destinations to attract residents on a regular basis, not enough unique
shops, downtown identity and awareness is low in the community. The opportunities are to
attract business to historic buildings,redevelop vacant and underutilized sites,add a park or
plaza, add connections from downtown to trail system and river, add a Riverwalk on south side
of river, create a stronger downtown entry from highway 50, improve character of streets such as
2°d Street and highway 50, add new housing options, create a stronger downtown identity. The
downtown core area is from 1st Street to 5th Street and from Walnut Street to the river.
Surrounding the core area is a downtown edge,riverside west which is west and north of the
railroad and riverside north. The plan is to focus on the downtown core first. A concept plan for
the core and downtown edges was presented.
A market feasibility study showed there is a retail sales leakage occurring in many categories.
The lease rates could be$18 -$20 per sq. ft. The priority would be to fill vacant buildings first
then redevelopment of other sites would be more viable. Riverside west could be mixed
residential and small use. The site has poor visibility and access for retail. A variety of housing
types could help attract multiple market segments to downtown. Current rental rates for
apartments range from $1.50 -$1.70 per sq. ft. Townhouses would be targeted for ownership
with apartments for rental. There would be potentially higher construction costs for housing
adjacent to the railroad tracks.
The recommended short-term strategies include building relationships with key downtown
property owners; refurbish existing vacant commercial buildings, interiors and exteriors,
particularly historic buildings; support civic/municipal destinations downtown; improve biking
and walking facilities; add outdoor seating and gathering places,permanent and temporary;build
downtown's identity.
The recommended implementation for the downtown core is to fill existing buildings and
redevelop strategic sites, add outdoor public space in the downtown core for events and informal
Council Workshop Minutes
February 8,2016
Page 3
gathering,add trails to connect downtown to the river and regional trails. For the downtown
edges it is to redevelop new housing options and for the Riverside districts to add park and trail
amenities on the south side of the river and add housing next to the river.
Redevelopment will be market driven which means things may not move as fast as we would
like. The Council and EDA need to be more proactive to make it happen. It is good to have the
library,post office and liquor store downtown. Whatever we have to make people come here
will also lead them to other shops as everything works together.
2016 Storm Water Work
There are two drainage issues. The first is on Embry Avenue in Akin Park Estates east. There
are issues in the summer and in the winter ice builds up in the curb from several drain tiles.
There is a drain tile at the top of the hill on the west side of the street. Staff suggested making a
connection from the surface drains into this drain tile. A survey would be done of the drain tiles
and sump pumps coming from homes and a cost estimate for the connection. Staff would like to
do this project this summer. It would be a good use of the storm water fund. Council agreed
with staff to obtain quotes.
(Councilmember Bartholomay left at 8:35 p.m)
The other issue is along Akin Road near 203rd Street. There is severe erosion to the east almost
to the evergreen trees. Staff recommends capturing the water from the culvert and taking it
around that property rather than allowing the water to go through the property. There is also an
issue to the north at Bible Baptist Church. Water is going over the berm between the path and
the parking lot and washing into the parking lot. Staff suggested in a year or two put curb and
gutter along Akin Road from the roundabout to Farmington Lutheran Church. It would involve
cutting out the shoulder and installing curb and gutter to make it more urban. Cost would be
approximately$500,000 to $700,000. This could be a possible use of MSA funding. It was
suggested to put curb and gutter on the east side of Akin Road only. Staff will research this
further.
Additional Municipal Services Staffing
Municipal Services has been short staffed since 2013. It is getting to the point where staff cannot
keep up with the work. Employees have been out on sick leave or vacation which adds up to 1.5
FTE. Employees have been moved around between solid waste, streets and snow plowing. Staff
would like to have a floater position. Half of the time would be spent in solid waste and half in
streets, so only 10%of the cost would come from the general fund. In the winter,two or three
employees are allowed to go on vacation if they are in town in case they need to come in for
snow plowing. We have 12 routes and there are seven employees for plowing. Vacation has to
be allowed in the summer because of preventing it in the winter. It is getting to the point where
the work is not getting done. Council agreed this is a core responsibility and we have to do it
right. Council asked about an organizational chart and a flow chart showing the duties. Staff
should provide Council with a list of work that is done with this many people and what is getting
left out. At the same time we are pulling from solid waste,parks, engineering and then those
Council Workshop Minutes
February 8,2016
Page 4
items fall behind. We try to keep people on the same plow route,but when pulling people from
other areas they are on a new route they are not familiar with. The same thing happens with
solid waste where garbage is picked up at a different time than normal. Staff will provide a snow
plow policy. Policies are not on the website because they are used as a guideline for staff to
follow.
The position being requested would fall under several categories from mechanics assistance,
solid waste operator, snow plow driver to building maintenance. Council noted these duties are a
priority and staff would not be requesting this if it wasn't necessary.
A council workshop was scheduled for February 22, 2016,to discuss municipal services staffmg
further and to receive a liquor store update.
MOTION by Pitcher, second by Donnelly to adjourn at 9:10 p.m. APIF,MOTION
CARRIED.
Respectfully submitted,
Cynthia Muller
Executive Assistant