HomeMy WebLinkAbout07.16.90 Council Packet AGENDA
COUNCIL MEETING
REGULAR
JULY 16, 1990
1. CALL TO ORDER
2. APPROVE AGENDA
3. APROVE MINUTES
a. 6/27 Special
b. 7/2 Regular
4. CITIZENS COMMENTS
5. PUBLIC HEARINGS
6. PETITIONS, REQUESTS AND COMMUNICATIONS
a. Approve 1991 ALF Ambulance Budget
7. ORDINANCES AND RESOLUTIONS
8. UNFINISHED BUSINESS
a. Stop signs in Dakota County Estates
b. Approve Fairgrounds sewer and water agreements
c. Siren damage settlement
d. Removal/trimming of boulevard trees
e. Space needs
9. NEW BUSINESS
a. Fire Cataract Pension benefits
b. Electrical connection for Christmas tree lights
10. MISCELLANEOUS
a. Review 1990-1991 Goals and Objectives
b. Warning sirens
c. Final plat of Farmington Industrial Park
d. Award bids for Project 89-7 - Flagstaff bridges
11. CONSENT AGENDA
a. School/Conference - State Chief's Conference - Police Dept.
b. School/Conference - Laws Update Class - Police Dept.
c. School/Conference - Advanced Driving School - Police Dept.
d. City Auction proceeds
e. Capital outlay request - Public Works dumpsters
f. School/Conference - Advanced Defensive Driving - Police Dept.
g. School/Conference - Parks & Rec
h. Capital outlay request - Tailgate lift for Public Works Dept.
i. Approve engineering agreement - Farmington Industrial Park
j . Bills
12. ADJOURN
13. ADD-ONS
a. Water service fees assessment
AGENDA REQUEST FORM
ITEM NO.
NAME: Larry Thompson
DEPARTMENT: Administration
DATE: July 9, 1990
MEETING DATE: July 16, 1990 )
/
CATEGORY: Petitions, Requests and Communications
SUBJECT: Approve 1991 ALF Ambulance Budget
EXPLANATION: Per the Joint Powers Agreement
REFERENCE MATERIAL/RESPONSIBILITY: Budget - ALF
REFERRED TO: (NAME) DEPARTMENT:
SIGNATURE
A m 1/5 gaii N
14200 Cedar Avenue South
Apple Valley, Minnesota 55124
Phone — 612-432-5664
ALF AMBULANCE
1991 PROPOSED BUDGET
To the Honorable Mayor and City Council Members:
Attached to this letter is the proposed budget for ALF Ambulance for the
1991 fiscal year. Per the three city Ambu]ance Joint Powers Agreement, the
ALF Ambulance Board has reviewed and approved the budget as presented.
The budget is being forwarded herewith to the three member cities for
their review and authorization for adoption.
It is the Board's goal for fiscal year 1991 to see ALF Ambulance continue
to deliver high quality emergency medical services to the citizens in our
ambulance service area. The Board will continue to recognize its fiscal
responsibility with regard to the overall operations of the ambulance
service. The following is a synopsis of the budget proposal:
The Board has opted to maintain the same coverage level for fiscal year
1991 as the current year 1990. That coverage consists of one unit being
operated twenty-four hours, with a second unit being operated sixteen
hour days (0700-2300 hours) . This has proven to adequately cover our
service area. The present call volume between the hours of 230-0700 does
not justify the expansion of hours for the second unit at this time. This
budget does reflect a slightly heavier call volume for 1991 over 1990.
The Board has also opted to continue the position of paramedic/education
coordinator. This position is utilized to instruct community education
and promotions, as well as instructing training for our allied first re-
sponder police and fire organizations. This position also fills in shift
vacancies due to vacations, sick leave and schooling for our other per-
sonnel. The 1991 Budget projects a $1.43 per capita subsidy. This is
down from $2.50 per capita from fiscal year 1990. This has been accom-
plished through proposed rate increases (user fees) and the slight reduc-
tion of our cash reserve.
Salaries: This line item consolidates all wages (i.e. Full-
time, Part-time, O.T. , etc. ) .
Education Equipment
Supplies: This is a new item for 1991. Due to the extensive
training we provide, this line item was added to
account for the materials used in training citi-
zens and public safety personnel.
Motor Fuels: Has an additional $2,100 added to cover antici-
pated mileage as well as higher prices at the
pumps.
Medical Supplies: Has an additional $1,500 added to cover the ever
increasing prices for supplies. Due to infectious
disease control measures, some items are used
only once while other have a shortened life
expectancy.
Collection Services: This line item now includes the collection fees
of Allied Interstate, Inc. (our collection agen-
cy) . Their collection percentage is reflected
here.
Professional Services: This line item covers all services such as pre-
employment physical, attorneys, etc.
Lease Contracts: This is a new line item for 1991. It covers the
lease of telephone pagers at a cost of approxi-
mately $290 annually. The remaining amount is
for the anticipated lease of a copying machine
for ALF.
Micro Filming: This is a new line item for 1991. The Lakeville
Finance Department advises that billing records
and other paperwork is to the point where it will
need to go onto microfilm for storage.
Additions to
Fixed Assets: This is our capital equipment budget. Monies to
finance these purchases come from our equipment
reserve account. There are five items listed for
1991:
1. Office Furniture - With the move into new
quarters, we obtained furnishings for all of
the quarters with the exception of our office
areas. This will be designated for the
purchase of file drawers and miscellaneous
office furniture as needed.
2. Monitor/VCR - These items will be placed in
our conference/training room. All of our
training for paramedics, first responders
and citizen courses are done with video
tape.
3. (2) Portable Radios - These are replacement
radios.
4. (2) Pagers - These are replacement pagers.
5. Computer/Computer Furniture - The Board has
had some discussion on this item. It is
possible the Board may delete this purchase
at a later time or look to one of the cities
for a used computer.
. •
-x I IC IC IC
-X 0 0 0 0 0
o 0 0 tr) o UI
r-I r-I • Cr) 10 to N.
ON 10 to
ON r-I 1/40 ul h. N. ON
r-I M l0 00
ul
'k 9C dC •k •k
•k 0 to O 0 0
O 0 • 0 1/40 03 to
ON N. 0
ON to 00 0 ON '.0 03
r-I r-I N 10 M
4
J.)
C)
bp
M %0 0 0
.n jC I. vO 4 0 ra
b 00 r -1 M M N 0
C) O\ to r-I 00 to I- 0
0) .--4 r-I M to 03
0a. 4
$4
0.
.-i
ON aC •x 9c •k -x
ON 10 M
r-I I 00 N M O m
03 03 • trl M 10 03
C) 03 In OO
.>~ ON to 10 I. N. '.0 I-4
J-) 1-1 r--I N M r-I r-I
4
ba c
.r.1
r-1
•rI
P.
O 0 M 0 0 N
U I r♦ n ON 0 M
n 4 r-1 r-i 4
t'. CO to N.
•1-1 ON M '-0 0 N to 0
r-1 r-1 N to M .-4
C)
0)
g
U)
C)
N
00 N 0 r•I 0 0
•1-1 jC M h CO N M
4-I '.0 00 • O'. M 00 '.0
00 to r-I
13 0N r-I 4 00 M 4 ra
0 r-1 1--1N 4 N.
CCIN
CO
4)
C.)
ro
4-I
4a
0
4.)
In
•rI •. y
r4 44 �.i )4
4 $a C)
En ,0
U 0 .. 4
ao al a3 •.-4 C •1 V
0 $a E-t .-1 .-1 >r z
a)
F .--i a) •.I J.))
J
ob 0 0 r�-1 Cid CU)
r-I C) W P-i .,...4 •r-)
r-I J-I C) •rI CO 4-) o
CO C) Jo) J..) •,-1 y U SJ
� a
C) 0 O U 33-I 3 EU)
Ems-+ w M Cr) E4 Z I< IC
ALF AMBULANCE
BALANCE SHEET
OPERATING AND EQUIPMENT FUND COMBINED
1988 1983 1930 1990 1991
ACTUAL ACTUAL BUDGET ESTIMATE BUDGET
ASSETS
Current assets
Cash $241,054 $306,730 $215,280
Operations 120,976 63,185
Equipment 95,893 128,178
Accounts receivable, net 153,125 138,680 145,138 125,607 167,909
Prepaid expenses 12,792 11,981 9,676 13,1.79 14,497
Total current assets $406,971 $457,391 $370,094 $355,655 $373,769
Property, plant and equipment
Machinery and equipment $244,455 $246,996 $257,154 $273,196 $282,696
Less; accumulated depreciation • (56,958) (85,411) (120,069) (115,411) (146,411)
Net equipment $187,497 $161,585 $137,085 $157,785 $136,285 •
Total assets $594,468 $618,976 $507,179 $513,440 $510,054
LIABILITIES AND RETAINED EARNINGS
Current liabilities
Accrued salaries $17,144 $18,325 $12,578 $18,650 $20,150
Accounts Payable 11,350 7,982 9,143 9,143 10,057
Accrued interest payable 2 . 1,341 3,658
Bonds payable-current 41,500 47,500
Total current liabilities $77,335 $77,465 $21,721 $27,793 $30,207
Long-term liabilities
Bonds Payable
Retained earnings
Invested in Property and Equipment $187,497 $161,585 $137,085 $157,785 $136,285
Reserved for Future Equip, Expenditures 59,460 86,925 129,896 95,893 128,178
Unreserved 270,176 293,001 218,477 231,969 215,384
Total retained earnings $517,133 $541,511 $485,458 $485,647 $479,847
Total liabilities and retained earnings $594,468 $618,976 $507,179 $513,440 $510,054
ALF AMBULANCE
STATEMENT OF REVENUES AND EXPENSE
1968 1969 1990 1990 '991
ACTUAL ACTL?.L BUDGET ESTIMATE DGET
Operat:rg re%er.ues
Gr:ss service billings $417,334 $485,346 $439,600 $439,600 $$567,650
Less MedlcarejMedicaid (18,837) (23,411 ) (16,485) (21,100) '.23,207)
Net service billings $398,497 $461.925 $423,115 $419,500 $569,443
City support 170,433 80,255 150,148 150,148 93,379
T wishio sucport 6,600 7.200 6,900 6,650 7,500
Miscellaneous 15,236 10,020 8,500 8,500 14,750
Interest 18,814 24,449 23,500 15,000 16,000
Total revenues $609,580 $583,859 $612,063 $598,948 $691,072
Operating expenses
Salaries $242,838 $339,455 $356,837 $396,837 $410,854
Pera 10,055 14,695 15,166 17,778 18,407
Fica 17,767 25,283 26,798 30,358 31,431
Hospitalization 12,406 22,044 29,700 28,139 31,500
Long term disability 1,984 2,157
Workmans Compensation 10,423 10,252 16,097 18,530. 19,405
Office supplies 357 840 1,000 1,000 1,250
Operating Supplies 1,689 1,095 1,500 1,500 1,700
Education Equipment and Supplies 700
Motor fuels • 6,600 9,293 9,500 9,500 11,600
Lubricants 64 197 500 500 500
Clothing 2,765 2,450 3,500 3,500 3,500
Equipment parts 1,613 1,203 3,000 3,000 3,000
Promotions 169 322 700 700 750
Medical supplies 5,861 1,126 7,100 7,100 8,600
Oxygen 487 773 575 575 675
Audit 3,100 1,500 1,200 1,200 3,600
Professional services 366 2,846 1,100 11,100 2,500
Collection services 20,396 26,356 19,900 26,900 29,200 •
Use of personal auto 571 516 650 650 675
Print public information 35 0 220 220 220
Insurance 11,572 13,398 16,500 15,000 16,500
Telephone 1,505 1,813 2,600 2,600 2,900
Lease Contracts (Pagers 5 Copiers) 3,800
Contract auto repair 4,421 5,604 6,500 6,500 7,200
Contract equipment repair 205 489 700 700 950
Contract linen 567 950 800 950 850
Contract radio repair 783 343 1,500 1,500 1,600
Data processing 535 381 600 600 600
Microfilming 1,000
Postage 0 100 100 100
Schools and conferences 677 1,741 2,400 2,400 3,500
Dues and subscriptions 393 476 950 950 1,100
Licenses 75 255 350 350 650
Interest expense 5,118 3,959 0 0 0
Uncollectible accounts 5,973 35,373 49,455 32,091 42,898
Depreciation 21,419 28,453 33,500 30,000 31,000
Total expense $391,411 $559.491 $610,996 $554,912 $E:,3,E72
Net inccce $216,169 U4,379 $1,065 ($EE,E941 ($5.900)
BUDGET ASSUMPTIONS
1988 19E9 1990 1930 1291
ACTUAL ESTIMATE BUDGET ESTIMATE
POPULATION
Apple Valley 29,109 32,309 33,278 33,622 35,000
Lakeville 18,222 20,783 21,406 22,107 24,175
Farmington 5,110 5,275 5,375 5,682 5,225
Total population 52,441 58,367 60,059 62,011 65,300
PER CAPITA COST $3.25 $1.38 $2.50 $2.50 $1,43
COST PER CITY
Apple Valley $94,604 $44,425 $83;195 $84,055 $50,050
Lakeville 59,222 28,577 53,515 56,768 34,856
Farmington 16,608 7,253 13,438 14,205 8,473
$170,433 $80,255 $150,148 $155,028 $93,379
(55,864) (5,800)
SERVICE BILLINGS
Total transports 1,558 1,549 1,570 1,570 1,610
Average revenue per call $268 $313 $280 $280 $365
Total service billings $417,334 $485,346 $439,600 $439,600 $587,550
SERVICE BILLINGS
For operations 386,175 457,881 404,432 404,432 545,865
Designated. for future equipment replacement 31,159 27,465 35,168 35,168 41,785
$417,334 $485,346 $439,600 $439,600 $581,650
k S ♦ �
ALF ANBUL4NCE
WORKING CAPITAL
1988 1989 1990 1990 1891
ACTUAL ACTUAL BUDGET ESTIMATE BaET
Current assets
Cash $241,054 $306,730 $215,280 $216,869 $191,163
Accounts receivable, net 153,125 138,680 145,138 125,601 167,909
Prepaid expenses 12,792 11,981 9,616 13,179 14,497
Total current assets $406,971 $457,391 $370,094 $355,655 $373,769
Current liabilities
Accrued salaries $17,144 $18,325 $12,578 $18,650 $20,150
Accounts payable 11,350 7,992 9,143 9,143 10,057
Accrued interest payable 1,341 3,658 0 0 0
Bonds payable-current 47,500 47,500 0 0 0 .
Total current liabilities $77,335 $77,465 $21,721 $27,793 $30,207
Total working capital $329,636 $379,926 $348,373 $327,862 $343,562
CHANGES IN WORKING CAPITAL
1988 1989 1990 1990 1991
ACTUAL ACTUAL BUDGET ESTIMATE BUDGET
Funds provided
Net income $218,169 $24,378 $1,065 ($55,864) ($5,800)
Depreciation 21,419 28,453 33,500 30,000 31,000
Total funds provided $239,588 $52,831 $34,565 ($25,864) $25,200
Funds applied
Additions to fixed assets $87,001 $2,541 $12,500 $26,200 $9,500
Debt retirement 47,500
Total funds applied $134,501 $2,541 $12,500 $26,200 $9,500
Net increase in working capital $105,087 $50,290 $22,065 ($52,064) $15,700 •
Working capital, January 1 224,549 329,636 326,308 379,926 327,862
Working capital, December 31 $329,636 $379,926 $348,313 $327,862 $343;562
ALF AMBu . ' tiCE
BALANCE SEET
OPERATING FUND
12E8 13E 193C' 1990 192,
ACTUAL ACILAI BUDGET ESTIMATE BUDGET
ASSETS
Current ""tt
Cash - Equipment $241,054 $306,730 $215,280
Equipment 120,976 63,185
Accounts receivable, net 153,125 138,680 145,138 125,607 167,909
Prepaid expenses 12,792 11,991 9,676 13,179 14,497
Total current assets $406,971 $457,391 $370,094 $355*,655 $245,591
Property, plant and equipment
Machinery and equipment $244,455 $246,996 $257,154 $273,196 $282,696
Less: accumulated depreciation (56,958) (85,411) (120,069) (115,411) (146,411) •
Net equipment $187,497 $161,585 $137,085 $157,785 $136,285
Total assets $594,468 $618,976 $507,179 $513,440 $381,876
LIABILITIES AND REIAINED EARNINGS
Current liabilities
Accrued salaries $17,144 $18,325 $12,578 $18,650 $20,150
Accounts Payable 11,350 7,982 9,143 9,143 10,057
Accrued interest payable 1,341 3,658
Bonds payable-current 47,500 47,500
Total current liabilities $77,335 $77,465 $21,721 $27,793 $30,207
Long-term liabilities
Bonds Payable
Retained earnings
Invested in Property and Equipment $187,491 $161,585 $137,085 $157,785 $136,285
Reserved for Future Equip. Expenditures 59,460 86,925 129,896
Unreserved 270,176 293,001 218,477 231,969 343,562
Total retained earnings $511,133 $541,511 $485,458 $485,647 $479,841
Total liabilities and retained earnings $594,468 $618,976 $507,179 $513,440 $510,054
ALF AMBULANCE
BALANCE SHEET
EQUIPMENT . U N D
19E6 19E2 lin 1 I) E91
ACTUAL ACTUAL BUDGET ESTIMATE BUDGET
ASSETS
Current assets
Cash $95,593 $128,178
LIABILITIES AND RETAINED EARNINGS
Retained earnings
• Reserved for Future Equip. Expenditures 95,893 128,178
ALF AMBULANCE
ADDITIONS TO FIXED ASSETS
1988 1989 1990 1990 1991
ACTUAL ACTUAL BUDGET ESTIMATE ESTIMATE
New Ambulance
Chassis $22,000
Module 35,653
Telecommunications equipment
Radios/telephone 4,696
Portable radios (2) 3,238 $2,139 $2,400
Pagers (2) 402 700
Defibrillation/monitor
Life Pak 5 7,019
Refurbish/Repower Medic #11 $10,500 $14,200
New engine, rebuilt frame
Interior/exterior refurbish
Miscellaneous equipment for new ambulance . •
Equipment 4,449
Optical emitters 4,050
Manakins 1,501
Account receivable software 2,995
Bullet proof vests (donated) 1,400
Office furniture
Miscellaneous furniture for new quarters 2,000 12,000 1,400
Computer and furniture 5,000
Total acquisition of equipment $87,00.1 $2,541 $12,500 $26,200 $9,500
AGENDA REQUEST FORM
ITEM NO.
NAME: Larry Thompsonp,,J) 26 acs-rte. ,
DEPARTMENT: Administration
DATE: July 9, 1990
MEETING DATE: July 16, 1990
CATEGORY: Unfinished Business
SUBJECT: Stop Signs in Dakota County Estates
EXPLANATION: Per Council directive -
REFERENCE MATERIAL/RESPONSIBILITY: Report - Dan Siebenaler
REFEREED TO: (NAME) DEPARTMENT:
Larry Thompson Administration
Tom Kaldunski Public Works
Dan Siebenaler Police
SI is
AGENDA REQUEST FORMe
ITEM NO. AP1Ak
NAME: Larry Thompson
DEPARTMENT: Administration
DATE: Jt 5 90 -1/41 jo
MEETING DATE: Giiso 7 70
CATEGORY: cations
SUBJECT:• Petition - Stop Signs - Dakota County Estates
EXPLANATION: ems- e j ��--�----
REFERENCE MATERIAL/RESPONSIBILITY: y -
REFERRED TO: (NAME) DEPARTMENT:
Larry Thompson Administration
Tom Kaldunski Public Works
Dan Siebenaler Police
SIGNA
June 13, 1990
'imi 18 ¶9
Dear Councilman
We would like to request stop signs at the follow-
ing!
Four way stop signs at 183 rd and Embers Ave and at
upper 183 rd and Embers Ave a three way stop sign .
At 183 rd and Ensley two way stop signs and at upper
183 rd and Ensley two way stop signs.
Due to the number of young children and traffic from
Pilot Knob .
We also would like you to seriouly consider "slow
children at play signs". There have already been to
many near accidents. There's also Four daycare homes
in the same block.
OUR CHILDREN ARE OUR FURTURE ! LETS KEEP IT THAT WAY.
Name Address Phone
kiiii-i4\ithk. Kiwackg / g3/3n• Ail 466-g3{!
4i V ,g 63vr w i va >51-46p_8761
Inaccill 1/ N _Agaee;o A0P5?0 1-1-1 /(J -i-e6 4e-'27.
, F a, 3:=26a /Z 0,
y `d3k,d 34- �� 46..E -g 6 cg
,544,0) /27A-Wi (5-27-5-- C"PPA SII 5s (1-/'-°4t: d 534- a , 3
3 sO. Ye,' - 45� y
can % '
5351 ufi ic i g3xo 41cs7Y3 '
ctA e 7/4c, 5363 C/ e (83 w q6 3 --7136,
�1 ca���s ,� -,a2--o-r)
I-613\x,, ,., ‘ i � 'H u.° — i14 O
►3 "45149 ""bo / ti103- Octd6 ��
Name Address Phone
avateclei4- 53c{ e34S 44CO3 cW4
463 - 8441
/r. F/
f/0
0.14,91.
CI. tAte- --w.1
07y (A.11
) °N' Oce, Lo--ere, rio - ho M�
ase` T
¢,,'iy •'"�`s '.. ,�.r�+,"•
;.•4..;�,�s�*..;�.,-j�+�"}"^t�w :"1•'F" .r'�°� - .� -+s .• �"�.M=ir.e3T 4+ ?•at� �+F 'n -T`!`y0'' .� �. •
t 4
•
� :,;e :•41,•...•,,-. "x .,.fir • • _ �rR Y N.. +a+ .. _ �+' f a r
•
17
- CI -PP.
•. --
it * ;-- '\‘14 %1 t
:.C w - -- - asig. n
- aLH. Pb. 31 r: t
Pill: 111t -
-—_- _
1,111113111111111111111
--- \71
Ik Do
_
' -5, :1 /
iimillimin
S'''
J ,I '� E
t'Y4.40 1 im,i •
al _c.
0.
t_ ..
_ n.
Z vi ..
IS ... piummiiim
(::)
. „
. 46 .
1Y v, ...t w• „ell . u- J + 5
`\ e ; o •I M1 .;.V"
: j ,
HIN. ,
al 1
�-- I l w w V .• 111-11
: LI,C) ,: ,. - - I ! Fill A
• 1 i'iCli,) 8 .,_,. 11 Mill Ini ilk
=MI , In
'',-- 4( = Ocr--_ : • C. _ P ..�' le.. 1,
4111211114.
,, Illn
--I MIMI
tS.r v.W c-• - • 5t12$.' �1gIII /8.��/ 7 MEE:.�r /7f�
'••bre i.. _'�� s .� .,.. a �����, er • a I Iti:rr��'
los
Y
-' E iiii l ! 3;1) .
h v _ x c J▪• :ttt._ i is _ 1 _ 'II' 1 k Inillitilli I�i�J
!Intl
• in kik:
(,O� ry� y : +/ ,
t
• •• seb . • --- •• h-- ` #i-"e lues• '',..,'.
104
alk1/4 . ___,
,' u. ... • Irtt,,,,, /' 1
h .n ^ CD s� j o 0 •j :! c :zic;I
h ", o, le 0, �0 •
4
IA /fid• . .. p $ •'o,P �. o ..• �:
u \ \* _ \W • i In
Z.;; .•• :6 si 1 vs
,k„,„.,., -,, qr. . --, N.c. ss. ..„..
^`R ti • h`
Mgl
•• (FIN lill
oil
kcs 4,
vl is
-(44, 4 NI ' / ; ..P-LF\ -. -e '1)1 • C),, ---.4 I. A. "
LP i O ii i• � , e• ,,(fp
• per. Kai , .lS`
4,4
U t�? j Q°1 01 iil
• - f k ^0 • • t Mil O w f.. Q k
s Q D. •l �did
' O O 0
•
r y co
.."..p Ci
0 J� cccoo offai I
•
V z was.•S ••-r•5 o"R.P .•'�H .. y; +rV2` •, w
I.X1 --- ••0•1•,, 1 . FM Ii0 MI c.)_..- .7.7w • . #4...., ..:4-)..: (:).J.7 ,.. 1. 4 . ._., : .
is
Ini -':;'...N'. f
MEN tom, •
,�¢, p}p�l a.
\ ,,a -� o • tet' d
L.
'.."0 :V •‘f.> . I.'' • ,.:`-'.,..din . : ;" e_. Z. -C.-9 _6; 0 .4 ce 0 ,.,.1 o
•
nv ^
0 t 4-:f. f :.---:1; r -.'0%t
ill 1—
111 i� a
L
• pc^• a 3OO 300 aoC, t� ,,;oc, ' �o-- IOPy :. i' - •ems o
1 I
� J
AGENDA REQUEST FORM
ITEM NO.
NAME: Thomas J. Kaldunski ct, ,(1 _4 -
DEPARTMENT: Public Works f
DATE: July 3, 1990
iAY-1(MEETING DATE: July 16, 1990CATEGORY: Unfinished Business (21r--
SUBJECT: Removal/Trimming of Soft Maples
EXPLANATION: See attached memo
REFERENCE MATERIAL/RESPONSIBILITY: Memo - Tom Kaldunski
REFERRED TO: (NAME) DEPARTMENT:
Larry Thompson Administration
Tom Kaldunski Public Works
Wayne Henneke Finance
Jerry Bauer Public Works
7.440,4141144j
SIGNATURE
MEMO TO: MAYOR AND COUNCIL
SUBJECT: TREE TRIMMING/REMOVAL
DATE: JULY 9, 1990
The Public Works Department has inventoried the City boulevards to identify all
large soft maple trees that need trimming and/or removal as a follow up to our
dicussions at the last Council meeting. I must stress that the City has a liability
to maintain these trees properly. If the hollow branches and dangerous trees are
not removed, the City could be held liable for damages caused by boulevard trees
following heavy wind storms. There were several soft maples that were blown down
during the last storm in June.
Attached is a list of large soft maples that need attention. H&H Tree Service has
estimated that it will cost $150/tree trimmed with the Public Works crew chipping
the brush and hauling the wood away. To remove trees completely, it will cost an
average of $300 per tree plus $25.00 per tree for stump removal. The following
summarizes the cost of maintaining the soft maples.
Trees to be trimmed (30 @ $150 each) $ 4,500.00
Trees to be removed (17 @ $325 each) 5,525.00
Total $ 10,025.00
At a future Council meeting, I will be requesting an adjustment to the Department
budget to address these trees. I will be recommending that the $3,000 cut from the
1990 Budget plus an additional $2,525 be targeted to fund the removal of the dangerous
soft maples in 1990. I will also request an additional $4,500 in the 1991 Budget to
handle the trimming and branches from the soft maples. Note that this is in addition
to the $3,000 budgeted in 1990 and 1991 for removal of diseased shade trees.
7--..,17004/4/4,14141
Thomas J. Kaldunski
Public Works Director
cc: file
Wayne Henneke
Jerry Bauer
TJK
TJK/mh
k
INVENTORY OF SOFT MAPLES
# OF TREES LOCATION RECOMMENDED ACTION
1 309 Fourth Street Trim
3 410 Oak Street Trim
2 420 Oak Street Remove
1 515 Oak Street Trim
1 520 Oak Street Remove
1 711 Oak Street Trim
1 704 Oak Street Trim
1 520 Spruce Street Trim
1 514 Spruce Street Trim
1 506 Spruce Street Remove
1 508 Spruce Street Trim
2 421 Spruce Street Remove
1 421 Spruce Street Trim
1 Spruce Place Remove
1 Red Oak Manor Remove
3 401 Spruce Street Trim
1 601 4th Street Remove
1 700 4th Street Remove
1 520 3rd Street Remove
1 513 3rd Street Remove
1 204 Walnut Street Trim
1 308 Walnut Street Trim
1 601 3rd Street Trim
1 601 4th Street Remove
1 404 Walnut Street Trim
1 601 Walnut Street Trim
1 612 Walnut Street Trim
3 613 Walnut Street Trim
1 521 Walnut Street Trim
2 512 6th Street Trim
1 609 Main Street Remove
1 601 Main Street Trim
1 317 Main Street Remove
1 301 Main Street Trim
1 305 Main Street Trim
,
• a
# OF TREES LOCATION RECOMMENDED ACTION
1 413 Willow Street Trim
1 39 Oak Street Remove
1 31 Oak Street Remove
1
AGENDA REQUEST FORM
ITEM NO.
NAME: Larry Thompson
DEPARTMENT: Administration
DATE: June 25, 1990
MEETING DATE: July 16, 1990
CATEGORY: Unfinished Business
SUBJECTi Space Needs
EXPLANATION: Staff requires direction from the Council as to which
way to proceed with the space needs matter.
REFERENCE MATERIAL/RESPONSIBILITY: Update - Larry Thompson
REFERRED TO: (NAME) DEPARTMENT:
Larry Thompson Administration
Tom Kaldunski Public Works
SIGNATUI /17
' MEMO TO: MAYOR AND COUNCIL
SUBJECT: SPACE NEEDS - REFERENDUM
DATE: JULY 11, 1990
Per Council directive, staff has reviewed the following issues relating to the
proposed Public Works Facility referendum.
Amount
It is felt that the amount of the referendum cannot be reduced without reducing the
actual size of the building or non-building costs. Most of the non-building costs
were felt to be either essential or "bare bones". The fence could be eliminated
($13,000) and installed in a future year. With upcoming regulations relating to salt
storage, it is not prudent to eliminate the storage shed. The testing/fees, fiscal
costs and contingency cannot be reduced without potentially cutting into other essenti,
areas if actual costs exceed estimates. Staff has discussed the possibility of the
HRA donating an industrial site for the project. The new State TIF law has included
a provision whereby City LGA is reduced by a certain percentage of captured increments
It may be beneficial to the HRA to donate a site in lieu of the LGA penalty, which
in essence would be revenue "neutral". It was intended to discuss this topic (LGA
penalties) at the next Council meeting, but I can present additional detail to this
concept at this meeting if requested. If the property were to be donated, the referem
dum could be reduced by $96,000.
The building size could be reduced by eliminating 2 bays (35') which would mean the
solid waste trucks would be stored at the present garage and Parks and Recreation wouli
continue to lease its existing space. The bays could be added at a later date. This
would eliminate one of the arguments for the centralized garage, that is, efficiency
of operations. Also, the Fire Hall was reduced in size in order to reduce the
referendum and five years later, the Fire Department is running out of space. Therefo.
while the size of the building could be reduced, I am opposed to this cut unless it is
felt that this is the only way the referendum would be passed. The reduction would
214# $61,250.
,.Timi
Staf r
ecommends the referendum be held on Tuesday, November 6, 1990 (General Election
Dy)r in order to attract the largest voter turnout.
Summary
The only way the size of the referendum can be substantially reduced is to eliminate
land costs or to reduce the size of the building. I would request direction from the
City Council to approach the HRA to obtain conceptual approval. I would report back
at the next meeting. At that time the Council will need to set the time and date for
the referendum in order to give adequate time to the Space Needs Committee to promote
the referendum. In the mean time, I would request that the Council reappoint the
Space Needs Committee to begin planning the promotion.
elr
cc: Tom Kaldunski
a.7/
"'"`ha rfm sdn" " "" Jim Bell
City Administrator
Space Needs Committee
Jerry Henricks
AGENDA REQUEST FORM ICU ITEM NO.
Nom: Larry Thompson P-9-IJ-COJJ
DEPARTMENT: Administration
DATE: July 6, 1990 /
MEETING DATE: July 16, 1990
CATEGORY: Miscellaneous
SUBJECT: Review 1990-1991 Goals and Objectives
EXPLANATION: Self explanatory
REFERENCE MATERIAL/RESPONSIBILITY: Goals and Objectives Update - Larry Thompson
REFERRED TO: (NAME) DEPARTMENT:
Larry Thompson Administration
Department Heads
Jerry Henricks EDC/HRA
SIGNA
CITY GOALS
1990-1991
July 11, 1990
1. Implementation of a Comprehensive Waste Collection/Processing System
Completed
A. Council adopted a new Solid Waste Ordinance.
B. Council adopted a Solid Waste Policy.
C. City implemented a volume based billing system.
D. City implemented an automated collection system.
E. City implemented a curb side residential recycling program. City presently
recycles newspaper, beverage cans, tin cans, glass, office paper, cardboard,
and plastics.
F. Yard waste has been separated from landfill waste stream.
G. Drop Off days held on May 20, 1989, October 14, 1989 and May 19, 1990.
H. City selected for County sponsored battery collection pilot program.
I. Resource Recovery Facility Task Force Report and Siting Task Force Report completed
and accepted.
J. Staff directed to prepare Resource Recovery Facility grant.
K. Commercial/Institutional/Multi-family recycling program implemented.
L. Volume based billing system refined.
To Do
A. Complete Resource Recovery Facility grant.
B. Complete weight based equipment grant.
C. Continue to refine commercial/institutional/multi-family recycling.
D. Implement automated commercial collection.
2. Implement Recommendations of the Salary Committee
Completed •
A. Job descriptions reviewed/revised/adopted.
B. Organizational Chart reviewed/revised/adopted.
C. Policies reviewed/amended.
To Do
A. Complete job evaluations.
B. Revise pay line.
C. Implement pay plan.
D. Review part time salary issues.
3. Continue with Southeast Area Storm Sewer Project/Henderson Dewatering
Completed
A. Project included in the Vermillion River Watershed Management Board (VRWMB)
Plan which has been adopted by the State.
B. Feasibility report ordered by the VRWMB.
C. Meeting has been held with township officials to discuss project.
D. Staff has met with VRWMB engineer to discuss project.
E. Feasibility report accepted/adopted by VRWMB.
To Do
A. Determine project financing.
B. VRWMB to hold public hearing on project/allocate costs. (During 1990)
C. VRWMB to order project.
D. Project completion - approximately 1991.
4. Complete Celebrate Minnesota 1990 Project
Completed
A. Public hearings conducted.
B. Presentation made to Council, HRA and EDC.
C. Financial commitments made by HRA and service organizations.
D. State grant approved/accepted.
E. Agreements obtained from Soo Line and NSP.
F. Storm Sewer project completed.
G. Property has been acquired from CMC.
H. Pathway and landscaping installed west of railroad tracks.
I. Awnings installed.
J. NSP cable buried.
K. Ceremony held.
To Do
A. Complete trail and landscaping east of tracks.
B. Bury Soo Line cable.
5. Sidewalk Repair and Installation
Completed
A. Plan completed and adopted by Council.
B. 900 lineal feet of sidewalk replaced during 1989.
C. 4,000 lineal feet of sidewalk replacement/new installation ordered for
Project 89-3 and 89-14.
D. $16,500 sidewalk maintenance bid let.
E. $25,000 sidewalk improvement project ordered (90-6) .
F. Revised inventory of sidewalks completed.
To Do
A. Review/revise/adopt comprehensive sidewalk plan.
B. Install sidewalks per schedule in sidewalk plan.
6. Establish and Implement 5 and 10 Year Public Improvement/Maintenance Plan
Including Controls/Policy/Financing
Completed
A. Storm Sewer
- Comprehensive Storm Sewer Plan adopted by Council.
- Development fee policy adopted by Council.
- Redevelopment fee policy adopted.
- Assessment policy adopted.
- Storm Water Utility policy and fees adopted.
B. Sanitary Sewer Rehabilitation/Installation
- Proposal to complete plan received from Bonestroo.
- $200,000 committed to rehabilitation in 5 year CIP.
- Assessment policy adopted by Council.
C. MSA Road and Bridge Improvement
- 5 year CIP MSA Plan adopted.
D. Water Supply and Repairs
- Comprehensive Plan adopted.
- Service fees increased for improvement.
- WAC charge for wells and reservoirs adopted.
- Improvement/redevelopment fees adopted for water trunk financing.
E. Street Installation/Rehab
F. Flagstaff Bridge Replacement Plans completed.
G. Master Park Plan
- Draft plan completed, presently being reviewed by PARAC.
- Stormwater pond/parkland policy adopted.
- Park/trail fee/dedication revisions drafted, presently being reviewed by PARAC.
H. Dustcoating/Sealcoating/Cracksealing programs.
- Inventory completed.
To Do
A. Storm Sewer 5-10 year CIP to be drafted/adopted.
B. Comprehensive sewer rehabilitation plan ordered.
C. Sanitary sewer 5-10 year CIP to be drafted/adopted.
D. Facilities plan to be prepared - apply for State loan.
E. MSA Road and Bridge to be reviewed/revised.
F. Water supply 5-10 year CIP to be drafted/adopted.
G. Street 5-10 year CIP to be drafted/adopted.
H. Flagstaff Bridge plan to be completed.
I. Park plan to be adopted by PARAC and Council.
J. Dustcoating/Sealcoating/Cracksealing plan to be drafted/adopted.
7. Specific Projects
Completed
A. Continue Street Rehabilitation
- Project 89-3 out for bids.
B. Replace Flagstaff Bridges
- Bridges south of TH 50 replaced.
- Bridge replacement north of TH 50 out for bids.
C. Continue to rehabilitate Flagstaff Avenue
- Entire length has been rehabilitated with subbase treatment and rerocked.
D. 2nd Street storm sewer.
E. Farmington Preserve
- Appraisals have been obtained.
- Grant has been accepted.
F. Extension of Water to Fairgrounds
- Feasibility report has been completed.
- Agreements have been drafted.
G. Recommission Well No. 1 - bids let.
H. Pine Knoll Park Grading
- Grading plan has been completed/approved.
- $11,000 placed in 1990 budget.
- 50% of material has been placed.
To Do
A. Street Rehabilitation
- Accept bids
- Complete projects
- Conduct assessment hearings/adopt assessment roll
B. Replace Flagstaff bridges
- Accept bids
- Complete project
C. Farmington Preserve
- Obtain purchase agreement with property owners.
- Finalize financing.
- Condemnation proceedings (if necessary) .
- Acquire financing from State.
- Apply for LCMR construction funding.
D. Extension of Water to Fairgrounds
- Approve agreements
- Approve plans and specifications
- Award bid/complete project
E. Recommission Well No. 1
- Complete project per contract (currently under construction)
F. Pine Knoll Park Grading
- Complete grading in conjunction with Project 89-3
8. Complete Development Manual
Completed
- Comprehensive City Plan, Storm Sewer and Water Plan approved.
- Assessment policy adopted.
- Development packet completed.
Zoning controls presently being reviewed.
To Do
- Revise/simplify development packet.
- Develop specific packets for different types of development activities.
- Complete improvement standards/adopt.
9. Update Comprehensive Plan
Completed
- Preliminary draft/revisions completed.
- Staff has received preliminary approval of revised population estimates and MUSA
boundaries by Met Council staff.
- Planning Commission has adopted 75% of the plan/policies.
To Do
- Planning Commission to complete review/adopt/forward to Council.
- Council to review/adopt and forward to Metropolitan Council.
- Metropolitan Council adopts.
10. Establish Light Industrial Park
Completed
- Duo Plastics Expansion utilizing TIF and IDR financing completed.
- Sewer and water extended to area.
- Purchase/option agreement approved by the HRA and property owner.
- TIF District/financing plan/bonds approved.
- Preliminary plat approved.
- Bids received/accepted.
To Do
- File plat
- Complete improvements
11. Study Existing Boundaries and City Services Relating to Possible Annexation
Completed
- No action taken except for annexation of lot on Linden Street
To Do
- Direction required from the Council.
12. Establish Policy on Firefighter Pension Benefits
Completed
- Fire Cataract has reviewed various financial reports.
- Subcommittee of Fire Cataract has prepared recommendation.
To Do
- Cataract to review/approve policy.
- Council to review/approve policy.
13. Implement Star City Program
Completed
- Several City officials attended Star City seminar.
- $7,000 placed in 1989/1990 Budget.
- Futures Committee presently conducting Business Retention/Expansion Survey.
To Do
- EDC to implement Star City plan.
14. Study the Following Planning and Zoning Issues - Fair Hills (R-3)
Completed
- Rezoning completed.
15. Pursue Construction of a Third High Density Senior Citizen Apartment
• Completed
- Property has been acquired.
- Zoning change/conditional use permit approved.
- RFP sent out by HRA.
- Developer selected by HRA.
To Do
- Reapply for conditional use permit if necessary.
- Approve developers agreement.
- Complete project.
16. Review City Traffic Signs, Road Names, Lighting
Completed
- City installed approximately 40 signs in 1989.
To Do
- Funding mO ate'd from 1990 Bud .e . Fur erdirection requi y u cil.
17. Construction of a New Library/Expansion of City Hall
Completed
- Matter has been discussed by the HRA and placed in the HRA's list of goals in
the revised Redevelopment Plan.
- EDC office has been remodeled.
- Preliminary discussions held with library staff.
To Do
Continue to monitor this issue. The HRA/City should be prepared to act if the
appropriate situation presents itself.
18. Extend Parkland to Western Edge of Fire Hall Boudaries
Completed
Included in Park Plan.
To Do
No funding available in the 1990 Budget. Further direction is required from the
Council.
19. Review Council By-Laws, Specifically Relating to Time Limits on Meetings
- No action taken. Further direction from Council needed.
20. City Fleet Policy
- No action taken at this time. Staff intends to make this a priority in 1990.
21. Expansion of ALF Hours of Operation
Completed
- Considered during 1991 Budget deliberation. Hours tentatively set at 16 hours
per day for 2nd unit with a reserve to expand to 24 hours per day if demand warrants.
I
` AGENDA REQUEST FORM
ITEM N0.
/ / i
NAME: Larry Thompson
DEPARTMENT: Administration
DATE: July 12, 1990
MEETING DATE: July 16, 1990
CATEGORY: Consent
SUBJECT: Approve Engineering Services Agreement - Farmington Industrial Park
EXPLANATION: Self Expalnatory
REFERENCE MATERIAL/RESPONSIBILITY: Memo/Agreement - Larry Thompson
REFERRED TO: (NAME) DEPARTMENT:
Larry Thompson Administration
Jerry Henricks HRA
TOtKa14114$14 Engineering
SIGNATURE
M
MEMO TO: MAYOR AND COUNCIL
SUBJECT: ENGINEERING AGREEMENT - FARMINGTON INDUSTRIAL PARK
DATE: JULY 12, 1990
Attached please find a proposed engineering agreement for the Farmington
Industrial Park. The agreement has been approved by the HRA.
It is ,recommended the agreement be approved.
4K7/1.17
rrY P Th
City Administrator
cc: file
Jerry Henricks
Tom Kaldunski
LT/sm
A
CITY OF FARMINGTON
ENGINEERING SERVICES AGREEMENT
CITY/HRA
FARMINGTON INDUSTRIAL PARK
THIS AGREEMENT, made and entered into the day of , 1990, by
and between the City of Farmington, hereinafter referred to as "City" and the
Farmington Housing and Redevelopment Authority, hereinafter referred to as
"HRA".
WHEREAS, the City has prepared plans and specifications for the Farmington
Industrial Park, hereinafter referred to as "Project"; and
WHEREAS, the HRA has requested the City provide engineering services for the
construction phase of the project.
NOW THEREFORE, in consideration of the above and other good and valuable
consideration, the parties agree as follows:
SECTION I CONSTRUCTION PHASE - BASIC SERVICES
Upon receipt of the Owner's authorization to proceed with the construction
phase, the Engineer shall:
A. Organize, attend and assist the Owner at the preconstruction conference with
the successful bidder, and any other parties, bodies, or agencies who have an
interest in the Project.
B. Make sufficient visits to the site to observe the progress and quality, of
the construction work to determine if the work is proceeding in accordance with
the contract documents. During such visits, and on the basis of his on site
observation as an experienced and qualified Professional Engineer, the Engineer
shall keep the Owner informed, in writing, of the progress of the work, advise
the Owner regarding necessary change orders, apparent defects or deficiencies in
the work of the Contractor, and inform the Owner of his disapproval of any work
which does not conform to the contract documents.
C. Review the Contractor's request for progress payments, advise the Owner as
to the Engineer's opinion of the extent of the work completed in accordance with
the terms of the construction contract, and issue for processing by the Owner,
Requests for Payment. The Engineer shall submit to the Owner estimated cash-
flow requirements when requested.
D. Make recommendations to the Owner as to all claims relating to the execution
and progress of the construction work.
E. Notify the Owner, in writing, of all permanent work which does not conform
to the standards and specifications of the construction contract, prepare a
written notice describing any apparent nonconforming work, and supervise the
performance of corrective work.
F. Review shop drawings, samples and other submissions of the Contractor for
conformance to the design concept of the project and for compliance with the
plans and specifications required by the construction contract.
G. Issue such additional instructions to the Contractor as may be necessary to
interpret the drawings and specifications or the illustrated changes required in
the Contractor's work.
H. Prepare Change Orders for work not covered by the contract or substantial
overrun of contract quantities per Paragraph C for the Owner's approval after
discussion of the same with the Owner. Change Orders shall be processed as soon
as practical after written approval thereof has been received by the Engineer
from the Owner.
I. Conduct construction progress reviews weekly with the Contractor and the
Owner related to the Contractor's date of completion.
J. Conduct in the presence of the Owner's Executive Director periodic tests
during the course of construction.
K. Conduct in the presence of the Owner's Executive Director a final inspection
of the project as constructed to determine whether it conforms with the design
concept of the project as contained in the contract documents, and determine
whether it is constructed in accordance with the contract documents. The
Engineer shall prepare a punch list for the Contractor and Owner listing thereon
work left to be completed by the Contractor. The Engineer shall certify, in
writing, his recommendation for acceptance of the work to the Owner and then
shall forward to the Owner his written approval of the Contractor's Request for
Final Payment which shall be signed by the Contractor.
L. Engineer shall attend two (2) HRA meetings, if necessary. The first meeting
shall be when construction is approximately half completed, the second meeting
to be upon completion of the construction phases of the project.
SECTION II- ADDITIONAL SERVICES
If authorized by the Owner, the Engineer shall furnish or obtain from others
those services which are not covered herein by Section I. Said additional
services include, but are not limited to, the following:
A. Service required due to significant change in the design of the project,
change in size, complexity or character of construction which occur after the
approval of the construction documents.
B. The Engineer shall be available to testify as an expert witness for the HRA
in any litigation or other proceedings involving the project and shall otherwise
assist the HRA or its representative in connection with litigation or other
proceedings involving the project.
C. If requested by the HRA or recommended by the HRA, one or more full time
resident project representatives shall be furnished by the City and directed by
the City in order to provide the HRA with continuous representation at the
project site during the construction phase.
•
D. Attend HRA meetings or other meetings outside of normal business hours.
SECTION III PAYMENT
A. The HRA will pay the City a fee equal to 5% of the final "Construction
Costs" for all of the service described in Section I. "Construction Costs" mean
the total costs of all the work designed or specified by the Engineer for the
project, including change orders, but does not include any payments to the City
or other consultants, the cost of the land, or right of way.
B. The HRA shall pay the City for additional service provided under Section 2
per the following schedule:
City Engineer $40.00/hour
Assistant Engineer $30.00/hour
Engineering Tech $15.00/hour
Engineering Intern $20.00/hour
Secretary $15.00/hour
Attendance at Meetings $40.00/meeting
Outside Services Per Invoice
C. The City will bill the HRA on a monthly basis. The HRA shall pay the City
within 30 days of the receipt of such bill.
SECTION IV MISCELLANEOUS
A. The City shall act as the HRA's agent only as provided for within this
Agreement.
B. The HRA hereby designates Gerald A. Henricks as the HRA's representative
with respect to the services to be performed under this Agreement. He shall
have the authority to transmit instructions, receive information, interpret and
define the HRA's policies and decisions with respect to service covered by this
Agreement.
C. The HRA shall act promptly on all Change Orders and provide authorization
before they are issued to the Contractor.
D. If any portion, section, subsection, sentence, clause, paragraph or phrase
of this Agreement is for any reason held invalid, such decision shall not affect
the validity of the remaining portion of this Agreement.
, .
ii
CITY HOUSING AND REDEVELOPMENT AUTHORITY
MAYOR CHAIR
ADMINISTRATOR EXECUTIVE DIRECTOR
Y
AGENDA REQUEST FORM
ITEM NO. /L:2a_
Nom: Larry Thompson
DEPARTMENT: Administration
DATE: July 12, 1990
MEETING DATE: July 16, 1990
CATEGORY: Add On
SUBJECTi Water Service Fees Assessment
EXPLANATION: Consider assessing water service fees
REFERENCE MATERIAL/RESPONSIBILITY: Memo - Larry Thompson
REFERRED TO: (NAME) DEPARTMENT:
Larry Thompson Administration
Tom Kaldunski Public Works/Engineering
Wayne Henneke Finance
Karen Finstuen Administration
SIGNATU
MEMO TO: MAYOR AND COUNCIL
SUBJECT: WATER SERVICE ASSESSMENTS
DATE: JULY 12, 1990
In past years services were not extended to all properties when mains were installed.
Therefore, there are various properties in the City which do not have water service
available. Because of recent changes in mortgage requirements, the request for
municipal water service has increased. The Water Board has agreed to extend service
but requires that the owners pay for installation plus a water trunk charge. The
fees range from $2,300 to $2,700. The City has received requests from property owners
to have these fees assessed as a benefit charge, payable over a 5-10 year period.
While the financing of the assessment would be born by the Water Board, the actual
assessment would be made by the City Council.
I would recommend that the Council agree to assess these fees upon request of the
Water Board.
771
Lay Thom son
City Administrator
cc: Tom Kaldunski
Water Board
Wayne Henneke
Karen Finstuen
file
ASSESSMENT AGREEMENT
UTILITY SERVICES
AGREEMENT, dated by and between the City of Farmington, a
Minnesota municipal corporation (City) , Farmington Water Board (Water Board) and
Owner.
1. Request for Water Service
The owner has requested that water service be extended to the property described
as follows:
2. Conditions of Approval
The Farmington Water Board has agreed to install water service to said property
upon the Owner paying a fee of $ and complying with the terms
and conditions of this agreement. The fee shall be assessed against the property
over a 10 year period with 8% interest on the unpaid balance. The assessment
shall be deemed adopted on the date this agreement is signed by the City. The
assessment may be assumed or prepaid at any time. The Owner waives any and all
procedural and substantive objections to the assessments including any claim that
the assessments exceed the benefit to the property. The Owner waives any ml
rights otherwise availab e pursuant to MSA 429.081. Td.c
3. Easements
The Owner ensures there is adequate public utility easement available to install
the water service from a City water main to the property line. The Owner agrees
to secure any such required easements for the City before installation of the
water service.
4. Ownership of Improvements
Upon completion of the work and construction required by the agreement, the
improvement lying within public easements shall become City property without
further action or notice.
5. Miscellaneous
A. This agreement shall be binding upon the parties, their heirs, successors
or assigns, as the case may be.
B. If any portion, section, subsection, sentence, clause, paragraph or phrase
of this agreement is for any reason held invalid, such decision shall not
affect the validity of the remaining portion of this agreement.
C. The action or inaction of the City shall not constitute a waiver or amendment
to the provisions of this agreement. To be bind, amendments or waivers shall
be in writing, signed by the parties and approved by written resolution of
the City Council. The City's failure to promptly take legal action to enforce
this Agreement shall not be a waiver or release.
P_ '� �, ✓ud( ,� .c S�y,/ lv i � l%SJf�S�tiT
f-/-5 /9j tl'd Lt v 7v�+< ( 7/ 04/.+.✓1 /, Uc. CJ?3tC q�1C v
r
j�r1✓l