Loading...
HomeMy WebLinkAbout06.06.95 Special Council Packet1 MEMO TO: MAYOR AND COUNCILMEMBERS SUBJECT: SPECIAL COUNCIL MEETING - JUNE 6TH DATE: MAY 23, 1995 This memo serves to notify you that Mayor Kuchera has set a special meeting of the City Council for Tuesday, June 6th at 7: 00 P.M. in the Council Chambers. The purpose of the meeting will be to discuss City space needs. . If you cannot attend this meeting, or if you have questions or comments, please notify me at City Hall. Larry Thompson City Administrator cc: file Department Heads Independent Tribune POST AGENDA REQUEST FORM Item No. 13a Name: Jerry Henricks Department: HRA Aar-g Date: April 3 , 1995 Meeting Date: April 17, 1995 Category: Upcoming Meetings /4)) Subject: Workshop on City Space Nepas Explanation: Discussion between Council and City staff cm space needs study report. Reference Material/Responsibilty Study/memo Referred To: (Name) Department Development Committee .°1d4.4214e/i• We',Z/Lte.11-) Signature w Memo To: Mayor and City Council Subject: Space Needs Workshop Date: April 12,1995 The City Council and the HRA had commissioned CNH Architect to perform a Space Needs Assessment for the City. The purpose for this study was to examine the present and future needs of the various departments within the City and to examine possible uses for the future vacated library space. The HRA and City staff have reviewed the study results it is suggested that the City Council set a date for a workshop to discuss the study results and possible layouts for the City Hall. The layouts included in the study should not be considered the only possible layouts of the City Hall. The Council may have others layouts plans. I would expect the communications between and amongst the Council and City staff would result in a building layout that may not be satisfactory to everyone but would be more conducive to the needs of the general public and to City business, such as; the general public normally visit City Hall to pay their utility bills, etc. and to have a discussion with the City Administrator or other department heads. Whereas, developers and contractors need to meet with department heads, such as; HRA Director, City Planner, City Engineer and Building Inspector. Attached for your review are the Space Needs Assessment and a memorandum that followed discussion between the staff and the Architect. Space Needs Assessment(supplies data to support a generic non function related diagram of the layout of the building) 1. Executive Summary - summarizes the information collected with recommendations for the short and long term planning for the City. 2. Scope of Work lays out the process to complete the study. 3. Population Projections - summarizes demographic information obtained from the Met Council and City. 4. Existing Facilities - notes the present City facilities and their sizes. 5. Space Standards -the Architect highlights the space standards used. 6. Program of Space Needs - here the Architect compares Farmington with surrounding communities in the Metro area. 7. Definition of Space Problems 8. Recommendations -the Architect suggest long-term and short-term recommendations for City space needs. 9. Layouts - in this section the Architect provides phased generic building layouts. 10. Appendix - the Architect notes projected space needs by the staff modified by the Architect. He has included a discussion of space options. Memorandum (follow-up of further discussion with City Staff) 1. Description of Drawings -this section discusses and illustrates a possible layout of the City Hall including the library space and a possible future layout with an addition to the City Hall. The diagrams are not drawn to specific size detail but illustrate possible functions to be included in specific areas. 2. Summary of Space Needs Study 3. Drawings - Future City Hall with an addition added and Present City Hall. The City Council is requested to set a workshop for April 24 or 25th,1995 at 7 P.M. to discuss the Space Needs Assessment and possible future layout plans for the City Hall. A goal of this meeting should be to provide direction to the City Staff as to the direction the City Council would wish to undertake relating to the City space needs. Possible steps could be: 1. City Council arrive at a conceptual consensus on the location of various City functions for the present building including the library space, such as; where should the City Council Chambers be located. Council determine what the phasing process should be to eliminate the space needs of the City, such as; which phase of the renovation will encompass the Police Department and the Public Works Department and which phase will encompass the renovation of the present facility. 2. City to hire an Architect to perform the detail specific layout designs. 3. Council authorize City Staff and one or two City Council members to obtain specific detail building layouts based on and relating to the function needs of the City. Function needs meaning the specific departments of the City, such as; the finance department. 4. City Staff obtain cost estimates based on the detail specific plans. 5. Detail specific plans returned to City Council with cost estimates and possible financing methods. City Council commits to implementing their space needs plan. If there are any questions, please feel free to contact me at 463-7111. "Ide-t-alces/9: Gerald A. Henricks HRA Executive Director cc: Development Committee CNHArchitects. Cording•Natwick•Hilbert Architects, Inc. 7300 W. 147th Street,Suite 504 St.Paul, MN 55124-7580 (612)431-4433 MEMORANDUM: PROJECT: Farmington City Hall Remodeling COMM NO: 9450 DA 1'h: 1-26-95 TO: Department Heads SUBJECT: City Hall Remodeling Attached are preliminary drawings, for your review and comment, of the proposed City Hall remodeling. Please have your comments back at my office by February 15, 1995. This is the beginning of the design process and the best time to make comments, so please feel free to comment, suggest, criticize, and question the designs. Description of Drawings The drawings attached are schematic and a starting point for design. They were drawn to show circulation patterns, grouping of functions and general allocation of space. Future The drawing labelled 'Future' assumes that sometime in the future, the police will have their own facility, and an addition would be added to City Hall. The propose of this drawing is to develop a framework for the future so that short-term plans to fit with this vision. Present The Present'plan assumes the City Council Chambers will remain in there current location and the Library space will be available for expansion. Because of the projected growth of the city and the current size of the building, the assumptions that were made affect the functions which are part of the plan. When (or if) the Council Chambers move out more space will be freed up for expansion. As with any design, priorities need to be set to develop the best overall design. This becomes even more critical in remodeling projects and fast growing organizations. If you could prioritize your comments, it would be appreciated and help in the overall design process. a : G HilbertAIA CNH-Architects cc: Larry Thompson, City Administrator Tom Kaldunski, Engineering Dan Siebenaler, Police Wayne Henneke, Finance Karen Finstuen, Administration Jim Bell, Park&Recreation Jerry Hendricks Summary of Space Needs Study The following is a summary of the space needs study suggested short-term and longer-term recommendations to meet the projected growth of the City. Short-term: 1. Build first phase of a new Central Maintenance Facility 2. Temporarily move Council Chambers to 'rental' space at new Library. 3. Expand Police and City Hall into Library and Council Chambers. 4. Expand Park/Recreation and/or Solid Waste into Central Garage. Long-term: 1. Build new Police Facility. 2. Remodel and add an addition to City Hall to accommodate Council Chambers and general growth. 3. Add to Central Maintenance Facility. FARMINGTON CITY HALL CIFArChlteCts JOB NO: 9450 JANUARY 2, 1995 7300 WEST 147th STREET, SUITE 504 ST. PAUL, MINNESOTA 55124 (612) 431-4433 THIS DRAWING IS DIAGRAMMATIC AND NOT SCALED FOR SPECIFIC 8 FUNCTIONS • i X X CONF ADMIN ADM LUNCH CLOS SST A I f COMM WORK X X FIN D FINANCE FILES-A _ S S ACCT CONF M W C C ACCT ST PR BLDG PR PL S S X X x INSP INSP INSP PR PL 1 l CONF PARK/REC -- — L OFF ra. SEC A MECH M W PR ELEC CONF 7 i �*r mi OFF CONF leti,iP -iKrov;neli2Wpti.ntritcc.A.;--tr$,-‘';` _, I r I I f ECP_ : ;; z-`, 5` -:� COP I. CAD I I - - COU,IVC L'/ - -�= COUNCIL/ COMM RM !=t74.4.7,T:1,4:::::1 �I ENG t. L ENG kaL' ASSTI ; +. ST FILES E DIR a ----1-r-* a ENGINEERING x I J h P- PUBLIC CIRCULATION - ❑ CIRCULATION ACCESSIBLE TO PUBLIC Fr I U JOB FARMINGTON CITY HALL C1ST Tr.J� yY���JOB N0: 9450 .t.1 j�l.V JANUARY 19, 1995 7300 WEST 147th STREET SUITE 504 ST. PAUL, INNESOTA 55124 (612) 431-4433 THIS DRAWING IS DIAGRAMMATIC AND NOT SCALED FOR SPECIFIC FUNCTIONS CITY COMMUNITY DEV ADMIN • c- • ASST n FINANCE -� ` -E- FIN D lirif PR DIR CONF • " PR PROG -1 •ECP M W PARK/REC Ali o POLICE POLICE `` y i S • i. OFF `' PL EX .T CHIEF ,. ST CONF • + MECH 1. ELEC —� ST //7-,,e, PL BKG CELL CE-1 (EXIT ;�; 04 STOR i 171:1;7; [� %'a rr r i d x:,--z r,-�� f : r 1, I r--7 r[ EXIS SQUAD R I LUNCH " ',s ' `` • r, LJ I 1_ LOC: c _� u INSP ' COUNCIL/ M W 11114' '`. CAD �/ ci FL] ENG PR COMM RM ;;, I=REv:rf;� ADM I' �`` ENG Z Mfr .;, r .47:/ • ASS._ J frr,:. WAIT' � �� "` I I E DIR ENGINEERING FT] A w rn E. PUBLIC CIRCULATIONr' 111CIRCULATION ACCESSIBLE TO PUBLIC (2`'+ a VAvotar CtT of a rmin ton Space \ Assessment Prepared By Cording•Natwick•Hilbert Architects, Inc. Wayne Hilbert, Architect November 3, 1994 CONTENTS: EXECUTIVE SUMMARY SCOPE OF WORK POPULATION PROJECTIONS EXISTING FACILITIES SPACE STANDARDS PROGRAM OF SPACE NEEDS DEFINITION OF SPACE PROBLEMS RECOMMENDATIONS LAYOUTS -PHASING DIAGRAMS LAYOUTS - CITY HALL OPTIONS APPENDIX A. Space Program Spread Sheets B. Discussion of Space Options •1 EXECUTIVE SUMMARY SUMMARY: Farmington is at the beginning of it's growth phase. According to Met Council's adjusted estimates, in 10 years the City will double in size, in 20 years almost triple and in 50 years quadruple from the current population of 7,000. Current facilities are tight for every department and future growth will only compound this problem. The construction of a new library in 1995 will free up some space in City Hall, but this will be filled quickly with current and short-term projected space needs. RECOMMENDATIONS: Our recommendations are divided between long and short term solutions. The following report covers these recommendations in more detail, discuss assumption made, analysis of space needs, and discuss other potential options. In these recommendations, we tried to choose the plan which would fit the City's needs and be the most cost effective. SHORT-TERM LONG-TERM 1. Build a new Central Maintenance 1. Plan the siting and construction of a Facility to house streets/utilities (and new Police Facility. overflow from other departments). The facility should be expandable to 2. Remodel the City Hall garages into accommodate additional vehicle/ stor- multi-media City Council Chambers/ age needs in the future. Community Room 2. Expand City Hall and Police into 3. Build additions to the proposed Public current library space when the library Works Complex to accommodate moves out in 1995. Solid Waste and/or Parks/Recreation. 3. Move Council Chambers (temp- orarily)to the 'rental' space at the new library facility. 4. Move.either Park & Recreation or solid waste vehicles to central garage • after remodeling. 2 SCOPE OF WORK This study takes an overall view of your facility needs. As part of this report we have reviewed your existing facilities, interviewed Staff and Council Members, analyzed population projections, developed an expansion plan and potential options. This study is not intended to develop specific building designs, but instead show conceptually anticipated future growth. As part of this study, the office, vehicle and storage space needs for Police, Public Works, Administration, Council and Park/Recreation Departments were reviewed. The Fire Department, Pool,Ice Arena, Senior Center, and Liquor Store and other speciality City facilities are not included in this report. Any remodeling or new construction which is undertaken as a result of this study will need to be programmed in more accuracy to assure a good space to needs fit. 3 POPULATION PROJECTIONS- FARMINGTON Population projections are based on Met Council estimates in 1987 with revisions made in 1992 and potential adjustments of 0 to 25% in 1994. It also assumes the current figure of 7,000 and assumes 2.8 population/unit. 1990 U. S. Census is also used. Annexation is figured but not included as part of this chart. Met Council Base Met Council+25% U. S. Census 1990 1990 6,000 1995 7,000 7,000 2000 8,700 10,800 2010 12,900 18,100 2020 16,200 22,800 2040 21,000 28,200 Population Projections - Farmington 30 • 25 —...._............._........_....... ._.........__........_- - -_ _...:•__. 20 "" " " —0—Met Council Base c15 • - •-•- -,k-Met Council +25% H 10 .. • -_..........._..._..._:_........__._._.._._......._._........_ --g—U. S. Census 1990 5 — 143—• 0 1 [ ti 1 I 1 I If It I 1980 1990 2000 2010 2020 2030 2040 2050 Year 4 • POPULATION PROJECTIONS (Combined for Eureka, Castle Rock& Empire) cil, and iter Population projections are based on combined figures for Eureka, Castle Rock&Empire. This chart is for reference only.No attempt has been made to allocate population to Farmington from a potential :age annexation. It also assumes 2.8 population/unit. - Combined Population Projection (Eureka, Castle Rock, Empire) 8 Growth For 1995 Adjusted up 0 to 25% 7 — • Met Council+25% -A-.1°3 Met Council Base 5 Yr. 6 to 23% 5 __....._.................__...,, .__..._._..._._ .._. ._._._.__ 10 Yr. 13 to 31% -2-Base Estimate 3,994 4 _.._... : .._._.._._ ......._...._.__.__. __--_.._._ 15 Yr. 20 to 40% 3 I I i i 20 Yr. 38 to 62% 1985 1995 2005 2015 2025 Year Per 199 20C 20C 201 204 5 SUMMARY OF POPULATION PROJECTIONS For use in this report we have used the population figures from the Met Council, adjusted up by 25%, for Farmington. Annexation was not figured. The following are the figures and interpolated figures used, and percentage growth over 1995 figures for 5, 10, 20 and 45 year intervals. Population Percentage Growth 1995 -Base 7,000 (rounded to nearest Base thousand) 2000 - 5 years 10,800 54% 2005 - 10 years 14500 106% 2015 - 20 years 20,200 187% 2040 -45 years 28,200 303% Summary of Population Projections Percentage Increase 30 1995 -Base M 2000 - 54% increase JO 20 g : Growth! 2005 - 106%increase O E F E. f: 10 2015 - 187%increase € 2040 - 303% increase 1995 2000 2005 2015 2040 Year 6 EXISTING FACILITIES Current (and future Erickson Grocery Store) City properties considered in this report are listed below: (The Liquor Store, Fire Stations, Senior Center, Pool, Ice Arena, Barn and other miscellaneous facilities are not included.) This is intended as a general assessment of the facilities and not a complete review for code compliance. CITY HALL ERICKSON GROCERY STORE (Future Farmington Library) Ownership: City Ownership: City Building Size: 12,500 sq. ft. Building Size: 16,500 sq. ft. Site: 40,000 sq. ft. (total) Site: 55,000 sq. ft. (total) Currently Houses: Administrative, City Currently Houses: Late 1995 it will Council, Police, Engineering and Library house the new Farmington Library and have (scheduled to move late 95). approximately 4,000 sq. ft. in'rental' space. Condition: Good, should have 40+years of Condition: Will be remodeled in 1995. useful life with continuous maintenance and General: Good downtown location. The periodic updating of systems/ facilities. The 'rental' space is potential expansion space for existing system circulation needs to be library. Any use of the'rental' space should be redesigned to meet codes. considered temporary. General: Good downtown location and potential for various uses make this building an excellent asset for the City. It has been I'HELEN SHOP mentioned that parking is currently a problem on the site, but the relocation of some depart- Ownership: Rented. ments should help this problem. Building Size: 4,000 sq. ft. Site: 6,500 sq. ft. CENTRAL GARAGE Currently Houses: Park/Recreation and Police storage. Ownership: City Condition: Marginal. Does not meet Building Size: 4,800 sq. ft. current codes and is not well insulated or Site: 21,000 sq. ft. (total) lighted. Currently Houses: Streets/Utility Dept. General: It would take some remodeling Condition: Marginal. This building lacks to make this adequate for City use. Consider- proper ventilation, ADA compliance, and ing it is a rented facility, it should not be insulation level is minimal. considered for long-term City usage. General: With some remodeling, this Although proximity to City Hall is convenient. building should serve adequately for a vehicle storage building. 7 ABE'S OR SOLID WASTE GARAGE MARSHALL GARAGE Ownership: Rented. Ownership: Rented. Building Size: 6,000 sq. ft. Building Size: 1,000 sq. ft. Site: 20,000 sq. ft. (total) Site: N/A Currently Houses: Solid Waste Depart- Currently Houses: Park/Recreation and ment and some Park/Recreation storage. Fire Department storage. Condition: Marginal. Code issues and Condition: Marginal. It is a cold storage adequate facilities are a concern. wood garage. General: It would take some remodeling General: This facility is not well located to make this adequate for City use. Being a for its function within a residential neighbor- rental facility, it should not be considered for hood. Also security may become an issue long-term City usage. over time. Again this is a rented facility and should not be considered for long-term City usage. 8 SPACE STANDARDS The following standards were used in the calculation of the space program and projections. Presently New Standard City Administration 275 320 Offices with conference 290 250 Offices 140 140 Drafting Stations -- 80 Workstations -- 60 Conference Rooms: 6 person -- 150 12 person -- 250 15 person -- 350 20 person -- 450 9 PROGRAM OF SPACE NEEDS Refer to Appendix A for the detailed spreadsheet of programmed space needs for 1994, 2000 and 2005. These numbers are based on needs observed and conversations with the Staff. INTRODUCTION: The following is a summary of the space needs for each department involved with this study. Square footage estimates are calculated slightly differently for each category. Current Is an estimate of actual square feet currently occupied. Yr. 1994 Current functions adjusted to space standards. Yr. 2000 Staff and CNH Architects estimated needs for space by year 2000. Yr. 2005 Staff and CNH Architects estimated needs for space by year 2005. Yr. 2015 These numbers are interpolated between 2005 estimates and estimates for 2040. Yr. 2040 These numbers are based on the projected population growth and other City's facilities. GENERAL: 1. To estimate future space needs, assumptions were made regarding functional relationships, sharing of facilities and circulation requirements. This is done to get a general, overall picture of the city's future space needs. Prior to any specific remodeling or construction project a more detailed analyses of space needs and existing buildings should be developed. Also, actual building designs will affect program numbers. 2. Direct correlation between different city's facilities and population is not possible due to varying organizational structures, priorities, stage of development, function, philosophy, etc. In the following projections under'comparisons' square feet of facilities from other cities are listed. The cities represent surrounding communities with current populations at or above Farmington's. 50 year projected population figures (without annexation). These figures are for general reference and to help estimate Farmingtons potential needs. 3. Projections beyond the 10 year period become increasingly difficult to predict due to unforeseeable changes and regulations. 10 CITY HALL: (Including Council Chambers, Administration&Engineering) Summary of Space Projections: Current Space 5,500 Year 1994 7,500 Year 2000 11,500 Year 2005 13,000 Year 2015 18,000 Year 2040 30,000 Comparison: Apple Valley Currently 20,000 sq. ft. Proposed 35,000 sq. ft. Eagan 35,000 sq. ft. Lakeville 27,000 sq. ft. City Hall Comparison (Surrounding Communities) ouaan . 0 10 20 30 40 1 I Farmington 6"*""" , Eagan 1M Current Lakeville 6E11994 CI 2000 Apple Valley D 2005 O 2015 ®Projected Comments: At the numbers projected, the existing City Hall would be filled with Council Chambers, Administration & Engineering in 10 years. It may be possible to put an addition on to the existing facility to accommodate additional growth, although parking on the site would need to be addressed. 11 POLICE: Summary of Space Needs: Current Space 4,000 Year 1994 5,000 Year 2000 9,000 Year 2005 10,000 Year 2015 15,000 Year 2040 25,000 Police Space Projection 4 y 20 w � E"' 10 0 Current Space 2000 2015 1994 2005 2040 12 Comparison: Apple Valley Approximately 25,000 sq. ft. Minnetonka Approximately 25,000 sq. ft. Brooklyn Park Approximately 25,000 sq. ft. Plymouth Approximately 25,000 sq. ft. Eagan Approximately 25,000 sq. ft. Lakeville 15,000 Hutchinson 8,500 Red Wing 10,000 Police Square Footage Comparison (With surrounding communities) 30 ni Current ® 1986 • 20 — 1988 i" 4 41994 t: I ®2000 g F' 10 — - IM 2005 ®2015 p ' _'E= > It It It It It 2040 Farmington Ivfinnetonla Plymouth Lakeville Hutchinson Apple Valley Brooklyn Park Eagan Red Wing Comment: Newer police facilities have been relatively consistent in size in the Metropolitan Area. Lakeville has taken the approach of building in phases. 13 CENTRAL MAINTENANCE FACILITY (Including Streets/Utilities, Park/Recreation and Solid Waste) • Current Space 15,800 (Thelen 4,000, Central Garage 4,800, Solid Waste 6,000 and Marshall 1,000) Year 1994 25,000 Year 2000 40,000 Year 2005 45,000 Year 2015 50,000 Year 2040 65,000 Central Maintenance Com parison I (W ith Surrounding Communities) 120 100 40 ®Current 60 ®1094 A 0 2000 40 .— MN 200S ®2015 :o .— z- 1221 2040 0 f!If t t I I I I t t t t t t Pars into. Bloom'neon Breokly.Park Coon Rapid. Edina Minnetonka St.Louis Pah Apple Va11ey Brooklyn Center Bemeville Byu Meple*ood Roseville Comparison Facilities: Apple Valley 75,000 sq. ft. on 20 acre site. Building sq. ft. does not include the Water Treatment Center which is on this site. Population 40,000. Bloomington 42,000 sq. ft. on 19 acre site. Population 85,000. Brooklyn Center 32,000 sq. ft. on 7 acre site. Population 30,000. Brooklyn Park 44,000 sq. ft. on 20 acre site. Population 54,000. Burnsville 100,000 sq. ft. Coon Rapids 35,000 sq. ft. on 23 acre site. Planning a 4,000 sq. ft. addition for a total of 65,000 sq. ft. facility. The City is approximately 75% developed, has 22.5 sq. miles of area and population of 46,000 in 1988. Eagan 40,000 sq. ft. on 20 acre site. The City is approximately 60% developed, has 34 sq. miles of area and a population of 43,000 in 1988. Edina 64,000 sq. ft. on 5 acre site. Population 46,000. Maple Wood 42,000 sq. ft. on 8 acre site. Population 29,000. Minnetonka 40,000 sq. ft. on 14 acre site. The City is approximately 90% developed, has 28 sq. miles of area and a population of 44,000. 14 Roseville 36,000 sq. ft. on 5 acres of a 30 acre site. Population is 35,000. St. Louis Park 62,000 sq. ft. on 4 acre site. Population is 44,000. Comments: These facilities vary widely from city to city, for planning purposes we have figured all vehicles and equipment would be stored inside. It is also assumed in the 65,000 sq. ft. projected figure that a large portion of this would be cold storage facilities and miscellaneous. Other City equipment which would be stored in these facilities (Such as police vehicles, evidence, parade trucks, etc.). Farmington is unique because it provides solid waste function to it's citizens;this is why the Central Maintenance Facility is programmed to be larger than comparable cities. 15 SUMMARY GRAPH: Year Population City Hall Police Public Works 1995 7,000 5,500 5,000 25,000 2000 10,800 11,500 9,000 40,000 2005 14,500 13,000 10,000 45,000 2015 20,200 - 18,000 15,000 55,000 2040 28,200 ' 30,000 25,000 75,000 SUMMARY GRAPH I 80 I 1 i i Population 2 ' Ys ( -0-City Hall r __ _I -�-Police p., 30 __«.«... ««. — __ ___�� ___._. $Public W orks A I I l 1990 2000 2010 2020 2030 2040 2050 • Year 16 DEFINITION OF SPACE PROBLEMS Currently the city is experiencing a number of conditions which indicate a general lack of space among all departments. • Fragmentation of departments in several locations in the same building or several buildings. • Postponement of hiring due to inadequate space. • Storage of items in difficult to access areas and areas a distance away from primary work space. • Lack of meeting rooms. The program numbers, general observations and discussions with staff all reflect this inadequacy of space. At the same time,Farmington is entering a growth phase in its development. According to adjusted Met Council figures, in 10 years the city will double in size, in 20 years almost triple, and in 50 years quadruple. This growth will only increase the pressures for additional space which affects both office and storage functions. 17 RECOMMENDATIONS To plan for the anticipated demand for additional space we are recommending short-term and longer- term solutions. We are outlining our recommended method of expansion in this section. Under 'Layouts- City Hall Options' and 'Appendix B' other alternatives are suggested and explained. Short-Term: (Less than 5 years) 1. Select a site and build the first phase of a multi-phased Central Maintenance Facility. The site should be selected to accommodate future additions which would include Streets/Utilities, Solid Waste, and Park/Recreation maintenance departments. The initial phase would house Streets/Utilities and the'core' facilities which would be shared with all departments (such as washbay, training room, restrooms, mechanical rooms, etc.). The initial facility should also accommodate other department's overflow while additions are waiting to be built, and the City is going through the pains of growth. This facility would be built to current codes, and some of your current rented facilities could be phased out. 2. Move temporarily the Council Chambers into the'rental' space in the new library when it becomes available. This space would be relatively easy to renovate for a temporary Council Chambers/Community Room. This would allow for a large meeting room and free up space at the City Hall for expansion of the Police and City Offices. Due to the confusion which may develop by the location not connected with the City Hall, • this should be considered only a temporary move until room is cleared for a permanent location. 3. Expand Police and City Offices into the current library space and Council Chambers. The Police Facility is a relatively expensive department to move temporarily. It needs garage space, cells, and offices. Since this is available in the current City Hall it would be less expensive to allow them to remain until a new facility is built. 4. Expand either Park/Recreation Maintenance or Solid Waste or both into the central garage. The facility should be remodelled prior to occupancy by either department, but would allow for expansion while additions to the Central Maintenance Facility are planned. Long-Term: (5 to 10 Years) 1. Select a site and build a new Police Facility(or new City Hall). This would free up the present City Hall for the exclusive use by the Council Chambers, Administration, and Engineering. The Police would be able to design a facility to meet their special needs. 18 1)1 (� 0 U • 2. Remodel City Hall to accommodate additional expansion and accept Council Chambers/Community Room in the present garage space. The garage space would allow for a street presence, large windows, high.ceiling, and design flexibility, and entrance from a new public lobby. 3. Build as required additions to the Central Maintenance Facility to accommodate Park/Recreation, Solid Waste, expansion of Streets/Utilities, and other City storage needs. • 19 LAYOUTS- PHASING DIAGRAMS To accomplish the short and long-term recommendations, the movement and expansion of departments must be phased for smooth transitions. The following drawings illustrate the movement of departments. No timeline is given, but the drawings are broken into: Current: Existing departmental arrangement within the city. Phase I: Short-term moves associated with the availability of the new library building and proposed Central Maintenance Facility. Phase II: Long-term moves associated with the proposed new Police Facility and expansion of the proposed Central Maintenance Facility. 20 a M .ti k• 1 y , O -1 iyil. ,. . _ 2 .„%.*14'7••'•,..„ .• . i • .• . II AIIIMMININ pro cost' ___________ ____Lizt. iii �i: t : al g 0 UI Z `v `vrnn I Hilo INNS TM , all 1. ■.'`^�.. rmtftti.m.rili Mil r 4-.) rCC) ..-1 1 1 H 1 11111111111- HIM �� �, -- x z `< _ 1 I -, 1111111'111 L i ll nu a I�Ii r1� d t=.1 z c) a n ( I J HEM!� t l l l 11 l l l l �j `j tt � Z � � 1111111111M11111mi ) - I ": CA tl 111i111i11 1111111111 1 .^ 1 _moi . = FA• ■. awe my im It •Z = ' 4 ► mTf I 11 �` �� I—SIT �' d �' "' a l 1 1 t�1 i Ii l i U_ II - I( I 1!!!!!iiui ' f ' ( J= `� I 1I 111111 + 1B — fI -1- I - tn lb e— in INN1• Illt" mos , ... ! C= r a 1111 111 i, { Cl) / y ill 1 - 1—[ 0 00O t� z I i 0 a q :y�; �$ i r 4' a ,� F r ai , • ", �, 3t y M-a , ._ 6 R R -i, N T . Sla Z 1 C M r -fie ej 1111 �" — :1',I.:1,..;: 1 GJ �'; ,wry ':, P. J►��� IIIOIMIMIIIMIIINII w ''Pro o ❑ Eli _.--.___ CT1 1 71-I -= -1 r II 1 .. I Enu) MI NM IMO Mil NM wi. t� 'v 'd r nn MUI� 0 - trf -3 -. .- x � z � _ 11111 1 is I -��i 1 = rNI d z " a n 1 WI 1 1 = 11'f Ng nw,= 1�IiNNi N -gam z � � r �_ 111111 , III 11 � = � i c� r al f- EMIR 1I 1 ' i - � ins tzi d I 1 1 11 -- l , ls -isLI:= M * b (-) --- 111111 H L 1 1 I Ha..-7--_- , hi r aU, _/ .--3 I-4 ', H /1------- --] H I 1 Lirt LI 17 o En Hi Id ea -�rq : y rin 111 111 ! y ,J , " ' �u 7 ' ,..; M--4. .t,',-;1-7-,ili.,,e,, , , , .1 1 „..., ,, ii• . x O f• Ili DO 0x tyl r r = co.--3 a t, 0 MMUM 0 L J yr � it O P Ti A s -,; I q ,..r.y .... . C w U) Ci �vJ O ‘` C z n ti O 0 U tri I ti fiff p ~- -� III 71 I I I_ --� 1 -II !II tfltor cn (,) rh ~d `drnn I 1 inn I ` — Ilan ~� IN ~ .__` .4. t- a t' ZIcd C a ITU H UI .� NM r I . i t� ,- ~ x z '- l i 1 1 ii i 11 m NII d t, z0 an Li J Illtt ►= IIIIIIINI ii _ . .�Cl) um•- Cr] '-C r a _ EEE 1 CAa d nr i T - y h liLFH11 11 . m „, . ,. � _ f 11 , 1 , I 1r' 1 N MI ,1 t� L T' I �J V n 9— ::/ III III ' 41mil CO:= — == B� Q: a o t En 1 IN iii _ Yom,..`' i 4.. .i„ r-j `�' t_ Q- -�' ° _ Oo00 tt c cn z l' 1I so IIIIIIIL d %111/11111111,1 / W F 0 E-, .....,-- - -,, U1 V C y PHASE I_ LAYOUTS- CITY HALL OPTIONS The following are options for layouts within City Hall in the short-term (Phase I) and long-term (Phase II). Notice one option indicates Police occupying the entire facility, this assuming the construction of a new City Hall in lieu of a new Police Facility. Drawings are broken into: Current: Existing department arrangement Phase I: Short-term options associated with opening new library space and proposed Central Maintenance Facility. Phase II: Longer-term options associated with the opening of a proposed new Police Station (or City Hall) and proposed expansion to Central Maintenance Facility. 21 THIS DRAWING IS DIAGRAMMATIC AND NOT SCALED FOR SPECIFIC FUNCTIONS -----___,____,___—) 1 r- NO am. T imm........ami All . " 4.'.• ,if-V.14,,,i.. 1 ' 4t,':'..iyi,.:; . L. f 1 r — ,. .„..,-,:fo.:::.:: .,.,. _---'",7 .. . , „„. „,„....i; • t :!"1 ,, . ': • _ CD . ._,-".:...71L.,.---LI ' il -1-'4.. P. ,.. cz, . . ,,.......r , , . . : .. 1.16..._ '' " . • :Ali Z., N CITY HALL ❑ COUNCIL CHAMBERS iliotto LIBRARY 11_2 PARK AND RECREATION POLI C E ❑ ENGINEERING U THIS DRAWING IS DIAGRAMMATIC AND NOT SCALED FOR SPECIFIC FUNCTIONS $ h :,..i.,..:,, I 1:....,,.: r— rs a iY�n- Ti • 0 ..,..-. ,.• :, •',.,. .. i ,•- -- ,.- .. , ..,. . 6 , ... . . , -j - ,, 1 ' 1 ,,..„,,,,.7._„.,,,,,,:.,_.,,-,...?„,,t,,,,,,,„...„:-..-:,,,,,,,...i.;,,„,-_,:„..,„,,..„,,,,,.,,,,.,,,,.,,,,,,,„..4.„....,,,,,,,,.. „,...„..... , ,, .„,„,.. .„ ._ .,... ...,..A,t•..t•.,:`,:lii .�5 tLA4X O O D a i \7 1 Z, UI CITY HALL ❑ C O U N C I L C H A M B E R S ❑ LIBRARY ❑ PARK AND RECREATION POLICE ENGINEERING THIS DRAWING IS DIAGRAMMATIC AND NOT SCALED FOR SPECIFIC FUNCTIONS Z 0 r - L— _ x a'� .i 4 t a i• y +1 F.,,•} `i },i 11 f Y • 1 4 + } ikM 111111 I 111111111 II Aq B L - r.1 Li' 1A ,,,J.. , - . ....i , ,. , i. ' ,. , ..„., .4-i... , . .....,„...,..,.,„....:.,,,..„, . .. ., , . .:.; --,,- Fri CI) CITY HALL ❑ C O U N CIL CHAMBERS ❑ LIBRARY Z ❑ PARK AND RECREATION ❑ POLICE 0 ENGINEERING THIS DRAWING IS DIAGRAMMATIC AND NOT SCALED FOR SPECIFIC FUNCTIONS ?•i J vy}' - U fr, ZI o 1 r r.....,u,-, , r,,„„„„400000„,..... • =,- 'S ® H r ® 1 ��`. . w 0 rz t f1; 'i µay Y:S wr4 i a es O O O GI 1 II rTl CID XCITY HALL i-iC O U N CIL CHAMBERS CI LIBRARY � Eli Q PARK AND RECREATION .06 POLICE ❑ ENGINEERING THIS DRAWING IS DIAGRAMMATIC AND NOT SCALED FOR SPECIFIC FUNCTIONS 1 .4, kr I '•-11 -, '10:0 , .01,% . ...- : 4, - . ,''.'.6 , s . i '1=4-,,"?:.i. );,,,.i.,•4.I. I..'' /Vi , . .".•' 1., ...•.. ' ''.:..N.14. pt „i..-pi.,:.4 ) „_:'3'.4kal .4•t'.',8 '1,•'q i.4rf Tir,i,,41e`:;' 4.,•!,,,,..;17:- 4.;13:',-,?.s, k,-,..= ,'•,;,;•41. ....i.;.;;..., -2,,... k• tk. Z '1 li‘. • ",',''''i';`,1* ''',P,!''i''''t ' ' ','.•-,,,),..4.-ATA,. ,,,,, . . : b.4 i. 1--1 , — ::-1..1.4,77—,„,';,. • 7':;'- -. ,,. • • ' t ' — ' —I ' ‘, If iii - . . ,.---At„.k.,,,,,firz, H 4.-s ,,-;;--;,ot.,,,,,,, , - : . -. -- I. r-) 1 • ., .. ,._ .,,,. ., ,.,i...„,,........ ... . . . : , -I 1,•..t...•;,1„.;,# ••-, / .. ' - , . ,, •A ..,44,v;,,...;,11-4 , ' ii ' ' ..- ' -,:%:',4:.:.0..:- ..4•4±.- ,.. ,. . - . ,- .!... -•-•,;., F.1,4-4 . ...- . , . .1 4.,',„If..,,t•t .1:72.4,•11:1,°.:, .•.7,...-.47.<;.a..d. 1 _... ...domis- . _ ,-,..•, . 111'IT:-'''. -'• ...0 ,;',:'143;t4. ;;F:p 1 ......0000.,........... ,1 ( — -- "' i'::`: ,' : ; i, •-': . ..f:Vii,'I.V•4 ...;',-;:i'-.7i ,.`-' ' • ;,: !-'-' . • . ' i'-,4.4341'e,T ..' '..;':1. •'-''.!--,; .' .- ;:L:`,.!'-i,ff:t:... , I---i .,.::. ,:'..1 ,',,,,.,. . , ;z,-,::-,c'...t.,.1.4.0.-., , ,•.:.; --'... ; :...1 i r;•.,...'. '!.-...:Htiti."4„, etit I !----1 , • . : ..1,. 4-,,,,, $,,,,,, , .• .-,,,- .., ar,..,57,..i.,• % • 2 -”" ^, t , •,.t.lirg"'"'4',V, I..-- , . A ...1— IL,,:iar... ......t, .. ..........,,,,,,, Y) E- 41 Z L5 U 11111111' CITY HALLNCIL CHAMBERS Li ATION rn AND RECRE El LIBRARY 0 F. A R K C7 ENGINEERING El POLICE THIS DRAWING IS DIAGRAMMATIC AND NOT SCALED FOR SPECIFIC FUNCTIONS Um— z kg rE': :',..2:4-:4<; a � z- 4 t: It aFia{4_! uI �� �' p ipa$..if tllJ , I H 'll,11.0 -'7,7 .V.----,... ....-47.!- -:•- -. -;----,reli-:-, ; ._.. , jf,44,1:- .-----iLiT...- 11,,;--1, - 4-1,441,-,410,02.„. «,.� I 'a Ail } 1i ` 1 1 ri:' .' ' ' , .4„%tV:.•••'. a +( ' fi. pci �L'' SSa I{t ' 0 ' • aT.w fjfj i 1 ___—_----9--- pi 2 4;pI _1� tet- '� r 1 ,� ''nIf IH o o -, , JI rTl c CITY HALL COUNCIL C H A M BER S IBRARYii LY t-----1E] P ARK AND RECREATION i ❑ POLICE ❑ ENGINEERING12-1 rn THIS DRAWING IS DIAGRAMMATIC AND NOT SCALED FOR SPECIFIC FUNCTIONS 1 z 1 o r _, Ii -w s 1 ' 4 E'- i 9 7 I n i \ii ,,,re , 0 0 0 ( lib• ••• •••ww.l..=.... ISI V 1 CITYliktio HALL ❑ C O U N CIL CHAMBERS ❑ LIBRARY ❑ PARK AND RECREATION ❑ POLICE 0 ENGINEERING THIS DRAWING IS DIAGRAMMATIC AND NOT SCALED FOR SPECIFIC FUNCTIONS 1 POTENTIAL ADDITION z tr -- 1111111111 J----.. _ i H �.. - I _ ii I ---- L . , i__i, _ „. _ C3 -...= r- j 1"'`'"'"1 S- 108. LOBBY ❑ A D M I N / I N V E STI G A T T ONS w :._1PATROL w NIDETENTION El CO N F / I N T E R V I E W ._ GARAGE o STORAGE a. - CITY OF FARMINGTON NEEDS ASSESSMENT Projected by City Staff and Modifications by CNH Architects November 3, 1994 Position/ Space Open/ Yr 1994 By 2000 By 2005 Space Stand Priv No SqFt No SqFt No SqFt ADMINISTRATION City Admin 320 p 1 320 1 320 1 320 B Inspect 140 p 1 140 2 280 2 280 Planner 140 p 1 140 2 280 2 280 Secretary 60 0 3 180 4 240 5 300 Asst Admin 140 p 1 140 1 140 1 140 Reception 100 s 0 1 100 1 100 Fin Director 140 p 1 140 1 140 1 140 Accountant 140 p 1 140 2 280 2 280 Clerk 60 0 1 60 2 120 2 120 Computer Room 140 p 1 140 1 140 1 140 Comm Dev 250 p 1 250 1 250 1 250 File Area 250 s 0 2 500 2 500 Subtotal 1650 2790 2850 Internal Circ 30% 495 837 855 Total 11 2145 17 3627 18 3705 GENERAL CITY HALL Chambers 2000 s 1 2000 1 2000 1 2000 Media Rm . 140 p 0 1 140 1 140 Mayor 250 p 0 1 250 1 250 Council 250 p 0 1 250 1 250 Meeting-15 350 p 0 0 1 350 Meeting-12 250 p 0 1 250 1 250 Meeting-6 150 p 0 1 150 2 300 Mechanical 400 e 1 400 1 400 1 400 W/M Rooms 400 1 400 1 400 1 400 Storage 200 0 1 200 1 200 Copier Area 140 1 140 1 140 1 140 Workroom 140 0 1 140 1 140 Lunch Room 400 1 400 1 400 1 400 Vending 100 0 1 100 1 100 Display Area 300 0 1 300 1 300 Subtotal 3340 5120 5620 Internal Circ 30% 1002 1536 1686 Total 4342 6656 7306 • POLICE Chief 250 p 1 250 1 250 1 250 Sargents 140 p 0 1 140 2 280 Officers 15 s 7 105 10 150 13 195 R Officers 15 s 5 75 9 135 13 195 Secretaries 100 s 2 200 2 200 2 200 M/W Locker 800 1 800 1 800 1 800 Evid Garage 400 0 1 400 1 400 Sally Garage 400 0 1 400 1 400 Garage 400 3 1200 3 1200 3 1200 Records 200 1 200 1 200 1 200 Squad Rm 400 1 400 1 400 1 400 M Cell 100 1 100 1 100 1 100 W CeII 100 1 100 1 100 1 100 J Holding ' 100 0 1 100 1 100 Conference 250 1 250 1 250 1 250 Interview 150 0 1 150 1 150 P Lobby 300 0 1 300 1 300 P Toilets 250 0 1 250 1 250 Radio Equip 100 0 1 100 1 100 File Arch 200 0 1 200 1 200 File Currt 100 0 1 100 1 100 Lunchroom 300 0 1 300 1 300 Waiting 150 1 150 1 150 1 150 Evidence 400 0 1 400 1 400 lnx/booking 150 0 1 150 1 150 Armory 200 0 0 1 200 • Workout 300 0 0 1 300 != Subtotal 3830 6925 7670 Internal Circ 30% 1149 2078 2301 Total 15 4979 23 9003 31 9971 ENGINEERING PW Director 250 p 1 250 1 250 1 250 Adm Asst 60 0 1 60 1 60 2 120 Engineer 140 p 1 140 1 140 1 140 Civil Eng 140 p 1 140 1 140 1 140 Tech 80 o 1 80 1 80 2 160 Eng Intern 80 o 2 160 2 160 3 240 CAD/Draw Storag 150 1 150 2 300 3 450 File Storage 120 1 120 1 120 1 120 Subtotal 1100 1250 1620 Internal Circ 30% 330 375 486 Total 7 1430 7 1625 10 2106 t • STREETS/UTILITIES U Foreman 140 p 1 140 1 140 1 140 Maint II 30 s 0 0 0 0 2 60 Maint I 0 5 0 5 0 6 0 PT Maint 0 1 0 2 0 4 0 M/W Locker 600 0 1 600 1 600 Lunchroom 200 1 200 1 200 1 200 Training 250 0 1 250 1 250 Repair Bay 1000 0 1 1000 1 1000 Part room 750 0 1 750 1 750 Mech Bay 1000 0 1 1000 1 1000 Wash Bay 800 0 1 800 1 800 Storage 1750 0 1 1750 1 1750 Mech Room 500 1 500 1 500 1 500 Equip Garage Projected Sewer Bucket 75 2 150 2 150 2 150 Diaphram Pump 5 1 5 1 5 1 5 Lawn Mower 5 1 5 1 5 1 5 Trailer Roll 84 1 84 1 84 1 84 Snow Blower 25 1 25 2 50 2 50 Back Blade 32 1 32 1 32 1 32 Garden Tiller 4 1 4 1 4 1 4 Sander Spread 64 4 256 4 256 4 256 Back Blade 32 1 32 1 32 1 32 • Paint Mach 5 1 5 2 10 2 10 Kelley Tamper 2 1 2 1 2 1 2 Duetz Water Pum 25 1 25 1 25 1 25 Duetz Water Pum 45 1 45 1 45 1 45 Paint Sprayer 8 1 8 2 16 2 16 Pavement Cutter 6 1 6 1 6 1 6 Sickle Mower 6 1 6 1 6 1 6 Sewage Pump 5 3 15 3 15 3 15 Air Compressor 3 1 3 1 3 1 3 Generator 120V 4 1 4 1 4 1 4 Tamper 2 1 2 1 2 1 2 Grader Side Wing 48 1 48 1 48 1 48 Grader Front Plow 132 1 132 1 132 1 132 Truck Plow 84 5 420 5 420 5 420 Pick-up Plow 4X4 16 1 16 1 16 1 16 One Ton Truck 170 1 170 1 170 1 170 Motor Grader 120 243 1 243 1 243 1 243 J.D.Backhoe 310D 133 1 133 1 133 1 133 Pelican Sweeper 162 1 162 1 162 1 162 Ford/L8000 170 1 170 1 170 1 170 Intn1./1700 170 1 170 1 170 1 170 J.D. 2555 187 1 187 1 187 1 187 Pick-up 133 3 399 5 665 7 931 Skidster 84 1 84 1 84 1 84 Sewer Roder 90 1 90 1 90 1 90 Chipper 144 1 144 1 144 1 144 Air Comp./175 78 1 78 1 78 1 78 1 Roller 32 1 32 1 32 1 32 Tar Kettle 144 1 144 1 144 1 144 Crack Sealer 78 1 78 1 78 1 78 Ferguson Tractor 66 1 66 1 66 1 66 Low Truck 520 0 1 520 1 520 Loader 150 0 1 150 1 150 Steamer 10 0 1 10 1 10 Vehicle Clear 2760 3498 3698 Subtotal 7280 15152 15678 Internal Circ 30% 2184 4546 4703 Total 7 9464 8 19698 13 20381 SOLID WASTE Projected SW Foreman 140 p 1 140 1 140 1 140 SW Oper I 15 0 2 30 4 60 5 75 • SW Oper II 15 0 1 15 3 45 4 60 Worker 0 1 0 0 0 0 0 Lunchroom 200 1 200 1 200 1 200 M/W Lockers 600 1 600 1 600 1 600 Storage • 150 1 150 1 150 1 150 Ford L8000 250 2 500 2 500 2 500 Ford C8000 200 1 200 1 200 1 200 International 250 1 250 3 750 4 1000 Mack 216 1 216 2 432 3 648 Ford F350 126 1 126 1 126 1 126 Box lOyd 88 3 264 3 264 4 352 Box 3yd 48 3 144 3 144 4 192 Box 1.5yd 24 3 72 3 72 4 96 Container 300 20 15 300 15 300 20 400 Container 90 1 200 130 200 130 250 163 Container 60 1 50 33 50 33 60 39 Container 30 1 40 26 40 26 50 33 Recycle Bins 20 20 400 20 400 25 500 Xmas Decorations 100 1 100 1 100 1 100 Vehicle Clear 2070 2607 3261 Subtotal 5966 7279 8834 Internal circ 30% 1790 2184 2650 Total 5 7756 8 9463 10 11484 - PARKS AND RECREATION Director 140 p 1 140 1 140 1 140 Rec Program 140 p 1 140 1 140 2 280 Secretary 60 o 0 0 1 60 • Maintenance 30 o 3 90 5 150 6 180 Facilities M 100 o 2 200 2 200 2 200 PT Maint 0 7 0 7 0 7 0 PT Rec Int 60 3 180 3 180 4 240 Gen Storage 1000 1 1000 2 2000 3 3000 Work Shop 250 1 250 1 250 1 250 Misc Equip 1000 1 1000 2 2000 3 3000 It is assumed some functions would be shared with other facilities Equip Garage Trailers 120 3 360 3 360 3 360 Dump Truck 220 2 440 2 440 2 440 • Pickups 120 2 240 2 240 2 240 Mowers 25 3 75 3 75 3 75 Five Wheeler 50 2 100 3 150 3 150 Suburban 125 1 125 1 125 1 125 Car 100 1 100 2 200 2 200 Senior Van 300 1 300 1 300 1 300 Vehicle Clear 1305 1418 1418 Subtotal 6045 8368 10658 Inter Circ 30% 1814 2510 3197 Total ' . 17 7859 19 10878 23 13855 Total staff 62 82 105 APPENDIX B DISCUSSION OF SPACE OPTIONS: 1. Park/Recreation move into Police space: This assumes Police would move out of City Hall. Combined with the Thelen Building next door would provide a good proximity of vehicle storage, offices and bulk storage. But this space is very valuable for other City functions and would not hold the Park/Recreation storage requirements over the long run. 2. Park/Recreation, Solid Waste, Streets/Utilities and potentially Engineering move to a Central Maintenance facility. This facility could be one building or a 'campus' of buildings. By combining these departments many facilities could be shared and would allow for convenient flexibility. 3. Convert existing library into a new City Council Chambers/Community Room/Media Center. This space is approximately the proper size for this function and could work well. In comparison to converting the present garage area, the library space is'hidden'behind the City Hall and is not as high a space. 4. Move Police to 'rental' space at Erickson Grocery (new library). According to the space projections this would be a temporary move until a new facility was built. Considering the • specialized construction of a police facility and the lack of garage space, this would be a relatively expensive move. 5. Remodel Police garage into new Chambers/Community Room. If and when the Police move out of their space, the garages provide a high space with good 'street' presence. It could also have a good presence if the existing Council Chambers is remodeled to create a new entrance lobby. • 6. In the long-term, convert the present City Hall into a Police Station. Further study would be required,but this seems to be a possibility. 7. Temporarily move Chambers/Community Room to'rental' space at the new library. This would free up additional room in City Hall and be a relatively easy conversion. 8. Move either Park/Recreation or Solid Waste to Central Garage. This building needs some remodeling and will not totally accommodate either department fully. The building should work well for temporary moves and overflow. 9. Expand Central Garage to accommodate Streets/Utilities. This assumes the residential property can be purchased. Even if it can, this site is limited in size and would not meet the needs of 22 Streets/Utilities in the long run. 10. Expand City Hall. Some expansion to the east of the library space is a potential. Additional expansion either to the north or west will be restricted due to parking required and property boundaries. Expansion up would need to be carefully investigated and would run into difficulties if the present facility was not vacated temporarily. The costs of adding up would make other alternatives more cost effective. 23