Loading...
HomeMy WebLinkAbout08-25-1986 221 MINUTES WATER BOARD REGULAR AUGUST 25, 1986 1. The meeting was called to order by President Shirley at 7:30 P.M. in City Hall. Present: Shirley, Bohm, Juenemann. Absent: None. Also Present: Thomas Kaldunski, City Engineer. 2. City Engineer Kaldunski advised the Board that the water tank was being evacuated in order to permit inspection and removal of residue from the tank on August 27, 1986. He further stated that specifications for painting and refurbishing the tank will be prepared based on the results of the inspection. 3. The Board was informed that the low bidder withdrew from the project to extend the water main west along Highway 50. Kaldunski said the project likely will be rebid. The looping of the main as part of the Terra project should be complete this week. Engineer Kaldunski departed from the meeting at this point. 4. The monthly accumulation of bills was reviewed. Motion by Juenemann, second by Bohm to authorize payment of all bills presented, totalling $6,876.18. APIF, motion carried. 5. President Shirley informed the Board that Finance Director Henneke will be present at the next regular meeting. Respectfully submitted, Robert Juenemann Secretary RJ/mh