Loading...
HomeMy WebLinkAbout06-01-1987 231 MINUTES WATER BOARD REGULAR JUNE 1, 1987 1. This meeting was deferred from May 26, 1987 when there was a lack of quorum. The meeting was opened by President Shirley at 7:30 P.M. in City Hall. Present: Juenemann, Shirley. Absent: Bohm. Also Present: Wayne Henneke, City Finance Director. 2. Director Henneke, representing City Engineer Kaldunski, advised the Board that the coating of aluminum paint just recently applied to the water tower, has begun to bubble and peel. The contractor has agreed to coat the entire exterior of the tower using a silicone-alkyd enamel at no additional cost to the City. However, it was noted that the lower five rings of the tower need to be sandblasted in order to allow the new paint to adhere properly. The estimated cost of sandblasting is $4,620, making the total cost for painting the tower to be $9,370. Motion by Shirley, second by Juenemann authorizing a change order to the contract to allow sandblasting of the lower five rings of the tower at a cost of $4,620. APIF, motion carried. 3. The Board accepted a proposal from the Bonestroo, Rosene, Anderlik Engineering firm for a water system analysis for the City of Farmington in the amount of $15,000. The board deferred action until the next meeting, three weeks from this date, when the entire Board is expected to be $resent. 4. Motion by Juenemann, second by Shirley to authorize payment of all bills presented to the Board totalling $4,070.96. Respectfully submitted, R.G. Juenemann