HomeMy WebLinkAbout08.12.19 Work Session MinutesMEM
CITY OF FARMINGTON
CITY COUNCIL MINUTES
WORK SESSION
AUGUST 12, 2019
Mayor Larson called the work session to order at 6:15 p.m.
Roll Call
Present-Larson, Bernhjelm, Craig, Donnelly and Hoyt
Absent-None
Also Present-Administrator McKnight, Public Works Director Gehler, Community Development
Director Kienberger, Police Chief Rutherford, Fire Chief Elvestad, Human Resources Director
Gabbard, Finance Director Malecha and Parks and Recreation Director Distad
Agenda
Motion by Bernhjelm, second by Craig,to approve the agenda. APIF, motion carried.
Heritage Preservation Commission Ordinance Update
Community Development Director Kienberger reminded the city council of recent discussions
that provided staff with the go ahead to reestablish the Heritage Preservation Commission
(HPC). City staff is proposing that the powers and duties of the HPC be assigned to the Planning
Commission.
This will allow action to occur on required permits without removing the city council ability to
appoint a separate commission in the future if desired. City staff worked with the city attorney
in developing draft language amending the existing HPC ordinance.
The consensus of the city council was to move forward as proposed on this issue and bring it
back to the city council for formal consideration.
Draft 2020 Budgets
Finance Director Malecha presented the draft 2020 budgets for city council review.
General Fund
At the July 8, 2019 work session, city staff presented the city council with a zero percent levy
increase:
August 12, 2019 Work Session Minutes - 1-
2019 Budget 2020 Proposed Increase/(Decrease)
Revenue $3,199,486 $3,406,372 6.47%
Expenditures $13,007,794 $13,637,563 4.84%
Fiscal Disparities $2,225,003 $2,240.713 0.71%
General Fund Levy $7,583,305 $7,990,378 5.37%
Debt Levy $3,212,460 $2,805,387 (12.67%)
Net Tax Levy $10,795,765 $10,795,765 0.00%
The consensus of the city council was to stay at the zero percent for 2020. The city council
asked staff to bring back options to increase the levy one percent with that money going
towards building maintenance projects.
Staff proposes the following priority one projects from the 2017 facility analysis if the levy is
increased.
Fire Station#1
✓ Provide Automatic Door Operations at Main Entrance $20,000
✓ Replace 17 Interior Doors and Hardware for ADA $33,000
Rambling River Center
✓ Replace eight interior Doors and Hardware for ADA $16,000
✓ Replace Front Desk Counter for ADA $5,000
✓ Replace Existing Water Main in Garage $27,000
Engineering/Design Fees $7,575
TOTAL $108,575
Councilmember Craig asked what the ADA issues included. Parks and Recreation Director
Distad shared it was primarily door/door handle issues in both buildings.
Councilmember Bernhjelm supported increasing the levy now to address these issues as
opposed to waiting for later.
The consensus of the city council was to keep the 2020 levy at zero percent and have staff bring
back 2020 building projects once the amount of dollars available for 2020 is better known.
Debt Service Funds
The Debt Service Fund budgets provide funding for scheduled debt principle and interest
repayment obligations as well as all fees associated with city debt. The 2020 debt levy is 12.67
lower than 2019 due to reduced debt obligations.
August 12, 2019 Work Session Minutes -2-
Park Improvement Fund
The Park Improvement Fund 2020 budget includes$25,000 in park development fees and
$75,000 in liquor store profits along with $8,245 in rental income and $3,500 in investment
revenue.
Projects proposed for 2020 include $3,000 for a Prairie Waterway shelter roof, $6,000 to
resurface the basketball court at Westview Park and $30,000 to replace the backstop at Feely
Fields#1.
Schmitz-Maki Arena
The arena operational budget is very similar year to year. The current budget has a loss of
$7,840. Malecha stated this budget would be reworked and brought back to the city council
with a break-even budget.
Cable Communications Fund
This budget receives funding quarterly from franchise fees and PEG fees. At the July 8, 2019
work session, city staff proposed using some of these franchise funds for a one-time project.
This work is still in progress.
Fire Capital Projects
This fund is now retired with the purchase of Engine 11 in 2019.
General Capital Equipment Fund
This fund is used for the purchase of capital equipment for many departments. Purchases
proposed in 2020, to be reviewed as a part of the capital improvement plan, include police
vehicles, police and fire equipment and department vehicles.
Maintenance Funds
Large-scale maintenance and replacement costs for streets,trails and buildings based on their
respective capital improvement plans are included in this fund. The 2020 budget includes
pavement management projects in the amount of$627,033 that will be reviewed as part of the
capital improvement plans.
Liquor Store Fund
The liquor store budgets are estimated to produce a profit of$302,808 in 2020. The transfers
from the liquor store fund include $61,452 in administration costs and $75,000 to the Park
Improvement Fund.
August 12, 2019 Work Session Minutes -3-
Water Fund
The city operates and maintains its own waster system. The 2020 budget includes the
construction of a new water tower in the north part of the city.
Sanitary Sewer Fund
The city is part of the metropolitan regional wastewater treatment system fun by the Met
Council. Wastewater collected in the city is discharged to regional trunk lines that flow to the
wastewater treatment plant in Empire. The Met Council charges all cities for the operation and
maintenance of these systems based on actual flow measured through volume weighed
annually. Farmington's charges for 2020 will be $1,390,877 which is roughly$66,000 higher
than 2019.
Mayor Larson asked that the discharge numbers be reviewed to ensure accuracy since there
was an issue a number of years ago. Staff will follow up on this issue.
Solid Waste Fund
The city operates solid waste collection services within the city and has the benefit of having a
single hauler community.
Street Lighting Fund
The city owns and maintains streetlights primarily in the downtown and Vermillion River
Crossings area. Expenses associated with our lights are budgeted for in this fund with revenues
generated from a quarterly fee paid with other utilities.
The city council was comfortable with the 2020 budget as it stands.
Review 2020-2024 Capital Improvement Plan
Public Works Director Gehler presented the capital improvement plans (CIP) for city council
review. There are several sources of revenue for the plans including the tax levy, local
government aid, utility enterprise funds, trunk funds, Municipal State Aid dollars, liquor
operation proceeds and debt.
Gehler shared the CIP's are a five-year look forward but year one is the most important year to
consider.
Capital projects and purchases are generally$5,000 in value or greater that replace or
significantly improve existing assets. The CIP is comprised of the following components:
1. Street Reconstruction
2. Pavement Management
3. Utilities (Water, Sanitary Sewer, Stormwater)
4. Vehicles and Equipment
August 12,2019 Work Session Minutes -4-
5. Trail and Sidewalk Maintenance
6. Parks Improvement
7. Building Maintenance
Street Reconstruction
Gehler reviewed the Street Reconstruction CIP. The 2020 budget includes a turn lane at 209th
Street on Highway 3 and participate in the NE Farmington Study with Dakota County and
Empire Township.
The next major projects is the reconstruction of Spruce Street and Division Street in 2023.
Pavement Management
This CIP includes the scheduled crack sealing, seal coating and mill and overlay work that is
done on city streets. The 2020 budget includes a significant amount of mill and overlay work
and a reduction in seal coating.
Gehler explained the issue with pavement that was used in the 1990's and how it is
deteriorating faster than expected.
Equipment Replacement
This CIP encompasses vehicles and equipment across all departments. The 2020 budget has
always been targeted as the year where significant investments would start to be made in this
area.
Gehler shared that significant points of the 2020 plan include the purchase of a tractor and
blower primarily for snow removal and the purchase of a plow truck from the storm water
fund.
Trail and Sidewalk Maintenance
Work on city trails and sidewalks continues to be an important issue. Gehler reviewed the
amount of funding available for 2020. Administrator McKnight stated that this is an area that
continues to need additional funding.
Councilmember Donnelly asked about the work around the Storm Water Pond Ann area.
Gehler stated that work had started in this area. Donnelly expressed some concerns about the
work that had been done and asked staff to review this work.
Water Fund
The 2020 CIP includes the construction of a new water tower.
August 12, 2019 Work Session Minutes -5-
Sanitary Sewer
The 2020 budget includes continued sanitary sewer lining projects. Gehler noted the purchase
of a new vacuum truck is scheduled for 2021. Gehler noted the fund balance in this fund is
healthy and no increase in the fees for this fund will be proposed for 2020.
Storm water
The 2020 CIP includes the traditional work that occurs with our stormwater system.
City Administrator Update
Administrator McKnight reminded the city council of the upcoming Coffee with the Council that
starts this week and the tour with the Parks and Recreation Advisory Commission scheduled for
Wednesday.
McKnight reminded the city council that applications are now being taken for a vacant seat on
the Planning Commission. The city council asked that these interviews be scheduled for
September 16, 2019.
McKnight reviewed the recent intoxicating liquor license violations.
McKnight asked the city council about a boards and commission reception/meeting. The city
council would like to hold a year-end summary meeting in early December.
Adjourn
Motion by Hoyt, second by Craig, to adjourn the meeting at 7:38 p.m. APIF, motion carried.
Respectfully Submitted
David McKnight, City Administrator