HomeMy WebLinkAbout01-12-21 Planning Commission
Minutes
Regular Meeting
January 12,2021
1. Call to Order
Chair Rotty called the meeting to order at 7:00 p.m.
Members Present: Rotty, Franceschelli, Lehto, Tesky, Windschitl
Members Absent: None
Also Present: Tony Wippler, Planning Manager
2. Approval of Minutes
a. MOTON by Franceschelli, second by Tesky to approve the minutes of December 8,
2020. APIF,MOTION CARRIED.
3. Discussion
a. Sapphire Lake 3rd Addition Final Plat
Sapphire Lake Development Company is proposing to plat 32 single-family lots within
the Sapphire Lake Yd Addition. These lots are located to the east of the previous 69 lots
platted as part of the 1St and 2nd Additions. This addition is part of the 131 single-family
lots proposed for the entire project. The total plat area is just over 32 acres. The
preliminary plat was approved in August 2018. The property is zoned R-2 (low medium
density residential) and requires a minimum lot size of 6,000 square feet with a minimum
lot width of 60 feet. All lots meet these requirements. The final plat includes three
outlots. Outlots B and C will be deeded to the city. This addition will include the
extensions of 213 Street W and Spruce Street into the development and will have
temporary cul-de-sacs at the eastern boundaries of the 3rd Addition. Both streets will
have 5-foot wide sidewalks on the north side. An 8-foot wide trail will go through Outlot
C, extending from Spruce Street to the intersection of the future Biscayne Avenue. The
trail will be constructed in future phases. Lot frontage trees will be provided.
Staff recommended approval of the final plat contingent upon the following:
1. The satisfaction of all engineering comments related to the construction plans for
grading and utilities.
2. A Development Contract between the applicant and the City of Farmington shall be
executed and security fees and costs shall be paid. Submission of all other documents
required under the Development Contract shall be required.
Mr. John Anderson, developer, had no issues with the report. They are working on the
storm sewer line and the parks department has requested a trail with this phase.
Construction will start this spring. Grading for the Yd and 4th additions will be completed
this summer. They will dig the storm water pond and dewater this spring for both phases.
Chair Rotty asked about the trail. Staff noted the trail will go to Biscayne Avenue. Chair
Rotty asked about cul-de-sac signage. Mr. Anderson stated there will be signage on both
Planning Commission Minutes
January 12,2021
Page 2
streets and they will be taken down this summer. The 4th addition will also have 30 lots.
Chair Rotty noted this is a nice addition and recommended forwarding approval to the
City Council. MOTION by Windschitl, second by Lehto to approve the Sapphire Lake
Yd Addition final plat with the above contingencies and forward it to the City Council.
APIF,MOTION CARRIED.
b. 2021 Meeting Calendar
All meetings in 2021 will be held on the second Tuesday of the month at 7:00 p.m.
There will be a special meeting on January 26, 2021.
4. Adjourn
MOTION by Lehto, second by Franceschelli to adjourn at 7:14 p.m. APIF,MOTION
CARRIED.
Respectfully submitted,
alJotKa M141tr
Cynthia Muller
Administrative Assistant