Loading...
HomeMy WebLinkAbout09.28.04 Special Planning Packet City of Farmington . 325 Oak Street -.-,... Farmington, MN 55024 . A Proud Past - A Promising ture .€ommitted to Providing High IIty, Timely and Responsive Service 0 All Of Our Customers AGENDA SPECIAL PLANNING COMMISSION MEETING September 28, 2004 7:00 P.M. CITY COUNCIL CHAMBERS 1. CALL TO ORDER 2. MINUTES a) September 15, 2004 3. PUBLIC HEARINGS a) Vermillion River Crossing Preliminary Plat Applicant: Randy Pedersen (New Century) . b) Amend Section 10-6-27 of the Zoning Code to Establish Erosion Control Measures c) Mattson Farm Preliminary PLat (continued) Applicant: M. P. Investments 4. DISCUSSION a) Farmington/f.astle Rock Joint Planning Board b) Next Planning Commission Meeting - Tuesday, October 12, 2004 5. ADJOURN . . . . TO: FROM: SUBJECT: DATE: INTRODUCTION City of Farmington 325 Oak Street, Farmington, MN 55024 (651) 463-7111 Fax (651) 463-2591 www.ci.farmington.mn.us Planning Commission Lee Smick, AICP tLfG City Planner Vermillion River Crossing Preliminary Plat September 28, 2004 New Century, on behalf of the Knutsen family, submitted a preliminary plat on August 27, 2004 for Vermillion River Crossing located at the southwest intersection of CSAH 50 and Denmark Avenue (see Exhibit A). The property is zoned Spruce Street Commercial (SSC) and Park/Open Space (PaS). The property consists of 60 acres, of which approximately 40 acres is developable. PLANNING DIVISION REVIEW Applicant: Property Owners: Referral Comments: Attachments: New Century - Randy Pedersen 14831 Energy Way Apple Valley, MN 55124 952-432-2445 Mr. Robert Knutsen 25681 Ipava Avenue Lakeville, MN 55044 Mr. Stan Knutsen 1008 W 155th St Burnsville, MN 55306 1. City Engineering Division (see Exhibit B) 1. Preliminary Plat 2. Grading Plan 3. Utilities Plan 4. Landscape Plan 5. Comments from the Dakota County SWCD 6. Comments from the Minnesota Department of Natural Resources . Proposed Development: Area Bounded By: Existing Zoning: Existing Conditions: Minimum Lot SizeslWidths: Parkland Dedication: Street Accesses: . Sidewalks: Topography: Wetland: . Commercial properties including Gas/Convenience Store, Retail, Hotel, and Mixed-Use. C.S.A.H. 50 to the north, Dakota County maintenance facility to the west, Denmark Avenue to the east, and the Vermilion River and agricultural land to the south. SSC - Spruce Street Commercial District The land is currently used for agriculture. The minimum lot size is 1 acre and the mlmmum lot width is 100 feet. All of the proposed lots meet the SSC bulk requirements except for the lot located in the northwest corner of the property. The lot is not a minimum of 1 acre and is not labeled as a lot or block. A revision to this lot in order to meet the SSC bulk standards is required. The parkland dedication requirement is currently under review. The plat shows three accesses along CSAH 50. The westerly and easterly accesses are right-in/right-out accesses. The central access is a full intersection and currently exists to the north into the Northern Natural Gas property. The fourth access (Spruce Street) is located along Denmark Avenue and will be a full intersection. The accesses were reviewed and approved by the Dakota County Plat Commission on September 20, 2004. Sidewalks are proposed throughout the plat including both sides of the north/south public street. However, sidewalks need to be added on one side of the private streets. Site topography is generally flat in the northern western section of the property and rises in elevation near the southwest until the topography falls off to the Vermillion River along the southern property line. The easterly portion of the site is lower in elevation than most of the property. Wetland areas do exist along the south and southwestern portion of the property. Dakota County Surveyor, Todd Tollefson, submitted a letter to the City on September 23, 2004 from Dakota County Attorney, Mike Ring, concerning a permanent easement for wetland purposes to the east of the gas pipeline easements. That letter is attached as Exhibit C. The City does not foresee this . permanent easement as an obstacle to the approval of the preliminary plat since the easement lies outside of the developable property on the plat. Flood Plain: A flood plain currently exists on the easterly portion of the property. Developer Added Amenities: Per Section 10-6-21 of the Zoning Code shown as Exhibit D, the Spruce Street Design Standards require 1 amenity for every 10 acres of developable area. Therefore, the Developer needs to provide 4 amenities within the development. DISCUSSION Section 11-3-2 of the Farmington Subdivision Code requires that the subdivider provide all information contained in subsection (A) and (B) shown as Exhibit E. Upon review of the Vermillion River Crossing Preliminary Plat, staff determined that the plat met the requirements in the above-mentioned sections of the code, and therefore, set a public hearing for the plat for September 28, 2004. The following comments are based on the preliminary plat submitted: . 1. Right-of-way on C.S.A.H. 50 and Denmark Avenue - The preliminary plat does not show the right-of-way on C.S.A.H. 50 and Denmark Avenue that is owned by the Knutsen family (see attached Exhibit F). The preliminary plat needs to show this information. 2. Minimum Lot Size - According to the Zoning Code, the minimum lot size in the Spruce Street Commercial zoning district is one (1) acre (43,560 square feet). As shown on the plan, the proposed lot located at the northwest corner of the Knutsen property is approximately 12,610 square feet, approximately 30,950 square feet less than the 1 acre minimum lot size requirement. The plan should be modified to reflect a larger lot that would comply with the Code or create an outlot that would accommodate the proposed private street. 3. Proposed Lot Acreage and Uses Lot 1 Block 1 1 .85 acres Convenience Store Lot 2 Block 1 1 .50 acres Retail Lot 3 Block 1 1.49 acres Retail Lot 4 Block 1 1 .72 acres Automotive Lot 5 Block 1 4.06 acres Retail Lot 6 Block 1 1 . 15 acres Retail Lot 7 Block 1 6.27 acres Large Retailer Lot 8 Block 1 2.30 acres Retail! Mixed-Use Lot 1 Block 2 1.14 acres Retail . Lot 2 Block 2 1.01 acres Retail Lot 3 Block 2 1.80 acres Fast Food Lot 4 Block 2 2.34 acres Retail Lot 5 Block 2 1.81 acres Hotel . Lot 6 Block 2 2.79 acres Retail/ Mixed-Use Outlot A 21 .48 acres Storm Water/Wetlands Outlot B 2.34 acres Wetlands Outlot C 0.73 acres Town Square 4. Comments from Minnesota Department of Natural Resources/Dakota County Soil & Water Conservation District The Minnesota Department of Natural Resources and Dakota County Soil & Water Conservation District submitted letters concerning the preliminary plat as shown in Exhibits G and H. Both agencies have requested that the City not approve the preliminary plat until their issues have been resolved. The City Engineer and other staff are currently working to resolve these issues. At the time of the drafting of this agenda item, the City has not had sufficient time to discuss the issues in question with the agencies. ISSUES TO BE REVIEWED AT THE SITE PLAN REVIEW STAGE . As stated in Section 10-6-23 of the Farmington Zoning Code, a formal site plan review is required upon the proposed "construction of new structures" on "vacant undeveloped land." Therefore, each Lot within the proposed Vermillion River Crossing Preliminary Plat needs to be reviewed through the formal site plan process by the Planning Commission after the final plat is approved but prior to construction. The plat is considered a "Major Project" and will be reviewed during the formal site plan process under Section 10-6-23 (E) of the Farmington Zoning Code that is attached to this packet as Exhibit I. Additionally, the developer will be required to comply with Section 10-6-21 of the Farmington Zoning Code concerning the Design Standards for the Spruce Street Commercial zoning district that is also attached to this packet. As shown in the attached code requirements, a number of issues need to be reviewed including but not limited to the following items: 1) Parking space needs 2) Handicap parking space needs 3) Landscaping 4) Refuse/loading areas 5) Lighting 6) Sidewalks/Trails 7) Grading 8) Building elevations - Floor plans 9) Fire protection plan 10) Site amenities 11) Signage plan 12) Variances to City Standards 13) Conditional Use Permits Along with the above items, the following items need to be discussed in detail at the site plan review stage: . 1. Front Yard Setback - According to the provisions for the Spruce Street Corridor zoning district, at least 50% of the front face of a structure must be located within 20 feet of . a public street right-of-way or private street edge. As shown on the plans, the proposed structures fronting C.S.A.H. 50 are not located within 20 feet of the right-of- way. The purpose of this provision is to create a streetscape within the entire Spruce Street Commercial zoning district that is similar to the existing downtown (with building fronts close to the road). The concept of buildings fronting C.S.A.H. 50 is not provided for in the Spruce Street Commercial district. If the plans for each lot along C.S.A.H. 50 represent a desirable development pattern, a variance from the setback requirement would be necessary. 2. Conditional Uses - The following proposed uses are conditionally allowed in the Spruce Street Commercial zoning district and therefore would require a conditional use permit: . Convenience Store . Hotel . Fast Food Restaurant The conditional use permits may be applied for at the same time as the review of the site plan. . 3. Parking Spaces - Exhibit J is a parking analysis for each lot within the development. As shown in the analysis, most of the lots show a shortage of parking spaces. The Developer needs to meet parking space requirements for each lot, or a variance would need to be applied for at the site plan review stage. Staff is currently reviewing the City's parking standards to determine whether the existing requirements are appropriate for some of the proposed land uses in the development. Staff will present its findings to the Planning Commission when completed. Landscaping - According to the Zoning Code concerning perimeter parking lot landscaping, the requirement is 1 tree and 3 shrubs for every 40 feet of parking lot perimeter is required. The Developer will need to meet these requirements for each lot at the site plan review stage. 4. SidewalkslTrails - According to the Spruce Street Design Standards, sidewalks are required on both sides of streets. The City's Development Committee has recommended that on private streets, one sidewalk would be required along the private street. These sidewalks need to be shown on the plan. Randy Distad, the Parks and Recreation Director submitted a detailed trails plan to the developer showing trails throughout the development. These trails need to be shown on the trails/landscape plan. 6. Street Lighting - According to the Spruce Street Design Standards, any light along the perimeter of parking lots and streets shall be installed as illustrated in the City's standard detail plate as "streetlight - downtown district" (see attached Exhibit K). . . . . ACTION REQUESTED The Planning Commission may: 1. Continue the plat until October 12, 2004 to provide additional time to address any currently unresolved issues. 2. Recommend approval of the plat if all unresolved issues have been addressed to the Planning Commission's satisfaction by the time or the public hearing on September 28, 2004. Respectfully submitted, ~ Lee Smick, AICP City Planner en ~ z ~ Cf) Cf) o IT U IT W > H IT z o H ~ --.J ~ w > 4- o oW co r-l CL >-- L co C .rl E .rl r-l OJ L CL w ~ "'on ~~ L ,/ ... ~ ~ ~-'" :., 98'6~~-t:t i g ~ 'OJ~-l .DO.OJ .90.11 go'U ~ I I- U) llJ 3: I- llJ llJ IT I- U) :r: I- (\J ...... (\J at\'>>' 1.IO,91'.00H o lD " ~ 'i cry ~ " ~ ~ on 18 . ".rOlE ~ " "'.IO.tO.OlIN ! - C\I 1f'00E: ~ ".IO.LO.OOII - ~ ~ ~ ~ ~ I cry o z >- <( 3: I (!) H I o H <( ".'" ".. llJ I- <( I- U) C\I i!:~ ,.H ...'" .E!.LZ.OON l1l gi. "'. ~~~ ~ ui Z ~~. 6 ttct u ~ 61'062 ".. ,;-.L~~~~ Et.~, 3.U'I1C.er" ~. a s 8 ! .. . ," -. 3nN3^V >H::lVf\JN30 M.OL6~.rON gr' aE M.E~.9il.'''" L i " ~ '" "! ~ "'" ~ C) -l ~ ::J C) 10 In U"fJ ""'" '<T BE'tn a:066 i,g;,I.OOS U'88lI i1.K.H.OlI5 lIt"t'l' m ~ s ""~~ CD 10 ~~ ~ tot''i6[ 3.i!.LE.0lIM P'LE! 61nJ51 ..... iii. ~ '<T lD S' . El"L9ZOJ H.9lidiE.OOS z C) I-< f- a. W u x w ., ~t--~ :'1'~m ~Gi~ ~~&: /' ~, "~;'~~ i "a i~ ~ E~f/IBrr A " ~i i: ~ :!.;. " ;~~ iis ~!~ ~@~ c., " UJ'lD=':5 ~ "" ~~~-=: IlJ .. lD III " III GJ II GJ at OJ III to c.. c. l. to. Co U 0 U U U U co 111 <<I III G <<I ~c;~~a;~ "';"';"';nj';ai . . . . I . C\InlC\lC\lNN ~~~~~.lilC tJ. U U U U u a 0 a a a a .... ~................ a:lUlID ID aJ lD...c!DC,) .: cd ri ~ ad' 113 ~ ~~ ........,......................... .....401 .:: .9.3':: .3.9 r3 aa .. aJ lR III III '" III Ql. III CD CD . lD CD QJ III C. C. c.. c.. c.. c.. to L 1d 16 1d M ~ :; 1d 1il ~~::~:5: . . . . . . . . ~ ~ ~ ~ ~ ~ ~ ~ ~ ro 0 0 0 0 Q Q 0 Q cu.........................-- c..lDtdCDlDlDlDlDaJ 4":nirt'i~t6uir.:tD 5~53~~:333 ~ ;:; ~ U t- ~ .. ,'l g! '0 ,; ~ '" t- 1;; " 0. .s t- ~ ., " " ;:; <= >- 0. Z .... t- ::J t- O '" (/) 0. " ... Z '" t- '" 0 " U c: 0 ... '" .. '" c: Z '" -' c: ~ -~ .. N ,..: ';; a: c: '" ~ ~ .. ~ ~ ~ on " ~ " <= on t- ~ " " ::J " '" (/) '" ., :c " ::J " ~ <= i << 0 z <= ~ ?; ::J on .... t- o. c: 0- ., t- lJ) " " ~ " 0. ;1 0- .. I- " 0. <= " 0 t- .... to 0.. ~ '"' -a en ... 0. c: '" ;,:. 10 ~ 0. OJ !;:; ., ~ -~ a: ~ t- '" I lD ~ .~ .. '"' " 0- " t- ~ 0. ... '" lD t- ~ lJ) << 0. I 0- lD " iO 0- <= ';; '0 t- ... I- 0- 10 . ~ ~ lJ) (/) 0 a: u a: ~ ... UJ ~ ~ ~ ~ '" .:!i a: b '" u Z . tn Z t- ~ " " .s:5 ::E E ;:j E to ,;", 0. -... U :::e: ,..- ...'" ex: t- ~... .... UJ ::J ... "~'" .. ,. ... on c: lD I " c: G.lO>O b "'''' '" ... U ... ...'" lJ) "'...~ I ., ,,-~ 0. '" ~ 0: ...en ::J c.'" ZlDtn<tOl ::J >- t- o. t- c.: lJ) '" ~ ... 0. C. .~ ~ ~ '"" .. " >- c: t- ... 0. 0.. 0 N OS:iNNtW 'A3'"'.~ ~'::; ~3)j..LS H1.;; M3N ^~ni~ ;.; iJ 0.: ~ a~ wO aU Q..t;j Ow U g:~ Z ......." Uw Z ~~ 0""0.: N ~ e; l-~-i .. I I '- r-! --,- I: , I ! ! ~~ h ~..... - u'... _~________.__ ~~- \ . ---~ ----r--____ ---"--==:::.:""l . ~_ __._ . ., .~~~~~;..~;;~..:.. ....... .'1 ' i /i;' I .. ~ //:1/ ;,'l fi/! -,--. :==~'" \ 'i ./ ,./ / ffi~~i <t ~~~1 0 -1 B ~i ~!~ ~' \ \\ , , \"\\ \\ , . \, \ \ ql -. -- . ::> I1l0>ll1Q .cl."3dO.,,d .clNno /> ISSO~::> l~-:)I S~N Olll""~3^ ...--. ~3^1~ NN'Ir'.....iJ.19 , -'--I -- -----., j III ti -1 ... ::> Cl ~ /1 . , '- II ~~. ~ ~~ !E;'':::'' "'....::=""..::.....-.......:;";..,.).......~~":n.-~ .... _ .lJI_.............................~..~ ::'.::- stoOlSJA:;Ill /tOl,LV:ll.jLUl:iJ ~ I'KlH.UIJ.S'Jl I.MS"lallS9lXYl Vl.OSHW;''tlVd1SolllXIJrlSo1Bl1S3lWJWflItl. N~IS3a ~ '::>NI~3:lNIC)N3. l.NnO.... V~V d VJ..QS.i1NNIW 'A,n1V^ 31ddV l..33M...LS HL9vL "M SL69 ^~n..lN3:::> M3N ~ .~- ~ S~NISSC>~J _ ~3^,,~1 ~<:'~~~3^ :,.;; ~--~ 6 H ~ ~ c m ~~ ! !! ~ l ! j! j j : I r ~ ~ 11;i 11 ~: i -'. , \ I - ~/-::::\~\JJ -_.._/ I I , l ,...... l \ "," I I . /~ ~ 1,.1" ) if \, 0/"''' r/~ }: \, - 8, /--! 'I \: /" -i)I \1 ',' ./ / ' I ( ./\: ! of; I I / (i \ I / O3!" \ I \ "...... 'I \ -... ~ . \ \f \"-, \ I' " m_ I '\ ""''. -: ~i"J <,SI r, ~I" ~ '" ...~: ~ ]1 ~~~ = -~ I~~ 71~~ZIo'Uf,,:-'.':'~1KL....~~ - - ................._..._-~~ ;.~:'" SNOlSto\::IH NOu.V:>UJ.LH:ia :ma t't'StHlt(l.~ lU'i"'!ll(l.S'IIllW~ V!053NNI'fn.1SoOOlurl';.J.BI1SJa'DW0H1. N'=>tS30 ~ =>NI)f33NI~N3 .lNnOTTV~Vd ~~ ~ ~I I ~"",: ~I~i ~I"l . .~...... ......... ...................-:--:~..... ... ~I -- ~;~l r-~- i~ ,......: .:' . il <<' \ , l- e) -' I- (5 .., 0 " -' '- .. ~ oJ) b -' .., o -' V.LOS3NNIW .A3".....^ ::nddV .L33.'M-.LS H-L9trL .N\ ~L6q ^~n..lN3::> M3N ~ I 1 Iii! ;i , '! !h I. '. ili ,..11 } I ~ Ii ~Il ~~i "'~I -II ~, I- ~,f Ol~ -',a ~I' ',' ~, ~ii ~, ill' o -' I~: ~' :l "~""_M ~ S~NISSC>~J _ ~3^1~ NOlll,^,~3^ :_-=: ""'... 31alaQ lolllIOL'i ON J.:i3IfS --- ! I i i ! I <", I \ '-., , ~v: 1 ~ III o c! => () ------- ----------- ------- :ll J.1;,l3dO>k! J.1Nno:) '110>l'1Q -l~--------- !l'I-----------'lI --- ___~=_____-_ _ _~--.----------m--______d~~~ ! II ~~. ~ ~18- ,,-...""'............"- fIQ .,... _~._"""~.._-.... - ...-..........-............-.........:.=: ::.:';:' SNOlSL\:nI MOLlYJJ.illH:):l ""'" lIKOi.U(lS'J) 16!it-9.UlWJ)XVI V!05lNNM'1rW~lS.OOl:1lJ'lS.WIlSJlN.)W_ N::J1530 'W ::>NIM33NI::>N3 iN no...... V'~V' d ......1.QS3NNIVV "A3"lV^ ::nddV J...33~..LS H1.9vL 'M $1-69 ^~nJ..N3::> 1\i\3N -- Ii ~~ .~- ~ S:::>NISSC>~:::> _ _~_3M"M N9"IW"M'!^ t" :J NII""ld;!ll3.l.Wl,lIl:llSi .uR'!IN?'il 'OJ( J.:I:nlS =1 I r~--j~~~~~~~~~~~-~~~~~~~~---~~-------- ",,- '- ~ _ _ ~ i I-c= .-.-:.~' ....~................. i i.. '. - ~rmr;:;=-~~~ i ,il,\ i .1. i;,i' .cc.-.:;i2~:=;c.c.:> / I IL '1'.1' (/~ ---- -<::--- ----- ,---j, i !! i f/ I ~~~i II <l....{\, \.{\'. {,I, (,' ---..._~~~:::::-:--~~-'---/, - ~~Qli \) \ i i i. \ \ , If ~ '\'\:\\j " \ ~I i i \\\\ i~\\ Ji~~ , \. ~'ilIi \. \\ \\ \ ~i.r ~ , " Illi I. I i J ~ i illl &h1 !II j ~I tlH ~I iJi I Q ~~ , J- !1~ r .J~ ~~l ____ ! -------- -'1 - Ii I , I : /1 ( : ( . 3 I \ , \m_ i ",,> -I: " '\", , ~ III o ,;' ::> \) I, f' ill III Ii Ii Ii Ii il i 'I c- o -' ~. ~: Ii" :\1 ~~i J...L"3dO>Od J...LNno=> '<1.LO>l'<10 ill ~iU___ __ ~~~__ ~ ~_ ~l ,,~(I~M~ A.-..aooM OVOl! NQSOnH ()I;06 A~3s~nN ~3m A31lV ^ SNI3H ---Imm--m-- Tn il"1 ----___ i _L --- - __nn_l____:..ilit . ---it :1 . I - --- - ~ -~------- -- -- , ~ ---- i - 1-- ! '~ LI ; ~I I ; ---- J..i.~3dO~d ...llNno:J V10>l'VC ~-- dd "'-'4 .,~~~~, ~,. 9NRSSCJ>~:J - <l3M>I"",~~~~~<l3^ ,~,2 11000i." U~~I 16S;'~!L ('W) XVJ VIOSlNNIW'1rW~'1.5'OOllllfl'i'muSXJ\')ln'O"" N~153a W ::>NI~33NI~N3 l.NnO.... V~V d V.LOS3NNIV'II 'A3""'^ :nddY .L.33}:1..LS H.L91>'"1.. "tV\ <;1..69 ^~nJ..N3J M3N t:WO~ ~~ ~ jl ~ \ ~ 1 2 \ i \:: H i ~ -1;- "_+_!; I 1 ' 1; I :z J. 'J 2 '~I ~~ :~~- ; ''','. - 'iJ. ii i'---'~--_~~ "<~~_.; ~ ..r- ;: -1--- .~-:-,,_.~-- -"J - , ~~ ,t ~ ~i ~ ~ ~ ~ -~ ~ lIt ~ .~ t. H ~ ; :il~ i. )\ ~iI ~i ~ ~l hi 't ~ iI~ H ~ ~ I a ~,.l-~-+-~ ----~--~~_i l~ I 1LQJQj 0 l~jo i I r ffii r ~\~ 3 ~i: ~Id jl EK if/8fT' C Kevin Carroll From: .ent: 0: Subject: Jim Atkinson Thursday, September 23,200410:20 AM Kevin Carroll; Lee Mann; Lee Smick FW: Plat Commission Meeting 9-20-04 fyi.. . Jim Atkinson Assistant City Planner City of Farmington (651) 463-1821 -----Original Message----- From: Tollefson, Todd [mailto:Todd.Tollefson@CO.DAKOTA.MN.US] Sent: Thursday, September 23, 2004 10:13 AM To: Jim Atkinson Subject: FW: Plat Commission Meeting 9-20-04 Jim, Please see the comments from Mike Ring regarding the wetland area for VERMILLION RIVER CROSSING. Todd Tollefson County Surveyor Secretary, Dakota County Plat Commision 952-891-7070 ~ -----Original Message----- > From: Ring, Mike > Sent: Monday, September 20, 2004 1:54 PM > To: Tollefson, Todd; Chatfield, Kurt; Elwood, Kristine; Franchett, Gene; McConnell, Gordon; Peters, Scott; Sebastian, Kristi; Zech, Dave > Cc: Zech, Dave > Subject: RE: Plat Commission Meeting 9-20-04 > > During our review of the proposed plat of VERMILLION RIVER CROSSING on 9/20/04, I raised an issue concerning the possibility that Dakota County obtained a wetland easement over much of the land bordering Pilot Knob Road south of CSAH 50. In checking my project file for CP 50-05 I see that we did obtain and record a permanent easement for wetland purposes over 4.41 acres from Melford and Genevieve Knutsen. That easement was recorded as document no. 1370368. The county also recorded a declaration of restrictions and covenants for replacement wetland against the same land which was recorded as document no. 1382304. I doubt the developer will be permitted to use our wetland replacement area as a settling pond for stormwater drainage purposes, unless they replace our wetlands at a 2:1 ratio. Todd, please forward this email to the planner from Farmington who attended our plat commission meeting. He will need to let the developer know that they must work through the county to resolve drainage and use issues if they intend to use any part of those 4.41 acres. > > Mike Ring > Assistant Dakota County Attorney > mike.ring@co.dakota.mn.us > > This email and any attachments are intended for the exclusive use of the individual or entity to whom it is addressed. The information contained in this email may be .roprietary, confidential, privileged, and exempt from disclosure under applicable law. If he reader of this email is not the intended recipient or agent responsible for delivering the message to the intended recipient, the reader is hereby put on notice that any use, dissemination, distribution, or copying of this communication is strictly prohibited. If the reader has received this communication in error, please immediately notify the sender 1 by email and delete all copies of this email along with any attachments. > > > . -----Original Message----- From: Tollefson, Todd > Sent: Friday, September 17, 2004 1:04 PM > To: Chatfield, Kurt; Elwood, Kristine; Franchett, Gene; McConnell, Gordon; Peters, Scott; Ring, Mike; Sebastian, Kristi; Tollefson, Todd; Zech, Dave > Subject: Plat Commission Meeting 9-20-04 > > See the attached agenda for the next Plat Commission meeting on September 20th. > > > << File: agenda2004 09-20.doc >> . . 2 EXIl/giT V 40-6-20 1.0-6-21 . any building wall. Pole signs will not be allowed. Adverti . g billboards are not allowed within the overlay zone. ( neral guidelines for signage available through the city planner.) (H) Mai ntenance: 1. Owners and occupants of any or all of a . e have the duty and responsibility, at their sole cost and ex nse, to keep the site, including buildings, improvements and grounds, well maintained, safe, clean and aesthetically pleasin . Such maintenance includes, but is not limited to, the following: (a) Prompt removal of all r er, trash, refuse and wastes. (b) Provide such car as required to maintain all vegetation in a healthy and aesthetical pleasing appearance. (c) Maintain e erior lighting and mechanical facilities in good working order. (d) Mai ain parking areas, driveways and roads in good repair. . (e) rompt repair of any exterior damage to any buildings and impr ements. (Ord. 002-469, 2-19-2002; amd. Ord. 002-477, 7- -2002) 10-6-21 : DESIGN STANDARDS FOR SPRUCE STREET COMMER- CIAL, MIXED USE, AND BUSINESSIFLEX ZONING DIS- TRlCTS: (A) Site Development Standards (In Addition To Any Performance Standards That May Be Applicable): These standards apply to the business/flex, mixed use, and Spruce Street commercial zoning distr:~9ts unless otherwise specified. The zoning. districts are depicted on the official zoning map. 1. Outdoor Storage: All materials shall be stored and/or warehoused within the principal building. 2. Off Street Parking: Off street parking areas shall be designed and located to minimize their impacts on adjacent development, streets and pedestrian corridors. Parking lot landscaping is required per this chapte r. . April 2004 City of Farmington _~1C-6-21 -~~ 10-6-21 . (e) Any other well designed area and/or focal feature that the city finds consistent with the intent of these design standards, and that substantially enhances such development and serves as a gathering place for residents, visitors, customers, and employees. 7. Parking Of Bicycles: Bike parking spaces shall be installed at ten percent (10%) of the total number of automobile spaces within the development. For convenience and security, bicycle parking facilities shall be located near building entrances, shall be placed parallel to the sidewalks, shall be easily visible and shall not be located in remote automobile parking areas. Such facilities shall not, however, be located in places that impede pedestrian or automobile traffic flow or that would cause damage to plant material. Bike racks shall provide a means for the bicycle frame and one wheel to be attached to a permanent fixture (designed for securing bicycles) by means of a lock. (B) Architectural Standards: . 1. Fronts Of Buildings: Any building face and yard that abuts CSAH 50, Spruce Street, or Pilot Knob shall be considered a front and shall reflect a level of aesthetic treatment equal to or greater than that of building faces and yards that abut the north-south corridor and the major roads in the mixed use district. 2. Unifying Design Theme: Buildings and/or streetscapes in the Spruce Street commercial district and the business/flex district shall reflect a unifying design theme that incorporates features found along the north/south corridor and within the mixed use district. City staff and the planning commission shall determine whether development proposals satisfy this requirement. 3. Exterior Surfaces: Major exterior surfaces of all walls shall be face brick, stone, glass, stucco, architecturally treated concrete, cast in plac~ or precast panels, decorative block, or approved equivalent, as dete"f'mined by the city. The following may not be used in any visible exterior application except when specifically permitted by the city in areas with limited public view: exposed cement ("cinder") blocks; fabricated metal or pole construction structures, including sheds, warehouses, and industrial buildings constructed either on or off site of corrugated metal panels; exterior brick that is painted over; or experimental materials with no proven record of durability or ease of maintenance in the intended application. . April 2004 City of Farmington ~.14J-6-21 ---~ 10-6-21 . 4. Facades: Unless otherwise agreed to in writing by the community development department, developers of buildings located along the north/south corridor and within the mixed use district shall use facade variations to differentiate separately leased commercial spaces. Facade variations shall incorporate modulated and articulated building wall planes and rooflines through use of: (a) Projections, recesses, and reveals expressing structural bays or other aspects of the facade, with a minimum change of plane of six inches (6"). (b) Changes in color or graphical patterns, changes in texture, or changes in building material. (c) Varying parapet heights and designs that demonstrate that the buildings are different from each other and that add interest to the streetscape. (d) Recessed entrances. (e) Building entrances that incorporate elements providing shade from the sun and weather protection for pedestrians. . (f) Corners which are distinguishable from the remainder of the building through the use of towers, architectural treatments, arches, roof forms, or size and mass. All buildings along the north/south corridor and within the mixed use district shall be constructed with at least one functional or decorative (false facade) upper story. To the extent practical or feasible, variations in rooflines or heights shall be used to differentiate separately leased commercial spaces within buildings. 5. Windows: Windows shall be provided on walls that are adjacent to public or private rights of way, parking lots and sidewalks. False windows are allowed. 6. Projections: Buildings may have one of the following projecting from the building facade: (a) Awnings/canopies over the first floor windows and along the frontage of all building entrances. (1) Projection: Awnings and canopies shall not project more than five feet (5') into the public right of way, except where . April 2004 City of Farmington -~1")-6-21 _..~~ lO-6-21 . 3. Sidewalks: Sidewalks shall be provided on both sides of all streets. Trails may be required instead of sidewalks as provided in the city's trail master plan. (a) All pedestrian walkways shall have and maintain a minim'um unobstructed pathway width of fifteen feet (15') along the north/south corridor (i.e., the first roadway constructed between CSAH 50 and Spruce Street, west of Denmark Avenue) and within the mixed use area. Pedestrian walkways bordering off street parking areas shall be at least eight feet (8') wide. Pedestrian and bicycle pathways connecting to greenways or trail systems are subject to standards in the city trail master plan. (b) Walkways shall be designed to create a safe and uninterrupted pedestrianway, and to avoid frequent crossings by driveways and streets. (c) Pedestrian walkways shall be designed as amenity areas with approved landscaping, benches, lighting, signage, and street furniture. .> (d) Pavers shall be required within the sidewalk design and within the crosswalk areas. Installation of the pavers shall comply with city standards. (e) Electrical and water services shall be required within the sidewalk areas to prepare for amenities including (but not limited to) water fountains, clocks, kiosks and seasonal lighting, and shall be master planned during the design phase of the project. 4. Screening: Screening of service yards, refuse, and waste removal areas, loading docks, truck parking areas and other areas which tend to be unsightly shall be accomplished by use of walls, fencing, dense planting, or any combination of these elements. Screening shalL block views from public rights of way, private street and off street parking areas, and shall be equally effective in winter and summer. Chainlink and slatted fencing are prohibited. 5. Lighting: The lighting in the Spruce Street area shall be designed to create a well balanced, integrated lighting plan for public and private locations that enhances vehicular and pedestrian visibility while minimizing glare and contrast. Exterior lighting shall comply with section 10-6-8 of this chapter. The intent for lighting is to provide needed illumination of the site, while at the same time preventing glare to residential uses either within or adjacent to the . April 2004 City of Farmington --=1.0-6-21 ...~ 10-6-21 . site. Light fixtures should be oriented to pedestrian circulation so that pedestrian walkways are emphasized and safety is enhanced. (a) At the time of site plan review for the development, a detailed lighting plan shall be submitted. (b) Any lighting required on the perimeter of parking lots or along streets shall consist of fixtures illustrated in the city's standard detail plate as "streetlight - downtown district". The interior portions of parking lots may be lit with cobra lights. 6. Required Amenities: For each development, one of the following amenities per ten (10) acres of net developable land area shall be required and installed at the time of construction of the project. The amenities shall be highly visible, easily accessible outdoor focal points or gathering places for residents, employees, and visitors to the development site: (a) Patio and/or plaza with permanent seating areas; provided such patio or plaza has a minimum depth of fifteen feet (15') and a minimum total area of three hundred (300) square feet. . (1) Pavers as required in the city standards shall be installed within the patio or plaza. ( (2) Patios and plazas shall include pedestrian amenities intended to support these places as gathering areas such as benches, water features, kiosks, etc. . (b) Landscaped minipark, square, or green, provided such amenity has a minimum depth and width of fifteen feet (15') and a minimum total area of six hundred fifty (650) square feet, and includes pedestrian amenities intended to support these places as gathering areas. The landscaped miniparks, squares or greens do not ~ount toward the park dedication requirements. (c) Protected customer walkway, arcade, or easily identifiable building pass through containing window displays and intended for general public access. (d) Water feature, such as a pond or fountain, provided the feature is easily accessed by pedestrians and includes or integrates permanent seating areas for pedestrians. . April 2004 City of Farmington -=to-6-21 . . . 10-6-21 located above an entrance, in which case the maximum projection shall not exceed eight feet (8'). In no event should an awning or canopy be supported by poles or other structural elements located in the public right of way. (2) Length: Awnings and canopies should emphasize the rhythm of the facade bays, windows and entrances, and shall not continue uninterrupted along the building facade. (3) Height: The bottom of awnings and canopies should be at least eight feet (8') above sidewalk grade. (4) Illumination: Back lit awnings and canopies are not permitted. (5) Inscription: Lettering on awnings and canopies shall comply with subsection 10-6-3(8)1 (k) of this chapter. (6) Materials: Awning and canopy materials should be limited to cotton, acrylic or vinyl coated cotton, copper or bronze coated metal, or clear glass. Other materials may be used if approved by the community development department. Awnings shall be designed with a slope. No horizontal awnings are allowed. Structural supports shall be constructed of steel and/or aluminum and shall (if or where visible) incorporate ornamental features. (b) Projecting signs perpendicular to the building. Projecting signs shall comply with subsection 10-6-3(B)5(e) of this chapter. 7. Public Entrances: For commercial buildings located along the north/south corridor, each separate ground level tenant space shall have at least one public entrance that faces the north/south corridor. For buildings located within the mixed use district, each separate groyrd level commercial tenant space shall have at least one public entrance that faces the nearest major public or private street. Developers shall be encouraged to also provide public entrances adjacent to off street parking areas. 8. Site Plan Review: All applications shall comply with the requirements of subsection 10-6-23(E) of this chapter for site plan review. Site characteristics to be evaluated for this purpose include building and plant materials, colors, textures, shapes, massing, rhythms of building components and details, height, roofline and setback. April 2004 City of Farmington """1..f)-6-21 10-6-22 . 9. Screening Of Roof/Exterior Equipment: Mechanical equipment, satellite dishes, and other utility hardware, whether located on the roof or exterior of the building or on the ground adjacent to it, shall be screened from the public view with materials identical to or strongly similar to building materials, or by landscaping that will be effective in winter, or they shall be located so as not to be visible from any public right of way, private street or off street parking area. In no case shall wooden fencing be used as a rooftop equipment screen. (Ord. 004-506, 2-17-2004) 10-6-22: BUSINESS PARK DESIGN STANDARDS: 1. Storage An isplays: All storage and displays shall be enclosed within the princip building. (A) 2. Parking Areas: Par . g areas should be designed and located to minimize their impacts 0 djacent development, street and . :~Ii . April 2004 City of Farmington . . . r eXHIBI'- C .,.j,,,1.-3-1 11-3-2 """-- CHAPTER 3 PLAT AND DATA REQUIREMENTS SECTION: 11-3-1 : 11-3-2: 11-3-3: 11-3-4: 11-3-5: Sketch Plan Preliminary Plat Final Plat Address Map Certification Required SKETCH PLAN: Sketch plans shall contain, at a minimum, the following information: (A) (B) (C) Scale. (D) n and adjacent to plat. (E) Designation of I d use and current or proposed zoning. (F) Significant topograp 'cal or physical features. (G) General lot locations an layout. (Ord. 002-470, 2-19-2002) 11-3-2: ".PRELIMINARY PLAT: The subdivider shall prepare and submit a preliminary plat, together with any necessary supplementary information. The preliminary plat shall contain the information set forth in the subsections which follow: (A) General Requirements: 1. Proposed name of subdivision; names shall not duplicate or too closely resemble names of existing subdivisions. July 2002 City of Farmington -<:'..~\j'1-3-2 11-3-2 . 2. Location of boundary lines in relation to a known section, quarter section or quarter-quarter section lines comprising a legal description of the property. 3. Names and addresses of all persons having property interest, the developer, designer and surveyor together with his registration number. 4. Graphic scale of plat, not less than one inch equals one hundred feet (1" = 100'). 5. Date and north arrow. (B) Existing Conditions: 1. Boundary line and total acreage of proposed plat, clearly indicated. 2. Existing zoning classifications for land within and abutting the subdivision. . 3. Location, widths and names of all existing or previously platted streets or other public ways, showing type, width and condition of improvements, jf any, railroad and utility rights of way, parks and other public open spaces, permanent buildings and structures, easements and section and corporate lines within the tract and to a distance of three hundred fifty feet (350') beyond the tract. 4. Location and size of existing sewers, water mains, culverts or other underground facilities within the tract and to a distance of one hundred feet (100'), beyond the tract. Such data as grades, invert elevations and locations of catch basins, manholes and hydrants shall also be shown. 5. Bqundary lines of adjoining unsubdivided or subdivided land, within three hundred fifty feet (350'), identified by name and ownership, including all contiguous land owned or controlled by the subdivider. 6. Topographic data, including contours at vertical intervals of not more than two feet (2'). Watercourses, wetlands, rock outcrops, power transmission poles and lines, and other significant features shall also be shown. . July 2002 City of Farmington --1.1-3-2 . (C) . . -,' 11-3-2 Proposed Design Features: 1. Streets And Rights Of Way: Layout of proposed streets showing the right of way widths, centerline gradients, typical cross sections, and proposed names of streets in conformance with city and county street identification policies. The name of any street heretofore used in the city or its environs shall not be used unless the proposed street is a logical extension of an already named street, in which event the same name sha.1I be used. 2. Widths: Locations and widths of proposed alleys and pedestrianways. 3. Sewer Lines And Water Mains: Locations and size of proposed sewer lines and water mains. 4. Easements: Location, dimension and purpose of all easements. 5. Lots And Blocks: Layout, numbers, lot areas and preliminary dimensions of lots and blocks. 6. Setback lines: Minimum front, side and rear building setback lines. 7. Curve; Width At Setback line: When lots are located on a curve, the width of the lot at the building setback line. 8. Dedicated Or Reserved Areas: Areas, other than streets, alleys, pedestrianways and utility easements, intended to be dedicated or reserved for public use, including the size of such area or areas in acres. 9. Water Supply: Water mains shall be provided to serve the subdivision by extension of an existing community system. Service conQ~ctions shall be stubbed into the property line and all necessary fire fi'ydrants shall also be provided. Extensions of the public water supply system shall be designed so as to provide public water in accordance with the standards of the city. 10. Sewage Disposal, Public: Sanitary sewer mains and service connections shall be installed in accordance with the standards of the city. July 2002 City of Farmington -4.;1.-3-2 . . . July 2002 (0) .11-3-2 Supplementary Information: It is the responsibility of the developer to provide any information as deemed necessary by the city as indicated, but not limited to, the following: 1. Any or all of the supplementary information requirements set forth in this subsection (0) shall be submitted when deemed necessary by the city staff, consultants, advisory bodies and/or city council. 2. Proposed protective covenants. 3. An accurate soil survey of the subdivision prepared by a qualified person. 4. A survey prepared by a qualified person identifying tree coverage in the proposed subdivision in terms of type, weakness, maturity, potential hazard, infestation, vigor, density and spacing. 5. Statement of the proposed use of lots stating type of buildings with number of proposed dwelling units or type of business or industry, so as to reveal the effect of the development on traffic, fire hazards and congestion of population. 6. If any zoning changes are contemplated, the proposed zoning plan for the areas, including dimensions, shall be shown. Such proposed zoning plan shall be for information only and shall not vest any rights in the applicant. 7. Provisions for surface water disposal, ponding, drainage and flood control. 8. Where the subdivider owns property, or has vested interest in, adjacent to that which is being proposed for the subdivision, it shall be required that the subdivider submit a sketch plan of the remainder of the property so as to show the possible relationships between the propqsed subdivision and the future subdivision. In any event, all subdivisions shall be required to relate well with existing or potential adjacent subdivisions. 9. Where structures are to be placed on large or excessively deep lots which are subject to potential replat, the preliminary plat shall indicate a logical way in which the lots could possibly be resubdivided in the future. 10. A plan for soil erosion and sediment control both during construction and after development has been completed. The plan City of Farmington -14-3-2 -~~. 11-3-3 . shall include gradients of waterways, design of velocity and erosion control measures, design of sediment control measures, and landscaping of the erosion and sediment control system. 11. A vegetation preservation and protection plan that shows those trees proposed to be removed, those to remain, the types and locations of trees and other vegetation that are to be planted. 12. Other information including, but not limited to, traffic studies and tree inventory/preservation. (Ord. 002-470, 2-19-2002) 11-3-3: FINAL PLAT: The owner or subdivider shall submit a final plat together with any necessary supplementary information. The final plat, prepared for recording purposes, shall be prepared in accordance with provisions of Minnesota state statutes and Dakota County regulations, and such final plat shall contain the following information: (A) Name of the subdivision, which shall not duplicate or too closely approximate the name of any existing subdivision~ (8) Location by section, township, range, county and state, and including descriptive boundaries of the subdivision, based on an accurate traverse, giving angular and linear dimensions which must mathematically close. . (C) The location of monuments shall be shown and described on the final plat. Locations of such monuments shall be shown in reference to existing official monuments on the nearest established street lines, including true angles and distances to such reference points or monuments. (0) Location of lots, streets, public highways, alleys. parks and other features, with accurate dimensions in feet and decimals of feet, with the ~tength of radii and/or arcs of all curves, and with all other information necessary to reproduce the plat on the ground shall be shown. Dimensions shall be shown from all angle points of curve to lot lines. (E) Lots shall be numbered clearly. Blocks are to be numbered, with numbers shown clearly in the center of the block. (F) The exact locations, widths and names of all streets to be dedicated. (G) Location and width of all easements to be dedicated. . July 2002 City of Farmington ~U-3-3 --- 11-3-5 . (H) Name and address of surveyor making the plat. (I) Scale of plat (the scale to be shown graphically on a bar scale), date and north arrow. (J) Statement dedicating all easements as follows: "Easements for installation and maintenance of utilities and drainage facilities are reserved over, under and along the strips marked 'utility easements'" . (K) Statement dedicating all streets, alleys and other public areas not previously dedicated as follows: "Streets, alleys and other public areas shown on this plat and not heretofore dedicated to public use are hereby so dedicated". (Ord. 002-470, 2-19-2002) 11-3-4: ADDRESS MAP: The address map shall be prepared by the city in accordance with city and county policy and shall include all addresses of lots as platted. (Ord. 002-470, 2-19-2002) 11-3-5: CERTIFICA TION REQUIRED: . (A) Certification by registered surveyor in the form required by section 505.03, MSA, as amended. (8) Execution of all owners of any interest in the land, any holders of a mortgage thereon of the certificates required by section 505.03, MSA, as amended, and which certificate shall include a dedication of the utility easements and other public areas in such form as approved by the city council. (C) Space for certificates of approval and review to be filled in by the signatures of the chairman of the city planning commission and the mayor and city clerk. The form of certificate by the planning commission is as follows: Reviewed by the Planning Commission of the City of Farmington this day of , 20_. Signed: . July 2002 City of Farmington . . ........ ro c.. c o c ~ o ..c en (]) ..Q o .; (]) L.. <( ::) ~ ~S ~~~ .~ ~ ~ct ~ r -, " n r EXHI8if F ."'- ,,"- '" '" <1z E~I-IIE3rr tEr Lee Smick .rom: ent: 0: Cc: Subject: Pat Lynch [pat.lynch@dnr.state.mn.us] Tuesday, September 21, 2004 3:07 PM Lee Smick Lee Mann; watson@co.dakota.mn.us; Brian Nerbonne; Michele Hanson Vermillion River Crossing Preliminary Plat (Spruce Street Development) Lee: I received the mailing regarding the hearing next week on the Vermillion River Crossing Preliminary Plat. Michele Hanson and I have had only a moment to quickly review the materials, and offer the following comments for inclusion in the hearing record next week: DNR staff have met with city staff and consultants in February and March of this year to discuss potential development of this area adjacent to the Vermillion River, a designated trout stream. Our early comments and concerns focused primarily on the anticipated vehicular and trail crossings and on stormwater management. In particular, we expressed our desire to minimize the number of crossings of the channel to protect the high-quality habitat that has been documented along the stream corridor. I'd like to take this opportunity to reiterate those concerns again. There are issues with floodway encroachment associated with crossings as well. Of greater concern are the likely stormwater impacts from the proposed development. The ponding/infiltration areas that are depicted on the current drawings are not much different than those which were shown in earlier drawings which we expressed concern about. We are not .onvinced that the stormwater management as proposed will effectively mitigate the thermal mpacts from the runoff generated by this proposed development. The automotive/service station depicted in the northwest corner of the site does not appear to have its own on-site treatment of stormwater. These types of facilities present a greater risk of contamination to receiving waters. The current plan shows that area being served by the overall site stormsewer system. This may be inconsistent with the requirements of the NPDES Phase II permit requirements. The current proposal closely resembles that which was discussed earlier this year. We were hopeful the city would encourage the incorporation of Low Impact Development (LID) strategies within the Spruce Street development, particularly in light of its proximity to the sensitive and high value trout stream. The high density, high impervious surface coverage proposed is not in keeping with LID design. We respectfully request the Planning Commission consider not approving the preliminary plat until the development incorporates stormwater management strategies that will result in a measurable reduction in stormwater runoff and adequately protect the health of the trout fishery. Pat Lynch Area Hydrologist Michele Hanson Watershed Coordinator . 1 EXH/Str if . DAKOTA COUNTYSOH.t& WATER CONSERVATION DISTRICT Dakota County Extension and Conservation Center 4100 220th Street West, Suite 102 Farmington, MN 55024 Phone: (651) 480-7777 FAX: (651) 480-7775 www.dakotacountyswcd.org September 17, 2004 Ref.: 04-FRM-147 Lee Smick City of Farmington Planning Department 325 Oak Street Farmington, MN 55024 RE: VERMILLION RIVER CROSSING - PRELIlVllNARY PLAT REVIEW Dear Lee: The Soil and Water Conservation District (SWCD) has reviewed the grading and storm sewer plans dated August 24, 2004 for the above-mentioned site. We submitted comments on the Spruce Street ADAR and have had ongoing discussions about this development for the past several months. . Other than the proposed water quality ponds and infiltration basins, there are no temporary or permanent erosion controls shown on the plans. The applicant is required to prepare a Stormwater Pollution Prevention Plan (SWPPP) that complies with the National Pollutant Discharge Elimination System (NPDES). The information submitted does not appear to comply with the NPDES program and most importantly adequately protect water quality. Temperature mitigation and stormwater treatment will be critical elements of the SWPPP. The proposed infiltration areas do not meet standard design specifications, such as those listed in the Minnesota Urban Small Sites BMP Manual (Metropolitan Council). To function properly, infiltration basins need to meet specific design criteria. The following are a few of the concerns' that need to be addressed if the infiltration basins are going to be of beneficial use: . . There should be three feet of separation between the bottom of the basin and high groundwater table. The proposed develbpment plans show infiltration areas where these design criteria may not be met but may be possible. . Vegetation is the key to the long-term viability and aesthetics of the proposed infiltration basins. Accordingly, the maximum depth of water within the basin should be one to two feet (depending on the plant species) with duration of no longer than 72 hours. The plan shows no vegetation in the infiltration basins. . The bottom elevation of the proposed infiltration basins is 1.5 feet lower than the proposed Normal Water Level in the stormwater pond. How will permanent standing water in the infiltration basins be avoided? Shallow standing water will increase water temperatures. . The removal of suspended solids prior to discharge to the basins is an important component of functional infiltration basin designs. We encourage the use of vegetated filter strips or swales to provide this pretreatment. In addition to providing presettlement, these biofilters will reduce runoff and remove other pollutants as well. VermiIlion River Crossing Preliminary Plat Review 04-FRM::!~? 2 ....." · The infiltration system should be designed to allow high flows to bypass the basins. The emergency spillway shown on the north infiltration basins should be eliminated and placed in the water quality pond. · Enhanced ~I'osion control measures are needed to protect infiltration basins during construction. These should be specified on the plans and detail sheets. · Soil compaction should be avoided or corrected in soils used for infiltration basins. This should be specified on the plans and detail sheets. . There are opportunities to reduce stormwater volumes and improve water quality discharged from the site. Bioretention, vegetated drainage swales, reduced impervious areas, and other practices are encouraged and need to be discussed. Many of these same comments were provided in the past. The Spruce Street ADAR Response to Comments and Final Mitigation Plan, dated June 2004, indicated that specific water quality protection issues would be discussed and communicated during the platting process. We expect and anticipate an increased effort by the developer to protect water quality within this portion of the Vermillion River Watershed, a designated trout stream. Compliance with the NPDES permit is uncertain and it is practical and feasible for the City to require submittal of the SWPPP prior to the City approving the preliminary plat. Accordingly, we recommend that the preliminary plat and any potential bid schedule be suspended until the issues noted above are addressed. You may call me at (651) 480-7777 if you have questions. ~ tJ~~ Brian Watson, District Manager Dakota County Soil and Water Conservation District . Cc: John Jaschke, Dakota County Water Resources Manager Pat Lynch, DNR Area Hydrologist Brian Nerbonne, DNR Trout Habitat Specialists Brian Gove, MPCA ~'. . . . . Vermillion River Crossing Preliminary Plat Review 04-FR.M:-147 ....~- "..... 2 -." ~ . The-r:rinltration system should be designed to allow high flows to bypass the basins. The emergency spillway shown on the north infiltration basins should be eliminated and placed in the water quality pond. . Enhanced etosioncontrol measures are needed to protect infiltration basins during construction. These should be specified on the plans and detail sheets. . Soil compaction should be avoided or corrected in soils used for infiltration basins. This should be specified on the plans and detail sheets. There are opportunities to reduce stormwater volumes and improve water quality discharged from the site. Bioretention, vegetated drainage swales, reduced impervious areas, and other practices are encouraged and need to be discussed. Many of these same comments were provided in the past. The Spruce Street ADAR Response to Comments and Final Mitigation Plan, dated June 2004, indicated that specific water quality protection issues would be discussed and communicated during the platting process. We expect and anticipate an increased effort by the developer to protect water quality within this portion of the Vermillion River Watershed, a designated trout stream. Compliance with the NPDES permit is uncertain and it is practical and feasible for the City to require submittal of the SWPPP prior to the City approving the preliminary plat. Accordingly, we recommend that the preliminary plat and any potential bid schedule be suspended until the issues noted above are addressed. You may call me at (651) 480-7777 if you have questions. ~ Jd-~ Brian Watson, District Manager Dakota County Soil and Water Conservation District Cc: John Jaschke, Dakota County Water Resources Manager Pat Lynch, DNR Area Hydrologist Brian Nerbonne, DNR Trout Habitat Specialists Brian Gove, MPCA ...~, . . . ~~-6-23 (fJEJ EXII /13/T :r ......-- 10-6-23 '. (b) Site plans involving properties within approved planned un' developments shall be subject to applicable evaluation criteria in is chapter, '., (c) \.oy major variance proposal will automatically quire the entire apP'tk;:ation to be processed in accordance wit he planning commission). view and city council approval provi ons of section 10-3-7 of this t e. (d) Administrat e approval including all applicable conditions and requirements sh II be made in writing the zoning officer. The applicant, in addition to all other app' able requirements, shall submit a written ackn wledgment of that approval prior to the commencement of any de elopment d prior to the issuance of any permits. (e) Any unresolved disput as to administrative interpretation of city code, ordinance, or oli requirements may be formally appealed pursuant to this apter. (f) Site plans inv ing condition y permitted uses are subject ents found in sec 'on 10-3-5 of this title, 3. Certification Taxes Paid: Prior to app ving an application for a minor project he applicant shall provide ce 'fication to the city that there are 0 delinquent property taxes, ecial assessments, interest, city utility fees due upon the parcel land to which the minor' oject application relates, Major Projects: A "major project" is defined as one both of the following and subject to review as prescribed in this secti n: 1, ConstructioR of new structures that mayor may not be in conjunction with site improvements on redevelopment site or vacant und~ieloped lands, and/or 2. Building projects that comprise more than a thirty percent (30%) building footprint expansion and/or fifty percent (50%) increase in the assessed value of the structure as determined by the Dakota County assessor. (a) Procedures: Pursuant to MSA section 15.99, an application for site plan approval shall be approved or denied within sixty (60) days from the date of its official and complete submission unless extended pursuant to statute or a time waiver is granted by the October 2002 City of Farmington -A.o-6-23 ., 10-6-23 . applicant. If applicable, processing of the application through required state or federal agencies shall extend the review and decision making period an additional sixty (60) days unless this limitation is waived by the applicant. (b) Site Plan Review Requirements: (1) Certificate: Certificate of survey. (2) Filing; Application: Request for site plan approval, as provided within this chapter, shall be filed with the zoning officer on an official application form. Such application shall be accompanied by a fee as provided for in this code. Such application shall also be accompanied by detailed written and graphic materials, the number and size as prescribed by the zoning officer, fully explaining the proposed change, development, or use and a list of property owners within three hundred fifty feet (350') of the subject property in a format prescribed by the zoning officer. The request shall be considered as being officially submitted and complete when the applicant has complied with all the specified information requirements. . (3) Proof Of Ownership Or Authorization: The applicant shall supply proof of ownership of the property for which the site plan approval is requested or supply written authorization from the owner(s) of the property in question to proceed with the requested site plan approval. (4) Recommendation On Action: The zoning officer shall coordinate the review of the site plan, and provide general assistance in preparing a recommendation on the action to the planning commission. _ (5) Additional Information Upon Request: The planning ,',' commission and city staff shall have the authority to request additional information from the applicant concerning operational factors or to retain expert testimony at the expense of the applicant concerning operational factors. Said information is to be declared necessary to evaluate the request and/or to establish performance conditions in relation to all pertinent sections of this chapter. Failure on the part of the applicant to supply all necessary supportive information may be grounds for denial of the request. . October 2002 City of Farmington ....lQ.-6-23 1 Q-6-23 . (6) Planning Commission Appearance: The applicant or a representative thereof may appear before the planning commission in order to present information and answer questions concerning the proposed request. (7) Recommendation Of Actions Or Conditions: The planning commission shall recommend such actions or conditions relating to the request as they deem necessary to carry out the intent and purpose of this chapter. (8) Approval By Majority Vote: Approval of the site plan shall require passage by a majority vote of the planning commission. (c) Certification Of Taxes Paid: Prior to approving an application for a major project, the applicant shall provide certification to the city that there are no delinquent property taxes, special assessments, interest, or city utility fees due upon the parcel of land to which the major project application relates. (F) Evaluation Crit~ria: The planning commiSSion shall evaluate the effects of the proposed site plans. This review shall be based upon compliance with the city comprehensive plan, the zoning ordinance and other city codes and policies. . (G) Information Requirement: The information required for all site plan applications generally consists of the following items, and shall be submitted when requested and specified by the zoning officer: 1. Site Plan: (a) Certificate of survey. (b) Name and address of developer/owner. (2) Name and address of architect/designer. (d) Date of plan preparation. (e) Dates and description of all revisions. (f) Name of project or development. (g) Scale of plan (engineering scale only, at 1 inch equals 50 feet or less). . October 2002 City of Farmington ..,.w-6-23 --" 10-6-23 . (h) North point indication. (i) Lot dimension and area. (j) Required and proposed setbacks. (k) Location, setback and dimension of all buildings on the lot including both existing and proposed structures. (I) Location of all adjacent buildings located within one hundred feet (100') of the exterior boundaries of the property in question. (m) Location, number, dimensions, and type of surfacing material of existing and proposed parking spaces. (n) Location, number, dimensions, and type of surfacing material of existing and proposed loading spaces. (0) Curb cuts, driveways. (p) Type of surfacing material. ;l) (q) Vehicular circulation. . (r) Sidewalks, walkways. (s) Location and type of all proposed lighting. (t) Location of recreational and service areas. (u) Location of rooftop equipment and proposed screening. (v) Provisions for storage and disposal of waste, garbage, and recyclables. (iN) Location, sizing, and type of water and sewer system mains, fire hydrants closest to the property and proposed service connections. 2. Grading/Storm Water Drainage Plan: (a) Existing contours at two foot (2') intervals. (b) Proposed grade elevations, two foot (2') maximum intervals. . October 2002 City of Farmington ....1,0-6-23 -- . 10-6-23 . (c) Drainage plan including configuration of drainage areas and calculations. (d) Storm sewer, catch basins, invert elevations, type of castings, and type of materials. (e) Spot elevations. (f) Proposed driveway grades. (g) Surface water ponding and treatment areas. (h) Erosion control measures. (i) Calculation of total square footage of site to be covered with impervious surfaces. 3. Landscape Plan: (a) Planting schedule (table) containing: (1) Symbols. . (2) Quantities. (3) Common names. (4) Botanical names. (5) Sizes of plant material. (6) Root specification (bare root, balled and burlapped, potted, etc.). ~" (7) Special planting instructions. (b) Location, type and size of all existing significant trees to be removed or preserved. (c) Planting detail (show all species to scale at normal mature crown diameter or spread for local hardiness zone). (d) Typical sections in details of fences, tie walls, planter boxes, tot lots, picnic areas, berms and the like. . October 2002 City of Farmington -~tO-6-23 10-6-23 . (e) Typical sections of landscape islands and planter beds with identification of materials used. (f) Details of planting beds and foundation plantings. (g) Note indicating how disturbed soil areas will be restored through the use of sodding, seeding, or other techniques. (h) Delineation of both sodded and seeded areas with respective areas in square feet. (i) Coverage plan for underground irrigation system, if any. (j) Where landscape or man made materials are used to provide screening from adjacent and neighboring properties, a cross through section shall be provided showing the perspective of the site from the neighboring property at the property line elevation. (k) Other existing or proposed conditions which could be expected to affect landscaping. 4. Other Plans And Information (May Be Required By The Zoning Officer): .. (a) Legal description of property under consideration. (b) Proof of ownership of the land for which a site plan approval has been requested. (c) Architectural elevations of all principal and accessory buildings (type, color, and materials used in all external surfaces). (d) "Typical" floor plan and "typical" room plan. \r) Fire protection plan. (f) Extent of and any proposed modifications to land within the wetland, shoreland or floodplain district as described and regulated in this title. (g) Wetland delineation and report. (h) Type, location and size (area and height) of all signs to be erected upon the property in question. . October 2002 City of Farmington --4.0-6-23 10-6-23 . (i) Certification that all property taxes, special assessments, interest, or city utility fees due upon the parcel of land to which the application relates have been paid. (j) Solid waste removal plan. (H) Lapse Of Approval: 1. Unless otherwise specified by the zoning officer or planning commission as may be applicable, the site plan approval shall become null and void one year af1er the date of approval, unless the property owner or applicant has substantially started the construction of any building, structure, addition or alteration, or use requested as part of the approved plan. The property owner or applicant shall have the right to submit an application for time extension in accordance with this section. . 2. An application to extend the approval of a site plan for up to an additional one year shall be submitted to the zoning officer not less than thirty (30) days before the expiration of said approval. Such an application shall state the facts of the request, showing a good faith attempt to utilize the site plan approval, and it shall state the additional time being requested to begin the proposed construction. The request shall be heard and decided by the zoning officer prior to the lapse of approval of the original request. After two (2) years have expired without substantially commencing construction, the site plan shall become null and void and no further extensions can be granted. The site plan review process must be reinitiated for projects that have exceeded two (2) years. ( 3. In making its determination on whether an applicant has made a good faith attempt to utilize the site plan approval, the zoning officer or the planning commission, as applicable, shall consider such factors as the type, design, and size of the proposed construction, anyppplicable restrictions on financing, or special and/or unique circumstances beyond the control of the applicant which have caused the delay. (I) Site Improvement Performance Agreement And Financial Guarantee: Following the approval of the site plan required by this chapter and before issuance of a building permit, the applicant, as required by the city, shall guarantee to the city the completion of all private exterior amenities as shown on the approved site plan and as required by the site plan approval. This guarantee shall be made by . October 2002 City of Farmington -;t.Q-6-23 10-6-23 . means of a site improvement performance agreement and a financial guarantee as provided below: 1. The applicant shall execute the site improvement performance agreement on forms provided by the city. The agreement shall be approved as to form and content by the city attorney and shall define the required work and project completion schedule and reflect the terms of this section as to the required guarantee for the performance of the work by the applicant. 2. The required work includes, but is not limited to, private exterior amenities such as landscaping, private driveways, parking areas, recreational fields structures or buildings, drainage systems, water quality ponds, wetland mitigation, wetland buffers, erosion control, curbing, fences and screening, and other similar facilities. The required work shall also include all aspects of a tree preservation plan and reforestation plan, if applicable. 3. A financial guarantee shall be submitted with the executed site performance agreement as provided herein: . (a) Financial guarantees acceptable to the city include cash escrow; an irrevocable letter of credit; or other financial instruments which provide equivalent assurance to the city and which are approved by the zoning officer. (b) The term of the financial guarantee shall be for the life of the site improvement performance agreement, and it shall be the responsibility of the applicant to ensure that a submitted financial guarantee shall continue in full force and effect until the zoning officer shall have approved and accepted all of the work undertaken to be done and shall thereby have released the guarantee or reduced the amount of the guarantee as provided in this section. (c) When any instrument submitted as a financial guarantee contains provision for an automatic expiration date, after which the instrument may not be drawn upon, the expiration date shall be November 15. Further, it shall be the responsibility of the applicant to notify the city in writing, by certified mail, at least sixty (60) days in advance of the expiration date of the intention to renew the instrument or to not renew the instrument. If the instrument is to be renewed, a written notice of extension shall be provided thirty (30) days prior to the expiration date; if the instrument is not to be renewed, and has not been released by the zoning officer, another acceptable financial guarantee in the appropriate amount shall be . October 2002 City of Farmington ""lC-6-23 ...-- 10-6-23 . submitted at least thirty (30) days prior to the expiration. The term of any extension shall be approved by the zoning officer. Upon receipt of an acceptable substitute financial guarantee, the zoning officer may release the original guarantee. (d) The amount of the financial guarantee shall be established by the zoning officer based upon an itemized estimate of the cost of all required work. A cash deposit or irrevocable letter of credit shall be in the amount of one hundred twenty five percent (125%) of the approved estimated cost. The amount of any other approved financial instrument shall be determined by the zoning officer. (e) The applicant may submit a separate financial guarantee for that portion of the required work consisting solely of landscaping improvements with another financial guarantee for all other exterior amenities and improvements which comprise the work. . (f) The time allowed for completion of the required improvements shall be set out in the site improvement performance agreement. The agreement and the financial guarantee shall provide for forfeiture to the city to cure a default or reimburse the city the cost of enforcement measures. As various portions of such required work are completed by the applicant and approved by the city, the zoning officer may release such portion of the financial guarantee as is attributable to such completed work. Landscaping materials shall have a two (2) year guarantee provided to the city. (g) The applicant shall notify the city in writing when all or a portion of the required improvements have been completed in accordance with the approved plan and may be inspected. Upon receipt of such notice, the zoning officer shall be responsible for the inspection of the improvements to determine that the useful life of all work performed meets the average standards for the particular industry, profession, or material used in the performance of the work. AnY"required work failing to meet such standards shall not be deem"ed to be complete and the applicant shall be notified in writing as to required corrections. Upon determination that the work has been completed, including the winter season survivability of all landscape improvements, a notice of the date of actual completion shall be given to the applicant and appropriate action, to release or to reduce the amount of the financial guarantee shall be taken by the zoning officer. (J) Minnesota State Building Code: The review and approval of site improvements pursuant to the requirements of city adopted building . October 2002 City of Farmington ....,.1.0-6-23 . (K) (L) 10-6-24: . (A) (B) . 10-6-24 and fire codes shall be in addition to the site plan review process established under this section. The site plan approval process does not imply compliance with the requirements of these building and fire codes. Plan Agreements: All site and construction plans officially submitted to the city shall be treated as a formal agreement between the building contractor and the city. Once approved, no changes, modifi- cations or alterations shall be made to any plan detail, standard, or specifications without prior submission of a plan modification request to the zoning officer for review and approval. Significant changes as deemed by the zoning officer may be subject to planning commission review and approval. Enforcement: The zoning officer shall have the authority to order the stopping of any and all site improvement activities, when and where a violation of the provisions of this section has been officially documented by the building official. (Ord. 002-469, 2-19-2002; amd. Ord. 002-477, 7-15-2002) B D AND BREAKFAST STANDARDS: Intent And P pose: The city recognizes tha ed and breakfasts are an asset to t community and help t preservation of historic structures becau the expense of ow mg and maintaining historic structures has ma them less suita e for single-family dwellings or businesses. Conversi of historic ructures into multi-family uses is usually determined by e nei orhood where it is located. It is therefore the intention of e . y to limit bed and breakfast uses to those structures where the se would benefit the surrounding area by allowing appropriate a ive reuse of historic structures. Bed and breakfasts are allo ed by conditional use permit, subject to the conditions provid Ci under s tion 10-3-5 of this title and the following conditions in the R-1, , R- T, R-D and B-2 zoning districts as regul ed in this sectio subject to the conditions outlined in subse ion (B) of this section. Standards: / 1. The structure is listed on the National His ric Register, designatkd on the city's list as a Farmington heritage ndmark or identified as an historically significant property by the ritage preservation commission. August 2003 City of Farmington . . -"':rG-6-24 10-6-24 2. The bed and breakfast shall be occupied by the owner or an agent of the owner. 3. At least two (2) off street parking spaces shall be provided on site for the owner or manager and one additional parking space per rental unit. Parking spaces shall be hard surfaced with concrete or asphalt and shall be well drained. The parking shall not be located between the front face of the principal structure and the street. 4. The dining facilities shall not be open to the public and shall be used exclusively by the registered guests unless allowed as a separate permitted or special use. 5. An identification sign not exceeding four (4) square feet may be located on the site. The sign must match the architectural features of the structure. The sign may be located on the house or five feet (5') from the property line. The sign may not be illuminated. 6. A maximum of five (5) bed and breakfast units may be established in a structure and at least one bedroom must be reserved by the property owner(s) or agent. 7. The owner of the bed and breakfast shall maintain a guest register showing the name, address, motor vehicle license number, and inclusive dates of visits of all guests. No guest shall be permitted to rent accommodations or remain in occupancy for a period in excess of fourteen (14) calendar days during any consecutive ninety (90) day period. ( \ 8. The structure and performance of the operation of the bed and breakfast and residence shall comply with all local, county, and state regulations. 9. The facility shall obtain all applicable local, county, and state licen~i~s as required for food service, lodging, and other service provided at, or in conjunction with, the facility. 10. The property shall comply with all bulk and density standards required in the applicable zoning district. 11. The property shall comply. with applicable screening and landscaping standards required by the zoning ordinance. 12. All rental units shall be established within the principal structure. This requirement may be waived if the planning commission - '\ August 2003 ~ City of Farmington . . . EXI!18rr J City of Farmington 325 Oak Street, Farmington, MN 55024 (651) 463-7111 Fax (651) 463-2591 www.ci.farmington.mn.us TO: Community Development Director, Director of Public Works/City Engineer, Engineering Division, Parks & Recreation Director, Fire Marshal, Building Official FROM: Lee Smick, AICP City Planner RE: Vermillion River Crossing Preliminary Plat - Parking Analysis DATE: August 30, 2004 A parking analysis for the Vermillion River Crossing Preliminary Plat was prepared and the following calculations were determined: Lot 1 Block 1 Convenience Store - Retail = 1 parking space1200 square feet plus 1 per employee 7,000 sf- Required Parking = 35 spaces + Number of Employees Proposed Parking = 31 spaces Shortfall of 4 or more parking spaces Lot 2 Block 1 Retail = 1 parking space/200 square feet plus 1 per employee 6,000 sf - Required Parking = 30 spaces + Number of Employees Proposed Parking = 83 spaces Overage of approximately 53 parking spaces . . . Lot 3 Block 1 Retail = I parking space/200 square feet plus 1 per employee 6,000 sf - Required Parking = 30 spaces + Number of Employees Proposed Parking = 83 spaces Overage of approximately 53 parking spaces Lot 4 Block 1 Automotive - Minor = 2 parking spaces/bay + 2 parking spaces/service station Required Parking = Unable to determine number of bays or service stations Proposed Parking = 28 spaces Lot 5 Block 1 Retail = 1 parking space/200 square feet plus 1 per employee 27,000 sf - Required Parking = 135 parking spaces + Number of Employees Proposed Parking = 193 parking spaces Overage of approximately 58 parking spaces Lot 6 Block 1 Retail = 1 parking space/200 square feet plus 1 per employee 10,800 sf - Required Parking = 54 parking spaces + Number of Employees Proposed Parking = 44 parking spaces Shortage of 10 or more parking spaces . . . Lot 7 Block 1 Retail = 1 parking space1200 square feet plus 1 per employee 114,000 sf - Required Parking = 570 parking spaces + Number of Employees Proposed Parking = 218 parking spaces Shortage of 351 or more parking spaces Lot 8 Block 1 Retail = 1 parking space/200 square feet plus 1 per employee 27,800 sf - Required Parking = 139 parking spaces + Number of Employees Proposed Parking = 105 parking spaces + Number of Employees Shortage of 34 or more parking spaces Mixed Use Housing Units? Lot 1 Block 2 Retail = 1 parking space/200 square feet plus 1 per employee 4,900 sf - Required Parking = 25 parking spaces + Number of Employees Proposed Parking = 22 parking spaces Shortage of 3 or more parking spaces Lot 2 Block 2 Retail = 1 parking space1200 square feet plus 1 per employee 4,000 sf - Required Parking = 20 parking spaces + Number of Employees Proposed Parking = 18 parking spaces Shortage of 2 or more parking spaces . . . Lot 3 Block 2 Class II Restaurant = 1 parking space/every 2 customers to maximum seating capacity 4,600 sf - Lot 4 Block 2 Required Parking - Unable to determine number of seats in restaurant Proposed Parking = 66 parking spaces Retail = 1 parking space1200 square feet plus 1 per employee 27,000 sf - Lot 5 Block 2 Required Parking = 135 parking spaces + Number of Employees Proposed Parking = 78 parking spaces Shortage of 57 or more parking spaces Hotel = 1 parking space/rental unit + 1 parking space /employee 50 Units - Lot 6 Block 2 Required Parking = 50 parking spaces + Number of Employees Proposed Parking = 77 parking spaces Overage of approximately 27 parking spaces Retail = 1 parking space/200 square feet plus 1 per employee 26,000 sf - Required Parking = 130 parking spaces + Number of Employees Proposed Parking = 188 parking spaces Overage of approximately 53 parking spaces Mixed Use Housing Units? Required Parking not including employees and Lot 4 Block 1 and Lot 3 Block 2 = 1,353 Proposed Parking not including employees and Lot 4 Block 1 and Lot 3 Block 2 =;: 1,234 Shortage of 119 parking spaces . . . ~~ Lee Smick, AICP City Planner I I .. I I I I I I Ie I I I I I I I Ie I eXfll8;( j( ---.-.:..... Electrical outlet 30" cast aluminum crossarm lO I 'V Color shall be PANTONE S60C (Dark Green) Multi-volt (1 OS-28S) NSP material specs. +DOE-48. Fisher Price model +6690B-ES638S09 OAE Photo lamp 3" x S" min. handhole COLUMBUS Base mounted extruded aluminum pole 3" 00 10 AMP fuse 30 Electrical conduit Screw in anchor base 60" long shaft by S-S/8" diameter slats for 1 0-1S" bolt circle diameters See footing detail city standard plate GEN-04 ~ . "4 .. .- .- 4' 0" Ii " NOTE: 1. A tapered screw in base may be used as an alternate to the concrete base if approved by the City Engineer. 2. Lamp-100W/SSV, 1SSW/SSV clear mogul based lamps. 3. Fixture-70W/120V, 100W/120V, 1SOW/120V HPS high performance acorn style luminaire Type III light distribution. NOT TO SCALE STANDARD DETAILS STREET LIGHT DOWNTOWN DISTRICT - Lost Revision: -May 2000 City Plate No. ( FARMINGTON, MINNESOTA J GEN-07 H: \STANDARDS\SIANDARD PLATES\GEN-07.DWG . . . City of Farmington 325 Oak Street, Farmington, MN 55024 (651) 463-7111 Fax (651) 463-2591 www.ci.farmington.mn.us TO: t'fC- City Planning Commission FROM: Jim Atkinson Assistant City Planner SUBJECT: Zoning Code Text Amendments for Title 10 Chapter 6 Section 27: Erosion Control DATE: September 28, 2004 INTRODUCTION The City of Farmington is proposing to revise Title 10 Chapter 6 of the City Code to establish erosion control measures. DISCUSSION Currently, the City Code mandates erosion control during the initial construction process, but does not regulate erosion-causing situations that arise after a home or business is constructed. These situations are typically caused by landscaping projects or other property improvements that remove vegetation, thereby causing sediment to be carried onto public rights-of-way and/or adjacent properties. The attached ordinance is similar to those used by other Cities in the Metro area. It includes acceptable types of erosion control measures, it establishes a time period after which exposed soil must be covered, and it requires that sediment carried onto City streets and/or adjacent property be removed daily. ACTION REQUESTED Recommend approval of the proposed ordinance. Respectfully submitted, Q~ ()j = Jim Atkinson Assistant City Planner . . . ORDINANCE NO. CITY OF FARMINGTON DAKOTA COUNTY, MINNESOTA AN ORDINANCE AMENDING TITLE 10, CHAPTER 6 OF THE FARMINGTON CITY CODE REQUIRING PROPERTY OWNERS AND CONTRACTORS TO IMPLEMENT EROSION CONTROL MEASURES WHEN LANDSCAPING, EXCAVATING, OR FILLING. THE CITY COUNCIL OF THE CITY OF FARMINGTON ORDAINS: SECTION 1. Title 10, Chapter 6 ofthe Farmington City Code is amended by adding a new Section 27 to read as follows: 10-6-27: EROSION CONTROL REQUIRED: (A) A property owner or contractor who removes substantial vegetative growth for any reason including landscaping, excavates for a building foundation or other purpose, or adds soil or other fill on property within the city shall adhere to erosion control measure standards and specifications contained in the Minnesota Pollution Control Agency publication "Protecting Water Quality in Urban Areas", as may be amended, the City of Farmington Comprehensive Plan and official controls, and any applicable water management plan of the City or other governmental units. Except as other measures are required by the above documents and plans, property owners and contractors shall take the necessary precautions, outlined below, to prevent soil erosion, damage to adjacent property and control of surface water runoff. The City may impose additional erosion control requirements if, in the opinion of the Director of Public Works or designee, said measures are necessary to protect adjacent properties and manage surface water runoff. 1. No land shall be developed and no use shall be permitted that results in water runoff causing flooding, erosion, or deposit of sediment on adjacent properties. Such runoff shall be properly channeled into a storm drain, watercourse, ponding area, or other public facilities subject to the review and approval ofthe Director of Public Works or designee. Appropriate erosion control measures shall be taken throughout the construction process. They include but are not necessarily limited to the use of erosion control fences, wood fiber blankets, rock construction entrances, seeding and/or mulch. Other techniques or combinations ofthe above may be used. The erosion control measures shall be maintained and repaired throughout construction and until such time as the property has been either sodded or a seeded vegetative cover has taken hold. All temporary erosion control devices including silt fence, gravel, hay bales or other measures shall be removed from the construction site and properly disposed of or recycled. This removal and . disposal must occur within thirty (30) days of the establishment of permanent vegetative cover on the disturbed area. 2. Proposed erosion control measures may be approved by the Director of Public Works, or designee, as part of site plan, landscaping or grading plan reviews. Erosion control may be specified by the Director of Public Works, or designee, as part of a site survey for individual building permits or other city approvals. Erosion control measures may also be specified by the Director of Public Works, or designee, as needed and deemed appropriate during the construction and post- construction periods for permitted or unpermitted activities separate from the above. 3. No dirt piles or spoil banks shall remain exposed without a protective cover to prevent erosion for a period longer than 7 days. No soil surface shall remain exposed without seeding, if allowed, or sodding or by mulching or covering or other equivalent control measure for a period longer than 7 days. Seed shall be a blend of rye grass or other fast germinating seed in addition to perennial grasses suitable for the soil and the exposure of the area to sunlight. All seeded areas shall be mulched and disc anchored, or covered with a Minnesota Department of Transportation approved fiber blanket, as necessary for erosion protection and seed retention. The Contractor should recognize that time is of the essence in controlling erosion . 4. Mud, dirt, or other sediment carried onto city streets, trails or adjacent properties from the building site shall be removed by the property owner or contractor prior to the close of each work day. If cleanup of the mud, dirt or other sediment is not carried out as required above, the Director of Public Works, or designee, may direct City crews and/or contract a third party to complete the clean up and bill the property owner or contractor for all associated costs, or deduct these amounts from any required bond or security. Unpaid charges will be certified by the City for collection with taxes and no city license, permit, or other approval shall be issued for the property while any charge is outstanding. 5. Failure to comply with any of the above requirements will result in the issuance of a Stop Work Order halting construction until the project area is brought into compliance. Failure to remedy the situation within a reasonable time determined by the Director of Public Works or designee will result in the issuance of a citation for violation of this subdivision. Failure to have erosion control measures in place may also result in denial of a certificate of occupancy for the structure under construction. SECTION 2. This ordinance shall be effective immediately upon its passage. . ADOPTED this _ day of Farmington. 2004 by the City Council of the City of . CITY OF FARMINGTON Gerald G. Ristow, Mayor David M. Urbia, City Administrator SEAL Approved as to form the day of ,2004. City Attorney . Published in the Farmington Independent the day of , 2004. . . City of Farmington 325 Oak Street, Farmington, MN 55024 (651) 463-7111 Fax (651) 463-2591 www.ci.farmington.mn.us TO: L'\;V Planning Commission ' FROM: Lee Smick, AICP City Planner SUBJECT: Mattson Farm Preliminary Plat (continued) DATE: September 28, 2004 INTRODUCTION/DISCUSSION . The Planning Commission, at its meeting on September 15, 2004, continued the public hearing for the Mattson Farm Preliminary Plat until September 28, 2004 in order to address issues regarding grading of the site and its impact on adjacent wetlands. The applicants submitted a revised plat and corresponding documents on September 20, 2004. Staff is currently reviewing the revised plat and may have comments prepared in time to present to the Commission on September 28, 2004. The main unresolved issues are listed below. 1. A pond is necessary on the site to treat stormwater prior to draining into the wetland that is partially located on the property. The pond would satisfy the requirements of the NPDES permit governed by the MPCA. The latest plat submittal shows a pond, which the Engineering staff is currently reviewing to determine whether it meets MPCA requirements. Given the date of the revised submittal, comments will not be available prior to delivery of the Planning Commission packets on Friday, September 24, 2004. Comments may be available by September 28, 2004 to present to the Commission at the meeting. 2. As shown on the Existing Conditions page in the attached submittal (page 4 of 5), a shed owned by the property owner to the south is partially located on the Mattson Farm property. This is an issue because grading is proposed in this location. Options to resolve this situation include (1) move the shed off the Mattson Farm property, or (2) the property owner to the south could purchase the portion of property on which the shed is located. . The plat could be approved as submitted if the shed is eventually moved off the Mattson Farm property. If, however, the property owner to the south purchases the land around the shed, the boundary of the plat would change, thereby requiring the plat and grading plan to be modified. Therefore, prior to plat approval, this issue should be resolved to avoid the need to re-plat at a later date. . 3. In addition to the shed, a septic system drain field partially exists on the Mattson Farm property that serves the property to the south. The drain field is located to the west of the shed previously discussed. The same options exist for the drain field as do for the shed. This issue should also be resolved prior to plat approval. ACTION REQUESTED The Planning Commission may: 1. Continue the plat until October 12, 2004 if engineering comments are not available, if issues with the design of the pond still exist, and/or the issues regarding the shed and drain field are not resolved. 2. Recommend approval of the plat if the previous engineering issues have been satisfied and the issues regarding the shed and drain field have been resolved. . R;2l:i2 Lee Smick, AICP City Planner cc: M. P. Investments . . . . I I 10""""--- ---- - ----- _ __'" _ ____ -of<"'J' c.,,,''' " /'_ c<>",<"",,-off ~ I~ .:- ~ r : '1'~ : ~ \ ,-- \ ~>_ \ ~2 \ '" \ 0 \ c" ~,.' ~ ~ "0 ~ z 0 u U1 ---- ----- I "0 '" ~~ I 'f. t' i~ u" !~ " 1::.... ~ 0 ... o ; ~ ~ omO on al ~ 0'" ~ ~~~.l ~$:~ l:! ~;~~i 11i .. ~ 5~ l<.]~: <0 ~~ ~...~I.I. l~~~! "E:;: Qii-iu" ~a~a o ~.... a. a. ... >- VI >- r-iil~~~ l~jJ "- -< .::;: >- f- Z Q > ~tg.55 tl,~'5t'~1""11 <( 0, z' . <C. , ~,' I- ~ ~ ...,' " ~~ o ~ ::> o l ",'" ",:"' .., "''" ",. ..~ '" '" ---- ------ ~:l \ \\~ ~~- . ' \j~ c~ ~\ \~} --...-...-- --- -' ' I' ,\ ( \ \ \ ~.(." \'~ '_I ..... ,~.. a ~ J t"..- G g, ~ ~!~~m j j :i~J'h 6 ~ Hl'.~l i= t lUi~jl Q;:! '0 ~"i~]~; ~ 5:' j~_r:.:;: : [;J jj ~~!1 )i~ ~ I-~~; ~iii~i~ ,. . l' ';! ffi ~l l;;~P~i ~ ~ ll" ~!~l;i' g: ~. ~~~!i": ~" .....01'1 . .l.~~l'tt ..ci;-~ ~ 1; -i .._-..1: . u Oi... s_ ~~ d ~ ~ ~ " QI .n ~ ~ ~~ ~ .~ ~ tIl W a: E~..~:3a:~ :i S! !~ ~.! .1 J ~it ~~~l ~ a: ~~~ ct2~~ i ': ~ ~ ~ J 1 a :i ~ ~ ~ .50 r .5 ~ -. :.::.:::~:~..:-.:~- 2, ,::;) C"'-: / ,., ~ ":......... '~~', \:., ;:"~) pcn\ ...~l~ 1.....-. -_...-~ ,- '-' I , N 0- W V") / ....---- ~~~' ,ir "IS- eiO $ ~; ;~\/'/' I)', \ \ ....:..~> \ '" '-... rJ) ......~ ~~ 0p,:.. Oz .S: 0 .1:: rJ) ~~ Q~ o ~.! I"'" i ... 0 l:~' ,:!I en ~ J ~ ~ ;~ 5~ i ~ ~ j - ~ go a.: (II g ~ ::E ~ ~ ...-- .t-.l..~G'.,':;j / / ~ I ~ ~ ; . ~~ I~ ~ffi ~ ~~ ~ so. v ~ ;;q C!) .~ ~ z" ~ cc ~ "'cc' ",'" ~ ~ coZ":' 0 ~j . ~ i . o "" s ~ <r , <r !t <olSCl::'g~lM z~~w,.. z ~~&;~ ~ ~2~!5~ ~ ~g~tii~ ~ i~~~~ ~ ....J~~I ~~~gg:g ...... ~ 0 8 g: g: ~ ~~~~t:] ; OOOOb I- ~~~.~~ ~ ...~....,- , ~';:-::::::5:'- ._" ':-:;';':"7~;:.i OJ o u VJ it~I!\ id 1 ;~ ~~ ......J o N C- UJ en .,~:_~ c.~.~.__~ ~ o ..J ~ :J o ~ ~~~ ~ <(<lil.. ;:) .......<1 fTI ~..~ g; S: / ~ d $t l" ~~ Q~ 0>' ..;;; '" :!::;~ d~i ~-:=4 -------- \ . \ -'t- .~. '" IS", ",' '.-/ , t.:.;. " ---- \~, ll~ \ ... If) ~1.: ~ \ ..... f)} \ Cl a: r<J () c. c: .Q l'J.l a.: S ~~ 35r:r.. ~d \:) 0 .S ~ ~~ ~::il a.: -----' ~ ~ 'i ~ ~'II i i~. : l~i~~.::E ...-- ~ 1 ~ g:~ .s ~ : ,,~. ~~~ - ~ go a. ". 'E ~ :i;~ e l ~ U 59 ~~ n .l1 111 I ~~ h ~~ ~~ 8 ~ I 'i ~ . i v ~ Zt;i l!>-& Z:>:. ;;:z: wa::l;; \IIw~;:' cnZ.tC. ~ 0- 0 ~ a::~u a:..J -,- -.-\--............-. ~~~ .......: '.... u: u: I 1'0), & u: & ~~ & <fl ~i~ ! <fl ;:; M <fl q~ h u: to M .. ~a " . . ... '" ui-.._ .;~~ ~~~ ~ r-: & 0 -'---'~ ~~ ~" ",- II.,^.~'':~~-- . a ~ 0" f~ II <fl lli-- -_~\ l:g~ ::l'l II - ~ ~ <~. lli ~ ...J a ~ ~ ; !~i "'- C<:.-...-----.---l C<: W <1:. ,----.----. ~ 0 : ; tt.8.5u <1: > ... HH >- 1/ w '5.d t:: ~ lit f ~ 0 w a ...J :r: ' . ~ '" w a C<: ;:: 0 >< a ~ ~ ~ ~ w Eo-< ~. . . ~ ~ i z l- I- W ,(!i, i:t u ~ 0:: ~ - I c c . . 0 <1: <1: l- e - nB " " " . . 1= W ~ ,_~E.i _. 0 ~ ! ! Big <1: Cl. C<: 01 Z . . ;!l U ~,,:i.., ,.. Q) .3 0 '" ...J ,t:: '0 ~ ....... III '" . . . I- 0 a ~ -.-0' ~-' i5 to <fl u ~ ~ ~ ~ ~ ~ i ~ z z ::~] r.:... <Il ::J Q ~ Q C ~ ~ ::5 ::5 C<: N e ~ ~ ~ ~ . . . . . 0 (/)) 1+ l- I- Z -- <- C.=i = w w w 'j l' I I s: s: ~'_i~ 0- ?;-g , 0:1( l.J..J }) 1 t t . I ...J ...J <1:....-.I! } I <1: <1: V) , l- I- l1J -\-' o+J t; : I 3 ~ ~ 0 0 ~ Prlf' oS: ~ d l- I- 0 ~ I ~ ~ -2~L ,I: ::!l .,~ ..:::: . ~ ~ ~~\ a.. . It !; //!: y.-,,/ )"1, . /./' /.., m! Ii '/' ..- w \ 1.' !t h -~~ l\ I' , i,C~1' i - \} Ill-.#: ~~.r/r --=- ----- ), I' --1-1/ / !~' / I~ (-- --- I J )0/ flU / Ii; . ,\ ...../ I.I!' Ii ., /., .'. \ ~... f I ~i \ ( , (I~I \ I \ "~\.\ 'I: !l!.' \ \ Ij \ \.' ,~ \ \ . \ ~8 ___ 1 \ \ \ ~:l ~ "il i \!i : "' \ !l\ '- \1 \ " -+ " '- f .--: -\\ \ \ \ . ~ ~.. ~ ~. ::) :s :.. @ ~.~ ~ ;::' '" ;:j ,-- co oz.\&~~~ ~\..,.'2.\ ~~". .:- ~ ---- ---- ---- I II I II.!, (' it,' !f' I' I!I !!: \ II !,I i !I !iilllll ,.I!lll'l'll'IIII\'!1 '1"'1,', I'il, flli"l'I'111 H...i \ i 1.1:1 I. 111t!!1I ll:'l"'II,'lllhIl1ijl \ ~[I! ~' ~ ~If !h! !!.I ~i '" o (-i 111/ !Iil," :lj,l,'! ,'11'1' 11 iid 1=11," , /11111' I , '1 I' "I. ,I I il~ ':,'1'11 'I' l'l!ill :1}lji 1'i'j'!I!P,:1 ',Ii "I · I I !I,', , l'lli! 1,!III'fllli! Mil! ',Ii !lIlllrlllll li1b II: .1 :1 I" 111,1 ",II": 11'11 . ~m ~!:l!li !!i !liIl! ~!i ~:I!!I! !1I: !Il! ill I "'Ifl!i I ~I iw fi I "IlI:I'1 lljlffi II l ij': ~ - i II "I ,!i!ll:III' I, !il;!'l: l'ljj 'f '! ! I ilb :1 f III II Ii j=1 : ~Wfi: ,II Ii I I'/jti/,j '.111," jll! "Ii: Ii . i · I..' !'!!u'fil dl:l'III~~H'II'I'lq~ !II!! .II I i! hl :,' ~1!\jJ. illJ ! I I fllll'l'lldl::lll H P 'I Hi{ 11 II .'J II n'!::i · II .. f ! ';'1 .. H,-." illl!II!!!!!!!I! !!! !I ili,;1 ~~illil i!ti ld!l!ill!!!~ ~~ll! JIll! j lllllli, ~~~!!i!!:!mlli I,ll 1,;1 !1I.1i ~lfi:Uf1!I'l !! j:llllill l!' :,il,nhlll!fj~!hJ!:. "-.., ~~~I:~I ~ ~ ~ E ~ ~ Ui Vi :J. ~~! ~: .~ ~ ::;; ~ ~ I ~ I g~ h ~~ ~~ ~ ~ . ~ ~ . , vm ~9 ~ .~ Z>~ a:Z: ~g:3 \Uz:::i:fj Ot? 0 - cr:J . ~ is ~ ~ z iL~~ ~ i~ \~O --.-- \~?-., ~) I/.J t- i/ c":i \c::J \~~J i /, \' :(.~) o N 0- W r..r; i flfd11 [!(~~~~::;.._J 4\g.~~ S\S'~\'S~"t ~ ~~~ ~ <t:(c"c .::) -J "Ie ~ ~1f~ ~ S:: ~ ~ . --- . o <t ~ '" '<i '" o ~ "- V1 "' O! N N '-'VI ~~ ~~ >-~ tl)~u ~ S~~ 2: 32:~ 8 a: ~~~ ~ ~ g~8 ~ a I ~ u ~ 0 eJ ~ :J ~ ~ ~ ~ ~ ~ ~ ~ ~ Ii; ~ I- 0 X <a j;? W wGl :di r l f I I \ ~ : ; I I II ~ ~ Ci) .f5 S ~ J-i '6 cd c:Pr.. 8 a O\~ ~~ .~ cd ~::a -' w ~ '" a. S ~ 2) -; . ~i~ ...... ; c: "' ~. ~ ~ 2' - ~ ~ a.. ;"E ~ ::q~ i , . a g~ , h · ~i ~ - ~ ~ u ~ ~" \!) ) z>' c;:z: \U~ f ~ C!:lz::E ~ ~j . /",-" S\ , .... r~F---""- i~J _. i,,~ 2) i "":;::; ~ l~ 0 I [g'ij N 1(Q) ~ Innfl il~ I(~ L'-- . . ~~ ~ ~~ ~~ '0 alto D ~ '6 .~ ~ HiB i.1 , '-.=. [.8.,1 - i w ~~. J f!~~i ':e ~ ;s~.r~ ~.i .~ i;Ui ;: · i. !~,~.iH. H. o Vi j Do _ ~ , ,:!!~ Ij ~ j I -.. a-5 g- j ~ i ~~~iE'~ Ii! w 0 ~~i;=:~ "O~e mmm =~l!iliO~:'E.a .~ 0- ~.~ ~~ "' . !; ~ ~~ . . tI~ .!.. i; ;~ ~ ~ ~ ::: o z ~ 2 ;; III . .~ ~ ~I ~ u '" '" . .Ii ..:i ,V1 i ~ ; ;; ~; i ; ! f}j i \ q;dd 8 t- '0: i h ~ I i ~ i ~ : ~ ~ z o iI @ . V1 . ie~ I;j · if. ~ i .i i Iii . ". ;;! ~i~! ii: ;~ ~ ! h :i :i ;; ~~ . !!! ~ r. ~C. ~ .~. "f ~-~. I w u ~ w ~ 'i Z . k 0 dG . OJ ,f i ~ i; B ~I ~ !! ~ m " j . Jil .. . .~.. =/ it z o I G !: .I ~ H 8 ~ i! i Iii u "I Iii ! . I ; 0 I ~ I l 1Il a.. 11.11111': ~ 8 i; ,I,!,! ~ I: II: '1:11 t: ,H r z Ii li:~~H ~ ...",.' ..";......\,, ~ ~:g "0 .tf. ~~ - .: ~ ] i ~ H S1~ I n H{i~ g;~~lt~ :~~;i~~ H~Hi; ~~18~~~ ~ .. 1 CI';:: E ~ is .Ii :i ./i.i : ~ ~Z 5 g e-~ -e.~ ~~ . ~ i ~~ .~~.. ~: ~ ~ g HH! i;l~~ gi 2=~ 'i: 'g ~ . . . ~;1 ! ~~~ i~ -..;,; Eo ~~~ ~~ 2.~:=- gi Hif~ H itiH1 iHi :~ ~v;~_ ~.:. ~ S i; 150";;_ l~ JHj B ~o l: ~l ::! . ~ 2 . is ~ - ~ l. j ~ ....J~ 1 u .~L, , ~ 0: I ~ ! B (;: i ,1z ~ ~ '" ~dDlt"IN]~ V1 ~ w V1 OJ o x --;::;-;--- w Z OJ .....,..... ~~ i ,~.~... ....-. . ~ . S H c: cd Cl .Pr.. Cl :::: a CJ 0 ..... I'll Q) ......, C) ..... cd :~ .-'~' .. . ~ I: ~I ~p i ! i; ; " :t _K>.' .. VI OJ .. ~ ~~ ~ ~ i. ~~! - -.s- a. at E ~ ~~ ~ i ~ .-.... . . I I ~ i . 0 . ~ ~ 0 lD 0 ~ l:; w ;" -... .. 7p ~ I i I; ; x . . i.. . ] ~ 5': ,... I" 'I ,I x a ;: II ~. . ~ I . ,~. h t .. \ ~ \. ! 1\, ~ " ~~ z I . J: ili u ~& z w lD ~ffi \. 9 ~~ u ~ ~ g ;s \!) z> -z ~ C:::r.:;: \.lIll.. \.lI~~ ""- 0 ~~v o z w ~ g 9 ~. ~ ~ ,;.' e , ~ , <oJ ~ ~ ~ B ~ ~ ~ 0:.. J ..........IH\"")ll\.&.:r:looID\.._....~._.................._\:, . . . / da;.., City of Farmington 325 Oak Street, Farmington, MN 55024 (651) 463-7111 Fax (651) 463-2591 www.ci.farmington.mn.us September 15, 2004 Maralee Rother Castle Rock Township Clerk 2537 240th Street West Farmington MN 55024 VIA FAX RE: Possibility of Joint Castle Rock/Farmington Meetings Dear Ms. Rother, As you may have heard, the September 7th meeting of the Farmington City Council included a discussion regarding the possibility of commencing a series of regular (yet informal) meetings between representatives of Castle Rock Township and the City of Farmington to talk about issues of common interest. The primary topic of discussion would probably be the growth pressures that the City and the Township are both facing, and the best methods for jointly dealing with related development challenges. For the last 2Y2 years, the City of Farmington and Empire Township have been engaged in regular discussions of the type referred to above. This City/Township discussion group, which was initially called the Empire/Farmington Joint Planning Board, is now referred to as the Empire/Farmington Planning Advisory Committee [EF-PAC]. The EF-PAC consists of three representatives from each jurisdiction - a City Council or Town Board member, a Planning Commission member, and a staff member or consultant. The current members of the EF-PAC are as follows: Empire Town Board member Ed Gerten Empire Planning Commission member Greg Feely Empire Planning Consultant Dean Johnson Farmington City Council member Christy Fogarty Farmington Planning Commission member Todd Larson Farmington Community Development Director Kevin Carroll The City representatives are appointed annually by the City Council, and it is my understanding that the Township representatives are appointed annually by the Town Board. The EF-PAC meets every six weeks or so, and the meeting locations alternate between Farmington City Hall and the Empire Town Hall. Dean Johnson and I take turns preparing and distributing the agendas and the minutes ofthe meetings. I've attached, for reference, a sample of one of our recent agendas. I certainly do not mean to suggest that any future joint meetings between the City of Farmington and Castle Rock Township would have to follow the "EF-PAC model." I have provided information about the EF-PAC group merely to indicate one possible method of conducting productive joint meetings. Many other options exist. Something that works well in one place may not work at all in another. The most important thing is that some form of regular communication takes place. The actual format or structure of the discussion process itself is much less important. I have to attend a Planning Commission meeting in Farmington tonight, so I'm not available to attend the Castle Rock Town Board meeting this evening. However, I would be happy to come to one of your future ~ meetings if your Board members would like to informally discuss the possibility of initiating a series of~ regular Cityffownship meetings. You can contact me by phone or bye-mail to notify me of the date and time of any Town Board meeting that you might want me to attend. If you have other ideas about how we could begin to explore this topic, I'd be happy to hear them. Feel free to call me at your convenience. Thank you for your attention to this matter. 651-463-1860 (w) 651-775-5962 (c) . .'