HomeMy WebLinkAbout06.12.01 Planning Packet
.
.'..
!f
..J
,Y
CITY OF FARMINGTON
PLANNING COMMISSION AGENDA
Regular Meetiag
June 12,2001 at 7:00 P.M.
1.
CALL TO ORDER
2.
APPROVAL OF MINOTES
a)
May 8, 2001
May 22, 2001
PUBLIC HEARINGS
b)
3.
a)
Wilson Property PrelilTlinary Plat Wilson Property Preliminary Plat
Applicants: Steve and Nancy Wilson, 5200 203rd Street West
Arcon Development, Inc.
D. R. Horton
b)
Application for the Michael and Eileen Devney and Lawrence Rother PropCrqc$~. ,:
Amend the Comprehensive Plan' to LowlMedium Density Residential and RCZOIlI)thC
Properties from A-I (Agriculture) to R-2 (LowlMedium Density..Resid~3J)"
(continued) . .,
Applicants:
Michael and Eileen Devney, 5810212* Street West
Lawrence Rother, 3305 200th Street ,
4. DISCUSSION
a) Middle Creek 4* Addition Final Plat
Applicants: D. R. Horton
Arcoo Development, Inc.
b) Meadow Creek Schematic Plan
Applicant:
Progress Land Company
5. ADJOURN
Planning Chair:
Planning Commissioners:
Dirk Rotty
Todd Larson, Chaz Johnson, Ben Barker, Dan Privette
David L. Olso~ Community DeVelopment DirectOr
Lee Slllick, Planning Coordinator
Michael Schultz, Associate P1aImer
City Staff:
.
.
.
TO:
FROM:
SUBJECT:
DATE:
INTRODUCTION
City of Farmington
325 Oak Street, Farmington, MN 55024
(651) 463-7111 Fax (651) 463-2591
www.d.farmington.mn.us
City Planning Commission
Lee Smick, AICP ^' D
Planning Coordinator 'Y
Wilson Property Preliminary Plat
June 12,2001
Steve and Nancy Wilson, 5200 203rd Street West, Farmington, Minnesota, Arcon Development, Inc. and D. R.
Horton have submitted an application for the Wilson Property Preliminary Plat to subdivide 9 lots on 4.7 acres.
The property is located in the central portion of the Middle Creek development and was recently rezoned to R-
3 PUD on May 21,2001.
Plannine: Division Review
Applicants:
Attachments:
Location of Property:
Area Bounded By:
Steve & Nancy Wilson
5200 W 203rd Street
Farmington, MN 55024
(651) 463-8311
Arcon Development, Inc.
7625 Metro Blvd. Suite 140
Edina, MN 55439
(952) 835-4981
D. R. Horton
3459 Washington Drive, Suite 204
Eagan,MN 55122
(651) 256-7140
1. Preliminary Plat Application
2. Location Map
3. Wilson Property Preliminary Plat
4. Engineering Review Memo
5. Dakota County Soil & Water Conservation District Review
Memo
Located in the central portion of the Middle Creek development.
Construction area to the north, wetland to east, open space to south
and construction area to west.
.
Existing Zoning:
R-3 PUD High Density Residential Planned Unit Development
Surrounding Zoning:
R-3 PUD High Density Residential Planned Unit Development
Existing Conditions:
The property consists of a house and garage.
Proposed Development:
The proposed development consists of 9 single-family lots on a cul-
de-sac eventually to be connected to 20300 Street.
Lot Coverage and Sizes:
The maximum lot coverage for an R-3 PUD single-family zone is
25%. The minimum lot size for the development is 10,000 sq. ft.
The minimum lot width is 75 feet measured at the front yard setback.
All lots meet the minimum width and lot size.
Streets and Accesses:
The proposed road layout follows the plans approved in the Middle
Creek Preliminary Plat.
Sidewalks/Trails:
No sidewalks or trails are proposed on the plat.
Topography:
The property slopes toward the southwest considerably.
Wetland:
No wetlands exist on the property.
Parkland and Trails:
No parklands are proposed on the property.
.
DISCUSSION
The applicants are seeking to subdivide the property into 9 single-family lots arranged around a 570-foot long
cul-de-sac. The property consists of the original 4 acres owned by the Steve and Nancy Wilson along with
approximately 0.7 acres to the west of the Wilson property currently owned by Arcon and D. R. Horton.
A total of2 outlots also exists on the proposed plat. Outlot A is included in Lots 2 and 3 in Block 3 of Middle
Creek 3rd Addition and Outlot B will be included in lots to be platted in a later phase.
The following is a calculation of lot sizes and widths for the proposed lots:
Lot Size Width
Lot 1 10,974 square feet 90.0 feet
Lot 2 14,044 square feet 85.0 feet
Lot 3 21,940 square feet 85.0 feet
Lot 4 27,472 square feet 80.0 feet
Lot 5 32,941 square feet 80.0 feet
Lot 6 19,923 square feet 80.0 feet
Lot 7 15,368 square feet 80.0 feet
Lot 8 16,653 square feet 80.0 feet
Lot 9 14,732 square feet 87.3 feet
Outlot A 1,728 square feet
. OutlotB 7,382 square feet
.
.
.
Proposed Housing
The Developer proposes walk-outs for five of the nine lots in the development. One look-out and three
ramblers with a full basements are proposed for the remaining lots located on the higher elevated sites as
shown on the attached grading plan.
Transportation
The preliminary plat shows 9 lots arranged around a 570-foot long cul-de-sac that will eventually connect to
the proposed 203rd Street east/west minor collector. Since the cul-de-sac length exceeds the City requirement
in Section 11-4-3 (B) stating that cul-de-sac streets shall not exceed 500 feet in length, a variance must be
applied for before the final plat may be approved.
The cul-de-sac roadway width is proposed at 28 feet measured from face of curb to face of curb. City policy
also requires a sidewalk proposed on one side of a 28-foot wide street. The plat does not show the sidewalk
and should therefore be a contingency in the approval of the preliminary plat.
Update on 203rd Street Issue
Engineering concepts are continuing to be prepared by the Developer's engineer to address the issue of the
encroachment of the existing McCarthy house in the current roadway easement.
Engineering Review
The Engineering Division and Dakota County Soil & Water Conservation District have submitted review
comments concerning the plat are attached to this packet.
ACTION REOUESTED
Consider approval of the Wilson Property Preliminary Plat and forward the recommendation to the City
Council with the following contingencies:
1. The Developer seek a variance request for the 570-foot cul-de-sac that exceeds the City standards in
Section 11-4-3 (B) of the City Code.
2. A sidewalk be required on one side of the 28-foot wide cul-de-sac road to meet City standards.
Re.. sp. ect~lly s. ub.m...: itted, / '
4'~L &'uuX2-
Lee Smick, AICP
Planning Coordinator
cc:
Steve and Nancy Wilson
Larry Frank, Arcon Development, Inc.
Don Patton, D R Horton
File
.
Location Map
Wilson Property Rezone
~ ~~.~ 11- rTl7Tm-\\m \ ~ !J!/lcrrnrY
~d@I~~ \~~~'
- I- - R'
- I- ::
:J -= - v
m ll~\(l /~,
==
_~IIII~~lO~ City \;
~ I~ Facility
Site
~~^~
~~\
~~I\ /I ~
~~V \ :z:
U<t( ~
) ll:
\\i
~
'-
c
W~E
S
~
~
~\\ I
J.\
~
\'i\ '1
\)-
~~
~
~'\ j.,
-;r- \\
~t; "mk': \~
I \ \i _7..H11
'--b ::::f\ Nf..-.. ~ ~1
Subject Property ~
L-J .~
// r- --#
~ r);:: [[I
~ I Y_
/ hmffi1
I-- ~-..r
- r--
- I-- ~
, nr:~ f! !
- ~
If' -l
. <:--
ITO LI ILU ~
I
/
/
I
/
o
z
<(
-1
I-
W
3:
I
I
I,
I I
, ,
,I I
o
.
~ ~
.
~
I
~--~~c___
.
531 V 153 >l33t1J 3100lVi
zz
<{<{
zZzzzzz -'-'
<l:<l:<{<{<{<{<{ ZZCLCL
-'-'-'-'-'-'-' <{<{WW
CL CL CL CL CL CL CL -'.J CL CL
0000000 CLCL<{<{
(J)ZZZZZZZ ~~UU
~~~~50000000 __~~
5555~~~~~~~~ ~~~~
CLCLCLCL00000000 ~~.J-'
~ rrrr5rrrrrrr~rrrr
~ZZ~~~~U~~~~~~~~~~~~
(J)<<ZZZZ0ZZZZZZZ(J)ZZZZ
~~~~~~~~~~~~~~~.J~~~~
W ~~~~~~~~~~~~~~~~~
6~~~~~~~~~~~~~~~~~~~
U(J) (J)CLa.CLCLWCLCLCLa. CLCLCLOCLCLCLCL
~N~~~~~romo~N~~~~~romS
...-..--..--...-.--r-_..--...-...-\."f
.
x
W
o
Z
~
W
W
:r:
(J)
.
UJ <{
WUJI-
I-ZO
;::<{UJ
--,W
UJo...Z
W Z
~>-~
W~
W <{ ~
~ZZ
U-O
~I-
W--'~
--'WZ
O~-
Oo...~
- ~
~ <{
LL
.
.
~
. h. '
~ ~ :I I ~
o ~~i <
Z ~~Hi
w " I . f
~ 11't ~ t t j ji ~ i p .: .
I-H n llll( ,1*
(J)
~ , '<:
U
~ ~ <l: t
" CD :<l
~ ~ ~
W
E [/) ~
I
i
mm
~~
~~
~~
tt I
00
n.
~~
~~
""
00
~~
m I-m
I l:f~
g....... ~~ ---.,;,,~'c:! ",,7"" Ch~<,'};;'<'<
!I ~!~ .
~~ l~ ~~.~
f~ ~ 1-n.:3
ww d l.:lww
~~ 9 ~~~
~~ :~ ttt
~
~ ~ ~
:. ~ ~ h
~ :0: .... W J.
M ~ g ~ g
~~~
,_:(.1~
z .~
~g~
~ffig
~o~
w~~
ow.
~ 8~~
~ ~:e6
~ N
W N
o ~~
~~~
~i~
3<'
~;~
d~~
.
~
Ii
i~~
Q.~~
~~~
~~
'"
w
z
*
~
5
o
~~
15
~~
z :;-
w",
~.
'0
..(~ .
~~ ~.!?
...-(3 "'0
~~ ~
~
'"
z
~
8
i
;:
.
m
o
w
'"
<
"-
w
'"
"-
----j/\
,/./.-------.. L.__../../.,......
-..-...-/..
,..
;
........,
"
//-.'-"1'.
/
\
",---
~ ~
~ ~;
~ tj
" <~
< ..
5lj~
" O~
-..... --
nm ,_:
I
I
-~~,~
!I
/' .I
i
;
"
i
j
.-..-..1 ."
\. ~
'- - >
---- .
Q
..
'"
Z
o
1=
..
U
o
-'
!.i i j! I~ ~
.10 t 1i! ,,~ -! '
G'i _.. si t; ~
l;'\lt ,t _ III j
il;l:~; HI I:; j
i!\iii~ m !"lti
!::h;s ;-{ ! I .
5~;:.!!J ,~h ~,r ~
niHH !J1 iil i
li.!l!l I,' J,.j i
;l~l!l!~i 11lt ;lH i
; _. ,.,1 t . IlIl !
U-ojr 1 -' _l;E'$
Im"I .l. II:.'
"I'I;! JP I ~i"
Ill; ,! ,! tli. I
!~~
! i
. "
. ~
o "
If)
I':!
..
l-
V>
W
Y
W
W
'"
U
W
-'
a
a
':i1
o
~~
."":
uz
zw
-'"
~g
I- "J
"'>
Ow
Ia
~5
au
'"
..
./
i
i
,
i
j
!
\
'\
i
i
i
'j
I-
W
W
I
If)
~
o
u
1! ;.
!
II
~~
'I
!1 J!
fk 'Z.~,J,
H_ ~-,,",
I
j
I
,
I I
il
H
B
::t
"
H
· ~i
i~l
l!:
Hi
it"
fi~
.1 i
Ii! III
Ii
~'I
c ,.
a:-~ II
hI!
..z.S:~
* Of.
"..0:' fl..
*.,
City of Farmington
325 Oak Street, Farmington, MN 55024
(651)463-7111 Fax (651) 463-2591
. www.ci.farminllton.mn.us
.
.
TO: Lee Smick, Planning Coordinator
FROM: Lee M. Mann, Director of Public Works/City Engineer
SUBJECT: Wilson Property Preliminary Plat Review
DATE: April 20, 2001
Engineering staff has reviewed the preliminary plat for the above referenced project and
forwards the following comments:
Storm water Issues
1. Confine drainage to rear and side lot easements. An easement must be provided for all
drainage routes. (Lots 3 - 6).
2. Changes to the construction plans during the review process may necessitate changes in the
plat easements.
Please feel free to contact me at 651-463-1601 if you have any questions regarding these
preliminary plat comments.
Sincerely,
~)h~
Lee Mann
Director of Public Works/City Engineer
cc: File
Paul Thomas, Pioneer Engineer
Dave Olson, Community Development Director
Lee Smick, City Planner
.
DAKOTA COUNTY SOIL AND WATER
CONSERVATION DISTRICT
Dakota County Extension and Conservation Center
4100 220th Street West, Suite 102
Farmington, MN 55024
Phone: (651) 480-7777 FAX: (651) 480-7775
www.dakotaswcd.org
May 16,2001
Mr. Michael Schultz
Associate Planner
City of Farmington
325 Oak Street
Farmington, MN 55024
RE: REVIEW OF THE PRELIMINARY GRADING PLAN FOR THE WILSON PROPERTY, PART OF
MIDDLE CREEK ESTATES P.U.D.
Ref.: OO-FRM-037
Dear Mike:
The Dakota County Soil and Water Conservation District (SWCD) has reviewed the Preliminary Grading
Plan for the above-mentioned site. This project entails 9 single-family lots on approximately 4.8 acres.
The following report summarizes the proposed erosion controls and submits additional erosion control
recommendations.
.
As no erosion controls are shown on the plan, we suggest the following:
1. Preserve as much existing vegetation as possible. Do not grade the western slope.
.2. Use erosion blanket on all graded 3:1 and steeper slopes.
3. Show type of energy dissipation devices at all storm sewer outlets.
4. mclude temporary and permanent seeding, mulching, and fertilization specifications on the plan.
5. mstall silt fence at the edge of grading at all down-slope gradients.
6. mclude notes regarding NPDES permit requirements on the plan, including inspection and
maintenance timing.
7. mclude locations and specification of all erosion controls on the plan.
8. mstall silt fence, a double row of sod, or alternative device behind curbs and the down-slope gradient
between lots to minimize runoff from lots during building construction.
9. Additional controls may be deemed necessary during construction to protect nearby wetland
resources.
Thank you for the opportunity to review this plan. Good implementation, consistent monitoring, and
maintenance of all erosion control measures are important to minimize erosion on this construction site.
Call me at (651) 480-7779 if you have questions.
Sincerely,
.. 2. Ese
Urban Conservationist
AN EQUAL OPPORTUNITY EMPLOYER
.
.
.
City of Farmington
325 Oak Street. Farmington. MN 55024
(651) 463-7111 Fax (651) 463-2591
www.dfarmington.mn.us
TO:
City Planning commipruSi
Lee Smick, AICP
Planning Coordinator
FROM:
SUBJECT:
Application for the Michael and Eileen Devney and Lawrence Rother Properties to Amend the
Comprehensive Plan to Low/Medium Density Residential and Rezone the Properties from A-I
(Agriculture) to R-2 (Low/Medium Density-Residential)
DATE:
June 12,2001
INTRODUcnON
At the May 22, 2001 Planning Commission meeting, the Commission reviewed petitions to amend the
Comprehensive Plan and Rezone the Michael and Eileen Devney and Lawrence Rother properties east of 213 th
Street and the Prairie Waterway. At the May 22,2001 meeting, the petitions for the properties were reviewed
together, therefore staff will continue to review the properties as a connected region because of their
significance to the City's transportation and sanitary sewer systems.
DISCUSSION
The properties together total 113.83 acres. Both property owners have petitioned to amend the Comprehensive
Plan to Low/Medium Density Residential and Rezone their properties to R-2 Low/Medium Density
Residential designation. The properties currently are designated A-I (Agriculture) as shown on the attached
map.
The properties were annexed into the City on April 16, 2001. Each property was brought into the City in less
than 60-acre increments and was given an A-I zoning classification per City policy. The total acreage of
Devney's property is 57.71 acres and Rother's is 56.12 acres.
At the Planning Commission meeting on May 22, 2001, the Commissioners requested certain issues be
reviewed before the Devney and Rother petitions were acted upon by the Commission. The following are
items that the Commission requested further discussion on:
1. Transportation System
2. Sanitary Sewer
3. Low/Medium Acres Calculation
4. Properties Not Anticipated in Comprehensive Plan
Transportation System
Shelly Johnson, Transportation Engineer for Bonestroo, Anderlik & Rosene reviewed the projected traffic
volumes for the Devney and Rother properties and his findings are documented in the attached memo. Mr.
Johnson has assumed a density of 2.5, 3.32 or 5.5 in projecting development rates and estimating traffic
.
.
.
counts. In his final analysis, he states that 213th Street functions as a major collector and can accommodate
future single-family detached development subject to the improvements specified.
Additionally, he recommends that a density similar to East Farmington at 3.32 is more desirable than the 5.5
density because it generates less traffic from the development. He also suggested a combination of single-
family and townhome units in the development because townhomes tend to generate less traffic as well.
Finally, he conjectures that the developments would create the need for signalization at the intersection of
213th Street and Trunk Highway 3 as well as improvements on 213th Street for left and right turn lanes to
maximize traffic movement.
Mr. Johnson's memo suggests that 213th Street can accommodate future traffic projections from the
developments, however, in Figure 2 he shows a number of additional assumed major ingress/egress routes to
the properties. Two accesses from the west are shown at 213th Street and Spruce Street, one is shown to the
north accessing 210th Street and one is shown to the south as a future access. In addition, the needed
improvements to 213th Street and 210th Street are not are not currently planned or programmed for by the City,
Township and MnDOT.
Additional transportation studies are required with these proposed accesses due to inherent problems with each
ingress/egress shown. The access shown at Spruce Street may be problematic because of the need to cross the
Prairie Waterway. Decisions to encroach into this environmentally sensitive ecosystem have not been
previously contemplated and thus would need to be extensively reviewed.
The access to the north needs to be reviewed because 210th Street is bounded on the north by Empire
Township. Additional discussions with this body must take place before development could occur. The
access to the south is also difficult because the property owner south of Rother has not indicated a desire to
develop his property and any future access to the south would most likely be slow in proceeding.
Therefore, additional accesses to both the Devney and Rother properties need to be planned and reviewed
before any development could occur on the properties.
Sanitary Sewer
The City has reviewed the feasibility of serving this property with sanitary sewer and water service. As the
attached comments from Mark Rolfs of Bonestroo indicate, only the west half of the properties can currently
be served with gravity flow sewer service (see attached plan). Other possibilities to serve the east half of the
properties would involve extending a new trunk line south from the existing interceptor line near CSAH 66
approximately % mile to the north of the properties or installing a lift station.
Since the City is not interested in adding lift stations to their sewer system and with only half of the properties
served with gravity sewer at this time, it is not feasible to develop the properties to their best potential.
Low/Medium Acres Calculation
The approved MUSA Staging Plan provides for low/medium density acres to be allocated in the MUSA in
2005 is 30. As mentioned above, the total number of acres being applied for by both properties is 140.6 acres.
Therefore, MUSA could not be granted to either of these properties because of the limited amount of MUSA
allocated to low/medium density acres in 2005.
. Properties Not Anticipated in Comprehensive Plan
.
.
In 1998 when the Farmington 2020 Comprehensive Plan was being prepared, these properties were in Empire
Township and have remained there until recently when they were annexed into the City on April 16, 2001.
Therefore, no planning was done or anticipated for these properties. Additional studies should be performed to
assist the City planning these properties for the future.
Options
The following are possible scenarios for the Planning Commission to consider in reviewing the requested for
Comprehensive Plan Amendment and Zone change for the Michael and Eileen Devney and Lawrence Rother
properties.
Option 1
The Planning Commission approves the amendments to the Comprehensive Plan and Zone change and
recommends approval to the City Council.
Option 2
The Planning Commission determines that updates to the City's Comprehensive Thoroughfare Plan,
Comprehensive Sanitary Sewer Plan, Comprehensive Water Plan and Surface Water Management Plan are
needed before these requested amendments to the 2020 Comprehensive Land Use Plan are approved.
Therefore, the request for Comprehensive Land Use Plan Amendments and Zone changes determined to be
premature should be denied for the properties at this time and forward this recommendation to the City
Council.
ACTION REOUESTED
The Commission may wish to recommend approval of one of the above options or propose a different option
and forward this recommendation to the City Council.
Respectfully Submitted,
~ ,~J2
Lee Smick, AICP
Planning Coordinator
cc: Michael and Eileen Devney, 5810 212th Street West
Lawrence Rother, 3305 200th Street
Roger Cook, 423 3rd Street
2020 Comprehensive land Use Plan
Devney and Rother Properties
.
onLSUN
Devney Property
Rother Property
Legend
/\ / City Boundary
I' 'I MUSA Boundary
Environmentally Sensative- Flood Plain/Major WetlandsIWoodland
I Environmentally Sensitive within Developed Areas
Environmentally Sensitive in Undeveloped Areas N
Comprehensive Land Uses *
~ Urban Reserve
Business W E
Industrial
Business Park S
CJ Low Density Residential
CJ Low/Medium Density 8-"""~".".
~ Medium Density ."
_ High Density .~
CJ Public/Semi Public "!. . ...
_ City Park/Open Space.......'.
_ Restricted Development
EJ Natural Open Space
ROW
..olE TH1Slol.PISFORPLANN,NQ
PURPOs.ES ONLY "',.,D SHOUI.D NOT
BE Vs.!:DJOR Ex.lCT "'EASI,IIlE"'E..TS
City of Farmington
Zoning Districts
Location Map of Subject Rezone
WfB EHt!@
.
210TH ST W
Devney Property
A-I
Rother Property
Legend
/'/ City Boundary
'/' I MUSA Boundary
~oning Districts
A-1 (Agriculture)
A-2 (Agriculture Preserve)
B-1 (Limited Business)
B-2 (General Business)
B-3 (Heavy Business)
B-4 (Neighborhood Commercial)
C-1 (Conservation)
F-1 (Floodway)
F-2 (Flood Fringe)
F-3 (General Flood Plain)
1-1 (Light Industrial)
_ PUD (Planned Unit Development)
R-1 (low Density)
R-2 (Medium Density)
R-3 (High Density)
R-4 (Mixed Code)
N
w+,
s
last Amended Apr~ 3, 2000
.
en
ro
Q) C
s....
<(ro
Q)e..
>"'0
+:iO
.- 0
en_
CLL
Q)-o
ICJ) C
- ro
ro
+-'en
C-o
Q) C
E ro
C+:i
o Q)
.~ S
C
W
.
i;:
l
. ';! ~
. i<J
f,"
""-r
~\.( .'
tlJ
z.~
:::
0..
-0 ~co "0
C ~ Co..
Q) ..g - 0.. co co
O>CQ).!:;;oo::::
Q) :J<.:l(/)Q)-=::; 0
.....J oro<DS"O ('i)
(() a.. .!::: 0 <(
>,>,0..> 0 I
~~ EZ>LL<(~:::t:(()O
OOW <( .'.
~{]DD~ IIDDD
...
~
~
~
gg
~~~
~M
~ag~
.
",
.
en
Q)
.-
t
Q)
c..
0
s.....
0....
Q)
c C/)
0 0)'
.-
N t
Q) 0)
0::: a.;
0
L-
"'C a..
Q) L-
en 0)
f~ ,.
s.....~
o....~
'+- 0)
0 c
c..a;
roo
~
c
0
.-
+-'
CO
t)
0
-.J
.
.
.
JQj Bonestroo
_ _ Rosene.
~ Ander..k &
. \J . Associates
Engineers & Architects
Bonestroo. Rosene. Anderlik and Associates. Inc. is an AffIrmative Action/Equal Opportunity
Employer and Employee Owned
Principals: Otto G. Bonestroo. P.E. . Marvin l. Sorvala. P.E. . Glenn R. Cook. P.E. .
Robert G. Schunicht. PE. . Jerry A. Bourdon. PE.
Senior Consultants: Robert W. Rosene. PE. . Joseph C Anderlik. PE. . Richard E. Turner. PE. .
Susan M. Eberlin. CPA.
Associate Principals: Howard A. Sanford. PE. . Keith A. Gordon. PE. . Robert R. Pfefferle PE..
Richard W. Foster. PE. . David O. Loskota. PE. . Robert C Russek. AI.A . Mark A. Hanson: PE. .
Michael T. Rautmann. PE. . Ted K.Field. PE. . Kenneth P Anderson. PE. . Mark R. Rolfs. PE. .
David A Bonestroo. M.B.A' Sidney P Williamson. PE.. l.S. . Agnes M. Ring. M.B.A' Allan Rick Schmidt. PE.
Offices: St. Paul. St. Cloud. Rochester and Willmar. MN . Milwaukee. WI
\Xfebsite: www.bonestroo.com
Memorandum
TO:
Lee Smick
Planning Coordinator
FROM:
Shelly Johnson
DATE:
May 30, 2001
RE:
Devney-Rother Property - Projected Traffic Volumes
On 213th Street West
Our File No. 141-99-101
You have requested an assessment of the potential traffic volumes that could utilize 213th Street
West given development of the Devney/Rother properties. A map showing the property
locations is attached as Figure 1.
The Devney property contains 57.5 developable acres and the Rother property contains 40.75
developable acres. You have informed us that the overall density of East Farmington is 3.32
dwelling units per acre and that the Devney/Rother properties will develop between 2.5 and 5.5
dwelling units per are. Comparison of the estimated vehicular traffic for the properties are
shown on Tables 1 and 2. We are assuming, for this document, that the dwelling units are single
family dwellings and not townhome style.
Table 1
D .1 T ffi E
D
/R th P
rf
ally ra Ie stImates - evneYJ 0 er rope les
: Dwelling Daily Traffic
Property 1 U nits2 Estimate
Du / Acre
Devney 2.5 143 1,370
(57.5 acres) 3.32 190 1,820
5.5 316 3,025
Rother 2.5 101 965
(40.75 acres) 3.32 135 1,290
5.5 224 2,145
Devney Plus 2.5 244 2,335
Rother 3.32 325 3,110
5.5 540 5,170
1. Dwelling units
2. Assumed all single family detached housing
2335 West Highway 36. St. Paul. MN 55113. 651-636-4600. Fax: 651-636-1311
.
.
.
Table 2
P kH
T ffiEf f
D
IR th P
f
ea our ra Ie sima es- evneyl 0 er roper les
Peak Hour Traffic Estimates
Property Dul/Acre Dwelling A.M. Peak P.M. Peak
U nits2 In Out In Out
Devney 2.5 143 25 85 95 50
(57.5 Acres) 3.32 190 35 110 125 65
5.5 316 60 175 205 115
Rother 2.5 101 20 60 65 35
(40.75 3.32 135 25 75 85 50
Acres) 5.5 224 40 130 145 80
Devney plus 2.5 244 45 145 160 85
Rother 3.32 325 60 185 210 115
5.5 540 100 360 350 195
1. Dwelling units
2. Assumed all single family detached housing
The daily and peak hour traffic estimates illustrate the range of values that could occur
dependent upon the design of the project. For this assessment we have assumed that the
development is all single family detached housing. The assessment, which follows, will address
the traffic impact on 213th Street W using the three project densities shown in Tables 1 and 2.
Figure 2 illustrates major ingress/egress points to the property that we have assumed for the
development. Project design will have an impact upon the travel choices made by residents of
the development.
The daily traffic estimates for the three density ranges are shown on Figure 3. Considering the
sum of both properties, we estimate that 70 percent ofthe traffic will use 213th Street, 5 percent
will travel north to CR 72 and then ultimately use 213 th Street, which is also CR 72, and 25
percent of the traffic will use Spruce Street.
The 1996 daily traffic volume on 213th Street was approximately 1,850 vehicles per day. This
volume was obtained from the MnDOT traffic flow map and is generally in the location where
213th Street meets Cambodia Avenue. The volumes on 213th, at the intersection with TH 3, are
probably higher than the 1850 daily volume due to the presence of the medical and residential
land uses along 213th Street between Cambodia Avenue and TH 3. Using the mid-range
density of 2,345 trips added by the developments would create a daily total of 4,145 vehicles
on 213th Street near Cambodia Avenue.
213th Street is designated as a major collector on the city thoroughfare plan. The volumes
projected to occur can be accommodated by a major collector. There will be a problem
developing at the intersection of213th Street with TH 3. The future volumes may create the need
for traffic signal control since the majority of the volumes will desire to negotiate a left turn from
213th Street to TH 3. The signalized intersection ofTH 3 with Elm Street is not very far from the
TH 3/213th Street intersection. Such signal spacing is surely not the most desirable, but may
.
.
.
become necessary. MnDOT and Dakota County would have to approve signalization should it
become necessary. An all-way stop would not be the most desirable either given its proximity to
a signalized intersection.
It should also be noted that should such volumes occur on 213th Street, some roadway
improvement work would be necessary on 213th Street at the intersection with TH 3. Two
intersection approach lanes would be necessary at the intersection in order to provide an
exclusive left turn lane and a right turn lane.
Summation
Cl The major collector of213th W (CR 72) can accommodate future volume projections of the
Devney and Rother properties, assumed as single family detached housing development.
Cl The overall density of3.32 is much more desirable than the 5.5 density merely because less
traffic is generated, thus creating fewer traffic issues.
Cl Dependant upon the total units constructed, a mix of single family detached housing and
townhouse may be desirable also. Townhome units generate fewer daily trips than single
family detached housing.
Cl Development of the Devney/Rother properties may create a need for a traffic signal at the
intersection of213th Street with TH 3. Intersection improvements to 213th Street will also be
necessitated.
.
.
.
1111
Legend
11\./ City Boundary
'l't 'l WSA BOUldllry
WI\Ylmentally SensaIlve- Flood PlalnlMaJor WetlandsIWoodland
i:::f Envinxunentally Sen&iliw within Developed Araa&
;;:;;::: Envlfonmentally Sensltlve In Undeveloped Ares, 1'1
O:Impl1lhBn&ive Land UlMlS -+
...-'.. Urben Reserve
Business W I!:
IndUlltrillI
."\' Busll1e$$ Parle
Law Density Rssidential
J.owIMedlum Oensity
!S:';;~ Medium Density
HlghOensity
PubllclSlIltIi Public
City PerWOpeo Space
~ RlICIrIcted DeveJopment
Natural Open Space
R{)W
s
~.~........,.............
....aun. .........-..a..-r
., oIUII""*CI'''-'''
r/6t11Z..E: ..t
-
J)EVNEY /7tdTH1: '"-
P /Z..dP Ii b-y J..b~lfT/tJ N
.
.
.
{F"'TIIIl~
1111
Legend
11\./ City Boundary
'l't I.' MUSA Ekuldery
WI\YlmentaUy SensalIve- Flood PlatnlMaJor WetlandsM'oodlencl
i:::f Environmentally Sen&iliw within Developed Araa&
;;:;;::: EnvlfonmenratlySensltive In Undeveloped Are8s 1'1
O:Impl1lhBnsive Land UlMlS -+
".".. Urben Reserve
~~ness w ~
Industrial
, Bu$lI1e$$ Parle
Law EJem;ily Rs&idential
J.owIMedlum Oensity
];s:r~ Medium Del'o$ity
., H"lgh Density
PubllclSlIltIi Public
City PerWOpeo Space
~ RUtrIcted Development
.., NsturaI Open Space
ROW
s
~.~""~1(lIIIII\l.INC
..............,...~....
." 11"'1 -.n&CP.......-.
f'/~1A 11. S 4-
- '.
ASS u h1 IS" m A -:r" t2.
XN6IZLS~'/~&tzE~S
.
.
.
l'1I,D
I
(2131/5)
r.-a I~ Dt) ]
I II f
Legend
11\../ City Boundary
'l't "/ MUSIl BOUldery
"Emilrcnmentally SensaIlve. Flood PlalnfMajor WetlandsIWoodlancl
c::::: Environmentally Sensitiw within Developed Araa&
:::;;:: Envlfonmentally Sensllive In Undeveloped Arees 1'1
O:Impl1IhBn&iveLand UlMlS -+
I.,".. ~":'~ W E
Industri8I
_:.-... ~C:Rssidential S
~~~~ =~nsity
PubllclSemI Public
City PerWOpeo Spllce
_ ReCtr1cted l)8ve1opl)'lent
E3 Nalural Open Space
D Af)W
11~
(7t.€)
[I, Z7bJ
~'~IS~fUlNC
_...-M...,.............
..wv.,.....:r..........
r/6Urz.t:. 3
. . ---4
Pl2fJP61lT"'1 6EN =~ATEJ)
. 'DA II- V. .Ttl"tF'Ft~. fS'TI ".AYS-S
LIi'p}/J:J
t,,,p - OAI7'1 v"LHmM - Z#S ~~/A(fle
(blJlJ) - f>A.J,.'1 V,J,.km~s - 3,32. DfAlJAf.fl.t!.,.
[~I!I~J - DI1Ja.V V'LU~ - S.S I>K1AI.IU.
.
.
.
City of Farmington
325 Oak Street, Farmington, MN 55024
(651) 463-7111 Fax (651) 463-2591
www.cLfarmington.mn.us
TO:
City Planning comOIJis . n
Michael Schultz
Associate Planner
FROM:
SUBJECT:
Middle Creek 4th Addition Final Plat
DATE:
June 12,2001
INTRODUCTION
D R Horton and Arcon Development Inc. jointly propose to plat 68 townhome units within the Middle
Creek 4th Addition. The 72 townhome lots are located directly east of Pilot Knob Road and south of the
previous 66 units plated as part of the Middle Creek 2nd Addition.
DISCUSSION
The 72-townhome units are part of the 222 townhomes overall townhome units proposed for the project.
The Middle Creek 4th Addition Final Plat corresponds with the preliminary plat approved by the Planning
Commission on August 8, 2000 and by the City Council on August 21, 2000.
The plat is comprised of the following area summary:
Block 1 Area =
Block 2 Area =
Total Lot Area =
Total Outlot Area =
Total Right-of-Way =
Total Area =
3.5020 acres
3.3105 acres
6.8125 acres
8.7449 acres
0.7942 acres
16.3516 acres
Transportation
The final plat shows the 206th Street right-of-way which will act as the main access in and out of the
townhome portion of the development until the north/south road is constructed in future phases. The
206th Street will be comprised of a 60-foot right-of-way and 34-foot roadway measured from the back of
curb to the back of curb and will be constructed from Pilot Knob Road to the easterly side of Lot 4, Block
1. A majority of the traffic is expected to enter and leave the property from this access, thereby requiring
a left and right turn lane on Pilot Knob Road into the development.
The homeowners association will maintain the private driveways that extend off of 206th Street and
which serve each of the units.
Parks & Trails
.
The Parks & Recreation Commission have requested that a park be provided in the southeastern portion
of the project, north of the creek and west of Akin Road.
Trails are planned on the south side of 206th Street, connecting to the future north/south trail along Pilot
Knob Road. That trail will also connect to the future sidewalk/trail along the north/south road that will be
constructed in future phases.
Off-street Parking
Staff requests that the developer strongly consider additional off-street parking stalls to be constructed in
locations off of the private drives, currently only four (4) off-street parking stalls (other than the
driveways in front of each garage unit) are proposed. The middle units of each building will have a one
stall garage with one parking stall behind for a total of two stalls, the end units will have a double stall
garage for a total of four parking spaces.
The Middle Creek plan indicates twenty-two (22) stalls in the first phase for 72 units, four (4) off-street
parking stalls are proposed in the second phase and twenty-one (21) stalls are proposed as part of the last
phase. Some on-street parking will be available along 206th Street.
Landscape Plan Review
A landsca~ing plan was approved as apart of the overall development plan. Boulevard trees are planned
along 206 Street. Trees are proposed between the driveways along the private drives, landscaping is also
. planned around each of the units.
Engineering Review
The Engineering Division has reviewed the Middle Creek 4th Addition Final Plat and recommends
approval contingent on minor revisions to the plat (see attached letter from Lee Mann dated June 7,
2001).
ACTION REOUESTED
Recommend approval of the Middle Creek 4th Addition Final Plat contingent on the execution of a
Development Contract and forward the recommendation to the City Council.
~~~+
Michael Schultz )
Associate Planner
cc: DR Horton, Don Patton
Arcon Development, Larry Frank
.
.
City of Farmington
325 Oak Street, Farmington, MN 55024
(651) 463-7111 Fax (651) 463-2591
www.ci.farminlrton.mn.us
June 7, 2001
Keith Willenbring
Pioneer Engineering
2422 Enterprise Drive
Mendota Heights, MN. 55120
RE: Middle Creek 4th Addition Final Plat
Dear Mr. Willenbring,
Engineering staff has completed reviewing the final plat that was submitted for the above
referenced project. All areas, outside of the unit pads, have been platted as a drainage and utility
easement over the remaining portion of each block. There are no comments forwarded at this
time that need to be addressed.
. If you have any questions regarding the final for this project please feel free to contact me at
(651) 463-1601.
Sincerely,
~m~
Lee M. Mann, P .E.
City Engineer/Director of Public Works
cc: file
Don Patton, DR Horton
Dave Olson, Community Development Director
Lee Smick, City Planner
.
z
o
I-
o
o
<(
I
I-
..q-
~
W
w
a:::
o
w
....J
o
o
::;E
I I
I" f I I
If I q I
I"i . HI ~ ]
i~il' f ~if II.ftl
' .J j ilt
ill' ~ ~.tl
,,,d ! ~l!J
ill' I JiH Ji
.Id I -1-1 ~
"1):' i h~ 'I
lill 'l~~i iJ
11 . t Jit, J
5\11 i ,~:t il
11I{ 2 !i'i li
~ 1 '11' I
....1111 i lil! h
'8~IlOU ln04llM
UOISl^8J. 0\ l~a{ qnS
A}JVNlrm3~d
=3J.ON
_J/
/
'lo
---;..
/~~
" _---;~~"ot
....')'"<::..:_.t+.:~ ~1\.
--,L -,; - -....----------
'lo _---;:/
~ /~../
'% ~<v,,"
~
, .~
,,)) ~
,
.
r .
j I
f !
II iJ
b ~ I r
~ ~ a h!
,..:;'> I
----
-,
LtJ <.
Ld Q
ij::: ~.
u ()
()
Ld <(
(5 ~~
D
> ("~
ft V lOlJ.n
~~:i
J
)
..
i
. J I
j 1ft
I 'II f
i !. i i
it it I
it t I .
H
~1
H
..
a,
H
if
i!
It
I"
!!
.
"
"
i
I
}
!
J
J
if
I"
,I
';1
..
.'
It!
t"
h
II If!
_D!
U~
"
b ~ rIa
~ a 1ft)
j .
~ h.
i~ifi
. jl.t;
j iilH I
I I; 'If I-
i iI)!~ !I
d hI': II
U I~+. "j
It ilhll ~.
l~!li I
~JJ.)
iF~lt
Wi:!
W.!!
..n.,
~~illh
11- '" I
.....1 ~tt
J'~Ht
_h'iil
..
.,
..;.~
..?.J>o>
Fat~.
":.t,~
~.v
... :z:
CD
t-
~
::>
o
:II
III
..,
C.'l
Ll..j g
l- <"J
2. ~
?ii
::E
~
...
..
;l
co
..
Z
Q.
0...
6~,
..:
a.:
n::0
wz
VJ -
zcr
OW
... W
LL Z
i3
:z
W
~
a
<.>
< T .
o > .........
a ~ ~~
12 ~ ~ ~
~ ~ 15i!;
u t-= ~ ~ ~
~ I bj :;;!i
~ ! w~
~ ~ ~I ~ ;
i!; .. ~- ~ ~
'i ~ =~ e 12
~ ~ i~ ~
~ ~~: : i<
o 0 0% C en
is is iSl:J
o 0 0:> I ~
ill I
1 . 0
8
~i
'"
N
~
"
~
15
~~~
~\.-:-
?J ~
r:::~i CO
Q!.'{jl I
@l ~
~I
LC_:-~
J!!
'" J!!Z
~i~iS~
>- ~~
Z~I-""~2
C-.jgiS2~ci
:C~lI!U"~
~~~i5~~
m,!<gl1.:!:::E
dQi!Cl..w)(~
~~;~~o~
I-~~~~~tj
~~~~~~;
~~~m:~~
~~~Qi!'=l~
~~~i~~~
_z~
:------T-----'l !il
, I' .""/, I ~
I ",'- . -,Y., j '"
: "..J:t,: \.) , ....-~
I . I ' ;:2
,-------,-------1 ~~!
I ~ I l'o, I rtic1
,. I ",9
':.~..., ~
~, F
fJ
II>
1 j
J! Ii
rl il
t ;1
II H
II
!]
h
11~
b. i.l"]
~~ ~
dh
.
I
f
i
I
f
i]
'ft
,
a
11
! h I
! II I
- 1
Ih
!J
Ai
I j"
.1
I II
J ~.
I .!
1.1 U
t J.
,I 1ft .
il il
J1 I
Ii! ; t
Ii If 1 ~ it
A" 8 ' I
I !i 5 1
, _A 1 U
i
.
I
,
if
il
,I
I)
~I
11
jl
.1
-I
J.
il
A .i I
. d
~ Ilft
i II
~ j I
a b
I !~
j
I
I
! I J
jl j
,,OJ! j
1 .
H j
i I -
h 1
:J'
I II
~ 1 J
- j'
~ I f:.1
j I fili
. _ I
.
j
J
j
II
~ I
I'
11
~
z
o
I-
o
o
<{
I
I-
~
~
W
w
a:::
u
w
...J
o
o
::?;
I
l:l
~
t)~
UI~~
5~'iUJ
<....<l(bJ
an.....w3
f3~~.o~<
515,.;'>-~
.o(<.~~~
:;::g<~l:;~
~n~""ll1
11:~~~
...N9~iioC
X"'-'-';J;J
og~~I-""
ffi~e~~e
'e:>llou lnO\lW^
UOISIAeJ Ol per qn5
.. A.~VN,~m~d
:]iON
.1 ~
*0 *
. - .
It.. .
ir.*
CD
....~
~5
a-
_o~
l a
j ~
, 00
:J I
; ~
,~~
~
~~
[3].
.~
Wi
..,; Iii
- ~=
II
iE~
~
...
GJ.
N~
r-=Tl
LlJ
~
~il
,;
w
~
1
II
q
I'
! I
!
(YIjj~ ~~
.
!
. i I
! ~.
: '
,
: !
st i .
1- r~b- SIL;
1
,
,
,
,
r--'---r- i~
,
,
,
,
,
,
,
,
,
,
,
i
,
,
,
!
,
,
,
,
.
,
..
.:
,
~
,
\.
.
\"
"
"'.
".
.......
.,.......--...""".
f
PARK
\.
WElUHD
:--1
L1
C.R. H
3459
EAGAN
,
,
,
,
:f~'-'-"
---
,
,
~ i s1RfET wEST
~ ~-~_ Jm!!L
~_____ PRQJEC
i.-----
,
,
,
~ ,........--
r:,---
CONTA
CON P
651-"
~
KEITH
REGlSTC
25504
REG. N
FUlIJRE
MULn FAIoIILY
;;mr
----
.
h intClf'f"'GUDf'I OItd/or ,....inqs and :'?Io:ts cantoil'led 1'1<<"'. SLIm a. slu<<t
ond 101 locoUort. dim"'Wan" 01--' londscG,.in, and om-..lt.:... or. of the
._ ~ of cM~tinq Q poesib'a u.. of lhe pl'opMtia, ond are IUbjecl
to cilo"lq.. '"' '.....'llotion or wotrQl'lty ~ to ZOfIinq. ..,..~t
oorn.-silip or tand u.. f)/ SUeft prop..ties i. being moc:l.. on.d Bur-a lIhOlAd
not Ol\d ..II nol r.,. on tn_ information o...d/OI renderl,uJs and mop. 01
vi.... contoined "...In in o.cidin, to 1Mt-'chOH on., pt'~t.,. ate.
PIon.. lrtqinoOf'Inl). iI..... molt. no WOIton:.itl. 01 ......Iotion. 01 00'1 kind
()t chOf'oc:t.., ...U" 01 1mpIi.d. ,."iU, rUG.:1 to Ihe ".ett~ deptr.tlH1 t'I
cOW',", by lhe ,..,_ing. drawing. ond otl'l_ information n...ein.
For det._ 01 ..tlrtt d...,..ed 01'"" r.'" to th. r.cordd ,:nal plat.
IlM ~ of t.... pr..-t, .nown ...111 l~ ~G""'" ane; ~ ,.......
lhe (j;ht to molt. zonlnq. d..,..opmetlt. alWl..... aIId/",. Qttd u. chon9" 'Of'
CIIIy patt(s) 01 t1''l. plop.ti...
.... .. .. .. Th. . d...... ,........ 11.. rMJIII to ",anv- th. pons ...t....,1 furthw nolle..
:: PIONEER Sub,..,. t. C1.. .... .. .............. _....L
.. .ngin..ring Pit _....,.r.t..... ,,..
*.... .;:=:-~~ ;:...;~~--
I"~' 111- on'U; Ie. '10
t R~~~~\1:mTY LINES
I h_~,. c_tif, thai lhi'I ~Cl" _. prltOOted ~., I'"t. (JI under m, 4irec:1
~"SlOl't one that I om a duly l'qiatef'ed poof....... E'.... unW
I'. 10'" of the State 01 M.....,.-ota
.....
RIIVi':OI'IS
1. 6- 29-CO
2. 8-1-ca
Dale
Ai,",. No. _ Dato
..
"'....
".-
"
\ r
\ /1 I
} J. I
, l' II
, ,1 J
, 'I I
I ",
I 'I I
I I, I
\ I! I
) \'! "
..... I I'
'I I,,'
I ~ d
, J 1,-,
1 'J
* I I
\ ,I I
/ II I
/ ,,/
/ \ \ l
I 'I
( I (
I" j I
\..-\ ' '\
\ !, \
" '
'I
II
"
II
/I
I',' I
I
~ ill!
. 'I \\
..... /g I \
.. Iii I :
C"lil,1 (
I, )
III I
I ,I L-
A. II I
~'11
_"1
... , II
... I"
'II
\'1
\! I,
ill I
l.j I
" I I
'i "
1,1'
II \ I
I'll
IIII
I,' "
I ,I
I'
\ \\....
I \
I ~!q~ 1\ ~~~
----
I I ~
, II
'\..\ ~\
~, -l'
""" --\~\ a\
_-' I ~'I
,- \, \
I I
'1 I
.l ,I
~ I ~
I I
I I
I I
\ ,
I I
7.: I~
i\ !t
., I ~
.: 11
I : i\
: : \
. I ,
., I
1 1
\ ' ,
, ,
\ I
, I
, I
., ,
\' ,
, ,
I
. I
. j\
\ I
. I
. \
) I
. I
"
,,-
,-
-'
-'
Z~8-:::'-:-__
C}lr ~~
I'
\ )
V
/
I
I
,
'\
, (~
a..
4::
<...>
(/)
0
Z
4::
.....J
w
~
I-
>=
I-
W
w
I
Vl
0 3::
~ '"
... <.
<::: :i :to
'" -, ~
..,
0>
~ ~ i
0
0 " C;
0 0
..0
c......
0",
"0; 0
.s:......
,,'"
l>:
\j ~
~ ..
"0
0
~ l~
~~.
) ~
"
E 0>
0 "
Z l>:
"Ul;
""0
.l:: C
"0::1
>--
~~
".c
..,u
5.
~"
00-
0
"u
E{l
~~
"0"0
~~
0"
0--
" ..
~:o
V1~2
0,..0
;0- ..
::I"
c"O C
%o;i
~~o
--"
--'0
00_
:S~((J
~g~
~ &'0
,..,iii II'
.0 os i:
~~.2
~ ~~
III i
~! ;;;
.ria ~
. x
~ .
Is ~ z~~
~~ii ~!
~lI ;%~
~i; ~...
- ~
~t~
~je d_
e
~n
,. . .
-
w
0
<(
0:::
C) ('
W -C)
0.. ~z
<( o..F
0 ww
(I) OW ..
0 I: I
Z 1')(1)
<( '-J>-
...J
'-J ~...J
0::: 00
W 00..
C) o::~
0 0::0
W ~~
~ _OJ
0:: .....
Z I: ::E
5 IO::E
~ I') -<0 -+
I r-
I 10::
0 0.. ~~ I')
(I) <( I -
~o (I) C
.., ~
I
I
I
I ,---
I I
I I I
I I I
__--1__-L L
0:: I --
o
n::!:: I
_~z I
z~ 1 r - - - .
- I wi I
0:: I I
- - - - -~ - --cn-r.-O::::> - - -1--
W ---
0::: I 0..10 I
__gJ ~I~ L
0::: 1(1)
~ 51
~~ (1)1
-w-z- - - -+- - - -
ffi ::::> I
::::> I
_g I
l I ,---'
I I I
-----~--i_--(------
I 1 I
I I I
I I I
____~ I L
I
I
I
. .~"
~.
,.
. ~I
~f(l,
~.'
I')I')CIO
1-1-1-
0..000
0..0..
~
~
.... ~
~ 0
Q. ~
~ ~
~tj' '2
~- ::)-<
~ ~
2~'" 26
;:) ~
ia: ~-<
ffi- ::::JI=:
~x iDQ
~< w~x
~.~In ~ ~3~
t.:I :x: ~g
II) ~cn<::.
~~ zt:J
~ ~i:F= Z ~w~
~ .~~ ::) 09:~
. '2 a: -~-
) -<w-< a: :;:ioa:
: ~> Q -<z~
: ~z-< ffi lA--<
) 01(-<1- I- a:i7l~
,:t:~:g ~ ~Vlcn
~ o..,:x: lI.J o~~
0::
Wt-
- &~I
8 I
.......
VI
n
lA-
o-
n
I
-l
I-
W
W
:x:
VI
~
w
w
(k::
o
W
-l
o
o
~
z
<(
~
(L
z..
00
_N
.- II
<(..
o~
z
:::)
o
l.J....
I-
U
w
..,
o
a:
a.
<.
~~
ot
ZL
...
...
~c
B(
~-
a:::~
oC
Ie
(k::.oI:
.(
O(
C
<
a:
w
~
o
L.
<J
Q
.
City of Farmington
Zoning/Subdivision Code Update
Planning Commission Workshop
5:-00 - tl'45p.m.
A41y 2e 2007
11113
(gO
AfJenda
1 . Business Park Discussion - rrerro attached
. 2. Planned Unit Development Discussion - m3ITD attached
3. Adjourn
.
.
Memorandum
Hoisington Koegler Group Inc.
1II13
(gO
TO: Farmington Planning Commission and Staff
FROM: Mark Koegler and Loren Gordon
DATE: May 18,2001
SUBJECT: Discussion topics - Business Park and Planned Unit Developments
We have two discussion topics for our workshop meeting on Tuesday - business park and
planned unit development areas of the zoning code. We have had discussions with Staff since
the last meeting on both and have concluded direction from the Planning Commission is needed.
.
Business Park
The Business Park is not a new topic in Farmington. The Comprehensive Plan has several
sections that address this area located on the south side of Hwy 50. What we are seeking from
the Commission is what type of regulations should be established for this district? From a use
perspective the Comp Plan envisions a combination of office and complementary commercial
uses such as hotels, restaurants, health clubs, and recreation uses. Here are some of the questions
Staff has raised where direction is needed:
. How much business park development can the Farmington market support? The 176
acres may be a very long term land supply for this type of development - 20+ years.
. What percentage of the business park should be reserved for those complementary
commercial uses?
. Is big box retail acceptable in the business park? It would appear that given the lack of
large commercial tracts in Farmington, the market might look at this area as highly
desirable for this type of development. Does Farmington want this type of development?
If so, where should it be located. If not, how can it be kept out? Is there a compromise
position the City would consider that addresses scale and impact issues.
Planned Unit Development
The current code allows PUD's as an overlay district for residential zones. Our discussions at
Staff level have been to expand the application to business and industrial zones to offer greater
flexibility. This is a common practice in many communities when the PUD is an overlay.
The second issue with the PUD is more procedural in nature. The current ordinance has a three
. step process for approval- schematic, preliminary, and final plan. A very peculiar part of this
123 North Third Street, Suite 100, Minneapolis, Minnesota 55401
(612) 338-0800 Fax (612) 338-6838
.
.
.
p.2
Farmington Planning Commission and Staff
May 18,2001
process is the rezoning takes effect after schematic plan approval. Most PUD ordinances
condition the rezoning on a preliminary or final plat approval with final probably being the most
common.
The last issue with the PUD's is the length a preliminary plan approval should be valid. With a
number of large land tracts owned by a few people, build out with a single developer will take
many years. The current ordinance would not allow a developer to receive preliminary
development plan approval over an entire tract and final plat each phase when it was ready for
development. To address this, some City's have longer periods of time an approval is valid.
Common is a 2 to 5 year period for preliminary plats. What is an acceptable timeframe in
Farmington?
Look forward to meeting with you again on Tuesday.
123 North Third Street, Suite 100, Minneapolis, Minnesota 55401
(612) 338-0800 Fax (612) 338-6838