Loading...
HomeMy WebLinkAbout12.14.99 Planning Packet . . .- AGENDA PLANNING COMMISSION Regular December 14, 1999 at 7:00 P.M. Council Chambers 325 Oak Street 1. CALL TO ORDER 2. APPROVAL OF MINUTES a) November 9, 1999 3. PUBLIC HEARINGS 7:00 PM a) Application to Rezone and Amend Comprehensive Plan - Silver Springs 3rd Addition Applicant: Tim Giles b) Variance on Section 10-6-5: Accessory Storgage Applicant: Mark & Cassandra Hatten c) Application for Conditional Use Permit - Off-Premise Sign - Cameron Woods Applicant: Wensco, Inc. d) Vermillion Grove Schematic Planned Unit Development Applicant: Rottlund Homes e) Murphy Farm Schematic Planned Unit Development Applicant: DR Horton/Arcon Development 4. DISCUSSION a) None 5. ADJOURN Planning Chair: Planning Commissioners: City Staff: Dirk Rotty Todd Larson, Ronald Ley, Chaz Johnson, Tim Dougherty David L. Olson, Community Development Director Lee Smick, Planning Coordinator Michael Schultz, Associate Planner . . . City of Farmington 325 Oak Street, Farmington, MN 55024 (651) 463-7111 Fax (651) 463-2591 www.d.farmington.mn.us TO: FROM: SUBJECT: DATE: INTRODUCTION City Planning Commission Michael Schultz f'v f) Associate Planner .l)Y' Application to Amend Comprehensive Plan and Rezone - Silver Springs 3rd Addition December 14, 1999 Mr. Tim Giles, TC Construction, has made an application to amend the Comprehensive Plan and rezone the vacant property located at the northeast comer of 190th Street W. and Pilot Knob Road. Planninl!: Division Review Applicant: Attachments: Location of Property: Size of the Property: Current Land Use: Tim Giles 1608 W. Hwy 13 Burnsville, MN 55337 1. Rezone Application 2. Location Map 3. Section 10-3-2: Permitted and Conditional Uses '4. Staff Memo dated April 13, 1999 5. , Planning Commission Journal Article on "Understanding Spot Zoning" Northeast comer of Pilot Knob Rd and 190th Street W. 3.3 acres VacantlUndeveloped . . . Current Zoning: R-I (Low Density Residential) Current Comprehensive Land Use: Low Density Area Currently Bounded by: Single-family residential to the north and east. Single-family residential also is located across from Pilot Knob Rd and 1 90th Street W. DISCUSSION Mr. Giles is seeking to amend the Comprehensive Plan from Low-Density Residential to High-Density Residential and Business and also to rezone a portion of the property from R-I (Low-Density) to R-3 (High-Density) and B-4 (Neighborhood Business). The properties are currently vacant and are surrounded by single-family residential. A portion of the properties, Lot 5 Block I, is surrounded by three streets (Pilot Knob Road, 190th St. W. and English Avenue) which is the determining factor for the developer to seek a business use in this location. The developer is proposing that Lot 4 Block 1 be amended and rezoned from Low- Density/R-I to High-Density/R-3. The developer proposes to construct a three-unit attached townhouse in this location, the land use would serve as a transition to the single- family residential to the north and the proposed business use to the south. The proposed parcel meets City requirements for lot size and width for a townhome within the R-3 zoning district. Staff would like to indicate that a two-family unit is permitted under a conditional use permit with a minimum lot size of 17,000 square feet. The developer is also proposing a two-family unit on Lot 1 Block 2, directly across the street from the proposed R-3 lot, maintaining the R-I (Low Density) zoning district (see attached Table 1 or Section 10-4- 2). Lots I, 2 and 3 on Block 1 would remain as low density residential and R-I (Low- Density) zoning district. All of the proposed lots meet the minimum requirements of the Zoning Code. Mr. Giles is currently proposing to rezone the area shown as Lot 5 Block 1 from R-I to B-4 (Neighborhood Business). The purpose of the B-4 zoning district is to provide a setting for low and medium-density housing combined with complementary and supporting business land uses that serve a neighborhood and are developed and operated in harmony with the residential characteristics of a neighborhood. . . . During the creation of the B-4 (Neighborhood Business District), City staff determined that an appropriate location for the new district would be at the intersection of 190th Street and Pilot Knob Road. City staff was not in support of the original application to rezone the property to B-1 (Limited Business) which Planning Commission supported at the April 13, 1999 meeting. Staff determined that this location was not appropriate for the types of uses allowed in the B-1 zoning district. Staff does support the B-4 zoning district and the permitted uses on the proposed commercial property. Staff is recommending that this parcel be rezoned to B-4 (Neighborhood Business) to provide services to the neighborhood without causing major impacts to the adjacent neighborhood. Impacts such as; noise, noxious odors, reflections from bright lights associated with service stations, or increased traffic that could be generated from the types of uses permitted within a B-1 zoning district. Lot 2 Block 2, located along 189th Street and English Ave would be dedicated as park space during the platting of the property. The property would remain in the R -1 zoning district and be used primarily as a tot lot; similar to the one established within the Troyhills development. This is a change from the original application where the park was located just south of the proposed park. ACTION REQUESTED Staff supports approval of the Comprehensive Plan amendment and rezone of the property as described: 1) Lot 5 Block 1 of the proposed Silver Springs 3rd Addition from Low Density Residential/R-l (Low Density) to Business/B-4 (Neighborhood Business); 2) Lot 4 Block 1 of the proposed Silver Springs 3rd Addition from Low Density Residential/R-l (Low Density) to High Density/R-3 (High Denisty); 3) And that the remainder of the properties; Lots 1,2 and 3 of Block 1 and Lots 1 and 2 Block 2 remain as Low Density Residential/R-l. Respectfully Submitted, Michael Schultz Associate Planner cc: Tim Giles, TC Construction . . . PETITION FOR REZONING I, the undersigned, am the fee owner of and hereby request that the following described land: :::-- \ '\ U ,,~'\ C:::::'-'f ~.", v... (') L', i- 1 0+ ) ~ be rezoned from: to: R-~ 13 -4 ~ ,L-:3 I understand that a public hearing is required, as well as a published notice of hearing, for which I hereby attach payment of the fee in the amount of S , which I understand further will be refunded if no meeting is scheduled. '/JJ; Signature / 1- .5~;; 7' Date The Planning Conurussion recommended on the to (approve) (deny) the petition. day of ,19_ City Planner Action of the City Council: 1. On the day of , 19_ declined to set a Public Hearing. 2. At a Public Hearing held the (approved) (denied) the petition. ,19_, day of Date City Administrator In accordance with Title 10, Chapters 2 and 12 of the City Code. cc: Planning Commission, Council, Attorney, Engineer, Water Board: P ARAC - R Property Location II IT) - - - -.....", - ~ ~ J r .......... -t ~ II -- ~ =::: I ~ l'i H S. W - ~I ~ w ~ - ~ 1- /~:-.. I... 'YY'Y - / ~~ ~ !~ -- ~ l '1 }l-- 1 ~;~ I ~ 'SIll\! ^ AN~ \ ~ ~ectPr01Jerty ---.. ........... ~ ~90 H ST~ ~ c..--- \- j ,,_____ ~ "-./_1- m' ~ I ~ \ ~ ri : -- N, ~ -- n; --- --- - w e-j F- - ( \ ~\ I City of Farmington Zoning Map ~ '>[ . ~ ~7 ~;tL~~ N ~ ~ = ~M~~ W~j ~ ~, -~.qJL.< . ~ ~ _,_ " I--- \ \ ~ m ffi& ~ (J ~ I\J---, ~ -.-:a ~ I] - [ ~ -- [ ~~~ ~ f7 ~ ~ V~S a ~ 11?\\;j\ ~ II N J I l~ <9fHeTwj ~ _~I~~ 1 ~~ ~YJjJ~H - rl!!tl = :---0 f-----. ~ ~~~ f ~ I \\ ~ :=<'>' - - ---., -( . Zoning Districts c=::> A-1 (Agriculture) ~ A-2 (Agriculture Preserve) c.:::::> B-1 (Limited Business) ~ B-2 (General Business) ~ B-3 (Heavy Business) ---{ ~ -c~ ~ - I~ · ~ ='YV~ ___ Jl-l " '-... ""-\ Subject Area 1\ ~ ....,. ~ -------- - - --{ ---I --' ~---- == ~ ~~~ l--- 1 ~ ~C1-- '- JII~ ---1 Legend ~ C-1 (Conservation) ~ F-1 (Floodway) c=::> F-2 (Flood Fringe) c=::> F-3 (General Flood Plain) ~ 1-1 (Industrial) ~ PUD (Planned Unit Development) ~ F" \ \ I 1 J / ~ ~ HnEH ~ 5Iffij .noDn~TW 6 R- ~~ H tyJ)~ c=::> R-1 (Low Density) c=::> R-2 (Medium Density) ~ R-3 (High Density) ~ R-4 (Mixed Code) . I \ \ \ I>~ H ~r o ft . 01 ~(,Io O101lu -..J .~U <0 ~, '\ "'~ .0> \ \ d. Ul \ ''IN \ (,10 010 ~u. ~.O> I'l 00 (J1 . 1>::0 r 1111 " '~(,I ~UlO1 UI(,I~ -~, (,I. 0 ~~(,I '0> . z o ~'!! UI. --..\ 800 . ~ S 89'25'12" E ~,~ 1 10,107 SF 126 ~-~ 2 10,015 SF 121 \ 9--1- \ 3 lh,129 SF \ 117 ?~fO~ ~~~' \ 4 15,863 SF 110 \ 1 \ " \ o 0.0 I , I 0, ;!:, \/ I "" ~\60 \ / I "- / / < '-... L..:J I, 1--,..) I r'~'.~'_.'~ LJ.l I" ~;'-... ..........1 ",It 0> " '" w I.J~ ~ IOlo rr, IX);::;-: "_., ~g <1 ,- 1--,. Z ~_; to <D tx:\, Z'\ ~ t-' ~ [-j~ 60 I' ../i....,_, -- -,., ,.., ..., ---, --- -. ._, 'ZI? ,..., ) ~';V n 1...--../ Sj:)^ Ir)// ' I I l/" \ . C,) ("\ \ \ .".) ----------------<;--~---- 1 (197'11 S"/'h'f','r:~' IJJ~{') /g , 65 .--.---~.L-/--71'.... I P~:k Z ~ w . / 0/1 / 10,000 SF oiu ~ lOti) "":in NO ~b z I I~ , / 147 , '10 10 2 0> 10 18,729 SF I I \ ~,. 1 " ,'-, \\~ \~" " \ \11 \ \~ C)/ <' <9\ '<, ':.-,':-'.Y : ~ ~ ~ /~J.>J. ., \ '/~-t .' 00 <;0':. , '(/)> 301 \ , Outlot A 7,076 SF .... 129 490,47 ~I on-I:: .4'n.""'" ... 10-2-2 . 10-2-3 R-2 Medium Density Residential R-3 High Density Residential R-4 Mixed Code Residential B-1 Limited Business B-2 General Business B-3 Heavy Business B-4 Neighborhood Business 1-1 Light Industrial C-1 Conservation F-1 Floodway F-2 Flood Fringe F-3 General Flood Plain (Ord. 086-177, 3-17-1986; amd. Ord, 099-423, 3-1-1999) 10-2-3: ZONING DISTRICTS, PURPOSE: A-1 Agricultural District is intended to protect existing agricultural investments until such time as public utilities may be extended and there is need for additional urban development land. . A-2 R-1 -.-;> Agricultural Preserve District is proposed to identify lands intended for long-term agricultural use with a residential density not to exceed one unit per quarter/quarter section. Low Density Residential District is established to provide extensive areas within the community for low density development with full public utilities in a sequence which will prevent the occurrence of premature scattered urban development. R-2 Medium Density Residential District is intended as an area which incorporates older existing development as well as undeveloped land that would be suitable for small lot single-family constructions as well as duplexes, townhouses and quad homes. R-3 :> High Density Residential District is designated to provide areas of the City which will allow multiple dwellings in areas close to business and services, public facilities and good transportation. The location of these areas generally follows the recommendations made in the Comprehensive Plan. R-4 Mixed Code Residential District is established to provide areas of the City where manufactured housing may be located on either subdivided or unsubdivided developments in attractive . 599 City of Farmington . . . ~ 10-2-3 10-2-3 neighborhoods in areas designated as medium density in the Comprehensive Plan. B-1 Limited Business District is intended to provide areas along major thoroughfares for unified commercial centers oriented to serving automobile traffic. B-2 General Business District is proposed to identify downtown Farmington allowing general commercial uses including retail and wholesale sales, office space and service establishments as well as repair services. These uses may be developed in combination with high density residential dwellings. B-3 Heavy Business District is a transitional classification designed to provide space for certain commercial and industrial uses which are compatible together but do not fit well in either the Limited or General Business Districts. (Ord. 086-177, 3-17-1986) 8-4 Neighborhood Business District is intended to provide a setting for low and medium density housing combined with complementary and supporting business land uses that serve a neighborhood and are developed and operated in harmony with the residential characteristics of a neighborhood. (Ord. 099-423, 3-1-1999) -;> 1-1 Light Industrial District will provide areas in Farmington that may be developed by industrial uses which are landscaped and otherwise compatible with adjoining residential districts. C-1 Conservation District is provided to recognize vital environmental resources of the community including steep slopes, wetlands and unstable soil conditions and to allow development only after careful analysis. F-1 Floodway District identifies the flood hazard areas of Farmington and regulates the construction in a manner which will protect the capacity of the flood plain to carry and discharge the regional flood. F-2 Flood Fringe District designates lands outside the floodway but subject to inundation by the regional flood. To minimize flood damage, structures are permitted on fill but with no first floor or basement below the flood protection level. F-3 General Flood Plain District identifies those areas inundated by the 100-year flood but determined by approximate methods with no base flood elevations shown or flood hazard factors determined. It 599 City of Farmington . . . 10-3-2 Permitted Uses 12. Day care center (Ord, 086-177, 3-17-1986; arnd. Ord. 2-16-1993; Ord, 096-383, 11-18-' 996) (B) 3' (C) 1, Two-family dwellings 2. Agricultural service 3, CommercIal recreation uses 4, Water recreation and storage 5. Public buildings 6, Public utility buildings 7. Kennels 8. Solar energy systems 9. Cemeteries 10. Mineral extraction 11. Equipment and mainte- nance storage 12. Feedlot 13. Accessory apartments 14. Public and parochial schools 15. Churches 16. Towers (Ord. 086-177, 3-17-1986; amd. Ord. 088-205, 8-15-1988; Ord. 093-298,2-16-1993; Ord. 096-383,11-18-1996) A-2 Agricultural Preserve District 1. Agriculture 2. Single-family dwellings 3. Public parks and playgrounds 4. Golf courses 5. Stables and riding academies 6. Drainage and irrigation systems 7, Specialized animal raising 8. Greenhouses and nurseries 9. Travel trailer and boat storage 10. Truck gardening 11. Seasonal produce stands 12. Day care center R-1 Low Density District 1. Agriculture 2. Single-family dwelling 3. Public parks ana playgrounds 4, Golf courses 5. Accessory storage buildings 6. Residential care facility serving 6 or fewer persons 597 10-3-2 Conditional Uses 13, Accessory apartments 14, Public and parochial SchOOlS 15, Churches 16. Towers 088-205, 8-15-1988: Ord. 093-298, 1, Cemeteries 2. Nursing homes 3. Nonprofit recreationai uses 4, Day care facility serving more than 14 persons 5. Hospitals and clinics 6. Public utility buildings 7. Public buildings City ot' Farmington 10-3-2 . Permitted Uses 10-3-2 Conditional Uses 8, Water recreation and water storage 9, Solar energy systems 10, Double and multiple-family dwellings 11. Planned unit developments 12. Greenhouses and nurseries 13, Townhouses - quad homes 14, Condominiums 15. Accessory apartments 16. Public and parochial schools 17, Churches 18. Congregate care facilities 19. Towers (Ord. 086-177, 3-17-1986; amd. Ord. 088-198, 2-'-1988: Ord, 091-246, 5-20-1991; Ord. 093-298, 2-16-1993: Ord, 094-335. 8-1-1994; Ord. 096-378, 8-19-1996; Ord. 096-383. 11-18-1996) 7, Day care facility serving '4 or fewer persons (D) R-2 Medium Density District . 1. Agriculture 2. Single-family dwellings 3. Public parks and playgrounds 4. Accessory storage buildings 5. Residential care facility serving 6 or fewer persons 6. Day care facility serving 14 or fewer persons . 1, Two-family dwellings 2. Multiple-family dwellings 3. Day care facility serving more than '4 persons 4. Solar energy systems 5. Planned unit developments 6. Boarding house 7. Water recreation and water storage 8. Hospitals and clinics 9. Nursing homes 10. Public utility buildings 1 1. Public buildings 12. Funeral homes 13. Cemeteries 14. Greenhouses 15. Townhouses - quad homes 16, Condominiums 17, Accessory apartments 18. Dental laboratOries 19. Public and parochial scnools City of Farmmgton 597 . . . ~ 10-3-2 :? (E) Permitted Uses 10-3-2 Conditional Uses 20. Churcnes 21. Congregate care facilities 22. Towers (Ord. 086-177, 3-17-1986; amd. Ord. 088-198, 2-1-1988: Ord, 091-246, 5-20-1991; Ord, 093-298, 2-16-1993: Ord, 094-335, 8-1-1994; Ord. 096-378.8-19-1996; Ord. 096-383,11-18-1996) R-3 High Density District 1, Single-family dwellings 2, Two-family dwellings 3, Day care facility serving more than 16 persons 4. Planned unit developments 5. Public utility buildings 6. Public buildings 7, Solar energy systems 8. Hospitals and clinics 9. Nursing homes 10. Clubs 11. Accessory apartments 12. Public and parocnial schoots 13. Churche~ 14. Funerp..: homes 15. Congregate care facilities (Ord. 086-177, 3-17-1986; amd. Ord. 091-246, 5-20-1991: Ord. 093-298,2-16-1993; Ord. 094-335, 8-1-1994) 1. Multiple-family dwellings 2. Townhouses - quad homes 3. Public parks and playgrounds 4, Accessory storage buildings 5. Residential care facilities serving 7 through 16 persons 6. Day care facility serving 13 through 16 persons (F) R-4 Mixed Code District 1. Single-family dwellings (UBe) 2. Public parks and playgrounds 3. Accessory storage buildings 4. Residential care facility serving 6 or fewer persons 5. Day care facility serving 14 or fewer persons 597 1. Two-family dwellings 2. Multiple-family dwellings 3. Planned unit developments 4. Townhouses - quad homes 5. Solar energy systems 6. Accessory apartments 7. Public utility buildings 8, Public buildings 9. Day care facility serving more than 16 Dersons 10. Public and parochial schools 11. Churches City of' Farmmgton 1 0-3-2 1 0-3-2 . Permitted Uses Conditional Uses 12. Motor fuel stations, major 10. Retail business 11. Restaurants 12. Fast food establishments 13. Solar energy systems (Ord. 086-177, 3-17-1986) ~ (J) B-4 Neighborhood Business District 1. Personal and professional 1. Personal and professional services (not exceeding services (exceeding 3,000 3,000 square feet of square feet in gross floor gross floor area) area) 2. Personal health and beauty 2. Neighborhood convenience services (not exceeding stores (no gasoline sales, 3,000 square feet of not exceeding 3,000 square gross floor area) feet in gross floor area - 3. Nonprofit/public buildings no automotive repair 4. Daycare facilities facilities allowed) 5. Residential care facility 3. Restaurants (no drive- 6. Neighborhood services thru services, limited to . (not to exceed 3,000 3,000 square feet of gross square feet in gross floor area, no alcohol floor area) sales) 4. Funeral homes 5. Animal clinics (no kenneling Interim Uses allowed) 6. Parking lots 1. Automobile repair; minor 7. Multi-family dwellings (eff. until 6-7-2002) 8. Churches 9. Schools 10. Light manufacturing and assembly (straight trucks only, no jointed or semi- tractor trailer trucks) 11. Clinics (Ord, 099-423, 3-1-1999; amd. Ord. 099-432, 6-7-1999) Permitted Uses Conditional Uses (K) 1-1 Light Industrial District 1. Research and testing labs 1. Manufacturing 2. Offices 2. Water recreation and water 3. Supply yards storage . 899 City of Farmington . . . TO: City Planning Commission FROM: Lee Smick, AICP Planning Coordinator SUBJECT: Application to Amend Comprehensive Plan and Rezone - Silver Springs 3rd Addition DATE: April 13, 1999 INTRODUCTION Mr. Tim Giles, TC Construction, has made an application to amend the Comprehensive Plan and rezone the vacant property located at the northeast corner of 190th Street W. and Pilot Knob Road. DISCUSSION Mr. Giles is seeking to amend the Comprehensive Plan from Low-Density Residential to Medium-Density Residential and Business and also to rezone the property from R-1 (Low- Density) to R-3 (High-Density) and B-1 (Limited Business). The properties are currently vacant and are surrounded by low-density single-family residential. A portion of the properties, Block 1 Lot 5, is surrounded by three streets (Pilot Knob Road, 190th S1. W. and English Avenue) which is the determining factor for the developer to seek a business use in this location. City staff met with Mr. Giles on November 3, 1998 to discuss the proposed project. He proposed Block 1 Lot 4 be amended and rezoned from Low-Density/R-1 to High-Density/R-3. He proposes to construct a three-unit attached townhouse complex in this location to buffer the single- family residential to the north and the proposed business use to the south. The proposed parcel meets City requirements for lot size and lot width. During recent discussions with the Planning Commission concerning the creation of the B-4 (Neighborhood Business District), City staff determined that an appropriate location for the new district would be at the intersection of 190th Street and Pilot Knob Road. The purpose of the B-4 zoning district is to provide a setting for low and medium-density housing combined with complementary and supporting business land uses that serve a neighborhood and are developed and operated in harmony with the residential characteristics of a neighborhood. Mr. Giles is currently proposing to rezone from R-1 to B-1 (Limited Business). The purpose of the B-1 zoning district is to provide areas along major thoroughfares for unified commercial centers oriented to serving automobile traffic. . . . City staff has infonned Mr. Giles that the staff would not recommend approval for rezoning the property to B-1. Staff has detennined that this location is not appropriate for the types of uses allowed in the B-1 zoning district because the property will not be allowed to have access on Pilot Knob Road or 190th Street causing traffic problems. Staff is recommending that this parcel be rezoned to B-4 (see attached pennitted and conditional uses) to provide services to the neighborhood without causing impacts to the adjacent neighborhood such as noise, noxious odors, reflections from bright lights associated with service stations, increased traffic generated from the types of uses pennitted in the B-1 zoning district. Block 2 Lot 2 along 189th Street does not comply with the existing R-I single-family residential zoning requirements. The City requires a minimum lot size of 10,000 square feet and a minimum lot width of 75 feet. The proposed parcel contains 8,255 square feet and a lot width of 65 feet, requiring that the lot be re-evaluated by the developer for lot size and width since this lot would require a variance of 1,745 square feet. The land area directly to the rear of Block 2 Lots I & 2 is reserved for a City park. ACTION REQUESTED I) Staff recommends approving the Comprehensive Plan amendment for Block I Lot 4 from Low-Density Residential to High-Density Residential and for Block 1 Lot 5 from Low- Density Residential to Business subject to Metropolitan Council approval of the Comprehensive Plan Amendment application. 2) Staff recommends approving the rezoning of Block I Lot 4 from R-I (Low-Density Residential) to R-3 (High-Density Residential). 3) Staff recommends the denial of the rezoning of Block 1 Lot 5 from R-l (Single-Family Residential) to B-1 (Limited Business). 4) Staff recommends that the developer re-evaluate the lot size and width to comply with City standards. Respectfully Submitted, Lee Smick, AICP Planning Coordinator cc: Tim Giles, TC Construction . /GJI /' en .-/',/' ~I .------- - wi en ~I ::11 I- en ~I I ~ I ~ I ........... I ~ ~ I I ~ I ~ I ~ I I I ~ e.... . I ~ C I rJ) ~ I tS ~ I '-.:... . l I \ \ :~r O:jD "':~UI UlCDO -J ,"" . co ~:"lf 101 \ .I .- ... \ 1:>;0 U n r ~~a '~'" ""UIUI UI"''''' ."", VI' 0 ~~'" _0> 60 ~ " \ 5 89'25'12" E ~~( 1 10,107 SF 126 ~:'\ 2 10,015 SF 121 \ ~,\ \ \ 3 10 1'&,129 SF <Xl \ 117 /( ~ ~i?------------------ ,-- ~ ~ ~ 0> ,... Sf) I?j IV G w~ iii~~ ~ ~~ .---t N!'l e-:j ~(.J ~ ~iVu CD UI 60 65 \ \ g/) \ \ 4 \~! _I \J 1\ ''"' '\ t3:j Z'" \ t;1 '" " t:. \ r- tJ) \ I~' ~ \~ '" \ \V' '" \(' \ \\\ "- \~ 0 ' ''1 ~ (' '- \ "...& ~ '\. ~ ~ ~ ~;>;. ~ '\. <Z" o~ , 0,>-> ,<' >... ~-d L:.~ I'J ~< ~~ p.';../-/J. ~ '" '" --........ , " ,"s "V;. V 0 , ...~&. <9 0:000 "', <!> -<PO ;~~ '\. '<'/ '{ --........"'" \r- ~ \11 --...... \10 , \-... \ ........ --......\ Ou ,......, , - '--, 7, '- R -I w ~~ "in NO ~O ? \ 15,86.3 SF . I I .,... i~ ~J ( 1 10,466 SF 2 8,255 SF 2 110 82 148 147 65 Park 1 "'--- .......... f/\ o PROPOSED SLOG 9.000 SF o .. '" z o ~CO UI:-' '-J qCD =E 120 .301 o ~~ '" N 89'54'0.3" W _ _ _ _ 190TH s".,or;r'ET SOUTH LINE SW1/4-SW1/4SEC - - - .l.Jl.!? . 1.3, T, 114N, R. 20W - - Jf~s..,T_ PCJ Article: "Understanding Spot Zoning," by Robert C. Widner . . . lof2 http://www.webcom.coml~pcjlarticles/wid060.html Most planning commissioners have heard the impassioned cry that a particular rezoning decision will constitute an invalid "spot zoning." This allegation typically arises where the community is considering the rezoning of a single lot or small parcel of property held by a single owner and the rezoning will permit land uses not available to the adjacent property. Because spot zoning often focuses on the single parcel without considering the broader context, that is, the area and land uses surrounding the parcel, it is commonly considered the antithesis of planned zoning. While rezoning decisions that only affect a single parcel or small amount of land are most often the subject of spot zoning claims (as opposed to rezonings of larger areas), a locality can lawfully rezone a single parcel if its action is shown to be consistent with the community's land use policies. As I will discuss shortly, courts look to the community's comprehensive plan, or to other planning studies, in determining whether the rezoning is, in fact, consistent with local land use policies. Of course, whether a particular rezoning constitutes an unlawful spot zoning depends largely upon the facts surrounding the zoning decision and upon the judicial decisions of each state. However, courts commonly note that the underlying question is whether the zoning decision advances the health, safety, and welfare of the community. A zoning decision that merely provides for individual benefit without a relationship to public benefit cannot be legally supported. Where a particular zoning decision is not supported by a public pU11?ose, the zoning decision is arbitrary and may be subject to invalidation as unlawful spot zonmg. Although courts throughout the nation differ in their specific approaches when reviewing spot zoning claims, the majority consider: 1. the size of the parcel subject to rezoning; 2. the zoning both prior to and after the local government's decision; 12/10/199910:59 AM PC] Article: "Understanding Spot Zoning," by Robert C, Widner . . . 2of2 http://www.webcom.com/-pcjlarticles/wid060.html 3. the existing zoning and use of the adjacent properties; 4, the benefits and detriments to the landowner, neighboring property owners, and the community resulting from the rezoning; and 5. the relationship between the zoning change and the local government's stated land use policies and objectives. This last factor -- the relationship of the rezoning decision to the community's land use policies and objectives -- is perhaps the most important one. As a result, when a planning commission (or governing body) initially considers a rezoning request it should determine whether the request is consistent with the comprehensive or master plan. Many communities' zoning codes also require a separate planning study that examines the merits of the proposed rezoning. This further ensures that any rezoning is consistent with the community's land use objectives, and not a case of spot zoning. The bottom line is that courts will give considerable weight to evidence that the locality's rezoning decision reflects thoughtful consideration of planning factors. It should be noted that there is one situation where a rezoning decision that does not conform to the comprehensive plan may nevertheless be upheld. That is where there is evidence showing significant changes in the community since the adoption of the plan that would justify a rezoning of the property. This is especially true where a review of other factors, such as benefit to the community and the size of the rezoned parcel, indicate that the rezoning was not merely intended to confer a benefit to the property owner. Please note that this article is copyright protected by the Planning Commissioners Journal. You are welcome to download or print the article for your own personal use -- or to provide a link to this article from another Web site. For other use of the article, please contact the Planning Commissioners Journal. , 12/10/199910:59 AM . . . City of Farmington 325 Oak Street, Farmington, MN 55024 (651) 463-7111 Fax (651) 463-2591 www.d.faJ1l1ington.mn.us TO: City Planning Commission Michael Schultz (V f) Associate Planner JY FROM: SUBJECT: Application for Variance, Encroach Required Distance between Accessory Storage Building and Principal Building DATE: December 14, 1999 INTRODUCTION Mark and Cassandra Hatten, 19073 Everest Trail, are seeking a nine (9) foot variance to encroach toward the house with an accessory structure; the minimum setback is ten (10) feet if not attached. Plannin~ Division Review Applicant: Attachments: Location of Property: Encroachment Distance: Current Land Use: Zoning District: Area Currently Bounded by: DISCUSSION Mark and Cassandra Hatten 19073 Everest Trail Farmington, MN 55024 1. Variance Application 2. Applicants site plan/details 3. Approved Grading Plan 4. Staff Pictures 5. Section 10-6-5: Accessory Storage Buildings 19073. Everest Trail 9 feet, the shed is 14 inches from the house, 10 feet is required if the structure is not attached to the house. Single-family Residential R-l Residential surrounds the property . . . The applicants, Mark and Cassandra Hatten, are seeking the eight foot variance to the 10 foot setback requirement for accessory storage buildings from dwelling units. The applicant constructed the storage shed after receiving incorrect information from a neighbor concerning minimum requirements of the City Code. The applicant was not informed of the 10- foot setback requirement. After Building Inspection staff was informed of the possible violation, a stop work order was placed on the structure just before completion so staff and the resident could resolve the situation. The resident claims that because of the berm in the rear of the property, the thirty- (30) foot front yard setback requirement in the Troyhill development and drainage patterns on the property, that a hardship can be claimed for the property. The lot was platted deeper than normally to accommodate for the fifty-foot setback along the future 190th Street (minor arterial), the lot is 163 feet deep by 83 feet wide (the lot is deeper along the curve of the cul-de-sac, see diagram). A thirty-foot setback is required within the development, placing the house further back resulting in smaller rear yards; coupled with a berm that was constructed completely within the rear yard for the purpose of screening and buffering, further restricting the applicant's use of his property. The applicant also points out that the placement of the shed anywhere else on the property may interrupt drainage patterns that run across the rear yard and south toward the front yard (see applicant information). Staff also notes that the proposed type of house on the lot was a full basement, typically wider and not as deep (shown as 32' on grading plan). The applicant's house is a split entry walkout, resulting in a deeper style house (measured on site plan at 48'). This results in a net loss of 16 feet from the rear yard. Both the City Fire Marshall and the City Building Official have reviewed the situation and have recommended that the State Building Code be used in guiding the appropriate distance needed in the variance. They state that the options that exist for the resident are: 1. If the shed is to be less than 3 feet from the house, a one-hour fire wall separation must be placed within both the house and the shed (resulting in 5/8" sheet rock be placed on both the inside and outside walls of both structures and no openings within three feet of either wall). 2. The shed may be located as close as five feet from the house with no requirement of firewall separation, according to the State Building Code. Planning staff would add two other options for the resident if either of first two recommendations are not feasible. 3. The resident place the shed 10 feet from the house, working with engineering staff on a location that will have the least interruption on drainage (the applicant's yard has not yet been final graded). . . . 4. The shed become attached to the home following City and State requirements (a matching frost footing along with a one-hour firewall would be minimum requirements). Staff feels that the property meets the criteria established within the City Code to claim hardship: . Literal enforcement of the City Code would result in undue hardship due to the construction of the berm and required setbacks established within the Troyhill development; . The berm (and resulting drainage patterns) was approved through the City; . The hardship is caused by the adopted minimum setback provisions of the Zoning Code and was not brought on by actions of the person having interest in the property; . The variance observes the spirit and intent of the Code and produces substantial justice that is not contrary to the public interest (City and State guidelines will be met with any of the respective options); . The variance will not effect a lower degree of flood protection. ACTION REQUESTED Staff recommends the Planning Commission consider granting a variance consistent with one of the staff suggested options, contingent upon: 1. That appropriate city staff be notified for inspection of the property upon completion; 2. The applicant have the structure compliant with the agreed upon option within 60 days of the time of the decision. cc: Mark and Cassandra Hatten . CITY OF FARMINGTON VARIANCE APPLICATION Farmington, "MN 55024 651-463-7111 PAX 651-463-1611 .. For offiee use Permit Number ApplicutName MJ\RK ANI> ,^S~NDAA IiAiTEN Applic:utAddress /9073 E'iERE&T T<<' _ PItI?MIAl6TJ;J1V MN , Street City State Pbone Number 4(00 -I{S91 Legal Description of Subjed Property: (lot, block, plat name, section, towoship, range) LilT '5.1 i3LLXK 3 I 1"/~oYHILL '1T14 ADO/170N 5-502.ct Zip Code . Current Land Use R - , Current Zoning District f{ - , Specific Nature of Reqllest I Claimed Hardsbip: ALLOW 5Het> TO fie LOCATEt> lESS rAAII.l ~N FEET FRoM HOU~E' . REQUeST l>uc: miMe c..IM I reD 51A.c.a;;, IN 8,,,,,, 'fARO 8E(A\JS~ OF A L.ARe:.e 8/~M At..:lO AL~O DuE ro l1i~ s\Je~&Gl~CI\)\ ,I>RAtNA6e '^TT€i\N 'TH^T me ~t\E:O t.tJOOc..O It\i fER"\) ~T " (SEE An) Following Attached: (please cbeck) _ Proof of Ownership -A. BoundarylLot Survey ..A.. Application fee ($150) _ Copies of Site Plan _ AbstraetlResident List (adjoining property owners only) _ Torrens (Owner's Dublieate Certificate of Title Required) Property Owner's Signature ~ A f";tt;A; Date /I 11/9" (lAAA~~loAL- For office use only Request Submitted to the Planning Commission on PUblie Hearing Set for: Advertised in Local Newspaper: Planning Commission Action: Comments:' _ Approved _ Denied . Conditions Set: Plann.ing Coordinator: Date: . . . ----....11 To: Planning Commission From: Mark and Cassandra Hatten Re: Variance Request for a shed at 19073 Everest Trail Weare requesting a variance to place our shed less than the mandatory ten foot setback (ordinance 088-210) due to a hardship case. There is a large binn in the rear of our yard that significantly diminishes the potential locations of our shed. The difficulty is compounded by the fact that the drainage in the back yard flows from West to East. If the shed was placed in a location consistent with the current setback ordinance, it would interrupt a significant portion of the drainage path. Lastly, it would break up the only continuous patch of yard my family has left for recreational purposes. This is a well constructed shed, very tastefully done. It is tucked behind the third stall of our garage and it's visibility from the street is minimal. Because of the size of structure, there is no building permit required thus no building codes to be met. The only regulation that we are unable to meet is the location of the structure. This is why we are applying for a variance from ordinance 088-210. Respectfully, Mark and Cassandra Hatten .- I - - "OIl~."N. . G81-1914 FAX:681-9488 PIONEERoPRESSENTER.COM ,tghwoy 10 N.E, , .'e. UN :'054,54 ,612) 783-1880 FAX:783-1883 . E--:mo~: PtONEER2GPRESSENTtR,COlol CaNST. ~ - '< of( * -tt .....ONEER engineering ... ~... * - - -- ~"*-t" .-___.~...-. lNCJ ~. lNCJ'SGN'( MOtI1UfS . Certificate of Survey for: MW JOHNSON 1A07,)'E\/EREST TRAIL N89' s' 43-E 83.00 LOT AREA = 14.201 sq.fl, HOUSE AREA =1.779 sq,ft, "-=--~-~---------- I --__'... DRAINAGE &: UTIUT'I' I I -... EASEMENT PER PLAT I I I I I I I I I I I I I .!.~~~ I ! I I I I ~ --- -~9.92------ I J I I -- t............. ...c.u"~6 BENCH MARK TNH LOTS 15-16 BLOCK 2 ELEv,=974,48 en t') ~ co ,.... ''It ..t- oo .... . '" '" ... cxi ... '" ... cxi ... o ..; ... ELEC, tELE. CATV, ,/ .. .~OO b*Z~Z6~--- ~~.~ ~p..\\.. , --- . ~t.S1 / t.""~' /' NOTE: f'AOPOSEIl CRAOES _ PER CflAOlNC Pl."" BY: SAlHRE-IIEIlCQuIST NOTE: llUIlOlNC DlIoIEKSlONS SHOW< ARE f'OR HORIZONTAl ....0 \/ER1lCAI. LOCAnON OF S1llUCllJRES llNl. y, SEE AllCHlTt:ClUAL P\.ANS f'OR BUll.llIKG AHO f'OUNOA 1lON OOlEHSIONS. NOTE: NO SPfOflC SOILS lNlltSllCA nON HAS BEEN COWPlLTEO ON 1llIS lOT BY THE SUR\'EYOfl, THE SUlTAIIlUlY OF SOILS TO SUPPORT THE SPfOFl(; HOUSE PROPOSED IS NOT THE RESPONSlBlUlY OF THE SURIltYOfl, PROPOSED HOUSE ELEVA nON LO~ST FLOOR ELEVA nON: q<k(M TOP OF BLOC!< ':LEVATION: q~q ~ GARAGE SlAB ELEVATION: q("A. A-- TOB 0 LOOKOUT ELEVATION: NOTE: TliIS CERTIfiCATE 0<l(S /lOT PURPORT TO SHOW EASOAEHTS OTHER THAN THOSE SHO\otI ON THE RECOllOEO PI..A T, x 000,00 DENOTES EllISlINC ElEVATION ( 000,00 ) DENOTES PROPOSED EU:VA 1lON _ _ _ DENOTES DRAINAGE ANO UTIUlY EASEMENT DENOTES DRAlNAC( f'lOW DIRECTION __ DENOTES lAONUlAENT --G-- DENOTES OFFSET MUS WE HEREBY CERTIFY TO MW JOHNSON CaNST, THAT THIS IS A TRUE AND CORRECT REPRESENTATION OF A SURY::Y OF HE BOUNDARIES OF: NOTE: CONTRACTOR WUST II(Rlfy ORl\'EWAY DESlC>/, NOTL &AR'NCS SMO.... ARE BASEO ON AH ASSU"ED DATU" . LOT 5, BLOCK 3, TROYHILL 4TH ADDITION DAKOTA COUNT'. MINNESOTA IT DOES NOT PIPPORT TO SHOW IMPROVEMENTS OR ENCHROACHMENTS, UNDER MY DIP ~CT SUPERVISION THIS 30m D~Y. ~r ,APf'L.)999 {,..ov:' J~", ".-/29'( SCALE : :H = 30 FEET /" ?-" C 1..rL- PION~R EN~' P,A, John C. Lorson. L.S, Reg, No, 19828 EXCEPT AS SHOWN, AS ~RVEYEO BY ME OR 19115 992~ . NJK . . - ---------..... . - (:) 81RM q- fViUttE. I\J DEC~1, J . PATIO HOG ~:)E: 5L~-- o --- . ,-~ 8~Rt;. ~ 6I-\RA(d~ ~5 TlZ.f\\L (1)~A'"N:ae IN REI>) . I' II I I I 11 . ClD +.. Ng _..~...., !t1 .+ (:ig 1.09X I I~ ~+ ~8 1/ 1. -- ~' +tI3.13 \, 73,5 . 973.7 173,3 @ 971,3 @ 973,8@ 3 1.4 "...)r t....1 (::T'iNFf:;>, I __' \.. , (lIS) 962,8 (IN) F, i \ 1,:\ r'....,,'71 , r H I 13 . ---- 964,6 .......----.'. -...... . .-..............._...~~".,.,...- -~. -..-... - .... . S/~M \l~\~~E 'I\EW fROrv\ NW. CORN~ OF ttO\)~E ff\CJ ~ (:, ~.I\\.E:.. . jI 111 .JI __ __ .- .II .II _ II .11 II II II . . . " z; : :::::: N . Ol) cd ~ q . \ ~;I'J \I.$'f '1'K,;- f, ! ,;l ,,;,'iJ \1" :"lq': I~~; 1 "'C'~""'f';;~;~~i{"" .,' t . -::., .',:1." _'~ t .....\.-.., ..} , ;, l', "l"t"l'" " '..' .' *'. . '.1,':..'i,';.."'","..!..':,', ',.<' ..,',"". ;'~ ,", . . ,:., ,'.. : ,'''' , ': 1 ,~ 'i'} !!':'l':e' '.~ ,;' 'I . > .\ Ie' "',e, ~'t\:., l,~. . t" f ; 't' I} ill,l-:it~ f , Il ,I i ':1 Itt,:.l.::;";",,,.:i-if^' ".' .f.""~ ,".~'.J.:.~ .,\..-:;.:,.K..}i..C.1.:t.....,. 1 '< "j . . "!" -"'"'''''' J ~ ~; ,.;1""\ --" .I"~:'< !~' '.' ,t J, 't,fj'F'1 ,;; ,~ f,t~' , ;'t ',' "" :,~, , "'""~ ',f, , 1f .~,~1';.o'i'J~" Lt., ' , '.". '".','.'."" '.}"....'~. ...' , 1,. '"...t.'.'.;(,'.,". '..,',.t,.t..".,:lFt. .,' ""',f'." i,'~'11"i , " .'" J "'l'+ieJ' ,,' ' .; !i,...: i..,'..,.,".,f,('..,' '..':". '.'."".".."...;..'.'.' "..' ' '1:" ' ];' ]~" 'f .' ;" h, ' "" .1.. ,:,'.,"1,( ". ..'. ,t :i.,l'.l '. '.~.' ',:,! :.',~~;.,*,,!,l..'.. ,., l ' · i" . ~'. ,'. ,:j,:' i, i; -~~": :f 11 J'~ 1 -~ :1 ", ;, }).., 1 ;.~ '\,~'l:~ ~" .~ ~. ," ~~ :" ,\0:'; }~:: -~. ~- l'" .J' ". } :..1 ',t. j d *. ,.i , ~, ,! '1 ~' tll I ~ 1 . '; f:' '..,.f f. t ,.l.'''.f'~ f J;; " ~'," "~'I"~ 'j"",,' ~ ~,~ ~t". jitl)~i, "f,g. \iJt., ' .' ,... it.~, -;::;},"'>" { ,'.' ':<,' " f t fJ.H~ ' ',' j, 'i '~';"'..' l:~,'::~'. " :!'1 ~:J i~'~: ::' ,,\,~ - .1:."'" ~;.~, i~l. I'., I ... tU .J,,~ ...., v "'~", ", ' ,'r"",.., .. ~( III; . 0'\ 0'\ 0'\ ..- ....... o ..- ....... N ,.-.., '"@ d (.) 0 e:: c:.- d ..J e:: t- o ..J 0 I t- U . ;> ~ > -< ~ Qj -< e C'l . 00 (Ij p.. . 0\ 0\ 0\ ....... --- o ....... --- C'l ,,-., ~ 0 d 0 c- e:: d ....j e:: 00 .....:l 0 0 00 , . U > ~ > ~ ~ <I) ~ tB . Farmington City Code (portion) 10-6-5: Accessory Storage Buildings: Accessory storage buildings shall be permitted uses in residential districts and conditional uses in business and industrial districts subject to the following conditions: (A) Residential: 1. They shall by placed in the rear yard of the principal unit and at least ten feet (10') away from the dwelling unit if not attached. (Ord. 088-210,11-7-1988) 2. They shall not exceed twelve feet (12') in height and one hundred twenty (120) square feet in area. (Ord. 096-378, 8-19-1996) 3. They shall meet the minimum requirements of the Building Code and be anchored in place as approved by the Building Inspector. (B) Commercial and Industrial: 1. They shall be approved as part of the conditional use process. . 2. They shall be constructed of similar materials as the principal use. 3. They shall comply with minimum requirements of subsection 10-6-5 (A) of this Section. (Ord. 088-210, 11-7-1988). . . . . City of Farmington 325 Oak Street, Farmington, MN 55024 (651) 463-7111 Fax (651) 463-2591 www.d.farrnington.mn.us TO: City Planning Commission Michael Schultz, Ii 0 Associate Planner r FROM: DATE: December 14, 1999 RE: Conditional Use Permit for Off-Premises Directional Sign INTRODUCTION Wensmann Homes Inc. is seeking conditional use approval to place two off-premise directional signs on City property, located just south of the applicant's property. Planning Department Review Applicant: ' Attachments: Location of Property for Proposed Sign: Size of Signs: Current Land Use: Wensmann Homes Inc. 1895 Plaza Drive Suite 200 Eagan, MN 55122 1. Section 4-3-1: Signs (A) 12 2. Diagram of Signs 3. Location Map 4. Water Board minutes from April 27, 1998 and May 26, 1998 City well site at the northwest comer of the intersection of Pilot Knob Rd. and Euclid Path (adjacent to Super America). 2 signs - each measures 6' x 4' (24 square feet) Public (City Water Board Property - well site) . . . Area Bounded By: Commercial to the east, Single-family residential to the west, multi-family directly north and south DISCUSSION Wensmann Homes Inc. is seeking a conditional use permit to erect two off-premise directional signs located on a City well site, located just south of the Cameron Woods development. The purpose of the signs is direct traffic off of Pilot Knob Rd and north on Euclid Street to the Cameron Woods cooperative. The size of each is 24 square feet. The City Water Board previously has granted permission for off-premise signage to Heritage Development (5-26-98) and TC Construction (4-27-98) for their respective subdivisions. The Board has not required any fees to be paid for use of the property but has required an agreement concerning the amount of time the sign would be located on the property. A contract date of January 1 S\ 2000 was established by City Engineer Lee Mann to remove all off-premise directional signs from the well site property. The Water Board has also reserved the right to remove all signage without prior notice. ACTION REQUESTED: Approve the Conditional Use Permit for the off-site directional signs for the Cameron Woods development contingent upon the following: a) Signage may not be erected until permission is granted by the Water Board; b) The signs be installed as to not be easily toppled or stolen from the property; c) The signs meet all setback requirements. cc: Wensmann Homes Inc. 4-3-2 '. . . 4-3-2 to this shall be limited to thirty two (32) square feet in area, conform with setback requirements in each district, and may be illuminated subject to timing and information controls stipulated as a condition to the conditional use permit. 9. On-Premises Signs: For the purpose of identifying or advertising a business, person, activity, goods, products or services located on the premises where the sign is installed and maintained, signs shall be regulated as set forth in subsections 4-3-3(B) and (C). 10. Illuminated Signs: Except for temporary signs, illuminated signs shall be allowed in "B" and "I" Districts. Such sign shall be illuminated only by steady, 'stationary, shielded light sources directed solely at the sign, or internal to it, without causing glare for motorists, pedestrians or neighboring premises as outlined by the section in Chapter 6 of the Zoning Ordinance dealing with exterior lighting. 11. No Trespassing Signs: No trespassing signs and no dumping signs shall not exceed two (2) square feet in area per side and not to exceed four (4) in number per lot in "R" Districts. In "A" and "C" Districts such signs shall not be less than three hundred feet (300') apart. (Ord. 086-173, 2-21-86) 12. Off-Premises Directional Signs: For the purpose of providing off street direction to a residential project described in this subsection (A), or a new venture less than twelve (12) months following occupancy permit, a public, religious or nonprofit institution, or a use which, in the determination of the Planning Commission, incurs substantial hardship from lack of reasonable identification as a result of its location: a conditional use permit shall be required. Such sign shall not exceed twenty five (25) square feet per face and such sign shall conform to the yard requirements of the zoning district in which it is located. In addition, a directional sign may be permitted for any uses which, in the determination of the Planning Commission, incur substantial hardship from lack of reasonable identification as a result of its location. If said sign is lighted, it shall be illuminated only during those hours when business is in operation or when the model homes or other developments are open for conducting business. (Ord. 093-320, 12-6-93) 13. On-Premises Directional Signs: Where one way access and egress drives are incorporated in a site plan, a sign indicating traffic direction no more than four (4) square feet may be placed at a driveway within five feet (5') of the street right of way. J!( directional 694 City of Farmington . . . - 1111U/99 15:41 'O"o1l 463 1611 un rA1<tUN\;TUN lllJ UUU4/UUU5 CITY OF FARMINGTON CONDITIONAL USE APPLICATION Farmingto~ MN 55024 651-463-1111 FAX 651-463.1611 Applicant Name W~~M.c..~~ \\nM~ :CtVL. Applicant Address '~Oa~ 'B."LA 'lYl\J~ ~\. '2('0 ~~U I Mt.-l. 65\2.1..' Street City tate Zip Code Phone Number (O~ l - 4:Q.g -~UtY) Legal Description of Subject Property: (l~ blo lAt name, section, township, range) ~ 'e"l?~/Se ~.- '7( qI- .. t"~~"""'~""''''\'''''''~''j'l '''~ ;~L", .....,~'. l \ ~ ~~~~ II T r""r\ rrr&:'~ i l"i:'f :';'.:l~&;)~' "'\-C:~~"')1~ 1 '; F~;.,~i'l .).~<p,1i'~ . .~ ~ ;~;~._~ ~'''~.' ~ It,~;~,;~;/\:O~-:/ll' ~\t:..,;:..;~:l." 1 ~+ ~~~ f-~;..-:,.( .; ;~,.' n<3l"--''lJ'\lJ,(,~.-l...,\\\\_,-=~Ir-''T"',..""" Current Land Use /IIJJ!jt W C:-tL #,~urrent Zoning District R- / Specific Nature of Request: O;:::? -- /1?~,6ik.5e' p/ PEL:77 ~~ L k.4/,r'E77/}/-u-- t?'F ~~e~c;.W ~PS :5/6-.4 rbA? FoDowiDg Attached: (please check) _ Proof of Ownership _ BoundarylLot Survey -f- Application fee (SI50) _ 6 Copies of Site Plan _ AbstractlResident List *(required 350' (rom subject property) _ T........ (OwDer'. Dlobli.... CertifICate .entle Reqai~ ~ APP_Sip-:.: 4~ Property Owner's Signature Date . 'to'd "ll:::llOl I' .... "-'J.\r.,: ,:::..- I . I ~ I I H I , I ! I L__ I I, 1 I ; ! ,_ _u ~ ," . . . ~ ~~ !f O'CIl .,~ ~~ m~' c:"E ~i ~o ::;) -< lU ~ CIl i -+z tr1 ~ \J (j) 3 sf (J) cO. :J [ r-+ o. :J ~ . . . MINUTES WATER BOARD REGULAR April 27, 1998 I) The meeting was called to order by Chair Shirley. Members Present: Wier, Krueger Also present: Engineer Lee Mann, Mark Rolfs, Finance Director Robin Roland, Bill Weierke 2) The agenda was approved as presented. 3) Motion by Krueger, second by Wier to approve the minutes for March 23, 1998. Motion carried. 4) Old Business a) Mr. Rolfs reviewed things happening on water tower. Work has started. Contractor has authorized his people to work overtime as needed with possible work on Sundays if needed, b) Well #4 has been pulled for repairs. Parts enroute. Hope to have operating during week. Hydrant flushing delayed for this reason. c) Motion to award contract for fence around old tower to Midwest Fence. Cost to be $7,635.00. Motion by Shirley, second by Krueger. Motion carried. d) No comments concerning Well #5 at this time. e) Mark Rolfs presented well field study. Some sites added as already owned by the Water Board. Further study is needed, t) Mr. Mann presented rate study. No action taken. 5) New Business a) Planner is asked to set up some plans for old tower site. Plans may be presented in neighborhood kind of meeting with Parks Chairman present. b) A request by Nelsen Hills developer was made to locate their sign on Well Site #4. Mr. Mann was directed to permit such use with the following conditions: i) No fees to Water Board, City fees are required. ii) An agreement (contract) to be executed allowing use but a definite time for vacation of use is to be made. 6) A water use report for first quarter was presented. No action needed. 7) A report on numbers of building permits for City to date was presented. No action needed. 8) Robin Roland presented the current financial report. Accepted report. 9) Bills as follow were presented: March 23 in the amount of $19,455.46. April 27 amount $7,774.50. Motion to pay bill s\n these amounts was made by Krueger, seconded by Wier. Motion carried. . · 6) . MINUTES WATER BOARD REGULAR May 26, 1998 I) The meeting was called to order by Chair Shirley. Members Present: Wier, Krueger Also present: Engineer Lee Mann, City Planner Lee Smick, Bill Weierke 2) The agenda was approved as presented. 3) Motion by Shirley, second by Krueger to approve the minutes for April 27, 1998 with correction in item 9 typing needed. Should read "Motion to pay bills in.....". Motion carried. 4) A request was received from ENRON to relocate a small building onto City owned property at the comer of 1901h Street and new Pilot Knob Road for Water Board usage. It was moved by Krueger, seconded by Shirley to permit Engineer Mann to negotiate terms of easement with ENRON keeping in mind building to be used to be compatible with surrounding area and will not interfere with future use of property by Water Board. Motion carried. 5) A request was received from Pine Ridge Forest development to use well site on Pilot Knob Road to install a sign to advertise that development. A motion was made to allow a sign on the site with the same terms as that granted to Nelsen Hills at a previous meeting. Included in the motion is a statement that further signage will not be permitted, City must approve placement and the Water Board reserves the right to remove signs without notice. Motion by Wier, second by Krueger. Motion carried. Old business a) Update given on water reservoir. Indicates that work is progressing as planned with many extra workers being used. b) The repair work on Well #4 is nearly complete. c) The fence around existing reservoir is in place. Water Board visited the site earlier in evening. d) Rates - The Board discussed the effect a watering ban would have on income. The proposals for a ban should meet with City Attorney approval for legality. A motion was made by Krueger, seconded by Shirley to direct Engineer Mann to initiate watering ban process by contacting the City Attorney. Motion carried. 7) The financial report was received, reviewed and accepted. 8) A motion was made by Shirley and seconded by Krueger to pay bills in the amount of $25,787.14. Motion carried. 9) City Planner Lee Smick talked with the Board concerning a comprehensive plan and of future interviews of City personnel including boards, concerning visions of the future of the community. She asked cooperation of the Water Board. . City of Farmington 325 Oak Street, Farmington, MN 55024 (651) 463-7111 Fax (651) 463-2591 www.ci.farmington.mn.us TO: City Planning Commission FROM: Lee Smick, AICP Planning Coordinator 1\\ 0 Vermillion Grove Schematic PUD \Y SUBJECT: DATE: December 14, 1999 INTRODUCTION Rottlund Homes proposes to develop approximately 122.5 acres of land in the southeast quadrant of the intersection of CSAH 31 (Pilot Knob Road) and CR 64 (195th Street West) as a single and multi-family development with a small amount of land set aside for neighborhood commercial. The developer proposes the R-3 PUD zoning due to the variety of land uses within the development. The Schematic PUD plan establishes the underlying zoning and location for each . of the different land uses within the development. Planninl.! Division Review Applicant: Rottlund Homes J. Michael Noonan, Division Vice President 3065 Centre Pointe Drive Roseville, MN 55113 (651) 638-0520 jmnoonan@rottlundhomes.com Referral Comments: 1. City Engineering Division 2. City Fire Marshal 3. City Parks & Recreation Commission minutes Attachments: 1. Location Map 2. Letter from Developer 3. Application for PUD 4. Boundary Survey & Legal Description 5. Aerial Photo of Property 6. Schematic PUD Plan 7. Existing Conditions 8. Concept Utility Plan 9. Westwood Trip Generation Analysis 10. Neighborhood Meeting Comments . . . . Schematic P.D.D. Plan Amendment Location of Property: Area Bounded By: Existing Zoning: Proposed Amendment: Proposed Development: Streets and Accesses: Southeast quadrant of the intersection of CSAH 31 (Pilot Knob Road) and CR 64 (195th Street West). Single-family residential on the east, agriculture on the south, vacant on the west and an elementary school on the north. R-l Single-Family Residential The development proposes to amend the existing low density residential land use to a mix of low, medium and high density residential and possible commercial uses as proposed in the 2020 Comprehensive Plan Update. The amendment for the changes to the proposed land uses will occur when the Metropolitan Council approves the 2020 Comprehensive Plan Update early in 2000. The development proposes constructed on approximately proposed land uses are as follows: 340 housing 122.5 acres. units The Single-Family - Gardens Villa Townhomes Commercial 41. 8 acres 24.3 acres 21. 1 acres 3.5 acres 97 units 95 units 148 units N/A The single-family product proposes ramblers, split- levels and two-story configurations. The gardens are slab on grade construction and provide one-level living and consist of a 4-unit building. The garden townhomes include a basement. The two-story villa townhomes consist of 8 to 12-unit building. If the neighborhood commercial area is not developed, 10 additional garden units will be proposed within the 3.5 acres generating approximately 350 housing units in total for the development. The development proposes three access from its property, one access on Pilot Knob Road to the west, a second access on 19Sth Street to the north and a third access on Akin Road to the east. The development proposes both public and private streets, whereby the private streets will be maintained by a homeowners association. 2 . . . Water, Sewer & Gas: Water access is located at the newly constructed City water tower and sewer will be available from the south through the Murphy Farm development. A 100-foot wide gas line easement runs north and south through the western portion of the site. No structures may be located within the easement, Sidewalks: Sidewalks or trails will be recommended along all local collector routes per City Code requirements. Topography: Site topography is rolling except for the central portion of the site that tends to provide wider contours. The drainage patterns are generally towards the south. There is a large existing swale area along the eastern property line that abuts the homes along Akin Road. This is a natural swale that is often times inundated with water and should be reviewed in detail at the platting stage of the development. Wetland: The wetlands shown on the site are classified as protect wetlands. The largest wetland encompasses approximately 14.8 acres and the smaller wetland is approximately 5.6 acres in size. The protect wetland classification requires that structures shall not be placed within a minimum of 10 feet of the buffer area. The buffer area provides a minimum of 75 feet from a protect wetland, thereby requiring a minimum setback of 85 feet. These wetlands exist in a largely unaltered state and have special and unusual qualities that call for a high level of protection. Flood Plain: There are no flood plains delineated on this property. Parkland and Trails: The developer proposes a park area and trails located throughout the site. The park dedication requirement is 12.5% of the total acreage and will be dedicated by the developer through land, fees and/or trail construction. Additional Comments Land Use Issues The 2020 Comprehensive Plan Update submitted to the Metropolitan Council on July 28, 1999 showed this area with medium density residential on the west along Pilot Knob Road and high density residential on the west and northern portion of the site. Low density residential made up the remainder of the property on the south and east portions of the site. 3 . . . However, on July 17, 1999, Larry & Doneene Wenzel owners of the property, requested to re- designate three acres of the property to business on the 2020 Land Use Plan for future commercial development under the B-4 Neighborhood Business zoning requirements. During the review, it was determined that the re-designation of the Wenzel property could be pursued through the Planned Unit Development process rather than an amendment to the comprehensive plan. The PUD process permits any combination of the following uses: single- family, two-family, quad homes, town or row houses and apartments. The PUD also permits commercial facilities that are designed and intended to serve the residents of the planned unit development. However, the PUD requires that no commercial use be constructed until fifty percent ofthe total dwelling units contained on the entire site is completed. The City Council determined that the PUD process was the most efficient way of re-designating the property to the proposed sketch plan because of the timing of the comprehensive plan approval process. Therefore, the City sent the 2020 Comprehensive Plan Update as previously approved by the City Council to the Metropolitan Council on August 5, 1999. A comprehensive plan amendment would delay the approval process, therefore, the PUD process would re- designate the uses of the subject site through the rezoning of the property. Proposed Density The development proposes the following gross densities: Housing Type Proposed Density City Requirement Land Use Designation Single-Family 2.3 du/ac 1 to 3.5 du/ac Low-Density Gardens 3.9 du/ac 2.5 to 5.5 du/ac Low/Medium- Density Villa Townhomes 7 du/ac 5.5 to 14.0 du/ac Medium-Density The proposed gross densities correlate to the 2020 Comprehensive Plan Update. Transportation Issues The Schematic PUD Plan shows three accesses from the subject property. The westerly access is proposed with a 70-foot right-of-way that connects to Pilot Knob Road. The roadway is shown as a future minor collector on the 2020 Thoroughfare Plan. A majority of the traffic is expected to enter and leave the property from this access, thereby requiring a left turn lane on Pilot Knob Road towards the south as shown on Figure 2 of the Westwood Trip Generation Analysis report. The northerly access is shown as a 60-foot right-of-way and meanders through the development. Upon review of this proposed roadway, City staff has recommended that the roadway follow the westerly property line to or near the City's well house site before diverting towards the east. This will allow for a shared access with the City property to the west and allow for a greater stacking distance. This roadway is considered a public street and will be maintained by the City of Farmington. It is recommend that a 70-foot right-of-way be proposed along the westerly property line until it diverts to the east within the subdivision. The City is interested in negotiating a cost share agreement in the future with Rottlund Homes for the construction of the roadway along the westerly property line. 4 . . . The easterly access is also shown as a 60-foot right-of-way that connects to Akin Road. The developer is in the process of acquiring a small piece of the Pettis property in order to connect the roadway to the right-of-way of Akin Road. This access will mainly accommodate vehicles travelling south on Akin Road into the subdivision and north on Akin Road, leaving the subdivision. The developer will most likely be required to provide a left turn lane on Akin Road. The developer has prepared a trip generation analysis for the development that is attached. In total, the Vermillion Grove development is expected to generate 2,410 average daily trips with an estimated 350 housing units. The trip generation model anticipates approximately 60% of site traffic will be distributed to the north on Pilot Knob Road (from the site via Pilot Knob Road and Akin Road) and approximately 20% will be distributed to the west via 195th Street. The remaining trips will be distributed to the south. Roadways associated with the villas and gardens will be private streets and will be maintained by a homeowners association. Park & Recreation Issues The Parks & Recreation Commission met on September 1, 1999 to discuss park issues concerning the site. The meeting minutes report that the members agreed on a passive recreation park design with trails throughout the property due to the large amount of wetlands and rolling topography within the subdivision. The Commission also determined that a ballfield was not appropriate because of wetlands and wooded areas throughout the site, however a play structure and possibly a trail kiosk are recommended. Upon further examination at the December 1, 1999 Parks & Recreation Commission meeting, the members stated that the proposed location for a play structure on the peninsula area is difficult to access because of the proposed storm water ponds directly to the north and northwest of the play structure site. Secondly, the proposed 4-acres of park space along the easterly property line is not conducive to the park system due to the inability of accessing the site. City staff recommends that this area be shown as an outlot and be dedicated to the City to preserve the area adjacent to the "protect" wetland. Finally, the Parks & Recreation Department have scheduled continuing discussions concerning the need for a play structure and/or shelter adjacent to a street for easy access to the park. The Parks & Recreation Director has suggested the purchase of a lot for a required well house on the site and constructing a shelter attached to the well house. These discussions will take place after the public hearing on December 14, 1999, therefore staff is recommending the continuation of the hearing to January of2000. Environmental Assessment Worksheet Minnesota Statute section 473.859 requires that any development that consists of mixed unattached and attached units must prepare an EA W if the following is true: The sum of the quotient obtained by dividing the number of unattached units by the applicable unattached unit threshold, plus the quotient obtained by dividing 5 . . . the number of attached units by the applicable attached unit threshold, equals or exceeds one. Therefore, 97 unattached units/250 unattached units = 0.38 + 243 attached units/375 attached units = 0.64, which equals to 1.02 indicating the need for an EA W to be prepared for the Vermillion Grove project. The EA W must be completed before any platting of the property is reviewed, however, the rezoning of a property may take place before the EA W is finalized. Rottlund Homes has employed Peterson Environmental to prepare the EA W for the City. The City of Farmington is the RGU or responsible governmental unit that is responsible for verifying the accuracy of environmental documents and complying with environmental review processes in a timely manner. The EA W must contain the description of the project, quantification of physical characteristics and impacts and major issues identifying potential environmental impacts and issues that may require further investigation before the project may commence such as transportation, wetlands etc.. Phasing of the Development The developer is proposing to gain preliminary plat approval for the entire development in the early 2000 with fmal plat approval for various phases of the development shortly thereafter. The developer will begin construction of the villas along the northern property and the gardens along the western property line in the first phase. The developer plans on the construction of model homes and the marketing of the homes by the middle of 2000 and plans to be built-out within 3 to 5 years, The proposed commercial area will be marketed to a developer who has experience in the construction, leasing and management of commercial property. Rottlund Homes will not be associated with the construction of the commercial property. Homebuyer & Housing Characteristics The development is proposed to meet the needs of the first time homebuyer, the move-up purchaser and the "empty nester" looking to down size. The villa townhomes will accommodate the first time homebuyer and are the most affordable in the Rottlund Development. This product will range in size from 1,220 to 1,645 square feet. The villas will be part of the first phase of development on the property. The gardens and the garden townhomes will meet the needs of the "empty nester" with one level living in the gardens home and one level and a basement living in the garden townhomes. These products will range in size from 1,260 to 1,450 square feet. The gardens and garden townhomes will also be a part of the first phase of development on the property. The single-family product will accommodate the move-up segment of the population and will range in size from 1,850 to 2,700 square feet in rambler, split level and two-story configurations. The single-family construction will be included in later phases of the development; however, most of the utilities and streets will be installed in the first phase. 6 . Population Projections The developer has estimated that at total build-out the population of Vermillion Grove will be near 670 persons. These projections are based on the following: 148 villa townhouses @ 1.25 persons per unit (ppu) 95 garden and garden townhomes @ 1.8 ppu 97 single-family homes @ 3.25 ppu = 185 persons = 171 persons = 315 persons Neighborhood Meeting - December 7, 1999 The developer held a neighborhood meeting at Akin Elementary School on December 7, 1999 to discuss the proposed development. Attached is a brief synopsis by the developer concerning the meeting. As the developer states, concerns included surface water management, increased traffic on Akin Road from the proposed access, the maintaining of vegetation on the site particularly where the single-family homes on Akin Road abut the property, parkland issues, the commercial parcel and the phasing of the project correlating to grading activity on the site. ACTION REQUESTED Approve the Vermillion Grove Schematic PUD rezoning the property to R-3 PUD and forward this recommendation to the City Council. . Respectfully submitted, ~~ Lee Smick, AICP Planning Coordinator cc: Rottlund Homes, J. Michael Noonan . 7 . Property Location Akin EI ementary . City Water Tower . N w*, s . I SUBJECT PROPERTY' D ,# . . . City of Farmington 325 Oak Street, Farmington, MN 55024 (651) 463-7111 Fax (651) 463-2591 www.ci.farmif\lton.mn.us TO: Lee Smick, Planning Coordinator FROM: Jerry Auge, Jr., Civil Engineer I O:.-toc--- David Sanocki, Engineering Division X1.~.L1. SUBJECT: Vermillion Grove DATE: November 10, 1999 Engineering staff has reviewed the schematic P.D.D. plans that were submitted on November 5, 1999, for the above referenced project. The following are engineering comments that require further discussions with the developer: GENERAL · All residential street shall be designed to ensure a horizontal sight distance of not less than 200'. The minimum design speed for residential streets shall be 30 MPH unless otherwise approved by the City for residential streets. The minimum design speed for collector streets is 40MPH unless otherwise approved by the City. · The access from 195th Street shall meet the above referenced design criteria as agreed at the meeting on December 7, 1999. This shall also include an access to the City property to the west. · Collector roads minimum width for Right of Way shall be 70 feet and for residential streets minimum width for Right of Way shall be 60 feet. . Submit soil borings and ground water monitoring reports, soil reports shall include recommended soil correction for street section. · The gas main is located within the west portion of the project. All proposed lots, landscaping, utility, and street locations within this easement shall be coordinated with the Gas Company. · Cul-de-sac's should be minimized and looped into other streets when at all possible. . Southwest cul-de-sac should be connected into collector to the north or into the south cul-de-sac in the Murphy Farm Development. . . . · All collectors shall have sidewalk along minimum of one side of the street and shall be placed according to the City's sidewalk/pathway plan. SANITARY SEWER . Sanitary sewer main will have to be connected through the Murphy Farm Development to the south or routed to the west and then south along the east side County Road 31 (Pilot Knob Road) and connected directly into the City trunk main (approximately 1300 feet south of the proposed development). . Sanitary sewer line that is proposed along the East-West corridor shall be deep enough to pick up existing homes along Akin Road north and south of intersection of the East-West corridor and Akin Road. W ATERMAIN · Trunk watermain shall be installed East-West through the development under the proposed streets (see City of Farmington Comprehensive Water Plan). This shall be connected into the City's future watermain project along the west side of County Road 31 to the Akin Road Watermain located on the west side of the roadway. Also connect watermain on the north side of the development into existing 12" DIP located under County Road 64 (1 95th Street). · One future well site needs to be sited within the middle portion of the development and one to the south side of the development. · All watermain within cul-de-sacs areas shall be looped. · Corridors for all future trunk raw watermains to the future treatment facility need to be provided. STORM SEWER · Trunk storm sewer is designated for the northeast pond to the southeast comer of the site. Proposed storm water ponds and piping be in accordance to the City of Farmington Comprehensive Storm Water plan. · Building lots around southeast cul-de-sac will be encroaching into wetland (DNR protected) area. . . . To: Lee Smik, AICP Planning Coordinator From: Brad Schmoll Fire Marshal Subject: Plan Review of Vermillion Grove[Rottlund Homes] Schematic PUD and Murphy Farm [D R Horton! Arcon] Schematic PUD. DATE: November 22,1999 After careful review of both plans that were submitted, I have noted the following: All streets and roads currently meet the minimum requirements of the Uniform Fire Code as it relates to Fire Department Access, the cul-de-sacs currently exceed the minimum requirements as established by the Uniform Fire Code, However, because they provide an adequate turning radius, they are acceptable. I would also like to suggest that if the cul-de-sacs continue to exceed the minimum requirements of the Uniform Fire Code of 150 feet and local ordinances of 500 feet, the city of Farmington should impose parking restrictions along one side of all cul-de-sacs. The plans that were submitted did not provide information relating to fire hydrant locations; therefore, I will need additional plans that show proposed future sites prior to development. Respectfully, ,d) ..d~ Brad Schmoll Fire Marshal ~. . . Minutes Parks and Recreation Commission Regular September 1, 1999 1. The meeting was called to order by Chairperson Johnson at 7:31 p.m. Members present: Johnson, Feldt. Gerten, Oswald and Sperbeck. Members absent: None . Also present: Parks and Recreation Director Bell, Planner Coordinator Smick, Chief Siebenaler and Michael Noonan - Rottlund Homes. Residents Herb and Holly Helms 2. Motion by Johnson, second by Oswald to approve the agenda with the following addition: Hunting Ord. Lottery APIF, Motion carried. 3. Chief Siebenaler conducted the Deer Bow Hunting Lottery by having Chairper50n Johnson draw 5 winning envelopes from the 19 sealed applications for pennits to hunt on park property. 4. Resident's Herb and Holly Helms were in attendance to voice their concerns about the park located north of their home in Troy Hill. They indicated that they did not want it in their back yard. Their concerns are that children will walk through their yard, safety concerns for children going to the park and kids hanging out in the park at all hours. No sidewalks are in the neighborhood and therefore speeding traffic and construction vehicles will endanger the children. They also indicated the City misled them by placing the play structure their when the lot was designated for a brick well house building. With all the residents using the park, they will get no use of their back yard and will have to keep the window blinds shut all the time. Mr. Helms indicated that his home value would now decrease, but later said a real estate woman told him that that would not be the case. Member Sperbeck indicated that the playground was placed there in response to requests from the neighbors and asked the Helms what they were asking for? The Helms indicated a fence~owever member Gerten indicated his desire for a natural buffer. Th~Iret;~ili~kiJl'f6~rm'~d landscaping to be placed on the park site and also on their property. Director Bell indicated that past City policy was to not place city purchased landscaping materials on private property. The Commission directed staff to develop a landscaping plan for the site with a berm and various plantings included. Staff is to share this plan with the Helms and forward copies to the PARAC for review prior to the October meeting. loll. /'ft ,..7\" 5. Michael Noonan representing Rottlund Homes presented the proposed plat and housing styles that are being proposed for the Wenzel property. Discussion centered upon the design of passive recreation areas and trails within the plat. The rolling and wooded property in question is not appropriate for a ball field. The members indicated a need for some type of play structure and possibly a trail information kiosk. Motion by Sperbeck, second by Gerten use the wetland as an opportunity to develop a passive park and trail system that includes a play structure with no ball field. APIF, Motion carried. The commission directed staff to work with the developer in the park and trail plan and to construct the trails as the development evolves. 6. Motion by Johnson, second by Gerten to approve the minutes of August 4, 1999. APIF, Motion carried. 7. The Commission reviewed the recommendation from the Historical Preservation Commission regarding the naming of the park in the Prairie Creek neighborhood. Motion by Feldt, second by Johnson to name the park in the Prairie Creek neighborhood Lake Julia Park. Voting for: Johnson, Feldt, Gerten, Oswald. Abstain: Sperbeck. . . . 7. The Commission had received a letter from a resident requesting the Commission consider recommending the change of the arena name to Maki - Schmitz Arena to honor two life long contributors to hockey in Farmington. The Commission recommended that the proposed change be forwarded on to the HPC for comment. After further review and discussion and HPC comments, the PARAC decided not to pursue the name change at this time. 8. Member Sperbeck reported on the successful construction of the play structure at Lake Julia Park by the neighborhood volunteers. . 9. Motion by Gerten, second by Oswald to adjourn at 9:08 PM, APIF, Motion carried. Submitted by, James Bell Parks and Recreation Director Approved L IS~ loftg(4'1 c c c . Minutes Parks and Recreation Commission Regular December 1, 1999 I. The meeting was called to order by Chairperson Johnson at 7:35 p.m. Members present: Johnson, GeTten, Oswald and Sperbeck. Members absent: Feldt. Also present: Parks and Recreation Director Bell. 2. Motion by Johnson, second by Oswald to approve the agenda with the following additions: Hunting Ord. Lottery and Mattson property. APIF, Motion carried. 3. Motion by Johnson, second by Sperbeck to approve the minutes of November 3, 1999. Voting for: Johnson, Oswald, Sperbeck. Abstain: GeTten, Motion carried. 4. Director Bell informed the Commission that the play equipment has been installed at Lake Julia and Daisy Knoll Parks. Curbing in three parks will be installed in the spring. Member GeTten suggested staff consider placing a small patch of com or sunflowers at Daisy Knoll Park to enhance the farm theme. 5. The Facility Task Force members Gerten and Oswald reported on the task force meetings. They indicated that the members of the task force seemed to be favorable to the Community Park I Athletic Complex. . 6. Director Bell reported on the items on the 2000 C.l.P. Members will bring their 2000 - 2004 C.I.P. to the next meeting for discussion. 7. Member Oswald requested staff survey the hunters with permits to determine the success ratio and inquire if additional permits can be awarded in areas that deer have been harvested. The Commission directed staff to obtain the information. 8. The Commission reviewed and made comments on the following plats: Charleswood 3'd & 4th - The Commission requests more access points to the park off the cul-de- sacs and street. Murphv Farm - Request only one site for a park and receive only land that is capable of development. Vermillion Grove - Earth walkways are necessary between the ponds and wetlands for trail development. The area on the east side of the plat is not desirable for parkland but could possibly be set aside as a preserve area. A play area needs be dedicated on the east side of the street between the street and wetlands for a play structure and trail access. Tamarack Ridge - Widen the park area to accommodate a ball field. Motion by Oswald, second by Gerten to direct staff to submit these changes to the developers. APIF, motion carried. 9. Director Bell informed the Commission of the owner's intent to sell the Mattson property. The owner has asked if the City is interested in the property. Motion by Sperbeck, second by Oswald to direct staff to decline the offer to sell, as the property does not fit into the long-range plan. APIF, motion carried. Director Bell will thank the owner for considering the City. . . 10. Motion by Sperbeck, second by Gerten to adjourn at 8:32 PM. APIF, Motion carried. Submitted by, James Bell Parks and Recreation Director Approved . . ~ eRO!!~!!~L!!co!!2MESTM November 5, 1999 Mayor and City Council, Members of Planning Commission, City of Farmington, 325 Oak Street, Farmington, MN. 55042 Dear Mr. Mayor, Members of Council and Planning Commission Members RE: Planned Unit Development - Vermillion Grove Schematic Plan Submittal . We are pleased to submit for the City's consideration our application for schematic plan approval. In support of our application, we enclose the City's application form, application fee of $2,747,49 ($500 plus $22/acre - gross development area less delineated wetlands of 102.1586 acres) and requisite supporting information. We trust this provides what is required by the City to commence its consideration of our application. Should additional information be required please do not hesitate to contact the undersigned. It is our understanding that this application will lead to the enactment of a zoning by-law for the lands. We have examiRed the City's current zoning categories and associated performance standards and feel that these serve as an appropriate basis to begin the zoning exercise. However, we are requesting that these lands be considered as a planned unit development in order to afford certain flexibility in terms of the final zoning of the property. We look forward to the opportunity of working with staffin advancing the zoning of these lands. Rottlund Homes has recently entered into an agreement of purchase and sale for the lands owned by Larry and Doneene Wenzel. The subject lands consists of approximately 122,5 acres and are situated in the south-east quadrant of the intersection of County Road 31 (Pilot Knob Road) and 195th Avenue South. Attached is an air photo on which the extent of the property has been identified. Also provided is a boundary survey prepared by Pioneer Engineering. In addition, we include a copy of the City's zoning district map on which the subject lands are identified. A legal description of the land forms schedule "A" to this letter. . As required, we attach an Abstractor's Certification prepared by Stewart Title listing all owners of real estate within 350 feet of the subject property. ~ L1C~~s~UJW~~ MLS Eog~~6'~it,ll~~ 3065 CENTRE POINTE DRNE ROSEVILLE, MN 55 Il3 (651) 638-0500 FAX (651) 638-0501 . . . We are requesting P.U.D. approval to designate the land uses that will enable both the City and Rottlund Homes the ability to respond to market demands and changes as the master planned community evolves. The flexibility we are requesting is necessary to develop a quality community that can adapt to emerging market trends and be responsive to ever-changing consumer demand. Ownership and Experience As noted, Rottlund Homes has entered into an agreement of purchase and sale to acquire the subject lands. The purchase of these lands is contingent upon Rottlund securing from the City of Farmington preliminary development approval and being satisfied as to the property's title, its soils and the environmental condition of the site. This application represents one of the first steps in satisfying the contingencies associated with the agreement of purchase and sale. Rottlund Homes has been a fixture within the Twin Cities' land development and home building industry for over one quarter century. During our twenty-five years of business, our company has played an important role in the shaping of the region having been responsible for the development of thousands of acres of lands and thousands of homes for individuals and families. In close proximity to the City of Fannington, we are presently completing the construction of Prairie Crossing in the City of Apple Valley a multi-product line development containing a total of257 homes. In addition, our company is presently undertaking developments in the Cities of Woodbury, Inver Grove Heights, Shoreview, Blaine, Minneapolis, Plymouth, Minnetonka, Maple Grove and Chanhassen and will soon be launching development in the Cities of Victoria and St. Michael. A brochure describing our current development projects also forms part of Appendix "A". Examples of completed housing developments can be found in most municipalities of the region. To date, we have no undertaken any development in the city of Farmington. Rottlund Homes' parent company, The Rottlund Company, operates housing and development divisions in four other states in addition to Minnesota - Iowa, Indiana, New Jersey and Florida. In 1999 Builder magazine ranked our company as the 52nd largest builder in the United States with closings of over 1,000 homes and revenues in excess of $150 million. A copy of our 1999 Annual Report is attached. We believe that we are uniquely qualified to undertake the development of the subject lands. Character of Vermillion Grove Master Planned Community Vermillion Grove has been planned to provide housing opportunities for a variety of individuals at different points of time in their respective lives, We envision the community affording accommodation to the first time buyer, the move up purchaser and individuals who are "empty nesters" looking to down size. . The concept plan attached to this letter proposes a total of 340 housing units on approximately 122.46 gross acres ofland. This translates to a gross development density of about 2.78 units per acre, including +/-3.5 acres ofland set aside for a neighbourhood commercial shopping centre. If the area slated for neighbourhood commercial land uses is developed for residential land uses the land's development density is approximately 2.86 units per acre (350 housing units). The concept plan proposes four distinct forms of housing: multi family - 8/12 unit building (villa townhomes), multi family - 4 unit building (gardens and garden townhomes) and single family homes. . The villa townhomes are the most affordable housing that Rottlund Homes currently builds and typically addresses the needs of the first time home buyer. For the Vermillion Grove development an area of approximately 21.1 acres as been set aside for villas. A total of 148 villas are proposed, translating to a gross density of7 units per acre. Elevations and floor plans of Rottlund Homes' villa townhouses are attached. These homes are side-to-side, back-to-back townhome structures in clusters of eight or twelve homes. All homes are two story, two bedroom and 1 ~ bathrooms. Units range in size from 1,220 to 1,645 square feet. A home owners' association will be responsible for the care and upkeep of the exteriors and roofs of the units, the maintenance of landscaped areas and snow removal in the winter. Rottlund Homes is presently constructing this product line in its Prairie Crossing development in Apple Valley, Walnut Creek in the City of Chanhassen and the Village of Rice Creek in the City of Shoreview. The gardens and garden townhomes product lines are directed to the needs of the "empty nester" and move down purchaser. A total of 95 garden units are proposed on 24.3 acres, a gross density of3.9 units per acre. Elevations and floor plans ofRottlund Homes' garden and garden townhouses are attached. Both housing forms provide maintenance free living in approximately 1,260 to 1,450 square feet oflivable space. Each home has two bedrooms/two bathrooms, a large formal dining/living room and a two car garage. The gardens are slab on grade construction, with the garden townhomes providing a full basement. A home owners' association will be responsible for the care and upkeep of the exteriors and roofs ofthe units, the maintenance oflandscaped areas and snow removal in the winter. Rottlund Homes is presently constructing this product line in its Deacon's Walk development in the City of Blaine and is marketing this housing at Cornerstone Commons in the City of Plymouth and the Village of Rice creek in the City of Shoreview. . The single family housing proposed in the concept plan is intended to meet the needs of the move-up segment of the local housing market. This housing provides the opportunity for those living in the immediate area to make the move from more modestly sized, higher density housing to acquire accommodation more suited to the particular requirements of the family. An area of 41.8 has been set aside for the construction of single family home. Within this area a total of 97 houses are proposed - a gross density of2,3 units per acre. Elevations and floor plans of Rottlund Homes' single family homes . . . are attached. The single family homes built by Rottlund Homes range in size from 1,850 to 2,700 square feet in rambler, split level and two story configurations. Refinements will be made to the single family home product line up to the commencement of marketing to ensure that the housing proposed is responsive to the desires of the consuming public. Rottlund Homes is presently constructing this product line in its Deacon's Walk development in the City of Blaine and Prairie Crossing in the City of Apple Valley. The concept plan also proposes a 3.5 acre block of land fronting onto Pilot Knob Road and the development's collector road for the development of either neighbourhood commercial or residential uses. Weare seeking the flexibility to proceed in either fashion at this point in time due to an uncertainty with respect to the viability of the site for a neighbourhood commercial development. Should it be deemed that the site will not support a neighbourhood commercial development Rottlund would like to have the ability to develop the subject land, as of right, for garden townhouses (10 units). Subject to the marketability of the site for commercial development, we believe that the use ofthe land for either residential or commercial uses can be supported from a planning perspective. As stated in the City's comprehensive plan, the commercial uses to be situated on these lands would be primarily intended to serve the needs of the immediate neighbourhood. Although we would not want to unduly limit the range of commercial land uses permitted on the site, we do acknowledge the concerns of the city with respect to the support of its downtown and to limit the range of uses to those detailed in the B4 zoning district. Rottlund Homes will not be the builder and owner of the commercial lands. Instead, the company will market these lands to a commercial developer with a proven track record in terms of the management ofneighbourhood commercial development. At this point in time, we have not commenced the marketing of the commercial lands and cannot provide the City with any images as to form, bulk or massing of any commercial uses. In terms of our negotiation of a sale of these lands, we would be extremely sensitive with respect to the relationship of the commercial uses proposed on this property with adjoining residential uses. We would also anticipate that the City would exercise the appropriate level of control through its site plan process. As part of this development, Rottlund will be setting aside sizeable tracts of land for wetlands, wetland buffers and stormwater ponding. In addition, our concept plan shows two distinct areas that are proposed for park and public amenity space (6.8 acres). The uses of these areas for park and public amenity space was discussed with the City Parks Commission on September I, 1999. Development Schedule The intention of Rottlund Homes is to work with the City of Farmington and secure by the early in 2000 preliminary plat approval for entire development and final plat approval for selected phases of the project. With the securing of these approvals, we plan to start grading the property and constructing utilities and street as soon as permissible. Ideally we would like to begin the marketing of distinct neighbourhoods of housing in the early . . . part of next year. We would plan to follow this introduction with the construction of model homes and the marketing of all housing product lines by the middle part of2000. Given the size of the property and the number of residential units proposed, we would anticipate the development of this site to represent a 3 to 5 year undertaking. Obviously, the pace of development is tied to local market and economic conditions and depending upon such conditions the pace of development may vary. The commercial lands associated with this community would not develop until such time as the local population reaches a critical mass in order to support such a land use. Rottlund Homes, in most likelihood, will not be constructing the commercial lands and will instead be selling the property to a developer who has considerable expertise in the construction, leasing and management of commercial property. Rottlund has commissioned the firm of Peterson Environmental to prepare an environment assessment worksheet (eaw) for the subject lands. It is anticipated that the eaw will be submitted under separate cover to the City of Farmington shortly. In discussions with our consultant we have not been advised of any features on the site that would warrant specific consideration from an environmental perspective. Ultimate Ownership All low density residential neighbourhoods will have public streets, utilities and ponding areas. Any amenity constructed on the site (i.e. entry feature) will be either maintained by an individual homeowner or a home owners' association. The medium/high density neighbourhoods will have some public streets and utilities that will be maintained by the City of Farmington. These is also the likelihood of some privately owned streets, parking areas, common areas and utilities would be the responsibility of a home owners' association. It is anticipated that the division of ownership responsibility will be the subject of further discussions between Rottlund Homes and the City of Farmington and will depend in part upon the ultimate form of medium/high density housing being constructed. Any commercial development will have frontage on and access to a public thoroughfare owned and maintained by the City of Farmington. Within the property lines of the commercial property all streets, parking areas, utilities and common areas will be the responsibility of the developer of the commercial property. Services Provided This community will form and be an integral part of the City of Farmington. As such, it will rely upon the City of Farmington and Independent School District #192 to provide the standard array of municipal services. Services such as police and fire protection, ambulance service, utilities, street maintenance, public education, parks and recreation, etc,.. are expected to be provided by the City and school board. Any street or utility that . . . is privately owned would be the maintenance responsibility of the benefiting private property owners, Population Proiections Based upon recent experience with comparable housing product in suburban location, we estimate the population of Vermillion Grove, at full development, to be in the order of 670 persons. These projections are based upon the following assumptions: 148 villa townhouses @ 1.25 persons per unit (ppu) 95 garden and garden townhouses @ 1.8 ppu 97 single family homes @3.25 ppu = 185 persons = 171 persons = 315 person. It should be noted that the numbers referenced above represent our best guesses based upon our recent experience. Underlying societal trends will impact demographic forecasts and therefore undoubtedly will affect future populations projections. Rottlund Homes looks forward to working with the City and its staff on this very exciting development. If you, any members of your staff or consultants have any questions regarding this submission or our company please do not hesitate to contact the undersigned. Yours very truly, ~~ VIce President Minnesota Division JMN/jmn EncIs. c.c. Paul Thomas (without attachments) Larry Wenzel (without attachments) Gary Fuchs (without attachments) . . . APPLICATION FOR PUD - PLANNED UNIT DEVELOPMEHT D::::~~~-rY-4~} IW Hame \ft:€.t\!\ ILLlOU GQ()VE Location~,. -eatft Cllt'\w-,t ~~Ro{lB' (Plld\.\(l1ltlkbo.d)~ 7\Wii\\J~ (S€-e (L~f ( , . rl Zoning District (s) , ,rIi ," ) . \.IYJb ' '. ,J~~ "z-6f\~ v{\"..y'J!(y'\QI\+ l' . D . \ Ct."-'\- I Hames & Addresses of All Owners: ' ZG L- ~' ~~ or\(Ai(\ ( )' Principal Contact ) \..\.Ii 0 Telephone b5\ b3t'J-65'OO Hame~Addres,ses~roperty Owners within 350 Fe~il~ble from S :.QillOJ\.1b _ on ,r, 8, )q00 Project Data Land Use 'rotal Acres " (w \ #\ G5N'\ fY\ QJ\.c,\.C-J ) 4( ,fj <f5-t.J. 3.6 TO+c-9 Af:r~;0 , (w\..1h~ O'lI'\n\e;\t~j 4-' .l3 ~6.q Single Family Multi Family , Retail/CQffi~~C~ Office Institutional Parks Wetland b.5 '20.3. 6.8 -2<9. :3 Density Residential Units/Acre 2.5& Q..'7[; Parking Single Family Multi Family Retail Office Institutional 'Ho Off, street ~,CtQ/tvV\ "t l-~~~~U~t!~ ~ fA N' /A . ~':ofu (RoJ Cll:lIf~"4 ll~ . . . POPULATION C~CrERIS~CS ~ c:p-e o*tn . ( CQ~A'/V\~ lQ V Schematic Plan Fee: Action by Planning Commission Action by City Council Public Hearing Date Approval Date Recommended Revisions Public Hearing Date Public Hearing Date Recommended Revisions Comments: Comments: Preliminary PUD Plan Approval Date Comments: Fee Approval Date Comments: Preliminary Plat Approval Date Comments: Fee: Approval Date Comments: Final Plan Approval Approval Date Comments: Approval Date Comments: Certification: I hereby certify that I am the applicant named herein and that all information given above, including exhibits submitted, is in all respects true and accurate to the best of my knowledge and that if the application is approved, the future use of the property will conform t)(the plans contained herein. I am the ____Owner, ____Lessee, Purchaser, '_Agent . ' ure of t~e AR.plicant ViCE 'f6=~)L)E,tJT R-ot-\-llVN{ ~ . . . Schedule "A" LEGAL DESCRIPTION That part of the Southwest quarter (SWI/4) of Section Twenty-four (24), and that part of the Northwest Quarter (NW1/4) of Section Twenty-five (25), all in Township One Hundred Fourteen (114), Range Twenty (20), Dakota County, Minnesota described as follows: Beginning at a judicial landmark on the North line of said Southwest Quarter (SW1/4) of said Section Twenty-four (24), 1614,3 feet East of the Northwest comer thereof; thence West 1614.3 feet to a judicial landmark at the Northwest comer of the Southwest Quarter of said Section Twenty-four (24); thence South on the West line of said Southwest Quarter (SWI/4) and on the West line of the Northwest Quarter (NWl/4) of said Section Twenty-five (25) 2,937,5 feet to a judicial landmark; thence East on a line parallel to the North line of the Northwest Quarter (NWl/4) of said Section Twenty-five (25), and 329.2 feet South thereof, 2646.7 feet to a judicial landmark on the East line of said Northwest Quarter of said Section Twenty-five (25); thence North on said East line and on the East line of the Southwest Quarter of said Section Twenty-four (24), 1,533.11 feet to a judicial landmark; thence South 83014' 23" West (the East line of the Southwest Quarter of said Section Twenty-four (24) assumed to be North 0015' 30" West) 80.2 feet to ajudicia11andmark; thence North 54051' 40" West 1081.05 feet to a judicial landmark; thence North 14000" East 467.47 feet to a judicial landmark and to the intersection of said line with a nontangent curve, radius of 1146.28 feet, which bears North 550 52' 40" East from the point of intersection; said curve being the center line of County Road No, 31 as now established; thence Northwesterly along said center line curve, said curve being concave to the Northeast, an arc length of 436.29 feet, central angle of 21 048' 27" to a judicial landmark, being the point of beginning according to the Government Survey thereof. Excepting therefrom the north 1303,89 fee.t of the west 792.00 feet of the Southwest Quarter of Section 24, Township 114 North, Range 20 West, Dakota County, Minnesota. AND ALSO EXCEPTING THE FOLLOWING: That part of the Southwest Quarter of Section 24, and that part of the Northwest Quarter of Section 25, all in Township 114 North, Range 20 West, Dakota County, Minnesota described as follows: Beginning at the northwest comer of the Southwest Quarter of said Section 24; thence southerly on the west line of said Southwest Quarter and on the west line of the Northwest Quarter of said Section 25, a distance of2,937.5 feet to a judicial land mark as called for in Certificate of Title No. 108101 on file in the Registrar of Titles office in Dakota County, MilUlesota; thence on an assumed bearing of South 88 degrees 29 minutes 37 seconds East on a line parallel with the north line of the Northwest Quarter of said Section 25, and 329.2 feet south thereof, 275.48 feet thence North 0 degrees 16 minutes 27 seconds East 425,57 feet; thence northerly 345,85 feet along a tangential curve concave to the west having a radius of 1909,86 feet and a central angle of 10 degrees 22 minutes 32 seconds; thence North 10 degrees 06 minutes 05 seconds West, tangent to said curve, 937.04 feet; thence northerly 493.81 feet along a tangential curve concave to the east having a radius of 2864.79 feet and a central angle of 9 degrees 52 minutes 34 seconds; thence North 0 degrees 13 minutes 31 seconds West, tangent to said curve, 759,84 feet to the north line of the Southwest Quarter of said Section 24; thence North 89 degrees 48 minutes 07 seconds West 20.00 feet along said north line to the northwest comer of the Southwest Quarter of said Section 24 and the point of beginning. Excepting therefrom the North 1303,89 feet of the West 792,00 feet of the Southwest Quarter of Section 24, Township 114 North, Range 20 West, Dakota County, Minnesota, Subject to an easement to Dakota County for highway purposes, ~ 2 ; i .... 'i ,,"- ~, :2 a 1= -< g ...J ~ ~ g ~ ~ t i c .Io!~ III II IL ~ >- !~ Jl ~ II A ~ ~ 0 ~ r::! ..... 0 a: ~ . i 0 ~ ...J 0.. ci ::i a: 0 1= -< ~ ~~ i :: : t' ----- - .YIO~~ NOI1l'Vi~3A Z ~ln~ '1 ~ ~ l ~ . ! .~~ ..", % I ~! 0 :; ! ~ i ; . . ~I=:J Z ~ ~ ~ ! ~ i " ~ ~iSl= . a:~~ - ::z:: . ~ W . . a 0 I ~N ~ ~ ~ : i; ;\ , ~ (J (J ~ 1=01= , l! W ~ <z< ~ J i i Y r Y::, m ~I=~ I *H r ! rIll.. J Oi olno ln~ln II , " . "':C\J,.; " ~ ~ d l A d . ~ '1/ -~ ! . ~ ! -~ ~ . f ~ i Vi I . ~ ; ! / E' : ~f C! ..8' !8' "'I!! ~ "'I!!li;:; ~~tn . ~~UI.. I~~ii: l~=n: ~~n; Un; ::::::::: tl:t:t:'t ~~$I~S J;H::~~~ ... N ~ ei i ; ; ! ~ :;:; g 118 E ...,...2 illt~h ij~~~~ . ,. .. o f r . I i I J' ,If I ,~'.. il I hll1't .", It' J Jf; Ilff Ult III: I IIH Ii.' " I 11~!!11 ill iJI ; I I lill' .fl nIl ilt!"f iff j1 ! J ddtH :U ffr I i ",,1,1 I ' "I i litH I: n. t i m.ltl J.I!II I' I ~ I . , j 1 H a ;1 .-::.t " Ii I~I ,! ih Iii ifl I,' . J J r . i . , Jt! : p,; I ..I' . , . If!. ~it. ...... . !~! ~ ~ ~ I . 0 ~, ~ 'i ~ ~:l;~~~il ~~~!;~~g~!~ '-~~lE2~:;~ 3~~1! o ~>r~~~~~o~og Z ~nh~'~~g~~ ~ ~ ~,~ H ~ : ':: ;11 ! i !i '" W a j j ~ 'i 'i : :, Q) !. ~ I j ~ *1'f n ! I "'11 i I i ~ I I Y , I --AE ;z::, . . * .... N i ~ o 0: " Z o ::J ..J ~ 0: ~ >- z <( ll.. :::E o u o z => t: o 0: .., IE i '" z o r= o z o u " z r= '" x ~.., , i ! ft 1-, ~! ~j ;l II It Iii H ,I; ~!: rli ~ I . --4E Z '~! I ~ , ~ I ~ o ~ d . ~ ~ ~ d ; :J :J o .~~;!'~~.~ ~ !~mS:li~~~~~:; Z ~~~i3!i:~ ouzc8::~. W ::t ~ U -c .... 0 w .... it: I- t... .n,~~ll<l!'~UillO v~...Ji ,,~~~~ W ~ ~ I'T ~ ? ~ i :; n ~ ~ r r. ~ J.IIY.~" ~!III 11'n i r i ii( /1 ~ ( I . I' ~ ~! ~ i :1 IIi ~: Ii I il ! I ' i i 1 ['.m '.nn"'.m.., r..,j 11 I I ili i ~ ==nt'-~~~~!...m..~r.m~:::~::~.:t.==. I . , cr--. Iii j ~~ I! ! I! i Iii . '" '" Ei ii ~ o cr '-' z o ::; ...J 'i ~ i >- z ... a. ~ o u o z ::> ~ o cr w ~ z ... ...J a. ~ ::; F ::> f- a. w u z ~8 . , ! : n~ , ! j i if if I, ii " .. ~ts 'jl !o! 1h Ii; Bo; !II ili ~ ! ,!~i ,:~ ~ 111':' ;I: j; .1; It:: .I'i . D . · i .. ...... . . . Westwood Professional Services, Inc. '" I./"Wf@ &.D\YJ~~ Ilf,\ [ lEe - 2.11 II!i i i "1'\.. J IU U! '.'/ '4"".,^,<_~_ i --.-..___ 7599 Anagram Drive Eden Prairie. MN 55344 Phone: 612-937-5150 Fax: 612,937,5822 Toll Free: ',888.937.5150 Email: wps@westwoodps.com ."._'--,.._---...._,. .. Trip Generation Analysis for the Vermillion Grove Development in Farmington December 1,1999 Overview The purpose of this memorandum is to summarize the trip generation characteristics and traffic assignment levels of the proposed Vermillion Grove Development in Farmington, Minnesota, Vermillion Grove is a multi-phase residential planned unit development that is situated south of County Road 64 (195th Street West), East of C,S.A.H. 31 (Pilot Knob Road) and west of Akin Road, The site will have a single access point to each of those three roadways and an additional internal connection to the planned Murphy Farms development immediately to the south, The project will commence construction in 2000 and the housing units are expected to be fully built out in three to five years, This study computed the trip generation based on the estimated number and types of housing units planned at this time, Trip Generation The trip generation for the Vermillion Grove Development was computed using the rates contained in the Institute of Transportation Engineers report Trip Generation, 6th Edition, 1997, applied to the expected development statistics, (Note: The Dakota County Planning Department has developed a County-Wide Traffic Forecast Model. The trip generation rates contained in that model are lower than those represented in the ITE Report, To be conservative in the analysis, the higher ITE based rates were applied for this study,) Trip Generation Summary Approximate Estimated P.M. Peak Land Use Acreage Units ADT Hour Trips Single Family Residential 41 ,8 ac. 97 928 98 Multi-Family 4-Unit Buildings 24.3 ac, 105 615 60 Multi-Family 8-Unit Buildings 24,6 ac. 148 867 84 TOTALS 350 2410 242 Designing the Future Today,..since 1972 / . . . Trip Generation Analysis for the Vermillion Grove Development in Farmington December 1, 1999 Page 2 Trip Distribution The trip distribution for the Vermillion Grove area was based on the Metropolitan Council Region-Wide Traffic Forecasting Model and on previous traffic analyses for the area. (The previous analyses included review of current traffic counts, review of the County's traffic forecast model and discussions with County Planning staff.) The resultant distribution for Vermillion Grove anticipates approximately 60% of site traffic distributed to the north on Pilot Knob Road (from the site via Pilot Knob and Akin Road) and approximately 20% distributed to the west via County Road 64/195th Avenue. The remaining trips are distributed to the south. Traffic Assignment Traffic assignments for Vermillion Grove were computed for both daily trip generation and for the P.M. Peak Hour. The traffic assignments were derived by combining the trip generation results with the trip distribution patterns and then routing the traffic on logical paths from within the development out onto the surrounding County and City roadway networks. The daily site traffic assignments show the following two-way volumes at key locations relative to the project area: C.S.A.H. 31 immediately south of 195th Street: Akin Road immediately south of 195th Street: 195th Street immediately west of C.S.A.H. 31: 195th Street immediately east of C.S.A.H. 31: 720 530 480 900 The Daily and P.M. Peak Hour traffic assignments (showing only traffic due to the Vermillion Grove development) are summarized on the two attached figures. These traffic volumes are consistent with trip generation values for residential developments and will be readily accommodated by the surrounding roadway network. At this time the entire development is being planned with the residential units referenced in this memorandum. There is a possibility that a small portion (about 3.5 acres) of the 4-unit building multi-family use may be developed as commercial. If this piece advances as commercial, it would host about 10,000 to 15,000 square feet of neighborhood-based commercial. Such a use would generate more trips than a residential use. However, for this small size of neighborhood commercial, the added trips would not impact the surrounding roadway network. . . 0> ~ 1l c: U ... ~ .... .~ <=l " ... d L ... " ~ .... Cl' Cl' " a: ... Vl u :r 0.. :r 0.. (\J (\J @ M o . , . I ., ;1: ....,.: ' , . . "'''. .._:..... ...1. Cl' Cl' "- o "- ~ ~~ . . . ... Vl u :r 0.. :r 0.. o .... ~ M o . . ! , Cl' Cl' "- o "- ~ 0> ~ 1l ni I... U ... ~ .... Cl' " \.:J :;, <=l " ... d L ... " -D .... Cl' Cl' " a: ~~ Lee Smick ..om: .nt: Subject: Noonan, J Michael [jmnoonan@rottlundhomes.com] Wednesday, December 08,19992:04 PM 'Ismick@ci.farmington.mn.us' Open House Further to last night's meeting I thought it would be prudent to document certain things related to the meeting. 11 indivduals, representing 6 households attended the open house. Those in attendance included: - Erwin and Helen Hagen 19643 Akin Road - Harvey and Iris Briesacher 4999 203rd Street - Troy and Debi Corrigan 19691 Akin Road - Tom Hoyer 19687 Akin Road - Leslie and DAle Pettis 19735 Akin Road - Allan and Jan Corrigan 19715 Akin Road. The open house commenced about 7pm and concluded at 8:40pm. There was a broad ranged discussion relating to Rottlund's plan and timing for the development. The current concept plan was explained and associated housing product described with the assistance of photos and renderings. Those in attendance seemed to be accepting of the form of development, the range of land uses and associated density. Specific concerns include: - surface water, stormwater management - Akin Road and the issue of proposing an access point onto the road - the maintaining of vegetation on site and landscaping proposed - parkland to be provided - the commercial parcel .me of activity. "e concluded the meeting with an invitation to attend this tuesday's planning commission meeting. The purpose of the meeting was explained and the indiciation was given that further detail will be forthcoming with the preparation of the preliminary pud. The participants were invited to phone and discuss any specific concerns about the development. JMN . 1 , / ( '-'\ 1 I ~,~. :'.:: ~ ~ -; 50' ...........,.rl\ c' ./ / ./ // / .,/' / / / / / / '.' ,:' - ---1 I I I I I 1-, I' , J If I I I I I I I I I : ! :,' I~ fl ,g., "~I ~ I ~!j E I I . '.. ;tf ~ I ;i~ ~I ~ r k;i ;'1 . I.',~' " I a~ ~, ~ I ~.: ~I I il~ ~I ~ Iq~1 .. I ~ :~: ~ I.. I I'" I di 1 I i I I , I I I I 1 , - J I I . -~::: ~~~~..J=}-=--"'.:: ...-.. '1 (I r' 'r:'Il""" ,_ ~.,., ~Il I I'. I I II! I I Iii I I .. I I I I I I I I I I , I I I 1 I 1 , I I I ' I .I I I , I I I :1 I -, \ I i: f ~I o (. , . ~~. . '\ .:>" 6019'1 -- I ". ......-" - - - ". J/~" ' , j..-"-'" \, ,_ .:>... __d_ _ ......-" /' i ;>~~\ \ ..,....-_._..........::.O~I'l ../0': .._..- "-.._.._..-- I \ \., ~! " .. '.'. '::i -' ! "--..::.~~'" ~ ~ I, rl ... "'f'... \ }!:! "\. \." i 'ft, \ j,.</ '6, ~ I ..",O" \ \ \ i // / ' -~ ,/'-"-"-"-" .-...;.... '" '- . - \:::.~; ::1-1. . .~~~~. , "-"-.. ..-.' ,') ~/"" i ' If \O( ~ i~ i .. \ on'..J r ~ \ ! .... . ''0 \ i-~u,,~-- 1- " on i ! ./"......., ! i// /'() ~ \ ./i ~ . /"' . " 'hL' .1/ , - ' i i J j ! -----L:~:/__:= .' ..-- ...--' ~ '" ?; .. ~ '" '" i:' ~ ~ CD '" o ~ d ?; I- o z ~ So ,... ~!;iUOo N '-:-<.0( ..,. ~s:~!:: ~ ~:;~:J~ .... ~cDf'i,,;" " ,.. I' ~ ~~~~~ 00:( C1:CC oC o"'..."'~ .. ~~~~cr t- -'i....O' ... io~~~ ;t~~:?~ ~....::J Q. ~\? ~ .. ..",(3 b ~-l .... ~;! g _ __---- _------ - - t --.' ! ! i -" -- --j-- --. ,--,;;iiiiiiI" __- - - -, s..: n... --.. ------ ...../' - -.. -:;:;:: 0,:.:..: ~~. ';Ql5 .-.. . i' m -1 r (~S~.: .:~~)- ~~/ .~~-~~=-~~~~~:~~0~::~~~:~.~:~~ - ~;~~_l~~:= :'== =~~~-- - - -- L~ -~:_ ~ _ ~ ~ ~~.:__ _~ 1__ L~ Aia IJ. cI:; O-r:; ~ -' ~j ': ~ . I " I I I I .., .. _... _ _ __. ...J_ __ __ __ .: :.. __ --.....'''111'....,...,......_. :"-..- ! ! ! ! i ! i i ! . J, r . n LO LO N x x ""'-. ..x oX ~""'-. gX lUX (J) (J) ""'-. or- n ~""'-. ~(J) xx xx xx xx xx xx xx xx xx xx III I!! o % U) f- Z 0 CL -.J 0 n:::: I- ~ Z '" 0 ... 0 I:l Oi z o l- e.? Z 2 0::: <( LL I o z :::> -..J I- ~I- ~o ~~ca:::: If ~ q ~ N Sl s: " i .. 15 ~ L() N N Sl '" '" .. I:; l ~ . . . City of Farmington 325 Oak Street, Farmington, MN 55024 (651) 463-7111 Fax (651) 463-2591 www.ci.farmington.mn.us TO: City Planning Commission Lee Smick, AICP Planning Coordinator Murphy Farm Schematic PUD P December 14, 1999 FROM: SUBJECT: DATE: INTRODUCTION D R Horton and Arcon Development Inc" in a joint venture, propose to develop approximately 210 acres east of Pilot Knob Road, south of the proposed Vermillion Grove subdivision, west of the Pine Knoll subdivision and north of Middle Creek and the Farmington Industrial Park. The developers propose single and multi-family housing within the development. The developer proposes the R-3 PUD zoning due to the variety of land uses within the development. The Schematic PUD plan establishes the underlying zoning and location for each of the different land uses within the development. Plannine: Division Review Applicant: Referral Comments: Attachments: D R Horton Custom Homes Don Patton, Manager Land Development 3458 Washington Drive, Suite 204 Eagan,MN 55122 651-256-7140 Don Pattori/HomebuildersIDRHorton@DRHorton Arcon Development, Inc, Larry Frank, Project Manager 7625 Metro Boulevard, Suite 140 Edina, MN 55439 612-835-4981 612-867-6157 (cell) 1. City Engineering Division 2, City Fire Marshal 3. City Parks & Recreation Commission minutes 1. Location Map 2. Narrative from Developer 3. Application for PUD . Schematic P.D.D. Plan Amendment Location of Property: Area Bounded By: Existing Zoning: Proposed Amendment: Proposed Development: . Streets and Accesses: . 4. Schematic PUD Plan 5, Existing Conditions 6. Concept Utility Plan 7. Letterfrom Developer 12/8/99 East of CSAH 31 (Pilot Knob Road), south of the proposed Vermillion Grove subdivision, east of the Pine Knoll subdivision and north of Middle Creek and the Farmington Industrial Park, Single-family residential on the east, agriculture on the north, vacant on the west and proposed mixed residential land use on the north, R-l Single-Family Residential The development proposes to amend the existing low density residential land use to a mix of low and medium density residential. The amendment for the changes to the proposed land uses will occur when the Metropolitan Council approves the 2020 Comprehensive Plan Update early in 2000. The development proposes 451 housing units constructed on approximately 210 acres, The proposed land uses are as follows: Single-Family - Executive SF Multi-Family Parks Wetland 67 acres 18 acres 54 acres 43 acres 30 acres 137 units 28 units 288 units N/A N/A The development proposes three known access from the property including the 203rd Street access to Pilot Knob Road on the west, a second access to the north through the proposed Vermillion Grove subdivision and a third access to the east utilizing 203rd Street. The developer also proposes two additional accesses, one south of 203rd Street at Pilot Knob Road and a second access to the south to intersect with 208th Street in the Farmington Industrial Park at a future date, The development proposes both public and private streets, whereby the private streets will be located in the multi- family areas and will be maintained by a homeowners association, 2 Water, Sewer & Gas: Water access is located at the newly constructed City water tower and will be required to be accessed from Vermillion Grove north of the site and sewer is available from the newly installed Middle Creek sanitary sewer line along the southern portion of the property. A 100-foot wide gas line easement runs north and south through the western portion of the site. No structures may be located within the easement. . Sidewalks: The developer proposes to install 5-foot sidewalks on one side of all interior streets within the single-family area. A sidewalk or trail is required along collector roadways within the development. Topography: Site topography is rolling except for lower elevations in the central and eastern portions of the site where the wetland and drainage areas are located, The drainage patterns generally funnel to the large wetland and ponding areas on the site with the two southerly wetlands and pond draining towards the south, The northerly wetland drains towards the east and south near the Pine Knoll subdivision, The Pine Knoll subdivision generally sits on higher ground than the adjacent proposed townhouse development to the west. Therefore, Pine Knoll residents will view the rooflines of the townhouses towards the west. . Wetland: The wetlands identified on the site fall into two separate classifications, The northern and south-central wetlands directly south of the Pine Knoll subdivision encompass 11 acres and are classified as protect wetlands. The southeastern wetland encompassing 6 acres is classified as manage 1 and the central wetland area encompassing 2 acres is identified as a pond boundary for a 100-year storm event thereby not identified as a wetland. The protect wetland classification requires that structures shall not be placed within a minimum of 85 feet. These wetlands exist in a largely unaltered state and have special and unusual qualities that call for a high level of protection. Manage 1 wetland classifications require that structures shall not be placed within a minimum of 40 feet of the wetland. Manage 1 wetlands have plant communities that exist largely in an unaltered state but have a moderate floral diversion compared to the protect wetland. . 3 . . . Flood Plain: The FEMA floodplain for Middle Creek is identified on the existing conditions map submitted by the developer, The floodplain encompasses a large portion of the southern boundary, The floodplain will be further delineated in the environmental assessment worksheet. Parkland and Trails: The developer proposes a 2-acre park area on the northern boundary of the site that will be shared with the Vermillion Grove subdivision to the north. Additional parks have been identified along the southern property line within the FEMA floodplain. The park dedication requirement is 12,5% of the total acreage and will be dedicated by the developer through land, fees and/or trail construction. Additional Comments Land Use Issues The 2020 Comprehensive Plan Update submitted to the Metropolitan Council on July 28, 1999 showed this area with medium density residential on the west along Pilot Knob Road, natural open space on the east and south and low density residential making up the remaining portion of the property, The development proposes the following gross densities: Housing Type Proposed Density City Requirement Land Use Designation Single-Family 2.0 du/ac 1 to 3,5 du/ac Low-Density Executive Single-Family 1.4 du/ac 2,5 to 5.5 du/ac Low -Density Villa Units 8-10 du/ac 5.5 to 14.0 du/ac Medium Density Townhomes 4-6 du/ac 5.5 to 14.0 du/ac Medium-Density The proposed gross densities correlate to the 2020 Comprehensive Plan Update, The overall density of the Murphy Farm PUD is proposed at 3,2 units per acre, Land Acquisition Issues At present, the developer has not acquired all the land needed to develop the property as shown on the plan. City staff recommends that the Schematic PUD be continued due to this fact. The 4-acre site in the north-central portion of the property that is proposed for single-family residential has not been acquired by D R HortonlArcon Development at this time. Additionally, the plan shows a home encroaching into the 203rd Street right-of-way easement that inhibits access to the east into the Pine Knoll subdivision that needs to be addressed, Acquisition of property for the cul-de-sac roadway intersecting Akin Road also needs to be addressed, 4 . . . The developer is also negotiating with Genstar Land Company for the property on the east side of Pilot Knob Road to acquire land for additional housing units and provide an additional access to Pilot Knob Road, Transportation Issues The Schematic PUD Plan shows three accesses from the subject property and three potential accesses after land acquisition issues are addressed on two of the roadways. The first access is 203rd Street to the west that connects to Pilot Knob Road and is proposed with a 70-foot right- of-way. This roadway is shown as a future east/west minor collector on the 2020 Thoroughfare Plan. A majority of the traffic is expected to enter and leave the property from this access, thereby requiring a left turn lane on Pilot Knob Road into the development. The second access connects to the north through the proposed Vermillion Grove development. This access is also considered a north/south minor collector running the length of the site with a jog along 203rd Street in the northeastern portion of the site. This roadway is also proposed with a 70-foot right-of-way width. The third access is on 203rd Street to the east through the Pine Knoll development. However, this access has a right-of-way encroachment issue that needs to be addressed as stated above, , The two potential accesses from the site include one to the west through the property currently owned by Genstar Land Company. As stated above, however, the developer is negotiating with Genstar to acquire this property. The second potential access is the cul-de-sac on Akin Road. It is viewed as a potential access because acquisition of the land for the connection to Akin Road has not been finalized, The final access from the property includes the north/south minor collector at the southern property line. This roadway is delineated as a minor collector on the 2020 Thoroughfare Plan and shows a connection with 208th Street in the Farmington Industrial Park. Roadways associated with the multi-family areas will be private streets and will be maintained by a homeowners association, Proposed Right-of- Way and Street Width Changes - Meeting December 8, 1999 At a meeting on December 8, 1999 with the developer, staff was made aware of a request by the developer to propose a 50-foot right-of-way and a 30-foot back to back street on all interior public streets within the single-family area on the west side of the Murphy Farm PUD. Currently, City standards for local streets require a 60-foot right-of-way with a 32-foot wide street. This request was submitted in writing on December 8, 1999 and is attached for review. Additionally, the developer proposes a 25-foot front yard setback (current Code requirements are 20 feet) and the addition of a 5-foot sidewalk along one side of all interior streets within this area. With the reduction in street width from 34 feet to 30 feet, the developer proposes to restrict parking to one side of the street in this area on the opposite side of the of where the sidewalk is located. 5 . . . The developer has proposed these changes in order to reduce traffic speeds within the single- family area and create a pedestrian-friendly environment with additional area devoted to landscaping and green space in the front yards of the single-family homes. However, because of the late date in submitting the above requests by the developer, City staff will need additional time to review the proposal so that adequate research may be conducted to evaluate this proposal. Therefore, staff is recommending that the Murphy Farm PUD public hearing be continued to the January 11,2000 Planning Commission meeting, Park & Recreation Issues The developer proposes a 2-acre park area on the northern boundary of the site that will be shared with the Vermillion Grove subdivision to the north, Additional parks have been identified along the southern property line within the FEMA floodplain, At this time, staff recommends that park siting issues be delayed until the environmental assessment worksheet is completed to determine if the proposed park land along the southern boundary of the site is outside of the identified FEMA floodplain. Environmental Assessment Worksheet Minnesota Statute section 473,859 requires that any development that consists of mixed unattached and attached units must prepare an EA W if the following is true: The sum of the quotient obtained by dividing the number of unattached units by the applicable unattached unit threshold, plus the quotient obtained by dividing the number of attached units by the applicable attached unit threshold, equals or exceeds one, Therefore, 163 unattached units/250 unattached units = 0,65 + 288 attached units/375 attached units = 0,77, which equals to 1.42 indicating the need for an EA W to be prepared for the Vermillion Grove project. The EA W must be completed before any platting of the property is reviewed however, the rezoning of a property may take place before the EA W is finalized. D R Horton and Arcon Development have employed Peterson Environmental to prepare the EA W for the City. The City of Farmington is the RGU or responsible governmental unit that is responsible for verifying the accuracy of environmental documents and complying with environmental review processes in a timely manner, The EA W must contain the description of the project, quantification of physical characteristics and impacts and major issues identifying potential environmental impacts and issues that may require further investigation before the project may commence such as transportation, wetlands etc .. Phasing of the Development The developer is proposing to develop the Murphy Farm PUD in phases over a 4 to 5 year period, The developer proposes construction to begin in the summer of 2000 after approvals have been granted for the project. 6 . . . Housing Characteristics The developer proposes two different product types available at all times during the development of the property. A total of 163 single-family lots will be developed along with 136 townhouse units and 152 villa units, Single-family housing prices are proposed to range from $180-250,000 while the executive single-family prices are proposed from $250-350,000, The proposed width for the single-family lots is between 75 to 85 feet and the executive single-family lots are between 85 and 90 feet. The townhouse product is proposed as 4-6 unit buildings with one-level. Some of the townhouses will be constructed as slab on grade, however, there will be basements or walkouts depending on the topography and soils, The townhouse price is proposed between $150- 220,000. The villa unit is proposed at $110-125,000 and are two-story, 8-unit buildings, Population Projections The developer has estimated that at total build-out the population of the Murphy Farm PUD will be near 1,730 persons. Of those residing in Murphy Farm, there will be 287 children and 1,443 adults. These projections are based 3.5 people per single-family household, representing approximately 1.5 children per single-family household. Additionally, the townhouse units were based on 2,1 people per unit and 0.2 children per unit. The villas were approximated at 1.8 people per unit and 0.1 children per unit. Neighborhood Meeting - December 9, 1999 The developer held a neighborhood meeting the Farmington City Hall on December 9, 1999 to discuss the proposed development, Concerns raised at the meeting included the maintaining of vegetation on the site particularly where the single-family homes are proposed on the property and parkland issues, Overall, the project was well received by the notified residents in attendance. ACTION REQUESTED Staff is recommending that the public hearing be opened and that comments from both the public and Commission members be taken, However, based on the land acquisition, traffic and park issues that have been identified by the City, it is recommend that the public hearing be continued to the January 11, 2000 Planning Commission meeting to allow time for revisions to be addressed. Resp,..,...e. ctfu,I,IY~S. ubmitted, ,,/ , (5i~ ' Lee Smick, AICP Planning Coordinator cc: D R Horton, Don Patton Arcon Development, Larry Frank 7 . . . ... Property Location D I SUBJECT PROPERTY , w s . . . City of Farmington 325 Oak Street, Farmington, MN 55024 (651) 463-7111 Fax (651) 463-2591 www.cf.fauninaton.f11n.us TO: Lee Smick, Planning Coordinator Dave Olson, Community Development FROM: Jerry Auge, Jr" Civil Engineer I c...tA- David Sanocki, Engineering Division PR,) SUBJECT: Murphy Farm PUD DATE: November 10, 1999 Engineering staff has reviewed the schematic P,U.D, plans that were submitted on November 12, 1999, for the above referenced project. The following are engineering comments that require further discussions with the developer: GENERAL · All residential street shall be designed to ensure a horizontal sight distance of not less than 200', The minimum design speed for residential streets shall be 30 MPH unless otherwise approved by the City for residential streets. The minimum design speed for collector streets is 40 MPH unless otherwise approved by the City, . Submit soil borings and ground water monitoring reports, soil reports shall include recommended soil correction for street section, · One future well site needs to be sited within the southern portion of the development. · The gas main is located within the west portion of the project. All proposed lots, landscaping, utility, and street locations within this easement shall be discussed with the Gas Company and the City, · Center the South-North collector on the sanitary sewer Trunk on the south end of the project. · All residential streets shall be 60-foot right-of-way and collectors shall be 70' right- of-way with sidewalk along one side of collector according to the City's Pathway plan, . . . · Interior streets will be reviewed in detail (layout and location) at the platting phase of the project. However, a reduction of cul-de-sacs shall be done prior to submittal of the plat. All watermain within all cul-de-sacs shall be looped into the watermain system, SANITARY SEWER . Sanitary sewer for the development shall be connected into the trunk main located at the south end of the North-South collector street or to the west of the development along the eastside of the County Road 31, . Sanitary sewer line that is proposed along East-West corridor shall be deep enough to pick up existing homes in the Pine Knoll Development. W ATERMAIN · Trunk watermain shall be installed East-West through the southern portion of the development under the proposed streets. This will be connected into the City's future watermain project along the west side of County Road 31 to the watermain west of Akin Road, Also a Trunk watermain shall be connected into the Vermillion Development to the north and extended to the south boundaries of the development along the collector road, . Corridors for all future trunk raw watermains to the future treatment facility need to be provided, STORM SEWER · Trunk Storm Sewer shall be at the northeast comer of the Development wetland to directly south wetland. Also an area south along the East-West corridor is designated for a Trunk Storm sewer, · All storm ponds and storm systems shall have a regulated outlet control structures. All storm facilities shall be designed in accordance to the City of Farmington Storm Water Management Plan, . . . To: Lee Smik, AICP Planning Coordinator From: Brad Schmoll Fire Marshal Subject: Plan Review of Vermillion Grove[Rottlund Homes] Schematic PUD and Murphy Farm [D R Horton! Arcon] Schematic PUD, DATE: November 22, 1999 After careful review of both plans that were submitted, I have noted the following: All streets and roads currently meet the minimum requirements of the Uniform Fire Code as it relates to Fire Department Access, the cul-de-sacs currently exceed the minimum requirements as established by the Uniform Fire Code, However, because they provide an adequate turning radius, they are acceptable, I would also like to suggest that if the cul-de-sacs continue to exceed the minimum requirements of the Uniform Fire Code of 150 feet and local ordinances of 500 feet, the city of Farmington should impose parking restrictions along one side of all cul-de-sacs. The plans that were submitted did not provide information relating to fire hydrant locations; therefore, I will need additional plans that show proposed future sites prior to development. Respectfully, ,dJ "~~ Brad Schmoll Fire Marshal Minutes Parks and Recreation Commission Regular December 1, 1999 . 1. The meeting was called to order by Chairperson Johnson at 7:35 p.m, Members present: Johnson, Gerten, Oswald and Sperbeck. Members absent: Feldt. Also present: Parks and Recreation Director Bell. 2, Motion by Johnson, second by Oswald to approve the agenda with the following additions: Hunting Ord. Lottery and Mattson property. APIF, Motion carried. 3. Motion by Johnson, second by Sperbeck to approve the minutes of November 3, 1999. Voting for: Johnson, Oswald, Sperbeck. Abstain: Gerten, Motion carried. 4. Director Bell informed the Commission that the play equipment has been installed at Lake Julia and Daisy Knoll Parks. Curbing in three parks will be installed in the spring. Member Gerten suggested staff consider placing a small patch of com or sunflowers at Daisy Knoll Park to enhance the farm theme. 5, The Facility Task Force members Gerten and Oswald reported on the task force meetings, They indicated that the members of the task force seemed to be favorable to the Community Park I Athletic Complex, 6. Director Bell reported on the items on the 2000 C.I.P, Members will bring their 2000 - 2004 C.I.P, to the next meeting for discussion. . 7. Member Oswald requested staff survey the hunters with permits to determine the success ratio and inquire if additional permits can be awarded in areas that deer have been harvested. The Commission directed staff to obtain the information. 8, The Commission reviewed and made comments on the following plats: Charleswood 3rd & 4th - The Commission requests more access points to the park off the cul-de- sacs and street. Murphy Farm - Request only one site for a park and receive only land that is capable of development. Vermillion Grove - Earth walkways are necessary between the ponds and wetlands for trail development. The area on the east side of the plat is not desirable for parkland but could possibly be set aside as a preserve area. A play area needs be dedicated on the east side of the street between the street and wetlands for a play structure and trail access, Tamarack Ridge - Widen the park area to accommodate a ball field, Motion by Oswald, second by Gerten to direct staff to submit these changes to the developers. APIF, motion carried. 9. Director Bell informed the Commission of the owner's intent to sell the Mattson property, The owner has asked if the City is interested in the property. Motion by Sperbeck, second by Oswald to direct staff to decline the offer to sell, as the property does not fit into the long-range plan. APIF, motion carried. Director Bell will thank the owner for considering the City. . 10. Motion by Sperbeck, second by Gerten to adjourn at 8:32 PM. APIF, Motion carried. Submitted by, . James Bell Parks and Recreation Director Approved . . NARRATIVE FOR MURPHY FARM P.U.D. . The Murphy Farm P.UD. is a proposed residential development in the City of Farmington on approximately 210 acres. The development proposes approximately 451 residential units on the property. The proposal offers a variety of residential housing products, ranging from 'villa' units at a density of approximately 8-10 DU/ Acre, 'townhouse' units at a density of 4-6 DU/ Acre, single family lots at a density of approximately 2 DU/ Acre and executive single family lots at a density of approximately 1.4 DU/Acre. Of the 210 acres, approximately 73 will be maintained as permanent open space. The overall density of Murphy Farm P.UD. is 3.2 units per acre. The Murphy Farm P.UD. site is characterized by rolling topography, scattered deciduous woodlots, three major wetland complexes and a long, flat draw running north and south through the west ~ of the site. This draw contains a narrow drainage ditch that provides an outlet for the northerly wetland south to a main east/west ditch (Middle Creek) that runs along the south boundary of the Murphy property, These physical characteristics, topography, vegetation and . wetlands, provide a natural separation and buffer between the different product types proposed withing the Murphy Farm P.UD. The property is currently under the ownership of Mr. Bernard Murphy and will be purchased from Mr. Murphy by a Joint Venture ofD. R. Horton and Arcon Development, Inc, The ultimate ownership of the property within the Murphy Farm P.UD. will be a combination of individual homeowners, homeowners associations and the City of Farmington. Maintenance of all the land within the P.UD. will also be the responsibility of these three entities. Along with the variety of housing types proposed, the development will retain three significant wetland complexes on-site, create a combination wetland/pond/open space corridor (approximately 14 acres) and designate additional open space/park areas (27:i:. acres) within the site (totaling 73 acres). There are several scattered deciduous woodlot areas on-site, and the site plan was developed to retain as many of these areas as possible through unit type and location. . The primary access to Murphy Farm P.UD. will be offCSAH 31 (Pilot Knob Road). There will be an east/west neighborhood collector street through the north Y:z of the site and a north/south neighborhood collector allowing connections to the properties north and south of the . development. Additionally, there will be internal neighborhood streets within Murphy Farm P. UD, and a direct access to Akin Road for the executive single family lots on the east side of the property. Sanitary sewer is presently on-site and water main will be brought south along Pilot Knob Road from the new Farmington water tower site. The development will be responsible for storm water detention on-site following the City of Farmington Surface Water Management Plan (1997). Public utilities; electricity, natural gas, telephone and cable T,V. will be provided to the development by the appropriate utility companies. The Murphy Farm P.U.D. will be developed in phases over a 4-5 year period. The proposal will call for a minimum of two different product types available at all times during the development process, The development plan calls for approximately 163 single-family lots to be developed. The anticipated population breakdown for typical single family residential is 3.5 people per household, representing approximately 1.5 children per single family home, The anticipated population breakdown for the approximate 136 townhouse units is 2.1 people per townhouse and . 0.2 children per unit. The anticipated population breakdown for the approximate 152 villa units is 1.8 people per villa unit and 0.1 children per unit. These totals result in approximately 287 children and 1,443 adults in the estimated 451 households residing in the Murphy Farm P,U.D. . APPLICATION FOR PUD - PLANNED UNIT DEVELOPMENT Date: Fee: . Name Murphy Farm Location East of C.S.A.H. 31 (Pilot Knob Road), West of Akin Road, and North of Middle Creek. Zoning District (s) R-l Names & Addresses of All Owners: D.R. Horton ~&~q U~~hing~nn nrivp Eagan, Minnesota 55122 Principal Contact Don Patton Telephone (651)437-3128 Names & Addresses of Property Owners within 350 Feet Available from on Project Data Land Use Total Acres Single Family . Multi Family Retail Office Institutional Parks Wetland :t85 :t54 o o o +41 :t30 Densitv Units/Acre Residential 3.2 Parkinc:r No Off, Street Single Family Multi Family Retail Office Institutional :t650 :t880 N/A N/A N/A PHASING See Attached Narr~tive . POPULATION CHARACTERISTICS See Attached Narrative tit Schematic Plan Action by Planning Commission Public Hearing Date Approval Date Recommended Revisions Fee: Action by City Council Public Hearing Date Public Hearing Date Recommended Revisions Comments: Comments: Preliminary PUD Plan Approval Date Comments: Fee Approval Date Comments: Preliminary Plat Approval Date Comments: . Fee: Approval Date Comments: Final Plan Approval Approval Date Comments: Approval Date Comments: Certification: I hereby certify that I am the applicant named herein and that all information given above, including exhibits submitted, is in all respects true and accurate to the best of my knowledge and that if the applica~ion is approved, the future use of the property will conform to the plans contained herein. I am the ____Owner, ____Lessee, ____Purchaser, _____Agent. . Signature of the Applicant . Vi~V.:l ^Hd~nVi . ~U)~ ,~ ~ x ~F=:J ~ n:~5 Oii!: u 8 u l;j ~"F= UJ ~~a ~ ~ ~ ~ U)i&jU) ~NI'i <( l- .0 ~O(/) a::::::>W <( .2 l.1...Q..2 >-O~ If- .. a..<(2 a:::~0 :JWf- ~:r:~ 02 (/)~ 0::: <( l.1... . . ~~i ~I!!~~ lii;I Igggd ~~~n tt:ttt 222:;jll: ....EtD i~~ ~~ji~! eee~i ~~~i~ ttttt 2~2~~ " .. mm ~~ I :l ~~ t li1 tt t 2~:;ji .-cn'l ;Q~t:t!d .. "'1O~ae ~i I~.~~~,~~ ... :z:: ~ h~! f ~ 0 ..~I'I,~r . f.l ~ ! > mi' ~' ~ Ii' I ~ ~ n~plil~A~i . ! 2 i "1116 ~ i'i' id II H ".J I I Y + .. I ,I ~ : I I !11!lliiiiJ \ 1 i I l:: !Iii 91 ~ ilSi2 ~ ~i ! o:'l~ ~ ~f Q Q~3 U:i ____L__=_ . I I: . 'I. '.- " ,Ii ~ I . if ' ' J Ii: ~ Itl' II. .J ,!: I ! ~i .r ::-. & II.. -.,.. & 1:!.6 1~ljIJ';IHIJn~~.. .t .l:; tl)~'Jdj '!! f ,lfJ ii&n!8ih~;h;I,~j~;", i il l:iJldtlhJl Ji"~lllIltlzl~JjIEjHI~~ I.:I~., I ' li!iil ~ iJ' j' i;:"~ 11'11 ~ .a~ !~;!~~!:lii I~JI~!"~ ii~r ;1 jt,-I'JU,I'jf""'J'.jh' .,IU'~llj J . ~~"J,I'i'I~Jlj ,")=ll\.~ j~U~1'8"J i5! ~J! Jij-.liH)lI PSI=U iUtJhJ:~ih~t~fjjlil; .ifF ] Hili' AI J'.I .,:. .. -1'1 .'}i r lJ'i1 !j)llfIIUJt~liI~ ~~J.~d~~I;:!- ji IHi~lI: all.J=e =~~i i~ J ~~f,I;Jjh l~fl1t~i ~tp'hii'j . U.h iJihl'..'j" · "~- .=, . 'hn.t~J i , jl.lf;j:; JJ'j.I!'81~!!~.!~~J~IIH.hH8.H !~~ i 0." ~jllhj~h~ ~,":' '~iJ .'li .'I'i '. jl.!!:~i ,nA~ ,Uljld!~h~Jlc)!flitll:~.iil!: l lj::l!:im)*!l~ .5;!i~!i!~!;'INI~rd~11111 : . :1~!~~I.l'! IIU;'~j.ti. 'l~i'lk;~~,~..j~~I' ;i"'l~ r ... lptP,llg .Z" ",.. oil!;; .:' ~~ ...",....,xot 3'" ,,11 fi ~ MlilalJl !mhhfhjnh~jliHnajh!n: i s I - , j ~ i !'f I ,1 .!.~ ,:~{ ;} =,, i t i f~' ,!,I,.~! f ,8 l' ,: i~l!.~ ,'!'If!, hi-, ,I,lll j!I!~~:..l!j! d i.~.... \.,.. .,i 5- Q...- 2 :;:1.. 1_' ~o ; Iso JjH'i..~..~~!.~llujrf,il! .j. iil~.~jd",;j thj,lti;i~~j'Ji~'ia.l.hI!I", tl~itlli ':~ iii~Jjiii jlhii!i~ii!~I!~tiUi..! l!ii~f.= J j:!j,; f'!i!~ilj!j. h!! }~III!.fW!.~~ WltJr';j.,.1 "/t-1-.}"J-8j="J'Fi::h-""h; I i= ,I'! ~, ,jl:>l:',}-,j~l;li i ,'r'I..lJ'ii. .1,d"~i.H J!lhi'~i.81..! rii~h.HH"~l~ ;g:h~.hl ..1'I'I~H'i'Ulr'l'!li=:!il,' , .11".:"1' b= ;H.'ti!l;l~~I;;~1 fi~H!!H.f~ij ~:.i~:.Hd:if t. 'I'II/l'll'f~~-''''h' ,'I"~. ., .! I. i= 'J~;l.pl.ii.ii'lillf.",!'j. ~'. '~. 1!~'U=.hl~f ili:'lt"i~H~!Hh:t!!~!'tfi~ ul! jlt~,.t L.!f' ".fI,iHU'II,H'WI~litl !l' !!8.!l~=' 1m l~l~.I;.llj.'ii:~d}!':.:H Ijd!~~,:'lii . :ll~~;5!ljliJJ;f,J.~li ~!~',.~~:hl! ,'b!'f'I.!H:i: -' .:-il.!;;I.... 1'8 _0;..1'....'1:.1... ..."! _--.af! ~ ;,ljiih;~Ei~lilin!lU!;~iam h~~i:Hah - :z: ~! I ~ ~ . ~ - ~ ~' . . " I - i ill. i I j j , i I.ital' f ~ if . .j y.! flur. j a , l~ ~' j i ni: ij" "II,;lllj Ih~ljl' 'Ill" #; . if I ',. )I"JaI!.1 .I HAl 19l1llh~ll '~II'8 liiJlIJ~i' 'J j '&(" .At.UI-.ln at: !:~~ihcIU~i S~~rl~~jlfUi Jt!n '~ill* !~ti;!I.fijll~!;~ I.-ii, j il'.ilI".'!III~'i! ;~Ih!;jj~~~i!:M~j~j,~~HJ~ . jiitl "n;I'~"j~I~,Ji'!:1 ' 'IJJ'Hj~t'~Hi= fiiliIJ~!Jh. i I'-II~ . I IR,I',"' ,~ ijl"t W' >> hlh' 'I"flll)' ,.Ii . i : 14 "Ii.rl'il hl"lab,lr : :UJIJ~!llJilj ..~.I.=IUj~t:!: IJ""'~'8~IS~~~f ~1i"n :r ~~Uli!Hmi~m JH~i; ! i i z ii , ~ ~ .., .... ~ ~ i ill z ~ N ~ . . s I i o z w o W J d , ~ z ~ iJ ; ~ ~ o > ~ .... ~ ~ i ~ 0 I .... . i ~ ~ ~ ~ ! . , . ~ *l'~ ~ ? 9 : :1 (l , 6 ! - ~ .., ~ : :1 I I , , ",' G> 11't n ~ \ IIi ,I , i ! . <::> H ~~ ~5 '. .. ~1 c " ll. ;!! ~;~ ...----- ~ / ~ :~ qi 'u _\ If?r-- , \ I,,~ ,Ill .. ,'-- '" 1:1!~b! . ~- c Il.1 ,,~ll'f~ i((~'lll .!.::~.:.:-' -~--~-~I~l ~-~~;~~~ '. j' - --" " ..a * · l[ · . << -.. . -z: ~ ~ iai~ ~ e 0 i~lsl~~i~~ Ii I i ~ nn!lil ,di B M W I *I'n 6 9. I ',I '. II' i ~ J B r r y f ~ : :1 0 ~ i 1 8 liHlliiifJ 1 i i I v . -------- ------ ---- ----------- ! i~ I I , I i I ------ ---- ///0/ I I : " / I I I I I , I I I I I I I I I I I I I , I I / I I I I .......'___J \ /~ -1 , / ' \ I I I I if t! 11 !~, ," Iii f!f~ fI - , . ARCON DEVELOPMENT, INC. 7625 METRO BLVD. · SUITE 350 · EDINA, MINNESOTA 55439 · PHONE 612/835-4981 · FAX 612/835-0069 . December 8, 1999 Ms, Lee Smick Planning Coordinator City of Farmington 325 Oak Street Farmington, MN RE: MurphyFarmP.D.D . This letter is a followwup to our meeting this morning regarding the Murphy Farm Schematic P.D.D, submittal. As was discussed, we are proposing a 50wfoot rightwof-way and a 30-foot back-to- back street on all interior public streets within the singlewfamily areas of the Murphy Farm P.D.D, Additionally, we propose a 25 foot front-yard setback (current City ordinance allows for a 20 foot setback) and the addition ofa 5 foot sidewalk along one side of all interior streets within the single-family area, With this reduction in street width from 34' B-B to 30' BwB, we would propose to restrict parking to one side of the street only (the opposite side of where the sidewalk is located), We feel this reduction in street width will reduce traffic speed within the local neighborhoods and result in additional area devoted to landscaping and green space, The addition of a sidewalk and the increased setback (20' to 25' setback) proposed would create pedestrian friendly neighborhoods within the Murphy Farm P.D.D, The second change to the original submission for the Murphy Farm Schematic P,D.D, is the removal of all public streets within the multi-family areas within the P,D.D" except the east/west street in the southwest comer of the property that will connect to Pilot Knob Road. All interior streets within the multi-family areas will be private and maintained by a Homeowners Association, Pioneer Engineering is in the process of making these changes today and will be delivering new plans around noon tomorrow (Thursday the 16th). If you have any further questions or need any additional information, please contact me at 835-4981, Sincerely, 4 & 7?-< Larry D. Frank Project Manager Cc: Don Patton, Mike Sue!, D. R. Horton WE DO MORE THAN DEVELOP lAND.... WE CREATE NEIGHBORHOODS .. / DEVELOPERS - PLANNERS - CONTRACTORS