HomeMy WebLinkAbout07.23.96 Special Planning Packet
.
.
.
AGENDA
PLANNING COMMISSION
SPECIAL
JULY 23, 1996
7:00 P.M.
1.
CALL TO ORDER
2.
PUBLIC HEARINGS
a.
7:00 P.M. - Wetland Alteration Permit Requested by Dakota County
Highway Department
b.
7:15 P.M. - Request to Rezone Lot 9, Block 5, Town of Farmington and
Adjoining Vacated Locust Street from R-3 to R~2
c.
7:15 P.M. - Variance Request to Create 2 Zero Lot Line Duplex Lots
d.
7:30 P.M. - Request to Rezone South One-Half of Southernmost Building
in the P.H. Feely Cluster from R-3 to B-2
3. DISCUSSION
a) Tim Giles Request for Schematic Plan Review - Revised pine Ridge
Forest Plat
b) Jack Benedict Request for Schematic Plan Review - East One-Half of
Cameron Property
c) Comprehensive Plan Amendment - prairie Creek Fourth Trunk Sewer Line
4 . ADJOURN
.
.
.
"
AGENDA REPORT
PLANNING COMMISSION
SPECIAL
JULY 23, 1996
1.
Call to Order
2.
Public Hearings
7:00 P.M. - Wetland Alteration Permit for Dakota County Highway
Department
The wetland being altered is located northwest of Farmington Industrial Park
within the stream channel of the middle branch of the Vermillion River. The
County has developed a replacement plan creating twice as much wetland in
Lakevi1le as is being destroyed in Farmington. The proposed wetland is situated
in a triangular shaped site northeast of the northeast corner of Dakota County
Estates 2nd Addition.
The wetland itself does not affect the adjoining development, but residents of
the north side of Dakota County Estates 1st and 2nd Additions are likely to
raise questions about the proposed stormwater conveyance channel being
constructed from Pilot Knob Road to the wetland. The Commission may wish to
expand upon the City Engineer's recommendation of a tree line along the south
edge of the wetland to include the entire length of the Dakota County Estates
neighborhood between County Road 31 and the wetland.
While the City Engineer is satisfied that there is a 2 to 1 replacement of the
wetland, the record should indicate the amount of wetland being altered and the
total area of replacement. The memo from the City Engineer to the City Planner
provides a recommendation to approve the Wetland Alteration Permit subject to
the 13 points listed in that memo.
. RECOMMENDATION
Consider concerns of the neighborhood and input by staff in drafting a motion to
approve the wetland alteration permit.
7:15 P.M. - Request to Rezone Lot 9, Block 5 and the adjoining north one-
half of the vacated Locust Street from R-3 to R-2
The ubroom factory", a building long since removed, was the reason that this
portion of Block 5 in the Town of Farmington plat was zoned R-3. Over time,
residential investments made in the block have created an environment consistent
with the other medium density development in the plat.
The rezoning is being requested because the ordinance is drafted in a manner to
encourage multiple family construction in areas zoned high density residential
and, conversely, to discourage single and two family units. In this particular
site, a multiple family dwelling can be built, whereas there is not enough land
area for a duplex. The property owner would like to build a duplex. In
I
I
.
.
.
. .
addition, another property owner has indicated that a more suitable zoning for
his property would also be R-2 Medium Density. Since the entire block is in
that same situation, the Commission could reasonably recommend that the City
Council also consider rezoning Lots 7 and 8, Block 5 from R-3 High Density
Residential to R-2 Medium Density Residential.
. RECOMMENDATION
Forward a recommendation to the City Council to rezone Lot 9, Block 5 and the
adjoining north ~ne half of the vacated Locust Street from R-3 to R-2 and to set
a public hearing to consider the best zoning option for other residential units
in this block.
7:15 P.M. - Request for Variance to create two zero lot line duplex lots
from Lot 9, Block 5 and Lot 5, Block 4, Town of Farmington,
in combination with vacated Locust Street
As pointed out during the last meeting, the Zoning Ordinance provides a zero lot
line option within Planned Unit Development projects but not elsewhere. Because
of this inequity, the Commission previously granted a zero lot line option at
the southwest corner of the intersection of Spruce and First Streets. The only
difference between these separate requests is that the original width of the
Spruce Street property was 110 feet whereas these lots are 100 feet wide. When
divided there will be four 50 foot wide lots, each of which contains one half of
a duplex.
A variance is justified because the spirit and intent of the ordinance is being
observed. A rental duplex can be built on each lot without any need for a
variance.
. RECOMMENDATION
Approve the variance request for two zero lot line duplex sites totaling four
living units as requested.
7:30 P.M. - Request for Zoning Change - south one-half of southernmost
building, cement block, in the P.H. Feely cluster west of
Second Street from R-3 to B-2.
There is an obvious mistake on a zoning map that divides one building into both
business and residential use. The mistake in this instance was brought to light
by the recycling business which started in the building in question. The GIS
maps now available clearly indicate that this building is more within
residential than business zoning district.
The building has been on this site for many years and its uses for much of that
time have been associated with Feely Elevator. While the building is not vacant
at the present time, its highest and best use is business.
'. -
. RECOMMENDATION
. Forward a recommendation to Council to approve this staff initiated rezoning of
the south building in the P.H. Feely complex from R-3 to B-2.
3. Discussion
. Tim Giles' Request for a Schematic Plan Review of a Revision to pine
Ridge Forest Plat
The land surveyor who works for this developer indicated two weeks ago that a
revised plan was being prepared, but nothing was submitted prior to mailing this
packet.
. Jack Benedict Request for a Schematic Plan Review of the East One-Half
of the Gary Cameron Property
The Developer has proposed 138 townhouse units on 13.65 acres for a density of
10 units per acre. The Planned Unit Development section of the City Code allows
4.5 units per acre within the R-1 District. When this was discussed with the
Developer, he agreed to revise the request to include only 62 units and to
reserve a larger portion of the land area for public open space. The plan will
be revised in time for a discussion with the Commission on Tuesday evening.
.
. Comprehensive Plan Amendment to Allow Trunk Sanitary Sewer Linking
Prairie Creek Fourth with the LakevillejApple Valley Interceptor
This amendment is necessary in order for engineering staff at the Met Council to
approve the revised construction plans for sanitary sewers to serve the Fourth
Addition. A draft was presented to Met Council staff but since the form has
been revised, a new one will be prepared for discussion at the meeting.
C4tLtfiL
Charles Tooker
City Planner
.