HomeMy WebLinkAbout02.14.95 Planning Packet
(..,
.'
.
.
....
t
AGENDA
PLANNING COMMISSION
REGULAR
FEBRUARY 14, 1995
1.
CALL TO ORDER
2.
APPROVE MINUTES
a. January 10, 1995
3. PUBLIC HEARINGS
a. 7:00 P.M. - Request to Rezone the East Side of Trunk Highway 3
Immediately North of the Budget Mart from R-3 to B-1
b. 7:15 P.M. - Variance Request from First National Bank to Reduce
Existing Off Street Parking Ratio to Accommodate
Expansion
c. 7:30 P.M. - Variance Request from HRA to ExcAed Maximum Size
for a Freestanding Sign in Downtown Business District
d. 7:45 P.M. - Conditional Use Request from Hanson Flavors to
Operate a Wholesale/Retail Business at Farmington Mall
4. DISCUSSION
a. Request from Minnesota Pipe and Equipment to Utilize a Temporary
Office Building During Construction of New Facility
b. Final Plan Approval - Nelsen Hills Farm PUD
c. Amend the Final Plat of Dakota County Estates 9th Addition
5. ADJOURN
~
.
AGENDA REPORT
PLANNING COMMISSION
REGULAR
FEBRUARY 14, 1995
1.
CALL TO ORDER - 7:00 P.M.
2.
PUBLIC HEARINGS
7:00 P.M. - Rezoning request from Susan Poirot to rezone the east
side of Trunk Highway 3, immediately north of the
Budget Mart from R-3 to B-1
a.
The Draft Comprehensive Plan prepared in 1990 indicated that an ex-
pansion of the Budget Mart facility would be appropriate. The proposed
land use map prepared at the time shows this site as part of a small
business node on the east side of Highway 3. The concept anticipated
expansion of the existing facility rather than an unrelated use proposed
by a different owner. In order for the two uses to compliment one
another, and to produce the least amount of traffic conflict along the
east frontage road, the two owners are encouraged to work together on
a site layout and to share building plans. This may be difficult if
Budget Mart has not started to anticipate what its expansion will
entail.
.
Development of the East Farmington neighborhood and accompanying
population growth will assure that business development along Trunk
Highway 3 will serve neighborhood convenience shopping needs rather
than become a continuous strip of unrelated commercial uses oriented
to through traffic from one end of town to the other.
Recommendation
Forward a recommendation of approval to the City Council expanding the
business node created by Budget Mart. Advise the applicant that a
site plan with fully developed landscape treatment will be required
as part of the permitting process.
b. 7:15 P.M. - Variance request from the First National Bank to
reduce existing off street parking ratio to accommodate
a 2700 square foot expansion
.
The proposed expansion of the First National Bank will shift some
existing on-site parking spaces but will not actually expand the
amount of parking to accommodate the addition. Currently, the Zoning
Code requires one off-street parking space for each 250 square feet of
floor space, except in the B-2 Business District. This would mean that
25 off-street parking spaces would be required for any bank not located
within the downtown. Because the bank iR within the downtown, no
off-street parking spaces are required. This was not recognized when
the variance application was received, as there was some discussion about
the possibility of using unused space within the Premier Bank parking
lot. The ordinance does allow for parking spaces on lots other than
those containing the principal use.
.
.
.
,
. Planning Agenda Report - 2/14/95 - Page 2
The applicant has done a good job in developing a plan with efficient
space utilization and producing convincing rationale as to why a
variance should be granted. Since the variance is not required,
attention should be directed to the site plan which can be approved
subject to some minor revisions. The drive up teller lanes encroach
into the parking lot by extending a concrete curb into the maneuvering
space behind automobile space 8. If this were reduced in length by
9 feet, that interference would be eliminated. It is also suggested
that spaces 4 and 5 should be reoriented in an east/west alignment at
the west end of the parking lot to eliminate the difficulty in utilizing
space 4. This would allow a larger planting mass between the drive up
lanes and the parking lot and create another larger planting pocket in
the southwest corner of the lot. A landscape plan needs to be developed
and submitted with the permit application.
Recommendation
Thank the applicant for the detailed plan of the addition, but request
a minor revision to the parking lot layout.
c. 7:30 P.M. - Variance request from the BRA to exceed the maximum
size for a freestanding sign in the downtown
The proposed sign will be located south of Elm Street immediately east of
the railroad right of way. The area ann height of pylon signs is
regulated or controlled by the speed of traffic on adjoining streets.
The proposed sign which will draw attention to downtown Farmington
and its stores may be 18 feet tall and 50 square feet in area. The
proposed sign at 15 feet is within height limits, but will exceed area
limits by 22 square feet since the traffic on Elm Street is limited
to 30 mph.
The applicant suggests that the sign being proposed is a combination
of business sign} directional sign and public sign. It is based upon
the premise that four available advertising panels are available for
monthly rental to any business within the B-2 District. In addition,
it serves as a welcome to Farmington and directs people into the down-
town, as well as serving as a message board advertising} for example}
Mountain Dew Days. The actual business related advertising will be
limited to 40 square feet with 32 square feet providing public service
information.
Variances from the sign ordinance may be granted in instances where
strict enforcement would cause undue hardship. In this instance, the
variance being requested is based upon the combination of sign functions
in one structure. From the point of view of reducing sign clutter, the
requested variance should be encouraged. A smaller sign, or two separate
signs, clearly would not be as effective in drawing attention to the
downtown or the business activity within it.
Recommendation
Approve the requested 22 square foot variance and request that land-
scaping of the sign shall be related to general landscaping of the
HRA land east of the railroad right of way.
"
.
.
.
~
Planning Agenda Report - 2/14/95 - Page 3
d. 7:45 P.M. - Conditional Use request from Hanson Flavors to operate
a wholesale/retail business at Farmington Mall
As noted in the memo from Dick Hanson, he would like to move his
wholesale space business from Lake Street in Minneapolis to the
Farmington Mall. He anticipates that such a change will help to
facilitate expansion into retail sales. The location selected in the
mall is situated across the hall from an auto dealership office. The
mall is zoned B-1 Limited Business which lists wholesale business as
a conditional use. This hearing has been established to explore the
kind of activity that will take place within the designated rental area.
It is difficult to imagine that conversion of or blending certain spices
to specific packaged mixtures would involve noxious machinery. However,
that question must be asked, along with the relative proportion of
space and operating hours for the retail activity.
Recommendation
Explore the activity requested in this petition and determine if it
fits within the guidelines established in the Planned Neighborhood
Commercial Center (page 14) of the 1990 Draft Comprehensive Plan.
3. DISCUSSION
a. Request from Minnesota Pipe and Equipment to utilize a temporary
office building during construction of its new facility
The Zoning Ordinance recognition of temporary structures, Section 10-6-10,
relates to construction activity rather than a temporary office to
be used during construction. The essence of this problem is that the
leased facility in Lakeville will no longer be available after March 1st
and their building in Farmington Industrial Park will not be ready to
occupy until July 1st. The temporary office structure will} therefore,
be in use for approximately 4 months. The need is for clarification
of the ordinance intent.
It could be assumed that if construction trailers are permitted for
periods of up to six months} a temporary office building for a similar
period would be acceptable. Rejection of this request would sub-
stantially set back recent interest in industrial development within
Farmington.
b. Final plan approval of Nelsen Hills Farm PUD
The attached booklet describes the Planned Unit Development as approved
in preliminary form and essentially is a formal presentation and final
record of prior decision making. The project summary indicates 265
single family lots} including 49 platted within the 3rd Addition.
Overall density is consistent with the first two phases of Nelsen Hills
at slightly more than 2 units per acre. The community facility bonus
with this development is the large neighborhood park adjoining the
City water tower. The PUD has been proposed with a north/south trail
system which will facilitate the movement of people in this neighborhood
to the hill top park.
Recommendation
Forward the final PUD of Nelsen Hills Farm to the City Council with
the recommendation that is should be approved.
;
.
.
.
. ~
. Planning Agenda Report - 2/14/95 - Page 4
c. Amend the final plat of Dakota County Estates 9th Addition
Between the time of original approval and the developer's negotiations
with Wensmann Homes, it has become necessary for Wensmann to divide
the large lot with deck homes into 3 lots. Nothing will change on
the plat except for the renumbering that occurs in the block with the
large lot. The City Attorney has advised that since the plat has not
materially changed, a resolution approving the addition of two lot lines
will be appropriate.
Recommendaiton
Forward a recommendation of approval for the revised layout of the deck
home lots in Dakota County Estates 9th Addition.
&~~~~
Charles Tooker
City Planner