HomeMy WebLinkAbout07.28.08 EDA Packet - with notes
./
ti~
AGENDA
ECONOMIC DEVELOPMENT AUTHORITY
July 28, 2008 - 7:00 p.m.
City Council Chambers. City Hall
Members
1. Call Meeting to Order (7:00 n.m.)
2. Pledge of Allegianc.e
3. Approve Agenda
Chair
David Pritzlaff
Vice Chair
Christy Jo Fogarty
Steve Wilson
4. Citizens CommentslPresentations
5. Consent Agenda (see attached) rV
a. June 23, 2008 EDA Meeting Minutes . L
b. May & June Bills .l,.i(1t"t('
c. June Budget Details ~~ .
6. Public Hearings (None)
David McKnight
Kevan Soderberg
'~itv Staff Representatives
Peter Herlofsky
City Administrator
7. Continued Business
a. Industrial Park Expansion Cost Estimates (Tina)
b. 308 Elm Street Demolition (Tina)
c. EDA-Owned Downtown Advertising Sign (Lisa)
Tina Hansmeier
Economic Development
Specialist
325 Oak Street
Farmington, MN 55024
8. New Business
a. Business Development Grant Selection (Tina)
b. Request to Encroach into EDA Owned Property - Regan (Tina)
c. Farmer's Market (Lisa)
d. Design Standards Workshop (Tina)
9. City Staff Reports
a. Economic Update, see attached
b. Downtown Idea Exchange, see attached
c. Business Guide, see attached
Lisa Dargis
Administrative Assistant
Phone: 651.463.7111
htt:p://www.ci.farmington.mn.us
10. Adjourn
_lt~ .. .
~ ;~ '~~
, ~ington ED .'Jm;,s~ove t eco~c vimlity of the city of Farmington ond to enIu1na th€ overall quality oflife
by creating partnerships, fostering employment opportunities, promoting workforce housing and by expanding the tax base through
development and redevelopment.
,I.;
, \
/": ~
i It
411 f1 C at.. 0Vl
(t~ ~,r~
j\ ~
.uo
~r~
Jt=/1Ut/Y1
(1) &r
.
.
.
.
.
.
MINUTES
ECONOMIC DEVELOPMENT AUTHORITY
Regular Meeting
June 23, 2008
1. Call Meeting to Order
The meeting was called to order by Chairperson Pritzlaff at 7:00 p.m.
Members Present: Pritzlaff, Fogarty, McKnight, Wilson, Soderberg
Members Absent: None
Also Present: Tina Hansmeier- Economic Development Specialist, Lisa Dargis-
Administrative Assistant, Peter Herlofsky-City Administrator,
Michelle Leonard, Nick and Stacey Schultz, Hosmer Brown III,
Hosmer Brown IV, Jeff Thelen, Ruthe Batulis
2. Pledge of Allegiance
3. Approve Agenda
MOTION by McKnight, second by Fogarty to approve the agenda. APIF, MOTION
CARRIED
4.
Citizen's CommentslPresentations
a. EGC Strategic Plan
Dakota County Regional Chamber President, Ruthe Batulis presented information
regarding the Farmington Economic Growth Committee's (EGC) activities over the
last five months and the draft of their Strategic Plan. Members of the EGC will also
be presenting this information to the surrounding townships in order to encourage
their participation and obtain their feedback. The EGC has identified their top three
priorities to support economic development. The group will focus initially on the
areas of industrial development, transportation and development/redevelopment of
the downtown area.
5. Consent Agenda
a. May 27, 2008 EDA Meeting Minutes
b. May Budget Details
EDA Member Wilson asked why the amount that was directed by the EDA to be
spent to establish grass on the Riste site was not included in the May 27, 2008
meeting minutes. Staff stated that there was not an actual amount stated, and the
EDA directed that the figure spent would be at the City Administrator's discretion.
MOTION by McKnight, second by Fogarty to approve the consent agenda.
VOTING FOR: Fogarty, McKnight, Wilson, Pritzlaff. ABSTAINED:
Soderberg. MOTION CARRIED.
6.
Public Hearings
None
EDA Minutes
June 23, 2008
Page 2
.
7.
Unfinished Business
a. Downtown Update
All planned improvements have been made to the McVicker Lot. Sod has been
placed on the Riste lot and it was installed prior to Rambling River Days. Member
Wilson asked what the cost of the sod was, and how staff plans to keep the sod alive.
He stated that he viewed the lot earlier this evening and feels the sod is in poor
condition. Staff stated that the cost of the sod was $4,477 and includes the
recommended six inches of topsoil and two weeks of watering by the turf company.
After the two week period, the Parks and Recreation Department will be watering the
site. Member Pritzlaff stated that he believed that there could be roughly $1,000-
$2,000 spent on seeding for the property and that sod would be at a cost of not more
than $3,000. He also stated that he feels there have been issues in the past with sod
dying and he is concerned about the watering after the initial two week period. He
asked how water would be obtained for the site. Staff stated that the turf company
and the City Parks and Recreation staff get water from the dispenser on the side of the
City Hall building to fill their water trucks. Member Pritzlaff also asked what is
behind the brick wall on the west side of the Larson Building because he viewed the
site last week and feels that the brick fal;ade is unsafe. He feels that the green space
that has been created increases the risk of someone being injured if the bricks were to
break loose. City Administrator Herlofsky stated that the owners of the building have
been informed about the issues with the exterior wall. Mayor Soderberg stated that
the concern should be discussed with the building owner and the green space is an
attractive enhancement to downtown. Member Fogarty stated that she feels that staff
did what they were directed to do. She said that it was very important to her to have
the improvements done prior to Rambling River Days and she is pleased that the site
looked good for the event. She stated that she was not surprised by the cost due to the
previously mentioned need for black dirt on the site. She feels that the Parks and
Recreation Department will work to keep the sod established. Member Wilson stated
that he feels that the price was too high and that he is also concerned about the safety
issues that may have been increased by making the site useable and he feels that we
should have addressed the exterior wall issues prior to making the sod improvements.
.
b. Exchange Bank Building
A letter from the City Attorney Joel Jamnik was distributed prior to the start of the
meeting regarding the Exchange Building status. The City Building Official has
approved the final inspection for the building and has issued a Certificate of
Occupancy. As of today all of the work that was required per the development
contract has been completed. The warranty deed has been recorded, but because the
original goal for this project was to see the building completed, not to obtain
ownership of the building, the City Attorney and City Staff are recommending
returning ownership of the building back to 2004 Real Estate Company. The
Brown's have indicated that they will contest any action by the City to retain .
ownership of the building. Member Wilson stated that he feels that this is one of the
most bizarre one month scenarios in his recollection of being on the Council and the
.
EDA Minutes
June 23, 2008
Page 3
.
EDA. He stated that one month ago staffwas stating that the building was only 75%
complete and now today there is a Certificate of Occupancy and the building is
finished. He stated that he commends the Brown's for finishing the work and getting
us to this point but his frustration is directed at staff. He feels that although the
outcome is good, he has been mislead by staff and that the communication to the
EDA was both sub-par and inconsistent. Mr. Hosmer Brown III stated that he was
unable to hear what was being said. Member Wilson clarified that his concerns and
frustrations were not with Mr. Brown or his son, but with Cit-' Staff. Member
McKnight asked the Brown's what there next steps were gomg to be to market the
building. Mr. Hosmer Brown IV stated that they have a lease out to a company called
Buds and Bytes for the former Fan Club Athletics space. He stated that his own
company, The Minneapolis Theater Garage would be leasing the upstairs space.
Mayor Soderberg stated that the goal has always been to get the building done and
have the building occupied. He stated that he is sorry that the methods to get the
work done had to get to this point. He stated that his greater frustration is that there
doesn't appear to be a lot of interest in Farmington from the Brown's. He stated that
the ten years to complete the project tells him that there isn't a lot of interest and he
hopes that the interest now is to get the space occupied. Member Fogarty stated that
she is very frustrated with the Brown's and her initial inclination is not to return the
building. She said that while she is happy that the building is done and she is not
going to draw the City into a long legal battle, she has lost some trust for the
Brown's. She will be very leery in trusting them to keep their word in the future. She
has had to watch this project for the last five years. Member Pritzlaff stated that he is
frustrated with the process that has taken place to get the building finished. He feels
that the communication to the EDA has not taken place. He feels that he was
betrayed because the paper quoted him in saying that "a deadline is a deadline", and
he feels that those words in a sense didn't mean anything. He stated that at the last
meeting he was told that the deed would be recorded and he had liability concerns
regarding letting them back into the space. He stated that he spoke with Peter
Wednesday and was told that there had been meetings and everything had been
worked out. He stated that he is frustrated by the fact that he did not know what was
taking place. City Administrator Herlofsky stated that after the June 1, 2008 deadline
there was contention until the meeting that took place on June 16th with attorneys for
both sides. There was continued work between the parties to attempt to resolve the
issues and get the project completed by today. Everything that was to be completed
was finished by this morning. Staff is happy that the issue is fmally resolved. He
stated that he is pleased with the work by staff to get this accomplished. He stated
that he is sorry that Council Members feel that they were not in tune to what was
going on and things were not actually completed until this morning. He stated that
staff will try to work better at communication. Member Pritzlaff stated that he would
like to know what is going to be done to repair the wall. Mr. Brown IV stated that he
has called a contractor and will be obtaining cost estimates and he will work in
concert with the Building Official to get the wall repaired correctly. Member Wilson
stated that he was under the impression that the EDA would be giving
.
EDA Minutes
June 23, 2008
Page 4
.
recommendations for completion of the building when the deed was recorded. He
feels that the EDA was not given the opportunity to provide direction and that staff
just did whatever they wanted to do.
c. Industrial Development Strategy
Additional information regarding cost estimates for the second phase of the industrial
park expansion have been received from the consultants as requested by the EDA.
Member Pritzlaff stated that he feels that the figures seem fairly open ended. City
Administrator Herlofsky stated that there is no way to determine absolute numbers at
this time and the figures are somewhat open ended. Member McKnight asked how
the EDA will be updated on the progress and current estimates during the process.
Staff stated that once initial meetings have taken place there will be better indication
of how long the process will take. Member McKnight stated that the negotiation
team needs to let the EDA know if the process is not going to move forward due to
lack of interest on the part of property owners. Mr. Jeff Thelen asked if the City is
planning on purchasing the land and maintaining ownership of the property. Staff
stated that they City would like to be in the position to control the price of the land.
Mr. Thelen stated that the current industrial park took about 19 years to develop. He
feels that the EDA should not maintain direct land ownership of the property and
develop it themselves. Mayor Soderberg reiterated that control of the land prices is
the ultimate goal.
.
8. New Business
a. 308 Elm Street
The property at 308 Elm Street is currently owned by the EDA and is used to house
city vehicles while they are not in use. A few years ago a portion of the roof/ceiling
fell and was temporarily replaced. The building is aging and there will no longer be a
use for the building once staff moves to the New City Hall. Staff would like to obtain
cost estimates to determine what the cost would be to demolish the building. Member
Fogarty stated that she would not like to use sod to cover the lot if the building is
demolished in the fall because the sod may not last the winter. Mayor Soderberg
stated that he agreed that he would prefer not to sod the lot in the fall and we should
look into seeding it instead. He asked how the demolition figure of $40,000 was
obtained. Staff stated that the demolition cost for the Riste building was $36,000 not
including the abatement. There has not been a formal bid obtained. Member
McKnight stated that he would not support demolishing the building right now
without a development plan in place. Member Wilson stated that he agrees with
Member McKnight. He asked if the building has been marketed at this point. City
Administrator Herlofsky stated that the building is still in use so there has not been
any marketing of the property. He stated that demolishing the building may remove a
step for a potential developer. Member Wilson stated that a commercial developer
would be able to see past the building and the City should not be investing in tearing .
down buildings. He stated that he would not support tearing down the building.
Member Pritzlaff stated that he is not in favor of tearing down the building without a
.
EDA Minutes
June 23, 2008
Page 5
.
use. He also stated that if he were to tear it down without a use, he would look into
making the site a parking lot rather than establishing grass. He stated that if we work
in conjunction with a potential developer we may be able to share the cost of
demolition. Mayor Soderberg stated that his concern with leaving the building is that
there may a developer who wants to buy the building and make minimal
improvements and still use it. Member Fogarty stated that she would be in favor of
looking into using the space for additional parking and laying asphalt. Member
Fogarty stated that staff could get more information regarding the costs involved and
the cost for both establishing grass and laying asphalt on the site. Member Pritzlaff
stated that he would not be in favor of demolishing the building without a use.
Member Wilson stated that he does not agree with what Member Fogarty is directing
and that he does not support staff doing any more work to investigate what we could
do other than trying to fmd a willing buyer. Mr. Jeff Thelen stated that in 1991 he was
kicked out of that building because the City needed it for parking. He stated that a lot
of things have changed since that time but the need for additional downtown parking
has remained consistent. He stated that the EDA should obtain bids and if in the end
they do not end up tearing down the building they should at least paint it because it is
the ugliest building on the whole block. He stated that the City-owned buildings
should be taken care of if the other business owners are expected to fix up their
buildings. MOTION by Soderberg, second by Fogarty to direct staff to obtain cost
estimates for the demolition of the building and for options for use of the land
including establishing grass and laying asphalt and creating parking. VOTING
FOR: Fogarty, McKnight, Soderberg, Pritzlaff' VOTING AGAINST: Wilson.
Mayor Soderberg left the meeting after this vote.
b. ED Chapter Activity Update
Staff has compiled a listing of current activities as they pertain to the Comprehensive
Plan Chapter. Information received.
.
c. Meeting Schedule
A schedule has been proposed for the EDA to meet every other month beginning in
July. There was discussion previously regarding modifications to the meeting
schedule in the future. Many of the projects currently under way are long term. For
months during which there is no meeting, staff will provide a written report for the
EDA. If it is necessary to meet during one of the months not indicated a meeting can
be scheduled. Member Pritzlaff stated that on the months where there is no EDA
meeting scheduled, then perhaps those months there could be ajoint meeting between
the EDA and EGC. Member McKnight stated that if the EGC is ready to meet on
issues it could be scheduled at that time and there would be open dates that could be
used. MOTION by Wilson, second by McKnight to approve the modified meeting
schedule. APIF, MOTION CARRIED.
EDA Minutes
June 23, 2008
Page 6
Je
9. City Staff Reports
a. Economic Update
Information received.
b. Downtown Idea Exchange
Information received.
c. Harley Night - McVicker Lot
The Downtown Business Association would like to use the McVicker property to host
their monthly Harley Night and coordinate a beer/food tent. The appropriate
licensure and insurance would be required prior to the event. Mr. Nick Schultz stated
that the DBA would like to use some of the proceeds for a charitable contribution of
some sort. Member Pritzlaff asked if the Riste lot might be a better location. Nick
stated that Gossips would be providing the food so the site would need to be closer to
that establishment. The EDA agreed that as long as the DBA communicates with the
adjacent businesses and provides the necessary liquor license and insurance they are
fIne with the use of the lot.
10.
Adjourn
MOTION by Fogarty, second by McKnight to adjourn. APIF, MOTION CARRIED.
.
R~spec~lly submitted,
~-~/~
Lisa Dargis ~
Administrative Assistant
.
.~
i~
l6
o
o
~
I:!
""
o
,
CIl
Ol
111
0..
~I~ ~
o ~ ~
~ ~ ~
w w
"" ""
~ ~
W
N
.q:
~
III
~
W UJ I-
-- 1::
~ 0 en &.
~ z
~ UJ CD
0.. tx:
E N ~
Z ::s <0
~ en 0 C9
~ 13 z
., "" ~
u.. .s::
U 0 :2;
u.. ~
0 'r:; ~Iffi ~
~ c C9
::s
U 0 It) ~~ 0
U 0 tx:
o 0 0..
I- I-
Z Z
UJ UJ
:2; :2;
0.. 0..
o 0
....I ....I
UJ UJ
ru ru
Cl Cl
U U
- ~ ~
'2 0 0
:::> z z
III 0 0
III U U
~ W 1.U
'ij; <. <.
::s tx: tx:
al :I: :I:
>-
Z U
<(
.1 0.. ~
:0 C9
0 z
U i=
.., en z
N l- ii:
C9 U
0 :::> 0..
....I Cl z
:0 0 0
tx: b
:::> 0..
~ ~I 0 z
U o U ~
It) "C tx: tx:
It) ~ ;& <(
c::: u..
*
5
o
o
l::!! .
.... CII
~ i'
o !l.
_IN ~ 0 0 0 0 III III <D <D 0 0 <D <D rn rn c; c; t-- t-- .... .... CO
C ~ 0 0 0 0 t-- t-- <D <D 0 0 III III CO) CO) <D <D <D
:J . ~ ~ ~ .,; .,; c:i c:i ~ ~ cO cO cO cO .,; .,; N N N N .,; .,; M
o N
~ ~ ~ t-- 0 0 III III III III ~ .... In In In In 0> 0> CO CO III
'" .... t-- t-- CO) CO) CO) CO) '" N N <D
-.i -.i -.i -.i iii Ill' ~
"'
:s
(/) (/) (/) w {!.
. CO W W w w () 1::
0 (/) :>
~ 0 () () () 8-
'" N ~ Z :> :> 0::
~ w CII
E !l. 0:: 0:: w 0::
C!l E w ~ w w (/)
Z :J (/) en en 0::
~ (/) ..J C!l ..J ..J <c
~ -lj , <( z <( <( !l.
CI) Z ~ Z Z W
CO 0 0 0 0::
u.. .r:: 0
u.. () ~ en :a; en en <.'l ()
0 'u en ~ en en z ii:
~ c M Ol~ 0:: ;t 0:: w w 0:: 0:: 0 I-
:J ~ W w C!l u.. u.. w w ()
0 .~ 0 ::c C!l ::c 0 0 0 ::c ::c ..J w
13 () 0 .Q 0:: I- w b 0:: 0:: 0:: I-- b 5 ..J
o !l. 0 ..J !l. !l. !l. 0 ell W
l- I-- I-- l- I-- I-- I-- I-- l- I--
Z Z Z Z Z Z Z Z Z Z Z
0 w uJ w w uJ w w uJ w uJ
en :a; :a; :a; :a; :a; :a; :a; :a; :a; :a;
Z !l. n. !l. !l. !l. !l. !l. n. !l. !l.
<( 0 9 0 0 9 0 0 0 0 9
!l. ..J ..J ..J ..J ..J ..J ..J
~ W uJ W W uJ W W uJ W W
[;j [;j [;j [;j [;j [;j [;j [;j [;j >
w
:.: 0 0 0 0 0 0 0 0 0 0
~ () () () () () () () () () ()
- n. :\j :\j :\j :\j :\j :\j :\j :\j :\j :\j
'c ..J 0 0 0 0 0 0 0 0 0 0
;:) <( z z z z z z z z z Z
tIl oc 0 0 0 0 0 0 0 0 0 0
tIl ~ () () () () () () () () () ()
Q) w w w w uJ w w w w w
c ;:) :<i: ~ :<i: :<i: :<i: :<i: :<i: ~ :<i: :<i:
'iij 0
:J 0:: 0:: 0:: 0:: 0:: 0:: 0:: 0::
ell ~ ::c ::c ::c ::c ::c :r: :r: :r: :r: ::c
() <.'l
~ z
:.: ~
::; ~
0:: uJ W
uJ :r: 0 ()
0 oil () z ~ :>
. ~ ;:)
~ z C!l 0 uJ 0::
<( Z <.'l () 0:: uJ
uJ z iii z ~ uJ en
0 z (/) ~ :.:
0 uJ :a; 0 :a; :> b ()
CO) ~ ;:) 13
N en 0:: ii: 0:: 9
<.'l 0 <( ..J ..J W !l.
9 0:: u.. ;:) n. !l. <( I- W W
u.. Z Z Z Z Z 0 0:: ..J >-
0 0:: :.: 0 0 0 ~ w w iii <.'l
:a; 0 ;:) ..J I-- I-- i= !l. I- 0::
;:) 0::. ..J C!l C!l <( en 0 w
I-- I- W <( <( :a; z
~ z z z 0 ()
~Ien z ell en :a; w
() o w ;:) !l. :\j :\j 0:: Z 0 I-- en ..J
III "0 Z ~ :a; 0:: 0:: W 0:: Z en :e w
In 5i 0 <( <( <( I- ~ :5 0 0 ~
0:: > ell ell U u.. u.. ~ !l. I--
.
""
!!
~5
8!
CD
to
CD
...:
ll'
<I>
.
ia
I
I
'"
.
i5i5i5i5i5~~i!:i5i2~
~22~2c:i~~2;::d
@~!s(irs C)l"'Jli~~
l'l
c
..
~
s
~
"
"
o
~
z
;g
'5
8l
g
<C
~
"
"
.;;
1;;
:!E
5
<C
..
:!E
.c
"
U-
"
..
...,
~l
~~
"
.9
C)
"
.~
..
U-
'5
.?;o
C3
"
o
:g
~
"
o
""
"
"
U-
<I>
.,.
~
o
::;
~
l;;
~
v
l;;
o
::;
~
~
v
~
o
::;
~
o
::;
N
CD
N
...:
co
'"
~
o
0)
'"
.,.
~
\5
v
..
CD
co
I'-
N
ll'
..
~
'"
'"
ll'
.,.
0)
to
CD
l:i
v
..
~
ii:
!i!
~
l-
'"
UJ
liE
D.
o
....I
UJ
Gi
o
tJ
:E
o
'"
o
tJ
UJ
I
o
o
o
'"
G""SGi
,,<XlJ!l,s
;,ocna
~9.
~1!
"
19"9
!iU-
E
)1
.'!l
.5
6)or--M
CDO"lt"="
1,,1OC'>CJ)
cO": iO
e
co
CD
V
~
"'I'- '"
t8 ~ I I ~
riri !i
'"
CD
v.
'"
'"
",CD
"'~
to "'.
gE
.:
"'CD
o~
to"'.
~
to
~
10
N
10
"'''''''
"'''''''
","'0
r--~~m~
..
:>
g..;;
fa m e
B~~~j
~~i~~~
~:~~io~
5-5~S~c
o<c.5OCCll8
OCOONOU)
(O'C'""l.C)f'-.~U)
"IQ'I.OCDCJ)Or)
...;''o;z'"-..;:f-..;:fU)U)
""
"
""
~~
,jj
~
I'-
~
..
.,.
~
.;
'"
~
.:
~
~
'"
~
to
~
to
o
o
"'
o
N
...
S
f.
-~w
o "
o "
'" ~
LO 'ii
I'- <Xl
""
"
:>
... U-
S
.. c
CP ~ .~B a: 1-
~ g ~~~ ~
B I ~~ ~~ie~~
CIS i: ~ .g:8 'a~ Q..3l!~
mU)Q).!:! g>a...g. Q..=&jg.ea..
u~~~~ ;~U mmo~~~
!~I~m = ~B! ~isW~~
~~O~~ ~ma.~~ ~~E~~~
~~~m~~~gmz:~mE~E~W~
~B~w:~~~!~~~'E~~Ue~~~~
sse C05j!~ a'3 Olme~ 5-3 2'3:50<_)
OOD.3:!Ewz.503il-:!EUJ'''D.<XlO~-
~~a~~~~gmgg~8~g~~~'~~
~ ~ ~ ~ ~ ~ ;g ~ ~ ~ :; ~ ~ ~ ~ m j:! ~ .--
----~~~~~~~-~~~
~~~~t--:~~~r'icqq~C'o!qf'-;
~i~@~r::t;~~~o~:gg~
"
"
"
..
a;
<Xl
M",",OMM;::-"'OCDOLSS
1.00 N'r""'OI'-Ln 0 m'C""'o to
I -(O~",",_M C!.':!.u) N f::!.. I.O~~
~N C
..
s
{!
t')f")O,.....M'C""'CO O)'C""'lnClJtf)
lOCDCOCOCI'-"Ilt' t>>CDI.D'l"'"oq-
t")N~coCDtD'N'l"'"r--t")
oc:a; r
..
"
"
Cl
~
z
tS
o
'9
8l
g
<C
~
~
0>
"
~
to'"
",0
"''''
uiri
~
'"
0>
~
iV
:::<
NNO
N"'O
~~
~
9
<C
~~~~~~~
MO~NC')~
_~N
[g
'"
~
'"
0)
.:
1'-00>
I'-CDO
N~
v
v
..
:!E
o
to
"'
v"''''
"''''0
~"'~
.g
u-
"
..
..,
ggt:;j~~
"''''
N
'"
~
~~
~ffi
0000000 000
.g8f5gf5~~,~~1D
ON ~
"'~
I~
,,0.
0.
:>
CIl
S5~
22~
00'"
....~
G)'6)j::'"
"'N'"
etO."'.
~e
~~1O~
t")U)NCO
~~
....~
CD~
0>
ll;
~
CO 1'-'"
1'-0 V
CON
i!!
~
~
'"
'"
g
i
N
"'
<'l.
~
..
'"
;;;
o
'"
..
~
l;;
~
v
l;;
o
::;
...
~
l;;
o
::;
..
l;;
o
~
..
~
l;;
o
::;
..
I'-
N
~
v
..
",I'-
ov
"''''
",.
....
;::
~
~
~
c:i
::;
~N co N
;:ci :g ~
~ ..; t5
'"
I'-CD
NV
0'"
~M
'"
;::
~
~
'"
o
CD
'"
O~'"
tOO~
"''''
ai~
CO
~
~
o
I'-
I'-
...:
'"
~
...
CO
g
CD
'"
I'-
~
V
~
I
'"
b
'l!
:!l
g
w
..
I
~
~
i
i
l~
",,0
q
8~
h
5~
><..
.,.
~
'"
N
o
o
~
to ~
!'l '"
.a t")~
ll'
o
'"
'0
~
.
City of Farmington
325 Oak Street
Farmington, Minnesota
651.463.7111 . Fax 651.463.2591
www.ci.farmington.nm.us
TO:
EDA Members
FROM:
Tina Hansmeier, Economic Development Specialist
SUBJECT: Industrial Park Expansion Cost Estimates
DATE:
July 28, 2008
INTRODUCTION
Staffs first attempt to put together a budget for the industrial park expansion project is
attached.
DISCUSSION
. A memorandum was included in the June EDA agenda packet providing cost estimates
for the first two phases of the business park expansion project. These costs were
provided by the Consultants and are reflected on the attached Industrial Park
Implementation budget spreadsheet. Staff has begun to identify additional steps which
may be necessary to move this project forward. As cost estimates are determined they
will be added to the Industrial Park Implementation spreadsheet and shared with the
EDA. please understand that the cost estimates provided are broad and could change
significantly as progress is made.
ACTION REQUESTED
This item is for information only.
Respectfully submitted,
\~4 lrl (~l'l CLV~1I1 ekX--)
Tina Hansmeier,
Economic Development Specialist
.
Cc: Peter Herlofsky Jr., City Administrator
Joel Jamnik, City Attorney
Lee Mann, Consultant
Bruce Maus, Consultant
.
0 0 00 CO CO
2 1.0 0 00 Ol """
Cll -:i 0 00 (") ex)
.S 1.0 0 00 """ Ol
$ N """ (')0 1.0 """
1ij I:: N c<i cim t.O ci
WCll ..... N 01.0 1.0 1.0
....~ t/7 t/7 CO""" co Ol
Q) ::l t/7 t/7 N c<i
C>Ul 0
"'01:: 0 t/7 t/7
::s 0 III III
lIlt) l- I-
iU
:E
en en
::l Ul
"'0 ~
E
Q) a.i e
.c 0-
.... " C>
- c:
0 Q) I::
.... ~ ~
I:: ~
Q) 0..
E "'0
0- Cl
0 co I::
(jj e! u: Cll
> .s:: E t) .
0) co g jg
"'0
... II i::- I::
.E e! .!!l 0
" u ......,
.... t> '2 .... Ul
I:: co I:: ~
Q) ~ el '" Q)
E "C
.s:: c: Cll E
0) "ffi co co 0) 0-
~ Q) II @ 0 ~ 0 0
Ol "C c: en Ll) (jj .-
Cll Q) Cl B ::s J: I:: > I::
I:: :0 '0; '0 ~ 0 0) Q)
'0; Q) ::l 'iij "'0 E
Cll '" "C Co ... "C () I::
... 0 "C 1ij co Q) >.
2 0- c: f!.! 0- f!! 0 E Cll :5 Cll
Cl co "'0 c::: 0- a.
I:: c: el '" ..c: I:: - g ~ -c ~
0) '0; .S .c
.s:: Q) co Cll 0 a; 0) ca
.9 '" " II "'0 c: .l<: a:
" co '" ~ ~ ~ Co ""
() ~ .r!l '" 2 :;:l
C) '" c: ::l g 0 I:: -
@ '6 II Q) 0 t) ca 0 a. 0) 0
.... E '0; '0 0:: '"
€ Q) ::l ~ :!2 C>
.~ c: co '" ;, 0 E '" I::
"'0 .e ~ '" 'E en Q) ~ ~
0) Q) en Ul 0 :e
0) E f!! ol:: en
tIl t;:: "C ~ =:; ca :s ::l ca 0
:;:l c: 8 - 1ii "
0 co Cl Q) ~ "'0 ~ u
:5 I:: Q) c: .S ~ .... I:: 0)
Q) ""'- 0- E "C :5 i 0)- .9 0:::
:!2 () e r:: Ul-
.?:' co CIl ... Q) c:- 1::- Ul I
.c 0- CIl >. .E =:; ;= 0 0) 1if
:;:l en Cl .!1l ca
I:: (jj 0 ..c: e! '0 ;= "C ca o en > ~
0) Cl () tIl .s c: en ~~ .S a:
~ co a; c: "'0 2 co CI)
:!2 .l!l Q) " ca a; E B C) iU '2 ..:
ca c: 0 8 ca 0) ca .Ill",
"'0 0- .!!l :S ..., e E g @ I:: .Q
.~ "C ~ Q) a.Ol ~ ~
I:: 0) :; c: e! ... .... (/) I:: eo u:: 11i
ca ::c II> 0- '" .e .g en .s:: CI) 0-(') .~ '5 ~~
~ c: " Q) 0) co -0 1if
~ 8 ;!: Q) ~ ca :50 "'0 0) ..
Q) ..Cl $ 1ij 0 :;:;- ~ .!!lQ) Cl :3
0) .tij '" .Q ..J '" ::l N tIl I:: a: I:: E Q; .- :a c:
I:: 8-g iU .~ 0) Cll ~me '"
> co Q Cl Cl 0 "C .l!! 0) 0 ~ '"
;= ca c: r:: >. c: Ul ::l ~ ~ 0::: '0
0 .s:: '6 ~ ~~ ~ en- S t) ~_;: "
() '0 .!!! .~ ....ca ca -... .9 OJ
~ "'0 CIl c: " 1::> Q) I:: I:: Ul en csLia.io c
I:: Q) '" "U E a. caw 0- 0).... t) '0' ~ 0 I:: C> O~36U 0- ..
0) Cll el c: .5 I:: 0- E 0) 0) 1a 0 .!: U.!:'l~815 e! 0:
~ ,2 Q) :~ 0- S?.
a. ~ ..c: 0 ~ u ct: aJ ca O).l<: 'e- o 0.. -l:
'1:: e N - :0 I:: 0) .... .~ ~ 2:5-g~'~ ..
0 c: 0) e! " --' --' "'0 a. Q) ~ .i!! a.
:5 0 a. I:: @) co '" 0- 0 ~8"8" I:: cn~ ::c gJa. ~ ~ ~~~:3w Ci5 ..
:.;::l ;= 0- ..c: '0 U .!!! Q) ..
::s :5 - 0- ca ca U .l<: "
.l!! 0 '" e! r:: a. .c I:: 0 0 c
0:{ .~ Cl 0- s: CIl 0 E E Q) .... 'S: Q) "'0 W t) '..
I:: C> r:: .~ .... I:: c:: $: "
'E Q) "" .5 Cl {! Qj ~ I:: E ca ~
w-c @ Q) c: .g .g ro ~
0) E Q) Q) ii 0 > Q) E :;:l 0:{ 0
E Q) 0) ca ~ E E 0- Q) Q) 0) I:: Cll .s::. ~ ::::l '0 '..
0.. :2: a. i= ~ Q) 0 a. a. u:: :2: $: 0 0:{ en :E c
a. ..,. c::: u ..
0 ..s tIl ca .c u "'0 (') """ 1.0 co I'- co Ol .
Qj a. N N N N
c: > ~ 2
0 0)
0, 0 Cll en
c: a. Ul
.~ u iU 0) ~
'E tIl "
co 'C '0
u.. 0 1ij Cll c
'0 I:: .c ~
0 ::l a. z
.?;o U "'0 E::
C3 W E ;.<
.
oq-N ..... l.O COC")
ON NCO NO')
LL."'! "'! ",!,<",: "'! .....
000 00 00 0
-
~
(;R- EA- EA- (;R- (;R- EA-
N CO oq-O 0 0
W~ "'! "'! l.O CO N
cx:..... 0') ..... cO Lri Lri
O~ oq- ..... l.O N N
CO_ CO_ 0 CO oq-
0::( - 0') 0') a:i 0) a:i
_CO
~
(;R- (;R- (;R- (;R- (;R- (;R-
0 0 0 0 0 0
CO CO "'! CO ~ ~
..... N l.O -i ..... N
N CO C") 0') ..... I'-
LL. CO I'- C") I'- oq- N
l.O N CO C") l.O 0')
00 CO l.O CO CO N .....
l.O N l.O CO I'- C")
C") oq- N ..... C")
U.c 0') l.O 0 0 0') l.O
Ow W oq- ..... 0 0 0 N
WCl)c::C:::I cO C") 0 ei cO -i
:::I<CI-..J l.O oq- 0 0 l.O CO
..JIDO:; ~ N_ ..... CO ..... 0')
:;~~~ l.O ..... ..... 0) L6 N
CO 0 I'- l.O C") 0
l:uffiCz C") 0') l.O ..... C") l.O
llI::D..Z:::l (;R- (;R- (;R- (;R- (;R- (;R-
a::OOO
<ca:: ()
:3ED..
CO 0 N C") ..... 0
Il. C") oq- oq- CO ..... I'-
CWZZ C") ("") oj oj -i oj
We>-O oq- 0') l.O ..... C") l.O
~!1i~~
!!a::O<c
1-0:::111.
~<cdfsj
~
W CO 0 N C") ..... 0
C> CO CO oq- CO CO N
0::( ..... I'- oj 0') oj <D
w CO 0') l.O ..... C") I'-
0:::
0
oct
.... 0 0 0 0 0 0
00 0 ~ 0 0 0 0
W I- ei 0 0 ei ei ei
r-- W W 0 0 0 0 0 0
O~ :::l 0 I'- ..... CO N 0
o a:: .J r--: C") - N
..... 0') 0')
No::( ~ N oq- I'- l.O CO oq-
02: I'- 0') l.O ..... C") CO
z
:s (;R- (;R- (;R- (;R- (;R- EA-
l.O ..... l.O l.O 0.....
N l.O CO CO mo
I I I I I I
..... 0 ..... N 00
C ..... C") ..... ..... ..... .....
0 0 0 0 00
ii: I I I I I I
0 0 0 0 00
0 0 0 0 00
l.O CO CO CO COl.O
C") N N N NC"')
0 0 0 0 00
I I I I I I
oq- oq- oq- oq- oq-oq-
..... ..... ..... ..... ..... .....
~o::: >. >. c 2:-z-.
.s::::. .s::::. CO
e- o. z-. E .- .-
WW .... E E
::J ::J' E Q)
c.Z ~ ~ "E CO CO
OS CO u.u.
0::::0 "E "'0 U. ::J >. >.
.... .... s: Q) Q)
IJ.. CO CO
C C Q) C C
.... .... .0 ~ > >
Q) Q) ::J Q) Q)
OJ OJ J: ....J 00
.
.
CO
0')
(>'"j
oq-
l.O
L6
l.O
CO
N-
(;R-
oq-
CO
0')
o
C"')
N
I'-
-i
I'-
C"')
(rj
m
.....
o
f-
.
City of Farmington
325 Oak Street
Farmington, Minnesota
651.463.7111 . Fax 651.463.2591
www.ci.fannington.mn.us
TO:
EDA Members
FROM:
Tina Hansmeier, Economic Development Specialist
SUBJECT: 308 Elm Street Demolition
DATE:
July 28, 2008
INTRODUCTION
Staff was directed at the June EDA meeting to obtain demolition estimates for the
building located at 308 Elm Street or the building commonly referred to as the "Old
Park & Rec Garage" (see Attachment A). Also obtained were cost estimates for possible
options for the use of the land after the building is demolished.
. DISCUSSION
Demolition estimates have been obtained from Friedges Excavating (Attachment B) and
Doboszenski & Sons (Attachment C), both of which have demolished City or EDA owned
buildings in the recent past. The demolition estimates are attached and indicate the
scope of work along with specific exclusions based on certain assumptions at this point.
The cost estimates provided include demolition of the building, disposal of building
materials, grading of site and placing 6" of class 5 aggregate over the building removal
area.
Options are presented below for what could be done with the site directly after the
building is demolished. They are:
o Sod (Attachment D):
$3630 - $6,534
$2,175
$29,784 - $47,896
o Seed (Attachment E):
I} Asphalt for additional parking (Attachment F):
.
Cost estimates are attached for the options presented above. Staff believes the option of
creating additional parking makes the most sense at this point. It continues to be
brought to staffs attention that there isn't a sufficient amount of parking in the
downtown area. With the location of this site adjacent to several of downtown's
eateries; it would help alleviate some congestion until interest in developing the
property is received.
For some additional background regarding the state of this building, attached is a memo
that was brought to the EDA in August 2006 (Attachment G).
ACTION REQUESTED
Authorize demolition of the EDA owned 308 Elm Street building.
Respectfully submitted,
-{j~1~mU~SrnCf()D
Tina Hansmeier,
Economic Development Specialist
cc: Peter Herlofsky Jr.
.
.
.
Attachment B
~-... .,;,;,;,~- .~----,_.. ;--._---.:;;,,~.,
""~
~~".
. ~ ~.-:.t.""'~
I,. '. h_' l~,-,-_-::' -.,-___
.:: v.~.
.--'_.._~ '. . 0
r:r= . F~;rn ~~'-TJirnJ TI fllJ CQJ)l,=. @. ~nJ
I >~~V~~~~~.J~'~~~~~ll
. ,., JJ~,~-T('Jt\ , ,t,,, ...r, ,
. _:...~ & 3"__ . .\ I"~!~i .$tl-t~~;. '....) ,
~~~~:. ~::r:-x~.", ,~ .~;o'\.""",.."'1W ~;>'i; rli'.~.... "'i:.l'l. *"':"':""~(II
~ . "4," ".;.~.;',:. ,.-:": .~.,t,!...'"..\.~,,:,,;.;:!"'" .:.'~' ;;'.:' : :,f--:'.,.: ~";~\l~' "~t ..l "tt~ ,$ilj;.~!..:;;
....... ;i".. J'...."".I.~}'!!~:~~."".:~'....".. ;I.'....,A'....<~...~I.. ~ . .'f,"<I';;!!I[t!:~~~;,.'m' "
"...":" . "".""\ --.-,..,;~~:---, ~. ..,.7"'~"~. 4~'i~"", .~~:-~y,!, :~.'l'~~'~"\': :\... ..~1)J-!},..-::- ~t~'t"'J rr 1.,1 t
r :,. "'~"" .......-. 4 ... it. ,4.'h "",".' :::t;.,~. ~~ V(''''.,~ .... :.. "J,." >.. ~ ;4-00..~"9/. \"1' s~.,~.;"
.:. ".~ .'. .'~"';'," '.. ....-....... ".~.,: ~..,,-(~ ";:.,,. ..-I,.}},,,,,,,,.,, '.' ,. .;~ , 1.')('
...~.-.,(.;:.....~_,.......,"'i~.: .~ '.!.'~.,..';.."'.""''''<...)~.. ~ '....'\.,~...,., t' i',f/?'.I
~~''':~::;.;'l'\'i;::2~~' ~:,~;.\;: :ic~,,:..,' :;:"~~~~::;.::~~~~'.,~;,~~ . ";';:~,.:.~:\';";i' ~,",41 I' rlt" .. ..\:1'
4t~~.",,;;~.,.~:..,.:~~,~....:;.........~~~.~.~~.:/\.,.,/:.....~:.,;;";~~':".;~<::,'~~:);r:: "~~ '....' i!]' ,j:'t~,
~~~.I" :;. t~.1t,~)::.,:;~\..~5;"~;':~ ..;.;.,..'.\.,;1,....',,_. .~;n.;:. ;?:~:,:\ ~.":~:..t...;.~';../<;...,' "l/,J":.. , ~
...... .'IiI-I";f...;.:'.~....' "."~,.w\~"_.~~<;,;;I..::!,,,.! "1';".: ':' .' ..'..\...... .\.'.....:.;......'\)-;-., '0/;. ......~""', glj
r~~ , ,..1l~~{~~....~~:t;1i:~~~f;;~'";~~~~:.i:g,'t!,~;.:>;2;:~,~/.?": ~~~~;r~;~~;~:<~::;~~A~,r'1..:~:.: .!?-." " .= ..\,:'~~(
"'.~ ~~. .r~~~~F.....~~'~ ..' .... "'fIi~..., . . ............w~,.,... ,'1..',-..... 1" ~or.. ~ ~~.
~~. . 'f,. t..~~~~~i.t1r1;;l~ji~'~~~y\~; ~".:~:. ::o.t.:~,:;~~,~~~~i:1 :'it:} .,,?p';.~"'i. ~~ ;,;)}.. ..;. ~:' ~!~. :i-;.;".. ~. ~.~ f.~~'~!;, ~s: J
..;;:;':'~ <.... ;" ::::",.;~:'~~:.~?,1~\'i::.';~.~:~?Hr ~'.. · 1~~~~;.J:~~...~;(.::';~ ...~.\~{: ....::: .<';.:.;~';;>~~~~;.b-i~I,_'W.:'tJ., <.
' ~ I """, - "."\'J.,':- ,'-.":" 'f,"""" ".;.J:.'''~!'.i ~~'.,..~...., ."(C~.I~~}.\ I}.. ~"~.i~' :."'~ ~ ;-.I':~~!f,...-:.j r.:~...tl~:.~~,., '. J. 1
-t" .~'.,p,..~tr::....... ~ /~/~;,:;s~.~).ct::~.~~;..,;;.tl' ~.;t~,~r}....::"t"":'"f.rl'.. t.. "~T"t::-.:f!J!7f.."!--t1i.... . ~; ~;:..~I\:~~.<;:~'\"...:..:.:~.t-_:~.,~
. · .~. ". ..... ",1 ,~:r",~v ~~:l.,\' ~ r~,f'.<:<~.(~.~!l! .~:-'.~ .......i~J~~iIW ,'t.:~:;:"i<",:...;"" -. '\";:~ .~:~ : !t.~~.~.'.}~.C~ .>, .~..~.; "~'i': .,
t,/.s ~~. " .;;;', :..,~.(~:;;';\, . ~:,F,~'::~i;'..~:..':,\::~:. ;.:'t:;.;1!:;:t;' ;,.:(.:;i[:f~;.".g'}:~.,'";. il:~. !~.,,~~t:J:.\~~,_'~~~ .r1;:.!-I!._.:.:.L:......j,.',t
l...t)~:~:d~: :; ",':'4.~~:;:~;~if~~.~::~.:;2~~Ji.~:~.~J~:~'~~lk~l\"~'~ : '~*~~'!:!..a~.-'-~~'" .""~._ ___
I
r:: .:.-~.
.
.
.
Attachment A
.
~~~~~...-_...
.......-
...... ----
1
Existing Sign
.
.
or conditional proposals, to request additional information from a proposer, or
to expand the period for submittal of proposals.
.
~ The EDA reserves the right to change its criteria in this Request for Proposals
without notice.
4) Required Contents of Response and Sign Design
a) A brief description of firm's qualifications and experience.
b) Rendering of sign design and construction plans.
c) Sight line study for proposed monument and/or pylon sign designs.
d) Description of sign programming capabilities and software/hardware
requirements.
e) Detailed breakdown of sign cost and costs associated with installation.
f) The sign design should be consistent with the existing city monuments signs (i.e.
shape, color, etc.). See Attachment B. The city would also like the option to
incorporate insignia for the service organizations located in our community (such
as the Rotary, Eagles, American Legion, etc.) that may desire representation.
g) A minimum of three (3) lines of text on the LED message center is preferred if .
visibility is not impacted.
5) Selection Process
The EDA will select the proposal which best meets the design requirements while
considering cost and other factors. The Economic Development Authority and city staff
will review all proposals. The final determination will be made by the Economic
Development Authority.
6) Other
Proposer understands and acknowledges that this proposal is subject to the Minnesota
Governmental Data Practices Act. Proposals are private or nonpublic until they are
opened by the City. Once the proposals are opened, the name of the proposer
becomes public. All other data in the proposals is private or nonpublic data until the
completion of the evaluation process. After the City has completed the evaluation
process, all remaining data submitted by all proposers is public with the exception of
trade secret data as defined and classified in Minnesota Statutes Section 13.37. Data
will at all times be governed by the Minnesota Governmental Data Practices Act,
Minnesota Statutes Chapter 13. Proposer agrees to maintain all data obtained from the
City consistent with the requirements of the Data Practices Act. Proposer agrees to
defend or indemnify the City from any claim, liability, damage or loss asserted against .
the City as a result of the proposer's failure to comply with the requirements of the Data
Practices Act.
.
City of Farmington
Economic Development Authority
Request for Proposals
LED Message Center Sign
1) Introduction
The City of Farmington Economic Development Authority (EDA) is seeking to replace an
existing pylon sign in the city's downtown that has been traditionally used for local
business advertising. It is the desire of the EDA to expand the use of the sign by
replacing it with a monument or pylon sign that incorporates an LED message center.
The preference is for a monument sign if feasible for the location.
.
2) Site Information
The existing pylon sign is located at the intersection of Elm and 2nd Streets in downtown
Farmington. The parcel is owned by the City of Farmington and the current sign
location is not in any easement or road right-of-way. Due to a recent reconstruction of
Elm Street, the current location of the sign may need to be adjusted slightly west to
accommodate triangle of visibility requirements when replaced by a monument sign.
The current sign is illuminated and power is functioning to the site. The site is roughly 2
blocks from City Hall and staff would need to be able to program the sign remotely.
See Attachment A for location map.
3) Submittal Instructions
a) Any questions regarding this Request for Proposals should be directed to Lisa
Dargis at (651) 463- 1620 or via email atldargis(cl?ci.farminqton.mn.us.
Proposals shall be submitted no later than to:
Lisa Dargis
City of Farmington
325 Oak Street
Farmington, MN 55024
b) Those submitting proposal do so at their own expense. The EDA will not
reimburse any expense incurred by the firm submitting proposals including, but
not limited to, expenses associated with preparation and submission of the
response, submission of additional information requested by the city, or
attendance at interviews or consultation meetings.
c) The selected proposer will be responsible for obtaining and paying for all
necessary permits, licenses and bonds/insurance.
.
d) Nothing in the proposal shall be deemed to commit the EDA to select the
proposer.
e) The EDA reserves the right to reject any and all proposals, in whole or in part, to
waive any and all informalities, to disregard all non-conforming, non-responsive
also had no similar issues with the advertising space that is sold for the yearly City .
Calendar. The sign does provide an advertising option for local businesses that would
be greatly improved with the addition of LED capabilities. Currently we are not
charging for use of the sign because we only have five businesses interested in
advertising there. We would not be able to fill the space for an entire year if we did not
leave their sign panels up. In 2007 we offered advertising space for free and notified all
local businesses; yet we were not able to generate interest from additional users for the
current sign. While interest would most likely be greater for advertising space if the sign
were replaced with an LED message center, this could also create issues that we will
need to acknowledged.
ACTION REQUESTED
Discuss the options for future use of the advertising sign.
RespectfuJly submitted,
\.
. .':>\--'
ti~a D~iii~~~i;ii~;tt Assistant
\., \\
'_J
.
.
.
.
.
City of Farmington
325 Oak Street
Farmington, Minnesota
651.463.7111 . Fax 651.463.2591
www.ci.farmington.mn.us
TO:
EDA Members
FROM:
Lisa Dargis, Administrative Assistant
SUBJECT: EDA-owned Business Advertising Sign
DATE:
July 28, 2008
INTRODUCTION
Staff would like to discuss replacement of the EDA owned advertising sign and possible
issues associated with the intended use of the sign.
DISCUSSION
An RFP has been drafted to solicit quotes to replace the EDA-owned business
advertising sign. The City Attorney has reviewed the RFP and does not have any issues
with the document, but has raised concerns regarding the intended use of the sign. As
has been discussed, if replaced, the sign would be converted to an LED message center
style of sign. City of Farmington events and meetings as well as community events
would be displayed on the sign. There would also be opportunity for permanently
affixed service organization insignia on the sign and business advertising rental.
The sign has historically been used for business advertising. The current sign code does
not allow for this type of sign due to the fact that it qualifies as off-premise advertising
and the size of the sign is over the allowable maximum. The current sign is a legal non-
conforming use and if it were replaced, we would need to make modifications to the
City's zoning code as it pertains to this type of sign. While this is reasonable to do, the
zoning code is not the only issue to be considered.
Allowing insignia for the service organizations to be placed on the sign and the sale of
rental advertising space could potentially raise concerns regarding the First Amendment
to the Constitution and the right to freedom of speech. While terms of use agreements
do afford some level of protection, there is no way to prevent 100% of undesirable use of
the sign. What this means is that a politically motivated or racially biased group could
request to place ads on the sign and if we refused they could pursue the issue legally and
would most likely prevail.
It is important to note that the existing sign already falls into this category of sign and
we have never had any issues with who has requested to advertise on the sign. We have
.
~
~ .
~
~~
. '}
~#
....
tPe
....
I CJ)
,"0
....
, :, fI)
~. '
'IG
:711
~
\.
P
I
i 'lI
[,
I
,; ~
. ~
)i
". -~~"'!""-k-~:- '-"~~;'TI:"":':~:~"D' "" )111:......'. "...~, ~';..\ . .~,. .--r'--
.-~"' Z"-----' ... -'--,...,.
~ - .
#~
"
... ..- #-.rJ,~'
;. :~', t' i ft.;,.., .
~. . ,.
~." ~i ';:'.. \~
~"~ -. " "..., ~ f'iE)
_ v .. ~'~....,
, .(1<
~'r-r-.
..... .:~ ........~,;...
. . f'1 .r"
O!-'!~ ,I' n, lffl
.".. ,- ')~
::.' , 1'"" .
_~_~_' ~ I
~ fi n : '1..,:1
'.' ~
,~.. ... ~ -r III
, :(
,
...
U
:...:...--=---.-:~ :.' ~ i' . " l -")
" ,~.. ~~~.l
! ~'I t,
.' '~"......., ~.,
. '......
' ~-,=",': ,:', . , - " ............
l~
I'
~ !J 1-
~~f ;t;lr~.'-'
t-f4 .-..".-
,
,.
r .
~ft)
.'~1
.-b .
.,..
"~I"
..,
~I
m~
~m--.1
m-,~
'fJ-Q- ~"
-;~~
~I
~. ~'r- ...
.,.. I ,..J'.
L"'.' ~, >. __
i~~~~~:::"
':r...,.'-"" I -. ..
f. ..
~j
"'~':1""~-"~"...-"'.' .
~'"
"I ., ~
. , '=~~,.
0:
rj
'.
::';1
(~
f!)
rJ
:...
",
f' '"
:.II,
I F" ".~' ~t.1 'J
.. ",-C' J0- 1i"r;,1 .<t'; '~I ' 1
.. ".""J . .......J "~'j .' .......1. J
~ t~-r~.;;~::r, '~"~,,,. -, ',~ ~_, '"'. ',.1
\~.:>~ ,@fil1l}L~1JU r.f
~~l .i~~ ~
-~:~~~ .-~ ,
: 1 ."'. ....--" ...._~ ",! !
\ . 00' ~ .. fl ':- t.FOODO ~
~ 0
.0
g , I
~. g ~J
, f1,~
. ~~
Oak Street
~.
,
~~<'.""'~ ~"
...i' ~ ....,; 4...~
~., .
.
.
.
City of Farmington
325 Oak Street
Farmington, Minnesota
651.463.7111 . Fax 651.463.2591
www.ci.farmington.mn.us
TO:
EDA Members
FROM:
Tina Hansmeier, Economic Development Specialist
SUBJECT: Business Development Grant Selection
DATE:
July 28, 2008
INTRODUCTION
Staff received one application for the Business Development Grant from a new business
locating in Farmington. Buds & Bytes is-requesting $7,740 in grant funds which will be
applied towards their monthly rent for a period of twelve months. The space they will
be renting is 213 Oak Street.
DISCUSSION
The application requesting grant funds is attached. Staff and the Community
Development Agency [CDA] (CDBG Administrators) have reviewed the submittal and all
required information and documentation has been received.
ACTION REQUESTED
Direct staff to award Business Development Grant funds in the amount of $7,740 to Mr.
Christopher Buckley and Ms. Vida Raine of Buds & Bytes, Inc. and enter into the
appropriate agreements.
Respectfully submitted,
f .
~rleHtlt1$rY\~~i
Tina Hansmeier,
Economic Development Specialist
cc: Peter Herlofsky
APPLICANT INFORMATION
.
D~@~OW~~
. JUL 01 2008 ~
Business Development Grant Program
Grant Application
NAME OF APPLICANT(S) CHRISTOPHER BUCKLEY & VIDA RAINE
\!\It G+d -eJ
ADDRESS 4429 WESDEL ROAD
=
=----
CIT~ STATE, ZIP FARMINGTON. MN 55024
PHONE
(651)319-1595
SOCIAL SECURITY #
473-90-8091/471-90-7486
BUSINESS lNFORMATION
LEGAL NAME OF BUSINESS
BUDS AND BYTES.lNC.
ADDRESS 213 OAK STREET
CIT~ STATE, ZIP FARMINGTON. :MN 55024
.
BUSINESS PHONE 651-463-4244
FAX 651-463-4244
FEDERAL TAX ID# 26-2862840
DATE ESTABLISHED 06-24-2008
SOLE PROPRIETORSHIP
CORPORATION XXXXX
PARTNERSHIP
CONTRACT FOR DEED
N/A
MORTGAGE PRlNCIPAL
N/A
LESSEE
xxxx
TERMS OF LEASE NET 3 /2 YEAR
OWNERSIllP lNTEREST OF ALL PARTIES NAMED ON TITLE: N/A
NAME
lNTEREST
NAME
lNTEREST
.
NAME
INTEREST
PROPERTY INFORMATION
aSTIMATED DATE OF BUILDING CONSTRUCTION
ESTIMATED CURRENT TAX MARKET VALUE
NUMBER OF STORIES
NUMBER OF BUSINESSES
NUMBER OF BUILDINGS
NUMBER OF APARTMENTS
HAS TIDS BUILDING BEEN mSTORICALLY REGISTERED?
PROJECT INFORMATION
BRIEF DESCRIPTION OF PROPOSED PROJECT:
,~";LJ':< '~';"i: w";\,( ! (~?
:,)
~'" >1-.
I '
;!-.. ~; ~~' ~-;; ..0; ~
,0.. ~>t. f,//-
. .....,-\/".,
.
ESTIMATED PROJECT COSTS
EXTERIORJFA<:::ADE
N/A
ESTIMATED COST
INTERIOR
N/A
ESTIMATED COST
ELECTRICAL
N/A
ESTIMATED COST
PLUMBING
N/A
ESTIMATED COST
MECHANICAL
N/A
ESTIMATED COST
FIRE SUPPRESSION
N/A
ESTIMATED COST
~ONTHLY LEASE PAYMENT (MICROENTERPRISE APPLICANTS ONLY) ESTIMATED COST $860-$1250
TOTAL ESTIMATED COST $860-$1250
FUNDING INFORMATION
TOTAL GRANT AMOUNT REQUESTED
$
$7.740
.
APPLICANT FUNDS
$
BALANCE
ADDITIONAL SOURCES OF FUNDING
$
N/A
NAME OF FINANCIAL INSTITUTION N/A
ADDRESS N/A
C~ STATE, ZIP N/A
CONTACT PERSON
N/A
PHONE #
N/A
REQUIRED ATTACHMENTS
I.Financial statements - Provide balance sheets and income statements for the past two years
2.Personal financial statements of all principals .
3.Current satisfactory credit report of owners/partners
4.Corporate resolution (if applicable)
5.Completed W-9 form ./
6.Most current property tax statement
7.Letter from the county clerk/treasurer verifying that there are no outstanding judgments or tax liens against the property
8.Business Plan (for microenterprise applicants only)'./'
J/We declare that the information provided on this application and the accompanying attachments is true and complete to
the best of my/our knowledge. JJWe understand that any intentional misstatements will be grounds for disqualification
and that the City of Farmington has the right to verify this information. JJWe agree to provide the project coordinator
reasonable access to information and reasonable access to the construction project site so that they may monitor project
implementation.
APPLICANT(S)
/,00<".....,..... ~ ;. .{/
/ Ii /'ir 5 ,." '7,"7
'\ A'/ - ~'~ "l iF';? ~ ,.,'
. ""~:.~:.':::::~.'_._,. ," .
~.."'_.,..l.:.'.~'~..;.,.:...
...../-' '/-' /"r;/
DATE < I.... ; ,.~.1 ,:>
1I.it. IZ~-
,
DATE 72..0~
DATE
.
.
MINNESOTA DATA PRACTICES ACT -TENNESSEN WARNING
In accordance with the State of Minnesota Government Data Practices Act, the City of Farmington is required to inform you of your
rights as they pertain to the confidential information collected from you. Confidential data is that information which is not available to.
you or the public. The personal information we collect about you is private.
The information collected from you and from other agencies or individuals is used to determine the disposition of your application
with the City.
The dissemination and use of the data collected is limited to that necessary for the administration and management of the Business
Reinvestment Loan Program. Persons or agencies with whom this information may be shared, include:
1. City of Farmington personnel administering the loan program.
2. The Dakota County Community Development Agency.
3. City Council Members, Economic Development Authority Members
4. Contracted private auditors.
5. Law enforcement personnel.
6. Those individuals or agencies to whom you give your express written permission.
NOTICE PURSUANT TO MS.60A.955
.
.
Buds & Bytes, Inc.
PROPOSED:
213 Oak Street
Farmington MN 55024
.
CURRENTLY:
Harmony Floral & BuckleyTech
1 Shopping Center
Silver Bay MN 55614
July 8, 2008
City of Farmington
Business Development Grant Review Panel
325 Oak Street
Farmington MN 55024
RE: Grant Application
Dear Farmington Grant Review Panel:
In accordance with the terms of the CDBG Business Development Grant Program, we are applying for
a Micro-enterprise rental assistance grant in the amount of $7,740.00 (75% of the monthly rental
payment on 213 Oak Street for a term of twelve consecutive months commencing August 15\ 2008).
This grant will allow the business owners of Harmony Floral (Vida Raine) and BuckleyTech
(Christopher Buckley), both low-income persons, to consolidate businesses into Buds & Bytes, Inc. and
relocate their family of four to Farmington. In addition, Buds & Bytes plans to create at least 1-3
additional employment opportunities for non-skilled or low-income persons within the first year of
business.
The future site of Buds & Bytes, Inc. is located at 213 Oak Street within the commercially zoned B-2
district. This downtown business district zoning makes for an ideal location for Buds & Bytes, Inc. with
several complementary businesses and services nearby.
.
The rental of 213 Oak Street will be filling a vacant space in the downtown business district and will not
result in displacement of residential or business tenants. No individual members of the governing body
of Farmington, its officials, employees, or agents will directly or indirectly benefit from this grant.
It is our goal to expand the business within 3-5 years to build or purchase existing commercial property
and remain in the Farmington Downtown District for at least the next 15 years.
Attached please find the comprehensive business plan, lease agreement, and personal tax statements
of owners as supporting documentation for this grant application.
Sincerely,
Christopher Buckley
Owner, Buds & Bytes
Vida Raine
Owner, Buds & Bytes
.
.
Buds & Bytes Inc.
unique floral design · expert computer repair
Business Plan for Leasing and Development of:
Buds and Bytes Inc.
213 Oak Street
Farmington, MN 55024
Prepared by:
Vida Raine & Christopher Buckley
19Bell Circle
Silver Bay, MN 55614
(Cell) 218-220-7884
.
June 2008
.
Table of Contents
I.Executive Summary
II. Product Information
III. Management Summary
IV. Company Summary
V.Green Business Initiative
VI. Marketing - Analysis
VII. Marketing - Strategy & Implementation
VIII. Pro Forma Financial Plan
9
10
2
.
3
4
5
6
8
9
.
.
3
.
I.
Executive Summary
The proposed location for Buds and Bytes, Inc. is 213 Oak Street in Farmington, MN The city of
Farmington is a quickly developing community in the south metro area of Minneapolis / St. Paul with a
current population of approximately 21,000. The Oak street location is prominantly situated in the heart
of Farmington's historic and vibrant downtown business zone.
The business will occupy a space of approximately 860 square feet on a heavily used portion of Oak
Street, directly across from the Farmington Bakery and the Farmington Post Office. The site was
previously occupied by the "Tiger Fan Club Store" which has relocated one block away on Oak Street,
due to the need for a larger retail space.
The business will provide two categories of products and services. The first category will be the design,
sale, and delivery of cut flower arrangements within a 20 minute driving radius. The second category
will be computer repair and training services, along with the retail sale of associated products.
.
Floral orders will be driven primarily by a nationwide network of wire services, Internet, and telephone
based fulfillment services. While the recipients of floral products will generally be located within the
greater Farmington area, this method of order gathering will provide the business with a nationwide
customer base. It is expected that Buds and Bytes, Inc. will be the exclusive provider of cut flower
arrangements in the Farmington area for a company with gross sales of over $913 Million yearly. In
addition, sales will be increased through membership in a second wire service with over 23,000 member
florists. This ensures that from the first day of business, Buds and Bytes will be filling floral orders
throughout the service area.
The computer repair segment of the business will require significant time to reach capacity. Very little
repair work is referred by manufacturers or nationwide referral services. While the customer base
exists, it will take time to reach through both marketing and the building of business relationships. As
with the floral segment, there is a deficit of providers within the local market. Through careful
marketing and competitive pricing, this customer base can be reached. The computer segment will also
benefit from the name recognition and word of mouth generated by the immediately high volume floral
segment.
Farmington has displayed a rapid growth in the number of households, and therefore the customer base,
over the past 38 years. In addition, the speed of population growth has been increasing, from 3.67% in
the period 1970-1980 to 7.28% from 1990-2000 and 7.34% from 2000-2006. The downtown corridor
will be an important retail area in support of this growth. This area is located at the "core" of
Farmington, with many of the government, educational, and recreational services located nearby. The
community has made the sustainability of the downtown area a priority in the comprehensive plan,
making 213 Oak street an ideal location for this business.
.
Currently, the closest Florists in competition would be Welcome Friends Floral, also in the downtown
corridor, as well as Flora Etc and Lakeville Floral, both in Lakeville. While there may be some
competition 10calJy with Welcome Friends, the"walk-in" portion of the floral business is extremely
small compared to that of the "delivery" portion. Current market research indicates that Farmington is
severely under-serviced in the floral category. This is likely aggravated by the recent sale of Welcome
Friends, and the subsequent loss of their lead designer and subsequent re-listing of the business for sale.
The addition of a second florist will serve to close this gap, and allow residents previously forced to
make purchases outside of Farmington to fill their floral needs within the community. At this time,
Farmington is the largest city in Minnesota with only a single provider of floral services.
4
Competition in the computer repair products and services segment is primarily "Big Box" retail stores .
with computer repair departments, as well as home-based repair businesses. The presence of a
legitimate, "brick-and-mortar" repair shop in Farmington should serve to convert the customer base of
the home-based services. The primary factors providing the consumer an advantage over the "Big Box"
stores will be price and quality of service provided. Currently, competitive research indicates that a
price point of 30% to 70% less than the competition will be profitable. Personable service, done on site,
will also be advantageous in that customers will be more satisfied with the work performed. The
turnaround time for services will be within 24 to 48 hours, as compared with a 2 to 3 week turnaround
for the competition. A secondary factor in customer conversion will be distance to the store. Buds and
Bytes will hold a significant advantage in this arena, as the nearest "Big Box" store is over 30 minutes
away for the bulk of the downtown market area.
The short-term business plan of Buds and Bytes, Inc. is to fill the market gaps, generate exposure in the
community, and leverage the advantages of combining the floral and computer businesses segments as
detailed in Section III. This plan will enable Buds and Bytes to generate 2-3 jobs (in addition to the 2
jobs held by the owners) in the community within the first 3 years. These jobs would be targeted
towards persons holding High School level education, with the company providing trade-specific
training to the employees. Workers with other time commitments, such as children, schooling, or other
employment would be provided an employment option with flexible hours to fit their schedules. The
mid-term goal is to generate sufficient revenue to justify building or purchasing retail space in the
downtown corridor within 3 to 5 years.
.
II. Product Information
The products and services offered by Buds & Bytes Inc. will include the following:
.Computer Repair Services
.Associated Computer Parts and Supplies
.Business to Business Technology Consultation
.Fresh Cut Flowers
.Pre-Arranged Flowers
.Fulfillment of local floral orders for national services
.
.
.
.
5
III. Management Summary
Vida Raine - Co-Owner and Master Designer (Floral Segment)
Background
Vida Raine has substantial ties to the Farmington community, and has been impressed with her
observations of the school district over the past 12 years, with 4 siblings having graduated from
Farmington High School. Her 4 year old twin daughters are approaching Kindergarten age, and will
undoubtedly be able to excel in the Farmington public school system.
Education
Vida left high school 1 year early with a 4.0 GPA to attend the University of Minnesota, Duluth on a 1-
Year Post-Secondary Education Grant from the State of Minnesota. Vida majored in
Business/Marketing, with a minor in Liberal Arts. Later, she switched her major to Graphic Design,
with a minor in Business/Marketing.
Work Experience
Ms. Raine has worked full-time since the age of 15 and has a passion for problem solving and business
acumen, in addition to her communication skills, and art/design background. Her work experience
includes 7 years of Marketing and Management positions, as well as 5 years of business ownership in
the floral industry.
In 5 years as Marketing Director of Eagle Ridge resort in Lutsen, MN the business saw an increase in
occupancy of 15% and an increase in gross revenue of 48%. This represents an average annual growth
of3% in occupancy and 9.6% in Gross Revenue. During this time, Vida also decreased the overall
marketing budget of Eagle Ridge by 32%. Vida also acted as the interim General Manager of Eagle
Ridge Resort's operations and 32 employees while still performing duties of Marketing Director for two
years. During this time, Eagle Ridge also benefited from a 9% drop in overall expenditures.
Since her tenure in the job market, Vida has expanded her creative talents through freelance Graphic
Design, and Web Design. Her talents were later utilized when she formed Harmony Floral & Gifts,
which she has operated for the past 5 years, serving as the owner and Master Designer.
Christopher Buckley - Co-Owner and Lead Engineer (Computer Department)
Background
Christopher Buckley was raised in a small town in northern Minnesota, and enjoys the community
minded atmosphere of the Farmington area. Because of this, of the several communities examined to
fmd a larger market for his computer repair business, Farmington made not only the best financial sense,
but was also the community he decided he would most like to be involved in.
Education
Chris completed his post-secondary education at Michigan Technological University in Houghton,
Michigan, where he studied Electrical Engineering, Computer Engineering, and Management.
Work Experience
Mr. Buckley has worked for several Fortune 500 companies, including General Motors, Honeywell, and
Panasonic, as an Electrical Engineer, Systems Designer and Technical Consultant. Since exiting the job
market, he has spent the last 8 years as a freelance consultant and the owner of a computer repair
business.
IV. Company Summary
6
.
As noted in the Executive Summary, the overall business plan for Buds & Bytes, Inc. is to establish a
customer base in the Fannington area, and leverage the unique nature of the business to increase
revenues.
At fIrst, the combination of floral design and computer repair into a single business may seem counter-
intuitive. The birth of the Buds & Bytes concept, in fact, was as unique as the concept itself. Facing
additional competition, a rapidly decreasing market base, and increasing rental and supply costs, the
owners of Hannony Floral and BuckleyTech began sharing the same leased space. While it was known
that splitting some of the fixed costs would reduce overhead for both companies, there were several
unexpected benefits unique to the combination of the two businesses.
Increased Labor Efficiency
It was found early on that the labor requirements for the two businesses were "identically opposite" over
any given time period. When looking at sales over the course of the week, the computer repair business
would peak at the beginning of the week and taper offuntil Friday. The floral business, however, sees
great increases in sales throughout the week, peaking on Friday, due to wedding preparation, church
orders, and general events taking place on the weekends. In addition, as sales are examined on a yearly
time period, computer repair needs are significantly less during the summer and near holidays, when
customers are usually spending more time outdoors or with family. This coincides with floral sales
trends as wedding season (summers) and holidays are the busiest times. To take advantage of these .
peaks and nulls, each owner has trained the other in the basic skills needed to allow the expert in their
field to work most efficiently, using the other as an assistant.
Need Based Services vs. Luxury Services
The computer repair business provides a unique "anchor" business to the floral design business in
several ways. Customers requiring computer repair know what they need, and where to go to get it,
while the floral design business is not needs based. Offering computer repair out ofthe same location
exposes the computer repair clients to the floral product, keeping that luxury option fresh in their minds.
The floral design business provides a unique marketing opportunity for the computer repair business as
well. When a competitive advantage exists for a needs based business, exposure to the customer base,
word of mouth, and marketing are invaluable. The steady and predictable floral business provided by
the wire services will serve to generate quick growth through increased exposure.
Demographics and Marketing
Both business segments have unique marketing challenges that are alleviated by the mixing of
demographics. Exposure of each segment's demographic to the other service generates sales for both
segments. The computer repair demographic is predominantly male- an extremely valuable, yet difficult
to reach demographic for the floral industry (outside of holidays). The demographic reached by the ..
floral segment's marketing (females with disposable income) is equally valuable and difficult to reach b>W
a computer repair business through traditional marketing means.
.
.
.
7
Retail Environment
The combination of the two businesses creates a retail environment that is comfortable for both sets of
clients. The addition of floral product to the environment provides a calming, relaxed atmosphere for
computer repair clientele. This is especially advantageous as consumers in need of computer repair are
often in a traumatic state due to their urgent need for repair services. Often times computer repair shops
are intimidating to the average consumer, not only with their layout, but also with the wide variety of
technological products that can confuse customers.
The intimidating nature of a flower shop for male clients has also been observed to be alleviated by
having "gadgetry" to browse through during flower preparation. Even the presence of another man in
the work area has proven to have a calming effect on male customers in the floral environment. The
additional tools and workspace provided by the computer repair segment can provide for increased
efficiency and orderly workflow for the floral design segment.
Conclusion
Currently, this concept works within a town of 2,000 people with an equal amount of competition
present. The population of the town the businesses are currently located in is decreasing rapidly through
both job loss and an aging demographic. This requires relocation of the businesses to maintain an
acceptable growth rate. The added efficiency of a combined business suggests the ability to service a
market the size of that which can be reached from the Farmington downtown business district. Future
additions to the service area (Rosemount, Northfield, Lakeville, Apple Valley) will require the addition
of several employees, and subsequently a larger business space, to handle demand.
Through a tight control on operating costs, efficient marketing spending, and a community minded
business plan, Buds & Bytes will translate its success into the larger market area serviced by the
downtown Farmington retail area. As detailed in section V, our marketing plan will leverage the
"quirky" nature of the business to generate an immediate word of mouth campaign, while a tightly
controlled marketing budget will serve to seed new customers, as well as preserve name recognition
with existing customers.
In addition, our Green Business Initiative, as detailed in section IV, will serve the purpose of not only
further reducing costs, but also do so in a way that is marketable (from a technological standpoint) to
new commercial clients, and shows investment in not only our endeavors, but in the community as a
whole.
v.
Green Business Initiative
8
.
The Buds & Bytes Green Business Initiative is based on several of the successful cost reduction methods
currently in place at Harmony Floral and BuckleyTech. Through the combination of the businesses, we
have been able to put in place a plan that not only extends on current practices, but examines other
environmentally conscious business practices, and implements them in a way that benefits not only the
business, but also the community as a whole. Several of the key components are detailed below.
Direct Recycling of Vases
One successful practice already in use is the direct recycling of V ases for floral orders. Customers are
allowed to return vases after the expiration of the arrangements. This creates a large stock of returned
vases, from which the cost conscious consumer can choose vases from to maximize the quantity of floral
product in vased arrangements. The nearly identical pricing between the vased and wrapped
arrangements thus reduces the number of customers who choose wrapped arrangements. These wrapped
arrangements are less environmentally friendly, as they are packaged in non-biodegradable plastic, or
single-use paper packaging.
Paperless Office
Nearly all businesses have made attempts to provide cost-savings through technology, however, the
floral industry is behind the curve in this respect. By developing in house software for point-of-sale,
order fulfillment, and even delivery vehicles, we are able to reduce paper waste. With the exception of .
customer requested receipts and legally required paper records and mailings, we are able to operate
without a need for paper.
Floral Waste Management
The largest amount of waste generated historically by the companies has been floral waste. These
offcuts, unacceptable product stems, and expired perishable product are all able to be disposed of as
compost, rather than added to a landfill. Using an off site facility along the delivery route, this waste
can be disposed of efficiently, and the resulting composted product can be recycled as a component in
potting mix.
Computer Repair Customer Education
Great strides have been made in the technology sector to ensure environmentally friendly products. Due
to recent EU regulation, all newly manufactured computer equipment is using a mercury free
manufacturing process, causing less damage to the environment when it is disposed of. More important,
however, is the adoption of Energy Star standards industrY-wide. While the actual repair process will
result in more energy efficient computer systems, customer education with regard to minimizing the
electrical energy consumed by their technology can also have a significant impact community wide.
Environmentally Aware Operations
The greatest advantage of the Green Initiative is the ongoing awareness of environmental impact.
that will be utilized in our decision making. When this impact is included as part of the decision
making process, several opportunities become apparent. The relocation has provided cost
savings and reduced impact through the use of recycled paint, for example.
.
.
.
9
VI. Marketing - Market Analysis
Market research data for the downtown business district was compiled mainly from an existing report
prepared by McComb Group, Ltd for the City of Farmington in October 2007. This report shows an
estimated market share of only 35% in the florist category, representing a market gap approaching $1
Million. The generation of sales via wire service using population correlation estimates the capture of
an additional $400,000 per year from outside the typical trade area for the downtown business district.
VII. Marketing - Strategy and Implementation
As mentioned previously, Vida Raine has extensive experience in the fields of Marketing and Graphic
Design. This provides an added advantage to generating sales quickly in both market segments, and
maintaining a brisk, yet manageable growth rate. Outlined below are some measures to accomplish
these critical goals.
Track Customers / Build Sales Loyalty
The in-house point of sale system is designed to not only track customers, but also floral recipients, the
occasions purchased for, and predict the recurrence ofthose occasions. Any computer equipment
repaired is similarly tracked for repair history information, as well as preventative maintenance
opportunities. The sales process will include periodic contact with past customers to ensure the next
time their anniversary is approaching, or their anti-virus is expiring, we will serve not only as a
reminder, but also the recipient of those purchases.
Leverage Oak Street Location
The Oak street location has the advantage of being centrally located, with several high traffic businesses
on the 200 block. It has the disadvantage, however, of being off of the main thoroughfare for downtown
business. To help introduce Buds & Bytes to the community, and fully utilize the traffic generated by
adjacent businesses, free wireless Internet access will be made available throughout the 200 block of
Oak St. Business signage will be consistent with the character of the historic downtown, and the retail
environment inside the store will be similarly inviting.
Public Relations
In a close-knit community such as Farmington, it is important to have a healthy rapport with area
businesses and civic organizations. Through involvement in community organizations, Buds & Bytes
. will help not only maintain a rapport, but also provide an initial set of faces behind the business. As a
family with small children, much of this involvement will come naturally.
Traditional Advertising
Typical media outlets will be utilized for a portion of the advertising budget. The Farmington
Independent, as well as the Yellow Pages, provide a cost-effective form of advertising when approached
with realistic goals and budgets. This marketing will be focused on the early months of the business,
when increasing awareness is the primary goal. Once the marketing goal becomes increasing sales to
existing customers, these methods will require re-examination for effectiveness.
VIII. Pro Forma Financial Plan
1
.
Initial Startup Phase
The following information was compiled based on both historical data for both businesses, as well as
market studies compiled for city govemments. Separate calculations based on population data
correlated with service markets results in figures within a 10% tolerance. The following chart describes
gross revenue throughout the initial startup period.
Gross Revenue
Initital Startup Period
45000
40000
35000
30000
.r::
C 25000
0
2:
20000
f!!
~ 15000
a
Cl
10000
5000
0
/\ ;/\ j\
!,j \__/\ /\ I ' \ -..
I V J
/-\;rv
-' Roral
.- Computer
Combined
.
Oet-08 Feb-09 Jun-09 Oet-09 Feb-10 Jun-10
Aug-08 Dee-08 Apr-09 Aug-09 Dee-09 Apr-10 Aug-10
Month
As can be seen in this graph, while the initial startup period is extremely vulnerable to seasonal business
within the floral segment of the business. As the computer segment grows, this will serve to even out
these fluctuations.
Cost of goods sold is very well regulated by industry standard in both market segments. Pricing of
perishable floral products is generally with a 200% margin. In the very competitive computer repair
market, required parts are itemized with a very low margin, or at cost, to remain competitive in the labor
market. Historically, cost of floral goods has been 33% of Gross Revenue +/- 2%, while repair parts
make up only 10% of gross revenue. These constraints allow estimation of net revenue unifonnly
throughout the chart above.
.
No. mo.
.
W~i!l llnO~tttun, made in duplicate this,
by and between 2004 REAL ESTATE COMPANY,
laws of the state of Minnesota.
P,rtlco.
Mn..\..u.,DI.'la Co.. b!'ll)tlUPOlll, ~'!..:1
day o[ 2008. ~
a corporation organized under the
hereinafter designated and referred to as lessor. and BUDS & BYTES, INC., a corporation
organized under the laws of the State of Minnesota.
hereinafter designated and referred to as tenant.
WITNESSETH: THAT said lessor in consideration 01 the rents and covenants hereinafter mentioned, to be paid ad
performed by said tenant. does hereby demise. lease and let unto the said tenant, and the said tenant does hereby hire ad
take from the said lessor. the 'following described premises situate in the City of.. fi'lrmington
County of ' DCl,kg,t.<:l .state or ..Minne sota
to-wit: 213 Oak Street, Farmington, Minnesota, and more particularly
described on Exhibit A attached hereto.
The restrooms and hallways shall be used as common areas of
building as provided herein.
the
D=c~rion
Premitt;L
To HAVE AND To HOLD the above premises just as they are. without any liability or obligation on the part of said
Te=.' lessor of making any alterations. improvements or repairs of any kind on or about said premises or the building or build,
ings of which they are a part. or the equipment. fixtures, plumbing, appliances, or machinery in. upon or serving same. ~r
the streets. alleys. areas. area-ways or passages adjoining or appurtenant thereto. for the term of two (2) years
.. from and alltr the
,1st.,. ....day of...~J.\g);\$,t...~,Q.o.,~".... .. t<)-.......... to the.......3.),,&.t............ day of ..J.).;\lY,.....~O 1 0.
_~ ... both dates inclusive. for the following purposes and for no other purposes. to-wit: Sale of flowers
and sale and repair of computers and other equipment used in
connection therewith.
And the said tenant agrees to and with said lessor to pay the lessor as rent for the above mentioned premises th
sum of ..~Ji.Q...P~,~...,r:r:t(;:mJJ)...,.:~,!?<:lp.~ ...I~!1:t:.,...,JQ.:r....tl:1l?.!l\Q.J;1.tl:1s...,.,DollM"5- -( ~ 7.7",,7"'"" -.,. -.,. 7 -tit- fOOl"tlhr-
~~b~~ of August 2008 through July 2010 per month. Rent is payable in
advance on the 1st day of each and every month during the full term of this
Lease at office of 20D4 Real Estate Company, c/o H.A. Brown, 3922 W_ 50th St.,
Edina, MN 55410, suite 201. Lessee shall not take possession of premises
until it has changed all utilities into its name except water services and
has given its address for billing to each utility. Lease term shall begin
with date of possesion when Lesee shall become l~able for utility expense
bu t b a~E'l...r..~I1,:t.i:i~....s.J:a..~.~...I1,<?~.~M~~f"",gg~"'ggHA. ~~8t.?;t;;l.1*..J~~~1e~ ~~?ili~ ~erT n:u",h-
-f;lr-<H'lft -6;;rt.Jg 4he..f<ll1-t~r-fll-Gi -!oRis- ~e; -ilHfle- -emee4. '" "'.. .......,..,.......'.... .....' ........ .,.... ....,..'..,....
Nt.tO"c
of
OeeupulC1.
.
.....
R",c
....h................................
--.-----------
Ter..ir.t
to
Muowo
."d
Surn:nder
i'rembe.
in Good
Ord,r.
The said tenant also covenants and agrees with the lessor SignL
as, follow,S: That the tenant will keep at his own expense
said demIsed ,premises and the ,equipment, plumbing, drains,
fixturts, appliances a.nd mac.htnHY in, upon, serving or
appurtenant to said demised premises, in gDod repair and in
good sanilary condition during said term, and that he will
replace at his own expense promIJtly any and all glass broken
in or abou.t nid premises with glass of the: same QualitYi CondltloD
that he wdl make no alterations in or additions to said of
premists, \~,dlhout first obtaining the lessor's v.,rritlen con. Prc:misu.
sent, Jnd that he will not use or permit anything upon said
premises Lhat will increase the rJtc of insurance thereon or
anything that mal' be dangerous to life or limb, a.nd that he
will not in any manner deface: or injure s.aid demised prem-
ises, or OI"Y ,part thereof, or overload the floors, or do or Rr:lea.sc
permit anythmg to be done upon said premises or in the of
passa.geways, allc)'s, an~as. aHa-ways, sidewalks or streets 1.,.;SIIIO..
adjacent thereto, that will amount to or create J. nuisance'
and that he will not use said premises or permit the sam~
or any part thereof to be used for lodging or sleeping pcr-
poses, or for any purpose contrar}' to the laws, ordinanccs
or regulations or lhe" United St:J.tcs vf America or the St:J.l::
of..........!1.t.,n.,P..~.E?.9.,t,Cj,.....".......".................... or (he City of
...... .. .E'.arming.to.J]........,.....................or of any ,ule' or
rcgubllollS of the Cit)' oL....... .,..... ~.~+.~qJ.D.-.9,:!:;..9n.. ......,..-,
or of ;H\Y boards or offir:crs (Ii said city: :llld tne tenant agrees It~~'S.
to rcl,HIl said premises peJcc:ably and promptly to the lessor
:'!.t Ihe e.nd vf the term of this lease, or 011 an)' previous termi-
nation thereof, in as good condition as the same are-now in or
m:!.y hereaiter ue put in, 1055 b,' fire and ordinary wear eX.
ce:pted,
And the tenant further covenants and agrecs to kcep the
sidewalks bordt'ring: on said demised premises (where the:
leascd space hNders upon a sidevn,lk or passageway) and
tnl:: roof or said demised premist.:s at all times free from ice
and snow and other obslructions, and to neither waste nor
misuse WOller, e1euricity. gas, steam, or any other utilities
or agencies '.vhich Jrc or may be furnish::,J by the lesso., and B~I1'kruptcr.
to promptly P:JY :1.11 rales, costs and charges for tn~ sam~,
~xcepl as to suC'h of the S:lnH:, if any, as the lessor has
speciflcall)-' ~grecd herein to) iurnish iret oi c.harge.,
let u:d
Snow,
V\ilitiu.
Lessee shall not crect or permit to be erected on ~.itd
premis~s, any signs ~n the exterior of the prtnlists or built:.
rn~3 Without the wntten consent of lessor endorsed ha,:\.i'l
nor place or p~rt1ljt to be l?laced in any portion of an)' 1)( the
demIsed pn::mlses any weight or wdghts in excess rJi th
reasonable or safe carrying cap3city of the slruct~rt:,
, The tenant acknowledges the receipt of the demised prna.
!s'es and the s.amc to be in good ar.d sanitary condit;un, 3f,j
In g~od n:palr, and the taking possession of Ihe dtmi:;~c
prc~lse:s by the It:nant shall be conclusive c\'itjwcc thaI \I.r
demIsed p~emises. and the cQuipmcnl, plumbing, cral!":s. It~.
tures, ~ppilancts a~d machinery lherein, were at the tlIf1(; ...~
so takrng POS5t,S~lon there?f in good, clean, s:l.niury :i:l'i
tenantable conditIOn, and 10 all respects satishclOrv :i!.,~
.acceptable to the tenant, and in the condition in which lht"',
?"trt repre.se.nted to the. le.nant to be and agreed to ke {Holt
In by the lessor; a~d the t,enant hereby releases the ]l;"H'~
!;om any :'lnd all. c1aJnl! ar~slDg from any defect in the (,:0,,"'::-
tlon, of sal~ demIsed premls.tS, or the equipment, ilxl~rtS .:.,r
apph~nces In or, ~CrvHlg saId premises, and lhe buiJJing- ,...r
bUIldmgs of WhlCll lhey are a [Jut, and tbo: succi:!!, a::t"',.l
areas, area-ways, passages or sidewalks adi".)ining ';..r
appurtenant then:t.J,
Th~ tenant agfl~C! that he will nOl sublet the dCjr.:5'=\~
prcmlscs,. or any part ,thereof, and will not assign this :-:i:.".
or any ,"lcrest thcr~ln, nor permit such lease to Lc('JI:,'~
transferrc? by opc:rallon of law o,r othenvisc. anrJ that c;u ;,.'
or acts WIll be don~ or suficrc:d whereby the s:im~ m~i \:~ '.':
bc~ome sublet or a.ssigned in wh'Jlc or in pan, ~nle.~s t:.:
wnt~en c~nsent of the lessor endorsed thereon shall be fl~'"
obtalOed In each and every case: of underletting or a.ss:gn.
ment, as they shall from time to time occur or be d~s;rt':.!
and that nothing what~\'er shall be held to lot a yn:',ti ',:
or supersede the necessity of such endorsement.
Any assignment, sale in bankruptcy or insol',',;nn ,)i T: I'
les~cc may. at the option of the lessor, be CO!:wjl.:rt:-: .~l.
assignment within the meaning c...r {his lea:>t' t1nd :.&5 :! !Jr,'a,:
o{ the c.oven3.nts. hereof. .
Lease - Page 1
ax~a~L LUL LLaULLLLLaS dLLsLny LL~U LaSSUL
breaGh of this Lease
. The tenant further agrees that Ithe lessor shall not be
lIable for any damage, either to person or persons or prop.
trty or the lo.s of property sustained by the tenant, or by
a.ny other person or persons due 10 the demised premises or
the building. of which the demised premise. are a part, or
the equipment, fixtures, appliances or machinery in or upon
the same. or the hal1s, passage!, areas, area-ways and side..
walks or streets adjoining or appurtenant to the same being
?r becoming OU~ of repair or defective, or due to the happen-
mg of any aCCident, or due to any act or neglect of the
tenant, or any tenant or occupant of said building, or of any
o!her person, persons or corporations, or by the bursting of
plpes, or by the use or mIsuse of any instrumentality or
agency in o.r connected with the demised premises or the
building of which it is a part, or occasioned by any nuisance Bond
made or suffered thereon or therein. ~c~t
It is further agreed between the lessor ar.d tt:n;j:~: ".
lease is made upon the c.ondjtion that if the h:r"l.{;I si:I'
neglect or (ail to keep. observe and perform all)' WI !l,~. (._,.'
nants and agreements contained in this lease, wi1ldl :;:~
be kept, obse.rved or performed by the tenant, 01" If Ih:",:;~;,
hold interest of the tenant shall be taken on t.\l:CU!t.n '
other process of law, or if the tenant shall petjlii~n :;; ~,,:
be declared bankrupt or insolvent according to Jaw, ,')r :i ~:.,.
tenant shaH vacate said premises or abandon the sa:11'! d"Jf:~':
~~ht ~~seso~er:ayofi~~:dl:~e51; ~~e~t ~~~ ~fm:n:he~~aftei;J. ~~.~{'~,\ ':,.
RHIltr)'. out further notice: or demand, enter into and ':l';."~:
premises, or any part thereof, in the name o{ {he '.n ,..',;
take absolute possession of the same fully il.r.{~ ;':',~...'
without such re-entry working a forfeiture oi Iht.: l"i:;,:.':
be paid and the covenants to be performed by the: Ie:,:;",: :
the full term of this lease, and may at the lessM's t!rC:~v,
The tenant further covenants and agrees at its own expense lease or sublei said premises, or any part thereof. t:n So ';c
to obscn'e and keep all regulations and requirements of the terms and conditions and for such rellls and fer SUcil ljJ:;t :.,
F ' t the lessQr may elect. and after crediting the rent a':~~J;,L
city of.......".9.-,l;;m.*.D..g....Q.!1......"......................."......or other pub- Subl",!n.. coilected by the lessor from such ..Ielting on ,I',t (,,r,,. '
lie authorities in force at the time of the taking possession by stipulated to be paid under this lease by the: h;r,;n:l ir ,':'
the tenant of the demised premises or which may thtreafter tim~ to time, collect from the tenant any balance r:::Jl;;'lf,,!..
be madt regarding the condition a.nd conduct of said de- due from time to time on the rem reserved under this !.;.. "
rniscd premises, any part thc:reof, and the: sidewalks adjacent charging to the tenant such reasonable expenses 3S th~ :n:,.<
thereto: including aU building, nre, sa~itary, police: or other may expend in putting the premises in tenanlable (t);;dl{U'.
regulations. Or the lessor may at his election and upon written nOI;(': '.
'ta.l::iUi The. tenant further agrees that if the demised premises, or TermilatioD the tenant declare this lease forfdted and VOid, aod t. ~
for any part thereof, or any part of the improvements of which ~N th~reupan. re-enter and take full and absolute f'OS~'.~'J':
PobUctl'De. they form a part, shall be taken for any street or other pub- '{Ddt:~ said p~emlses as the owner thereof, and free from .,rq j..,
lic use, or shall during the continuance of this lease be deH B;D rup C1. or chum of the tenant, or ~ny person or perSCHlS ,I.. ': .
stroyed by the action of the public authorities, then this through ~r under ~he tenant, and such eJec\lon and !' c:....
S........ cr...d lltr llO'UJ dCLUiHd shall~termlUate.dnn--t:enant-hrrt'1fie'fihoned shall be and constitute an absolute bar to ~: ,
shalL e entJ. tIed to receive navment of thf'> right to enter by the tenant upon the payment of all ,rr"",,
De.li1::ruction It is further agreed between the lessor and the tenant tfiaT To * ages of rent and costs after a dispossession under D.n\ ~ \,; ,
rtrre. if during the te.rm of this lease the demised premises or the or prpcess for breach of any of the covenants cl- this "le:OH
1 impro\'ements thereon shall be injured or destroyed by fire and the commencement by the lessor or any attion to Her:, ..,::'
Of the elements, or through any other cause. so as to render possession of said premises aforesaid shaH be deemed a ~i,li~"
the demised premises unfit for occupancy, or makes it impos~ tient notice of election of said lessor to treat this Ifi:h .,:
sible to conduct the business or the tenant thereon, or to such void and terminated, without the written notice aho"t ~"rC'
.n extent that they cannot be rep.ired with re..on.ble dili- fied, unles. the lessor shall in writing before beginnln, ~ ., .
genee within thirty (30) days (rom the happening of such proceeding, notify the tenant that after obtaining such . '~':':
injury, then the lessor may terminate this Jease and the term session the lessor will continue to look to the tenant ir../!!-;;
herein demised from the date of such damage or destruction, performance: of this tease and will submit the premE;o:~ . '.
and the tenant shall immediately surrender the demised the tenant's account, in the manner as abovt: pro\'jded. -
premises a.nd all interest therein 10 the .Iessor, and the ten-
ant shall pay rent only to the: time of such surrender; and in
case of any such destruction or injury the les.sor may re.enter
and repossess the demised premises discharged of this leasc,
and may dispossess all partin then in pos'session ther~oi. But
if the demised premises can be restored within sLxty days (60)
days from the happening of the iUjUT)' thereto, and the: lessor
within fifteen (15) days from tbe occurrence of such injury
e.lects in writing to so repair or restore said premises within
sixty (60) da)'s [rem the happening of the injury thereto,
then this lease shall not end or terminate on 4.CCQunt of such
injury by fire or otherwise, but the rent shall not run or
accrue aftfr the injury a.nd during the: process of repairs, and
up to the time when the repairs shall be completed, except
only tbat the tenant shall cl.uTing such time i?ay a pro rata
portion of such rent apportioned to the portIon of the de-
mised premises which are in condition for occupancy or
which may be actuatIy occupied during such rcpairit;g period,
If, howeverj the demised premise! shall be so slightly in- bl
jured by an)' cause aforesaid, as: not. to be Tendcre.d unfit (or
occupa.ncy, then the les,sor shall repaIr the same: WIth reason-
able promptness, and 10 that .c~$e the. rent sh.a.1l not cease
or be abated during such repalrmg penod. All l!Dprovem~nts
or betterments placed by the tenant on the demised premises
shall, howevcr, in any e"ent, be repaired and replaced by the
tfnant a.t his own expense and not at the expense of [he lessor.
The lessor agrees and covenants that the tena~l, on paying
Q-nJ the rent and performing the covenants afor~sa,d, slnd,l and
~Ol~L may peaceably and quietly h01ve, ho!d and enJoy .the s.'lld d~-
mised premises for the term aroresald, except as In thiS lease
otherwise provided.
**(continued on Lease-Page 3)
L4blllt]'
,f
Lcuor
",d
Tt:lJ.tlt.
llibiU.,.
of
I.e..".
",d
Tcn.tIlL
The tenant as.ume. all liability and obligation on account
of all damage. on account of the matters and things above
referred to, and agrees to save the Jessor ha.rmless thereon
and thtrefrom, .nd to indemnify the lessor on account there-
of. This provision shall apply especially, but not exclusively,
to damage caused by water. snow, rain, hail, backing up of
water mains or sewers, frost, steam, sewage, illuminating
gas, sewer gas, or odors, electricity and electric current, and
by the bursting, stoppage or leaking of pipes or radiators,
plumbing, sinks and fixtures in or about the demised prem-
ises or tht building of which lht demised prtmises are 'a
part. In case of such damage the lessor may at his option
repair such damage, and if such damage has occurred in
the demised premises or on account of the defects in the
demised premises against which the tenant has agreed to
make repairs, the tenant shall thereupon reimburse the lessor
for the costs of repairing such damage, and jf the tenant (ails
to perform a.ny of the Covenants or agreements he.rein pro~
vided to be kept or performed by the tenant, the lessor may
perform the same and charge the tenant with the expense of
such performance, and the tenant agrees promptly on demand
to repay to the lessor the cost of such performance by the
lessor.
Nod"
to
0=
Pn:mifCa.
The tenant further covenants and agrees that the service
01 notice by any officer of the City 01.......f..~.f.m.tDg,t9.!.!......
................,...........................upon eithtr party to this lease 10 clean
said premises, or to do any other act in connection therewithl
shaH be conclusive evidence as between the parties hereto of
the breach by the tenant of the covenant with respect to the
non.performance of which by the tenant such notice ha. been
served.
Any notice from the Jessor to the tenant, relating to the
demised premises or the occupancy thereof, shall be deemed
duly served if left .t the demised premises addressed to the
tenant.
Ttm.nl Lo
Comply
,,"m City
Rerub.riocs.
~
~o:I
.VId
Fire.
S SJ:.'eCLLLC
The le.sor agrets that if the prtmise. hereby le."d ,h,::
at the time hereinbefore stipulated for the beginning o! I ~~~
term of this lease, be in the possession and occupancy o! .ii~lY
person not lawfully entitled to said possession and o.tcup~nr ~
the lessor shall use: due diligence to obtain possession trH:tt~
of for the lessee, but it is expressly understo;d and a~rt';' ~
that the lessor, using due diligence as aforesaid Sh31! nojl ",
any way be liable for any failure \0 obtain the poss':::::.;,,-.n t
the premises for the lessee and th~t this Icase .shal! r,.:t .:>\.
affected in any way by any such fa.llure to obtilln r)l..I~''''~~
except that the rentals hereunder shall be abated unl" 1-' ~
session shalt be secured by the lessor (or the le.H.N:" <i~F~ \~:'.
ten notice to tha.t effect given by the lessor to tht' lcs,!.tc
.
It is understood and agreed with resf,ect to ull alttr:lli-s-r~
and repairs, improvements or al:erations to s~!d d~:::L::'..:
premisesJ or any part thereof. whIch shall only tie '\'d!!l. :: '::
written consent of the lessor, that tenant shall and ......J. :
each instance save said lessor and said premis.es i.ort\t'r
harmless and free from all costs, d;a.mages, loss and lli1b:l::,
of every kind and character which may be claimed, aSSt'r":<
or charged, including liability to adj.ctnl owners based u;.;:,
the acts of negligence of said tenants or their agcms, (: ~ I'
tractors or employees, or upon the negligence oi iHI)' 0:' 0;'
person or persons in or about said premises or upon the. j I..
ure of any or either of them to observe and c:ompl:.' Wl{~l .:
requirement of the Jawor with the regulations of t,h: iil.:tb_ r
ties in the said city of ....f.Ci:r::f.!\tl1,gt:.9n
and will preserve and hold .the lessor and said premises !-:.t:,
ever free and clear from hens for labor and rnalrnal l:Jr.
nished. A ll<l-t..e-l<......~rel:'S-that--it.....,..;.Il-Ir.-.- .....".....,.. ..:"'..
-b-c:ft>~mg- 'It'fl1-st:C'ft -r~!"5~tf:t1f'HlreFR~-.jt:. ..;}..;.(~u:~_
-f'Om;,h'- th-e- +t~o-r-...,.jH1-e. -4'loO'fl'El-tn-:H\-fifi'l.~\-:i-A~ W~~\o.l.l~W'_
-"~*~~4~~~~n~-~~~~~4~-~~~rl~ffl~~-
-~-~~~~~~-~~~~~~-~~~~~~~~~f~m~-
-~~~~4~~~~~~~~MM~
.
Ii. the taxc: paid by the lessor urJon the prOlltrty
w . leased premises are a p~rl. shall in an)'
during erm of this lease be incrc:as(
.
......) annually, then
C' annual rental ur said pr(rnist:~, fl.,r . II " e"
addition to the amount heTl'il~bcfort: nH~;.'
.. , iFr.CfUl.n,
LEASE - Page 2
*(conti~uation from previous
.
11 is furtner agreed between the parties to this lease:
Lessor is not obligated to make any improvements, changes or additions to the
premises whatsoever and plans for any changes or additions to be made by
Lessee must be submitted first to Lessor in writing for approval before com-
mencement. If a sewer access charge is required because of tenant's instal-
lation of new water and sewer facilities. Its payment will be negotiated 'L
between the parties based on increase in use. ' ~ b ( i C- If [
At signing of this lease Lessor acknowledges receiving $1500 ~m~~e'~eposit --
to be applied to any damage to premises during the lease term, Any unused
portion shall be refunded at the end of the lease term.
lthtblof The Jessor shall at aU times have the right to enter upon
E,l)trt. said premises to inspect their condition,. and at his election
to make reasonable and necessary repairs thereon f(lT the-
protection and preservation thereof, but nothing nere!!, ~hJII
be construed to require the lessor to make such npaHs, :!rld
the lessor shall not be liable to the tenant, or any othtf 1;l:r-
san or persons, for failure or delay in making said rcpu.irs.
or for damage or injury to person or properly causel.! In C'T
by the making of such repa.irs, or the: doing of su,,:h work.
The lessor shall have the right doring tht: last 30 days (;j tht
term of this lease to place and. maintain on the ch:mi!.t.j
premises and in the windows thereof the usual IHHlCe "j
"To Let" or uTo Rent." and to show said premises to prr.:.
spective tenants.
Rein 2nd Each of the coven3nts, proyi~ions, terms and agrccmtnt;
Olbers. of this lease "'shall inure to the: bencht of and shall be cbligo..
tory upon the resptctive heirs, executors, administrators. suc-
cessors and assigns of the lessor and tenant respectively.
......"...........!.~9..,,~~,T.l,i:.i:lL..i:l9~,T.l.c;.Y.L. ,.
acting as agent. only! assumes no obligation Wh31S0l:\'tr 1:1
respect 10 any representation, Wilrranty or covenant hertl"
contained, and shalt not in any event b~ held liable to l!:'s.sor
or (0 lessee for the fulfillm,nl or non-fulfillment of any of :1",
terms or conditions of this lease or for any action or .,r(,lct:ed-
ings that may be taken by ~ither 2gainst the C>tht:r.
There 3fe no under.5landing.1 SIr agreements ol.llside rh!{ It~i5.
lease. except tne AuOenoum ano Ex J.DJ. t
A attached and incorporated herein.
I N TESTIMONY \VHEREOF the lessor and tenant have hereunto set their hands <lnd seals the day and year first wrinen
We. the tenant. hereby acknowledge that <It the lime 01 making and delivery of (his lease and mortgage lien. the Les;t.r
delivered to us a full, true and complete cop)' of same.
Signed. sealed. and delivered in presence of:
2004 REAL ESTATE CO.
Lesse.el upon leaving the premise.s hereby leased, shall .:at
his own expense remove all ashes, dirt, rubbish and refuse.
and upon lessee's failure 50 to do, lessor may immediately
without further notice to lessee do the same a.t lessee's ex-
pense, which the lessee shall immediately pay upon receipt of
a bill for same from lessor.
X(loce
of
VilCUC1.
Rh:bllof
LU$c!
to
T~rmiD:ue,
The tenant further agrees 10 give the lessor written notice
Ihirt). PO) days before the expiration of this lease of his
intention' to vacate at the end of this lease .-eH:le-rwHrc-{.h-E-
~~~~~~~~~~~~wM~mm~~~~~n~4~~
~M~~ffi~~~~~~~H~~~~~k~~w*~~~
1-o~40-l-<""''''h- II.-J.o.w~l'r4l><-~.. -<J".e;;-",* ...k04-1<>
9'tI-co-~i1'K."e:-lh1!""'J.t.~e-~ the tenant remains in said prem.
ises 6fter the expiration of the term of this lease, such re-
maining in possession shall not, exctpt at the option of the
lessor, extend the term of this lease, and the tenant shall
promptl)' vacate said premises; and if for any reason the ten~
ant does not promptly vacate the premises at th, end of the
term, the tenant agrees to pay the lessor, for such time as
elapses between the end of the term of this lease and 1he
time when the ten2.nt :lctually vacates the premises, a pro
rata rental equal to one Olnd onc-halI (1~) times the rent
provided 10 be paid during the term 01 the lease,
.
Tne ten2.nt agft:ts th;Lt no assent, ex.pre.ss or im?lied, by
the It.5!ior to an}' breach of any of tht tenant's covenanls or
:lgreements shall be deemed or laken lo be a wJi\"er of any
succeeding bre.<:.ch of such covenant.
As to Lessor.
Christopher William BuckleyA~ to Tenant.
as of Lessee. and
Vida Raine
as
of Lessee
STATE OF
COUNTY OF
,M.INNE.S01'.1\p
HENNEl'IN .
'... }'"
.
On Ihis 00)' of .2QO S}{%,P..."
b'fm "". 0 No"{(o~~I~rwil;:: a1igvf~0 fIJ?\(;{dlU}/ly
oPt'afto .,,, .....,.,H.o.sm.eJ;..pA......BIo,wn,..IV,.................
to'mr ptrsonaily kno'W7$, who, bein.g b) me duly sworn. did .fOY tr..ol
the)' art IIu ViuMPrfS1dml and Surclary of the Corporall'on- M1TItd in
the fortg01'ng ins/rumtnl, cmd--thr::1~Jre7C"Gl-tr5im "'tcrmitJimin;mrnr-
i1*~t't-~et-&J-StHJ-HPftH'&lWm;orld that said ins/rument WaJ
;ignld and ,,0110 i. behalf of ;ojd co'porotion b)' outhority of its Boord
Hosmer A. Brown III
Df Dir.e.ctoJ;=s. ond said ....,HoSmer....A,.Bro~n...I.v
acknowledgrd said nutrun1tnl 10 be the fra ad and dced oJ sa~d c.orpo.
folion.
2004 REAL ESTATE COMPANY
By.... ,.......,.....,....,
Its President
[SBL]
and,
[SE^L]
Its
--LESSOR--
Buri1/"&{')3YTgEI~~=~~~'"
..C~:tfJ~~' " .. /~, "
By,\1t<<6~~' ....... .. ...
and by OWl\l12lZ-S
Ifs
COUNTY OF
STATE OF..
[SE.'L)
[SF.'L]
[SE^L]
as to Lessee
\
(H.
0" this
do:, of
'9
before tMt', Q.
within aH-d for said County, ptr,sonol1y apptort.d -.
tD "'; knDlm 10 be Ihe pmon i;;i;ib;;J'i. "nd whD ,rlCul,d In'
fortgoing inJtru7iunt, and acknowledged that }U fri'Cll:cd Iht
scant OJ
Ira a.d and dad.
Notary-publiC:;" HennepTriCO;' MN
My.commiss.ion. .expir.e.s,;...
LEASE - Page 3
.
Assignment
For value received, the undersigned
I Tenant.
hereby sells, assigns, transfers, and sets over unto
all h u. right, title and interest to the within lease ancj premises therein described; It being understood, however, that this
transfer in no way releases said tenant from h ,..liability for the performance of all the terms, covenants and payment of
rental under said lease.
For value received,_
under the terms of the within Jease and agrees to perform all
therein stipulated, pursuant to the above agreement.
hereby assumes all the obligations
of the terms. covenants and conditions and pay the rent as
The within landlord hereby consents to the above assignment.
Dated this........................ ........,day of ,
...., A. D. 19.....
.
M tJ :>- :,0 II t;Q
x " :l "
"0 ;:; 0 ~. J ~
5' c
0", a " I
0 '" en
::>
i ~
i Z
I trJ
II ..." (fJ
o-l: ;<j
0 0 CFJ
~
l==1 .
I..
l7J
~';r.-
:;; .... (,.fJ
'D
[rJ
.
Sheet1
Expenses By Major Category - Budget and Spending to Date
Date Range 05/01/08 to 08/04/08
pepartment Category Budgeted Spent To Date
Facility
Lease Payments $2,500.00 $2,340.00
Net 3 Add $400.00
Decorating $1,000.00 $1,232.30
Furniture $1,750.00 $455.67
Fixtures $5,000.00 $2,132.29
Computer C/O
Tools $2,500.00 $2,870.05
Inventory $8,000.00 $4,979.91
Hardware $2,500.00 $1,804.78
Floral C/O
Tools $2,500.00 $2,090.00
Inventory $3,000.00 $1,183.59
Hardware $0.00 $0.00
Computer Gen
Tools $400.00 $27.30
Inventory $1,000.00 $508.19
Hardware $0.00 $0.00
. Floral Gen
Tools $1,000.00 $847.10
Inventory $1,500.00 $0.00
Hardware $0.00 $0.00
Misc
Logistics $5,000.00 $3,288.68
Software $4,000.00 $1,500.00
Office Supply $500.00 $178.32
Marketing $2,000.00 $398.73
Gov / Permit $250.00 $180.00
Community Involvement
Business Associations $500.00 $50.00
Downtown Wi-Fi $1,200.00 $957.44
Community Outreach $500.00 $242.54
Totals $47,000.00 $27,266.89
.
Page 1
.
City of Farmington
325 Oak Street
Farmington, Minnesota
651.463.7111 . Fax 651.463.2591
www.ci.farmington.mn.us
TO:
EDA Members
FROM:
Tina Hansmeier, Economic Development Specialist
SUBJECT: Request to Encroach into EDA owned Outlot with an Access Drive
DATE:
July 28, 2008
INTRODUCTION
.
On July 10, 2007 the Planning Commission approved a Conditional Use Permit [CUP]
and site plan that was submitted by Patrick Regan for the property legally described as
Lot 3, Block 1, Farmington Industrial Park 208th Street Addition. Mr. Regan has now
requested an amendment to his approved CUP and site plan in order to move the
location of the property's access drive.
DISCUSSION
As shown on the attached site plan (Exhibit A) the access drive that was approved as
part of the CUP and site plan extends south through the "handle" portion of the Mr.
Regan's property and connects with 208th Street. In addition, the Engineering
Department has reviewed and approved construction plans that depict the location of
the access drive in the location previously mentioned. It should be noted that the
approved access drive on this property would be a temporary drive that would be
required to be removed if and when Eastview Avenue is extended southerly from the
Middle Creek East subdivision, along the eastern border of Mr. Regan's property.
.
Mr. Regan has since discussed with staff an option of locating the majority of the access
drive off his property and onto the property located directly east of his which is owned
by Bernard Murphy and the City of Farmington Economic Development Authority
[EDA]. Mr. Regan's proposal (Exhibit B) is to upgrade an existing gravel drive which
currently provides access to a residential trailer that is owned by Mr. Murphy to a 24
foot wide paved drive. This existing gravel drive is located in a portion of an EDA
owned Outlot (Outlot C Farmington Industrial Park 2nd Addition). As shown on Exhibit
B, Outlot C is a 16.5 foot wide corridor that was preserved for a future trail extension
(Please see attached memo from Randy Distad, Parks and Recreation Director) from the
Middle Creek subdivision south to CSAH 50. The gravel driveway that currently exists
was allowed to remain as it was a pre-existing condition prior to plat approval with
minimal traffic use.
This information is being brought before you because the EDA is the owner of the Outlot
where Mr. Regan is requesting to improve his driveway. Staffs position would be to
deny the request as it would set a precedent that could open up the potential for anyone .
to request to improve any City and/or EDA owned properties.
ACTION REQUESTED
Staff would like the EDA to provide direction to the Planning Commision on this item as
the owner of a potentially impacted property. The CUP Amendment will be going to the
August 12th Planning Commission meeting
Respectfully submitted,
!~!l 174-tu~VcZ)
I L~
Tina Hansmeier,
Economic Development Specialist
Cc: Peter Herlofsky Jr., City Administrator
Joel Jamnik, City Attorney
Lee Mann, Consultant
Bruce Maus, Consultant
.
.
T any Wippler
&::~ patric~~~~a~"i~~re~an~"~;~~~ai~~~~~i~~~~'=~~"~~~--~~~~~-.~~~~~-~~'
Sent: Monday, July 21,20086:21 PM
To: Lee Smick; Dave Sanocki; Kevin Schorzman; Peter Herlofsky; Tony Wippler; Grant Jacobson; Rich Hocking;
Nathan Denny
Subject: POR-MKR Real Estate/Bernard Murphy Shared Driveway
Dear Lee, et al:
As requested by Peter Herlofsky last week when we met on site of our new 208th Street Industrial Park property, I am writing to
make a formal request to have the
City Planning Commission and City Council act to allow us to relocate our driveway on this site to a location which has been
agreed to by me and Mr. Murphy
via Temporary Easement Agreement. This is a change from the site plan originally approved for my property, but is a change we
publicly discussed and anticipated
at the time of site plan approval in late 2007. The reason for this revision is to establish one shared, upgraded, and
paved driveway in essentially the same
location as is now used by Mr. Murphy along the the border of our two properties. His current gravel driveway is located over the
City outlot within which we have recently
installed utilities to serve our site. These utilities were increased in size at our expense and under the direction of City Engineering
Staff so that they would be able to
serve future development in the area. Mr. Murphy and I have since come to an agreement on a shared, paved, 24 foot wide
driveway along our property lines and over the 16.5 foot
wide City outlot. This outlot was acquired by the City from Mr. Murphy a few years ago as part of the DR Horton development to
the North of our properties. This outlot and
.ed driveway design are both in line with what is anticipated to be the future extension of Eastview Avenue to the south
ss Middle Creek and to it's eventual connection
with 208th Street.
Since the final road easements are not yet in place, Mr. Murphy and I have agreed to a Temporary Easement, which allows the
City to retain all it's current and future rights
to the outlot. In the future, along with any extension of EastviewAvenue south to 208th Street, my driveway as currently
designed and approved, would be rendered
unnecessary and superfluous. We always planned for a direct driveway entrance off of an extended Eastview Avenue once it is
constructed. These are some assumptions which
caused us to trade land on 210th Street and Hwy 3 with the City for this Industrial Park lot. We understand the risk we took since
the necessary road easements for Eastview Ave
were not in place when we closed on that trade. Nor was there ample opportunity or reason to make an agreement with Mr.
Murphy at that time. We have since gone to great time
and expense and have had many cordial, productive meetings with Mr. Murphy which have resulted in our agreement. Our
agreement basically improves his driveway and the
neighborhood at my expense. It eliminates an existing gravel driveway in the area. In the interim, we have agreed with City Staff
and Mr. Murphy to share the gravel driveway, which
we have already improved significantly, until the City can take formal action on this request for a site plan revision. Our new
building and parking lots are nearing final completion.
We think they'll look just great. We have met personally with our neighbors at the Daycare to discuss our landscape plans and
screening of our parking lots. Our tree plantings
far exceed what was originally required and approved.
I'm most happy to report to you that since we received approval for this project, which was largely speculative at the
Ie, Marschall Line, Inc. has expanded to the point
re we will now fully occupy this property in August. We have secured another school bus contract for an adjacent School
Istrict which will result in 100 new jobs being brought
into the Farmington Industrial Park.
We would now ask that the City simply agree to this minor site plan revision, which will allow us to save on the unneeded
expense of building a long blacktop driveway across our
7/23/2008
property which not only restricts the maximum the use of our site, but will also be useless upon the future extension of Eastview
Avenue.
We will also provide copies of engineer's drawings and the Temporary Easement Agreement to the City for consideration prie
your meetings in August.
Thank you for your consideration.
Pat Regan
POR-MKR Real Estate, LLC
.
.
7/23/2008
-
Planning Commission Minutes
July 10, 2007
Page 4
g) Conditional Use Permit ~md Site Plan to allow a Truck Terminal in the IP zoning
district
Applicant:
POR-MKR Real Estate, LLC
101 East 10th Street, Suite 300
Hastings, MN 55033
-
Mr. Patrick Regan is requesting a site plan review for the last remaining industrial
park lot. .The lot locati.on is Lot 3, Block 1 of the Farmington Industrial Park 20Sth
Street Addition. The applicant is proposing dismantling a 12,600 square foot building
that is currently on the former Marshall Bus Line property east of Trunk Highway 3.
The building would be: relocated to this property. There would be no requirement for
a special exemption permit because the building would be moved in pieces. The
building would be located on the rear portion of the lot with an entrance coming from
20Sth Street. There will be 12 parking stalls and areas for outside storage of busses.
There are plans for additional buildings on the lot in the future. The second phase of
the plan would have to go through a site plan review prior to construction. There is a
100 foot wide gas line easement that runs through the property. The landscaping plan
meets all requirements for the IP zone. Part of the property is heavily wooded and is
in a wetland area that 'MIl not be developed. The lot coverage maximums are being
met. Engineering is reviewing the grading plan. There will need to be a conditional
use permit for the use as a bus/truck terminal. The following contingencies would
need to be met:
1. Approval of the grading and utility plan by the Engineering Division.
2. Applicant must obtain an encroachment agreement from the gas company to
construct a parking area within their easement.
Commissioner Larson asked if this use is allowed in the Industrial Park with regard to
doing maintenance to the vehicles. Staff stated that the use is allowed in this
Addition ofthe Industrial Park. Commissioner Barker asked if there would be
fencing requirements for the outside storage area. Staffwill check on that
requirement. Chair Rotty asked Mr. Regan to describe how the building that is being
moved will fit with the design standards for the Industrial Park. Mr. Regan stated that
part of the reason that he is moving the building is to accommodate the completion of
210th Street. The building will be raised by two feet so that the doors are higher and
the metal siding will be covered with new material that meets the design standards.
There will be screening with trees and possibly berms. Chair Rotty asked if there are
any concerns for the safety of people using the daycare facility that is near this
property. Mr. Regan stated that the 100 foot wide gas easement provides a safety
buffer to the adj acent properties. He stated that the work done to the busses will take
place inside of the building.
~
MOTION by Larson, second by Oswald to close the public hearing. APIF,
MOTION CARRIE]). MOTION by Oswald, second by Larson to approve the site
plan and conditional use permit. APIF, MOTION CARRIED.
4.
Discussion
.
.
.
[;xr\~ ~lt- c
City of Farmington
.. 32,5 Qak Street ....
Farmin~tQn. Minnesota
6~1.463.j1 U · Fax 651.463,4591
www.ci.f~rmington.mn.l.l$
TO:
Farmington EDA Members
FROM:
Randy Distad, Parks and Recreation Director
RE:
Comments on Allowing Driveway to be Constructed on EDA Owned Outlot in the
Farmington Industrial Park
DATE:
July 24, 2008
INTRODUCTION/ACTION REQUESTED:
POR-MKR (the Developer) has requested that he be allowed to construct a driveway on an existing
EDA owned out lot in order to provide a driveway access to a parcel that he owns in the Farmington
Industrial Park. It would be the recommendation of the Parks and Recreation Director to not approve
the Developer's request.
DISCUSSION:
While I understand that the Developer would like to create a new access driveway to his property from
what was approved in the Site Plan that was approved by the Planning Commission, I feel that it would
be setting a bad precedent for allowing someone other than the City to construct anything on City or
EDA owned property. I feel that it is important for the out lot to be preserved for a future trail
connection. The trail master plan identifies this outlot, which actually stretches all the way to CSAH
50, to be an important connection from the Middle Creek East subdivision to CSAH 50. If the
Developer was not able to access their property, then I may have been more receptive to allowing the
construction to occur on the EDA owned out lot. However, because there is an approved Site Plan that
allows him to construct a temporary driveway on his own property, I feel that the EDA should not
approve the Developer's request. If at some point Eastview Avenue is constructed in the future, this
would allow the Developer to create a new access driveway from his property to Eastview Avenue.
~e lly SU~1l1~
~O i)~
andy D~
Parks and Recreation Director
cc: Park and Recreation Advisory Commission Members
.
.
.
City of Farmington
325 Oak Street
Farmington, Minnesota
651.463.7111 . Fax 651.463.2591
www.ci.farmington.mn.us
TO:
EDA Members
FROM:
Lisa Dargis, Administrative Assistant
SUBJECT: Farmer's Market
DATE:
July 28, 2008
INTRODUCTION
Staff would like to move forward with steps to begin establishing a farmer's market.
DISCUSSION
Staff has been compiling information for necessary steps to establish a local farmer's
market. There is a significant amount of planning that needs to take place ahead of time
and we feel that it would be appropriate to obtain resident feedback regarding their
interest, preference for products and preferred day of the week/time for the market to
be open. We will create a survey to be located on the City of Farmington's web site and
notice of the survey will be sent out in the utility bills for the next three months. The
utility billing is sent out in geographically delineated sections so it will take three
months to mail the notice to all households. Simultaneously we will be soliciting
possible vendors for the market. The cost to mail the notices out in the utility bills will
be approximately $105 and there is no fee for the survey, as it is covered in our yearly
contract with Survey Monkey.
Information is attached regarding the steps involved in establishing a local market and a
copy of the notice to be mailed.
ACTION REQUESTED
Authorize staff to move forward with establishing a farmer's market if resident feedback
is positive.
R?J~brgitted,
r;:-d=_~i~--> 'S:
Lisa Dargis, Adminisb:ative Assistant
.
The ideal time line is to start a year prior to oDenina your market. Plan. Plan. Plan
Any market must have customers and suppliers. The first step is to ascertain if the
two ingredients exist.
I. Is there a demand in the area of the proposed market for high quality, farm fresh
Produce? A search for suppliers and custom should be conducted.
II. Are there suppliers willing to market in the community?
1 Local food supplies can't be generated overnight. It may surprise one to know
that successful farmers plan their marketing before they plan production. A
farmer, supplier of locally produced food, needs a one year start up time to
produce for a given market. Therefore, the timetable for finding suppliers
should come one year before the market opens.
2 Are the selling regulations and conditions such that a supplier can afford and will
be willing to market at the proposed location? Consult with the targeted
suppliers to get their input and involvement.
III. If the answers to I and 11-1&2, above are positive, then proceed with planning the
market!
SUGGESTED TIME TABLE FOR ESTABLISHING A FARMERS' MARKET
.
Assume that you want to start a Farmers' Market the summer of 2009.
2008 Spring
2008 Spring:
Join the Minnesota Farmer Market Asso. WWW.mfma.org
Determine if there is adequate supply and demand for your
proposed market.
2008 Summer:
Form a Committee to Organize the Market.
2008 Summer:
Locate a sponsoring organization. May be a business, church,
Lions club etc..
2008 Summer:
Determine location and propose days, hours, etc. Secure all
Permits, insurance and work out all legal related issues.
2008 Summer:
Develop a job description and locate a competent Market
Manager (Coordinator).
2008 Fall:
Locate interested farmers and craft vendors available for your
market. Secure at least two high quality larger volume vendors to
set the tone of the market. Have them on each end of the
market. Smaller vendors to fill in the middle stalls.
Do not have more then 10% crafts.
.
.
2008 Fall &
Winter
Involving the Sponsor, Organizing Committee, Vendors
and Community representative (Mayor, city manager etc.) - plan
the market. Join the Minnesota Farmers Asso. WWW.mfma.org
1. Establish opening dates, days, time.
2. Establish a budget and vendors fees.
3. Consider start up fund raiser if needed.
4. Establish a product mix and vendor volume agreed by the
vendors.
5. Develop an extensive advertising campaign, radio ads,
newspaper ads, siqnaqe, prior to opening the first year.
6. Develop your bylaws.
2009 Spring:
Have a meeting of all involved to check ideas and activate
your plan
2009 Spring:
When the market opens all will be ready and the market will
stand much better odds of success.
.
(As you work through this outline other item/issueslconcems may arise and should be
incorporated into your work plan)
Above all attend the Fall and Spring 2008 MFMA workshops sponsored by the
Minnesota Farmers Market Asso.
Resources you might find helpful:
Links:
"Farmer Market Manual"
Minnesota Farmers Marker Asso. WWW.mfma.ora.
Central Reaional Sustainable Development Partnership
www.reaionaIDartnershiDs.umn.edu
"Starting a farmers' market the right way" Article by Andy King Posted by the Rodale Institute.
htlp:/Iwww.newfarm.oralfeatures/2006/2006/frmmrktlkina.shtmI
.
Market Manager resource center from the West Virginia University Extension Center. Features
many useful links to get a market started including finding funding sources, creating market
policies and bylaws.
http://www.wvu.edu/-aaexten/farmman2lmanaaeres.htm
General overview on starting a farmers' market from the Southland Farmers' Market
Association in CA, includes estimated start-up costs.:.
www.cafarmersmarkets.oro/aboutsfmalhow2start.shtml
.
Publications
Minnesota Farmers Market Manual:
Your best resource for starting a farmer market manual in print. www.mfma.org
"How to Organize and Run a Successful Farmers' Market" by Julia Freedgood, $3. Based on
actual Farmer' Market experience and literature from a number of outside sources. Available
through the Federation of Massachusetts Farmers' Markets. (781) 893-8222.
"Starting and Strengthening Farmers' Markets in Pennsylvania" available through the Center for
Rural Pennsylvania Penn State Cooperative Extension. (717) 787-9555.
Things to think about:
Pricing
Canopies
Tables
Meetings
Parking
Start date/close date
Market hours
Location
Location
Location
Notes:
.
Remember this is a Farmers Market not a flee market.
Dallas Flynn 218.841.6380 drusadal@hotmai1.com WWW.1ocalharvest.com
.
.
.
.
We need your input...
The Economic Development Division has created
a survey to assess resident interest in establishing
a local farmer's market. The survey is available on
the City of Farmington web site at:
www.ci.farmington.mn.us
We need your input...
The Economic Development Division has created
a survey to assess resident interest in establishing
a local farmer's market. The survey is available on
the City of Farmington web site at:
www.ci.farmington.mn.us
We need your input...
The Economic Development Division has created
a survey to assess resident interest in establishing
a local farmer's market. The survey is available on
the City of Farmington web site at:
www.ci.farmington.mn.us
.
.
.
City of Farmington
325 Oak Street
Farmington, Minnesota
651.463.7111 . Fax 651.463.2591
www.ci.farmington.mn.us
TO:
EDA Members
FROM:
Tina Hansmeier, Economic Development Specialist
SUBJECT: Downtown Commercial District Design Standards Workshop
DATE:
July 28, 2008
INTRODUCTION
Staff would like to set up a workshop with the EDA, Planning Commission and Heritage
Preservation Commission to discuss design standards for the Downtown Commercial
District [DCD] that was delineated earlier this year.
DISCUSSION
An example of design standards for the DCD district was brought before the EDA for
informational purposes in May 2008. In June the HPC met to discuss the provided
example and recommended forwarding them to the Planning Commission for
comments. The Planning Commission reviewed the attached at its meeting on July 8
and recommended setting a workshop with the various Boards to discuss more specific
architectural design requirements.
Would any of the following dates work for the majority of the EDA members?
Monday, August 25th
Tuesday August 26th - Prior to the HPC meeting
Monday September 22nd - Prior to the EDA meeting
Tuesday, October 14th - Prior to the Planning Commission meeting
ACTION REQUESTED
Recommend a date to set a workshop with the Planning Commission and Heritage
Preservation Commission to discuss details of the Downtown Commercial District
design standards.
Resp~ctfully submitted,
. '~;/ll\(L'7"Lf{L r~.yy-'(',j- e.r-
'r c..-;1.
Tina Hansmeier,
Economic Development Specialist
cc: Peter Herlofsky
Architectural Standards for Downtown Farmington - Discussion Draft
Prepared by Robert C. Vogel, Preservation Planning Consultant
May 27, 2008
.
The architectural standards would apply to all construction within the "downtown
district" (as delineated by the City Council -- the boundaries of the district would
not necessarily be coextensive with those of any future heritage landmark or
preservation overlay district). The primary community development objective is
to revitalize the city's traditional central business district by maintaining and
enhancing the positive historical, aesthetic, and economic character of the
downtown area; secondarily, the standards provide a basis for integrating
heritage preservation concepts with policies, procedures, and strategies for
economic development.
The standards are neither technical nor prescriptive; they are intended to provide
guidance to property owners, developers, architects, contractors, and others who
are responsible for the design, construction, renovation, repair, and maintenance
of buildings, sites, structures, and areas within the district. The standards
supplement the city's building, zoning, and heritage preservation codes and in no
way reduce the requirements established by these or any other codes.
The downtown built environment has been extensively studied, particularly with .
respect to its historic buildings. Several properties within the district boundaries
have been designated or determined eligible for designation as Farmington
Heritage Landmarks. These landmark properties will serve as focal points for
economic revitalization. Although they lack individual distinction as heritage
preservation resources because of exterior remodelings and alterations, many of
the other older buildings still convey a strong visual "sense of place" and
contribute to the historic character of the downtown neighborhood. Several of
the "remuddled" building facades are also potential candidates for rehabilitation
and restoration of their original architectural character. The standards envision
an architecturally diverse downtown environment with a mix of preserved historic
structures and well designed contemporary buildings.
The objectives of the design standards are to:
o Encourage integrated site planning to create a cohesive, sustainable built
environment
· Define & enhance public spaces as "outdoor rooms"
o Maintain and reinforce "small town" & "Main Street" architectural traditions
· Control vehicular access and parking to encourage an active pedestrian
environment
11) Make service facilities unobtrusive
· Respect the character of historic buildings
6 Mitigate massing & bulk of new construction
.
1
.
. Unify & articulate building facades
. Place a strong visual emphasis on streetscapes
. Demarcate building entrances
. Encourage high-quality design & construction
. Emphasize human-scale design
. Require new construction to be compatible with existing buildings
. Respect the residential neighborhoods on the edge of downtown
ED Create appealing streetscapes
. Eliminate "left-over" (non-functional) spaces
. Encourage replacement or remodeling of undesirable or architecturally
incompatible buildings
.. Adaptively reuse older buildings that contribute to the district's sense of
time & place
I>> Encourage the development of pocket parks, gardens, plazas, and
courtyards for public use
o Establish well-defined transitions between the downtown and adjacent
neighborhoods
Standards for New Commercial Buildinqs
.
1) The size, scale, massing, setback, and facade materials of new
construction will complement the architectural character of historic
buildings.
2) New construction shall be oriented to front on and relate to the street so
that the intersection of the facade and the sidewalk will be a place of
intense interaction; corner buildings shall be designed with two street
facades and a main entrance on both elevations.
3) Buildings on Third and Oak streets will maintain a consistent setback at
the front property line; new commercial development west of the railroad
tracks and on the edges of the downtown district may be "pulled back"
from the sidewalk to promote visibility and to increate comfortable,
functional, and aesthetically pleasing outdoor spaces.
4) The maximum height of new construction shall be two stories, except on
corner lots where three-story buildings may be appropriate.
5) The ground or street level of a building shall be visually distinguished from
the upper level(s).
.
6) In new construction, 70% or more of the total surface area of exterior walls
exposed to public view shall consist of a mixture of two or more of the
predominant downtown finish materials (clay brick, stucco, natural stone,
ornamental concrete, or extruded metal storefront framing); except for
portions of exterior walls not visible from the public viewshed, exterior
2
walls shall not be covered with metal panels, EIFS (exterior insulation & .
finish system), vinyl siding, faux half-timbering, logs, shakes, shingles,
exposed aggregate, or poured-in-place concrete; pre-assembled clay brick
panels, artificial stucco, decorative pre-cast units resembling stone, and
other modern materials that convincingly match the appearance of historic
materials may be appropriate.
7) Transparent glass will comprise a minimum of 50% (but shall not exceed
75%) of the total wall area of the first floor elevation on the primary facade;
transparent glass or facade openings shall comprise a minimum of 20%
(but shall not exceed 50%) of the total wall area on the upper floor
elevation of any street facade; upper-story windows will be vertically
proportioned and have the visual appearance of traditional double-hung
sash; blank, windowless walls will be avoided wherever possible.
8) New commercial buildings shall solidify the relationship between old and
new buildings and support a human-scaled, street-oriented downtown
environment; infill construction on side streets will designed with
architectural features evocative of pre-World War" prototypes.
9) Large, monolithic "big box" type buildings will not be allowed; the massing
and bulk of new buildings will be mitigated by varied massing and proper
articulation of street facades; large commercial buildings will be designed .
to appear as multiple storefronts.
10)Standardized corporate or "trademark" commercial building types will be
discouraged.
11) Imitation of historical styles will be discouraged in new construction and
renovation of existing buildings; references to historic architectural styles
and periods will be interpreted in a contemporary manner; new and
renovated buildings will reinforce and not compete with heritage landmark
properties.
12) Required off-street parking shall be provided by spaces at the rear or
sides of a building, provided with architecturally compatible security
lighting, and screened with landscape buffers or low walls; underground
and structured parking will be encouraged and new parking structures will
be compatible with (but not indistinguishable from) adjacent buildings in
terms of height, scale, massing, and materials.
.
3
.
J.~'t\.
7~ ~\
'<3 ~
I ---_
,,. ...
\~. $
\0,," \ .:,
." ~ /. '<
" 'It ...'"
'~.~~".\'"
Workshops, Training &
Networking
· Tina Hansmeier attended the
Chamber Business After Hours
Event at Gossips Bar & Grill
. Lisa Dargis attended the NDC
Economic Development Finance
Professional Course ED202
· Tina and Lisa toured the new
Farmington High School
· Tina participated in the ICMA's
Real Life Strategies to Create a
Sustainable Community Audio
Conference
Fartnington Econotnic Update
Economic Development Staff Report
July 28, 2008
Volume 12
Bugaloo's Ice Cream Shoppe
'Ii' - /. lIQ.... '. ~~: ~
l .,~.: '- ii! - Ii:~..' ,.~, '",~ ~ - .:;l".
,: 'Ii.' 1....,,_ .. eO --......._ _ ....
.I . 21.. _ . ....,'" . ~): -..... ....,.,.-....... ~
1
r~... ---:_ - 111'''-- --'.c::Ii!l;lii'
f~l~'"";iiiiiiFlrr.::=:"-~-r""""'-" '"1 ~~"'4 ..,.....~~,:-~~~..
:........v, ~'th \ -., . 'i. -~~!"'t..71"~I' '.....:~
~~.~. - .. .------
. -..... ~'" . , , .. '-.. -.~ .
lAf!!!ll~ :.... Ji!--;-~,;"'-'-""..J2 ',' "; .. n .-. ~ filii. _ "P" _..._~ --.
.......~ ~'... -- --- 'J - ......._-~-
Looking for somewhere to cool off 1 ~.';.<."~" a, iii. .-:-:-
this summer? How about treating I ~..'
I'.' P "<il' - . .'-::.: "~I
yourself to a visit to Bugaloos in - , ~" I')~'.""':'
Downtown Farmington? You'll find "'J =-:=: ~ ~:._.
enough flavors of ice cream to I e;' j
satisfy any taste. They also offer a .
lunch menu and carry a wide selec-
tion of candies and gift items.
Bugaloos is located at:
342 Third Street
(651) 460-3085
FarmiBDslNESdS
I, 6\
r'r',,:" ,--
~f:1i-.~ ,
a' ~ Q)r~-
~o .~ ..~
~ .
b
. i200B
a: _
You may have noticed Bugaloos
Ice Cream Truck at local events
Business Guide
Economic Development Staff have
recently created the Farmington
Business Guide. The publication lists
the retail, service and dining
establishments in Farmington. Look
for your copy to arrive soon.
Please review the listings and contact
a staff member with any updates or
changes to information, or if you would
like to receive additional copies.
Staff contact information is listed in the
blue box to the left.
Pa~e 2 Farmington Economic Update
Prairie Centre
Progress Land Company recently received a Preservation
Award from the City of Farmington's Historic Preservation
Commission for their preservation of the Historic Loftus
House, which is now known as Prairie Centre. The
turn-of-the century farmhouse is located at 18556 Pilot
Knob Road just south of Super America Gas Station. The
Centre is currently home to the four businesses featured
on pages 2 and 3 of this month's issue.
-
FARMERS'
David Story 651-463-9692
www.farmersagent.com/dstory
.
.lJA ;:_._~~~~'": 1;1(."'."
,,\'<," ., r2I
) \., .. i"
..{r ~ r~' 'N' I
",1 /. ."
,r~ ".. . I
.. -.,.' I
~f I~l \ ^'~ ;( tq
. ~!~~. ~ ~.! t ~
M "
Sherring Hands Massage
Sharing her gift to change people through
touch is the basis of Sherry JaclA's
business. Trained in Swedish-based ma!P!ge
and practicing in Farmington for over seven
years, she offers traditional massage services,
hot stone therapy, raindrop therapy, and pres-
sure point massage. Sherry hopes to be
offering Belivei Facial Massage and Waxing
services which uses all natural products by this
fall. Each session is created based on
individual needs and lasts anywhere from 30
to 90 minutes. Sherring Hands is open by
appointment only.
(651) 463-7916 or (651) 263-1349
,
~
j
~
Farmers Insurance
David Story Agency
David Story has been a Farmer's Insurance agent for over twenty-one years and has
been practicing in Farmington for the last six. He offers insurance produc.r
Auto, Home, Life, Business and much more. He is also a Registered Represen e
with Farmer's Financial Solutions, LLC and is a Loan Officer with Five Star Financial
Services which has enabled him to assist his clients with their lending needs for the
last eight years. Contact David for more information about how his agency can help
you. (651) 463-9692 or (612) 990-0044 www.farmersagent.comjdstory
Page 3
.
Light of the World Church
.
.
Integrity
Chiropractic
Light of the World Church began worship
services in late 2007 at North Trail Elementary
School (they are currently worshipping at the
Farmington High School for the summer
months). The church is self described as a
place where they are serious about having fun
and where all are welcome. Pastor Deb Stehlin
leads services for the roughly 200 member
church community. For more information re-
garding worship times, or for information about
their mission and programs please see their
website at www.lotwl.com or call the office
(located in Prairie Centre) at (651) 463- 7001
Dr. Mike Fink of Integrity Chiropractic
moved his practice into Prairie Centre
in the fall of 2005. Integrity Chiroprac-
tic treats conditions ranging from
sports and auto accident injuries to
pregnancy related back pain. They also
offer exercise and nutritional counsel-
ing. Dr. Fink has recently added cus-
tomized nutritional planning with the
use of the Biomeridian Nutritional
Scan. For more information regarding
their services please see their web site
at www.integritychiro.net or give them
a call at (651) 428-2247
Page 4
I
Trinity Care Center
.
Trinity Care Center started as a 24 bed nursing
home in 1965. In 2008 they completed their
most recent expansion and currently have a
total of 65 beds. This most recent expansion
area is not your traditional nursing home.
Complete with an indoor park and plaza area,
the new wing offers residents a unique envi-
ronment that has been dubbed "Cottages on
Main". Offering front porches and predomi-
nately single occupant rooms, the new area is
an inviting alternative to more traditional nurs-
ing home designs. For more information about
the Center visit their web site at www.sfhs.org
or contact them at (651) 463-7818.
Located at 3410 213th 51. West.
.
I ~@5
I
.
Trinity Terrace
Also part of the Trinity Campus in Farmington is
Trinity Terrace. Offering 1 and 2 bedroom
apartments, the facility offers independent
living with services. Residents can take
advantage of the many amenities offered for
free or choose additional services that are
offered for a fee. You can stop in and tour a
model to see their beautiful, modern environ-
ment. There are currently units available for
lease. Contact Marsha for more information.
f
I"'"'
.
De!!.!!!"!.!
~".1!'C~:';j~',,";;;::;;;;;~ .'. ;~_->c--:;:-- .--
~~- -~:-..,
---~~ f!!I ~; '."
....~. .
www.sfhs.org
Mark Phillips
After four years in the insurance business, Mark Phillips has
made the transition to practicing as an independent insurance
agent. With over 75 companies to choose from, Mark can
compare products to find you the best rates for auto, business,
worker's compensation, general liability, employee practice or
any other commercial or residential insurance need. He is
conveniently located in the same building as Janie's Home-
Team REALTORS@ in Downtown Farmington.
Dolliff Insurance
331 Third Street
(952) 593-7415 or (651) 587-2888
mphillips@dolliff.com
Page 6
~
=:---=
.
7 Stylists and a Barber...
In business for over 20 years, Farmington Barber & Beauty offers
complete salon services including hair cuts, perms, custom colors
featuring Aveda color line, waxing and manicures. They have
recently added esthetician services including facials and other skin
care procedures. Owner Doug Klemenhagen was recently
appointed to the Minnesota Board of Barbers and Cosmetologist
Examiners. Pay them a visit and check out their complete line of
Aveda Products.
Farmington Barber & Beauty is located at:
324 Third Street
(651) 463-4700
www.farmingtonbarbers.com
Dakota County Technical College
Small Business Resources
There is a resource available to small business own-
ers in our area that you may not have been aware of.
The Small Business Development Center (SBDC) at
Dakota County Technical College's Institute for Busi-
ness Innovation & Entrepreneurship in Apple Valley
offers programs and resources designed to help your
business succeed. From free individual business
counseling to customized training, the SBDC can
help. The Institute also offers space for entrepre-
neurs as part of the Strive Business Growth Center.
There is a wealth of information available on their
web site or you can call them directly at :
(651) 423-8600.
www.dctc4business.com
-'
~~~Jt
~
~
~
j
~
~
.
~
1J.~;J~~~.I=r!-IJ;,J:,:, ~/
RUSIN ESS. ;~RNovX'TI~~~:;'''~
Si ENifREP.REN EURSHIP
j
,
Page 7
- I .
.
Spruce Street
Construction has begun on the reconstruction
of Spruce Street between Second and Fourth
Streets in downtown Farmington. The project is
anticipated to be completed by late September
or early October of this year. There is still
access to the businesses located on Third and
Fourth Street including the Dakota County
Library. For information on detour routes and
how to access these locations please see the
City of Farmington's road construction link at:
www.cLfarmington.mn.us
i
~
I
~
~
F
City Hall
The New Farmington City Hall is nearing
completion. It is anticipated that city
staff will be operating in the new facility
as of Monday, August 25th. The City
Hall Offices will be closed on Friday,
August 22nd for the move to take place.
The future use of current facility has not
. yet been determined. The City Council
will be exploring options and receiving
input at a workshop to be held on
Monday, August 11th at 6:30 p.m.
Construction Update
.;
.:.J:-
~:~
:~. -=-.
Highway 3
Highway 3 has now been closed for
construction of the roundabout at the inter-
section of TH 3 and 190th Street. The road
will remain closed until September 30th.
Access is still open to the businesses
located in Tamarack Ridge Retail Center.
Detour information is available on the City
of Farmington web site at :
www.cLfarmington.mn.us
..~' ~ l'
, o!J
'; c', ffi' ~~~f
~I
.~
.....,,2
~ -:---.
Pae:e 8 Farmington Economic Update
Twin Ponds
-
Front Elevation
You may have noticed construction
taking place on the east side of
Highway 3 near the Mini Smart conve-
nience store. The CDA has begun
grading for their Twin Ponds
development. The first phase of
development will consist of 25 rental
town homes. Watch for more
information and details in next month's
issue of the Economic Update. _
~
98 'oN l!WJed
NlI\I 'UOlOU!WJe:::l
Ol'v'd
38'v'.lSOd 's'n
pJepuelS jJoseJd
~<,\.,.;;;;.:~
S>!' . ~..,
~ J -- ~o\
lit \
l~ .~" i?)
\~ ~j
~JVH~~~/
,------y
j
j
~
J
~
I
~
pelsenbet:j e:::>!I\.Jes sseJpp\f
vZOSS NW 'UOJ6U!WJe:J- l
JaaJJS >tea SZ~
uOJ6u!wJe:J 10 ~!::>
I
.
Essential Information For Downtown Revitalization
Vol. 55, No. 13 . July 1, 2008
Clean & Safe
Programs promoting safety and
partnerships downtown are working
.
At a time when more people
than ever are coming to downtown
Boise, ID (pop. 185,800), to enjoy
the active night life, crime is actu-
ally decreasing. It's the result of
concerted efforts between down-
town, the city, and the police
department. Even more impressive
is that crime hasn't simply been
displaced to the surrounding neigh-
borhoods, it's decreasing through-
out the core and adjacent areas.
Before a slew of effective
actions were organized, crime had
posed an emerging threat to down-
town's safety and quality of life.
Beginning in early 2005, the Down-
town Boise Association (DBA),
Boise Police, and the Office of
Mayor David Bieter began focusing
on creative solutions to recurring
issues that citizens were starting to
notice in the downtown core area,
namely more congested sidewalks,
pockets of extreme traffic conges-
tion, and a perceived increase in
violent crime.
In 2006, the Mayor's office for-
malized the problem-solving with
(Continued on page 2)
Business Recruitment & Retention
Revitalization begins with research and
helping current businesses to improve
.
Unlike a redevelopment project,
which replaces or rehabilitates old
buildings in the hope of luring new
occupants, often with no real plan
for how the new buildings will be
used or how to attract occupants that
will be successful, a revitalization
plan restores viability to a business
district through employing strategies
that energize economic activity. The
focus, then, is not on buildings but
on business recruitment, business
retention, and destination marketing.
Such a revitalization plan is
currently in the works for Orange,
NJ (pop. 32,870), where the down-
town revitalization consultant,
JGSC Group LLC, has been con-
tracted to complete a plan to revi-
talize downtown's three main
business corridors.
"We are seeking a comprehen-
sive approach to stimulate business
growth in our shopping districts,"
says Marty Mayes, City of Orange
(Continued on page 4)
Three key elements for
"Mommy Niche"
Mothers make up a large
segment of the consumer mar-
ket, and making downtown
attractive to them is key to tap-
ping this customer base. Among
the key factors in strengthening
the "Mommy Niche":
· Enhance convenience.
This includes easy-to-cross
streets, public restrooms, and
a stroller-friendly environment.
· Broaden activities.
Family-friendly restaurants
and learning centers such as
dance or karate studios allow
for quality time together.
· Network. Cultivate rela-
tionships with local mothers.
Hold focus groups with them
or arrange discussion groups
between downtown business
operators and local moms.
Source: DANTH Inc., www.danth.com
Inside this issue
Bar owners play key role in
public-private partnerships
improving safety. . . . . . . . . . . . 3
Carrots and sticks to herd the
cats: Incentives and code
enforcement. . . . . . . . . . . . . . . . 5
New walking and biking trails
will enhance old downtown. .. 6
Bringing a Silicon Alley to your
downtown. ...... . . . . . . . . . . 7
@ 2008 Alexander Communications Group, Inc. All rights reserved.
ISSN 0012-5822
Downtown @
Idea Exchange
A publication of the
Downtown Research & Development Center
712 Main Street - Suite 187B
Boonton, NJ 07005-1450
Phone: (973) 265-2300 . Fax: (973) 402-6056
Email: info@DowntownDeve1opment.com
Web site: www.DowntownDevelopment.com
Editor
Paul Felt, ext. 119
pfe It@DowntownDevewpment.com
Customer Service
Mary Pagliaroli, ext. 101
mpag liaroli@DowntownDevelopment.com
Reprints and Permissions
Mary Dalessandro, ext. 103
mdalessandro@DowntownDevelopment.com
Publisher
Margaret DeWitt, ext. 106
msdewitt@DowlltownDevelopment.com
Downtown Idea Exchange@ is publisbed twice monthly
by the Downtown Research & Development Center. The
Center provides news, infonnation and data for success-
ful downtown revitalization through its newsletters,
books, reports, and website.
~) Alexander Communications Group
" @ 2008 Alexander Communications
Group. llU:. All rights reserved. No pan of this pub-
/icatian may be reproduced, stored in a retrieval
system.. or transmined in any form or by any means.
electronic, mechanical. photocopying or otherwise,
withour the prior wrinen pennission of Alexander
Communications Group.
Please start/renew my one-year
subscription to Downtown Idea
Exchange for $227.*
NAME
TITLE
FIRM/ORGANIZATION
ADDRESS
CITY
STATE
ZIP
PHONE
FAX
EMAIL N15
~ MAIL: 712 Main Street - Suite 1878
800nton, NJ 07005-1450
be FAX: (973) 402-6056
W PHONE: (973) 265-2300
@ EMAIL: info@DowntownDevelopment.com
. North America, $227. Elsewhere. $257
(includes airmail delivery).
Programs promoting safety and
partnerships downtown are working
- continued from page 1
the creation of the Mayor's Down-
town Safety Task Force, whose
members include representatives of
the Boise Police Department, DBA,
city attorney's office, city clerk, the
county highway district, Capital
City Development Corporation, and
the Alcohol Beverage Control divi-
sion of the Idaho State Police.
"This has been a total coopera-
tive effort," says Michael Masterson,
police chief. "We have to include
several major strategies when we
talk about what's been successful.
Without one, the others may not
have worked nearly as welL"
Regular safety meetings to
share concerns, ideas
First, for the past three and half
years, downtown bar and restaurant
owners have met regularly with
Boise Police and Boise City attor-
neys through the DBA, and the
Mayor's Downtown Safety Task
Force, to air concerns and discuss
ideas and solutions. This open, con-
tinuous dialogue has built relation-
ships and promoted open, honest
discussion on issues where all have
a common goal - a healthy and
vibrant downtown.
"We brought people to the table
to start talking about trends they
were seeing, things that we could
improve, and talking through what
it means to the businesses," says
Karen Sander, executive director of
the Downtown Boise Association.
Most of the series of meetings over
the last few years had to do with
how the business owners could do
some things differently, she says.
The meetings also provided a
forum to establish a relationship
between city hall, the police, and
.
the business owners. "That relation-
ship is incredibly important," she
says. "In the past, when there was
not a relationship, it was more of a
confrontational situation versus,
'Let's work together so that we can
resolve something.'''
Out of those conversations,
downtown saw a good effort by its
bar owners to step up their efforts
to do ID checking. Voluntarily,
many of them also began participat-
ing in alcohol server training for
new hires. Since 2005, ongoing
training to educate bar and restau-
rant employees on the responsible
service of alcohol has been provided
through nationally certified trainers
through a state grant with the assis-
tance of Boise Police and the Alco-
hol Beverage Control division of the
Idaho State Police. This training is
something that the DBA seeks to
make mandatory.
.
Narrow sidewalks, bar entrances,
street vendors didn't mix
Downtown also looked at
where crowds gathered after hours.
"We've got a historic district where
a lot of our bars are, and very nar-
row sidewalks," Sander says. "We
realized that that was a situation
where fights would be possible." Or
rather probable, due to the presence
of street food vendors making the
sidewalks in front of the bars even
more crowded.
"You had this overcrowding on
the sidewalks that was just creating
conflict. People couldn't tell who
was in line for the hot dog vendor
and who was in line for the bar,"
she says. Mixed with alcohol, the
confusion often led to physical
altercations causing property dam-
.
2
Downtown Idea Exchange . www.DowntownDevelopment.com
July 1, 2008
.
.
.
age to neighboring businesses.
"We had a couple of windows that
kept on getting broken out because
there was a hot dog vendor right
next to a big plate glass window.
Every time there was a fight,
somebody would end up in the
middle of the store window."
So in early 2007, the city relo-
cated street food vendors to across
the street from bars, to locations
that didn't have a bar entrance in
close proximity. That eased side-
walk congestion, and the potential
for fights and assaults.
"Initially, the hot dog vendors
really, really fought going across
the street. We just didn't have a
choice. '" We've seen a huge
decrease in the number of fights,
and the most positive thing is the
crime rate has gone down."
Regular safety meetings to
share concerns, ideas
"Bring everybody to the table,
talk, and collaborate. You're not in
it by yourself. It has to be a collab-
oration," Sander advises other
downtowns addressing similar
Bar owners can also play key role in public-private partnerships
"The downtown bars and restaurants have been
more than willing to work together with City Hall and
the Boise Police Department to keep downtown
safe," says Karen Sander, executive director of the
Downtown Boise Association. In addition to those
mentioned in the accompanying article, the following
problem-solving initiatives were used with good suc-
cess in downtown Boise.
· Increased street lighting: The DBA, through a
Boise City Neighborhood Block Grant, installed 12
vintage-looking streetlights in a historic area where
poor lighting had been a factor in chronic problems.
That's enhanced the nighttime safety of downtown
visitors walking to and from their cars. In addition,
some downtown business owners voluntarily installed
additional lighting in the alleys behind their establish-
ments. The additional lights have been credited with
decreasing fights, assaults and urinating in public.
· Voluntary elimination of "all you can drink" spe-
cials by downtown bar owners: "All you can drink"
specials were cited as one cause of excessive drunk-
enness that contributed to problems. Especially late
at night, those specials were "adding fuel to the fire"
of downtown rowdiness and unruly behavior, Sander
says. All bar owners voluntarily did away with this
type of promotion, which wasn't a good business
model for them to begin with and was clearly causing
problems associated with over-service. The city is
now looking at other city's ordinances to come up
with an ordinance of its own that would legally pro-
hibit or restrict such dangerous gimmicks.
· Voluntary elimination of "after hours" venues by
downtown bars and restaurants: The bar and restau-
rant owners' elimination of closings that were as late
as 4 a.m. has helped decrease problems caused by
lingering patrons who had been drinking heavily.
July 1, 2008
· Passage of new taxi ordinance: In early 2007,
the city enacted a new ordinance that has calmed
traffic congestion around a key intersection by des-
ignating a nearby taxi zone for pick-ups and drop-
offs. The taxi zone is one block over, in a bus lane
not used at night. Before the ordinance, taxis would
circle endlessly, and sometimes provoke road rage
when they would stop for passengers and block the
flow of traffic. The city continues to work with taxi-
cab and business owners to identify other safe, con-
venient taxi zones.
· Additional leisure night police patrols: A dedi-
cated directive police patrol works with downtown
bars and restaurants on Friday, Saturday, and other
busy nights. In June 2007, downtown patrols added
bikes to the foot and vehicle patrols. The bike patrols
allow officers quicker response to parking lots and
alleys, and faster mobility through congested areas.
"There's always a [police] presence. The visual
[deterrent] is really important," Sander says.
· Safety updates to the sidewalk cafe ordi-
nance: In early 2007, the City modified the sidewalk
cafe ordinance that allows cafes to stay open until
2 a.m., but now eliminates service of alcohol in
glass bottles after midnight. Outside tables also
need to be bussed promptly. This has decreased
litter and injuries caused by glass bottles on the
streets.
· Educate incoming college students about
responsible drinking: The owner of one nightclub
worked with Boise State University and the police to
produce a public service video for the university's
first-year students, based less than a mile from
downtown. "So the new students, as part of their
introduction into the community, get to learn a little
bit about downtown as well as responsible drinking."
Downtown Idea Exchange . www.DowntownDevelopment.com
3
safety issues. "You have to get the
bar owners and the police at the
same table. They have to work
through this together."
How hard that will be to do all
depends on the city and its history.
"In our area, we certainly felt it
was 'us against them.' Bars were
considered the bad guys because
they were serving alcohol, and we
had to get beyond that," she says.
"Change is always difficult, but
as we started talking through it, we
had some bar owners that had huge
success, especially with server
training. When you're in the busi-
ness of selling alcohol, your liabili-
ty is incredibly huge. And they just
realized that protecting their own
businesses is in their best interest.
With things like over-service and
not checking IDs, the fines are just
not worth it. So for them, it's more
of a benefit than not. Taking care
of business is utmost for them so
they can stay in business."
Contact: Karen Sander, Downtown
Boise Association, (208) 472-5250,
ksander@downtownboise.org, www.
downtownboise.org. .
.
Revitalization begins with research and
helping current businesses to improve
- continued from page 1
director of planning and economic
development. "We want to im-
prove upon the steps we have
taken to date and go to the next
level. Our streetscaping improve-
ments, Urban Enterprise Zone and
Main Street designations, and
other business incentives all need
to be combined with a professional
analysis that will concretely move
us toward our goals."
Trends have turned more
favorable for downtowns
For the last 50 years or more,
downtown Orange has struggled to
be competitive in an ever-changing
retailing environment, observes
Mark Lohbauer, a general partner
of the JGSC Group, who is over-
seeing its revitalization plan for
Orange.
"But the good news is that
their fortunes are looking up now.
Because more and more, people are
becoming interested in not only
shopping in a downtown setting,
but also thinking about living and
working in a downtown setting.
They're getting to a point where
it's becoming increasingly difficult
to try to commute long distances to
a job, because of the high cost of
gas, the traffic congestion, and the
nuisance that's involved with that,"
he says.
"The same thing with regard
to suburban living. When you're
living out in the suburbs, you've
got to drive everywhere, for
everything that you do. As a
result, downtowns like Orange
are seeing that there's a renewed
interest that people have to shop,
eat, work, and live there. What
we're doing is trying to help the
City of Orange capitalize on that
renewed interest, and put them-
selves in the best possible posi-
tion to capitalize on it."
First, support the businesses
already downtown
Retention has everything to
do with doing things to support
the businesses that are already in
downtown. For example, the busi-
nesses in each of downtown
Orange's commercial corridors
have always gone their own way
in marketing themselves.
"We should try to treat each
corridor as a manageable area,
instead of a collection of individual
stores or restaurants that are islands
unto themselves, which is the way
they've normally been viewed,"
Lohbauer says. "We should try to
say, 'We are Main Street, and this is
what we have to offer.'''
Promoting the main corridors
of downtown as diverse shopping
and dining destinations unto them-
selves, he says, will help retain the
businesses already there. This will
include, for example, coming up
with collective advertising and
marketing programs that will cap- .
ture some of the people that are
routinely in the area on holidays.
Identify, provide technical
assistance to at-risk retailers
JGSC is currently meeting
with merchants in downtown and
examining their businesses and
properties, in order to make rec-
ommendations as to whether or not
they are presenting the best possi-
ble appearance that they can to
make shoppers interested. For
example:
· Could the store's sign age be
more effective?
· Could its window displays be
more effective?
· Could its product offerings
be more relevant and in step
with the times?
Another excellent retention
practice is helping businesses to .
develop customer databases. Some
businesses could already do that,
4
Downtown Idea Exchange . www.DowntownDevelopment.com
July 1, 2008
.
which presents cross-marketing
opportunities. "If we can develop
that information with local mer-
chants right in Orange, we can
share that information with the
other merchants," Lohbauer says.
"We try to share the bounty of
those customers. Because if we
know there's a customer we can
draw from 10 miles, it's so much
easier to try to get them to come
another hundred feet to another
store."
.
Take stock of retailers and
spaces in the mix
In business recruitment, "you
want to make sure that the retailers
that you're recruiting are, number
one, retailers that you need. They're
in categories that would be sustain-
able and important to have in your
marketplace, and that's something
that you can only do after a lot of
analysis," Lohbauer says.
That means identifying what
kinds of businesses downtown has
as well as all the vacancies it has,
including the size and particular
building features of each available
space that could accommodate a
new kind of retailer.
.
Examine and survey
downtown's trade area
Then it's time to examine
downtown's trade area for its buy-
ing power. "What are the kinds of
retail categories that this market-
place could support, based upon
the demand that's been identified
by the people who live there, their
ability to spend, what level of dis-
posable income they might have,
and factors like the percentage of
families with small children?"
JGSC will be doing this
research for Orange, including a
survey of the city's residents and
shoppers to find out:
· What residents and shoppers
like about downtown's three
commercial corridors, and
what they don't like?
· What stores are their
favorites?
· Which stores they don't like?
· Which stores they wish were
located on the main street that
are not there now?
"We'll go through a pretty
extensive survey that will ask for
those preferences, and we'll overlay
what people tell us they would like
against what the data about their
purchasing habits tell us they actu-
ally support. We'll get what some-
times appear to be contradictory
comments in a survey response
until we're able to analyze what
they mean." Surveys will be dis-
tributed in stores for mail-in
responses and conducted online.
After downtown Orange has
been successful at making its
existing stores better and recruiting
an optimum mix of new kinds of
stores and restaurants, it will then
be well-positioned to do destina-
tion marketing and implement a
very comprehensive plan for con-
tinuing to improve itself as a place
to be and do business.
Contact: Mark Lohbauer, lGSC
Group, (856) 661-0008, mlohbauer@
jgscgroup.com. .
Carrots and sticks to herd the cats
Incentives are typically necessary to encourage businesses to
upgrade the outer appearance of their stores. "Typically, incentives
are the ~ing to do in order to make it easier for merchants to do what
you woulctiike them to do," says Mark Lohbauer, a general partner of
JGSC Group.
"Unless you also have the threat of a stick lurking behind, you're
never going to capture everyone with the carrot of an incentive," he
adds. "Because there are some folks who just don't care, who will sit
back and watch everyone else do the hard thing and layout the expen-
diture, figuring, 'Ultimately I'll profit by what they're doing, and I don't
even have to invest anything. I'll just enjoy the extra customers that are
coming in because the other guys are doing things.'
"That's not fair, and in any program that we recommend, we always
do it on a carrot-stick basis. We say, 'Offer whatever carrots you can to
try to make it easier for the merchants to come along and do what you
would like them to do. But in the end, know that after you've given them
plenty of opportunities to take advantage of the carrots, they have to
know that the city will use a stick to enforce to the maximum extent it
can against those merchants or property owners who are neglecting
their businesses or properties. Because it's only fair to the ones who
work hard."
The best stick, which every municipality has at its disposal, is code
enforcement. "And in order to be able to use code enforcement as a
stick for stores, you have to have a zoning ordinance in place that's
very specific about what you allow and what you don't," he says. "That
specifies even what business uses you will permit, so that you don't
wind up with undesirable business uses that may drag down your abili-
ty to have a really vital, effective business corridor."
July 1, 2008
Downtown Idea Exchange . www.DowntownDevelopment.com
5
Walking and Recreation
Coming soon: Walking and biking trails
through downtown's historic district
A combination walking and
bike trail will be constructed by
the city next spring in historic
downtown Natchez, MS (pop.
18,460). After nearly two years of
grant-writing and fundraising, the
first phase of the Natchez Trails
Project is now fully funded with a
budget of $2.9 million.
The goal of the project is to
create a healthy, informative, and
enjoyable way to experience the
heart of this historic riverside
downtown.
The project will consist of two
distinct trails totaling 5.6 miles in
length: the River Front trail and the
Historic Downtown trail. Both
trails will originate and conclude at
the landmark Natchez Gazebo in
downtown's Bluff Park overlook-
ing the Mississippi River.
The two main trails will
consist of multiple routes that
traverse sections of the central
business district, riverfront, and
surrounding historic districts,
and emphasize points of environ-
mental and historic interest along
each route.
The River Front Trail will
consist of three separate routes that
highlight the topography of the
bluffs. Relaxation areas, kiosks,
and shaded benches will be fur-
nished for the entire length of the
1 I=:J 1 Web Extras
I=~-\'.JD To get a sense of this pro-
ject's own history, read the many let-
ters supporting it back in September
2005 by visiting www.Downtown-
Development.com and clicking on
Web Extras.
6
walkway, plus designated lighted
areas for safety and security will
be provided. The lower and upper
routes will provide restroom facili-
ties as well.
Museum of the Streets high-
lights downtown's rich past
The Historic Downtown Trail
will comprise two distinct routes.
Color-coded directional arrows on
the sidewalks will mark them.
An additional feature of the
downtown trails is a Museum of
Streets that will be made up of
informational kiosks containing
before and after photographs of
period streetscape scenes along
each trail. This Museum of Streets
concept will show a glimpse of the
past viewed by vintage, turn of the
century photographs as compared
to the present as seen from the
user's vantage point.
The trails will utilize existing
sidewalks and lighting where pos-
sible, and modifications will be
made to existing sidewalks where
changes are required. For exam-
ple, existing sidewalks along the
bluff will be widened to a width
of 10 feet to accommodate bicy-
clists. Trails where existing side-
walk is not presently available
will be constructed of a combina-
tion of concrete, asphalt and/or
crushed limestone, accented by
landscaping.
Where new lighting is
required, it will consist of period-
style lighting designed to match
that of the historic downtown.
Each trail will also furnish
informational brochures to inform
walkers of items of interest along
the route, the Museum of Streets,
and the particular route they are
on. The brochures will be placed
at the downtown visitor center,
convention center, and other area
locations.
.
Many benefits cited for
new trails
The city and county expect
this project will help enhance the
area's quality of life by providing
a means to access the Mississippi
River frontage, which was recently
reclaimed by the U.S. Army Corps
of Engineers. Additionally, other
areas of the river trail will be
usable once again since these areas
are currently highly vegetated.
The historic downtown trails
will also present the opportunity
to explore Natchez's rich heritage
and history as never presented
before. The creation and daily
use of these trails will help main-
tain the area and preserve the his-
torically significant areas along
each trail.
.
Funding comes from many
sources
The primary source of funding
is a $2 million grant from the
state department of transportation.
Government support also came
from the state legislature, which
provided $275,000, Congress,
which earmarked $218,000, and
the National Park Service, which
gave a $25,000 Lower Mississippi
Delta Initiative Grant. There was
also $380,000 raised locally to
help pay for matches for some of
the grant monies.
Contact: David Gardner, PE, Superinten-
dent, Natchez Water Works/City Engineer,
City of NatchezITrails Project Leader;
Natchez/Adams County Conununity
Alliance, dgardner@natchez.ms.us. .
.
Downtown Idea Exchange . www.DowntownDevelopment.com
July 1, 2008
.
Technology
Bringing a Silicon Alley to your downtown
through assets, incentives
e
As downtowns tend to have cul-
tural assets galore and often college
or university assets too, they are
prime places for technology compa-
nies to locate and recruit the type of
gifted, sociable, college-educated,
and creative-thinking employees
they need. That said, incentives can
be effective in tipping the scales
toward downtown for start-up entre-
preneurs deciding where to locate.
For example, the vision of the
Harrisonburg Downtown Technolo-
gy Zone (HDTZ) is to grow jobs
and strengthen the economy of Har-
risonburg, VA (pop. 40,470), by
clustering information technology
(IT) companies in the central busi-
ness district and giving them the
support they need to succeed.
The initial phase of the HDTZ
focuses on the integration of IT
businesses within existing build-
ings. The idea is that the zone's
members will collaborate, connect,
and attract other IT firms from out-
side Harrisonburg to relocate to the
downtown, in the process attracting
other kinds of support businesses,
shops, and attractions.
Led by the city's economic
development department, the Har-
risonburg Downtown Technology
Zone's management team established
a networking environment to facili-
tate members collaborating on pro-
jects and technology development. In
addition, the management team orga-
nizes and hosts regular business
assistance seminars and workshops
for its members. The management
team also connects its members with
other support organizations, universi-
ties, and technology companies from
whom they could benefit.
.
Meanwhile, partners and spon-
sors of the program gain greater
exposure in the information tech-
nology market sector, while enjoy-
ing access to an entrepreneurial
community, and the downtown ben-
efits from a stronger economy and
broad attention through the success
of companies located there.
"A big part of our community's
economic engine is James Madison
University, and they're located
about a mile from our downtown.
What we found is that there are a
lot of graduates that would love to
stay here in this part of Virginia,
and we wanted to go about creating
an environment to entice them to
stay, start their own businesses, and
create a real technology cluster in
the downtown," says Brian Shull,
economic development director,
City of Harrisonburg.
Incentives make downtown a
logical choice
So to help foster that, the city
created the Harrisonburg Down-
town Technology Zone, spanning
the mixed-use downtown core,
where the following incentives are
available:
· A reduction in sales taxes on
equipment to get up and running
for one year.
· A three-year exemption on
the business, professional, and
occupational license tax, meaning
a three-year break on the gross
receipts tax.
· For businesses building their
own facility, an exemption on the
water and sewer connection fee.
There's also a property tax break
for businesses moving into a struc-
ture of at least 25 years of age
that's being rehabilitated, renovat-
ed, or replaced.
· The city also helps HDTZ ten-
ants secure tax credits through fed-
eral and state assistance programs.
As a mixed-use zone, the
downtown core lends itself nicely
to the technology sector's small
professional offices and people liv-
ing downtown where they're work-
ing, Shull says.
The Downtown Technology
Zone was adopted in 2005, and 13
small technology firms today call
downtown Harrisonburg home.
Quite a few of those are start-ups
formed by recent graduates. There's
also one very big firm based down-
town that was formed by James
Madison University professors,
Rosetta Stone Language Learning
Software, which is approaching
500 employees.
The HDTZ has made downtown
a much more vibrant environment,
active around the clock. "We're
finding that a lot of the technology
workers really like to live in or close
to downtown. So more restaurants
are popping up, and more residential
units are being developed, which
helps strengthen our revitalization
efforts downtown," he says.
What advice does Shull offer
other downtowns contemplating a
technology zone? Spend time talk-
ing to the local graduates and
learning what would really entice
them and be meaningful incentives
to make them want to stay. "Make
sure you go out and see what it
really is that will make them come.
Don't try to guess what they want.
Find out for sure what they really
need."
Contact: Brian Shull, City of Harrison-
burg/Downtown Technology Zone, (540)
432-7736, brians@ci.harrisonburg.
va. us, www.hdtz.org. .
July 1, 2008
Downtown Idea Exchange . www.DowntownDevelopment.com
7
Eminent domain discour-
ages business growth
In recent years, eminent
domain has become an increasing-
ly popular (and controversial)
development tool. Any downtown
considering this approach should
keep in mind the following from
Clarksville Online, a virtual "pub-
lic square" to share opinions and
information about Clarksville, TN
(pop 103,500). A columnist iden-
tified these problems associated
with the threat of eminent
domain:
· It discourages other redevel-
opment because entrepreneurs are
reluctant to invest in a business
that may be subject to eminent
domain.
· It drives away established
businesses. Successful entrepre-
neurs often decide to move to new
locations to ensure their business-
es' long-term survival.
· It deters new residents from
renting or buying downtown prop-
erties. Fewer residents means
fewer customers.
Regulating parking is a
balancing act
The owner of a glass shop in
Kearny, NB (pop. 27,430), recently
requested that three parking spaces
in front of his business be convert-
ed into a loading zone. He said
customers have no easy access to
the store and often have to carry
large pieces of glass as far as sev-
eral blocks because of lack of
parking spaces. However, the
downtown improvement board
expressed concern that approving
8
such a request for one business
would lead other business owners
to ask for the same treatment.
Other options included enforcing
parking regulations in the area and
sending a reminder letter to busi-
nesses about parking behaviors.
Downtown workers get
free transportation
It's an old strategy, but one
that's taking on increased signifi-
cance with today's high gas
prices. The city of Chico, CA
(pop. 59,950), provides downtown
business owners and employees
with free passes for all city and
county buses. The faculty, staff,
and students at California State
University's Chico campus also
receive free bus access. Employ-
ees can get the passes at the
.
city municipal building by provid-
ing a recent paycheck stub and
identification. Students just need
to show their student LD. to the
bus driver.
Town-gown program to pay
off in engaged students
The University of Auckland's
$220-million Owen G. Glenn
Building, the new home of the uni-
versity's business school, is the
result of the former vice-chancel-
lor's seven-year-old "Knowledge
Wave" project, which focuses on
town-gown relationships. Just as
important to downtown as the new
building is the business school's
enlarged focus, which aims to
inspire students' entrepreneurial
spirit and help them connect with
the surrounding businesses. .
.
Noise pollution as bad as street litter
More and more, leaf blowers are being used to clean trash and dirt
from sidewalks and streets. But be sure to consider how downtowners
might feel about it. A resident of downtown Mansfield, MA (pop. 23,100),
recently wrote to the local paper to complain about the noise from clean-
up crews using the equipment. "I could not believe what I saw - or I
should say - heard tonight," he wrote. "Two City employees wearing
lawn blowers on their backs walking idly down North Main Street at
12:30 a.m. blowing dust and dirt off our sidewalks."
He noted, "If your objective is to make downtown Mansfield a
ghost town - continue irritating your community residents like this and
we too will leave." He added that a forewarning such as an announce-
ment in the paper or flyers posted downtown might have made the
noise more bearable.
To combat such ill-will, some towns are banning the use of leaf
blowers during certain times of the year. In Mamaroneck, NY (pop.
18,750), for instance, the equipment is prohibited from June 1 to
September 30.
.
Downtown Idea Exchange. www.DowntownDevelopment.com
July 1, 2008
.
Essential Information For Downtown Revitalization
Vol. 55, No. 14. July 15, 2008
Residential Development
Residential growth is a delicate albeit
critical balancing act
e
Residential development is
central to the plans of downtowns
from coast to coast, as municipali-
ties are figuring out how to best
welcome more of it into the mix.
Doing that well in a downtown is
never simple.
Residential development is rife
with complex planning and policy
considerations concerning afford-
ability, design, parking require-
ments, quality of life issues, and
balancing mixed incomes as well
as mixed uses against brute market
forces.
r
I
t
I
In downtown Missoula, MT
(pop. 57,050), one of the shapes of
things to come is a new luxury
apartment building called the
Uptown Flats. It features granite
countertops, an elevator, hardwood
floors, gated parking, a security
entrance, a private fitness room,
private balconies, and an Owner's
Lounge and Deck. Studios start at
$154,900, and one-bedrooms at
$163,900.
To people from much larger
population centers, that probably
(Continued on page 3)
Walking & Recreation
Walking trails enhance downtown
pedestrian, cycling activity
~
The City of Peterborough,
Ontario (pop. 74,900), placed fifth
in a bid for the title of "Best Walk-
ing City in Canada 2008". The
Canadian Federation of Podiatric
Medicine hosted the contest that
was open to all cities in Canada.
The evaluation criteria included
length of trails, area of parks, num-
. ber of people who walk to work,
air quality, points of interest, rate
of personal crimes, and pedestrian
injury rates.
Key factors in Peterborough's
impressive showing were its length
of walking trails, number of points
of interest and scenery, and low
personal crime rate.
Trails criss-cross downtown
The city has 22 miles of fonnal,
multi-use trails, mostly along aban-
doned railway lines, and another 15
miles of informal yet well-trodden
paths through nature areas and
(Continued on page 5)
Three keys to
promoting biking
As budget-conscious dri-
vers continue to deal with high
gas prices, many downtowns
are seeing increasing numbers
of bicyclists. There are several
ways to make downtown more
bike friendly. Here are three
strategies successful in Europe.
· Create shortcuts allowing
cyclists to make right-hand
turns before intersections and
exempt cyclists from red lights
at T-intersections. This increas-
es cyclist speed and safety.
· Mark bike lanes with
bright colors at intersections.
· Establish "bicycle
streets," narrow roads where
bikes have priority over cars.
Source: "Making Cycling Irresistible, "
John Pucher and Ralph Buehler, Trans-
port Reviews
Inside this issue
Perspectives: Every five years,
a fresh start. . . . . . . . . . . . . . .2
Transit is key to attracting
downtown residents. . . . . . . . 4
Where the walking trails meet
the main street.. . . . . . . . . . . . 6
Increasing parking, improving
access move downtown
forward. . . . . . . . . . . . . . . . . . . 6
Courts allow use of city funds
for church improvements. . . . 8
@ 2008 Alexander Communications Group, Inc. All rights reserved.
,
ISSN 0012-5822
Downtown @
Idea Exchange
A publication of the
Downtown Research & Development Center
712 Main Street - Suite 187B
Boonton, NJ 07005-1450
Phone: (973) 265-2300 . Fax: (973) 402-6056
Email: info@DowntownDevelopment.com
Website: www.DowntownDevelopment.com
Editor
Paul Felt, ext. 119
pfelt@DowlltownDevelopment.com
Customer Service
Mary Pagliaroli, ext. 101
mpag I iaro/i@DowlltowIIDevelopment.com
Reprints and Permissions
Mary Dalessalldro, ext. 103
mdalessalldro@DowntowIIDevelopment.com
Publisher
Margaret DeWitt, eXI. 106
msdewitt@DowlltowIIDevelopment.com
Downtown Idea ExclulIlge@ is published twice monthly
by the Downtown Research & Development Center. The
Center provides news, infonnation and data for success-
ful downtown revitalization through its newsletters,
books, reports, and website.
~ ~ Alexander Communications Group
.J@ 2008 Alexander Communications
Group. 1m:. All rights reser;ed. No pal1 of this pub-
lication may be reproduced, stored in a retrieval
system, or transmilled in allY fon" or by any means,
electronic, mechanical, photocopyillg or otherwise,
wirhout rhe prior wrillen pennission of Alexander
Communications Gmup.
. .'
Please start/renew my one-year
subscription to Downtown Idea
Exchange for $227.*
NAME
TITLE
FIRM/ORGANIZATION
ADDRESS
CITY
STATE
ZIP
PHONE
FAX
EMAIL N15
~ MAIL: 712 Main Street - Suite 187B
Boonton, NJ 07005-1450
6b FAX: (973) 402-6056
~ PHONE: (973) 265-2300
@ EMAIL: info@DowntownDevelopment.com
. North America. $227, Elsewhere. $257
(includes airmail delivery).
\
Perspectives
Every five years, a fresh start
By Lawrence O. Houstoun Jr.
The number of Business
Improvement Districts (BIDs) in
North America with initial annual
assessment budgets of less than
$250,000 is probably 500 or more.
Many of these small BIDs, if not
most, were formed less than 10
years ago and thus have either
undergone a statutory renewal
process, are soon to do so again, or
will be doing so for the first time.
Some BID leaders believe that
renewal will be easily achieved,
mainly by dusting off the old ordi-
nance and resubmitting it for local
government approval, sometimes
with a hope that the assessment
rate can be increased. Many don't
bother to test the waters with the
local government, the assessees,
their tenants, or the consumers,
and are surprised as well as dis-
pleased when the path to re-
approval proves rough.
Compared with the multi-
million-dollar BIDs, why do local
people bother with such seeming-
ly small amounts of revenue?
First, $200,000 times five years
equals a lot of economic influence
in a small district without another
reliable, sustaining, non-categori-
cal source of revenue. While most
could usefully apply more funds,
in context the possibilities are
considerable. BIDs generally
finance the first district marketing
program ever. Many correctly
see BID funding as an essential
precondition for planning and
applying capital grants. It is all
but impossible to find a grant
source for continuing district
management.
.
The greatest hazard associated
with the keep-our-heads-down
approach is that it misses a price-
less opportunity to learn of unsus-
pected potential opposition to
renewal, not to mention missing
fresh ideas regarding programs,
budgets, service area, cost sharing,
and BID management and gover-
nance that can come from those
who are paying the bills.
Where does renewal opposition
typically emerge? Opponents most
often are those from the less valu-
able properties (who pay the least)
and from properties at the edge of
service areas. Despite their small
value, they will receive consider-
able attention from the governing
body. Rarely do opponents com-
plain about the annual charges; it is
not exceptional for the bottom fifth
of property values to pay fifty cents
or less a day.
More likely complaints come
from those who feel left out of the
process, those who claim they
don't know about board meetings,
don't know board members, or
have seen little of the BID director.
Sometimes they claim that others
get greater service benefits.
Recently, two opponents com-
plained about what they saw as
conflicts of interest where board
members received contracts for
BID work (and as it turned out the
bylaws did not prohibit conflicts
or the appearance thereof). If
there is some form of security pro-
gram, some will charge that the
municipality should pay for these
charges. The last place BID propo-
nents want these questions raised
is in the BID hearing before the
municipal council.
.
.
2
Downtown Idea Exchange . www.DowntownDeveJopment.com
July 15, 2008
I
.
How can this be avoided?
Begin by assuming that selling a
renewed BID will not be a slam-
dunk. Surveying the constituents
- including those who do not use
the district's shops and services -
is important, although sometimes
costly. Ask: What do you like
about the existing BID? What
would you want in a new one?
Just two community meetings
can enable participants to get BID
perspectives not otherwise avail-
able, and BID planners to learn
more about the downtown district's
needs and opportunities than they
could otherwise learn.
The reauthorization process
should be led by a steering com-
mittee with broad representation of
local commercial interests. The
BID decision process needs to be
well publicized; even the appear-
ance of a secret process can derail
approval. Municipal officials may
not care much about how the board
spends its money, but they are all
experts on and concerned about
democratic process.
Why take a fresh look at all
the important elements? First, a
considerable amount of change has
doubtless occurred in the past five
years. It is not exceptional for a
new, small BID to have had three
or four directors in five years.
Board members change. Owners
and operators change.
Economic conditions are prob-
ably altered. Some BIDs began as
desperate measures to save the dis-
trict; today, they may be better
focused on opportunities rather
than problems. Perhaps it is time
to change emphasis; allocating half
the budget to sweeping sidewalks
may not have produced the essen-
tial new businesses, not so much,
say, as financial incentives for
store upgrades are likely to.
.
,
.
July 15, 2008
Was the first budget prepared
to overcome the cost of inflation?
Does the standing ordinance penal-
ize adequately assessment default-
ers? Do the by-laws adequately
guard against political manipula-
tion? Do they assure that the board
and staff members are oriented to
for-profit enterprises, or have they
produced a not-for-profit or a gov-
ernment philosophy or orientation?
Would the BID function better
under another state BID law?
One state statute requires that an
assessee vote every year, but there
are other statutory options. For
example, Pennsylvania and New
Jersey BID laws offer a choice
between government-run and not-
for-profit-run BIDs. Should the
state law be amended?
But the best reason to start
fresh is to strengthen the BID con-
stituency. As with the original BID,
the more stakeholders who feel they
have shaped the BID, the more peo-
ple who will help sell it, hence
community meetings and surveys.
Another good reason was
given by a former Downtown
Denver Partnership BID director.
Reauthorization, he said, "keeps
us on our toes."
Lawrence O. Houstoun. ir. is the author
of Business Improvement Districts. Con-
tact him at lhoustounjr@verizon.net. .
Residential growth is a delicate albeit
critical balancing act - continued from page 1
sounds quite reasonable. However,
consider that 10 years ago, the medi-
an home price in Missoula was less
than the cost of an Uptown Flats stu-
dio, only $119,900. What's more,
78 percent of Missoula residents
could not afford that median house
today, at $206,600. Over the eight
years from 1998 to 2006, average
family incomes rose 34 percent, but
median home prices rose 72 percent.
To address the city's increasing
affordability gap, which will be a
key factor in downtown's residen-
tial development, Missoula Mayor
John Engen earlier this year led a
community discussion of the chal-
lenges presented by housing prices.
About 125 people attended. Fol-
lowing the presentation of a video
on the issues, the mayor talked
about his new Housing Initiative, in
which he poses four questions the
city is now working to answer:
· Who needs affordable hous-
ing in Missoula?
· Where is housing appropriate?
· What should housing look
like?
· How do we as a community
help pay for affordable
housing?
The goal of the initiative is to
share information, inquire about
solutions, explore ideas, identify
what's missing and cooperate on
working toward answers.
Growth plan and public support
downtown housing
Meanwhile, the city is engaged
in several initiatives that will affect
and shape downtown housing. First,
Missoula is about nine months into
developing an Urban Fringe Devel-
opment Area (UFDA) Project, in
response to the city's concerns about
how the region has been sprawling.
"While the title of this project is
Urban Fringe, it's really dealing
Downtown Idea Exchange . www.DowntownDevelopment.com
3
,
with the entire community, and iden-
tifying, if growth is going to occur,
where should it go, and why should
it go there?" says Roger Millar,
director, Missoula City-County
Office of Planning and Grants.
"We're coming together on a
preferred future [growth pattern],
which shows quite a bit of residen-
tial in the downtown," he says.
"There's land available, and it's an
area that doesn't have many neigh-
bors worried about infill. That
study, and the public's reaction to
it, has led us to believe that there's
a demand in the community for
housing downtown. "
Formulating goals city policy
can help meet
In a second important step, the
city's downtown business improve-
ment district has teamed with the
downtown business community to
hire a consulting firm and do the
first Greater Downtown Master
Plan. The consultants are about
halfway through their study, and
have recommended about 2,500
units of housing as a goal for the
downtown.
"The third thing we have going
on is the reform of our zoning reg-
ulations, to encourage more hous-
ing in urban situations. Right now,
it's relatively easy to build on a
greenfield in the fringe, and rela-
tively difficult to build in the city.
If the community wants to see
housing in the downtown, and if
the plan calls for housing in the
Ir~1 Web Extras
1- -{'uP Visit www.Downtown-
Development.com and click Web
Extras to see related documents
from the City of Missoula Afford-
able Housing Program and the
Baton Rouge City-Parish Planning
Commission.
Transit-oriented development is key
to residential growth
.
Residential development strategies need to consider not only how to
make it easier for developers to build downtown, but most importantly,
how to make it easier and more attractive for people to live there.
In Broken Arrow, OK (pop. 74,860), the city's new downtown devel-
opment plan requires that new structures of two stories or higher on
downtown's main street be mixed-use. A strongly residential downtown
is far off in the future, however, believes coucilman Craig Thurmond.
What would create strong market demand for housing in downtown is
enhanced transit service. In particular, a downtown stop on a proposed
light rail system linking to Tulsa would anchor transit-oriented develop-
ment in downtown Broken Arrow.
downtown, then the regulations
should make it easy to build hous-
ing in the downtown," he says.
For example, if housing plans
call for over 16 dwelling units per
acre, the city currently requires an
onerous and expensive conditional
use permitting process.
The city is considering
whether some situations could pro-
vide for a higher density of resi-
dential development by right? The
city is also looking at how it could
work with developers for offsite
parking, where various projects
can pool parking resources.
"We're also looking at design.
What can we do to ensure that we
get good design on these pro-
jects?" he says. Two policies that
won't have to be reformed are den-
sity limits and parking require-
ments for housing in downtown
Missoula, as there are none.
Benefits of more residents
Currently, downtown Missoula
has low-end projects and pricey
lofts, but little in between. Long
term, Millar expects that the in-
creasing residential development
and settling of downtown by
mixed-income users will be a
good thing.
Downtown residential, he says:
· Supports downtown business.
· Reduces traffic coming into
downtown to work.
· Gives 24-hour character and
safety to the community, with
eyes on the street and active
street spaces.
Among the residential develop-
ment success stories that Missoula
can look to is downtown Baton
Rouge, LA (pop. 227,800), which
has grown by about 300 residents
over the last 10 years, and now has
about 2,400 residential units. Davis
Rhorer, executive director of the
Baton Rouge Downtown Develop-
ment District, hopes to implement
new strategies that will help double
or triple the number of downtown
area residents.
"What we've seen is the resi-
dential conversion of second and
third floors along the historic arts
and entertainment district area," he
says. However, downtown is run-
ning out of such spaces to convert,
and demand is the highest in the
state for more office space, he adds.
The city looks to address these
challenges in an update it is com-
missioning of the lO-year old Plan
Baton Rouge.
"I'm getting ready to interview
.
.
~
4
Downtown Idea Exchange . www.DowntownDevelopment.com
July 15, 2008
I
.
the four consultant finalists for it.
A big component of that, probably
40 percent of the plan proposal, is
going to be the economic strategy
I've got to put in place to get major
residential down here. Because
that's where we want to center our
focus now," Rhorer says.
''I'm very pleased with the
progress we've made, but I want to
see that 24-hour life to be stronger
down here. Having people living
here just affects the market posi-
tively in so many ways, to get
additional types of retail and sup-
port services," like the Shaw Cen-
ter for the Arts, which opened
three years ago. "It's emerging as a
cool and interesting place to live."
Contact: Roger Millar, Missoula Office
of Planning and Grants, nnillar@co.
missoula.mt.us; Davis Rhorer, Baton
Rouge Downtown Development District,
ddd@brgov.com. .
Walking trails enhance downtown
pedestrian, cycling activity - continued from page 1
.
parks. What's more, "because the
Peterborough trail system is so well
connected for getting from A to B
in some parts of the city, it is viable
to use for transportation as well as
recreation," remarks Susan Sauve,
transportation demand management
planner with the city's Utility Ser-
vices Department.
"Most of our trails do link
quite closely to the downtown,
partly because that's where our
railway hubs were, and some still
are," she says. "So we've been able
to do some rail to trail initiatives,
like one big one that runs north-
south and another that runs east-
west. Both of those trails bisect the
downtown. That really helps build
a trail system that works for people
who are trying to get places, not
just for recreation."
In fact, six percent of Peterbor-
ough residents walk to work. In a
2005 transit survey people indicat-
ed that trails were the number one
thing that would encourage them to
drive less.
"One of the reasons we have
so many people walking is because
38 percent of our population still
works downtown. You can buy
almost everything you need in our
downtown, and a lot of people live
within walking distance of the
ntown."
Service groups, donors, city
all contribute
Surprisingly, the first trail was
only done in 1995. To develop
such an extensive trail system so
quickly, it's vital to have partners.
"Almost all our trails have been
built by our local service clubs,"
Sauve says. Additionally, two local
philanthropists donated funds for
trail construction to the tune of
about $750,000.
With support from city coun-
cil, the city has responded by pro-
viding the necessary support
infrastructure such as road cross-
ings and bridges. A major river
runs north-south through the city,
and there are three bridges that are
just for pedestrians and cyclists.
"So it's more convenient. There
are more options for people to get
across the river by walking and bik-
ing than by car," Sauve says.
"That's helpful too, and of course it
makes it scenic, and our downtown
is right beside that area."
A mile-long stretch of trail
along the tourist-oriented area
between the river and downtown is
also lit at night.
Also supportive of downtown's
walking infrastructure, the city
upgraded its sidewalk policy, so
that sidewalks are now required on
both sides of all streets. And to
keep the opportunity for active
transportation available year round,
the city plows its trails and side-
walks. That minimizes icy walking
conditions and makes for trails that
are completely clear as soon as it's
wann in the spring.
Promotion is also central to
walking success
The city also works on getting
people out on the trails, through a
coalition it formed with a local
health agency and a not-for-profit
environmental organization. "We
put our promotional budgets togeth-
er to do a Peterborough Walks cam-
paign," which yielded online trail
maps and distribution of an Out-
door Adventure Guide.
Peterborough also promotes a
month-long commuter challenge,
called the Shifting Gears Trans-
portation Challenge. This spring,
the event's fifth year, over 50
workplaces competed to have the
most employees walk, cycle, car-
pool, and take transit to work.
Downtowns typically host that
sort of commuter challenge for a
week. "Ours is a month-long,
because we're trying to establish a
new behavior, and we figure it takes
longer than a week."
Open up traffic-free paths
to downtown
How can trails benefit other
downtowns? "I think that a lot of
Downtown Idea Exchange . www.DowntownDevetopment.com
5
people prefer to access the down-
town walking and biking because
of parking issues. If the downtown
is going to compete with the malls
that have excessive free parking,
making downtowns fun and enjoy-
able to walk and bike to is impor-
tant," Sauve says.
"And because the trails link
right into the downtown, even peo-
ple who aren't even comfortable
being around a lot of traffic can
get right into our downtown,
where the sidewalks are nice and
wide and intersections are pedes-
trian- friendly."
Items on the to-do list to im-
prove Peterborough's trail system
include trail signage and improv-
ing links where gaps exist.
When planning trails, keep
density and connections to activity
centers front of mind, Sauve
advises. "Most people will walk
15 minutes to go do something,
but a lot more than that is too far
for people."
The city never expected peo-
Where the walking trails meet the main street
.
How can municipalities plan walking and cycling trails for maxi-
mum benefit to downtown? "Of course, having pedestrian routes inter-
sect in the middle of a downtown is perfect," comments Peter Bruce of
Pedestrian Studies.
"Most downtowns have the challenge of connecting a pathway or
trail to the main street. There are certain distances where it's not worth
trying very hard. But within a couple blocks, anywhere from 1,200 feet or
so up to 2,000 feet, you'll get people that might take a recreational walk
into town from the trail, and then perhaps start spending money, if they
find something they like and it's presented well."
For a town fortunate enough to be able to locate an intersection of
walking or cycling trails with the main street, it's important to provide
amenities there that will capture a person's attention. For example,
provide a tree-shaded bench for a people-watching break, a drinking
fountain, a directory of stores, a gazebo, etc. "Something to get them
to stop there, stand, look around, and understand what the opportuni-
ties are for shopping and dining in a convenient way," Bruce says.
"Pedestrian-scale amenities are important for that good feeling."
Contact: Peter Bruce, Pedestrian Studies, pbruceceo@aol.com, www.pedestrianstudies.com.
pIe to donate the kind of money
that has come in to its trail system,
she adds. "If you don't have the
money within your municipality,
don't be afraid to see who around
you might have it that would be
interested in trails."
Contact: Susan Sauve, City of Peterbor-
ough, ssauve@peterborough.ca., www.
peterborough.ca. .
.
Revitalization Projects
Increasing parking, improving access
move downtown forward
The Olathe, KS (pop. 114,700),
county seat was once the center of
community activity, providing a
variety of trades, professional ser-
vices, and retail businesses. Gov-
ernmental offices, including those
of the city, county, post office,
library and related services, are
offered downtown. But through the
years other services left downtown
or relocated to newer areas of the
city. So while downtown remains
a place of activity from 9 a.m. to
5 p.m. weekdays, there is little
6
activity during evenings and
weekends.
In 2002, Olathe residents iden-
tified downtown revitalization as a
priority through a long-term strate-
gic planning process - a process
that embraced a sizable cross sec-
tion of the community. In 2003, the
City of Olathe adopted the Envi-
sion Olathe Downtown Plan.
The City of Olathe and com-
munity partners are backing the
plan to rejuvenate downtown as a
mix of government and profession-
al services, support businesses,
niche retail, housing, and cultural
and entertainment venues. The
Envision Olathe Downtown Plan is
the guiding framework, and com-
munity partners are providing
important support.
Olathe moved ahead with the
plan's recommendations to first
improve downtown's reinvestment
economic climate. Two significant
capital improvements achieved
through partnerships have marked-
ly improved downtown.
Expanding existing garage
It was no surprise that Olathe'-
2003 downtown plan recogni-
Downtown Idea EXChange . www.DowntownDevelopment.com
.
.
the need for parking supply solu-
tions to support existing downtown
parking demand as well as future
parking needs. The need for more
parking, especially short-term
parking, was discussed and studied
for decades.
It was the downtown plan,
though, that kick-started an impor-
tant partnership to provide more
parking. Four hundred additional
parking spaces were produced as a
result of the partnership between
the City of Olathe and Johnson
County government. Initially, the
partnership shared the cost of a
feasibility study, which led to their
sharing the costs for an $8-million
structure. The project added six
stories to an existing downtown
parking garage located on a prime
downtown comer.
Opened early this year, the
parking garage successfully incor-
porates the architectural elements
of other downtown buildings. The
appearance of the original garage
is substantially improved with a
new facade that minimizes the
appearance that the garage was
expanded.
Improving impeded access
With that success in hand,
downtown Olathe moved on to a
more complex engineering and
capital improvement challenge.
ai
"@
o
Ii;
~
o
o
-;
o
o
.c
a.
In partnership with the county, downtown Olathe
added six stories and 400 spaces to an existing
'ng garage.
The City of Olathe raised the rails over
four downtown crossings, easing traffic
congestion. The photo at right shows a
new railroad bridge.
Railroad track crossings on
approaching downtown roadways
produced ongoing delays for
motorists. Each day, the crossings
were blocked by trains an average
3.3 hours, delaying travel for more
than 7,000 vehicles, and costing
motorists about 500 hours of time
waiting for trains. Since 2000, citi-
zen input stressed the importance of
relieving traffic congestion, espe-
cially from train-related delays.
In 2006, the City of Olathe
began a $41.2 million construction
project to raise the rails over four
street-track crossings, two of which
were among the busiest in the State
of Kansas. By early 2008, trains
traveled on both sets of tracks over
the roadways. This improvement
keeps open the doors to downtown's
main gateway, the downtown corri-
dor and to downtown itself.
Government partners and
the cooperation of the BNSF
Railway made the monumental
project come together, with
approximately $19.5 million
of the project costs coming
from the Kansas Department
of Transportation, Federal
Highway Administration, and
through the Mid-America
Regional Council, which
locally allocates Federal Air
Quality funds.
"1J
".
"
R
~
Ii
^
~
o
CD
~'
The BNSF Railway assumes
maintenance and future improve-
ments of the project.
Railway partnership continues
for quiet zone
Olathe continues working with
BNSF Railway to find more solu-
tions to reduce the impact of train
traffic in the downtown area. With
approximately 80 freight trains
traveling through downtown on the
west tracks, the area experiences
about five hours of train whistles
each day.
Creating a rail crossing quiet
zone for the tracks on the down-
town core's west edge was identi-
fied as the best solution for 11
crossmgs.
A quiet zone is a new federal
program that involves working
with the railroad to significantly
improve safety at designated
crossings, eliminating the need to
sound train horns.
As the Olathe Downtown Plan
enters its third phase, the impor-
tance of community partners can-
not be overstated when it comes to
bringing more life to downtown, a
city official says.
Contact: Emily Kllkal, senior planner,
City of Olathe, (913) 971-8969,
ekllkal@olatheks.org. .
Downtown Idea Exchange. www.DowntownDevelopment.com
7
Parking workshops
promote idea exchange
One of the biggest difficulties
with solving parking problems is
that everyone has a different per-
spective on what those problems
are and how best to solve them.
You can overcome this challenge
by holding a public workshop on
parking like those in Middletown,
CT (pop. 43, I 70). Sponsored by
the Middletown Downtown Busi-
ness District, the workshops give
downtowners an opportunity to
express their feelings and ideas on
parking, rather than expecting a
handful of downtown leaders to
accurately infer how everyone feels
about the topic and solutions.
What can your downtown
brag about?
Tired of complaints about
downtown Quincy, IL (pop. 40,370),
a contributor to the BlogQuincy!
website listed dozens of great things
about the downtown. Among them:
· Watching the sunset from
Quincy's new riverfront park.
· Browsing through the shops.
"To see a great example of invest-
ment in our downtown," he says,
"be sure to visit Ceilia's completely
renovated building."
· Attending events in the State
Room. "This classy little place is yet
another example of readapting Quin-
cy's old buildings for new use."
· Going to a doctor's appoint-
ment. "This isn't always a high-
light, but it's development
downtown nonetheless."
The lesson is clear: While there
may be significant improvements
8
and development downtown, peo-
ple's perceptions won't change
unless leaders publicize these
achievements.
Limit the link between
bars and crime
Establishing a downtown enter-
tainment district can be a good way
to begin revitalizing downtown, but
according to a University of Florida
study, creating districts with high
concentrations of bars and night-
clubs can lead to a rise in crime.
The increase in crime can even
limit other development, as people
may be reluctant to shop in the
area. Recommended strategies for
downtowns looking to develop an
entertainment district while mini-
mizing crime: limit liquor licenses,
set up zoning that favors businesses
serving food in addition to alcohol,
and encourage activities that attract
.
a wider range of age groups, such
as family entertainment. Increasing
security also helps.
Website spotlights state's
downtowns
The Wyoming Economic Atlas,
a website of the Department of
Agricultural & Applied Economics
at the University of Wyoming, has
a special section focusing on the
state's downtowns. Still a work in
progress, the site currently offers a
virtual tour in which visitors can
click on various points on the map
to see pictures of Wyoming's many
downtowns. This type of tool
promises great potential for pro-
moting economic development, and
it may be worth seeing if a similar
resource is available in your state.
The downtown section is located at
http://agecon.uwyo.edu/econdev/
downtownwyOI.htm. .
.
City funds for church improvements OK
A federal court last year upheld Detroit's use of city money to fund
structural improvement at three churches as part of a 2003 facade
improvement plan that provided reimbursements for upgrades. The
court ruled that city funds can be used for church renovations - pro-
vided the project has a civic purpose such as downtown beautification
and does not promote religion.
The decision covers normal building and parking lot repairs and
upgrades. However, "the reimbursements for the improvement or repair
of the signs [displaying the church's name] and stained-glass windows
displaying religious images and messages crosses the line because
these projects so clearly benefit the religious mission of the churches,"
the judge wrote in his ruling.
This was an important case because prior to 2000, the use of gov-
ernment funds for any religious organization was generally prohibited.
But the Supreme Court case Mitchell v. Helms opened the way for the
government to give funds to religious organizations. The Detroit case
was the first major ruling based on that precedent.
Downtown Idea Exchange . www.DowntownDevetopment.com
Attornelds
Burville Law Office, PA
429 Third Street
651-460-3751
Otten Seymour Law Offices
311 Oak Street
651-463-1151
Auto/Truck - Repair/SaLes
Block's Auto Service
805 Third Street
651-463-3024
Dakota Motors
212 Elm Street
651-460-6655
Farmington Truck Center
22098 Canton Court
651-460-6229
K & K Auto Ranch
1024 Eighth Street
Lorenz Towing
22068 Canton Court
651-460-6464
651-463-1101
M.R. Auto Repair
321 Elm Street
651-460-2101
Parkway Collision & Northwest Auto Sales
3344 W. 220th Street 651-463-1919
Pederson Auto Shop
101 Third Street
651-463-2111
Rambling River Repair
20 Fourth Street
651-460-6111
Starr Automotive
3360 220th Street
651-463-2281
Banking
Anchor Bank
324 Oak Street
651-463-1531
Anchor Bank
18400 Pilot Knob Road
651-463- 2010
Premier Bank
316 Oak Street
651-463-4440
Roundbank
3380 Vermillion River Trail
651-463-8300
Wells Federal Bank
115 Elm Street, Suite I
651-463-4883
Entertainment
Farmington Billiards
933 Eighth Street
Farmington Lanes
27 Fifth Street
651-463-2636
651-463-1811
Financial/Business Services
Anchor Investment Management
324 Oak Street 651-615-4683
Barbara J. Ackerman, PA Tax & Acctg.
5437 212th Street W. 651-460-6106
Edward Jones Investments
405 Third Street
Expert T Billing, Inc.
311 Oak Street
Farm Bureau Financial
115 Elm Street
H & R Block
20700 Chippendale Ave W.
Midwest Staffing Group, Inc
18400 Pilot Knob Road
Northern Concepts
821 Third Street
Quality Credit
420 Elm Street
TEAM Personnel Services, Inc
5465 212th Street W., Suite 2
Xpress Business Solutions
314 Oak Street
651-460-8229
651-463-3861
651-460-4300
651-460-2250
651-460-4498
651-460-4426
651-460-8800
651-460-4344
651-460-4089
Fitness
America's Fitness Center
109 Elm Street
651-463-8555
Anytime Fitness
20700 Chippendale Avenue
651-344-9999
Brenda's School of Dance
945 Eighth Street
651-460-6188
Curves for Women of Farmington
925 Eighth Street 651-463-2403
Snap Fitness
18450 Pilot Knob Road, Suite E
651-460- 2220
USA Tae Kwon Do
328 Third Street
651-581-9431
Gas 6- Convenience
Farmington Amcon
957 Eighth Street
651-463-1333
Kwik Trip
217 Elm Street
651-460-2082
Kwik Trip
18290 Pilot Knob Road
651-463-8902
MiniSmart: Convenience Store & U-Haul Rental
22280 Chippendale Avenue 651-460-6199
Oasis Market/Marathon Gas Station
705 Eighth Street 651-463-1705
SuperAmerica
18520 Pilot Knob Road
651-460-3353
Government Offices/Facilities
Central Maintenance Facility
19500 Municipal Drive
651-463-1640
City Hall
430 Third Street
651-463-1111
Dakota County Library
508 Third Street
651-463-0250
Police Station
19500 Municipal Drive
Non-Emergency
651-463-3333
Rambling River Center
431 Third Street
651-463-4828
medicaL Care
Allina Medical Clinic
3500 213th Street W.
Fairview Clinic
19685 Pilot Knob Road
FamilyHealth Medical Clinic
4645 Knutsen Drive
Family Vision Clinic
19645 Pilot Knob Road, Suite 106
Farmington Clinic
417 Third Street
Journey Couseling
821 Third Street
River Valley Home Care, Inc.
916 Eighth Street
Other Services
Action Driving
933 Eighth Street
Expressive Embroidery
305 Oak Street
Farmington Independent
312 Oak Street
Farmington Mini Storage
22020 Canton Circle
651-463-1181
651-463-511
651-460-2300
651-463-2020
651-460-4555
651-460-8085
651-460-4201
651-460-6669
651-460-3336
651-460-6606
651-463-4151
Farmington Printing, Inc.
306 Fourth Street 651-463-8444
Heikkila Studios
349 Third Street 651-460-8359
Janie's HomeTeam REALTORS
331 Third Street 651-463-8326
Lake Marion Marine & Small Engine Repair
5465 212th Street W. 651-460-2008
Performance Travel
315 Pine Street
651-463- 2404
Sherring Hands Massage
18598 Elk River Trail #203
651-463-1349
TAT24U & Piercings2 Inc
821 Third Street
651-460-8282
White Funeral Home
901 Third Street
651-463-1314
Pet Care
Akin Hills Pet Hospital
18400 Pilot Knob Road, Suite C
651-460-8985
Farmington Veterinary Clinic & Pet Hospital
645 Eighth Street 651-463-8985
Pampered Pet Spa
18450 Pilot Knob Road
651-463-9311
Shopping/Retail
Carquest
210 Oak Street
651-460-8334
CVS Pharmacy
19605 Pilot Knob Road
651-463-1380
Decache Style
320 Third Street
Econo Foods
115 Elm Street
651-463-3404
Fan Club Athletics
306 Oak Street
651-460-8485
f
~
~
~
~
I
~-LJ !
. ',-' "k::-tL1L I - i
--; L\-i>$Jl'l'.' 0-~ !
· \R-(S's:J-,,~ :~, b I !
PI' '-:j7T' <I(.>c:-i, I i~~:l I ~
I J , r _ "
"I """ I ~-~-t-__--__L____--_-
: iH=:-_.n:n~lI;~.. n ----.. _ n_ I. :\ .
CITY..Qf~~~~!>.kON--- i I L-J..
rCm-OnARMm" \~~\: -Itm~ ,',! ;'~::J
: -\''T ,-1~ /". (~)
I r\;>.. " '---r-.. rr
! Vi} L-'--'I~d' I ~)
i "'-- ~~\(~, ,~ _
i '--.J ~:, ~ \' ,T .~ _ I
i -q --;TC\B >j _: ~/.~ I
+.",,,..... I fJJ[~ _ ~I_'.---,=- ... ~\ I
! ~ t2Q:&!, ~ "1~"~' '\\1 Ir- l
i I ~ Ijrl'" \ ,- i---.J--" ~ c.-j
" ",,,\\ ! r ':
: (1""5- I -==l: j ~"J I I:::L-~ ' !
J! _ f.lil'''''''' L r-T.:. -- :-:-:J--J !
61 I T I ,j hTt~ !
:-,1 r- """iiW II l.r f--,-"i'i , ,"h !
'.11 I ~ Y L..LJ [ '----it I I I-I,:ll~~:_, l-+-ctl j'_n_______
! '....0 - I , , -Jo;ia.\llII~ _Q-1 ,
-+-,..1'''Ilil!lOIl€l".......~._ ~ "'--' - _ , __ ~H-i--I" r-i-:-bj Ln_.
' -- - 1111.-0::_ ! !
I - I " JRr.,Jbj' J i I. ['--
j -, ~-1-...L\ ..- IO!! ~i t.Lt-~
',! ~= ,
! ----- m,,,,o:;t "i..:, _.J J
I n_n_n I ~ , -1 I ~
. ARMINGTON --~---- ! .._ . :. I _
.i9JYY}EL--_-Tm,-- i I ,_~nJ .~ I, I r"':-,
"",,",",OWN . . '_.
E i ,___ _J' CAS<LE ROCK
1 ___J --- TOWN"'ll'
I
i5
I~
I;:
:g
l[il
,~
j=
:~
!~
:
i
~
T
i
! \
!
__-L.
.
IMiles
.
.
.
,
150 SOUTH FIFTH STREET SUITE 2300
MINNEAPOLIS, MINNESOTA 55402
612-335-1500 MAIN
612-335-1657 FAX
LEONARD
STREET
AND
DEINARD
S. STEVEN PRINCE
612-335-1882 DIRECT
STEVE. PRINCE@LEONARD.COM
July 25,2008
Thomas Scott
Campbell Knutson, P A
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, MN 55121
VIA E-MAIL (tscott(@.ck-law.com)&U.S.MAIL
Re: City o]'Farmington Economic Development Authority - 2004 Real Estate
Company
Dear Tom:
On June 16th we met at the Farmington City Hall, and the City requested that our client complete
certain work at the Exchange Bank Building in return for the re-deeding of the building to 2004
Real Estate Company and return of our client's $80,000. On June 20th I wrote you to confirm the
work was completed. Since then Farmington has acknowledged the completed work by issuing a
certificate of occupancy, but has, despite repeated requests, failed to provide the required
Certificate of Completion under the Parties' Agreement, failed to record the promised deed, and
failed to return our client's $80,000.
You and I last spoke on Wednesday, July 16th regarding the City of Farmington's proposed
settlement agreement with our client 2004 Real Estate Company.
As we discussed, our client is uninterested in executing a release unless additional consideration
is provided by the City. I understand from our discussion that the City is unwilling to pay any
attorney fees incurred by our client in response to the unlawful behavior of City officials.
Accordingly, and as already requested, please provide a Certificate of Completion consistent
with the parties' agreement, arrange for the City and/or EDA to record a deed confirming title in
the Exchange Bank Building in our client, and return the $80,000.00 (with interest at 3% from
June 20,2008). This demand is consistent with the City's offer at our June 16,2008 meeting.
LAS4sao2~R,llS IN MINNEAPOLIS. MANKATO . ST. CLOUD' WASHINGTON, D.C.
A Professional Association
WWW.LEONARD.COM
.
.
.
Thomas Scott
July 25,2008
Page 2
Our client has now waited over a month for return of title and money that we believe is
unlawfully held by the City. I hope that the City will honor its attorney and manager's earlier
proposal so that litigation will not be necessary.
If you have any questions or concerns, please don't hesitate to call. Please be sure that all
communications regarding this matter are directed to me.
Very truly yours,
LEONARD, STREET AND DEINARD
B:rOJia;j$
S. Steven Prince
SSP/egl
..,
.
.
.
Economic Development Activity Report
June 20 - July 25
Meetings/Events.. .
Staff attended the DCR Sponsored Business after Hours event at Gossips.
Staff attended a tour of the new High School
Staff participated in a site visit with a DEED Representative and industrial site selector.
Stafl lIstened to an ICMA AudlOconference on Sustamable Commumtles: Successful
Leadership Strategies.
Staff attended the NDC EDFP Course ED202
Inquiries...
Staff was contacted by Cerron regarding a specific user interested in the Vinge Tile & Stone
building. Use was not permitted per the Zoning Ordinance. Staff provided other space
availability options.
Staffwas contacted by Kent Levi Jacobsen who wanted to know ifthere were any networking
groups in Farmington. He recently brought his Vending Management business (Levi Vending
Managment, LLC) to Farmington and currently operates it out of his home office. Staff
informed him of the EGC, Rotary Club and DCR Chamber plus Chamber After Hours
Staff was contacted by a Commercial Real Estate Broker interested in a specific downtown
property that is for sale and/or lease. Spoke with him about available space opportunities that
may fit his needs client's needs and emailed him the Available Space spreadsheet.
Staff was contacted by the owner of the Farmington Steakhouse regarding the need for a brief
use of the McVicker lot for a bucket truck to access his building to replace rooftop units.
Staff was contacted by a property owner looking for information regarding the future use of
his property if it were sold. The property is zoned residential however a commercial use
currently is in operation on the site.
Staff was contacted by an individual who wanted to know if there was a seasonal campground
located in Farmington. Provided her with information for the Lebanon Hills campground in
Apple Valley.
Staffwas contacted by a long-time resident of Farmington who wanted information on what
the City is working on with regard to Economic Development. She wanted to know what
types of incentives are offered to attract new businesses to the City. Staff provided her with
the information she requested.
Staff was contacted by an individual interested in the Farmington Business Park. Staff
provided him with the Plan, PUD Agreement and zoning definitions.
Miscellaneous.. .
Tina Hansmeier
~rom:
~ent:
To:
Cc:
Subject:
Tina Hansmeier
Wednesday, July 16, 2008 11 :30 AM
'Gene Goddard'
Peter Herlofsky; Lisa Dargis; Tony Wippler; Lee Smick
Follow-up to Site Visit - Data Center
itl
350 IP SITE
MAPS1.pdf (2 MB)
Gene,
'itl
FiberLines.pdf (5
MB)
It was a pleasure meeting with you and Frank on Monday afternoon and thank you for considering
Farmington as a potential site for the Mega Data Center. There were several questions brought up
during our time together that lId like to address in this email. To begin, the presented site, illush"ated
on "Map A" and located generally north of CSAH 50 and west of Pilot Knob Road/County Road 31,
consists of approximately 300 acres. The acreage figures indicated on the map excludes any right-of-
way acreage and therefore does not accurately reflect the total number of acres for this area. As
youlll see on the attached "Map B", I've illush"ated the full acreage for each site located within the
outlined area, which now encompasses more property than was indicated on the maps provided
yesterday. The acreage figures for this outlined area total approximately 374 acres. Please keep in
.mind that approximately 22 acres of the total figure presented are currently zoned for commercial
uses (located at the NW intersection of Pilot Knob Road and CSAH 50).
With regard to the site, the Huber and Wurdeman properties were mined from approximately 1994
to 2003. To the best of our knowledge both properties have been reclaimed to there original
condition (i.e., elevation and topography). And, we have noticed that the Huber property has some
storage of vehicles, h"actor tires and petroleum products on the west side of the property that will
need to be cleaned out/ up with any development. The Wurdeman property has a home located on
it that has been identified as a possible eligible historic property. We see this as an opportunity for
some type of information or conference center possibility. lIve attached an aerial picture (attached
"Map C') to give you an idea of what the house looks like.
Since you were interested in obtaining a map identifying the owners of parcels beyond the site we
were looking at, I've attached "Map D'I titled Possible Locntioll of Future Industrinl Arens which
identifies the owners of property located generally in the southwest corner of Farmington.
Attaclunent "B" identifies more properties located north of the 300 acre site presented Monday. I
apologize in advance for the handwritten map, but I was having difficulty with our map software
today, and wanted to provide you with a response to the questions as soon as I could.
LAKEVILLE SITE
As I understand it, you viewed a site consisting of approximately 200 acres located in the southeast
.orner of Lakeville on Monday. Frank was curious if Farmington would consider rezoning the
griculturally zoned property to indush"ial to add to the 200 acre site in Lakeville. I don't believe that
this is a very good option largely due to the amount of laO-year Floodplain that runs through this
area. Please take a look at attached "Map P which is the 2030 Comprehensive Plan map that will go
1
to the City Council for approval later this fall as part of the should be approved with the full 2030
Comprehensive Plan Update. With a rough calculation, it looks like there may be roughly 110 acres
(south of CSAH 50) that may be developable. However, these acres would not be contiguous. If this
is something Frank would like to explore further we could discuss more details at that time. It .
wouldn't be out of the question but a bit challenging to say the least.
PHONE EXCHANGE/FIBER
The phone exchange for the Farmington area (including the site of the Farmington High School) is
651-463 or 651-460. However, if the customer chooses to go with a provider other than Frontier the
phone exchange would be different from what is listed above. On a side note, Frontier also provides
internet capabilities. I am working on gathering some maps to reflect where fiber is currently
located tlu.oughout town. Once I have received maps from the School Dish.ict and Frontier I will
send them your way. Attached to this email is a map identifying the locations of the City's fiber lines.
If you have any other questions please feel free to contact me at anytime. Thank you and have a great
day!
Tina Hansmeier
Economic Development Specialist
City of Farmington
651-463-1821
.
.
2
.
.
.
,/
...--"
-~ '--"~"
~ (
~ ,----
"k[~ =
g /L .7
x ~
a
2!.
::-
Co
c:
~
iii'
:l>
n
"'~
u>'"
"-I'"
.CO
"-I'"
"'~
'"
le.
o
....
:!!
a
,..---.-
"::
S
~
>-
-:.
r~
r--
/
,;-~______J (
I
~
i..
..:..,
(?--
'.-,: .
I....., \_
.-----~;:;-
I \--, .....-.
r? '-:~'j-~'~
,'"" ~j ::: _/7_' v"
,= ~~:-=-==-J~7-<~
( ,-
- ~~-)
~ -~7 ~
..~~~~I~
,----
Print Preview
~~
B c'
Page 1 of1
.
.
Disclaimer. Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and
should not be substituted for a title search, appraisal, survey. or for zoning verification.
M"p~c"l<:1
1 inch = 895 feet
~1~o 12
@tuff!. S
.
http://gis.co.dakotamn.us/websitel dakotanetgis/printPrevi ew .aspx?PrintOptData= Dakota County, I'vlNlOl2!truel falseltruelfaIsel falsel52 9766.689... 7/15/2008
,~
eo
C>
0
~
c
C
N
.
~
~ ""
;;
~g
ON
~ .
~~~
'~;1
~! 5.
..
. OJ 0 -
:J 0 =
gi~
5~~
~ ~
;:;
0 ~.
U
'" r,!., '.....
'8 .~...J:--~
~ \tt ',"i
";; ~
Cl ~l2:J_ _ _
.
.
...
o
<>
00
CO
c..
00
CO
CO
c:
\0
-
r-
_' V~~ .~."".
i';;.~ t: ..:~~:o'
~'I~:'_......,
r 1
. .
,i;'"
1.ft
-> .
Ci:.j
'"
o:d
Q
~
"is.
"d
.~
~
0;
01
eo
.2
"'"
CO
-0
II
o
eo
o
;;J
~
;:;
"
U
'"
"
"'"
"
Cl
II
~
~
d
;>,
~
"E
~
"
;>,
~
]
,e
"
3
E
d
'8
";;
-0
o
<>
,;
"5"0
}
$
-
"V
'.. .t,.i i
f1
o
~
~
: "1
'l,
"
.. _~-4111'.__
..
~
. r-I ~
.
en
~
~
"1
o
.
o
cD
o
o
N
.
.
.
.
c
co
0...
OJ
>
CJ)"Q)
c......
OJ-@;
-a5g
!....co
0.0
Eo
~
o
o
o
0')
o
N
~
u)
~
~
...
...
/,,'
" .
~
~
u.
r~
./tz
i
~
~ ~ ~ <
I '" ~~1i 13
] I ~ i f i i ! ~ i i ~ ~ i
~.g g~'; ~ ~]r~~t1.~~o
jDDuIitDtDDDDDD~~
i~ ~
5.8 ~
~~ c:
~~
.
City of Farmington
Farmington Fiber Optic Lines
0.5
I
1 Miles
Page 10f3
Tina Hansmeier
.om: Kent Levi Jacobsen I Global Vending Management [kent.levi@thelvm.com]
Sent: Monday, June 30, 2008 10:56 AM
To: Tina Hansmeier
Subject: RE: test
Tina,
I just wanted to take a moment and Thank You.
I spoke with Jeff Thelen, and then met him at the chamber's business after-hours last Thursday at Gossips downtown. He is a
very nice person and seems to have a wealth of information.
He had talked about the meetings at Anchor Bank, and it definitely seems quite intriguing for me to find out more about it. I'd love
to come and check out the next one to listen to what goes on.
Ruthe was also an amazing lady, and helped me out in various things.
Thank You again in advance!
Warmest Regards,
KENT LEVI JACOBSEN
PRIN CIP AL
Levi Vending Management, LLC
.t: 651.319.52961 Main: 866.847.26161 Fax: 888.213.7701
il: kent.levi@thelvm.com
www.TheLVM.com
"The key to unlock Your Future. 'rrM
MY PROFESSIONAL NETWORK I Mll..LIONAIRE MIND INfENSIVE I MANNARELIEF
Galatians 6:9
"Do not get tired of doing good, for at the proper time, you will reap a harvest, if you do not give up. "
NOTICE - This email and any files transmitted are intended solely for the use of the addressees and may contain privileged, confidential and/or copyrighted material. If you
have received this email in error, please notify the sender immediately by reply email and delete this email from your computer and destroy any copies.
DISCLAIMERS - Views and opinions expressed in this email are not necessarily the views and opinions of The Levi Vending Co., LLC or its employees. Absent an existing
written, mutually executed agreement to the contrary, nothing in this email creates a contract or other binding obligation.
t!1 Please consider the environment before printing this e-mail
From: Tina Hansmeier [mailto:thansmeier@ciJarmington.mn.us]
Sent: Tuesday, June 24,2008 12:41 PM
To: Kent Levi Jacobsen I Global Vending Management
Subject: RE: test
Kent,
Thank you for the email below, likewise, it was nice chatting with you. It is exciting to hear that you are
.py to be back in Farmington and we are glad to have you. I will be checking out your website shortly
t I wanted to mention that there will NOT be an Economic Growth Committee meeting this Thursday. I
just received a Chamber update indicating that the meeting has been cancelled for 6/26/08.
7/1/2008
Page 2 of3
Regarding the information below:
The Chamber President is actually Ruthe. Otherwise, you have the rest correct.
.
Tina Hansmeier
Economic Development Specialist
City of Farmington
651-463-1821
From: Kent Levi Jacobsen I Global Vending Management [mailto:kent.levi@thelvm.com]
Sent: Tuesday, June 24, 2008 12:22 PM
To: Tina Hansmeier
Subject: test
Importance: High
Tina,
It was great talking with you!
I am very excited to be back. Being born & raised here, and my family still living here, I have a lot of fond memories that I'm
happy to be able to bring my company back here from South Carolina, and now start a solid foundation.
Also, if you do have any opportunities for me, please let me know. Please take 2 minutes to look at my website so that you may
understand what my vending management company is capable of. www.TheLVM.com
I think I'd really enjoy being able to help the City of Farmington in its efforts to strategically expand in the next 3 years. There is
never any cost to you ever for our services, and I can significantly increase the revenue of your facilities & recreational locations.
Being that I'm just starting off all over again, I'm quite passionate about getting this off & running!
.
I hope this information below is correct:
Anchor bank 3:30pm 4th Thursday
Rudy pres of chamber 651.452.9872
Jeff Thelen (owner of Thelen Cabinet Company) 651.463.3442
Tina Hansmeier
Thank You again in advance!
Warmest Regards,
KENT LEVI JACOBSEN
PRIN CIP AL
Levi Vending Management, LLC
Direct: 651.319.52961 Main: 866.847.26161 Fax: 888.213.7701
Email: kent.levi@thelvm.com
wwwTheLVM.com
"The key to unlock Your Future. 'rrM
MY PROFESSIONAL NETWORK I MILLIONAIRE MIND INTENSIVE I MANNA RELIEF
Galatians 6:9
"Do not get tired of doing good, for at tlte proper time, you will reap a Itarvest, if you do not give up. "
.
7/1/2008
Tina Hansmeier
~rom:
"Sent:
To:
Cc:
Subject:
Tina Hansmeier
Wednesday, July 16, 2008 10:27 AM
'Steven Warner'
Lisa Dargis; Tony Wippler; Lee Smick
Aerial Image of Allina Site-900 Main Street-Farmington
!1l
Allina - former.jpg
(887 KB)
Steve,
Attached is an aerial image of the soon to be former Allina Medical Building site (900 Main Street).
Using the aqua/blue line I've illustrated to you where the right-of-way area will be once the property is
platted. Currently it is a metes and bounds parcel that would need to be platted before development
could occur. The attachement identifies the right-of-way and remaining acreage as Dakota County
property records indicate. Please see below for those details.
Property Record Details
Many commonly asked questions about assessment information may be answered at Understandinq Taxes & Values.
Note: Click data field headings for further information on each value.
. Data Updated 7/11/2008.
PROPERTY ID NUMBER: 14-03200-012-25
FEE OWNER:
JTL PROPERTIES LLC
3153 LAKESHORE BLVD
MINNETONKA MN 55391
PROPERTY ADDRESS:
900 MAl N ST
FARMINGTON MN 55024
.
2008 ESTIMATED MARKET VALUE (PAYABLE 2009)
LAND: $297,000
BUILDING: $1,220,400
TOTAL: $1,517,400
2008 TAXABLE/UMITED MARKET VALUE (PAYABLE 2009)
LAND: $297,000
BUILDING: $1,220,400
TOTAL: $1,517,400
1
2007 ESTIMATED MARKET VALUE (PAYABLE 2008)
TOTAL: $1,512,100
2007 TAXABLE/LlMITED MARKET VALUE (PAYABLE 2008)
TOTAL: $1,512,100
PAYABLE 2008 TAXES
NET TAX: $50,433.00
SPECIAL ASSESSMENTS: $0.00
TOTAL TAX & SA: $50,433.00
LAST QUALIFIED SALE:
DATE: 12/91
AMOUNT: $100,000
LOT SIZE
RIW ACREAGE: 0.68
.
TOTAL ACREAGE: 2.39
YEAR BUILT: 1991
SCHOOL DISTRICT: 192
WATERSHED DISTRICT: VERMILLION RIVER
PAYABLE 2009 HOMESTEAD STATUS: NON HOMESTEAD
PAYABLE 2009 ASMT USAGE:
COMMERCIAL - PREFERRED
.
2008 BUILDING CHARACTERISTICS (PAYABLE 2009):
n
PLAT NAME:
SECTION 32 TWN 114 RANGE 19
PT OF SW 1/4 OF NW 1/4 BEG
NW CORNER S 301.12 FT E 190
FT S 21 FT E 145.28 FT N
322.04 FT TO N LINE W
335.19 FT TO BEG EX PTS FOR
STH #3 & CR #72
TAX DESCRIPTION:
32 114 19
TYPE OFC,MD/DTL YEAR BUILT 1991 ARCH/STYLE FOUNDATION sa FT NOT APPL FINISHED sa FT 10844
BEDROOMS 0 BATHS 10 FRAME C-CONCRETE GARAGE sa FT 0 OTHER GARAGE MISC BLDG
Tina Hansmeier
Economic Development Specialist
City of Farmington
651-463-1821
.
2
l'
.r ;:r
,,'
[J
;, I'
-
III
l lf~'o^~j
..
'-
.
.
.
City of Farmington
325 Oak Street
Farmington, Minnesota
65I.463.7III . Fax 651.463.2591
www.ci.farmington.mn.us
TO:
EDA Members
FROM:
Tina Hansmeier, Economic Development Specialist
SUBJECT: 308 Elm Street Demolition
DATE:
July 28, 2008
INTRODUCTION
Staff was directed at the June EDA meeting to obtain demolition estimates for the
building located at 308 Elm Street or the building commonly referred to as the "Old
Park & Rec Garage" (see Attachment A). Also obtained were cost estimates for possible
options for the use of the land after the building is demolished.
DISCUSSION
Demolition estimates have been obtained from Friedges Excavating (Attachment B) and
Doboszenski & Sons (Attachment C), both of which have demolished City or EDA owned
buildings in the recent past. The demolition estimates are attached and indicate the
scope of work along with specific exclusions based on certain assumptions at this point.
The cost estimates provided include demolition of the building, disposal of building
materials, grading of site and placing 6" of class 5 aggregate over the building removal
area.
Options are presented below for what could be done with the site directly after the
building is demolished. They are:
. Sod (Attachment D):
$3630 - $6,534
. Seed (Attachment E):
$2,175
. Asphalt for additional parking (Attachment F):
$29,784 - $47,896
Cost estimates are attached for the options presented above. Staff believes the option of
creating additional parking makes the most sense at this point. It continues to be
brought to staffs attention that there isn't a sufficient amount of parking in the
downtown area. With the location of this site adjacent to several of downtown's
eateries; it would help alleviate some congestion until interest in developing the
property is received.
.
.
.
For some additional background regarding the state of this building, attached is a memo
that was brought to the EDA in August 2006 (Attachment G).
ACTION REQUESTED
Authorize demolition of the EDA owned 308 Elm Street building.
Respectfully submitted,
{0~ ~;t(cU1SmC~(jU
Tina Hansmeier,
Economic Development Specialist
cc: Peter HerIofsky Jr.
A
/}
~
Quotation from----nnu---
FRIEDGES EXCAVATING, INC.
Excavating - Utilities - Landscaping Contractors
21980 KENRICK AVE LAKEVILLE, MN 55044
Johnny Hardyman
Office (952) 469-2776
Fax (952) 469-2463
J ohnny@Friedgeslnc.com
July 19,2008
Project:
Demolition of City Garage, Located North of City Hall
Hwy 50
Farmington, Minnesota
Architect:
Plan Set:
Owner:
City of Farmington
To:
City of Farmington
Tina Hansmeier
325 Oak Street
Fannington, MN 55024
Phone: 651-463-1821 Fax: 651-463-1611
.
*** $ 19,686.00 ***
Demolition Quote for Building: Nineteen Thousand Six Hundred Eighty Six Dollars.
Scope of Work:
Remove & properly dispose of the following items according to MPCA & City of Farmington Standards:
MPCA permit, construction entrance, silt fence, signage, safety fence as needed during demolition.
Abandon water/sewer/storm services.
Demolish and remove building, foundation walls, footings, slab, concrete aprons.
Import, place & compact suitable subsoil for all footing & foundation wall trenches.
Furnish & place 6" of recycled class 5 aggregate on old bldg. pad area.
Notes:
Friedges will use Atomic Recycling, which operates the largest construction waste recycling facility in the state, 63% of
all the construction waste will be recycled. To furnish & place 6" of topsoil, seed & mulch is the same price as recycle
class 5 aggregate. All salvage rights belong to Friedges.
Exclusions: Testing/fees/escrows/bond, as built surveys, soil correction, shoring or bracing, removal/relocate/replacement
of any public utilities, ACM/ Environmental survey/inspection/reports or abatement of asbestos/Iead
aaintlmold/contaminated soil or hazardous materials, SWPPP permit, private locates, fencing after project completion,
~rb & sidewalk removal or replacement, asphalt & asphalt sawing.
Thank you,
JJuuuJ .JlwuUptum
B
(/
.
DOBOSZENSKI & SONS, INC.
9520 County Road 19
LORETTO, MN 55357
TELEPHONE 763-478-6945 FAX 763-478-3186
EMAIL TRANSMISSION
DATE: July 24th, 2008
TO: Ms. Tina Hansmeier
# OF PAGES INCLUDING TIDS SHEET: !
COMPANY: City of Farmineton
FAX #: 651-463-1611
PHONE #: 651-463-1821
PROPOSAL
PROJECT: BuUdin!! Demolition @ 308 Elm Street in Farmineton. MN
SPECIFIC INCLUSIONS:
1. Demolish and haul away existing building, slab and foundation.
2. Grade site level.
.
SPECIFIC EXCLUSIONS:
1. Soil testing or contaminated soil.
2. Layout or licensed surveyor.
3. Permits or fees. Winter conditions.
4. Well sealing or capping. Septic or waste tank pumping or removal.
5. Survey, removal or disposal of hazardous or regulated materials.
6. Erosion control. Restoration beyond that listed above.
7. Topsoil import, seed & mulch, or turf establishment.
BASE BID: $14,400.00
ALTERNATES:
1. Lights, ballasts, thermostats, appliances, & etc. removal and disposal.
ADD: $1,500.00
2. Cut off water & sewer within the property lines.
ADD: $700.00
3. Furnish & install 6" of recycled Class 5 over the building removal area.
ADD: $2,000.00
.
Please feel free to contaet me for clarification or with any qnestions. Thank yont~or /
calling us regarding this pricing and we wish you the best of luck on this projec~ \ D
Respectfully Submitted, ~ \ l6 I l.Q b 0
~E7~~~
Tom Bermel
Estimator/Project Manager
c
07/17/2008 09:32 5514508194
BRAUN TURF
PAGE 01 D
.
BRAUN TURF FARMS
2950 232"d STREET EAST
"
,
"
HAMPTON, MINNESOTA 55031
PliO 'E: 651-463-2302
FAX: 651- 460-8194
July
: .
, .
, .
! ;
I::
! .'
City r Farmington
Attn: 'na Hansmeier \ (1 cA u tM.D I,
~O 0\ + SD(\
\ ()~\ \ lL~\O() I
QUOT . FOR PROJECT: F . ITION
~ sui \ ~ t-op ~o I I
'? \ (j (L rrt-Xlt I
JtNO S~l ~"\ f\X ~/L. J
. 968 sq.yds. sod \ }-J\9Ql)"~ l"'ENT -m pQ.'LPf)2\\/
ith 2" topsoil and no watering $3.75 per sq.yd. j: :S/~i:;>.::>D
ith 2" topsoil and two weeks watering ** $5.25 per sq.yd:3', ': !U6 L-
ith 4" topsoil and no watering $5.25 per sq.ydfb S, o~ 2-- i'.
ith 4" topsoil and two weeks watering ** $6.75 per sq.yd. '];, lo,C) 3L(
i.:,
! .
.
, ,
, .
] :
! .
i.
i'
** Ci to provide water at no charge
~_.~----_.-----..._._-_._--
.
7671
Co.
Phof\<l #
Fa~ #
Fa~ #
I'
2).
Valley Creek Express Blower™ Service
Local 651-458-0778
.' Free 877-77-MULCH
~ 651-458-0822
www.valleycreekmulch.com
MN -5209 G
A Division of Valley Creek Express, Inc.
8362 Tamarack Village
Suite 119-443
Woodbury MN 55125
Work Estimate
All figures are estimates. Actual totals may vary due to the actual amount of product used.
PRICES ARE VALID 60 days from estimate date.
Contact Person:
Phone:
Email:
Client:
Address for Billin
Cit , State, Zi
Office Phone:
Fax:
Email:
Hose length needed: /}r,(;
Truck #:
Descri tion of Service:
f t
Location of Service:
~~ CL~ S,
PI4(!rn,/V[) -r() N
Directions:
ltW'11J;;t.- <;U~. t' ,"'d' "'11
c;,,,~ en Qi\p~t\~~k ~(...
hI El~.
2CO Sf E"
'" '4.- t-
v
0.&...
timate: includes roduct
Product
Iication and c1ean-u
Estimated Quanitity
i"f~
<;100 ~ ~.t-
II
Estimated Schedule Date:
Invoices & Payments:
1/2 down, balance due upon completion unless otherwise noted.
Jobs are scheduled upon receipt of down payment & signed estimate.
Trip Charge:
A $500 trip charge will be assessed if we arrive at your site
on your scheduled day and the site is not prepared for install.
Cancellations to your scheduled day must be made at least
24 hours in advance.
Price per )!a16:ic?yar'-d' Total Application Price
~6' ~b.
· 1'; 4-
11 ~ 7.)'<:3:.
Start Time:
Visa or MasterCard
Card #:
Expiration Date:
Card Holder Name:
Address:
City, State, Zip:
Amount to be applied:
Signature:
CVV#:
I hereby accept all terms in the stated contract and the work estimate as an acting agent for the above stated client
.enucontact Person Signature:
Valle Creek Ex ress Slower™ Service:
Cell Phone: C::I:Z ~{)(1- J. 7'/)....
E-mail:
Date:
Date: 1/??/c f
'ibJ1tJel, . f!j}-JJ'(
C:-
TERMINATION OF CONTRACT
Valley Creek Express Blower™ Service may, at its sole option and without prior notice, terminate this contract for non-
payment over 30 days of invoice date. In all other cases, this contract shall continue in full force and effect until the
scheduled effective contract termination date set forth and/or the end of the listed location item listing, whichever comes
first, unless either party gives thirty (30) days written notice by certified or registered mail with return receipt requested of
its intention to terminate. Receipt of a termination notice by either party shall automatically terminate this contract at .h
end of the notice period, unless both parties agree in writing to reinstate the contract prior to the effective date
termination.
For the purpose of the service of notice of termination for the services listed in this contract, pursuant to the paragraph
above, servIce must be made to Valley Creek Express Blower™ Service 8362 Tamarack Village Suite 119-443, Woodbury,
MN 55 I 25. For the purpose of the service of notice of termination to the client, pursuant to the paragraph above, service
will be made to client contact person listed.
DEF AUL TOR DELAY OF GOODS OR SERVICES
Valley Creek Express Blower™ Service shall not be liable for delays or defaults in furnishing goods or services hereunder,
if such delays or defaults on the part of Valley Creek Express Blower™ Service are due to:
a. Acts of God or of a public enemy;
b. Acts of the United States or any state or political subdivision thereof; .
c. Fires, severe weather, floods, earthquakes, natural disasters, explosions, or other catastrophe;
d. Embargos, epidemics or quarantine restrictions;
e. Shortage of goods, labor strikes, slowdowns, differences with workmen or labor stoppages of any kind;
f. Delays of supplier or delay of transportation for any reason;
g. Causes beyond the control of Valley Creek Express Blower™ Service in furnishing items or services including but not
limited to breakdown or failure of machinery or equipment.
Acceptance of delivery or goods or services shall constitute a waiver and release of Valley Creek Express Blower™ Service
by Client of any claim for damages, setoff, discount or other liability on account of delay.
INSURANCE
Valley Creek Express Blower™ Service represents that it maintains and shall continue to maintain insurance covering its
liabilIty under thIs contract for loss or damage to persons or property from any acts or omissions and arising directly from
the provision of service hereunder, subject to the limitations of this contract. Valley Creek Express Blower™ Service
certIfies that it has Worker's Compensation insurance.
INDEMNITY
The Client shall indemnifY and hold harmless Valley Creek Express Blower™ Service and any of its directors, officers,
shareholders, employees and agents from and against any action or threatened action, suit or proceedings arising out o.
as a result of, the indemnifYing part's performance under this contract and against any and all claims, expenses, losse
damages (including reasonable attorney's fees), arising out of the clients willful negligence or willful acts of omission.
LEGAL EXPENSES
In the event Valley Creek Express Blower™ Service commences a lawsuit for the recovery of payments due pursuant to the
contract or any other amount due under the provisions of this contract, due to liability, loss, damage, cost, or expense
(including reasonable attorney's fees) by reason of any act or omission of client or because of default in the clients
performance of any other term or provision of this contract, the client shall pay Valley Creek Express Blower™ Service
reasonable attorney fees and costs and disbursements associated there with.
ADDITIONAL NOTES
-This contract supersedes any and all other agreements, either oral or in writing between the parties with respect to the
matter stated
herein and this contract contains all of the agreements between the parties with respect thereto. This contract may be
amended or modified only in writing and shall be effective only after signed by both parties.
-The failure of either party to this contract to insist upon the performance of any of the terms and conditions of this contract,
or the waiver of any breach of any of the terms and conditions of this contract, shall not be construed as thereafter waiving
any such terms and conditions, but these shall continue and remain in full force and effect as if no such forbearance or
waiver had occurred.
- If any provision of this contract is held to be invalid or unenforceable for any reason whatsoever, the remaining provisions
shall remain valid and unimpaired and shall continue in full force and effect.
-All work orders and communication must come from the client contact person listed on this contract for the above listed
site. Other persons, other than the client contact person, handling any portIOn of said contract must be authorized in writing
by the client contact person to Valley Creek Express Blower™ Service.
- Work shall include all labor, supervision, tools, vehicles, supplies and other services that are necessary to maintain the
above contracted services.
- Vehicles and equipment will be operated safely and procedures employed shall be according to accepted industry
standards.
-Work performance shall comply with the Federal Occupational Safety and Health Act.
APPLICA TIONS
- Valley Creek Express B1ower™ Service is not responsible for application problems due to the weather or weather
conditions or acts of God.
-In applications of mulch or compost, Valley Creek Express Blower™ Service is not responsible for negligence on the part
of client and/or client's customer.
.
In applications of compost seeding, Valley Creek Express Blower™ Service is not responsible for negligence on the part of
client and/or client's customer. ThIS would include, but not be exclusive of: lack of watering and/or excessive watering of
seeded areas, walking on or mowing seeded areas prior to seed establishment.
.
.
.
G
City of Farmington
325 Oak Street, Farmington, MN 55024
(651) 463-7111 Fax (651) 463-2591
www.ci.farmington.mn.us
TO:
EDA Members
FROM:
Kevin Carroll
SUBJECT:
Park & Rec Building - Status Report
DATE:
August 24, 2006
The EDA is the owner of a building located behind Subway and the former downtown liquor store. It is
commonly referred to as the "Park & Rec building" or the "old Parks building." It is a two-story brick
and concrete block structure that in recent years has been used primarily for the overnight and weekend
parking of City vehicles (Engineering, Building Inspections and Park & Rec) and for the storage of City
files and records.
A few weeks ago, some sheetrock and insulation fell from the ceiling and landed on one of the parked
vehicles during the night (no significant damage to the vehicle resulted). The sheetrock had apparently
become damaged and weakened due to a roof leak, which was caused by some missing and/or damaged
shingles. City staff cleaned up the material that had fallen, and determined that the building could once
again be safely used for vehicle parking. The roof appears to be leaking in only one location, and now that
the sheetrock directly under that leak is gone, any water that comes through the roof simply falls to the
concrete floor below and either runs to a floor drain or seeps through cracks in the concrete. This
situation is tolerable during warm weather, but will have to be resolved before winter. The present
condition of the building raises both short-term and long-term issues.
Short-term issues: City staff members believe that steps should be taken to ensure that the building
can be used through the upcoming winter. Parking City vehicles inside during the winter makes them
easier to start and eliminates the need to clean off ice and snow every morning. Keeping the vehicles out
of the municipal parking lot also makes it easier to plow the lot after a snowfall. In the past, snowplow
drivers had to plow around the City vehicles, and then return later to plow again after the vehicles had
been moved. Staff members are in the process of obtaining quotes or estimates for the cost of repairing or
replacing shingles in the area of the existing leak, and in any other areas that appear likely to leak during
the winter. There is no plan to reshingle the entire roof; the objective is simply to protect the interior
from the elements at the lowest possible cost. Quotes are also being obtained for replacing the sheetrock
that is missing from the ceiling, which is apparently a building code (fire safety) requirement. It is
anticipated that the price quotes will be available for the EDA members to review at their meeting in
September.
Lon2-term issues: Although the building is handy for parking and storage, its age and condition
suggest that it will continue to need repair work from time to time. It may have exceeded its useful life,
and the EDA may not want to continue to expend funds on it after the upcoming winter. City staff
members are in the process of obtaining quotes or estimates for the potential demolition of the building in
the spring or summer of2007. That information should also be available for the EDA's review in
September. In the meantime, staffwill also examine alternate uses of the site (additional parking for
nearby businesses, for example). Staff will also explore options for dealing with the 60-80 boxes of City
records that are currently being stored in the building, such as scanning them to create electronic records.
RECOMMENDED ACTION: None at this time. Informational or discussion item only.
&
.
~ .
~..
"
.;!tl' ~~'(: "V:'>~ .to,_
,t'
.~
~
~;!' 1ii
'G).
...
......
.tJ)
~ ~f...
Ir' ~~ +# :/
~w"'.~ . '\.
~.
r - i..:
.'r:' .
, .It
, ~
[,
lo.
(
r~
,~
~~f
.~
~
--
...~'I
=-
..~I
-
~~
~~
rrt.m--l
m)"
tu:.~
-~
~~~
. ':' =~~... r.::1
~~-..
~. '"
a !I
Oak Street
~
IjJ
cPCDDO
c.
.- CJ r'
- Q'
Cl
o
c
, I'.l
~ 'r'-.
.~' 1
\,
'fJ
,-
.
~.
"
-......
.
not
.
.
l/o.:s.:s: ~:J~
.)......./'..,':..r' i -.' .-
.~
..:LD .:;~C..~:1'!,
Project &1).4- P'Vl<>-14, t, i'f' Project No Page
Client I Prepared by f)z' f(. Date
Calculations for Reviewed by Date
~~;{ ';f;r' .~'"T''''I :,"~ . -. . '--r- ~
!.'<:.,,..,, -' .
'f" .
;~~,il4~Bonestroo' .'
,~~,.'n . - ....
~-i)':.~'" ~ .. ~
(~,,~y.;.. h-:'." . .. ,
k~t~~.: I~j ,.....: 41' ~ ~ ~ I . .~.
.,-.,.r.. ~
-::.>
.-]---
.' I
.. ..__ ~.'~~..~. T . -. - .
1'.;.:-;.:=-._'.,.,...__........
. f ~.. ...~~ ,.......
".'" .
-,,\.
......"-:1.
"
...w.._ ____..WWM________.___..______.._......________ .__M...____w_______.._._
.'
D
I c..V'':':
'....,.
..~~-
....._-. ,-"
'..;:--.
....M. .. .....;::..__._.._.
"",
..,>,., , ....~.-
~\ ....., "
---......-----..\-----.---...........-..--",-...--.....--.-----.. Z;:"---
", "'. .'"
,
. ,
.....----...-........":-.--...
I'~: __M'_'
! '
..........
. .."'.;;........-..
.......'-.;,:.---......
"
".
.............';: .
""
. .........., .
"
~t)Q
..--...,....
........
''I.... "._~>'_
_.'M"_ _ "\;~..... ..
."\. "\,
.._.._____._~:--- __.._____M....M. ~::.~,____._..____~
.~_.......\.-~. ... ',,-
"
......,~.......
"',
",.
........:~l
.f...........
',.,..
.....-....":". -- -~--_.._.- ...
'"
......~._..
'.,
'''.. .."......'..."
.-- ._~-~.~.~\:..;:---~-----------
'~\,
...- '""~...
,,! .....,
..___ I._..___~__ .~....2-:...~..~....__.
. ,
'.,
""
..-..-.,...,
-"
. "'-''''''<
,
"-
.....,,~-
.~--'- ~--~.
.~,
"'l,~.
.~:
---.....;!..----....-
h
,
.....-j!..
I
;1
I'
. ..!i'
l; ~'~'"
......__..........._................ ..I' ......, ........... .......-........---...--......--
r ... .,"
,I. ""'",.
'.'l:' :::~\ .............. -_..-.~--..~
----.... ...- -I:=~>: =:;~c:=:~,::..~"-...~'~~ ....
...
.......
...~.. H~' ._\. ._.... .
/..'01
....1............
\
/.10\
I
..~........_..~...... ...H.....H.._HH.._..~___...._...._.._.._.._~_..~..~_._.._~._._~..HH__H~~..__.._..~._...._...._
...._H___H_~H..__..H..___..H__~_.._~__HH______H__ .."...__.._.._....._..__~H_.._.H__._H_.H_.__HH__H..___.._~___----~.---
Ole!
0.::c"b?,:~.':~m...... X..._ J_2?._'......... ;.;... Y!?_~---
I r.<- '~""'-/
....:=-::.:::::._" H_H ..J.' .::........--
-"-
/V.
t -.,: i
.....L..../..C:::'......
; (..~=.f..~.
..H..___.._HH~_..~.H_______H..__._......_. ____....__.._._~~__.__......_..._..__._.H.H._~__~_H.
c 5)Q
[,1"$5 $'-
-".,-,."- ...;;';';;0;:;';:';;';
e
.............._ ... ......__....__..... :.._ 5 .'-:-g~i~-;~~~.. 6' ': ;;,__li~_:~!:~~CLYd::.....,.---.--~!~t:~=~...."-..;:;..-,;
:~~~: '.: ~:....::t..,~o,::.~c:......_I~~d
t~,. -
.:~::.::~.:.!.~~..:~..::l..:..: ...._ _ _.~~_ ........ ..~f...~:..t~.::-:..~1}<r ....H
_5_?>.:::2_:::~::- .:.:..~11'..... :C.(I_ ._s.,;.....:~-.I.'-,>....,./.i~...""...:'1:'~~
...,.,..._........."'..,.~.-."'.,..~"""'.....,.~.""- .""- ..-.. '.-
.~L.~:.._..~I;'. .....:~i~:,..
....._ . T5.-c~;' :_.-..J.?;..~:1.0::~:~..:...: .t..... ..-
.. ..~. .~_ .1.:2.. j~.r~ _.._~':.. (. t:~~F?9?...).... ~ ~~:.:.. .L..c=~_.
;-:,:..:~
,,-
;?....t.)
,(.,Z
j70:
.~l~~..~~~~: =~_='.= .H~l~~~H__=_MM___HH..M2_:_ti..'f~ i
~~r-:..I..
_~.~~.._M_~~-::-,~7_"7~-.;:..:_;:;:;:.-:;:_-..:O:"~..-
_..___.____J?~:.'_:..r:...j.$:,..;Jl(J.t, ....__{E..',:,.~::,...,J._.._!~__..J~e::_:~...?...._j~::,:!.~:::!!_',;i..___J.L~__..---..-------.
G v
(~:!{-<L ...5.'_~J:,-,:~/,!;:,~<,..: ,:;:.('. ,I' ~:"-l.{.. .!'.~.~i~!!.~i;~-) .
\ ," I S....\:.d(S''''\
._.I>!:.L.l....:::::... .3...... .... ..__....L ............
._..l;..? .:~ _.~i-.~. f::.:.'~
-f,i',:c:'
~.~ ~
.., .~
__y..~. .' .
,
~ ~ ',-': .!'....-""
/ .~--c
~..-.. #-,/
;;~ ',-
(', .
<<'-,~6' .f.1~.
'2173 ,~;-<
...?:.q=~.~.C..:~ . .~-::""~"~~
''''..."".;:.~,;::.:.:.';~,.i::~.::..:;_ _....._H....
/ ';{ t:;; :~ . !
:5/, :.J ,0/'.'-
-, ,
i; r:.--
i"; _-:- . .- .~., ,~.....~
CV';) .~~
...._..M....___~..M.._._....___.___~.._....~........._....__~_.._...._H____.._~_H .HM_____.. .._...__.._~._____.___.. ....._H.
/-\.\,. r *'"
......-,;,..:,......C""r:..
" -."
. ,~
/.~
",-
,-
~2-::;-.?:l:~""
,.'~
.. v~.
~ .~.. .
...:.(..! ~.#,,:.-
,::., ,.:- '.~. . . 1'. ,- {.. :)
:(~ c:: ,-;... ~ ~,~~.)-
.-...r
.""-'
:i .~_::.~-
"
.- ..
";H-/~ ..._.. . . .
. \...
,~
.......M......~....__..__..____.__. _ H___H__._____ .___ ._...__._.____nH_ .---.-----.
c.
G
City of Farmington
325 Oak Street, Farmington, MN 55024
(651) 463-7111 Fax (651) 463-2591
www.ci.farminlrton.mn.us
t-
TO: EDA Members
FROM: Kevin Carroll
SUBJECT: Park & Rec Building - Status Report
DATE: August 24,2006
The EDA is the owner of a building located behind Subway and the fonner downtown liquor store. It is
commonly referred to as the "Park & Rec building" orthe "old Parks bUIlding." It is a two-story brick
and concrete block structure that in recent years has been used primarily for the overnight and weekend
parking of City vehicles (Engineering, Building Inspections and Park & Rec) and for the storage of City
files and records.
A few weeks ago, some sheetrock and insulation fell from the ceiling and landed on one of the parked
vehicles during the night (no significant damage to the vehicle resulted). The sheetrock had apparently
become damaged and weakened due to a roof leak, which was caused by some missing and/or damaged
shingles. City staff cleaned up the material that had fallen, and determined that the building could once .
again be safely used for vehicle parking. The roof appears to be leaking in only one location, and now that
the sheetrock directly under that leak is gone, any water that comes through the roof simply falls to the
concrete floor below and either runs to a floor drain or seeps through cracks in the concrete. This
situation is tolerable during warm weather, but will have to be resolved before winter. The present
condition of the building raises both short-term and long-term issues.
Short-term issues: City staff members believe that steps should be taken to ensure that the building
can be used through the upcoming winter. Parking City vehicles inside during the winter makes them
easier to start and eliminates the need to clean off ice and snow every morning. Keeping the vehicles out
of the municipal parking lot also makes it easier to plow the lot after a snowfall. In the past, snowplow
drivers had to plow around the City vehicles, and then return later to plow again after the vehicles had
been moved. Staff members are in the process of obtaining quotes or estimates for the cost of repairing or
replacing shingles in the area of the existing leak, and in any other areas that appear likely to leak during
the winter. There is no plan to reshingle the entire roof; the objective is simply to protect the interior
from the elements at the lowest possible cost. Quotes are also being obtained for replacing the sheetrock
that is missing from the ceiling, which is apparently a building code (fire safety) requirement. It is
anticipated that the price quotes will be available for the EDA members to review at their meeting in
September.
LOll2-term issues: Although the building is handy for parking and storage, its age and condition
suggest that it will continue to need repair work from time to time. It may have exceeded its useful life,
and the EDA may not want to continue to expend funds on it after the upcoming winter. City staff
members are in the process of obtaining quotes or estimates for the potential demolition of the building in
the spring or summer of2007. That information should also be available for the EDA's review in .
September. In the meantime, staff will also examine alternate uses of the site (additional parking for
nearby businesses, for example). Staffwill also explore options for dealing with the 60-80 boxes of City
records that are currently being stored in the building, such as scanning them to create electronic records.
RECOMMENDED ACTION: None at this time. Informational or discussion item only.
!
Valley Creek Express Blower™ Service
ecaI651-458-0778 .
II Free 877-77-MULCH
Fax 651-458-0822
www.valleycreekmulch.com
~
.~
MN -5209 t:::'
A Division of Valley Creek Express, Inc.
8362 Tamarack Village
Suite 119-443
Woodbury MN 55125
Work Estimate
All figures are estimates. Actual totals may vary due to the actual amount of product used.
PRICES ARE VALID 60 days from estimate date.
Contact Person: .-- HM\.~7;Y\Fi K
I j~!k
Phone: (.-;,t; i - U~} - I f2.. i
Email:
Client: O.Ift,i ~"' j:::jJIl!...iMIt.:.6nlv
., r-
Address for Billing: 7J 26 l HJ,k 'Sf'
City, State, Zip: f:Af-m INl:ifDA1 ';;;"- 2 II
. ",(I .
Office Phone: I
Fax: it-;;' - Lflt, ~ - 1ft, If
Email:
Hose length needed: /}rJ~:
Truck #:
Description of Service: (\'n\ c';:.{- <:;;.:::tC\ o,~
-.\- ~.~ (t" 4f'
9>100 ~x1
\
Location of Service:
_~g ai',\ 5-,
tiJi!/}ll A, tlTf! (oJ
Directions:
~h.v';,{ J)";l.; S-"Jt'\. y'4~~ t11
~I.(t~' Cf'\ (~.Lflpo~\{b.k ~~
:'1 E!.,.\.
~OS-l-~
~ '~I-.i-
v
'vi. !,.d 0{ i ,,-.c. d,;-"'V1(~ :,.h'Ulo
I
Estimate: includes product, deliverv. application and clean-up
Product Estimated Quanitity Price per $1[Jiczyar.d' Total Application Price
s.~. ()b .
('lit
<:;'00 sa' ~'i-
l)
Estimated Schedule Date:
Invoices 11 Payments:
1/2 down, balance due upon completion unless otherwise noted.
Jobs are scheduled upon receipt of down payment & signed estimate.
Trip Charge:
A $500 trip charge will be assessed if we arrive at your site
on your scheduled day and tile site is not prepared for install.
Cancellations to your scheduled day must be made at least
24 hours in advance.
. '1'-'+
"~~'\of'
11 !J./I,s-i:.:!:.
Start Time:
Visa or MasterCard
Card #:
Expiration Date:
Card Holder Name:
Address:
City, State, Zip:
Amount to be applied:
Signature:
CVV#:
. I hereby accept all terms in the stated contract and the wor!{ estimate as an acting agent for the above stated client
'Iient/Contact Person Signature: Date:
Valley Creek Express Blower™ Service:
Cell Phone: {;(1. ~t;(1- J.7t.f-~
Date: 1/~?'(~ f'
.
E-mail: t.l:/t71(i:~!i1.(it~e.~i:IJ..I1-ticJ( . eiJ-1J1
I
/
p
Parking Lot Estimate (Rough Estimate)
*Price does not include cost associated with the demolition of existing building
.
Pave Entire Lot
Unit Unit Price Quantity Total
Saw Cut Bituminous LF $ 5.00 265 $ 1,325.00
Bituminous Removal SY $ 5.00 462 $ 2,310.00
Class 5 (8" Section) TON $ 25.00 458 $ 11,450.00
Bituminous Base TON $ 80.00 120 $ 9,600.00
Bituminous Wear Course TON $ 80.00 120 $ 9,600.00
Total $ 34,285.00
Contigency (10%) I $ 3,428.50
Total Construction Cost I $ 37,713.50
27% Engineering and Administration $ 10,182.65
Total Cost I $47,896.15
Pave Only Where Building Has Been Demolished ( 1'-/ (0~)' !:;-- \ ::\ (\...)
Unit Unit Price Quantity Total
Saw Cut Bituminous LF $ 5.00 180 $ 900.00
Bituminous Removal SY $ 5.00 98 $ 490.00
Class 5 (10" Section) TON $ 25.00 298 $ 7,450.00
Bituminous Base TON $ 80.00 78 $ 6,240.00
Bituminous Wear Course TON $ 80.00 78 $ 6,240.00
total $ 21,320.00
.
Contigency (10%) I $ 2,132.00
Total Construction Cost I $ 23,452.00
27% Engineering and Administration $ 6,332.04
Total Cost I $ 29,784.04
.*, 1>~cs
,No j- -r I I
_/I C It) ((
f' .
(AI^" I'"h- .f\:lh.J /}
C),r- et/r 1.,,';' I I
; :j v'nl'/"
.