Loading...
HomeMy WebLinkAboutAgenda_2016_5_23_Meeting(133)A Proud Past - A Promising Future Committed to Providing High Quality, Timely and Responsiv e Service to All of Our Customers City of Farmington 430 Third Street Farmington, MN 55024 AGENDA WATER BOARD May 23, 2016 7:00 PM 1.CALL T O ORDER 2.APPROVE M INUT ES (a)Approve Minutes-April 25, 2016 Meeting 3.CONT INUED BUSINESS (a)Approve Wellhead Protection Plan Part 2 Agreement 4.NEW BUSINESS (a)W ireless Internet Antennas 5.APPROVE BILLS (a)Approve Bills-April 21 to May 18, 2016 6.OPEN FORUM 7.ADJOURN City of Farm ington 430 Third S treet F armington, Minnes o ta 651.280.6800 - F ax 651.280.6899 www.ci.farmingto n.mn.us TO:Water Board Memb ers , C ity Adminis trato r FROM:Kevin S cho rzman SUBJECT:Ap p ro ve Minutes-Ap ril 25, 2016 Meeting DATE:May 23, 2016 INTRODUCTION Attac hed are the minutes from the April 25, 2016, water b o ard meeting. DISCUSSION N/A BUDGET IMPACT N/A ACTION REQUESTED Review, make any c hanges , and then ap p rove the minutes. ATTACHMENTS: Type Desc rip tion Exhib it April 25, 2016 Water Bo ard Meeting Minutes MINUTES REGULAR WATER BOARD MEETING Monday, April 25, 2016 7:00 PM Conference Room 170 City Hall 430 Third Street Farmington, MN Members Present: Weierke, Jensen, Snobeck Members Absent: None Staff Present: Kevin Schorzman, P.E., City Engineer, Sue Miller, Administrative Assistant, Jen Dullum, Natural Resource Specialist and John Greer, Barr Engineering Call to Order: The meeting was called to order by Chair Weierke at 7:00 p.m. 1. Approve Minutes - March 28, 2016 – Motion by Jensen second by Weierke to approve the minutes as presented. APIF, Motion Carried. 2. Continued Business – a. 2016 Water Patrol Position – Motion by Weierke second by Snobeck to approve the hiring of Domonique Wright for the 2016 season. APIF, Motion Carried. 3. New Business – a. Public Input Meeting – Wellhead Protection Plan Update - John Greer with Barr Engineering gave a presentation to the board and noted that the first part of the plan was to identify areas around our wells that are vulnerable and/or susceptible to contamination. Discussion focused on report and Mr. Greer answered questions. b. Water Board Policy Update – Engineer Schorzman reviewed the policy and the proposed amendments with the board. The amendments are specific to the “Water Meter Accuracy Check” as follows: A consumer may, by written request, have his their meter accuracy checked. by depositing the amount stated below with the Utility Department. In case a test should show an error of over five percent (5%) of the water consumed (Industry Standard), the deposit will be refunded to the consumer, a correctly registered meter will be installed, and the bill will be adjusted accordingly. In the event that the error is less than 5%, the owner will be charged a Meter Testing Fee consistent with the current Fees & Charges Resolution. This testing fee will be added to owner’s next quarterly bill. The City will retain the deposit to cover costs if the error is less than 5%. Adjustment shall not extend back more than one billing period from the date of the written request. The charges for meter testing are in the Fees & Charges Resolution, and shall be deposited into the Utility Operating Fund. Motion by Jensen second by Snobeck to accept the amendments AND to add verbage to the Water Use Restrictions Policy indicating the daily restriction on water time restrictions (noon to 6PM). APIF, Motion Carried. c. 2016 Water Conservation Education Plan – Motion by Snobeck second by Jensen to approve the plan as presented. APIF, Motion Carried. 4. Approve Bills – Motion by Weierke second by Snobeck to approve the bills in the amount of $7,332.04 APIF, Motion Carried. Water Board Minutes April 25, 2016 Page 2 of 2 5. Open Forum – Member Jensen updated the board on the water use issue for 19 Spruce Street. It turned out that the resident’s water softener was the issue and it has been repaired by the resident. 6. Adjourn – Motion by Weierke second by Jensen to adjourn at 7:58PM. APIF, Motion Carried. Respectfully submitted, Sue Miller Administrative Assistant City of Farm ington 430 Third Street Farmingto n, Minnesota 651.280.6800 - Fax 651.280.6899 www.c i.farmingto n.mn.us TO:Water Board Memb ers , C ity Adminis trato r FROM:Kevin S cho rzman SUBJECT:Ap p ro ve Wellhead Pro tec tion P lan Part 2 Agreement DATE:May 23, 2016 INTRODUCTION At the Ap ril 25, 2016, meeting, part one of the wellhead protectio n p lan was pres ented to the board at a p ublic inp ut meeting. T his meeting wrapped up part one of the wellhead protec tio n p lan update. On April 28, 2016, s taff and Barr Engineering met with s taff fro m the Minnes o ta Dep artment o f Health (MDH) to b egin part two of the plan up d ate. Bas ed on the original s ched ule, part two of the plan up d ate was to b e completed by Novemb er of 2016. DISCUSSION The meeting with MDH o n Ap ril 28th was very p ro d uc tive and info rmative. Several items c ame out o f that meeting related to part two o f the p lan update: Staff req ues ted a completio n d ate extens io n fro m No vember o f 2016 to No vember o f 2017. This req uest was b as ed on the s ubstantial d elay in review of p art o ne b y MDH. MDH staff felt this was reas o nab le, and we have begun the formal req uest for extension. It s hould be noted that we do not intend to take until Novemb er of 2017 to c omplete the p art two up date. Our go al is to complete it b y March o f 2017. Bas ed o n the type o f wo rk req uired to c o mp lete p art two , s taff is rec ommend ing that we enlis t the s ervic es o f Barr Engineering to help us c omplete it. S taff at Barr spec ializes in gathering the required information related to potential c o ntaminant s ources within the wellhead p ro tec tion area. City s taff d o es not have this level of s p ecialization. S taff at Barr also has experienc e with what types o f p ro tec tio n meas ures actually have a meaningful impac t o n the protection of o ur s o urc e waters b as ed o n their extens ive involvement in wellhead protectio n in multip le c o mmunities . If the extens io n is granted (whic h p reliminary indic ations say it will), we wo uld have the o p p o rtunity to ap p ly for a grant in S ep tember which c ould help defray the cost of up d ating p art two of the plan. As d is cus s ed at the meeting in April, part two of the plan is really the most imp o rtant p art when it comes to trying manage our wellhead p ro tec tion areas. We want to d evelop a plan that will have c lear, impac tful items that will work to minimize the potential of co ntaminatio n within the areas . BUDGET IMPACT As s hown in the attached proposal, the cost o f up d ating p art two of the plan will not exceed $27,805 witho ut p rio r autho rizatio n. T his cost c an p o tentially b e reduced b y as much as $10,000 if the grant applic ation in Septemb er is approved . ACTION REQUESTED Approve the attac hed agreement with Barr Engineering to assist the city with c o mp letion of p art two of the wellhead protec tion plan up d ate. ATTACHMENTS: Type Desc rip tion Exhib it Barr Pro p o s al Barr Engineering Co. 4300 MarketPointe Drive, Suite 200, Minneapolis, MN 55435 952.832.2600 www.barr.com April 27, 2016 Mr. Kevin Schorzman City Engineer City of Farmington 430 Third Street Farmington, MN 55024 Re: Agreement for Part 2 Wellhead Protection Plan Amendment Dear Mr. Schorzman: Thank you for retaining us. We will do our best to justify your expression of confidence in us. Per your request, this letter, together with our Standard Terms (attached) sets forth the Agreement between the City of Farmington (City) and Barr Engineering Co. (Barr) regarding amendment of Part 2 of the City’s Wellhead Protection Plan (WHPP). The scope of professional consulting services we will provide for preparing the Part 2 WHPP amendment is described in Attachment 1. This Agreement will be effective for the duration of the services unless earlier terminated by either you or us. John Greer, whom you worked with on Part 1 of your Wellhead Protection Plan Amendment, will attend a scoping meeting for the Part 2 work on Thursday April 28th, as you requested. His attendance of that meeting will be billed on a time and materials basis and is included in the attached fee estimate. The remainder of the work for this project will commence upon receipt of a copy of this letter signed by you. The estimated schedule for the services is to have the work completed within nine months of notice to proceed, absent schedule delays out of our control such as extended City, Minnesota Department Health (MDH), or local unit of government review of the draft Part 2 WHPP amendment report. We will inform you of our progress by bi-weekly status update emails, other as needed emails, telephone calls, and our invoices. For the services provided, you will pay us according to the attached Standard Terms. Please note that the attached Standard Terms are the same terms under which we completed the amendment of Part 1 of the City’s WHPP. Please return a signed copy of this letter to us. We will bill you on our standard 4-week billing cycle. The cost of the services will not exceed $27,805 without prior approval by you. We understand you have the authority to direct us. We will direct communications to you at the address on this letter. Direction should be provided to John Greer at the letterhead address. If this Agreement is satisfactory, please sign the enclosed copy of this letter in the space provided, and return it to us. Mr. Kevin Schorzman April 27, 2016 Page 2 G:\JCG\Farmington\DRAFT Agreement Letter_Farmington Pt 2 WHPP Amendment.docx Sincerely yours, BARR ENGINEERING CO. Brian LeMon, PE Its Vice President Accepted this ____________ day of ___________________, 2016 City of Farmington By Its Attachments Attachment 1 Project Understanding and Scope of Work Standard Terms—Professional Services 1 G:\JCG\Farmington\DRAFT Attachment 1 Farmington Part 2 WHPP Scope of Work_4-26-2016.docx Attachment 1 Barr Engineering Project Understanding and Scope of Work for Preparing Farmington Part 2 Wellhead Protection Plan Amendment Currently, the Minnesota Department of Health (MDH) deadline for the City of Farmington (City) to complete the process of amending their Wellhead Protection Plan (WHPP) is November 4, 2016. Barr Engineering’s understanding is that the City will request a schedule extension from the MDH. Our understanding of the project and the scope of professional consulting services for preparing the amendment of Part 2 of the City’s Wellhead Protection Plan (WHPP) are described in the following paragraphs. Project Understanding The development of Part 2 of a WHPP must be done according to the Wellhead Protection Rules. Per the rules, Part 2 of the WHPP must include 1) an assessment of data elements relevant to the Plan, 2) an inventory and mapping of potential contaminant sources within the Drinking Water Supply Management Areas (DWSMAs) that were identified during development of Part 1 of the Plan, 3) a discussion of issues, problems, and opportunities associated with the DWSMAs and the source water aquifers, 4) an assessment of the impact on the public water supply wells of potential future changes in the DWSMA s, 5) identification of goals for the Wellhead Protection Program, and 6) development of management strategies for addressing the identified potential contaminant sources. Our scope of work presented below is based on our experience with developing Part 2 WH PPs. It is our understanding that Scoping Meeting No. 2 with the MDH will be held on April 28, 2016. Per the City’s request, John Greer of Barr Engineering will attend that meeting. His cost for attending will be billed to the City on a time and materials basis. The estimated cost is included in the project fee. The MDH will issue Scoping Decision Notice No. 2 to the City within 30 days of the meeting. In the Scoping Decision Notice the MDH will identify (based on the discussions at the Scoping Meeting): 1) the data elements that must be assessed in Part 2 of the WHPP, 2) the potential contaminant source types that must be inventoried during development of the plan amendment, and 3) the due date for completing Part 2 of the WHPP. The MDH Planner that will be responsible for reviewing the Part 2 WHPP amendment is Karen Voz. Once the Scoping Decision Notice is issued, Barr Engineering Co. will review it and notify you if anything in the document results in a change to the scope defined herein. Scope of Work Tasks and Assumptions Barr Engineering’s scope of work is presented in the following paragraphs. 2 G:\JCG\Farmington\DRAFT Attachment 1 Farmington Part 2 WHPP Scope of Work_4-26-2016.docx Task 1: Attend Scoping Meeting No. 2 As noted above, it is our understanding that the City has scheduled Scoping Meeting No. 2 with the MDH for April 28, 2016. The meeting will be held in the City’s offices. Per the City’s request, Barr Engineering staff will attend the meeting. We propose that this meeting also serve as the project kick off meeting.  We have assumed that the meeting will last no more than 2 hours. Task 1 Cost: $720 Task 2: Potential Contaminant Source Inventory The Wellhead Protection Rules require that potential contaminant sources within DWSMAs be inventoried. Types of potential contaminant sources that must be inventoried depend upon the aquifer vulnerability classifications within the DWSMAs. Since aquifer vulnerability within the Farmington DWSMAs ranges from Low to Moderate, it is expected that the MDH will require that the potential contaminant sources that must be inventoried include wells, storage tanks, and Class V wells. It is possible that not all potential contaminant source types are present in the DWSMAs. It is also possible that the MDH will require that additional potential contaminant source types be inventoried.  We have assumed that Barr will be responsible for compiling information on potential contaminant source types in the DWSMAs from publicly available databases.  The MDH requires that the locations of a minimum of 25 of each type of potential contaminant source present within the DWSMAs be verified during development of the Part 2 Plan. If there are less than 25 of a particular type of potential contaminant source within the DWSMAs, the MDH requires that all of the locations for that type of potential contaminant source in the DWSMA s be verified. For our cost estimate, we have assumed that Barr Engineering staff will be responsible for completing the location verifications for each type of potential contaminant source using GIS mapping techniques and, if necessary, drawing on local knowledge of City staff. We have further assumed that field verification activities such as windshield surveys, door to door surveys, or mail/telephone requests for information from property owners will not be necessary. If the City so chooses, we will limit the verification to 25 locations of each potential contaminant source type during development of the Plan. If you prefer that City staff complete the location verification during development of the Plan amendment Barr staff will provide guidance to City staff on how to complete the location verifications.  We have assumed that if the City has in its possession any GIS files used in the preparation of their existing Part 2 Wellhead Protection Plan that a copy of the GIS files will be provided to us. Task 2 Cost: $5,410 Task 3: Wellhead Protection Plan Part 2 Preparation Barr Engineering will prepare, in consultation with the City, an initial draft of the Part 2 WHPP amendment for City review. After addressing any City comments on the initial draft, Barr will provide a copy of the 3 G:\JCG\Farmington\DRAFT Attachment 1 Farmington Part 2 WHPP Scope of Work_4-26-2016.docx draft Part 2 WHPP amendment via electronic means (i.e., email or secure Internet download) to the MDH for preliminary review. Barr Engineering will review any MDH comments that come from the preliminary review of the draft Part 2 WHPP amendment, discuss the comments with City staff, make necessary changes to the draft that result from MDH comments, and provide the City with CDs containing the draft Part 2 Plan that the City will distribute to local governmental units (LGUs) whose jurisdictions overlap the DWSMAs. If requested, Barr will also provide the City with a template for a transmittal letter that could be used by the City to send the draft Part 2 Plan to the LGUs. Please note that the Wellhead Protection Rules require that the LGUs be given 60 days to review the draft Part 2 Plan. Barr Engineering will address, in consultation with the City, any comments received from the LGUs and prepare a final Part 2 WHPP amendment. Copies of the final Part 2 Plan will be provided to the City on CD for submittal to the MDH (note: the MDH requires submittal of six copies of the Part 2 Plan on CD; paper copies will not be accepted). If you desire, Barr can submit the Part 2 WHPP amendment to the MDH for approval on behalf of the City. Paper copies of the final Part 2 Plan amendment can be provided for Ci ty use at an additional cost.  We have assumed that communications with City staff, including receiving and/or discussing comments on the draft Part 2 WHPP, will occur via telephone and/or email.  We have assumed that a meeting with MDH staff to discuss any comments arising from the preliminary review will not be necessary. If such a meeting is necessary we will attend on a time and expenses basis over and above our budget for this scope.  We have assumed only one round of comments from the MDH and the LGU’s. Task 3 Cost: $19,295 Task 4: Public Hearing The Wellhead Protection Rules require that the WHPP be presented at a Public Hearing. The MDH requires that the Public Hearing be held prior to submittal of the Part 2 Plan to the MDH for approval.  We have assumed that John Greer of Barr Engineering will present the Plan at the Public Hearing. Task 4 Cost: $900 Task 5: Project Administration This task includes completion of necessary project administrative tasks. Task Cost: $1,480 4 G:\JCG\Farmington\DRAFT Attachment 1 Farmington Part 2 WHPP Scope of Work_4-26-2016.docx Project Schedule We have assumed that the plan development and submittal tasks identified above will be completed within nine months of notice to proceed. This schedule assumes that preliminary MDH review of the draft Part 2 WHPP will be completed within 30 days and that the public hearing will be held within 30 days after the 60 day local unit of government review period. Ver. 07-01-15 STANDARD TERMS—PROFESSIONAL SERVICES Our Agreement with you consists of the accompanying letter or other authorization, Work Orders, and these Standard Terms – Professional Services. Section 1: Our Responsibilities 1.1 We will provide the professional services (“Services”) described in this Agreement. We will use that degree of care and skill ordinarily exercised under similar circumstances by reputable members of our profession practicing in the same locality. 1.2 We will select the means, methods, techniques, sequences, or procedures used in providing our Services. If you direct us to deviate from our selections, you agree to hold us harmless from claims, damages, and expenses arising out of your direction. 1.3 We will acquire all licenses applicable to our Services and we will comply with applicable law. 1.4 Our duties do not include supervising your contractors or commenting on, supervising, or providing the means and methods of their work unless we accept any such duty in writing. We will not be responsible for the failure of your contractors to perform in accordance with their undertakings. 1.5 We will provide a health and safety program for our employees, but we will not be responsible for contractor, job, or site health or safety unless we accept that duty in writing. 1.6 Estimates of our fees or other project costs will be based on information available to us and on our experience and knowledge. Such estimates are an exercise of our professional judgment and are not guaranteed or warranted. Actual costs may vary. You should add a contingency. 1.7 The information you provide to us will be maintained in confidence except as required by law. Section 2: Your Responsibilities 2.1 You will provide access to property as required. 2.2 You will provide us with prior reports, specifications, plans, changes in plans, and information about the project which may affect the delivery of our Services. You will hold us harmless from claims, damages, and related expenses, including reasonable attorneys’ fees, involving information not timely called to our attention or not correctly shown on documents you furnished to us. 2.3 You agree to provide us with emergency procedure information and information on contamination and dangerous or hazardous substances or processes we may encounter in performing the Services. 2.4 You agree to hold us harmless as to any claim that we are an owner, operator, generator, transporter, treater, storer, or a disposal facility within the meaning of any law governing the handling, treatment, storage, or disposal of dangerous or hazardous materials. 2.5 Site remediation services may involve risk of contamination of previously uncontaminated air, soil, or water. If you are requesting that we provide services that include this risk, you agree to hold us harmless from such contamination claims, damages, and expenses, including reasonable attorneys’ fees, unless the loss is caused by our negligence. 2.6 You agree to make disclosures required by law. If we are required by law or legal process to make such disclosures, you agree to hold us harmless and indemnify us from related claims and costs, including reasonable attorneys’ fees. Section 3: Reports and Records 3.1 We will retain analytical data relating to the Services for seven years and financial data for three years. 3.2 Monitoring wells are your property and you are responsible for their permitting, maintenance and abandonment unless we accept that duty in writing. Samples remaining after tests are conducted and field and laboratory equipment that cannot be adequately cleansed of contaminants are your property. They will be discarded or returned to you, at our discretion, unless within 15 days of the report date you give written direction to store or transfer the materials at your expense. 3.3 Our reports, notes, calculations, and other documents, and our computer software and data are instruments of our Services, and they remain our property, subject to a license to you for your use in the related project for the purposes disclosed to us. You may not use or transfer our reports to others for a purpose for which they were not prepared without our written approval. You agree to indemnify and hold us harmless from claims, damages, and expenses, including reasonable attorneys’ fees, arising out of any unauthorized transfer or use. 3.4 Because electronic documents may be modified intentionally or inadvertently, you agree that we will not be liable for damages resulting from change in an electronic document occurring after we transmit it to you. In case of any difference or ambiguity between an electronic and a paper document, the paper document shall govern. When accepting document transfer in electronic media format, you accept exclusive risk relating to long-term capability, usability, or readability of documents, software application packages, operating systems, and computer hardware. 3.5 If you do not pay for the Services in full as agreed, we may retain reports and work not yet delivered to you and you agree to return to us our reports and other work in your possession or under your control. You agree not to use or rely upon our work for any purpose until it is paid for in full. Section 4: Compensation 4.1 You will pay for the Services as agreed upon or according to our then current fee schedules if there is no other written agreement as to price. An estimated cost is Ver. 07-01-15 not a firm figure unless stated as such and you should allow for a contingency in addition to estimated costs. 4.2 You agree to notify us of billing disputes within 15 days and to pay undisputed portions of invoices within 30 days of invoice date. For balances not paid under these terms, you agree to pay interest on unpaid balances beginning 10 days after invoice date at the rate of 1.5% per month, but not to exceed the maximum rate allowed by law. 4.3 If you direct us to invoice another, we will do so, but you agree to be responsible for our compensation unless you provide us with that person's written acceptance of the terms of our Agreement and we agree to extend credit to that person. 4.4 You agree to compensate us in accordance with our fee schedule if we are asked or required to respond to legal process arising out of a proceeding to which we are not a party. 4.5 If we are delayed by factors beyond our control, or if the project conditions or the scope of work change, or if the standards change, we will receive an equitable adjustment of our compensation. 4.6 In consideration of our providing insurance to cover claims made by you, you hereby waive any right of offset as to payment otherwise due us. Section 5: Disputes, Damage, and Risk Allocation 5.1 Each of us will exercise good faith efforts to resolve disputes without litigation. Such efforts will include a meeting attended by each party’s representative empowered to resolve the dispute. Disputes (except collections) will be submitted to mediation as a condition precedent to litigation. 5.2 We will not be liable for special, incidental, consequential, or punitive damages, including but not limited to those arising from delay, loss of use, loss of profits or revenue, loss of financing commitments or fees, or the cost of capital. Each of us waives against the other and its subcontractors, agents, and employees all rights to recover for losses covered by our respective property/casualty or auto insurance policies. 5.3 We will not be liable for damages unless you have notified us of your claim within 30 days of the date of your discovery of it and unless you have given us an opportunity to investigate and to recommend ways of mitigating damages, and unless suit is commenced within two years of the earlier of the date of injury or loss and the date of completion of the Services. 5.4 For you to obtain the benefit of a fee which includes a reasonable allowance for risks, you agree that our aggregate liability will not exceed the fee paid for our services or $50,000, whichever is greater, and you agree to indemnify us from all liability to others in excess of that amount. If you are unwilling to accept this allocation of risk, we will increase our aggregate liability to $100,000 provided that, within 10 days of the date of our Agreement, you provide payment in an amount that will increase our fees by 10%, but not less than $500, to compensate us for the greater risk undertaken. This increased fee is not the purchase of insurance. 5.5 If you fail to pay us within 60 days following invoice date, we may consider the default a total breach of our Agreement and, at our option, we may terminate all of our duties without liability to you or to others. 5.6 If we are involved in legal action to collect our compensation, you agree to pay our collection expenses, including reasonable attorneys’ fees. 5.7 The law of the state in which the project site is located will govern all disputes. Each of us waives trial by jury. No employee acting within the scope of employment shall have any individual liability for his or her acts or omissions and you agree not to make any claim against individual employees. Section 6: Indemnification 6.1 Each of us will indemnify and hold harmless the other from and against demands, damages, and expenses to the comparative extent they are caused by the negligent acts, omissions, or breach of contract of the indemnifying party or of those others for whom the indemnifying party is legally responsible. 6.2 To the extent that may be necessary to indemnify either of us under Section 6.1, you and we expressly waive, in favor of the other only, any immunity or exemption from liability that exists under any worker compensation law. Section 7: Miscellaneous Provisions 7.1 We will provide a certificate of insurance to you upon request. Any claim as an Additional Insured shall be limited to losses caused by our sole negligence. 7.2 This Agreement is our entire agreement, and it supersedes prior agreements. Only a writing signed by both of us making specific reference to the provision modified may modify it. 7.3 Neither of us will assign this Agreement without the written approval of the other. No other person has any rights under this Agreement. 7.4 A writing may terminate this Agreement. We will receive an equitable adjustment of our compensation if our work is terminated prior to completion as well as our fees and expenses on the basis agreed upon through the effective date of termination. 7.5 We will not discriminate against any employee or applicant for employment because of race, color, creed, national origin, sex, religion, age, genetic information, marital status, sexual orientation, gender identity, familial status, disability, status with regard to public assistance, membership or activity in a local human-rights commission, or status as a protected veteran. We will take affirmative action to ensure that applicants are considered, and employees are treated during their employment, without regard to those factors. Our actions will include, but are not limited to notifications, hiring, promotion or employment upgrading, demotion, transfer, recruitment or recruitment advertising, layoffs or terminations, rates of pay and other forms of compensation, and selection for training or apprenticeship. End of Standard Terms City of Farm ington 430 Third S treet F armington, Minnes o ta 651.280.6800 - F ax 651.280.6899 www.ci.farmingto n.mn.us TO:Water Board Memb ers , C ity Adminis trato r FROM:Kevin S cho rzman SUBJECT:Wireles s Internet Antennas DATE:May 23, 2016 INTRODUCTION The city has been approac hed b y a c o mp any that p ro vides wireless internet s ervic e via antennas lo cated o n water to wers and other tall s tructures within c ommunities . DISCUSSION The antennas that are us ed for wireless internet are s ub s tantially smaller in s ize than typ ical cell p hone antennas and they d o no t req uire as much ground s p ace (if any) at the base of the to wers. Currently, o ur city fee sc hed ule o utlines costs assoc iated with "Water To wer Communic atio n Devices". T hese costs were d eveloped b as ed o n cos ts for cell p hone antennas . The b o ard should dis c uss two items at the meeting: Do you want to expand the use o f the to wers to inc lude wireless internet p ro viders? If so, d o yo u want to maintain the c urrent c o s ts in the fee s ched ule regard les s of the type and s ize o f antenna, or d o yo u want to es tablish d ifferent fees fo r smaller, wireles s internet s ize antennas? Staff will provide ad d itional info rmation related to s ize and spac e requirements at the meeting. BUDGET IMPACT N/A ACTION REQUESTED Disc uss this item and p ro vide d irectio n to s taff on ho w you wo uld like to proc eed . City of Farm ington 430 Third S treet F armington, Minnes o ta 651.280.6800 - F ax 651.280.6899 www.ci.farmingto n.mn.us TO:Water Board Memb ers , C ity Adminis trato r FROM:Kevin S cho rzman SUBJECT:Ap p ro ve Bills -April 21 to May 18, 2016 DATE:May 23, 2016 INTRODUCTION Attac hed are the bills fro m April 21, 2016, through May 18, 2016. DISCUSSION N/A BUDGET IMPACT N/A ACTION REQUESTED Review, as k any q ues tio ns you may have, then ap p ro ve the bills. ATTACHMENTS: Type Desc rip tion Exhib it Bills -April 21 thro ugh May 18 5/18/2016CITY OF FARMINGTON 14:07:35R55CKS2LOGIS600V 1Page -Council Check SummaryNote: Payment amount may not reflect the actual amount due to data sequencing and/or data selection. 5/18/20164/21/2016 - Check #AmountDate Supplier / Explanation PO#Doc No Inv No BU Obj Sub Subledger Account Description BU Description Co Dept Div 135740 4/22/2016 110844 DAKOTA COUNTY FINANCIAL SRVS 06500 08627245.42 6502FEB CITY DIESEL FUEL CHRGS 145823 00020185 FEB'16 FUEL WATER UTILITY EXPENSE 45.42 135755 4/22/2016 100024 GOPHER STATE ONE-CALL INC 06500 086401144.27 6502MARCH UTILITY LOCATOR SRVS 145693 6030359 MARCH PROFESSIONAL SERVICES WATER UTILITY EXPENSE 144.27 135765 4/22/2016 100049 LOCAL GVMT INFO SYSTEMS ASSN. 06500 086402752.00 6502MAR UB SFTWR SUPPORT 145533 41666 MARCH'16 DATA PROCESSING WATER UTILITY EXPENSE 752.00 135779 4/22/2016 113031 NRG RELIABILITY SOLUTIONS LLC 06500 0864221,679.21 6502MARCH ELEC, MAINT FACILITY 145555 3347-1604 MAR'16 ELECTRIC WATER UTILITY EXPENSE 1,679.21 135794 4/22/2016 103228 SIMPLEXGRINNELL LP 06500 08640116.71 6502SPKLR TEST, INSPECT@ MAINT FAC 145705 78544421 / 934490 PROFESSIONAL SERVICES WATER UTILITY EXPENSE 06500 08640166.72 6502FA TEST, INSPECT @ MAINT FACIL 145709 78551190 / 934490 PROFESSIONAL SERVICES WATER UTILITY EXPENSE 83.43 135812 4/29/2016 103774 AMERICAN PUBLIC WORKS ASSOCIATION 06500 086460193.75 6502JUL'16-'17 APWA MEMB RENEW 145874 699682 JUL16-17 SUBSCRIPTIONS & DUES WATER UTILITY EXPENSE 193.75 135822 4/29/2016 100025 CINTAS CORP LOC 754 06500 08629020.96 6502UNIFORMS145743754578233 UNIFORMS & CLOTHING WATER UTILITY EXPENSE 20.96 135831 4/29/2016 109931 FACTORY MOTOR PARTS CO 06500 086230409.01 6502BRAKES FOR #0736 145878 1-4954888 VEHICLE SUPPLIES & PARTS WATER UTILITY EXPENSE 06500 08623051.82 6502OXY SENSOR, #0736 145879 1-4954794 VEHICLE SUPPLIES & PARTS WATER UTILITY EXPENSE 460.83 135845 4/29/2016 102725 MINNESOTA DEPT OF HEALTH 06500 08646023.00 6502MAY'16-'17 WTR SYST RENEW 146038 9086 BEN V 2016 CL C SUBSCRIPTIONS & DUES WATER UTILITY EXPENSE 23.00 135874 5/6/2016 100025 CINTAS CORP LOC 754 06500 08629020.96 6502uniforms145742754580809 UNIFORMS & CLOTHING WATER UTILITY EXPENSE 06500 08629020.96 6502WKLY UNIFRM SRVS, MAINT FAC 145930 754583432 UNIFORMS & CLOTHING WATER UTILITY EXPENSE 41.92 135886 5/6/2016 100007 HAWKINS INC 06500 08626019,763.80 6502WTR TWR CHEMICALS 145697 3865422 RI CHEMICALS WATER UTILITY EXPENSE 19,763.80 5/18/2016CITY OF FARMINGTON 14:07:35R55CKS2LOGIS600V 2Page -Council Check SummaryNote: Payment amount may not reflect the actual amount due to data sequencing and/or data selection. 5/18/20164/21/2016 - Check #AmountDate Supplier / Explanation PO#Doc No Inv No BU Obj Sub Subledger Account Description BU Description Co Dept Div 135890 5/6/2016 112268 LEICA GEOSYSTEMS INC 06500 0862207.83 6502GDZ69 PEN W / ALLEN BIT, CS10 145722 US 900723747 EQUIP SUPPLIES & PARTS WATER UTILITY EXPENSE 7.83 135894 5/6/2016 100070 MVTL- MINN VALLEY TESTING LABS 06500 08640148.75 65024/11 WATER TEST REPORT 145856 803594 PROFESSIONAL SERVICES WATER UTILITY EXPENSE 48.75 135898 5/6/2016 100093 PELLICCI HARDWARE & RENTAL 06500 08622013.90 6502hammer drill bit 145748 99206 EQUIP SUPPLIES & PARTS WATER UTILITY EXPENSE 06500 0862202.26 6502SCREWS, EQUIP SUPPLIES 145843 99186 EQUIP SUPPLIES & PARTS WATER UTILITY EXPENSE 06500 08622018.01 6502TACK HAMMER 145844 99144 EQUIP SUPPLIES & PARTS WATER UTILITY EXPENSE 06500 0862503.60 6502WALL HANGERS 145888 99570 OTHER SUPPLIES & PARTS WATER UTILITY EXPENSE 06500 0862206.07 6502HARDWARE TO HANG CAMERAS 146007 99653 EQUIP SUPPLIES & PARTS WATER UTILITY EXPENSE 06500 0862508.37 6502;PARTS, POLY PUMP WELL 4 146064 99596 OTHER SUPPLIES & PARTS WATER UTILITY EXPENSE 06500 0862506.99 6502STORAGE BOX 146066 99751 OTHER SUPPLIES & PARTS WATER UTILITY EXPENSE 06500 08624063.39 6502Enter Explanation 146090 4314 /F BUILDING SUPPLIES & PARTS WATER UTILITY EXPENSE 122.59 135903 5/6/2016 103228 SIMPLEXGRINNELL LP 06500 086401154.73 6502SRV ALARM SYST, CITY GARAGE 145845 82404206 PROFESSIONAL SERVICES WATER UTILITY EXPENSE 154.73 135907 5/6/2016 112307 T-MOBILE 06500 0862206.67 65023/17-4/16 GPS SRVS 146008 6517577560 MAR-APR16 EQUIP SUPPLIES & PARTS WATER UTILITY EXPENSE 6.67 135911 5/6/2016 113413 VERIZON WIRELESS 06500 08641289.73 6502MARCH WTR CELL PH SRVS 146118 9762961322 MAR-APR CELLULAR PHONES WATER UTILITY EXPENSE 89.73 135917 5/13/2016 112190 BARR ENGINEERING COMPANY 06500 0864011,371.00 6502WELLHEAD PROTECT PLAN 145774 23191278.00 - 5 PROFESSIONAL SERVICES WATER UTILITY EXPENSE 1,371.00 135926 5/13/2016 100058 CARQUEST AUTO PARTS 06500 08623021.22 6502SPARK PLG, OIL FOR MOWER 146274 2131-408257 VEHICLE SUPPLIES & PARTS WATER UTILITY EXPENSE 06500 08623030.00 6502TURN ROTORS ON VEHICLE 146289 2131-407039 VEHICLE SUPPLIES & PARTS WATER UTILITY EXPENSE 06500 08627417.28 6502MOTOR OIL 146290 2131-406859 LUBRICANTS & ADDITIVES WATER UTILITY EXPENSE 06500 0862203.22 6502COMPRESSOR OIL, MAINT FACIL 146314 2131-408497 EQUIP SUPPLIES & PARTS WATER UTILITY EXPENSE 71.72 135927 5/13/2016 100025 CINTAS CORP LOC 754 06500 08629020.96 6502WKLY UNIFRM SRVS, MAINT FACIL 146309 754588633 UNIFORMS & CLOTHING WATER UTILITY EXPENSE 20.96 5/18/2016CITY OF FARMINGTON 14:07:35R55CKS2LOGIS600V 3Page -Council Check SummaryNote: Payment amount may not reflect the actual amount due to data sequencing and/or data selection. 5/18/20164/21/2016 - Check #AmountDate Supplier / Explanation PO#Doc No Inv No BU Obj Sub Subledger Account Description BU Description Co Dept Div 135946 5/13/2016 114654 INVOICE CLOUD 06500 08654510.14 6502APR IC OBD TRANS FEES 146352 819-2016_4 APR PYMT PROCESSING FEES WATER UTILITY EXPENSE 10.14 135958 5/13/2016 113442 METERING & TECHNOLOGY SOLUTIONS 06500 08622015,450.00 6502METERS, REGISTERS, HORNS 145858 6128 EQUIP SUPPLIES & PARTS WATER UTILITY EXPENSE 15,450.00 135969 5/13/2016 100070 MVTL- MINN VALLEY TESTING LABS 06500 08640137.50 65024/16 WATER TEST REPORT 145857 804641 PROFESSIONAL SERVICES WATER UTILITY EXPENSE 37.50 135971 5/13/2016 110272 NORTHERN CONCEPTS 06500 086450112.05 6502MAILING SRVS- SUM'16 CNRG 146256 10841C OUTSIDE PRINTING WATER UTILITY EXPENSE 112.05 135973 5/13/2016 101254 ORKIN EXTERMINATING 06500 08640116.98 65024/22 PEST CTRL SRVS 146128 108326250 / 7200371 PROFESSIONAL SERVICES WATER UTILITY EXPENSE 16.98 135993 5/13/2016 109290 UNITED RENTALS (NORTH AMERICA) INC 06500 086470216.66 65024/08 SAFETY TRAINING, PUB WRKS 146170 136924650-001 TRAINING & SUBSISTANCE WATER UTILITY EXPENSE 06500 08647043.33 65025/06 EXCAVATION SAFETY CLASS 146172 137159177-001 TRAINING & SUBSISTANCE WATER UTILITY EXPENSE 259.99 135994 5/13/2016 102392 USI EDUCATION & GOVERNMENT SALES 06500 08621038.53 6502LAMINATING FLIM 146091 0379361 200015 OFFICE SUPPLIES WATER UTILITY EXPENSE 38.53 20160414 4/22/2016 111046 VOYAGER FLEET SYSTEMS INC 06500 0862722.10 6502MAR BLDG MAINT FUEL CHRG 146142 869088237613 MAR'16 FUEL WATER UTILITY EXPENSE 06500 086272202.29 6502MAR WTR DEPT FUEL CHRGS 146142 869088237613 MAR'16 FUEL WATER UTILITY EXPENSE 06500 086272.75-6502MAR FUEL REBATE ADJ 146142 869088237613 MAR'16 FUEL WATER UTILITY EXPENSE 06500 08627223.08-6502MAR FUEL REBATE ADJ 146142 869088237613 MAR'16 FUEL WATER UTILITY EXPENSE 180.56 20160419 4/28/2016 102160 CARDMEMBER SERVICES 06500 08647078.34 65023/30 VISA U OF MN CCE-APWA 146156 4798...1668 APR'16 VISA TRAINING & SUBSISTANCE WATER UTILITY EXPENSE 78.34 5/18/2016CITY OF FARMINGTON 14:07:35R55CKS2LOGIS600V 4Page -Council Check SummaryNote: Payment amount may not reflect the actual amount due to data sequencing and/or data selection. 5/18/20164/21/2016 - Check #AmountDate Supplier / Explanation PO#Doc No Inv No BU Obj Sub Subledger Account Description BU Description Co Dept Div Report Totals 41,286.66