1. CALL TO ORDER
The meeting was called to order by Mayor Larson at 7:00 p.m.
2. PLEDGE OF ALLEGIANCE
Mayor Larson led the audience and Council in the Pledge of Allegiance.
3.
ROLL CALL
Members Present:
Members Absent:
Also Present:
Audience:
Larson, May, Wilson
Donnelly, FogaJiy
Andrea Poehler, City Attorney; Peter Herlofsky, City
Administrator; Robin Roland, Finance Director; Brian Lindquist,
Police Chief; Randy Distad, Parks and Recreation Director; Kevin
Schorzman, City Engineer; Lisa Shadick, Administrative Services
Director; Brenda Wendlandt, Human Resources Director; Tony
Wippler, Assistant City Planner; Cynthia Muller, Executive
Assistant
Jerry & Denise Ristow, Cathy Bisser, William Stiles, Ed
Samuelson, David Pritzlaff
4. APPROVE A GENDA
City Administrator Herlofsky pulled the Executive Session as it has been rescheduled to
September 21,2009.
MOTION by Wilson, second by May to approve the Agenda. APIF, MOTION
CARRIED.
5. ANNOUNCEMENTS
a) Safe and Sober Campaign - lllob O'Brian
Mr. O'Brian is the Law Enforcement Liaison for the Department of Public Safety
and assists with administering the Safe and Sober Program. During the July speed
enforcement program Farmington was selected for a prize. The Police
Department chose two light bars for squad cars amounting to $3,000. The
purpose of the program is to inform residents and schools on safety. Police Chief
Lindquist presented Mr. O'Brian with a challenge coin for his law enforcement
work.
6. CITIZEN COMMENTS
Ms. Annette Kuyper, 20530 Dyers Pass, gave an update on the Farmington Warrior to
Citizen Campaign. This campaign started one year ago to support and recognize military
families. Due to their efforts, Farmington became the first Yellow Ribbon City and
Council Minutes (Regular)
September 8, 2009
Page 2
remains the only one in Minnesota. The committee is comprised of 22 people and
represents all areas ofthe community. There are also 140 volunteers who participate in
activities and provide service to military families. So far the campaign has assisted 30
military families. Upcoming events include a First Anniversary celebration on
September 22, Support Our Troops Haunted House October 9 and 10, and a community
training event on October 20. Ms. Kuyper thanked Council and community leaders for
supporting their mission. Mayor Larson thanked Ms. Kuyper and the committee for their
work.
Mr. David Pritzlaff, 20255 Akin Road, read a portion of the June 23, 2008, EDA minutes
regarding the Exchange Bank building status. At the time Mr. Pritzlaffwas frustrated
with the process in getting the building completed. He asked why the warranty deed is
part of the current lawsuit.
Regarding Dew Days and the shortfall of $25,000, Mr. Pritzlaff did not believe the City
should be paying the money. He noted putting it under the EDA was covering it up, as
residents want to know about it. One or two people making decisions over the past year
for Dew Days are going to be bailed out by the taxpayers of Farmington if the City pays
the $25,000 to pay the bills. Some people have been paid in full, so fees cannot be re-
negotiated and others have not been paid at all.
Mr. William Stiles, 421 Main Street, spoke regarding the seal coat assessment. He stated
the assessment is wrong and is no different than putting salt and sand on the streets or
sweeping the streets. He has been hit the last three years with assessments; one for
constructing Main Street, then CSAH 50. He wanted to submit his objection to the
assessment.
7. CONSENT AGENDA
MOTION by Wilson, second by May to approve the Consent Agenda as follows:
a) Approved Council Minutes (8/17/09 Regular) (8/24/09 Special) (8/26/09
Workshop)
b) Adopted RESOLUTION R34-09 Approving Participation in the Dakota County
Traffic Safety Group - Police Department
Councilmember Wilson was pleased Farmington is again participating in the
Traffic Safety Group. Anytime we can collaborate with other entities on DWI's,
warrants, etc. it is a good thing. Police Chief Lindquist explained what the Traffic
Safety Group does.
c) Received Information School and Conference - Police Department
Councilmember May reminded staff to include specific costs for conferences.
Police Chief Lindquist noted the costs were not available at the time, but will
provide them to Council.
d) Received Information School and Conference - Police Department
e) Approved Joint Powers Agreement with State of Minnesota - Municipal Services
f) Acknowledged Retirement Fire Department - Human Resources
g) Acknowledged Retirement Fire Department - Human Resources
h) Acknowledged Retirement Fire Department - Human Resources
Council Minutes (Regular)
September 8, 2009
Page 3
i) Approved School and Conference - Human Resources
j) Approved Appointment Recommendation Parks and Recreation - Human
Resources
k) Adopted RESOLUTION R35-09 Approving Distribution ofDCC Undesignated
Fund Balance - Finance
I) Approved School and Conference - Fire Department
m) Approved Temporary On-Sale Liquor License - Administration
n) Adopted RESOLUTION R36-09 Approving Gambling Event Permit-
Administration
0) Approved Bills
Councilmember May had previously asked about a bill for machinery and
equipment for $5400. Staff explained it was for smart boards for City Hall.
Finance Director Roland noted this was in the new City Hall budget. Human
Resources Director Wendlandt explained it is similar to a white board, where
notes can be made and sent directly to a printer. There are also many other uses.
Councilmember May asked to look at leases for the liquor stores in future budget
discussions.
APIF, MOTION CARRIED.
8. PUBLIC HEARINGS
a) Sealcoat Assessment Hearing - Engineering
The amount of the assessment is $127.43 per residential equivalent unit. The
estimated cost was $132.90. Councilmember Wilson stated Main Street was done
in 2004-2005 and asked about the seal coat following a project. City Engineer
Schorzman stated a seal coat is done three years after a project. Councilmember
Wilson recalled they had discussed exclusion of certain roads associated with
other construction. Staff clarified the discussion was to remove some of the
streets that will be in need of heavier maintenance and those streets were
removed. Councilmember Wilson asked if a seal coat done three years after a
project is included in the original project funding. Staff replied it is not as you
cannot assess for something that has not been done yet.
Councilmember May understood the cycle and recalled an earlier discussion was
to forego the assessment process and put this event in the budget. She asked
about the status of that. City Administrator Herlofsky stated that was part of a
discussion on how to handle seal coats in the future. There was the issue of
making it part of the general fund levy or as part of a utility franchise. No
decision was made by the Council to change anything. City Engineer Schorzman
has been working on that and will bring it to Council this fall during budget
discussions. Councilmember May felt it makes sense to not have the assessment
process due to the amount of paper and time involved. Councilmember May
noted it is clearly more money for those in the seal coat group this year than last
year. She had an issue with that. One of staff s proposals addresses that.
Councilmember May stated it is necessary to have a seal coat done and realizes
Main Street in particular really got hit hard.
Council Minutes (Regular)
September 8, 2009
Page 4
Mr. Stiles, 421 Main Street, stated he is a retired person with a limited income.
To be hit with assessments for three years, even though this is a small assessment,
it hits the pockets hard. They are paying out a large amount of money with
assessments. He felt seal coating should be part of the regular maintenance
program and not be assessed separately. He asked if the City will be assessing for
salting streets because the cost of salt has gone up. He asked if they will be
assessing for sweeping streets. Mayor Larson stated they are in the process of
changing the assessment process and they are going by the rules set by previous
Councils. Council realizes it is not fair this year compared to last year and they
are working on it.
Mr. Jerry Ristow, 516 Lower Heritage Way, stated he was on the Council when
they set these policies and procedures on seal coating. He wanted Mr. Stiles to be
aware there is a lot of tax exempt property that is not on the assessment rolls and
the residents are paying for that. Someone has to pay it. The City does not have
the money and these projects are necessary.
Mr. David Pritzlaff, 20255 Akin Road, asked why all of Akin Road was not done.
There are 10-11 properties north of 195th Street. Akin Road was turned back to
the City as one section and now it is done in two sections. He wondered if the
cost would have gone down if those other properties had been included. The big
part of the assessment is the grouping of people. There are not as many multi-
family units in this group. That is why this group is paying $50 more this year
than the last four years. City Engineer Schorzman stated the addition of the
properties north of 195th Street would have had little impact on the assessment as
many are single family residences. As far as why the line was drawn at 195th
Street, the road characteristic changes at 195th Street as far as the amount of traffic
and the type of traffic. Mr. Pritzlaff asked how the prices compare this year per
square foot to the last two years. The last two years oil prices were higher. City
Engineer Schorzman stated the price per square yard was 10% higher than last
year. Mr. Pritzlaff stated over the last four years the assessments were $75 - $80.
He asked how staff warrants he received $127 more property value for this
project. City Engineer Schorzman stated property values have been declining. It
is not always a measure of the increase in value, but the benefit is equal if it
reduces the amount of decline over similar properties that have not been seal
coated. Mr. Pritzlaffstated his property value did not go up $127. He agreed
they have to do maintenance, but for the past four years it has been $75-80 and
now this year the group will pay $50 more. Mayor Larson explained the seal coat
possibly kept his value from dropping $127. Councilmember May stated the
issue is that there is not enough multi-family units in this group and Akin Road is
a culprit of the formula because there are fewer homes and it has to be seal
coated. Councilmember Wilson understood prior to proposing a seal coat that an
analysis is done of the benefit to the affected properties. That is analyzed before
we receive the information every spring before we go out for bid. If we cannot
show value, then we cannot take action. Finance Director Roland stated we are
Council Minutes (Regular)
September 8, 2009
Page 5
not allowed to assess in excess of the value that is added to the property. We have
spoken with appraisers and they have indicated it is not only the increase in value
of the individual property, but the lack of loss of value to the property compared
to other properties. She noted if Mr. Pritzlaff is making a formal objection to his
assessment he needs to state that and it will be analyzed at a separate meeting.
Mr. Pritzlaff stated he received the notice last Tuesday and was working out of
town. On Friday City Hall was closed in the afternoon, therefore, he was unable
to talk to someone about the seal coat. When saying summer hours helps
residents, in this situation it did not help him. Finance Director Roland noted the
notice says he only needs to appear at this meeting. The statements were mailed
in the appropriate amount of time. Mr. Pritzlaff noted Council is looking at
changing the assessment process. If it was done on the wrong year where five of
the seven groups paid the assessment and it was changed a year later, that would
not be fair to the previous groups. It should be done after the seven years. Mr.
Pritzlaffwas not making a formal objection.
MOTION by Wilson, second by May to close the public hearing. APIF,
MOTION CARRIED. Councilmember Wilson noted this has been the most
challenging seal coat year. He noted Mr. Pritzlaff made a comment about
rebundling the mix. Councilmember Wilson noted anytime you change a policy
you are going to positively impact one group and negatively impact another. He
believed there is a tremendous value for the seal coat project. MOTION by
Wilson, second by May to adopt RESOLUTION R37-09 adopting the
assessment roll for the 2009 seal coat project. APIF, MOTION CARRIED.
b) Vacate Drainage and Utility Easement Parkview Ponds - Planning
Staff received a petition to vacate the rear portion of a drainage and utility
easement at 19790 Dover Drive, Lot 26 Block 2, of Parkview Ponds. When the
original drainage plan and final plat were approved for Parkview Ponds the
property contained a 25 ft. drainage easement on the rear of the property. The
three lots directly north had 30 ft. wide drainage and utility easements on the rear
of the lots for the purpose of a drainage swale. Due to the construction of Mystic
Meadows to the east as well as the construction of Diamond Path, the swale was
moved into the right-of-way of Diamond Path. Therefore, the necessity for that
wide of an easement is no longer there. The property owner is requesting 15 ft. of
the 25 ft. wide easement be vacated. This leaves a 10ft wide drainage and utility
easement which is the standard size.
Councilmember Wilson asked if it was necessary for a resident to petition for this
to be vacated as opposed to staff bringing this to Council. Assistant City Planner
Wippler stated it would be preferable to have a petition. City Attorney Poehler
stated it is not required, but it can come by petition or Council action.
Councilmember Wilson asked how we were made aware of this. Staff noted it
was through a petition. Mayor Larson asked if there was a fee for this and staff
replied the resident did pay a fee.
Council Minutes (Regular)
September 8, 2009
Page 6
Councilmember May asked why don't we vacate all of those easements. Staff
replied we probably should have. When we receive a future petition we will look
at that. Two of the three lots directly north are bank-owned and the other one is
owned by Keyland Homes. They are both vacant at this time. If a petition is
received in the future, staff will look at getting those easements reduced as well.
Councilmember May asked if we do not need a specific petition why don't we
just do it. Staff replied we needed a public hearing notice and it was only noticed
for this particular property. Councilmember May suggested staff put this on their
calendar as there is no reason for us to wait and it seems very evident we should
grant this.
Councilmember Wilson asked the amount of the fee. Staff replied it was $150-
$200. Councilmember Wilson and Mayor Larson had a difficult time with this.
Councilmember Wilson stated we are providing a benefit to four properties as a
result of this. It seems this could have been managed better. Staff noted the
developer did have an opportunity to revise the plat, but it never happened. City
Engineer Schorzman stated he asked these same questions. The information
indicated the reason these easements were put in place to begin with was that the
developer of Parkview Ponds was not confident that the developer of Mystic
Meadows would be on the same timetable. Instead of waiting for Diamond Path
to go in, they chose to plat these easements. Mystic Meadows moved quicker
than expected and they were able to move the easement out. To not slow down
the development of Parkview Ponds, they chose not to re-plat those lots with the
standard 10ft. easement and left it for this process to sort out.
Mr. Steve Duro, 19790 Dover Drive, stated the reason they asked for the vacation
was for planting purposes. They did not know how busy Diamond Path would be
and wanted to plant some trees in the back.
MOTION by Wilson, second by May to close the public hearing. APIF,
MOTION CARRIED. Councilmember May did not understand why they are
not doing all the lots. She was struggling with the fee which the City already
collected. Mayor Larson stated it was the developer's option to leave the
easement in. That is why it has to be vacated. City Engineer Schorzman stated
there are costs associated with the City doing this that could have been avoided
had the developer chosen to re-plat the easements versus leaving it for this
process. Councilmember Wilson stated based on that, it would seem there could
be work unfinished between the City and the developer with regard to this area.
He understood how this easement was created, but if there is a hardship created
by a developer in the platting of an area, it seems like there is some control
missing. City Engineer Schorzman stated it was a timing issue and the developer
of Parkview Ponds choice not to re-plat those because he wanted to move forward
with his development. Drainage easements of this size when necessary are not
uncommon. Councilmember Wilson stated Parkview Ponds and Mystic Meadow
were approved in 2005-2006 when there was a lot of rapid development. It would
seem that the Development Contracts would point out how easements are going to
Council Minutes (Regular)
September 8, 2009
Page 7
be identified on the plat and contingencies of roads. City Engineer Schorzman
stated the issue with the timing is that if Mystic Meadows would not have
happened and Diamond Path had been constructed on the timeframe it was
constructed, these easements would have been necessary to create a swale in that
area to handle the drainage until such time Diamond Path was constructed. From
the Parkview Ponds developer's standpoint it made sense to plat the lots even if
there was a chance the easements were not needed, depending on the timing of
Mystic Meadows. MOTION by Wilson, second by May to adopt
RESOLUTION R38-09 vacating 15 ft. of an existing 25-ft. wide drainage and
utility easement located on Lot 26, Block 2 of the Parkview Ponds plat. APIF,
MOTION CARRIED.
9. A WARD OF CONTRACT
a) Award Dushane Parkway Project - Engineering
Six bids were received for this project. The low bid was for $844,174.20 from
Ryan Contracting. When bids were reviewed that amount is beyond the funding
available for the project, therefore, staff is recommending the contract be awarded
based on the base bid minus section 5 of the base bid which means the contract
amount would be $697,329.20. The project is funded by an escrow that is being
held on the City's behalf.
Mayor Larson asked what was included in section five. City Engineer Schorzman
replied it includes streetscaping on the northeast quadrant of the Dushane
Parkway, Knutsen Drive intersection near McDonalds, as well as streetscaping in
the medians from CSAH 50 to Spruce Street.
Councilmember Wilson stated the amount is over the allowable amount in
escrow. Staff stated it is not over the amount in escrow, but you have to account
for potential change orders as well as engineering costs. We estimate those
percentages and then we arrive at a number for the actual construction cost
budget. The $844,000 was over that. Alternate 1 was the remainder of the
streetscape for the portion south of Knutsen Drive on the east and west sides of
Dushane. There is a trail along the Northern Natural Gas easement from CSAH
50 to Spruce Street. Alternate 2 was a connection from where it makes the turn to
the intersection of Denmark and CSAH 50. Staff is not recommending awarding
either of the alternates. Councilmember Wilson asked if any streetscaping will be
done at this time. City Engineer Schorzman stated the plan would be to tone
down the intensity of the streetscaping to a point where we would have sidewalks
similar to downtown with the pavers outlining the concrete versus exposed
aggregate walkways in the middle. The part of the project staff is asking Council
to approve includes the curb and gutter construction, roadway construction,
sanitary sewer and storm sewer construction, the second layer of the road already
in place, and the trails as proposed. Street lights are not included at this time.
Staff is recommending finishing this portion of the project, get a better handle on
the available funds and look at street lighting possibilities. The more standard
items included in the base bid for the utilities and the road work are very good
Council Minutes (Regular)
September 8, 2009
Page 8
prices. We have funds set aside and the longer we wait, the more potential there
is for higher prices. City Administrator Herlofsky stated if Council approves this
there would be pre-construction at the end of this week with construction starting
as soon as next week. Councilmember Wilson clarified we are having a segment
of paved road with no street lights. This was a concern to him. Staff noted there
are other areas of town without street lights and the amount of traffic would not
be adversely impacted by waiting until next year. Staff cannot recommend doing
both, because the project has to stay within budget to keep the City from spending
City funds to finish it.
Councilmember May asked if we are foregoing part of an original requirement for
the streetscaping. City Engineer Schorzman stated the streetscaping portion was
added by the developer after the Development Contract was approved. City
Administrator Herlofsky noted the developer is no longer part of this and staff
met with the property owner and his financial adviser to outline the current issue.
Mayor Larson asked when will the streetscaping, trails and street lights be
installed; when development occurs? City Engineer Schorzman stated the trails,
outside of alternate 2 which is the stub connection to Denmark and CSAH 50, will
be constructed as part of this from Pederson Drive near the county shop down
CSAH 50 to the gas easement, and tie into the trail system on Spruce Street. That
is included in the base bid. Mayor Larson asked about alternate 2. Staff will be
bringing options to Council in the near future. The reason staff is not
recommending the alternate is that the pipe required to be installed at that corner
is expensive. Mayor Larson asked what if we did not install any of the trails and
used the money for street lights and put the trails in later as development occurs.
City Engineer Schorzman stated that would save cost on the project. We would
have to change order that out of the existing project and re-bid the street lights
because they are part of alternate 1 which is not included in the resolution. Staff
estimated that is a $40,000 - $50,000 item. The bids for the street lighting were
five times that much.
Councilmember Wilson did not like voting no on this because we need the road to
go through. There seems to be a lot of uncertainties as to what we are actually
building. Council had to ask about section five. He did not know about the street
lights. He did not feel he was fully informed as to what we are doing. This is a
fair amount of money and a significant connection. He would like to have more
information for the September 21, Council meeting. This is a two week delay, but
we have been talking about this road for two years. Mayor Larson understood
there are missing pieces, but a two week delay could mean the project does not
get done this year because we are coming to the end of the construction season.
Councilmember Wilson stated we are talking about trails or no trails, street lights
or no street lights, change orders, and a basic road. He did not feel he knows
enough about what we are proposing to vote on it. Mayor Larson asked if we are
talking about a standard street minus the street lights. City Engineer Schorzman
stated the road as it was proposed is two lanes each direction, separated by a 9 ft.
Council Minutes (Regular)
September 8, 2009
Page 9
median. It is similar to the piece of road already in from CSAH 50 to Knutsen
Drive with the median in the middle. The look of that would be similar to
medians on CSAH 50. They would be capped with concrete. Section 5 included
4" concrete sidewalk, 4" concrete sidewalk with exposed aggregate, 4" concrete
sidewalk with integral color which is colored concrete originally planned to go in
the medians, tree grates, one monument sign, trees and an irrigation system. The
total for this section was $146,845. The price of the concrete for the exposed
aggregate as well as the colored concrete is double the cost of normal concrete.
The tree grates were $2,000/each and the plan was to have 18 trees in the median.
Putting this off will affect even the ability to get the wear course on the portion
already installed. The contractor has agreed to this and was low on the base bid,
even with section five removed from all the bids. Council needs to determine if
they want the road in this year, or wait and package a different contract and re-bid
in January or February. City Administrator Herlofsky noted the amenities look
very nice as long as there is someone there taking care of them. Without the
development there, there will be a gap where someone will have to take care of
what is there. Our staff is already stretched and it would be better to be done with
development. Mayor Larson stated the sidewalks will be constructed when
development occurs. City Administrator Herlofsky stated the sidewalks will be
in, it is just the trees. City Engineer Schorzman stated section five did include
some of the sidewalks. What we concluded was by removing section five, toning
down the exposed aggregate concrete, there will be money left to do a more
standard sidewalk like we have downtown. The intent would be to construct that
on the side of McDonald's. If funds are available after the construction of this,
we will have a better handle on the remaining money. City Engineer Schorzman
stated conduit will be placed in the boulevards so street lights can be placed
without disruption of this work.
Councilmember Wilson asked if we are looking at those other components being
covered through development and not money from the City being spent. That is
staff s recommendation, to do what we can with the funds available without
spending City funds. Councilmember Wilson asked for an explanation of the
current source of funds. Finance Director Roland replied the funds are in escrow
being held by Dougherty Funding. This escrow has been there for several years.
The City agreed to this escrow as part of the development agreement and its
addendums. After the Pederson's left the project, the escrow is there to ensure if
the developer were not able to build the road, that the City could do so. It is
different from a standard letter of credit because at the time Council agreed to the
development contract, the developer was not able to secure a letter of credit in
addition to their construction loan. They were able to put aside this amount of
escrow for any future work. The current escrow balance is approximately $1
million. However, staff has already spent funds for the engineering on this
project. The developer's engineers did the plans. The original engineer who had
done the work on the plans to begin with completed the plans and those were used
for the bids. Those plans have been paid for for that portion of the engineering.
There are other minor expenses, but the majority of the funding is remaining in
Council Minutes (Regular)
September 8, 2009
Page 10
the escrow. Councilmember Wilson confirmed going back to the original bid of
$844,174.20 when we factored in the 10% contingency and other components we
were pushing the point where we felt the City could be liable for overages that we
did not expose taxpayers to. That is why the project is being reduced to keep it
within the escrow balance and still allow for overages.
Mayor Larson asked how different this will look from the original plan. City
Engineer Schorzman stated as far as the streetscape design from 2005-2006, it
will look substantially different from that. You would see the sidewalk similar to
the downtown separated from the curb by a boulevard. He encouraged having
developers do plantings such as trees as part of the individual lot development
that would bring it more into a parkway look. However, we will not have the
trees down the middle, the different colors in the median, or the trellises, raised
planters, etc. Those items were included in alternate 1. Mayor Larson stated
those are things that cannot be added as development occurs. City Engineer
Schorzman stated if we do sidewalks in the manner we are describing, he would
not recommend that. Mayor Larson asked if it was just this stretch of street or
everything. Finance Director Roland stated historically when the original
development agreement was done, the idea at Vermillion River Crossings was
that all of the properties would be owned by one developer and they would be
rented or leased with land leases to the various businesses that would build on
those properties. Several years later and four development agreement addendums
later, the entire idea of the Vermillion River Crossings area has changed. The
developers have come and gone, the owner of the property is attempting to sell all
of the properties. As those are sold, individual development agreements will be
arrived at with individual developers. Instead of the unified vision for that project
which would have occurred with one developer leasing out all the properties, all
that streetscaping would have been terrific and there would have been someone to
take care of it. As we go forward the whole demeanor of the development has
changed and you could require during the course of development of those
individual properties that whatever amenities are put in by those developers, they
be consist with what is already existing in the public spaces. At the time the
development was originally envisioned, the streetscape items did not come into
the picture until six months after the original development agreement was signed.
They did not have a plan for it when they signed the original development
agreement. City Administrator Herlofsky stated the discussion today with the
developer is that they were originally planning to keep them as private streets and
they would plow them. Even the current streets there with the trees in the median
have fallen to the City for maintenance, not the project itself. Staff is working out
how the owner would hand over the streets to the City so we can plow them. The
whole concept of what they were going to do, and what very little the City would
do, has changed substantially. For us to put that in, would require the City to be
the maintenance person for that project. From a City perspective, this is a better
situation for us. Mayor Larson stated this information would have been really
handy to have in the beginning because that cleared it up. He was on the Planning
Commission and sat through the visioning sessions and all the changes and saw
Council Minutes (Regular)
September 8, 2009
Page 11
the final project. He had that in mind, not knowing all the information. City
Administrator Herlofsky stated the information only became available over the
last 2-3 days and staff was hoping to do everything with the money available.
Mayor Larson felt this was doable and as development occurs, we should keep a
close eye on it and get some of the amenities in as the project moves forward.
Councilmember Wilson stated a new issue was just identified he was not aware
of. We are talking about building roads with escrow dollars the City will be doing
the maintenance on thus incurring new expenses with the limited budget we
currently have. Finance Director Roland stated Dushane Parkway has always
been intended to be a public road which connected CSAH 50 to Spruce Street.
The private road is Knutsen Drive, which is the cross street south of CSAH 50.
The developer is in discussions with staff to turn it over to the City as a public
road. The City has been plowing it and charging it back to the developer because
they have ask ed staff to plow the road. Once the plow is out there, it is not a
significant ex pense to add on those two streets. Weare not talking about a
significant increase in maintenance dollars. There were roads in this development
that were envisioned as private roads that would be maintained by the developer
in the form of an association and that is not coming to fruition. The estimate for
plowing is included in the maintenance budget for 2010. It is not specifically
identified in the budget. Councilmember Wilson was concerned we will have a
road that does not fully meet City standards to be maintained and other issues will
come along that will require taxpayers to put in street lights, etc.
Councilmember May stated we received a very abbreviated summary and it
would have been nice to have a drawing. She felt we should move forward and
use the funds now while we have a decent bid.
Mr. David Pritzlaff, 20255 Akin Road, stated he sat through this while on the
Council for four years. He asked how different this road will be from Spruce
Street for which we had a $900,000 grant plus $1.1 million to extend Spruce Street
out with a bridge. Taxpayers paid for a nice looking road and streets cape on
Spruce Street only to make a turn onto another road and make it less attractive.
Why not build it compatible with Spruce Street where we have already invested
money and as far as the lights and the trees, we could do without those for now.
We could have done without the lights turned on for the last four years on Spruce
Street and saved a lot of money. We could save money by delaying the lights as
we have enough on Spruce Street. He asked how much different the road will be
when turning off Spruce Street. Mayor Larson stated it will be the same width
and design without some amenities. City Engineer Schorzman stated the
sidewalks will look similar to the sidewalks along Spruce Street without the trees
in the boulevard. The median will look totally different. It will look similar to
CSAH 50. The median is created by two curbs, back to back, with a cap of
concrete between them.
Council Minutes (Regular)
September 8, 2009
Page 12
MOTION by May, second by Wilson to adopt RESOLUTION R39-09 awarding
the bid to Ryan Contracting minus section 5. APIF, MOTION CARRIED.
10. PETITIONS, REQUESTS AND COMMUNICATIONS
a) Old City Hall Parking Lot - Administration
Paving the parking lot and alleys around the old City Hall was brought up at the
August 17, 2009 Council meeting. Council had asked about the available funding
sources. Staff received a low bid from Bituminous Roadways for $61,175. Staff
has determined $22,000 of that cost could be covered by the road and bridge fund
and the remaining $39,000 would have to come from other sources.
Councilmembers May and Wilson would not support more funding at this time.
Mayor Larson understood the parking lot needs to be redone, but wanted to wait
another year and suggested including it with the Walnut Street project.
b) Approve Agreements Room Naming Rights Rambling River Center - Parks
and Recreation
As a fundraiser to cover construction costs for the new Rambling River Center,
the committee has offered room naming rights to the public. The prices range
from $50,000 to name the entire building to $1,500 for a small conference room.
Four parties have agreed to commit money to the project in exchange for room
naming rights. Those parties include:
Empire Township contributed $10,000 spread out over four years; $2500 per year
to name the former classroom as the Empire Room.
The McKnight family has agreed to contribute $5,000 in payments of $2,000 in
2009, $1,000 in 2010, $1,000 in 2011, $1,000 in 2012. The family would like to
name the fitness room in memory of their parents - Jack & Bev McKnight Fitness
Center.
Charlie and Joanne Weber have agreed to contribute $1,500 spread out over three
years; $500 each year in 2009 - 2011 for naming a small conference room the
Weber Room.
Jerry Ristow has agreed to contribute $3,000 upfront to rename the organ/library
room the Jerry Ristow Library.
This will contribute $19,500 towards the project. So far the committee has raised
$37,000. Parks and Recreation Director Distad commended the Fund Raising
Committee and Missie Kohlbeck, Senior Center Coordinator. Ms. Kohlbeck
informed Council of upcoming fundraising events. DMC cards will be in this
week, the Sons of the American Legion and the American Legion will donate
proceeds from the September 13 omelet breakfast to the fundraising project, on
September 19 there will be a garage sale at the Rambling River Center, and there
will be a Belgian waffle breakfast at the new location on October 25.
Council Minutes (Regular)
September 8, 2009
Page 13
Councilmember May noted the spreadsheet shows a balance from previous fund
raising events at over $10,000 and asked ifthis has been accumulating in a
designated account. Staff explained that has been in an account and used to buy
some capital items for the Rambling River Center rather than using tax dollars.
The goal was to spend the money on flooring in the existing building.
Mr. Jerry Ristow stated it is a great place and Missie Kohlbeck and the volunteers
should be commended for their work. It says a lot about our community for the
seniors. It will show our heritage and he appreciated all the people that have
worked hard on this project. He hoped Council and staff continues to work with
these people. Parks and Recreation Director Distad stated the open house will be
October 19 with a ribbon cutting. MOTION by Wilson, second by May to
approve agreements with Empire Township, the McKnight family, Jerry Ristow
and Charlie and Joanne Weber for the naming rights to certain rooms in the new
Rambling River Center building. APIF, MOTION CARRIED.
11. UNFINISHED BUSINESS
a) Twitter Update - Human Resources
Human Resources Director Wendlandt stated as they were looking at Twitter and
Facebook, staff found a new product, Nixie. This is specific to public agencies.
There is no spam, no advertising, and messages can be sent to residents that are
specific to Farmington. Police Chief Lindquist demonstrated how Nixie works.
Staff would like to put a link on the City's website directly to Nixie. Once in the
link, residents can register to be a Nixie user. Nixie will verify your location by
your primary address. This service is also available to schools. This site is very
secure and it is a one-way communication, responses cannot be sent. The Police
Department has been set up and staff will be working on setting up the Fire
Department and the City accounts. Next staff will begin telling residents to
subscribe.
b) CEEF Events - Administration
As a way of trying to resolve the financial issue with Dew Days, City
Administrator Herlofsky recommended if there is agreement by the Council that
CEEF is to continue, the best option would be to provide a loan to CEEF. Staff
would meet with the CEEF Board to develop a repayment plan. If CEEF were to
no longer exist, we would have a more serious issue as to who would be
responsible for the debt. There is approximately $25,000 in bills by local
businesses yet to be paid. There are many community activities tied to CEEF
where revenue can be generated during the year. If Council wants to continue
these events, staff needs to start planning for next year's Dew Days as well as
other CEEF events. The most reasonable outcome is for CEEF to continue and in
order for them to continue, we need to pay some bills and work out a payment
plan to repay the City.
Council Minutes (Regular)
September 8, 2009
Page 14
Mayor Larson liked the loan idea better than the grant. He believed Dew Days is
an important activity for the City and would like to see it continue with some
management. Councilmember Wilson asked if we have a current list of debts
owed. City Administrator Herlofsky noted the list Council was given is
substantially what they are looking at.
City Administrator Herlofsky asked for authorization to write a check to CEEF
for approximately $25,000. Staffwill obtain an accurate amount based on
information from the treasurer and monitor it. A re-payment plan will be
prepared. Mayor Larson asked about Empire Township. Staff noted Empire is
still willing to give 10% and staff will continue talking with the other townships.
Councilmember Wilson asked about the source of money. Finance Director
Roland replied there is an escrow account the City would provide the loan from
and it would be repaid through that account. -
Councilmember May stated with due respect to everyone who has done a lot of
work for Dew Days and all those involved with CEEF, she was not convinced
Council has statutory authorization to either give or loan CEEF money. She noted
City Attorney Jamnik had stated we need to contract for services and mentioned
there is statutory authorization. She questioned why he is concluding that fact.
CEEF is a separate entity. There is some mixed use of the word "official
representation." Although the Mayor and City Administrator Herlofsky are on the
board, they do not officially represent the City. They are just members on the
CEEF Board. The City Council is not taking a vote and making decisions and
going back to the CEEF Board. She had a hard time saying the taxpayers are
supposed to foot the bill for an independent 501 c3 organization. She noted staff
mentioned if CEEF is to continue, so we are almost making two decisions. If we
grant the loan, how do we know what future commitment they will have? How
does this impact the budget? We have already contributed about $10,000 in
services to Dew Days. From a taxpayer's viewpoint, there is a precedent set if we
do move forward with a vote. From a legal viewpoint, she did not think Council
was able to do that. Administrative Services Director Shadick noted during the
annual organizational matters, a Councilmember is appointed to represent the City
on the CEEF Board. As far as a Councilmember or a staff person, we do
represent the City. Councilmember May asked if that holds the City legally liable
for activities involved in that organization. If there are other City employees that
are members of other organizations, voting members, does that also hold the City
liable for any loses they may have? City Attorney Poehler replied no. Council
needs to look at whether they want to participate in this situation as a City. For
certain purposes the City would have the ability to provide the necessary funding.
It depends on what the funding is for. This is a recreational situation and there is
statutory support for recreational activities. Councilmember May clarified
because this is a recreational activity we are able to donate or loan money.
Council Minutes (Regular)
September 8, 2009
Page 15
City Administrator Herlofsky stated no one is happy with the situation. We are
looking for the best way to move on. There are a number of local vendors who in
good faith provided services and there is a cost associated with that. The City has
contributed in many ways to help this Dew Days activity. If it will continue, there
will have to be more coordination by the City.
Mr. David Pritzlaff, 20255 Akin Road, stated during his four years on the
Council, he participated in Dew Days. To keep it going is crucial to the City. A
loan would be better than bailing them out. Unfortunately, in the last two years,
there were one or two people making bad decisions on locations and money spent
on locations and electrical services. If the bills were to be paid for with City
dollars he would not stand for it, because we are bailing out a couple people who
made some bad decisions. A lot of people volunteered and he commended them
for their hard work. If it is a loan, what is the interest rate as $25,000 in the bank
would be drawing interest? Mayor Larson stated that will be part of the
negotiations. Mr. Pritzlaff stated if this happens and there was representation by
the Mayor, he was not part of the decision to have it at the Fairgrounds. Board
members did not have a say to have it at the Fairgrounds. It is not in the City. It
could be an economic tool if the event was held in the City. Before we bail them
out, wouldn't it be prudent to figure out who will be running this. He did not
think the City should take this on. It should be business people or other
volunteers that want to make up a group. Mayor Larson noted that is being
worked out.
Mayor Larson asked what was worked out at the last meeting as to who was going
to oversee certain events. City Administrator Herlofsky stated a coordinator from
either the City or the school has been assigned to various events. Staff was
looking to get the debt situation resolved so they can move forward. If the debt
situation is not taken care of, he was not sure what the CEEF position would be.
MOTION by Larson that the City loan CEEF not more than $25,000, determine
the exact amount, determine the townships portion, negotiate the interest rate and
payment schedule with CEEF. MOTION FAILED for lack of a second. This
will be brought back to the next CEEF meeting.
12. NEW BUSINESS
a) Adopt Resolution - 2010 Preliminary Tax Levy and Budget - Administration
The tax levy needs to be certified to the county by September 15, 2009. Once
adopted, the City Council may lower it in December, but it cannot increase it.
The preliminary levy is $9,787,532. Thisis $474,117 or 5% over the 2009 levy
of$9,313,415. Although the Council levied $9.3 million, the City will actually
receive in 2009, $8.9 million as we will not be receiving $300,000 from the State
for market value homestead credit. The proposed levy for 2010 includes $2.09
million for debt service and the required contribution for the relief association of
$195,584. In addition, this levy provides for the levy back of lost 2008 and 2009
market value homestead credit (MVHC) which is allowed under the levy limit law
Council Minutes (Regular)
September 8, 2009
Page 16
revision for 2010. That $350,000 is comprised of the $173,000 we did not receive
at the end of December and half of what we will not receive in 2009. Finance
Director Roland compared the 2009 levy with the 2010 levy. There is a 5%
increase to the 2010 levy over the 2009 adopted levy of $9.3 million. Finance
Director Roland then explained the net tax capacity. 2008 was the last year it was
increased. 2010 shows a decline of approximately 8%. Regarding property taxes,
in 2009 the property taxes on an average home went down $21 to $1,044. This is
before any impact ofMVHC. In 2010, the proposed levy would show an increase
to an average home valued at $212,000 of$I,071 in taxes, or a $27 increase over
the 2009 taxes. The 2010 preliminary levy supports Council's commitment to the
Rambling River Center renovations, Rambling River Center operations increase,
2010 elections, LELS contract salaries and benefits increase, required Fire Relief
contribution increase, full year of the School Resources Officer, replacement
patrol officer for an SRO promotion, and a statutory PERA rate increase. The
other budgets supported by the levy show 0% increases in other categories. There
are no other staffing requests, no new positions, no lay-offs, no furloughs, no
additional capital outlay other than the $54,000 for two replacement squad cars.
This delays over $500,000 worth of capital outlay items and is the second year for
this delay. The pool continues with a transfer of liquor store profits, however, any
structural improvements for the pool and the arena are postponed to a later year.
The property tax levy results in a tax capacity rate of 50.44%, up from 44.16%.
The tax rate is a combination of the tax rate going up and the valuations going
down. The proposed 2010 preliminary levy is under the City's levy limit by
$343,000.
Truth-in-taxation hearings are no longer required. Notices will be sent in early
November comparing the taxes between the two years from the levy amount set
tonight. Council is required to offer a date for a public comment period during
the discussion of the tax levy and the budget between November 25 and
December 26. The final levy and budget could be adopted at the same meeting;
however, staff is recommending holding the public comment period at the first
meeting in December and adopting the final levy and budget at the second
meeting in December.
Councilmember May was concerned as there were only three Councilmembers
present and at the budget workshop she made it clear she did not support this tax
rate. She was concerned with preliminarily supporting a number knowing she
will not support it later. She came with the intention of voting no, but understood
this is a process. She wanted to make it clear she is struggling with this tax rate.
She felt we need to focus on the real essentials such as Police, Fire, roads, snow
removal, trash, clean water; the real basics. These are unprecedented times and it
is difficult for a lot of homeowners. She proposed to look at salary freezes and
staff reductions as it has been stated labor is 80% of the budget. She will be
bringing these up at future budget discussions. This tax rate increase is in
addition to the utility franchise fee. Finance Director Roland stated we did not
talk about the franchise fee at the previous meeting. We discussed the street light
Council Minutes (Regular)
September 8, 2009
Page 17
utility. Staff has segregated the cost of the City's street lights for 2010 to go into
a separate utility, similar to water, sewer and storm water. The cost would be
$2/monthlutility account. This would include the non-taxable properties within
the City to pay for the cost of street lights. Currently, for a house valued at
$221,000 the cost for street lights alone is $20/year. With the utility fee they
would pay $24. Non-taxable properties would pay for street lights. Higher
valued homes and commercial/industrial properties would pay a lower price
because their taxes are higher than the $24 collected by the utility bill. So there is
an additional fee for a street light utility, however in an attempt to even the field,
it will include exempt properties and lower the cost to commerciallindustrial
properties. Regarding franchise fees, staff is still in negotiations with the gas and
electric companies. Staff will be bringing scenarios to Council to show what type
of revenues we could receive and what they might pay for. At this point, it does
not impact this tax levy. If Council does not do franchise fees, but wanted to
include the cost of seal coating as a tax levy, we would need to add between
$350,000 - $500,000 to the tax levy to encompass the entire cost of the seal
coating and make the assessment go away. In doing so, Council would relieve the
tax burden from the exempt properties. They would no longer have to pay for the
seal coating improvements as part of an assessment because they would not be
paying taxes to pay for the seal coating.
Councilmember May did not have a problem with that as a church gets their
money from the residents. Whether it is exempt or not does not carry as much
weight.
Councilmember Wilson did not support the current budget. In previous years it
has been difficult for Council to agree on priorities as a group. He did not want to
take advantage ofthe decrease in property values and capture additional taxes
from declining properties. He was looking at a reduction of $225,000 from this
current budget which would have a slight reduction in the tax rate amount from
50% to 49.26%. For the average value property of$212,000, their property taxes
in 2009 were $1,044 and would be $1,045 for 2010. He felt that was more than
fair. Council needed to look at whether to retain staff or release staff. He would
prefer to retain staff and look at a furlough option as well as other options where
reducing $225,000 would not be painful. Council should discuss what services
they want to prioritize. He would never cut services to the Police and Fire
departments. He will not support this budget at the end, but realized there will be
further discussions, so would support it tonight. He suggested if there is a
workshop the second Monday in October to have a Town Hall meeting and invite
residents to give us their thoughts on the budget, then have a budget workshop
after that. He asked if staff was working with Ehlers to examine the debt services
and find ways to re-finance, package or reduce it. Finance Director Roland stated
she will be meeting with them to discuss re-structuring the lease revenue bonds
for the Police Station and Central Maintenance Facility. This will reduce the debt
service required over the remainder of the loan.
Council Minutes (Regular)
September 8, 2009
Page 18
Mayor Larson stated he would support this preliminary levy as a worst case
scenario. He is concerned with what else the State could take from us. By no
means are we done with this. Finance Director Roland noted staff is already
working on ideas to put forward at the first budget workshop regarding what
services cost.
Mr. David Pritzlaff, 20255 Akin Road, felt sorry for the Council because a month
ago he looked at the attendance of the Council and we were at 50% attendance for
all the meetings. Tonight will drop it to 50% if not lower. That is the importance
of having a full Council. This is an important meeting. There are a couple
Councilmembers not here, but for the ones that are here it is their duty to take the
action in front of them. He challenged the Council to set a levy amount tonight
that they will support in December and have staff and Council make the cuts. No
service reduction should be taking place. Furloughs, lay-offs, consolidation of
staff and positions. This year we have not filled some vacant positions and last
year eliminated a position. This year we are not recommending any staff
reductions. In this economy we would be the only one in the State proposing no
staff reductions. Mayor Larson reminded him this is preliminary. Mr. Pritzlaff
challenged the Council to set a levy amount tonight they will support in
December. He noted this year we are not doing anything with positions. His
taxes will go up just under $100. He is already paying $127 for the seal coat
project. Based on the street light utility fee, the City will get more revenue and
still is not cutting.
Finance Director Roland read Council's strategic plan and one thing that stood out
was a statement that City staff does not have a lot of free time. We run very lean
and we are all busy. From the workshop there was a large amount of items we put
on the back burner because of reduced hours this summer. We reduced the
amount of pay and the amount we were counting on. We are not real flush with
people. We have taken the cuts in the past, not that we cannot look at them or talk
about them, but we have a good staff and they work really hard. It is them who
make the budget cuts work. It is the line staff and the cops and the fire fighters.
We have done the cuts in the past; we will look at them again and at
consolidations. The existing staff really works hard to make this budget work
whether it is at the levy now or the levy set in December.
Councilmember Wilson thanked Mr. Pritzlaff and agreed with his comments.
When he saw there was 3/5 of the Council here, he could have proposed a
$225,000 reduction in the levy and it might pass. In October he will not be at two
meetings and will give the rest of Council the benefit of the doubt. He will not
take advantage of these circumstances to take a sneak attack to get the levy his
way. That is not a team approach. Mr. Pritzlaffwas not asking to take cheap
shots at the rest of Council. This is an important meeting and priorities have to be
changed. He challenged them to pass tonight what they will support in
December.
Council Minutes (Regular)
September 8, 2009
Page 19
Councilmember May also appreciated Mr. Pritzlaffs comments. If she says she
will not support the number later, how does she know how the rest will vote later.
By supporting it now, she could be supporting it later.
Councilmember Wilson stated the previous years we have not done a good job of
saying this is the preliminary budget. It becomes the final budget. Over the next
couple months he wanted Council to look at the priorities. He was looking out for
the taxpayers and they need a break. He trusted the process that the majority will
see it that way. Councilmember May asked what if Council does not adopt this.
Finance Director Roland stated we are frozen at the 2009 level of $9.3 million
less the MVHC and we would have to operate on that in 2010; a levy of$8.9
million. City Administrator Herlofsky stated the amount suggested now provides
for options later. We do not know what will happen between now and the end of
the year with the State. This is to give a benchmark to work from.
Mayor Larson stated Councilmember Wilson's comment to reduce it by $225,000
is not unreasonable. It is something we need to work at in the next couple
months. This is the preliminary levy and by no means are we done working with
this.
MOTION by May second by Wilson to adopt RESOLUTION R40-09 certifying
the 2010 preliminary levy to Dakota County and authorizing staff to notify
Dakota County of the December 7,2009 Council meeting at which the budget and
levy will be discussed. APIF, MOTION CARRIED.
13. COUNCIL ROUNDTABLE
a) Council Workshop Schedule - Administration
Councilmember Wilson suggested setting October 12 with a Town Hall meeting
from 5:30 - 7:00 and the budget workshop at 7:00 p.m. Council agreed to set
October 12, November 8, and December 14 as budget workshops and contact
Council for other dates. Councilmembers stressed it is very important for all of
Council to be there. Mayor Larson asked about the number of workshops needed.
Councilmember Wilson felt the members present agree to reduce the budget by
$225,000. If the majority of Council wishes to do that and come to priorities it
should not be difficult.
Co unci/member Wi/son: Wished all the kids a good first day back to school. He
attended the Riverview Open House and they did a nice job converting the building.
City Administrator Herlofsky:
22, from 3 :30 - 5 :00 p.m.
Twin Ponds will have an open house on September
The ice arena issue is not totally resolved. Additional issues were found and staff hopes
to have them resolved by the end of the week. This could become a budget issue.
Council Minutes (Regular)
September 8, 2009
Page 20
Mayor Larson: He encouraged residents to visit the local liquor store for
events. He also encouraged residents to support the local Farmington businesses
whenever possible. If we want to grow the commercial and retail sector it is important
we support what we do have.
School is open so remember the school bus laws.
The DCC is setting up a mass telephone communication system called Code Red. He
asked the City to place a link on the website.
The Dakota County Technical College is having their summer fest September 12,2009.
14. ADJOURN
MOTION by Wilson, second by May to adjourn at 10:23 p.m. APIF, MOTION
CARRIED.