Loading...
HomeMy WebLinkAbout02.17.26 Council Packet, amended 2.16 Meeting Location: Farmington City Hall, Council Chambers 430 Third Street Farmington, MN 55024 CITY COUNCIL REGULAR MEETING AGENDA Tuesday, February 17, 2026 7:00 PM Page 1. CALL TO ORDER 7:00 P.M. 2. PLEDGE OF ALLEGIANCE 3. ROLL CALL 4. APPROVE AGENDA 5. ANNOUNCEMENTS / COMMENDATIONS 5.1. Swearing In of Fire Department Personnel Conduct the Oaths of Office and Badge Pinning Ceremony for Firefighters Tyler Beaune, Matthew Jahns, and Katelynn Scholl, Fire Captains Matthew Dinneen, Brian Hanson, and Steven Karsten, and Deputy Fire Chief Caleb Bolton. Agenda Item: Swearing in of Fire Department Personnel - Pdf 4 5.2. Recognition of Mayor Joshua Hoyt's City of Farmington Service Please take this time to recognize Mayor Joshua Hoyt's contributions to the City of Farmington. Agenda Item: Recognition of Mayor Joshua Hoyt's Contributions to The City of Farmington - Pdf 5 6. CITIZENS COMMENTS / RESPONSES TO COMMENTS (This time is reserved for citizen comments regarding non-agenda items. No official action can be taken on these items. Speakers are limited to five minutes to address the city council during citizen comment time.) 7. CONSENT AGENDA 7.1. Downtown Liquor Store Lease Renewal Agenda Item: Downtown Liquor Store Lease Renewal - Pdf 6 - 32 7.2. Mayor Joshua Hoyt's Resignation 33 - 35 Page 1 of 276 Agenda Item: Mayor Joshua Hoyt's Resignation - Pdf 7.3. Minutes of the February 2, 2026 Council Work Session Agenda Item: Minutes of the February 2, 2026 Council Work Session - Pdf 36 - 56 7.4. Payment of Claims Agenda Item: Payment of Claims - Pdf 57 - 58 Payment of Claims 2026-02-17 City Claims - Council Detail 59 - 64 7.5. Updated Capital Asset Policy Agenda Item: Updated Capital Asset Policy - Pdf 65 - 84 7.6. Assistant City Administrator Job Description Update Agenda Item: Assistant City Administrator Job Description Update - Pdf 85 - 87 7.7. Staff Approvals & Recommendations Agenda Item: Staff Approvals & Recommendations - Pdf 88 7.8. Agreement with Cool Air Mechanical, Inc. for Relief Valve Replacement at Schmitz-Maki Arena Agenda Item: Agreement with Cool Air Mechanical, Inc. for Relief Valve Replacement at Schmitz-Maki Arena - Pdf 89 - 97 7.9. Donation from Happy Harry’s Furniture to the Rambling River Center Agenda Item: Donation from Happy Harry’s Furniture to the Rambling River Center - Pdf 98 - 99 7.10. First Amendment to Joint Powers Agreement with Dakota County for Communities for All Initiative Funding Agenda Item: First Amendment to Joint Powers Agreement with Dakota County for Communities for All Initiative Funding - Pdf 100 - 108 7.11. Professional Services Agreement with WSB for Staff Augmentation Agenda Item: Professional Services Agreement with WSB for Staff Augmentation - Pdf 109 - 121 7.12. Professional Services Agreement with WSB for a Storm Water Asset Management Program Agenda Item: Professional Services Agreement with WSB for a Storm Water Asset Management Program - Pdf 122 - 135 7.13. Receive Bids and Award a Contract for the Devonshire Ave. & 206th Street Pond Maintenance Agenda Item: Receive Bids and Award a Contract for the Devonshire Ave. & 206th Street Pond Maintenance - Pdf 136 - 139 8. PUBLIC HEARINGS 9. AWARD OF CONTRACT Page 2 of 276 10. PETITIONS, REQUESTS AND COMMUNICATIONS 10.1. Resolution 2026-010 Approving the Final Plat - Dakota Meadows Preserve 2nd Addition; and Development Contract - Dakota Meadows Preserve 2nd Addition By separate motion, approve the following actions: A. Adopt Resolution 2026-010 Approving and Authorizing the Signing of the Dakota Meadows Preserve 2nd Addition Final Plat, contingent upon the following: 1. The satisfaction of all engineering comments related to the construction plans for grading and utilities. 2. A Development Contract between the Developer and City of Farmington shall be executed and security fees and costs shall be paid. Submission of all other documents required under the Development Contract shall be required. B. Adopt the attached Development Contract and authorize its execution. Agenda Item: 1. Resolution 2026-010 Approving the Final Plat - Dakota Meadows Preserve 2nd Addition2. Review and Approve Development Contract - Dakko - Pdf 140 - 199 11. UNFINISHED BUSINESS 12. NEW BUSINESS 12.1. Professional Services Agreement with WSB, LLC for the 2026 Street Improvements Approve the Professional Services Agreement with WSB, LLC for the 2026 Street Improvements Final Design and Bidding Agenda Item: Professional Services Agreement with WSB, LLC for the 2026 Street Improvements - Pdf 200 - 276 13. CITY COUNCIL ROUNDTABLE 14. ADJOURN Page 3 of 276 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: Matt Price, Fire Chief Department: Fire Subject: Swearing In of Fire Department Personnel Meeting: Regular Council - Feb 17 2026 INTRODUCTION: Conducting the Oaths of Office and Badge Pinning for our six full-time Fire employees and Deputy Fire Chief. DISCUSSION: Oaths of Office and Badge Pinning for the six full-time Fire employees and the Deputy Fire Chief. The three Firefighters are: Tyler Beaune Matthew Jahns Katelynn Scholl The three Fire Captains are: Matthew Dinneen Brian Hanson Steven Karsten The Deputy Fire Chief is: Caleb Bolton The Oath of Office will be administered by Fire Chief Matthew Price. ACTION REQUESTED: Conduct the Oaths of Office and Badge Pinning Ceremony for Firefighters Tyler Beaune, Matthew Jahns, and Katelynn Scholl, Fire Captains Matthew Dinneen, Brian Hanson, and Steven Karsten, and Deputy Fire Chief Caleb Bolton. Page 4 of 276 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: Lynn Gorski, City Administrator Department: Administration Subject: Recognition of Mayor Joshua Hoyt's City of Farmington Service Meeting: Regular Council - Feb 17 2026 DISCUSSION: Joshua Hoyt was elected to the Farmington City Council as a write-in candidate and served from January 2019 through December 2020. In January 2021, he was sworn in as Mayor of the City of Farmington and served in that role from January 2021 through February 4, 2026. ACTION REQUESTED: Please take this time to recognize Mayor Joshua Hoyt's contributions to the City of Farmington. Page 5 of 276 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: David Chanski, Asst City Admin/HR Director Department: Administration Subject: Downtown Liquor Store Lease Renewal Meeting: Regular Council - Feb 17 2026 INTRODUCTION: The initial term for the Downtown Liquor Store lease is set to expire on August 31, 2026. Per the terms of the lease, the City has two 5-year renewal options it may execute by written notice to the landlord not less than 180 days prior to the expiration of the term, which is March 1, 2026. DISCUSSION: The lease for the Downtown Liquor Store was originally approved on March 15, 2021 and then went into effect on June 1 of that year for a period of 63 months. As such, the initial term of the lease is set to expire on August 31, 2026. Per the terms of the lease, the City has two 5-year renewal options with the same terms as the initial lease except that "the Base Rent shall increase annually at the greater of 3.0% or the Consumer Price Index (CPI) from the prior year throughout the Renewal Term(s)." Staff believes that these terms are very favorable and that the first 5-year renewal term should be executed. Per the terms of the lease, the City has no less than 180 days prior to the expiration of the lease term to notify the landlord in writing of our intent to execute the renewal term. That deadline is March 1st. BUDGET IMPACT: Lease fees are included in the 2026 Budget. ACTION REQUESTED: Authorize Staff to notify Legacy Investment Group, landlord for the Downtown Liquor Store, of the City's intent to execute the first 5-year lease renewal term effective September 1, 2026 - August 31, 2031. Page 6 of 276 ATTACHMENTS: Downtown Liquor Store Lease Agreement 2023.09.18 Downtown Liquor Store Lease Amendment Page 7 of 276 FARMINGTONMALLNET LEASE AGREEMENT This Lease (“Lease”)dated as of this Marcl.A5“,2021 by and between Farmington Mall,LLC,(“Landlord”)and City of Farmington,a Minnesota Municipal Corporation,d/b/a Parmington Liquors (“Tenant”). WHEREAS,in consideration of the Rent hereinafter defined,and the covenants contained herein,Landlord and Tenant hereby agree as fOHOWSI 1.Basic Lease information/Definitions. 1.1 Premises 923 8thStreet #945,Farmington,MN,consisting of approximately 7,400 square feet as depicted on ExhibitA attached hereto and incorporated herein by reference.See Section 2. 1.2 Building Farmington Mall (“Property"),consisting of approximately 41,223 sq.ft.,attached as ExhibitB. 1.3 Commencement Sixty (60)days from Landlord’s delivery of the Premises to Tenant.Tenant is granted early occupancy to begin buildout.Landlord contemplates delivering Premises to Tenant on May 1,2021. Sixty Three (63)months unless soonerterminated or extended pursuant to the terms and conditions of this Lease. 1.4b Renewal Term 80 long as Tenant is not in default of any terms or conditions of the Lease,Tenant shall be granted Mo (2)Renewal Termsof five (5)years each upon the same terms and conditions except Base Rent which shall increase annually at the greater of 3.0%or the Consumer Price index (CPl)from the prior year throughout the Renewal Term(s).Tenant shall exercise its Renewal Term(s)by giving Landlord written notice of such exercise not less than 180 days prior to the expiration of the Term. 213936v11 Page 8 of 276 1.5 rBaseRent Base Rent shall be the following for the initialTerm: Months 1 ~—8:$0.00 per month Months 4 ~12:$4,933.33 per month Months 13 ~24:$5,081.33 per month Months 25 —36:$5,233.77 per month Months 37 ~48:$5,390.79 per month Months 49 ~63:$5,552.51 per month Renewal Option 1 Increase by the greater of 3.0%or CPI from prior lease year,increasing by such annually. Renewal Option 2 Increase by the greater of 3.0%or CPl from prior lease year,increasing by such annually. »lTenant’sPro1.6 Estimated to be approximately17.95%of the Building. 1Rate Share See Section 3.3. 1.7 LSecurityDeposit None.See Section 4. 1.8 Tenant's Notice Farmington City Hall Address 430 Third Street Farmington,MN55024 1.9 Landlord’s Farmington Mall,LLC Notice Address 7401 Bush Lake Road Edina,MN See Section 17. I» I 1.10 1insurance $2,000,000 public liability,bodily injury and property Requirement damage combinedpolicy.See Section 10. 1.11 Signage Tenant is required to erect signage,at its sole cost and expense,on the exterior of the Premises in accordance with LandlordsSign Criteria and all governmentalcodes.Tenant shall receive onepanel on each side of the pylon sign per ExhibitD. 213936141 Page 9 of 276 2.Premises. Landlordhereby leases to Tenant the Premises for the Term pursuant to the terms and conditions of this Lease. 3.Rent. 3.1.Base Rent.Tenant shall pay to Landlordthe Base Rent identifiedin Section 1.5 of this Lease with Tenant’s pro—ratashare of operating expenses in advance on first day of each calendar monthduring the Term electronically via direct deposit to Caspian Management,LLC or such other location as Landlordshall advise Tenant of from time to time,and Base Rent checks shall be made payable to Caspian Management.Should the Term commenceor terminate on a day other than the first day or the last day of a calendar month,Landlordand Tenant agree that Base Rent for the first and last month of the Term shall be prorated and Base Rent for the remaining months shall be due and payable on the first of the month as provided above.Base Rent plus all other sums due and owing pursuant to this Lease shall be collectively called “Rent.”Tenant shall be responsiblefor utilitiesfor Premises and all systems solely serving Premises. 3.2.Late Payment.if any installmentofRent or any other sums due from Tenant is not received by Landlordwithin 5 days following the due date,Tenant willpay to Landlorda late charge equal to 5%of the Gross Rent due.Landlord and Tenant hereby agree that such late charge represents a fair and reasonable estimate of the costs Landlordwould incur as a result of sUch latepayment. 3.3 Additional Rent.in addition to Base Rent,Tenant shall be responsible for its Proportionate Share of Operating Expenses including but not limitedto; commonarea maintenance (CAM),insurance,Real Estate Taxes and Special Assessments for the Building,all of which is referred to as “AdditionalRent” withinthe Lease.Gas and electricity serving exclusively the Premises shall be separately metered to the Premises and paid by Tenant directly to each such utility company. 2021 budgeted Operating Expenses and Real EstateTaxes are $2.59 per square foot,estimated at $1,597.17 per monthfor Tenant.Landlordshall provide Tenant with an annual accounting of the AdditionalRent expenses and allocation. 213936V11 Page 10 of 276 3.4 Free Gross Rent.Tenant shall receive three (3)months of free Gross Rent (definedas Base Rent and AdditionalRent),starting at the lease Commencementdate specified in paragraph 1.3.Tenant shall be responsible for utilitiesand Tenant’s insurance from date of Landlord’sdelivery of Premises. 4.Security Deposit. N/A 5.Use. The Premises shall be used and occupiedfor the operation of a retail liquor store and ancillary products and services and for no other purposewhatsoever withoutthe prior written consentof Landlord.Tenant,at its sole cost and expense,shall comply with all statutes,laws,ordinances,orders,rules,regulations and requirementsof the federal, state and local governmentsand of the Board of Fire Underwritersand changes thereto affecting the Premises or applicable to the use of the Premises.Tenant agrees to use the Leased Premises in a careful,lawful,sanitary and proper mannerand not to commit any waste or permit any nuisance thereon.Tenant shall not permit unreasonableor obnoxiousodors to emanate from the Premises/Any violationof such shall constitutea Tenant Defaultof the Lease. 6.Utilities. Tenant agrees to pay directly to the utility company when due all utilitycharges incurred in connectionwithits use and occupancy of the Premises,including,but not limitedto, electricity,natural gas,and telephone and to immediately transfer all utility accountsinto its own name and to make all required deposits on the CommencementDate.Tenant shall at all times keep the Premisesadequately heated to prevent the sprinklersystem and water pipes from freezing.Landlordshall not be liablefor any interruption or failure in supply of any utility to thePremises that are not caused by the Landlord.if any additionalutilitiesare required,itwillbe the sole responsibilityof the Tenant to provide such equipment with Landlord’sapproval. 7.Condition of Premises &Tenant improvement Allowance. Tenant hereby accepts the Premises and any equipmentthereon in their condition existing as of the lease Commencementdate specifiedin paragraph 1.3 orthe date that Tenant takes possession of the Premises,whicheveris earlier.Landlordshall deliver Premises to Tenant as-islwhere is per ExhibitC. 213936v11 Page 11 of 276 in addition to Landlord’sDelivery of the Premises,and providedTenant is not in default of any terms of the Lease,Landlordshall provide Tenant with a Tenant Improvement Allowance in the amount of Thirteen Dollars and Fifty Cents ($13.50)per square foot of Premises (total of $100,000.00)to be used towards constructioncosts only.Such Tenant improvementAllowance shall be payable to Tenant within thirty (30)days following the completionof all of the following events:(i)Landlord’sreceipt of paid invoices and final lien waivers from all contractors,suppliers,materiaimenand others providing constructionservices for Tenant’s constructionfinishes within the Premises; (ii)receiptby Landlordof Tenant’s payment of first months Base Rent,AdditionalRent, and Certificateof Occupancy;(iii)receipt by Landlordfrom Tenant a sign and sworn construction statement,containing a complete and accurate list of all persons and entities who have worked or supplied materials for Tenant's Work within the Premises; (iv)Tenant‘s opening for business,and (v)removal of any contingencies.Landlord’s obligation to pay the Tenant improvement Allowance shall expire if Tenantdoes not fulfillthe‘above requirements within 180 days from the rent Commencementdate specified in paragraph 1.3. 8.Maintenance and Repairs. 8.1 Landlord’s Obligations.Landlordshall maintainand keep in good condition and repair the Building,including periodic maintenance,repairs and replacements of commonareas including but not limitedto,landscaping,snow removal,parking lot sweeping,parking lot lighting and trash removal,replacements,including costs of materials,supplies,tools and equipment used in connection therewith;and including the repaving of parking areas,replanting of landscaped areas and replacing building components;costs incurred in connectionwith the operation, maintenance,repair,replacing,inspection and servicing (including maintenance contracts)of electrical,plumbing,heating,air conditioning (HVAC)and mechanical equipment and the cost of materials,supplies,tools and equipment used in connection therewith,including leasing as appropriate;cost of services including heat,air conditioning,electricity,gas,water and sewer and other utilities; replacements of the original components of the building;and all other expenses and costs of every kind and nature incurred for the purpose of operating and maintaining the common areas,whether or not similar to the foregoing. Specifically,Tenant shall be responsible for the interior of the Premises and anything serving the Premises exclusively. Landlordshall be responsible for any HVAC unit repair or replacement costs above $1,000 per unit annually,during the Term of the Lease,which are not directly due to Tenant’s negligence.Tenant shallbe responsible for 213936V11 Page 12 of 276 all regular maintenance and repairs below $1,000.00 per unit during this period.However,upon rLandlord’sfull replacement of such HVAC unit(s), such maintenance and further replacement shall become the responsibility of the Tenant.Landlord shall transfer to Tenant any warranties for such equipment. 8.2 Tenant’s Obligations.Tenant shall,at its own cost and expense,maintain the Premises in a neat and clean,condition including making all necessary repairs and replacements including but not limitedto the Premises lighting, electricaland plumbing fixtures and equipment,HVAC,all doors,overhead or otherwise,glass and windows,all interiorwalls,partitions,including the regular painting thereof,all exterior entrances to the Premises,and levelers located in the Premises or otherwise located in the Building for Tenant's sole use;and Tenant shall further,at its own cost and expense,repair or restore any damage or injury to all or any part of the Building or any part or all otthe Property caused by Tenant or Tenant‘s agents,employees,invitees,licensees,visitors or contractors,including but not limitedto any repairs or replacements necessitated by (i)the construction or installationof improvements to the Premises by or on behalf of Tenant,and (ii)the moving of any property into or out of the Premises. lf Tenant fails to make such repairs or replacements promptly,Landlord may,at its option,upon prior reasonable notice to Tenant (to be no less than 24 hours except in an emergency)make the required repairs and replacements and the costs of such repair or replacements shall be charged to Tenant as Additional Rent and shall become due and payable by Tenant plus an administrativefee equal to fifteenpercent (15%)of such costs. 9.Alterations. Tenant shall not make any alterations,additions,modificationsor improvements to or affecting the structure of the Premises or Building withoutthe prior written consent of Landlord,which consent shall not be unreasonably withheldor delayed. 10.Insurance.Tenant willbe responsible for providingRenters insurance. 10.1.Liability Coverage.During the Term,Tenant willcarry,at its own expense,public liability insurance,in a form and with a company satisfactory to Landlord,a bodily injury and property damage combinedsingle limitpolicy of at least $2,000,000.Allsuch insurance policies shall name Landlordand Landlord’sagent as additionalinsureds and shall contain a provisionthat the same may not be canceled or materially modifiedwithout giving Landlordat least ' 213936v11 Page 13 of 276 thirty (30)days prior written notice.in addition,such policies or certificates evidencing that such policies are in effect,shall be deliveredto Landlordat the commencementof the Term and renewals shall be deliveredat least ten (10)full days prior to the expiration or cancellation of any such policy.It Tenant fails to comply with its covenant to maintaininsurance as providedherein,Landlord may,at its option,cause insurance as aforesaid to be issued and,in such event, Tenant shall pay the premiums for such insurance as AdditionalRent hereunder. During the Term,Landlord willcarry,at its own expense,public liability insurance,in a form and with a company satisfactory to the Tenant,an AllRisk form commercialproperty insurance on the building and all improvements therein for their full replacement value,and commercialgeneral liability insurance, occurrenceform,and if necessary commercialumbrellaor excess insurance with a total limitof not less than $2,000,000 each occurrence. 10.21ndemnity.Landlordshall not be liable to Tenant for and,Tenant does hereby release Landlordand its respective agents and employees from liability for any injury,loss or damages to Tenant or to any other personorproperty occurring upon the Premises unless caused by Landlord’sor its agent’s negligence or willfulmisconduct.Tenant agrees to indemnify,defend,and hold Landlord,Landlord’sofficers,directors,stockholders,employees and agents (collectively“LandlordGroup”)harmless against and from any and all liability, loss,costs,damages,expenses,including reasonableattorneys’fees,claims and demands.that may be brought against LandlordGroup,for or on account of any damages,loss or injury to persons or property in or about the Premises during the Term,or during any occupancy by Tenant prior tothe Commencement Date or for any damages,loss or injury to persons or property caused by Tenant whatsoever,unless caused by Landlord’sor its agent’s negligence or willful misconduct.“Tenant”shall include Tenant,its employees,agents,servants, invitees,licensees,contractorsand subcontractors.This indemnificationshall survive the expiration or earlier terminationof this Lease. Notwithstanding the foregoing,Landlordwillbe solely responsible for and will defend,indemnify,and holdTenant,its agents,and employees harmless from and against any and all direct claims,costs,and liabilities,including reasonable attorneys'fees and costs,arising out of or in connectionwith the removal, cleanup,or restoration of the property with respect to hazardous materialsfrom any and all sources other than those materialsintroducedto the property by Tenant or its agents. 213936v11 Page 14 of 276 '11.Assignment and Subletting. Tenant may not assign this Lease or any interest herein or sublet the whole or any part of the Premises,or permit the same to be occupied by anyone other than Tenant, without the prior Writtenconsent of Landlord,which the landlordshall not reasonably refuse. 12.Subordination/Estoppel Certificates. Tenant accepts this Lease,and the tenancy created hereunder,subject and subordinate to any underlying leases,mortgages,deed of truet,leasehold mortgages or other security interests now or hereafter a lien upon or affecting the Premises or any part thereof Tenant shall,at any time hereafter,on request,execute any instruments that may be required by any mortgage,mortgagee,deed of trust,trustee,or underlying owner or Landlordhereunder to subordinate Tenant’s interest hereunder to the lien of any such mortgages,deed or deeds of trust or underlying lease.Tenant agrees at any time and from time to time upon five (5)business days prior notice by Landlord to execute,acknowledge and deliver to Landlorda statement in writing certifying that this Lease is unmodifiedand in full force and effect (or if there have been modifications,that the same is in full force and effect as modifiedand stating the modifications)and the dates to which Rent and other charges have been paid in advance,if any,and stating whether or not Landlordis in default in performance of any covenant,agreement or condition contained in this Lease and,if so,specifying each such default of whichthe signer may have knowledge,and such other matters as Landlordmay request,it being intended that any such statement hereunder may be relied upon by any third party not a party to this Lease.The failure of Tenant to execute any such instruments,leases or documents shall constitute a Default hereunder. 13.Defauit. Tenant hereby agrees that if Tenant shall fail to make its payments withinten (10)days of written notice from Landlordthat any such payment is overdue,or in performingany of the other agreements,terms and conditions of this Lease,then Tenant shall be in .“Default”under this Lease.Landlord,in addition to all other rights and remedies available to,Landlord in law or equity,may re-enter immediately into the Premises and remove all persons and property therefrom,and,at Landlord’soption,terminate and cancel this Lease as to all future rights of Tenant,and Tenant hereby expressly waives the service of any notice in writing to re—renteras aforesaid.Tenant agrees that in the case of any such terminationTenant willindemnify Landlordagainst all loss of rents and other damages which Landlordmay incur by reason of such termination,including,but 213936v11 Page 15 of 276 not limitedto,costs or restoring and repairing the Premises and putting the same in rentabie condition,costs of renting the Premises to another tenant,loss or diminutionof rents and other damage which Landlordmay incur by reason of such termination,and all reasonable attorneys’fees and expenses incurredin enforcing any of the terms of this Lease.Neither acceptance of rent by Landlord,with or without knowledge of a default,northe failure of Landlordto take action on account of any default hereof or to enforce its rights hereunder shall be deemed a waiver of any breach,and absent written notice or consent,said breach shall be a continuing one.in the event of a dispute betv‘veenthe parties hereto with respect to the enforcement of either party’s obligations contained herein,the prevailing party shall be entitled to reimbursementof reasonable attorney’s fees,costs,and expenses incurred in connection therewith. 14.Surrender/Hold Over, Tenant shall vacate the Premises at the expiration date or other terminationof this Lease and shall remove all goods and effects not belonging to Landlordand shall surrender possession of the Premises and all fixtures and systems thereof in good repair,reasonable wear and tear excepted.IfTenant holds over and remains in possession of the Premises or any part thereof after the Expiration Date orthe sooner termination of the Term or Tenant’s right to possession hereunder,Tenant shall be deemed to hold the Premises as a tenant at sufferance,subject to all of the terms, conditions and covenants of this Lease,except that Base Rent payable during such holdover period shall be an amount equal to one hundred fifty percent (150%)of the installmentsof Base Rent payable at the time of such expiration or earlier termination. The provisions of this paragraph do not waive Landlord’sright of reentry or right to regain possession by actions at law or in equity or by any other rights hereunder. '15.Destruction,Fire or Other Casualty. in case of damage to the Premises by fire or other casualty,Tenant shall give immediatenotice thereof to Landlord,and Landlord,to the extent that insurance proceeds respecting such damage are subject to and,in fact,are under the controland Use of Landlord,shall thereupon cause such damage to all property owned by Landlord to be repaired as promptly as possible at the expense of Landlord,due allowance being made for delay which may arise by reason causes beyond Landlord’scontrol,and to the extent that the Premises are rendered untenantable,the Rent shall proportionately abate,provided the damage above mentioned occurred without the fault or neglect of Tenant,Tenant’s servants,employees,agents,contractors,licensees,invitees or visitors.Notwithstanding the foregoing,if such damage is due to the fault or neglect of Tenant or any of other said persons,the damage may be repaired by Landlordat 213936v11 Page 16 of 276 Tenant's expense and there shall be no apportionmentor abatement of Rent.in the event the damage shall be so extensive to the Premises as to render it uneconomical,in Landlord’s opinion,to restore for the use of Tenant,or Landlordshall decide not to repair or rebuild the Premises,this Lease,at the option of Landlord,shall be terminated upon written notice to Tenant and the Rent shall,in such event,be paid to or adjusted as of the date of such damage and Tenant shall thereupon vacate the Premises and surrender same to Landlord,provided that no such terminationshall relieve Tenant from any liability to Landlord arising from such damage or from any breach of the obligations imposed on Tenant hereunder. 16.Eminent Domain. if the entire Premises shall be substantially taken for public purposes,or in the eVent Landlord shall convey or lease the Premises to any public authority under threat of condemnation or taking,this Lease shall thereupon terminate.ln the event of a taking, lease or condemnation,whether or not there is a terminationhereunder,Tenant shall have no claim against Landlordother than an adjustment of Rent to the date of taking, lease or condemnation,and Tenant shall not be entitled to any portion of any amount that may be awarded as damages or paid as a result or in settlement of such proceedings or threat.Notwithstanding the foregoing,Tenant may pursue its own claim against the condemning authority for any damages or award permitted under the laws of the State of Minnesota,to be paid to Tenant without diminutionor reduction of the award,judgment or settlement received by Landlord. 17.Notice. Any notices required to be served in accordance with the terms of this Lease shall be in writing and deliveredto Tenant at the address identifiedin Section 1.8 and to Landlord at the address identifiedin Section 1.9.Either partymayat any time designate by written notice to the other a change in the above addresses or addresses.All notices, demands and requests shall be deemed sufficiently served or given for all purposes hereunder at the time such notice,demand or request shall be mailed by United States Postal Service registered or certifiedmail,return receipt requested,or deposited with a reputable overnight courier,at the time such notice,demand or request shall be deposited with the overnight courier. 18.Access by Landlord. Landlord,its agents and representatives shall be entitled to keep pass keys to the Premises and shall have the right to enter and inspect the Premises with Tenant 213936v11 Page 17 of 276 apprOValprior to accessing the property for the purpose of ascertaining the condition thereof or in order to make such repairs as may be required to be made by Landlord under the terms of this Lease or as Landlordmay deem necessary.During the progress of any such work,Landlordmay keep and store all necessary materials,tools and equipment upon the Premises.Landlordand its agents and representatives shall have the right to enter the Premises at reasonable times to exhibit the same for the purpose of sale or mortgage,and during the last six (6)months of the Lease Term,Landlordand Landlord’sagents and representatives shall have the right to enter the Premises at reasonable times for the purpose of showing the Premises and shall have the right to erect on the Premises a suitable sign indicating that the Premises are available.Any such entry by Landlordshall neVer be deemed an eviction or disturbance of Tenant’s possession of the Premises,or render Landlordliable to Tenant for damages,or relieve Tenant from performance of Tenant’s obligations under this Lease. 19.Miscellaneous. it any term or provisionof this Lease or the applicationthereof to any person or circumstances shall,to any extent,be inValidor unenforceable,the remainder of this Lease orthe application of such term or provisionto persons or circumstances other than those as to which it is held invalidor unenforceable,shall not be affected thereby and each term and provision of this Lease shall be valid and enforceable to the fullest extent permitted by law.All headings in this Lease are intendedfor convenience or reference only and are not to be deemed or taken as a summary of the provisionsto which they pertain or as a constructionthereof.Except as otherwise provided,the covenants,conditions and agreements contained in this Lease shall bind and inure to the benefit of Landlord,Tenant,and their respective heirs,distributees,executors, administrators,grantees,successors and assigns.This Lease contains all agreements of the parties with respect to any matters contained herein.No prior agreement, proposal or understanding pertaining to any suoh matter binding unless expressly incorporated herein.This Lease may be modified only in writing and signed by the parties in interest at the time of the modification.This Lease shall be governed by and construed in all respects in accordance with the laws of the State of Minnesota. 20.Exclusive Use. 80 long as Tenant is not in default of the Lease,Landlordshall not lease to any Tenant at the Property whose primary use is that of a liquor store. 213936v11 Page 18 of 276 21.Expansion Right. So long as Tenant is not in default of the Lease,Landlord shall allow Tenant to make the first offer on additional leasable space adjacent to Tenant's Premises which becomes availablefor lease.Landlordshall make good faith efforts to notice Tenant of any upcoming availabilities which come available adjacent to Tenant.In the event that such leasable space becomesvacant and remains so for sixty (60)days without Landlord’snotice to Tenant of such availability,then such Expansion Right shall be considered waived as Tenant shall have had suf?cient time to make itself aware of such opportunity. lN WITNESS WHEREOF,Landlord and Tenant have signed and sealed this Lease as of the day and year first above written by their duly authorizedpartner or officer,as the case may be. LANDLORD: Farmlngton Mall,LLC Name:flk Moore its:Principal TENANT: City of Farmington _e:Joshua H its:Mayor QM”760% Na :David McKnight its:Administrator 213936v11 Page 19 of 276 EXHIBITA:DEPICTIONOF PREMISES ..__:||H‘H'L____Ilmml .... hm—u—ur—u-n—I—ul I :unnununt m g3:2 PM“::gmy“no ——. '-'unun' 2 2 2 8 O: 2i I Mmmxu :uqmwu J C‘ l?ghmya [owpmmawwlizmvpn 213936v11 Page 20 of 276 EXHlBlTB:PROPERTY DESCRIPTION “Farmington Mall” 923 8thStreet,Farmington,MN Property 1.1),:1437702504010 213936V11 Page 21 of 276 EXHIBIT0:CAPITAL IMPROVEMENTSBY LA?DLOBQ Landlordshall deliver Premises to Tenant in as~islwhere~iscondition,with no further responsibility to Tenant other than to confirm that HVAC is in fully operable condition. 213936V11 Page 22 of 276 TENANTPLAN vm: 213936V11 Page 23 of 276 EXHIBITD:SIGN CRITERIA Exhibit “D” Farmington Mall (“Shopping Center”) Shopping Center Sign Criteria (“Sign Criteria”) Tenant,prior to the Rent Commencement Date of the Lease,shall install a lighted storefront sign (“Storefront Sign”)as approved by both the local ordinance(s)of the City of Farmington (“City")and Shopping Center Sign Criteria as set forth herein in this ExhibitD.in such areas or instances where the Sign Criteria may differ from the City’s sign code(s)and ordinance,the Sign Criteria,where more restrictive,shall prevail. At least thirty (30)days prior to installationof Tenant’s Storefront Sign,and priorto the manufacturing or fabrication of Tenant's sign,Tenant shall submit scaled,colored drawings (“Sign Drawings")to Landlord for approval as detailed below herein.Landlord shall have five (5) days to approve Tenant’s sign and return drawings signed by Landlord as approved.If Landlord does not approve the Tenant‘s Sign Drawings,Tenant must resubmit the Sign Drawings with the necessary changes in order to conform to the Sign Criteria.Landlord shall have five (5)days to review the resubmitted Sign Drawings.This process shall repeat until Tenant’s Sign Drawings conform to the Sign Criteria and receive writtenapproval from both the City and the Landlord. Tenant is solely responsible for,and must obtain,a sign permit (“Permit")from the City prior to fabrication and installation of Tenant's sign after receiving Landlord written approval. l.General Reguirements A.All Storefront Signs shall be affixed to the Tenant’s storefront on an approved raceway in the area designated by Landlord,at Landlord’s sole discretion,as Tenant’s sign area(s)("Sign Area”).Storefront Sign is restricted to Tenant’s retail market trade name that is integral to the primary retail service of Tenant and approved by Landlord.Tenant logos, if any,shall be considered on a case by case basis per Section ll herein at the sole discretion of the Landlord.Landlord shall determine the appropriateness of Tenant‘s sign based on but not limitedto the following: size,scale,color,and location,compatibility with other tenants,materiais, height and style. B.Allsign transformers,and power supplies must be placed inside of the raceway.Ailelectrical connections and decals shall be concealed behind raceway or hidden inside the raceway.Allsigns to be connected to a photo cell.No timers allowed.Manufacturer's names,stamps and decals 'shall not be exposed. 213936V11 Page 24 of 276 213936v11 All letters or approved logos must be mounted on the raceway as specified herein. No exposed neon or incandescentbulbs or flashing,blinking,rotating or moving signs shall be permitted.Signs shall not make or emit and sound or noise. No Storefront Sign shall be of a type wherein the signing is housed or contained withinan illuminatedor non—illuminated“sign can"or ”sign box” or a “box mounted"sign,unless expressly approved by the Landlordin writing as per Section Ill of this Exhibit. Small~scalesigns stating store hours,which are neatly lettered on the glass of the Tenant’s storefront,shall be permitted only subject to Landlord’s approval.Any non~oustomer door for receiving merchandise may have the name of the Tenant in two inch (2”)block letters.Address signs shall be composed of four-inch (4")high (maximum)Helveticastyle white letters centered on the transom glass above the door or such area as required by the City. PROCEDUREFOR SIGN APPROVAL: A11proposed signs shall be reviewed and approved by CaspianVentures, LLC.‘ No sign shall be painted on the exterior of the Shopping Center wall or Tenant's storefront,doors,windows or any other surface of the Demised Premises or Shopping Center,nor on the roof or parapet of the Premises or Shopping Center. No sign shall be erected untilwritten specifications and drawings of such sign are first approved in writing by Landlord per Section ll (F)below herein.Such specifications and drawings shall show the size, construction,materials,colors,script,name of sign manufacturer and proposed location of such sign in conformity with the requirements stated herein and shaft include a cross section drawing. Tenant‘s signature or logo,hallmark,insignia or other trade identification will be allowed withinthe guidelines set forth herein and approved by Landlord at Landlord's sole discretion. All signs erected by Tenant pursuant to the provisions herein shall be erected at Tenant’s own risk and expense including:final materials, fabrication,delivery,installation,labor,permits,electricalconnections, Page 25 of 276 213936v11 and photocell(s).Alllabor and materials and installations shall be in accordance with applicable State and municipal law(s).Tenant shall secure and pay any necessary permits and fees at Tenants sole cost and responsibility.Tenant shall maintain said signs in a good state of repair and save the Landlordharmless from any loss,cost or damage as a result of the erection,installation,maintenance,existence,and removal of Tenant’s sign.Tenant shall maintain and repair any damage to Tenant’s Sign.Upon vacating the Premises,Tenant shall remove all Tenant’s sign(s)and repair all damage,if any,caused by such removal to the satisfaction of the Landlord at Landlord’ssole discretion.The contractor, materials and methods for repair muet be approved in writing by the Landlordin advance of the work. Allelectrical hook-ups shall be performed by a licensed electrician, approved in advance by Landlord and installed in accordance with all State and municipal codes connected to Tenant’s electrical panel and shall include a photo cell.No timers allowed. Any damage caused to Landlord’sWork by Tenant’s sign installationor removal not repaired by Tenant shall be repaired by the Landlordand charged to the Tenant.Tenant shall reimburse Landlord within thirty (30) days of such repairs made by Landlordon Tenant’s behalf. Public safety decals or signs on glass in minimumsizes required by Federal,State or municipalcode(s)or law(s)are allowed. Prohibited Exterior Signs:The following signs are prohibited:paper,cloth, vinyl,cardboard,or plastic signs,stickers,banners,?ags or any other type of material(s)designed to generate attention,signs that flash,blink, pulsate,rotate,move,change intensity or color or signs that have moving parts,or reflect,orflutter,roof signs,bench signs,sidewalksigns (sandwich boards),awning signs,or canopy signs or signs that sit on the ground. Window Signs:Window painted signs shall be professionally affixed by a licensed sign painter/installer and approved in advance in writing by Landlordat Landlord’ssole discretion.No window sign shall be displayed for more than sixty (60)days and must receive prior Landlordwritten approval at Landlord’ssole discretion.At no time may more than twenty- five percent (25%)of Tenant‘s window be covered in signs.All interior window signs or banners most receive prior Landlord approval at Landlord’s sole discretion.No window sign shall:flash,blink,pulsate, rotate,mOVe,change intensity,or change color.No window sign shall have moving parts,or reflect or flutter. Page 26 of 276 ll.Specific Requirements 213936V11 A.Iyp_e —individuallylighted channel letters with translucentfront(s)mounted on a racewaythat matches the exact exterior StorefrontSignAreacolor.Raceway to be one foot and six inches ('i'~6")deep with amaximumheightofseveninches(7”).Raceway muat be constructed fromaluminumandapprovedbyLandlordpriortofabricationandinstallation. Size;Tenant’s sign(s)may include upper and lower case letters,letter strokes or characters.and punctuations ("Letters”)and logos subject to prior written approval of Landlordat Landlord’ssole discretion.SuchLettersshallnotexceed86"in height if available in Tenant’s Sign Area and shall not be less than 12"in height.Letters for two (2)lines of copyshallnotexceed48"in height if and where availablein Tenant‘s Sign Area is 60”and 40"in height if and where available in Tenant’s Sign Areais52".The size of the Tenant’s sign and the Letters are subject to Landlordprior writtenapproval as stated above and below herein and theCityandmustfitwithintheShoppingCenter’s pro—rate allowance as approved by Landlord. Sign Placement The sign shall be placed on the Storefront in the Tenant’s Sign Area as shown on the attached Sign Area diagram herein and not exceed maximumsquare feet of the City per tenant or The Shopping Center’s pro—rateallowance as approved by Landlord. Base line and center line of sign to be located by Landlordand/or Landlord’sArchitectand must be contained within Tenant’s Sign Area. Colors and Materials 1.Acrylicface colors must be pre—approved by Landlordwith dark bronze trim cap and dark bronze returns. 2.LED’scolor to be red,white,green or bide no multiple color or color changing LED’Sare permitted 3.Sign letter(s)or characters shall have aluminumchannel returns (minimum .050)withflat or molded plastic face and mounted with dark bronze trim cap concealed fasteners.Channel returns shall be painted dark bronze as specified by Landlord,All letters shall be illuminatedwith LED‘spowered by normal factory transformers Page 27 of 276 installedin raceway.All letters shall be approved by UnderwriterLaboratories(’UL”)and carry the ULseal of approval. 4.Upon sign installation,a?penetrations made to the exterior Storefrontmust be caulked with a polyurethane based product called Sonnelastic 150 or SonnebornNPi.Any alternative products must be approved by Landlord. 5.Sign racewaysshall be attached to building with stainless steelbolts,washers,and nuts. 6.As part of Tenant‘s electricalWork,Tenant shall installa photo celltocontrolhoursofilluminationinaccordancewiththeoverallProperty's policy determinedby the Landlordat Landlord‘ssole discretion.N0 timers allowed. F.As describedabove herein,one (1)complete set of scaled sign drawingswithdetaileddimensionsmustbesubmittedtothelandlordforapprovalbeforefabricationandatleastthirty(30)days prior to Tenant’s Rent Commencement.Tenant’s sign drawings must include the following: 1.Provide a complete listingand Verbal description of sign(s)to be erected on the Premises. 2.Provide elevationviews of storefrontshowing all signs (drawn to accurate scale)withdimensionsof heights of Letters,logos and length of sign(s). 3.Provide a cross section view through sign letter and sign panel showing locationof sign relative to the Storefrontline,mounting height,and the dimensionedprojection of the face of the letter from the face of the sign panel. ill.MiscellaneousProvisions Landlordshall not be responsible for the cost of re—fabricationof signs fabricated,ordered,orconstructedthatdonotconformtothesigncriteriaandtheCityordinances.The Sign CriteriamaybeamendedfromtimetotimebyLandlord.Deviation(s)or variance from this Sign CriteriaExhibitisnotallowedexceptfortheexpressedwrittenapprovalofboththeCityandtheLandlord.Such written approval of any deviationto the sign criteriais at the sole discretionofboththeCityandtheLandlordandmaybedeniedorwithheldatthesolediscretionofboththeCityandtheLandlord.Any approved deviation or variance of the Sign Criteria for the TenantdoesnotchangeanyaspectorportionoftheSignCriteriainthisExhibitforanyotherTenant or 213936v11 Page 28 of 276 the Shopping Center.Deviationsor variance approvals are arbitrary and made on a case bycasebasisatthesolediscretionofbothCityandtheLandlord. Any nonconformancewith this ExhibitD shall result in a Defaultof the Lease and Lease DefaultprovisionsshallbeenactedandenforcedperthetermsoftheLease. !Tenant Panel 213936V11 Page 29 of 276 Authentisign ID:52F61A50-A151-EE11-A3F1.6045BDEF20F8 FIRST AMENDMENT TO LEASE AGREEMENT THIS FIRST AMENDMENT TO LEASE AGREEMENT ("Amendment") dated September 12, 2023 is entered into, by and between LEGACY FARMINGTON MALL LLC, a Minnesota limited liability company("Landlord"), and CITY OF FARMINGTON, a Minnesota municipal corporation, d/b/a as Farmington Liquors ("Tenant"). RECITALS: WHEREAS, the Tenant and between Farmington Mall, LLC, a Minnesota limited liability company ("Prior Landlord") entered into a Lease Agreement dated March 15, 2021 ("Lease") for the lease of certain space within the building located on the property owned by Landlord at 923 8t' Street#945,Farmington, MN 55024 ("Property"); WHEREAS,in December 2022,Prior Landlord sold the Property to Landlord and took over the rights and responsibilities of Landlord in the Lease; and WHEREAS, Landlord and Tenant desire to enter into this Amendment to clarify an ambiguity in the Lease regarding the cost of the Landlord's insurance obligations for the Property. NOW, THEREFORE, in consideration of the foregoing and the mutual covenants contained herein,the Landlord and the Tenant agree that the Lease shall be amended in accordance with the terms and conditions set forth below. I. Modified Sections. a. Section 3.3.Additional Rent. In addition to Base Rent, Tenant shall be responsible for its Proportionate Share of Operating Expenses including but not limited to;common area maintenance (CAM), Landlord's Insurance as described in Section 10.1.2, Real Estate Taxes, and Special Assessments for the Building, all of which is referred to as Additional Rent"within the Lease. Gas and electricity serving exclusively the Premises shall be separately metered to the Premises and paid by Tenant directly to each such utility company. 2023 budgeted Operating Expenses and Real Estate Taxes are $3.69 per square foot, estimated at $2,275.50 per month for Tenant. Landlord shall provide Tenant with an annual accounting of the Additional Rent expenses and allocation. b. Section 10.1. Liability Coverage. Section 10.1.1. Tenant Insurance. During the Term, Tenant will carry, at its own expense, public liability insurance, in a form and with a company satisfactory to Landlord, a bodily injury and property damage combined single limit policy of at least 2,000,000. All such insurance policies shall name Landlord and Landlord's agent as additional insureds and shall contain a provision that the same may not be canceled or materially modified without giving Landlord at least thirty(30)days prior written notice. In addition, such policies or certificates evidencing that such policies are in effect, shall 1 227402v4 Page 30 of 276 Authentisign ID:52F61A50-A151-EE11-A3F7-6045BDEF20F8 be delivered to Landlord at the commencement of the Term and renewals shall be delivered at least ten (10) full days prior to the expiration or cancellation of any such policy. If Tenant fails to comply with its covenant to maintain insurance as provided herein,Landlord may,at its option, cause insurance as aforesaid to be issued and,in such event, Tenant shall pay the premiums for such insurance as Additional Rent hereunder. Section 10.1.2. Landlord Insurance. During the Term, Landlord will carry public liability insurance,in a form and with a company satisfactory to the Tenant,an All Risk form commercial property insurance on the building for their full replacement value, and commercial general liability insurance, occurrence form, and if necessary commercial umbrella or excess insurance with a total limit of not less than$2,000,000 each occurrence. Landlord shall receive at least three bids for all insurance required under this Section. The bids can be gathered via a broker of the Landlord's choice.The Tenant's costs related to the Landlord's Insurance shall not increase more than 5%from year to year. The base year for this calculation shall be 2023 and the cap described above will be applicable in 2024 and subsequent years. 2. Settlement of 2022 CAM Reconciliation. The 2022 common area maintenance and additional rent charges are resolved with a final payment from the Tenant to the Landlord made on August 1, 2023 for an amount of$2,750.00. 3. Effect of Lease. Except as specifically modified or amended by this Amendment, the Landlord and Tenant agree that all of the terms and conditions of the Lease are in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the day and year first above written. Remainder ofpage intentionally left blank. Signature page follows.] 2 227402v4 Page 31 of 276 Authentisign ID:52F61A50-A151-EE11-A3F1-6045BDEF20F8 LANDLORD: Legacy Farmington Mall LLC a Minnesota limited liability company By: Legacy Capital Partners LLC a Minnesota limited liability company Its: Manager Authentivan: By: Ben Kall, Its Co-Managing Member TENANT: CITY OF FARMINGTON By: oshua Hoyt, Ma r JAI I)And: Q, VV(AqA 1 4641 0 V w%A"W' i ley R 6tclksTer, Its Wy Clerk 3 227402v4 Page 32 of 276 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: Lynn Gorski, City Administrator Department: Administration Subject: Mayor Joshua Hoyt's Resignation Meeting: Regular Council - Feb 17 2026 DISCUSSION: On February 4, 2026, Mayor Joshua Hoyt submitted his written resignation from the office of Mayor, effective immediately. ACTION REQUESTED: Formally acknowledge and accept the resignation of Mayor Joshua Hoyt, effective February 4, 2026, and declare a vacancy in the office of Mayor. ATTACHMENTS: Mayor Joshua Hoyt's Resignation 2026-017 Accepting Resignation and Declaring a Vacancy Page 33 of 276 To th e Ci t y of Fa r m i n g t o n , It is wi t h de e p re ? e c t i o n an d si n c e r i t y th a t | su b m i t my re s i g n a t i o n as Ma y o r , ef f e c t i v e im m e d i a t e l y . Se r v i n g ou r co m m u n i t y ha s be e n on e of th e gr e a t e s t ho n o r s of my li f e . I am pr o f o u n dl y gr a t e f u l fo r th e tr u s t yo u pl a c e d in me , th e de d i c a t i o n of ou r ci t y st a f f , an d th e pa s s i o n an d re s i l i e n c e of ou r re s i d e n t s . To g e t h e r , we ha v e wo r k e d th r o u g h ch a l l e n g e s , ce l e b r a t e d pr o g r e s s , an d la i d fo u n d a t i o n s th a t I be l i e v e wi l l co n t i n u e to se r v e ou r ci t y we l l in t o th e fu t u r e . Af t e r ca r e f u l co n s i d e r a t i o n , I ha v e co m e to th e di f ? c u l t de c i s i o n th a t I mu s t st e p aw a y fr o m my ro l e as Ma y o r to fo c u s on my me n t a l he a l t h . Th i s wa s no t an ea s y co n c l u s i on to re a c h , bu t it is a ne c e s s a r y on e . I be l i e v e th a t le a d e r s h i p re q u i r e s cl a r i t y , pr e s e n c e , an d we l l — b e i n g , an d at th i s ti m e , I ne e d to pr i o r i t i z e my he a l t h in or d e r to he a l an d re ga in ba l a n c e . Th i s de c i s i o n do e s no t di m i n i s h my pa s s i o n fo r ou r co m m u n i t y or my be l i e f in it s fu t u re . l ha v e fu l l co n ? d e n c e in ou r le a d e r s h i p te a m an d el e c t e d of ? c i a l s wh o wi l l co n t i n u e th e wo r k we be g a n , an d I re m a i n ho p e f u l an d pr o u d of wh a t li e s ah e a d fo r ou r ci t y . Th a n k yo u fo r yo u r un d e r s t a n d i n g , yo u r su p p o r t , an d th e op p o r t u n i t y to se r v e . It ha s tr u l y be e n a pr i v i l e g e . Wi t h gr a t i t u d e an d re s p e c t , /% Jo s h u a Ho y t Ma y o r Q43 0 Th i r d St , Fa r m i n g t o n . MN 55 0 2 4 FA RM IN GT ON o OFa r m i n g t o n M N . g o v m‘ l ‘‘{‘ 1 {11 2 15 : ,. C I T OF Page 34 of 276 CITY OF FARMINGTON DAKOTA COUNTY, MINNESOTA RESOLUTION 2026-017 A RESOLUTION ACCEPTING RESIGNATION AND DECLARING A VACANCY WHEREAS, the Farmington City Council has received the written resignation of Joshua Hoyt, effective February 4, 2026. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Farmington, Minnesota, as follows: 1. The City Council accepts Joshua Hoyt’s resignation as described above. The City Council declares that a vacancy exists on the City Council effective February 5, 2026. Adopted by the City Council of the City of Farmington, Minnesota, this 17th day of February 2026. ATTEST: ____________________________ ______________________________ Nicholas Lien, Acting Mayor Shirley R Buecksler, City Clerk Page 35 of 276 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: Shirley Buecksler, City Clerk Department: Administration Subject: Minutes of the February 2, 2026 Council Work Session Meeting: Regular Council - Feb 17 2026 INTRODUCTION: For approval are the minutes of the February 2, 2026 Council Work Session. ACTION REQUESTED: Approve the minutes of the February 2, 2026 Council Work Session. ATTACHMENTS: 02.02.26 Work Session Minutes Page 36 of 276 Work Session Minutes of February 2, 2026 Page 1 of 5 City of Farmington City Council Work Session Minutes Monday, February 2, 2026 The City Council met in a work session on Monday, February 2, 2026, at Farmington City Hall, 430 Third Street, Farmington, Minnesota. 1.CALL TO ORDER Mayor Hoyt called the meeting to order at 5 pm. Members Present: Mayor Joshua Hoyt Councilmembers Holly Bernatz, Jake Cordes, Nick Lien, and Steve Wilson Members Absent: None Staff Present: Lynn Gorski, City Administrator David Chanski, Assistant City Administrator/HR Director Deanna Kuennen, Economic & Community Development Director Josh Solinger, Liquor Operations Manager Kellee Omlid, Parks & Recreation Director Nate Siem, Police Chief John Powell, Public Works Director/City Engineer Ben Humlie, Natural Resources Specialist Dani Olson, GIS Specialist Shirley Buecksler, City Clerk 2.APPROVE AGENDA Motion was made by Councilmember Bernatz and seconded by Councilmember Cordes to approve the agenda, as presented. Motion carried: 5 ayes / 0 nays 3.DISCUSSION ITEMS 3.1 Emerald Ash Borer (EAB) Natural Resources Specialist Ben Humlie provided an update on the EAB Management Plan implementation and answered questions for the City Council. Specialist Humlie’s PowerPoint presentation is attached with details on the EAB Management Plan. Page 37 of 276 EMERALD ASH BORE R (E AB) UPDATE FARMINGTON Pa g e 3 8 o f 2 7 6 EAB REVIEW •Boulevard ash tree inventory completed summer 2016 •3,374 boulevard ash trees were recorded •Trees were rated as poor, fair or good condition and measured. •44% of the city’s boulevard trees were ash •As of 2023, an estimated 3300 ash trees remained in the boulevard. Pa g e 3 9 o f 2 7 6 2016 ORIGINAL ASH TREE INVENTORY Pa g e 4 0 o f 2 7 6 EAB MANAGEMENT PLAN REVIEW •March of 2023 the city adopted the EAB Management plan •The plan called for an aggressive removal approach with continued treatment of ash to delay/stage future removals that prioritizes public safety. Pa g e 4 1 o f 2 7 6 2023-2024 BOULEVARD ASH TREE INVENTORY AUDIT •2392 trees reviewed •219 not present or wrong species •42 ash added •35 very good condition/”heritage ash” •112 found to be on private property •2087 Ash remained in the boulevard •Estimated 700 Ash trees were inventoried in Park and Natural areas focusing on high use areas and trails •Since this audit, more trees have been added and data has been modified Pa g e 4 2 o f 2 7 6 2023 EAB WORK Estimated 3300 Total Boulevard Ash Trees Jan. 2023 332Contractor removed 201Public Works Removed Estimated 2767Trees remaining in the boulevard Estimated 700Total Park Ash Trees Jan. 2023 0Contractor removed 208Parks Removed Estimated 492Trees remaining in Parks 1060Total city trees injected Pa g e 4 3 o f 2 7 6 2024 EAB WORK Estimated 2,767 Ash Trees in the Boulevard Jan. 2024 732Contractor Removed 348Public Works Removed Estimated 1,687 Total Trees Remaining in the boulevard 0Trees Planted in the boulevards Estimated 492 Ash Trees in Parks Jan 2024. 0Contractor Removal 170Parks Removal Estimated 332 Total Trees remaining in Parks 65Trees planted in Parks 157 Total City Trees injected (Final year ) Pa g e 4 4 o f 2 7 6 2025 EAB WORK Estimated 1687 Total Boulevard Ash Trees Jan 2025 604Contractor Removed 103Public Works Removed Estimated 980Trees Remaining in the boulevard 230Trees planted in boulevards Estimated 332Total Parks Ash Trees Jan 2025 29Contractor Removed 21Parks Removed Estimated 282Trees Remaining in parks 25Trees Planted in parks Pa g e 4 5 o f 2 7 6 2025 COST PER TREE SNAPSHOT •Winter Ash Tree and Stump Removal- 216 trees, average cost •$984/tree •Summer Ash Tree and Stump Removal- 92 trees, average cost •$532/tree •Fall Ash Tree and Stump Removal- 115 Trees and 11 additional stumps •$521/tree •Institutional Community Work Crew (ICWC) Contract with stumps removed with a separate contract- 135 trees •$194/tree Pa g e 4 6 o f 2 7 6 DISTRIBUTION OF ASH TREES END OF 2025 •Green, yellow, orange and red colored dots indicated standing ash trees •Brown dots indicate trees and stumps completely removed Pa g e 4 7 o f 2 7 6 2026 REMOVAL STRATEGY •Focus of removal for 2026 will be moving in a north / south manner with tree contractors. •We have applied for grant funding for continuing removals, which has a required replanting component. (ReLeaf Grant) •Public Works and Parks staff will continue, when available, to remove trees of all sizes but will focus primarily on non ash trees that are hazardous. •Trees and stumps are now included on all removal contracts with the exception of the ICWC contract. Pa g e 4 8 o f 2 7 6 2026 ASH REMOVAL PROJECTS IN PROGRESS Winter Ash Tree and Stump Removal Public Works/ICWC Inhouse project Pa g e 4 9 o f 2 7 6 EAB REFORESTATION PROJECTS •Replanting trees is a necessity in some areas. •2025 projects •Arbor Day planting in Distad Park •25 Trees planted •Tree planting along 2024 Street Improvement Area •15 Trees planted •Shade Tree Grant area •215 Trees planted •2026 projects •2025 Street Improvement Area •Unknown Number •Arbor Day Planting in Evergreen Knoll Park •Unknown Number •Shade Tree Grant area •At least 116 more trees will be planted •We have applied for the ReLeaf grant for additional tree planting projects Pa g e 5 0 o f 2 7 6 REFORESTATION PLANNING •Using grant funding when available or required for projects •Being intentional with planting as to not cause issues in the future •Working around existing utilities •Planting smaller trees if needed and/or allowed by DNR grant planting guidelines Pa g e 5 1 o f 2 7 6 FUTURE ISSUES •Trees on private property •Potential nuisance and hazardous tree situations •We will still need to be aware of future insects or diseases that may come •Maple varieties are still being heavily planted both in new developments and in established residential yards and have the highest percentage population of trees in the city •Top 4 tree species/families in the city are •Maple (Acer) •Linden/Basswood (Tilia) •Spruce (Picea) •Ash (Fraxiunus) •New Oak disease was found in Hennepin County •Sudden Oak Death Pathogen (Phytophthora ramorum) •Similar symptoms to oak wilt •Identify priority areas for replanting Pa g e 5 2 o f 2 7 6 Work Session Minutes of February 2, 2026 Page 2 of 5 3.2 Geographic Information System (GIS) Update GIS Specialist Dani Olson provided an update for the City Council on the City’s recent GIS activities and a look at what is ahead. GIS Integration Across Departments • Building Inspections: Photo dashboard; BS&A integration support. • Community/Economic Development: RFI figures; forecasting figures and stats for potential developments. • Fire: Adopt-A-Hydrant. • Natural Resources: Ash tree removal and shade tree planting maps; storm pond and outfall inspections. • Parks and Recreation: Parks and trails web map; Holiday Lights Tour maps. • Planning & Zoning: Zoning web map; Current Developments web map. • Police: Toys for Town; parking violation alerts. o Toys for Town: ▪ 489 children enrolled; 175 families enrolled. ▪ Automated email for survey link incorporated. ▪ Delivery Zones incorporated. • Public Works: As-built Linked Utilities map; PCI maps and OpenGov integration. o As-built linking: ▪ Approximately 1,100 individual pages linked. ▪ Date of document, contractor, link to full record drawing document, and type of utility all logged for every page. ▪ Organization-accessible map for mobile and desktop browsing. Automation – automated emails • Farmington Fix • Storm pond and outfall maintenance • Parking violations • Adopt-A-Hydrant • Toys for Town coordination GIS Specialist Olson answered questions for the City Council. Councilmember Bernatz suggested a more visible location for the GIS hub on the City’s website so it’s easier for the public to find. Mayor Hoyt told her to keep pushing the bar – don’t hesitate to bring new ideas and creativity. Page 53 of 276 Work Session Minutes of February 2, 2026 Page 3 of 5 3.3 Municipal Liquor Profits Allocation Discussion Assistant City Administrator Chanski discussed with the City Council the allocation of Municipal Liquor profits. In 2015, a policy was established to designate where Municipal Liquor operation profits are allocated. It was determined that profits would be split into four categories (pots). With our rapid growth and our desire to have more of a direct benefit to our community, it is Staff’s recommendation that we adjust the Municipal Liquor Stores’ profit allocation. Page 54 of 276 Work Session Minutes of February 2, 2026 Page 4 of 5 Discussion ensued and Assistant City Administrator Chanski answered questions for the City Council, who agreed with the proposed allocation and directed Staff to draft a revised policy for Council approval. 4. COUNCIL COMMITTEE UPDATE 5. CITY ADMINISTRATOR UPDATE 6. ADJOURNMENT Motion was made by Councilmember Lien and seconded by Councilmember Bernatz to adjourn the meeting at 6:24 pm. Motion carried: 5 ayes / 0 nays Page 55 of 276 Work Session Minutes of February 2, 2026 Page 5 of 5 Respectfully submitted, Shirley R Buecksler City Clerk Page 56 of 276 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: Kim Sommerland, Finance Director Department: Finance Subject: Payment of Claims Meeting: Regular Council - Feb 17 2026 INTRODUCTION: Minnesota Statutes require that all claims for payment be presented to the City Council for review and approval. DISCUSSION: The City Council has established a process to review and approve claims for payment at each regular meeting. The list of claims for the period of 01/29/2026 to 02/xx/2026 is being presented for consideration, ensuring compliance with State law and maintaining proper financial oversight. BUDGET IMPACT: The claims paid will reduce the available budget for the accounts listed in the detailed report provided to the Council. ACTION REQUESTED: Approve payment of claims. ATTACHMENTS: 2026-02-17 City Claims Page 57 of 276 CLAIMS FOR APPROVAL 01/28/2026-02/09/2026 CHECK PAYMENTS 155,660.81$ ELECTRONIC PAYMENTS 283,164.65$ TOTAL 438,825.46$ The City Council receives a detail list of claims paid that is available to the public upon request. CITY OF FARMINGTON SUMMARY PAYMENT OF CLAIMS February 17, 2026 Page 58 of 276 Pa g e 5 9 o f 2 7 6 Pa g e 6 0 o f 2 7 6 Pa g e 6 1 o f 2 7 6 Pa g e 6 2 o f 2 7 6 Pa g e 6 3 o f 2 7 6 Pa g e 6 4 o f 2 7 6 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: Kim Sommerland, Finance Director Department: Finance Subject: Updated Capital Asset Policy Meeting: Regular Council - Feb 17 2026 INTRODUCTION: Staff recommends updating the City's Capital Asset Policy to change the depreciation method from the current six-month convention to beginning depreciation on the first day of the month the asset is placed into service. This change will improve accuracy in financial reporting and align with best practices. DISCUSSION: The City's current practice of using a six-month depreciation convention has been in place for several years, likely dating back to the early 2000s, when governments were first required to depreciate capital assets in government-wide financial statements. While the City's the address did update the 2025, not amended was Policy Asset Capital in depreciation method. Governmental accounting standards require that depreciation begin when an asset is "placed in service," but does not prescribe a specific proration method. Monthly proration, starting the first day of the month the asset is available for use, is widely recognized as best practice Governmental with aligns and usage it reflects better because actual Accounting Standards Board (GASB) principles. The six-month convention, while simple, does not provide the same level of accuracy. Under the proposed change, depreciation will begin on the first day of the month the asset is placed into service. All assets placed into service on or after January 1, 2025 will follow this method. BUDGET IMPACT: The policy change is not expected to have a direct budgetary impact. Timing differences in depreciation expense recognition are expected to be immaterial. ACTION REQUESTED: Staff requests that City Council review and approve the updated Capital Asset Policy. Page 65 of 276 ATTACHMENTS: Capital Asset Policy 20260217 Capital Asset Policy redlined 20260217 Page 66 of 276 FINANCE POLICY CAPITAL ASSET POLICY Purpose The purpose of this Capital Asset Policy is to provide clear guidelines for the identification, accounting, and reporting of capital assets owned by the City of Farmington. This policy is intended to ensure compliance with applicable accounting standards, promote consistent and accurate reporting, and provide a framework for safeguarding the assets. Overview Capital assets are critical to the City’s operations, providing long-term benefits to the community. These assets include both tangible and intangible items that are expected to be used in City operations for more than five years. Proper management of these assets is critical for maintaining transparency, ensuring financial accuracy, and complying with regulatory requirements. This policy covers the following key areas:  Definition and categorization of capital assets  Capitalization thresholds  Asset valuation  Depreciation method  Reporting and accountability requirements Scope This policy applies to all capital assets owned or controlled by the City of Farmington. The Finance Department is responsible for establishing and maintaining an asset accounting system, ensuring accurate financial reporting, and safeguarding these assets. Department Directors, Division Managers, and Supervisors are accountable for managing and protecting the capital assets under their control. All City employees are responsible for using City property solely for official City purposes and must exercise due diligence in safeguarding these assets to prevent loss, damage, or misuse. CAPITALIZATION OVERVIEW Capitalization is the process of allocating the cost of an asset, tangible or intangible, over its estimated life. Tangible assets have physical substance and include items such as land and land improvements, buildings and building improvements, machinery and equipment, vehicles, and infrastructure. Intangible assets lack physical substance but provide long-term benefits to the City. Intangible assets include easements and purchased software. The Finance Department will capitalize assets that have an expected useful life of more than five years and a value above the established threshold for their specific asset category. CAPITAL ASSET CATEGORIES Land & Land Improvements Land refers to real property, excluding structures and land improvements. Page 67 of 276 Capital Asset Policy 2 Approved 02.17.2026 FINANCE POLICY Land improvements are non-building assets that enhance the quality or facilitate the use of land and do not have an indefinite useful life. Examples of depreciable land improvements include fencing, outdoor lighting, playgrounds, and athletic fields. Land improvements such as fill, grading, and excavation that provide permanent benefits and incur limited deterioration with use or the passage of time are to be classified with land as non-depreciable. Building and Building Improvements Buildings are structures that are physical property of a permanent nature that enclose people, equipment, services or functions. Buildings may include major high cost components such as boilers, elevators, HVAC systems and roofs. If practical, these components should be recorded separately in the capital asset system to simplify future replacement transactions and because their useful lives can differ from buildings. Building Improvements are additions or improvements to buildings that increase the value or extend the useful life of a building. Examples include replacing major building components, structural additions to a building, major energy conservation projects, installation of upgraded plumbing or electrical systems, and major renovations of exterior structural deterioration. Machinery, Equipment, and Vehicles Machinery, equipment, and vehicles include physical, movable personal property used in the operations of the organization. These assets are typically not permanently affixed to buildings or land and are essential for day-to-day operations. They include a wide variety of items that support different functions within the organization, ranging from tools and machinery to motorized vehicles. Examples include machines, tools, furniture, computers, servers, lawn mowers, snowblowers, skid steers, street sweepers, cars, trucks, emergency vehicles (e.g., fire trucks, police vehicles), and specialized vehicles (e.g., plow trucks, construction vehicles). Infrastructure Infrastructure is categorized as assets that are long-lived, generally stationary in nature, and normally preserved for a significantly greater number of years than most capital assets. Examples are pavements, curbs, gutters, and sidewalks associated with roadways, bridges, sewer systems, water distribution systems, and water drainage systems. Intangible Assets Intangible assets are non-physical assets that have value due to their legal, economic, or intellectual property rights. Software and easements are typical examples. These assets are typically amortized over their useful lives, which can vary based on the asset type and contractual or legal terms. Construction In Progress Construction in Progress refers to costs incurred for assets that are in the process of being built or developed but are not yet ready for use or service. These assets are recorded in this category until the asset is substantially ready to be placed into service. Once substantially completed, the accumulated costs are transferred to the appropriate capital asset category (e.g., buildings, infrastructure, machinery) and at that time depreciation can begin. Page 68 of 276 Capital Asset Policy 3 Approved 02.17.2026 FINANCE POLICY CAPITALIZATION THRESHOLDS The following thresholds apply for the various asset categories: Asset Category Single Purchase Land All Land Improvements $50,000 Building and Building Improvements $50,000 Machinery, Equipment, and Vehicles $25,000 Infrastructure $100,000 Intangible Assets* $10,000 Other Capital Assets $10,000 *Though leases under Governmental Accounting Standards Board (GASB) Statement No. 87 and software-based IT arrangements (SBITAs) under GASB Statement No. 96 may be considered intangible, their capitalization should follow the thresholds of the applicable category of their underlying asset as described later. Additionally, permanent easements are considered intangible assets but are not depreciated or amortized, regardless of their value. Assets below the thresholds stated may still be capitalized when there are secondary benefits or requirements for doing so (e.g. Federal grant thresholds below those shown). Exceptions to the Capitalization Threshold BULK/AGGREGATED ITEMS According to GASB, some assets individually may fall below the capitalization threshold but may be purchased in large quantities. In cases where tangible assets are acquired together as a part of routine replacement with an aggregate value of $200,000 or more, the total cost of the group will be capitalized. The aggregated items may be maintained separately in the accounting system for easier identification during inventorying and disposal. GRANT-FUNDED EQUIPMENT Many grantor agencies permit the acquisition of non-expendable equipment with project funds. It is necessary to know who owns the equipment which is addressed in the sponsor’s guidelines and/or in the property clause of the agreement. It is the responsibility of the primary department receiving the grant to ascertain the specific requirements of the award prior to ordering equipment. Capitalization will follow the grantor's requirements if they are specified. ASSET VALUATION Historical Cost Capital assets are recorded at their historical cost, which includes the acquisition price and any additional costs necessary to bring the asset into its intended location and condition for use. This may include installation, testing, and professional fees. Costs should only be capitalized if they meet the following two criteria: 1. The cost is directly identifiable with a specific asset. 2. The expenditure occurs after it becomes probable that the asset will be acquired. For example, while a feasibility study or site selection study is not capitalized, legal costs incurred to acquire property are capitalized. Page 69 of 276 Capital Asset Policy 4 Approved 02.17.2026 FINANCE POLICY Subsequent Costs Subsequent costs, such as improvements or additions, should be capitalized if they enhance the asset’s functionality or extend its useful life. Routine repairs and maintenance, which restore the asset to its original condition, should be expensed when incurred. For example, resurfacing a road would be a repair and not capitalized, while reconstructing or adding a new lane would be capitalized as an addition. For expenditures related to existing capital assets to be capitalized, they must meet at least one of the following criteria and exceed the defined thresholds: 1. Significantly extend the asset's useful life beyond its initial estimate. 2. Increase the service capacity of the asset. 3. Materially improves the asset’s efficiency. Expenditures that do not meet the above criteria but return the asset to its original condition (regardless of cost) should be classified as maintenance or repairs and expensed. Generally speaking, an extended useful life usually involves a significant alteration or structural change. Also, if this does occur, be sure to dispose the old asset value being replaced from the asset listing. For example, if a road project is considered capital, the value of the existing road should be removed since you won’t have two roads when the project is completed. Capitalizable Costs Costs incurred after acquisition becomes probable are capitalized. Typical costs include, but are not limited to:  Purchase or Construction Cost: Actual costs related to acquiring or constructing the asset (e.g., land, building, equipment, or infrastructure).  Materials and Supplies: Items directly used in constructing, improving, or enhancing the asset that become a permanent part of the finished asset (e.g., concrete for a building, steel for a bridge).  Professional Fees: Fees for services such as architects, engineers, legal, or other professional expertise required to acquire, design, or improve an asset.  Installation & Testing Costs: Expenses for installing the asset and testing it to ensure readiness for its intended use.  Site Preparation Costs: Costs related to preparing land or other assets for use (e.g., excavation, grading, demolition).  Permits, Licenses, and Taxes: Expenses related to required permits or taxes directly associated with acquiring or constructing the asset. General Exclusions from Capitalization The following costs do not meet the criteria for capitalization and should be expensed as incurred:  Routine Repairs & Maintenance: Regular maintenance costs (e.g., plumbing repairs, repainting) that do not extend the asset’s useful life or increase its value.  Decorative or Cosmetic Improvements: Non-essential aesthetic upgrades (e.g., drapes, wallpaper). Page 70 of 276 Capital Asset Policy 5 Approved 02.17.2026 FINANCE POLICY  Extended Warranties & Maintenance Agreements: Separate costs for extended warranties or maintenance contracts unrelated to the asset’s acquisition.  Operational Costs Unrelated to Capitalization: General administrative costs or operational expenses not directly related to the acquisition or development of the asset (e.g., unrelated employee wages).  Replacement with Like-Kind Parts: Replacing parts with the same type that do not enhance the asset’s performance (e.g., replacing a boiler with one of the same type). Donated Capital Assets Assets acquired at a nominal amount or received as donations should be recorded at their estimated fair value at the time of acquisition, plus any associated charges. If fair value is not easily obtainable, the City should use the cost it would incur to acquire or contract for the asset. DEPRECIATION Depreciation is the process of allocating the cost of tangible property over a period of time rather than deducting the cost as an expense in the year of acquisition. All non-current assets with limited useful lives, including intangibles, shall be depreciated. Accurate depreciation methods and estimated useful life is critical in correctly determining City financial performance. Estimated useful lives shall be as accurate as possible and take into account physical wear and tear, technical obsolescence and commercial obsolescence, and conform to any government regulations. Depreciation Method The City will utilize the straight-line method for depreciation. Equal periodic depreciation charges are therefore recognized over the life of the asset. The total amount depreciated will never exceed the asset’s historical cost. Depreciation will begin on the first day of the month in which the asset is placed into service. This approach aligns with Governmental Accounting Standards Board (GASB) guidance that depreciation should start when an asset is available for its intended use. This method is effective for assets placed into service on or after January 1, 2025, replacing the previous half-year convention. LEASES AND SBITAS For leases and Software-Based Information Technology Arrangements (SBITAs), the City will apply the straight-line method of amortization over the full term of the agreement based on the date placed into service. Useful Life The City’s capital assets will be depreciated based on the following schedule of estimated useful lives. If a more accurate estimated life is known, that estimate should be used instead of the life shown below for that asset. Asset Category Useful Life Land indefinite Buildings 30-50 years Improvements (Land & Building) 10-20 years Machinery, Equipment, and Vehicles 5-20 years Infrastructure 30-50 years Page 71 of 276 Capital Asset Policy 6 Approved 02.17.2026 FINANCE POLICY LEASES A lease is a contract granting the right to use another entity’s non-financial asset (e.g., land, buildings, vehicles, equipment) for a set period in exchange for consideration. Any contract that meets this definition should be accounted for under the GASB 87 guideline, unless specifically excluded by GASB 87. Leases do not include contracts that transfer ownership at the end of the contract or short-term leases. Lessee Accounting When the City obtains the right to use a non-financial asset from another party and that meets the following criteria shall be reported as a lease. 1. The lease term is more than one year. 2. The transaction is exchange-like (i.e., not a $1 lease). 3. The present value of lease payments is material to the financial statements, based on the nature of the lease and the City's financial position. Lessee accounting involves:  Record Asset and Liability: The City, as the lessee, must recognize the lease asset and corresponding liability at the present value of future lease payments, which include fixed, variable, and reasonably certain payments.  Interest and Liability Reduction: As lease payments are made, the principal portion reduces the liability, and the interest portion is expensed.  Discount Rate: If the lease specifies an interest rate, that rate should be used to discount the future payments. If no interest rate is specified, the City should use the lessor’s interest rate. If the lessor’s rate is unavailable, the City may use either the City’s incremental borrowing rate (IBR), which reflects the interest rate the City would pay if borrowing funds for a similar term and with similar security, or an adjusted risk-free rate, such as the US Treasury yield rate plus 1%. Lessor Accounting When the City provides the right to use a non-financial asset to another party through a lease agreement, the City, as the lessor, must report the leased asset in its financial statements and recognize a lease receivable for the future payments expected from the lessee. 1. The lease term is more than one year. 2. The transaction is exchange-like (i.e., not a $1 lease). 3. The amount of the lease payments is material to the financial statements, based on the nature of the lease and the City's financial position. Lessor accounting involves:  Record Lease Receivable and Leased Asset: The City must record the lease receivable (representing the future lease payments) and the leased asset on its books.  Deferring Upfront Payments: Any upfront cash payments received must be deferred and recognized over the lease term.  Track Payments and Incentives: The City must track and measure lease payments, including fixed and variable payments, residual value guarantees, and any incentives. Page 72 of 276 Capital Asset Policy 7 Approved 02.17.2026 FINANCE POLICY  Discount Rate: If the lease includes an interest rate, the City uses that rate to calculate the present value of future lease payments. If no interest rate is specified, the City may use either the City’s incremental borrowing rate (IBR), which reflects the interest rate the City would pay if borrowing funds for a similar term and with similar security, or an adjusted risk-free rate, such as the US Treasury yield rate plus 1%. Lease Administrative Procedures Departments must coordinate with the Finance Department when adding new leases or making any significant changes to existing leases, such as contract modifications, payment adjustments, or other updates, to ensure accurate reporting and compliance. For leases that involve multiple assets, each asset should be accounted for separately unless it is impractical to do so. In such cases, the lease can be consolidated based on professional judgment. All lease-related records must be maintained for audit purposes. SOFTWARE-BASED INFORMATION TECHNOLOGY ARRANGEMENTS A Software-Based Information Technology Arrangement (SBITA) is a contract granting the right to use another party’s IT software (often cloud-based or subscription software) and, in some cases, related tangible assets. It applies to software acquisitions and excludes contracts transferring ownership. SBITA Term The subscription term includes the non-cancellable period and any options to extend or terminate, based on reasonable certainty of their exercise. SBITAs with a term of 12 months or less cannot be capitalized and should be recorded as current expenditures. Periods with mutual termination options are considered cancelable and excluded from the term. SBITA Accounting SBITAs with expected total payments that are material to the City’s financial position must be capitalized. This total includes all expected subscription payments, such as fixed, variable (based on index/rate), termination penalties, and incentives, and is not limited to the upfront cost. Payments based on performance or usage are expensed when incurred. Training costs are always expensed. The intangible subscription asset is the sum of the subscription liability, upfront vendor payments, and capitalizable implementation costs, minus any vendor incentives. Future subscription payments will be discounted using the vendor's interest rate. If the vendor’s rate is not available, the City may use either the City’s incremental borrowing rate (IBR), which reflects the interest rate the City would pay if borrowing funds for a similar term and with similar security, or an adjusted risk-free rate, such as the US Treasury yield rate plus 1%. SBITA Administrative Procedures Departments must work closely with the Finance Department when adding new SBITAs, as well as to track and report any significant changes such as termination penalties, variable payments, or contract modifications. All records must be retained for audit purposes. Page 73 of 276 Capital Asset Policy 8 Approved 02.17.2026 FINANCE POLICY ASSET MANAGEMENT Record of Inventory The City’s fixed asset system will serve as the inventory record for capital assets. Each asset in the fixed asset system will include a description, year of acquisition, cost, estimated useful life, current net book value and accumulated depreciation. The inventory record will also identify the department or division responsible for the asset. The responsibility for the custody, use, control and care of City property rests with each department. Departments should track small and attractive assets that fall below the capitalization threshold but are at higher risk for theft or misuse, as well as those that require special attention to ensure public safety and mitigate potential liability (e.g., police weapons). Responsible departments should implement appropriate measures, such as asset tagging, where feasible, to control and track these sensitive non- capital assets. Departments have the discretion to define what constitutes "small and attractive" assets. However, it is recommended that, at a minimum, all weapons, regardless of cost, and assets with a unit cost of $1,000 or more be tracked. These assets include, but are not limited to:  Communications equipment (audio and video)  Optical devices (binoculars, infrared viewers, range finders)  Cameras and photographic projection equipment  Personal computers, laptops, notebooks, and cell phones  Data processing equipment and components (scanners, data displays, etc.)  Radios, televisions, and video/audio recorders  Power tools If resources allow, an inventory of tracked assets, particularly critical capital assets, should be completed annually. The Minnesota Office of the State Auditor recommends performing a full inventory at least once every five years. Any discrepancies identified during the inventory process must be reported to the Finance Director within 30 days. It is the responsibility of every City employee to use property only for City purposes and exercise reasonable care for its safekeeping. Transfer or Disposal of Assets The City will dispose of capital assets that are no longer needed, obsolete, or beyond repair. Departments should regularly review their inventory and dispose of equipment deemed unnecessary or obsolete within 12 months. This helps to minimize storage costs, avoid the accumulation of unnecessary assets, and maintain accurate financial records. Before disposing of any capital assets, departments must first obtain approval from the City Council. After receiving Council approval, the department responsible for the asset must report the disposal to the Finance Department within 30 days to ensure proper documentation in the fixed asset system. Surplus capital assets that are suitable for sale must be sold through a public auction or a sealed bid process. Assets not suitable for sale may be disposed of by following legal requirements for disposal. In all instances, the City shall comply with applicable Minnesota Statutes regarding the disposal and sale of capital assets. Page 74 of 276 Capital Asset Policy 9 Approved 02.17.2026 FINANCE POLICY The disposition of capital assets purchased with Federal grant funds must adhere to the specific guidelines of the grant, including the duration the asset must remain under the City's ownership and the disposal of any proceeds from the sale. Page 75 of 276 FINANCE POLICY CAPITAL ASSET POLICY Purpose The purpose of this Capital Asset Policy is to provide clear guidelines for the identification, accounting, and reporting of capital assets owned by the City of Farmington. This policy is intended to ensure compliance with applicable accounting standards, promote consistent and accurate reporting, and provide a framework for safeguarding the assets. Overview Capital assets are critical to the City’s operations, providing long-term benefits to the community. These assets include both tangible and intangible items that are expected to be used in City operations for more than five years. Proper management of these assets is critical for maintaining transparency, ensuring financial accuracy, and complying with regulatory requirements. This policy covers the following key areas:  Definition and categorization of capital assets  Capitalization thresholds  Asset valuation  Depreciation method  Reporting and accountability requirements Scope This policy applies to all capital assets owned or controlled by the City of Farmington. The Finance Department is responsible for establishing and maintaining an asset accounting system, ensuring accurate financial reporting, and safeguarding these assets. Department Directors, Division Managers, and Supervisors are accountable for managing and protecting the capital assets under their control. All City employees are responsible for using City property solely for official City purposes and must exercise due diligence in safeguarding these assets to prevent loss, damage, or misuse. CAPITALIZATION OVERVIEW Capitalization is the process of allocating the cost of an asset, tangible or intangible, over its estimated life. Tangible assets have physical substance and include items such as land and land improvements, buildings and building improvements, machinery and equipment, vehicles, and infrastructure. Intangible assets lack physical substance but provide long-term benefits to the City. Intangible assets include easements and purchased software. The Finance Department will capitalize assets that have an expected useful life of more than five years and a value above the established threshold for their specific asset category. CAPITAL ASSET CATEGORIES Land & Land Improvements Land refers to real property, excluding structures and land improvements. Page 76 of 276 Capital Asset Policy 2 Approved 04.07.202502.17.2026 FINANCE POLICY Land improvements are non-building assets that enhance the quality or facilitate the use of land and do not have an indefinite useful life. Examples of depreciable land improvements include fencing, outdoor lighting, playgrounds, and athletic fields. Land improvements such as fill, grading, and excavation that provide permanent benefits and incur limited deterioration with use or the passage of time are to be classified with land as non-depreciable. Building and Building Improvements Buildings are structures that are physical property of a permanent nature that enclose people, equipment, services or functions. Buildings may include major high cost components such as boilers, elevators, HVAC systems and roofs. If practical, these components should be recorded separately in the capital asset system to simplify future replacement transactions and because their useful lives can differ from buildings. Building Improvements are additions or improvements to buildings that increase the value or extend the useful life of a building. Examples include replacing major building components, structural additions to a building, major energy conservation projects, installation of upgraded plumbing or electrical systems, and major renovations of exterior structural deterioration. Machinery, Equipment, and Vehicles Machinery, equipment, and vehicles include physical, movable personal property used in the operations of the organization. These assets are typically not permanently affixed to buildings or land and are essential for day-to-day operations. They include a wide variety of items that support different functions within the organization, ranging from tools and machinery to motorized vehicles. Examples include machines, tools, furniture, computers, servers, lawn mowers, snowblowers, skid steers, street sweepers, cars, trucks, emergency vehicles (e.g., fire trucks, police vehicles), and specialized vehicles (e.g., plow trucks, construction vehicles). Infrastructure Infrastructure is categorized as assets that are long-lived, generally stationary in nature, and normally preserved for a significantly greater number of years than most capital assets. Examples are pavements, curbs, gutters, and sidewalks associated with roadways, bridges, sewer systems, water distribution systems, and water drainage systems. Intangible Assets Intangible assets are non-physical assets that have value due to their legal, economic, or intellectual property rights. Software and easements are typical examples. These assets are typically amortized over their useful lives, which can vary based on the asset type and contractual or legal terms. Construction In Progress Construction in Progress refers to costs incurred for assets that are in the process of being built or developed but are not yet ready for use or service. These assets are recorded in this category until the asset is substantially ready to be placed into service. Once substantially completed, the accumulated costs are transferred to the appropriate capital asset category (e.g., buildings, infrastructure, machinery) and at that time depreciation can begin. Page 77 of 276 Capital Asset Policy 3 Approved 04.07.202502.17.2026 FINANCE POLICY CAPITALIZATION THRESHOLDS The following thresholds apply for the various asset categories: Asset Category Single Purchase Land All Land Improvements $50,000 Building and Building Improvements $50,000 Machinery, Equipment, and Vehicles $25,000 Infrastructure $100,000 Intangible Assets* $10,000 Other Capital Assets $10,000 *Though leases under Governmental Accounting Standards Board (GASB) Statement No. 87 and software-based IT arrangements (SBITAs) under GASB Statement No. 96 may be considered intangible, their capitalization should follow the thresholds of the applicable category of their underlying asset as described later. Additionally, permanent easements are considered intangible assets but are not depreciated or amortized, regardless of their value. Assets below the thresholds stated may still be capitalized when there are secondary benefits or requirements for doing so (e.g. Federal grant thresholds below those shown). Exceptions to the Capitalization Threshold BULK/AGGREGATED ITEMS According to GASB, some assets individually may fall below the capitalization threshold but may be purchased in large quantities. In cases where tangible assets are acquired together as a part of routine replacement with an aggregate value of $200,000 or more, the total cost of the group will be capitalized. The aggregated items may be maintained separately in the accounting system for easier identification during inventorying and disposal. GRANT-FUNDED EQUIPMENT Many grantor agencies permit the acquisition of non-expendable equipment with project funds. It is necessary to know who owns the equipment which is addressed in the sponsor’s guidelines and/or in the property clause of the agreement. It is the responsibility of the primary department receiving the grant to ascertain the specific requirements of the award prior to ordering equipment. Capitalization will follow the grantor's requirements if they are specified. ASSET VALUATION Historical Cost Capital assets are recorded at their historical cost, which includes the acquisition price and any additional costs necessary to bring the asset into its intended location and condition for use. This may include installation, testing, and professional fees. Costs should only be capitalized if they meet the following two criteria: 1. The cost is directly identifiable with a specific asset. 2. The expenditure occurs after it becomes probable that the asset will be acquired. For example, while a feasibility study or site selection study is not capitalized, legal costs incurred to acquire property are capitalized. Page 78 of 276 Capital Asset Policy 4 Approved 04.07.202502.17.2026 FINANCE POLICY Subsequent Costs Subsequent costs, such as improvements or additions, should be capitalized if they enhance the asset’s functionality or extend its useful life. Routine repairs and maintenance, which restore the asset to its original condition, should be expensed when incurred. For example, resurfacing a road would be a repair and not capitalized, while reconstructing or adding a new lane would be capitalized as an addition. For expenditures related to existing capital assets to be capitalized, they must meet at least one of the following criteria and exceed the defined thresholds: 1. Significantly extend the asset's useful life beyond its initial estimate. 2. Increase the service capacity of the asset. 3. Materially improves the asset’s efficiency. Expenditures that do not meet the above criteria but return the asset to its original condition (regardless of cost) should be classified as maintenance or repairs and expensed. Generally speaking, an extended useful life usually involves a significant alteration or structural change. Also, if this does occur, be sure to dispose the old asset value being replaced from the asset listing. For example, if a road project is considered capital, the value of the existing road should be removed since you won’t have two roads when the project is completed. Capitalizable Costs Costs incurred after acquisition becomes probable are capitalized. Typical costs include, but are not limited to:  Purchase or Construction Cost: Actual costs related to acquiring or constructing the asset (e.g., land, building, equipment, or infrastructure).  Materials and Supplies: Items directly used in constructing, improving, or enhancing the asset that become a permanent part of the finished asset (e.g., concrete for a building, steel for a bridge).  Professional Fees: Fees for services such as architects, engineers, legal, or other professional expertise required to acquire, design, or improve an asset.  Installation & Testing Costs: Expenses for installing the asset and testing it to ensure readiness for its intended use.  Site Preparation Costs: Costs related to preparing land or other assets for use (e.g., excavation, grading, demolition).  Permits, Licenses, and Taxes: Expenses related to required permits or taxes directly associated with acquiring or constructing the asset. General Exclusions from Capitalization The following costs do not meet the criteria for capitalization and should be expensed as incurred:  Routine Repairs & Maintenance: Regular maintenance costs (e.g., plumbing repairs, repainting) that do not extend the asset’s useful life or increase its value.  Decorative or Cosmetic Improvements: Non-essential aesthetic upgrades (e.g., drapes, wallpaper). Page 79 of 276 Capital Asset Policy 5 Approved 04.07.202502.17.2026 FINANCE POLICY  Extended Warranties & Maintenance Agreements: Separate costs for extended warranties or maintenance contracts unrelated to the asset’s acquisition.  Operational Costs Unrelated to Capitalization: General administrative costs or operational expenses not directly related to the acquisition or development of the asset (e.g., unrelated employee wages).  Replacement with Like-Kind Parts: Replacing parts with the same type that do not enhance the asset’s performance (e.g., replacing a boiler with one of the same type). Donated Capital Assets Assets acquired at a nominal amount or received as donations should be recorded at their estimated fair value at the time of acquisition, plus any associated charges. If fair value is not easily obtainable, the City should use the cost it would incur to acquire or contract for the asset. DEPRECIATION Depreciation is the process of allocating the cost of tangible property over a period of time rather than deducting the cost as an expense in the year of acquisition. All non-current assets with limited useful lives, including intangibles, shall be depreciated. Accurate depreciation methods and estimated useful life is critical in correctly determining City financial performance. Estimated useful lives shall be as accurate as possible and take into account physical wear and tear, technical obsolescence and commercial obsolescence, and conform to any government regulations. Depreciation Method The City will utilize the straight-line method for depreciation. Equal periodic depreciation charges are therefore recognized over the life of the asset. The total amount depreciated will never exceed the asset’s historical cost. To simplify the process of depreciating assets, the City will use a half-year convention. This means that any asset placed in service during a given year will be treated as if it were placed in service at the midpoint of the fiscal year, regardless of the actual purchase or service date. Since the City’s fiscal year aligns with the calendar year, will be considered in service starting July 1st. Depreciation will begin on the first day of the month in which the asset is placed into service. This approach aligns with Governmental Accounting Standards Board (GASB) guidance that depreciation should start when an asset is available for its intended use. This method is effective for assets placed into service on or after January 1, 2025, replacing the previous half-year convention. LEASES AND SBITAS For leases and Software-Based Information Technology Arrangements (SBITAs), the City will apply the straight-line method of amortization over the full term of the agreement based on the date placed into service. Useful Life The City’s capital assets will be depreciated based on the following schedule of estimated useful lives. If a more accurate estimated life is known, that estimate should be used instead of the life shown below for that asset. Asset Category Useful Life Land indefinite Page 80 of 276 Capital Asset Policy 6 Approved 04.07.202502.17.2026 FINANCE POLICY Buildings 30-50 years Improvements (Land & Building) 10-20 years Machinery, Equipment, and Vehicles 5-20 years Infrastructure 30-50 years LEASES A lease is a contract granting the right to use another entity’s non-financial asset (e.g., land, buildings, vehicles, equipment) for a set period in exchange for consideration. Any contract that meets this definition should be accounted for under the GASB 87 guideline, unless specifically excluded by GASB 87. Leases do not include contracts that transfer ownership at the end of the contract or short-term leases. Lessee Accounting When the City obtains the right to use a non-financial asset from another party and that meets the following criteria shall be reported as a lease. 1. The lease term is more than one year. 2. The transaction is exchange-like (i.e., not a $1 lease). 3. The present value of lease payments is material to the financial statements, based on the nature of the lease and the City's financial position. Lessee accounting involves:  Record Asset and Liability: The City, as the lessee, must recognize the lease asset and corresponding liability at the present value of future lease payments, which include fixed, variable, and reasonably certain payments.  Interest and Liability Reduction: As lease payments are made, the principal portion reduces the liability, and the interest portion is expensed.  Discount Rate: If the lease specifies an interest rate, that rate should be used to discount the future payments. If no interest rate is specified, the City should use the lessor’s interest rate. If the lessor’s rate is unavailable, the City may use either the City’s incremental borrowing rate (IBR), which reflects the interest rate the City would pay if borrowing funds for a similar term and with similar security, or an adjusted risk-free rate, such as the US Treasury yield rate plus 1%. Lessor Accounting When the City provides the right to use a non-financial asset to another party through a lease agreement, the City, as the lessor, must report the leased asset in its financial statements and recognize a lease receivable for the future payments expected from the lessee. 1. The lease term is more than one year. 2. The transaction is exchange-like (i.e., not a $1 lease). 3. The amount of the lease payments is material to the financial statements, based on the nature of the lease and the City's financial position. Lessor accounting involves:  Record Lease Receivable and Leased Asset: The City must record the lease receivable (representing the future lease payments) and the leased asset on its books. Page 81 of 276 Capital Asset Policy 7 Approved 04.07.202502.17.2026 FINANCE POLICY  Deferring Upfront Payments: Any upfront cash payments received must be deferred and recognized over the lease term.  Track Payments and Incentives: The City must track and measure lease payments, including fixed and variable payments, residual value guarantees, and any incentives.  Discount Rate: If the lease includes an interest rate, the City uses that rate to calculate the present value of future lease payments. If no interest rate is specified, the City may use either the City’s incremental borrowing rate (IBR), which reflects the interest rate the City would pay if borrowing funds for a similar term and with similar security, or an adjusted risk-free rate, such as the US Treasury yield rate plus 1%. Lease Administrative Procedures Departments must coordinate with the Finance Department when adding new leases or making any significant changes to existing leases, such as contract modifications, payment adjustments, or other updates, to ensure accurate reporting and compliance. For leases that involve multiple assets, each asset should be accounted for separately unless it is impractical to do so. In such cases, the lease can be consolidated based on professional judgment. All lease-related records must be maintained for audit purposes. SOFTWARE-BASED INFORMATION TECHNOLOGY ARRANGEMENTS A Software-Based Information Technology Arrangement (SBITA) is a contract granting the right to use another party’s IT software (often cloud-based or subscription software) and, in some cases, related tangible assets. It applies to software acquisitions and excludes contracts transferring ownership. SBITA Term The subscription term includes the non-cancellable period and any options to extend or terminate, based on reasonable certainty of their exercise. SBITAs with a term of 12 months or less cannot be capitalized and should be recorded as current expenditures. Periods with mutual termination options are considered cancelable and excluded from the term. SBITA Accounting SBITAs with expected total payments that are material to the City’s financial position must be capitalized. This total includes all expected subscription payments, such as fixed, variable (based on index/rate), termination penalties, and incentives, and is not limited to the upfront cost. Payments based on performance or usage are expensed when incurred. Training costs are always expensed. The intangible subscription asset is the sum of the subscription liability, upfront vendor payments, and capitalizable implementation costs, minus any vendor incentives. Future subscription payments will be discounted using the vendor's interest rate. If the vendor’s rate is not available, the City may use either the City’s incremental borrowing rate (IBR), which reflects the interest rate the City would pay if borrowing funds for a similar term and with similar security, or an adjusted risk-free rate, such as the US Treasury yield rate plus 1%. SBITA Administrative Procedures Departments must work closely with the Finance Department when adding new SBITAs, as well as to track and report any significant changes such as termination penalties, variable payments, or contract modifications. Page 82 of 276 Capital Asset Policy 8 Approved 04.07.202502.17.2026 FINANCE POLICY All records must be retained for audit purposes. ASSET MANAGEMENT Record of Inventory The City’s fixed asset system will serve as the inventory record for capital assets. Each asset in the fixed asset system will include a description, year of acquisition, cost, estimated useful life, current net book value and accumulated depreciation. The inventory record will also identify the department or division responsible for the asset. The responsibility for the custody, use, control and care of City property rests with each department. Departments should track small and attractive assets that fall below the capitalization threshold but are at higher risk for theft or misuse, as well as those that require special attention to ensure public safety and mitigate potential liability (e.g., police weapons). Responsible departments should implement appropriate measures, such as asset tagging, where feasible, to control and track these sensitive non- capital assets. Departments have the discretion to define what constitutes "small and attractive" assets. However, it is recommended that, at a minimum, all weapons, regardless of cost, and assets with a unit cost of $1,000 or more be tracked. These assets include, but are not limited to:  Communications equipment (audio and video)  Optical devices (binoculars, infrared viewers, range finders)  Cameras and photographic projection equipment  Personal computers, laptops, notebooks, and cell phones  Data processing equipment and components (scanners, data displays, etc.)  Radios, televisions, and video/audio recorders  Power tools If resources allow, an inventory of tracked assets, particularly critical capital assets, should be completed annually. The Minnesota Office of the State Auditor recommends performing a full inventory at least once every five years. Any discrepancies identified during the inventory process must be reported to the Finance Director within 30 days. It is the responsibility of every City employee to use property only for City purposes and exercise reasonable care for its safekeeping. Transfer or Disposal of Assets The City will dispose of capital assets that are no longer needed, obsolete, or beyond repair. Departments should regularly review their inventory and dispose of equipment deemed unnecessary or obsolete within 12 months. This helps to minimize storage costs, avoid the accumulation of unnecessary assets, and maintain accurate financial records. Before disposing of any capital assets, departments must first obtain approval from the City Council. After receiving Council approval, the department responsible for the asset must report the disposal to the Finance Department within 30 days to ensure proper documentation in the fixed asset system. Surplus capital assets that are suitable for sale must be sold through a public auction or a sealed bid process. Assets not suitable for sale may be disposed of by following legal requirements for disposal. In Page 83 of 276 Capital Asset Policy 9 Approved 04.07.202502.17.2026 FINANCE POLICY all instances, the City shall comply with applicable Minnesota Statutes regarding the disposal and sale of capital assets. The disposition of capital assets purchased with Federal grant funds must adhere to the specific guidelines of the grant, including the duration the asset must remain under the City's ownership and the disposal of any proceeds from the sale. Page 84 of 276 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: Samantha Hazelrigg, Human Resources Manager Department: HR Subject: Assistant City Administrator Job Description Update Meeting: Regular Council - Feb 17 2026 INTRODUCTION: City Assistant the position, Resources Manager the of creation the With Human Administrator no longer actively conducts day-to-day Human Resources activities. As such, the position job description should be updated. DISCUSSION: While the Assistant City Administrator (ACA) still oversees the Human Resources Division, the creation has day-to-day the removed position the Resources Human of Manager responsibilities from the position. This change is allowing the ACA to shift focus to leading organizational development initiatives to strengthen leadership, workforce engagement, and in operational effectiveness while continuing to support the City Administrator managing daily municipal operations and implementing City Council policies and priorities, overseeing special projects, and coordinating Human Resources, Communications, City Clerk, Liquor Operations, and Reception. The attached updated job description reflects these changes. ACTION REQUESTED: Approve the updated Assistant City Administrator job description. ATTACHMENTS: Assistant City Administrator - February 2026 Page 85 of 276 CITY OF FARMINGTON, MN CLASS SPECIFICATION CLASS SPECIFICATION TITLE: ASSISTANT CITY ADMINISTRATOR 1 BAND GRADE SUBGRADE FLSA STATUS: D 6 2 Exempt CLASS SUMMARY: The Assistant City Administrator supports the City Administrator in managing daily municipal operations, overseeing special projects, and implementing City Council policies. This role oversees and coordinates Human Resources, Communications, City Clerk, Liquor Operations, and Reception to ensure efficient, compliant, and customer-focused services. A key responsibility is leading organizational development initiatives to strengthen leadership, workforce engagement, and operational effectiveness. The position supports budget development, strategic planning, and cross-departmental projects, and represents the City Administrator as assigned. The Assistant City Administrator serves as the City’s Chief Administrative Officer in the absence of the City Administrator. TYPICAL CLASS ESSENTIAL DUTIES: (These duties are a representative sample; position assignments may vary.) 1. 2. 3. 4. 5. 6. 7. 8. Assists the City Administrator in the overall administration of city affairs, policies, programs and public relations; prepares and monitors budgets for the City Council, Administration, Human Resources, City Clerk, Elections, Communications, Municipal Liquor, and general government; assists in research, community relations, and special projects; serves as City Administrator in their absence; prepares and presents information to City Council, advisory committees, citizens and/or staff as needed. Manages Human Resources, Communications, Liquor Operations, Reception, and City Clerk areas. Oversees operations while assisting staff to act consistently with council’s strategic goals and best practices. Leads organizational development initiatives to strengthen leadership, workforce engagement, and operational effectiveness. Reviews and analyzes state and federal laws, rules and regulations related to employment, safety and labor relations to determine applicability and actions necessary for compliance and to reduce liability. Explains laws and regulations to management staff and employees. Assigns, leads, trains, and reviews the work of department staff; provides rewards and discipline; coaches, counsels, and evaluates staff performance; develops staff schedules; ensures deadlines for the department are met; develops and achieves high performance and strategic objects for the department; supervises daily operations. In coordination with the Human Resources Managers, provides recommendations on hiring, terminating, promoting/demoting, and suspensions of City staff to City Administrator and managerial staff; Participates in commissions, committees, and community groups; serves as Farmington Cable Commissioner, and leads and/or serves on various internal committees. Performs other duties and assumes other responsibilities as apparent or as delegated. Page 86 of 276 CITY OF FARMINGTON, MN CLASS SPECIFICATION CLASS SPECIFICATION TITLE: ASSISTANT CITY ADMINISTRATOR 2 Training and Experience (positions in this class typically require): • Bachelor’s degree in Public Administration, Human Resources, Business Administration, Organizational Development, or a degree in a related field. • Five years of related experience in the public sector or equivalent. • Three years of supervisory experience. • Or, an equivalent combination of education and experience sufficient to successfully perform the duties listed above. • A valid driver’s license. Preferred Qualifications: Master’s degree in Public Administration, Business Administration, Human Resources, Organizational development, Industrial Relations or related field; minimum of five years of supervisory experience. Knowledge, Skills and Abilitues (position requirements at entry): • Ability to demonstrate integrity, ingenuity and inventiveness in the performance of assigned tasks; • Ability to maintain highest confidentiality when dealing with sensitive or private information. • Thorough knowledge of the principles and practices of human resources and considerable knowledge of public administration. • Throrough knowledge of city objectices, procedures and organization. • Excellent public education/presentation skills. • Considerable skill in interpersonal communication as applied to interaction with City staff, subordinates, labor union representatives, coworkers, supervisor, the general public, etc. • Considerable ability to provide leadership which promotes collaboration, innovation, and a spirit of teamwork that fosters individual and organizational growth. • Ability to learn and effectively use multiple types of software such as Microsoft products, recruitment and hiring software, performance management software and records management software. • Ability to handle stress and/or stressful situations. • Ability to handle conflict and uncertain situations. • Ability to establish and maintain effective working relationships with officials, subordinates and other employees, including the general public. • Ability to problem-solve challenges and issues faced. • Ability to work in a fast-paced environment with many interruptions. • Ability to look at all angles, perceive potential problems and handle details. Physical Requirements: Positions in this class typically require: standing, walking, pushing, pulling, lifting, reaching, fine motor skills, grasping, feeling, talking, hearing, seeing and repetitive motions. Position occasioanlly requires balancing, stooping, kneeling or crouching, Sedentary Work: Exerting up to 10 pounds of force occasionally and/or a negligible amount of force frequently or constantly to lift, carry, push, pull or otherwise move objects, including the human body. Sedentary work involves sitting most of the time. Jobs are sedentary if walking and standing are required only occasionally and all other sedentary criteria are met. NOTE: The above job description is intended to represent only the key areas of responsibilities; specific position assignments will vary depending on the business needs of the department. Classification History: Draft prepared by City of Farmington Date: 03/29/2022, 02/17/2026 Page 87 of 276 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: Samantha Hazelrigg, Human Resources Manager Department: HR Subject: Staff Approvals & Recommendations Meeting: Regular Council - Feb 17 2026 INTRODUCTION: Staff recommends the following:  Appointment of Keaton Reuben as Police Sergeant. DISCUSSION: Staff is excited to present the appointment of Keaton Reuben as Police Sergeant. Keaton currently serves as a Police Officer with the Farmington Police Department and has served the Department since 2017. BUDGET IMPACT: Included in the 2026 budget. ACTION REQUESTED: Approve the appointment of Keaton Reuben as Police Sergeant. Page 88 of 276 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: Kellee Omlid, Parks & Recreation Director Department: Parks & Recreation Subject: Agreement with Cool Air Mechanical, Inc. for Relief Valve Replacement at Schmitz-Maki Arena Meeting: Regular Council - Feb 17 2026 INTRODUCTION: The Schmitz-Maki Arena’s (Arena) refrigeration system uses ammonia and includes thirteen (13) relief valves. Ammonia relief valves are required to be replaced every five (5) years to ensure safe and reliable operation. DISCUSSION: Ammonia relief valves, also referred to as pressure relief valves, are critical components of ice-making refrigeration systems. They prevent catastrophic equipment failure by automatically releasing excess pressure, protecting the system from over-pressurization. These valves help maintain system stability by allowing compressed ammonia gas to vent safely and are often connected to emergency, automated shutdown systems. Relief valves are installed in various sections of the refrigeration system. If the valves do not function properly, pressure can build up, potentially resulting in equipment failure or, in extreme cases, fire or other safety hazards. Cool Air Mechanical’s proposal includes the supply and installation of thirteen (13) new relief valves, as well as the proper disposal of the existing valves. The full proposal is included in the attached Agreement as Exhibit A. The relief valves at the Arena were last replaced in January 2021. Cool Air Mechanical performed that work and is, therefore, very familiar with the Arena’s refrigeration system. BUDGET IMPACT: The total cost to replace the ammonia relief valves is $7,240. This expense will be funded through the Parks and Recreation Department’s approved budget for Ice Arena Operations Expense. Page 89 of 276 ACTION REQUESTED: Approve the attached Agreement with Cool Air Mechanical, Inc. to replace the ammonia relief valves at the Schmitz-Maki Arena. ATTACHMENTS: 2026 Cool Air Mechanical Agreement Signed Page 90 of 276 ______________________, Page 91 of 276 Page 92 of 276 Page 93 of 276 Page 94 of 276 17.WAIVER. In the particular event that either party shall at any time or times waive any breach of this Contract by the other, such waiver shall not constitute a waiver of any other or any succeeding breach of this Contract by either party, whether of the same or any other covenant, condition, or obligation. 18.GOVERNING LAW. The Jaws of the State of Minnesota govern the interpretation of this Contract. 19.SEVERARILITY. lf any provision, term, or condition of this Contract is found to be or become unenforceable or invalid, it shall not effect the remaining provisions, terms, and conditions of this Contract, unless such invalid or unenforceable provision, term, or condition renders this Contract impossible to perform. Such remaining terms and conditions of the Contract shall continue in foll force and effect and shall continue to operate as the pa,ties' entire contract. 20.ENTIRE AGREEMENT. This Contract represents the entire agreement of the parties and is a final, complete, and all-inclusive statement of the terms thereof, and supersedes and terminates any prior agrcement(s), understandings, or written or verbal representations made between the parties with respect thereto. 21.TERMINATION. This Agreement may be terminated by the City for any reason or for convenience upon written notice to the Contractor. ln the event of termination, the City shall be obligated to the Contractor for payment of amounts due and owing for materials provided or for services performed or fi1rnished to the date and time of termination. Dated: 2026 -----� CITY OF FARMINGTON By: ___________ _ Nicholas Lien, Acting Mayor By: ___________ _ Shirley R Buecksler, City Clerk Dated: ht> ..J , 2026 NICAL, INC. 5 Page 95 of 276 Page 96 of 276 Page 97 of 276 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: Kellee Omlid, Parks & Recreation Director Department: Parks & Recreation Subject: Donation from Happy Harry’s Furniture to the Rambling River Center Meeting: Regular Council - Feb 17 2026 INTRODUCTION: A donation was recently made to the Rambling River Center (RRC) by Happy Harry’s Furniture. DISCUSSION: A donation in the amount of $119.90 was recently made by Happy Harry’s Furniture to the RRC. The donation was made through a program created in 2011 in which a customer of Happy Harry’s Furniture can select a charity of their choice to receive a donation when merchandise is purchased from the store. Then 10% from the sale to the customer is donated to the charity. The RRC is one of the charities that can be selected by customers. With these donations, Happy Harry’s Furniture has donated a total of $17,976.13 to the RRC since the program’s inception. This partnership with Happy Harry’s Furniture has been very beneficial over the long term given the funds that have been donated to the RRC. The donation has been deposited into the RRC Capital Improvement Fund to fund future building improvements and/or purchase new equipment and furniture. Staff will communicate the City’s appreciation on behalf of the City Council to Happy Harry’s Furniture for their generous donation to the RRC. ACTION REQUESTED: Adopt Resolution 2026-016 Accepting a Donation of $119.90 from Happy Harry’s Furniture to the Rambling River Center. ATTACHMENTS: 2026-016 Accepting $119.90 from Happy Harry's Furniture Page 98 of 276 CITY OF FARMINGTON DAKOTA COUNTY, MINNESOTA RESOLUTION 2026-016 A RESOLUTION ACCEPTING A DONATION OF $119.90 FROM HAPPY HARRY’S FURNITURE TO THE RAMBLING RIVER CENTER WHEREAS, the City of Farmington is generally authorized to accept donations of real and personal property pursuant to Minnesota Statutes Section 465.03 for the benefit of its citizens and is specifically authorized to accept gifts, as allowed by law; and WHEREAS, the following persons and entities have offered to contribute to the City: Happy Harry’s Furniture has donated $119.90 to the Rambling River Center ; and WHEREAS, it is in the best interest of the City to accept this donation. NOW, THEREFORE, BE IT RESOLVED that Acting Mayor Lien and the Farmington City Council hereby accept with gratitude the generous donation of $119.90 from Happy Harry’s Furniture to the Rambling River Center. Adopted by the City Council of the City of Farmington, Minnesota, this 17th day of February 2026. ATTEST: ____________________________ ______________________________ Nicholas Lien, Acting Mayor Shirley R Buecksler, City Clerk Page 99 of 276 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: Kellee Omlid, Parks & Recreation Director Department: Parks & Recreation Subject: First Amendment to Joint Powers Agreement with Dakota County for Communities for All Initiative Funding Meeting: Regular Council - Feb 17 2026 INTRODUCTION: At the September 2, 2025 City Council meeting, the Council approved a Joint Powers Agreement (JPA) with Dakota County for Communities for All (CFA) funding and accepted the $16,000 CAF grant for the adult changing station at the Rambling River Center. DISCUSSION: In May 2025, the City of Farmington Parks and Recreation Department (City) submitted a Letter of Interest for Dakota County's Communities for All Initiative, a program dedicated to fostering initiative The abilities. all of spaces for welcoming inclusive, more residents supports cities, businesses, and organizations in creating environments where everyone can fully participate whether through consultation, education, or small modifications that make a big impact. The City requested $16,000 to cover the purchase and installation of an adult changing station to be installed in the newly constructed restroom adjacent to the banquet room. The costs submitted in the Letter of Interest included the following estimates: • Adult changing station: $10,226 • Required electrical work: $5,300 • Installation: $474 In July 2025, Staff were notified that the City had been awarded $16,000 in reimbursable funding through the Communities for All micro-grant program for this project. At the time of application, CM Construction Company, Inc. estimated installation costs to be approximately $400 - $600. The installation requires marine board to be securely attached to the block wall using Page 100 of 276 specific fasteners capable of supporting a load up to 500 pounds. Due to these structural requirements, the installation is more complex than originally anticipated. City Staff do not have the specialized expertise required to complete the installation in accordance with the manufacturer’s specifications. As a result, Staff requested a formal installation proposal from CM Construction Company, Inc., which submitted a proposal in the amount of $6,600. This cost exceeded the amount originally requested and was awarded for installation through the Communities for All micro-grant program. Thus, City Staff contacted Dakota County’s CFA Program Coordinator to inquire about additional funding to assist with the increased installation costs. The CFA review committee agreed to fund the additional unanticipated installation expenses in the amount of $6,126, bringing the total reimbursable grant funding to $22,126. The attached First Amendment to the JPA reflects the additional funding for the adult changing station and installation. The City Attorney reviewed the First Amendment to the JPA and found it acceptable. BUDGET IMPACT: The CFA grant will now provide $22,126 in reimbursable funding for the purchase and installation of the adult changing station and associated electrical work. ACTION REQUESTED: Approve the attached First Amendment to the Joint Powers Agreement with Dakota County for the Communities for All Initiative funding. ATTACHMENTS: First Amendment to the JPA Communities for all Funding Page 101 of 276 DC Contract #CLA20779.1 City of Farmington - #CLA20779.1 Page 1 CS_AMEND GPB (Rev. 10-24) FIRST AMENDMENT TO THE JOINT POWERS AGREEMENT BETWEEN THE COUNTY OF DAKOTA AND AND CITY OF FARMINGTON FOR COMMUNITIES FOR ALL INCLUSION INITIATIVE WHEREAS, effective September 10, 2025 (Effective Date from original contract), the County of Dakota, by and through its Social Services Department, (“County”), and City of Farmington, 430 Third St., Farmington, MN 55024 (“Contractor”), entered into a Contract for the provision of services related to Communities For All Inclusion Initiative (“the Contract”); and WHEREAS, the parties desire to amend the Contract; and WHEREAS, the Contract provides that any amendments shall be valid only when in writing and signed by Authorized Representatives of the parties. ACCORDINGLY, the parties agree to amend the Contract to increase the Total Cost as follows: 1.Section 4, County Obligations, of the Contract is hereby amended to read as follows: The County agrees to reimburse the City in an amount not to exceed $22,126.00 for costs incurred in performing services fulfilling the Purpose described above from the Effective Date through August 31, 2026. 2.Exhibit 3, Service Grid, of the Contract is hereby replaced with Exhibit 3, Service Grid-Revised, and is otherwise amended or terminated in accordance with law or the terms of the Contract. 3.All other terms of the Contract between County and Contractor shall remain in full force and effect unless otherwise amended or terminated in accordance with law or the terms of the Contract. 4.If any provision of this Amendment conflicts with the any provision of the Contract, or an earlier Amendment, the conflicting provision of this Amendment prevails. ELECTRONIC SIGNATURES EACH PARTY AGREES THE ELECTRONIC SIGNATURES OF THE PARTIES INCLUDED IN THIS CONTRACT ARE INTENDED TO AUTHENTICATE THIS WRITING AND TO HAVE THE SAME FORCE AND EFFECT AS WET INK SIGNATURES. IN WITNESS WHEREOF, the parties have executed this Amendment to the Contract on the dates indicated below. IN WITNESS WHEREOF, the parties have executed this Agreement on the dates indicated below. Page 102 of 276 DC Contract #CLA20779.1 City of Farmington - #CLA20779.1 Page 2 CS_AMEND GPB (Rev. 10-24) COUNTY OF DAKOTA By: Title: Director Community Services County Board Res No. 26- Date: Dakota County Contract #CLA20779.1 Dakota County KS 26-___ CITY OF FARMINGTON By: Title: Acting Mayor Date: By: Title: City Clerk Date: Page 103 of 276 DC Contract #CLA20779.1 City of Farmington - #CLA20779.1 Page 3 CS_AMEND GPB (Rev. 10-24) Communities For All Project: City of Farmington Partnership to Build Inclusive Communities Service Location: Dakota County, City of Farmington Purpose The purpose of this project is to advance the objectives of the Communities for All initiative. This project category is: ☐ Training ☐ Technical Assistance ☒ Microgrants ☐ Communications & Marketing Increase inclusion for adults and youth with and without disabilities, as well as the broader community in Dakota County by adding accessible features to public spaces in the City of Farmington. REVISED February 2, 2026 In May 2025, the City of Farmington Parks and Recreation Department applied to Dakota County’s Communities for All Initiative for $16,000 to purchase and install an electric adult changing station at the Rambling River Center. The City was awarded $16,000 in reimbursable funding in July 2025. The original cost estimates included $10,226 for the changing station, $5,300 for electrical work, and $474 for installation, based on an initial installation estimate of $400–$600. City staff later determined the installation required specialized expertise and structural reinforcement to support up to 500 pounds. A formal proposal from CM Construction Company, Inc. identified installation costs of $6,600. Communities for All Review Committee has approved an additional $6,126 for installation costs. Target Group Residents of Dakota County Goals Advance Physical Accessibility in Public Spaces Equip community recreation facilities with adaptive tools, such as adult-sized changing tables, to ensure individuals with physical disabilities can access, use, and enjoy public amenities with dignity and independence. Foster Belonging and Dignity for All Community Members Reduce isolation and exclusion by removing barriers to participation, empowering individuals with disabilities to engage more fully in recreational, cultural, and social activities throughout Farmington. Page 104 of 276 DC Contract #CLA20779.1 City of Farmington - #CLA20779.1 Page 4 CS_AMEND GPB (Rev. 10-24) Lead by Example in Building Inclusive Community Infrastructure Position Farmington as a leader in accessibility and inclusion by intentionally designing spaces and programs that reflect the diverse needs of all residents, modeling equity, empathy, and respect as cornerstones of civic engagement. Service Expectations Procure and Install Inclusive Equipment • Purchase and install an adult-sized universal changing table in the Rambling River Community Center in the City of Farmington. Maintain Accessibility of Installed Resources • Ensure that all newly installed equipment remains functional, clean, and accessible to the public. Promote Awareness and Use of Inclusive Resources • Promote awareness of these new inclusive tools through city communication channels (social media, flyers, website). • Train relevant staff and volunteers on the purpose and use of the inclusive resources. Engage the Community • Gather community feedback, particularly from individuals with disabilities and their families, to inform the effectiveness of the resource. • Respond to feedback and adjust to improve inclusion and participation. Comply with Project Oversight and Reporting Requirements • Collaborate with Dakota County staff to ensure transparency, timely updates, and alignment with county-wide inclusion goals. • Submit project updates and required reports, including documentation of equipment purchases, installation photos, and use feedback. Provider Collaboration • Provider will attend grant meetings to share progress, discuss challenges, and align efforts. Attendance ensures transparency, accountability, and opportunities for collective problem- solving. Additionally, providers will collaborate and communicate with one another regarding their community outreach activities. This includes sharing insights, coordinating efforts to avoid duplication, and identifying opportunities for partnership to maximize community impact. Project Publicity • Publicity regarding the subject matter of this contract must identify Communities for All, Dakota County, and the Minnesota Department of Human Services as the sponsoring agencies. All Page 105 of 276 DC Contract #CLA20779.1 City of Farmington - #CLA20779.1 Page 5 CS_AMEND GPB (Rev. 10-24) projects within the grant activities must include branding and marketing images for Communities for All, the Minnesota Department of Human Services, and Dakota County. Outcome Measures Increased Accessibility of Public Spaces • Measure: Number and type of inclusive resources installed • Target: Installation of all requested. • Evaluation Method: Pre- and post-installation inventory and photographic documentation. Improved Community Participation by People with Disabilities • Measure: Observed or reported use of inclusive equipment and resources by individuals with disabilities. • Target: Documented use of the installed resource at least once per month within six months of implementation. • Evaluation Method: Staff observation logs, user feedback forms, and informal surveys at events or facilities. Enhanced Community Awareness of Inclusion Tools • Measure: Reach and engagement of communications promoting new inclusive features. • Target: At least 500 community members reached via city newsletters, social media, signage, or other outreach methods. • Evaluation Method: Social media and newsletter metrics, flyer distribution logs, signage placement confirmation. Positive User Feedback • Measure: Satisfaction and perceived benefit reported by users with disabilities and their families. • Target: 80% of respondents report that the new resources made spaces or events more accessible and welcoming. • Evaluation Method: Feedback collected through QR codes at facilities, online surveys, or in- person interviews. Staff and Volunteer Preparedness • Measure: Number of staff and volunteers trained on the use and purpose of inclusive resources. • Target: 100% of front-facing staff and volunteers trained at locations where the new resource is deployed. • Evaluation Method: Training attendance logs and pre/post training knowledge checks (optional). Page 106 of 276 DC Contract #CLA20779.1 City of Farmington - #CLA20779.1 Page 6 CS_AMEND GPB (Rev. 10-24) Reporting 1. Meet with Dakota County staff at the project's outset and as needed throughout the project. 2. Participate in a meeting with Dakota County staff at the conclusion of the grant period and present outcomes of the project. Provide a written final report providing a summarization of the data for the entire period of the grant. (see details of final report #4) 3. Submit all dated, itemized receipts for project purchases. 4. The service provider (Farmington Parks and Recreation) will be responsible for submitting timely and complete reports to Dakota County to demonstrate progress, ensure accountability, and support continuous improvement. Required reporting includes: Initial Implementation Report Due Date: Within 60 days of contract execution or upon installation of the first inclusive resource. Contents: • Timeline for procurement and installation of all proposed items. • Confirmation of installation sites and schedule. • Any initial barriers or adjustments to the implementation plan. Mid-Project Progress Report Due Date: Midway through the project term or 6 months after start, whichever comes first. Contents: • Status update on the inclusive equipment purchase and installation. • Photos documenting the installed resource. • Summary of community outreach or staff training conducted. • Preliminary usage or feedback data (if available). • Any revisions to the project timeline or budget. Final Report Due Date: Within 30 days of project completion or by the end of the contract period. Contents: • Confirmation that all funded items were purchased and installed. • Final expenditure report including itemized budget and receipts. • Summary of user feedback and community impact (quantitative and qualitative). • Metrics tied to outcome measures (e.g., usage data, awareness outreach, training completion). • Reflections on successes, challenges, and recommendations for future inclusion efforts. Ad Hoc Updates (if requested) • Contents: Brief updates on installation delays, changes in resource location, or emerging community needs related to accessibility. • Due: As requested by Dakota County staff. Page 107 of 276 DC Contract #CLA20779.1 City of Farmington - #CLA20779.1 Page 7 CS_AMEND GPB (Rev. 10-24) County Responsibilities 1. Collaborative plan strategy and logistics for the successful execution of: The City of Farmington Partnership to Build Inclusive Communities. 2. Schedule and attend all 1:1 project check-in meetings with the Contractor. The meeting will occur: at the initiation and conclusion of the grant and as outlined in the Reporting Section. 3. Process invoices for the Contractor 4. Provide opportunities for the Contractor to provide feedback on the Communities for All initiative. Payment Limitations The County will pay for services as follows: (Revised Feb 2026) NTE $22,126 to equip the designated community space with essential inclusive resources: $22,126 for 1 adult-sized changing table and installation Payment Source: Workforce Shortage - DHS Grant Funds Billing Procedures a. Contractor shall, within 7 days after the end of the month, submit an invoice and request for payment on an invoice form acceptable to the County. b. The invoice shall include all expenses for the previous month and certify expenditures and itemize (as applicable), 1) the date such services were provided, and 2) a general description of the services provided. c. Invoices shall be submitted to DeAnn Prouty at deann.prouty@CO.DAKOTA.MN.US d. The County shall make payment to the Contractor within thirty-five (35) days of the date on which the invoice is received, and services are accepted by the County. e. If the invoice is incorrect, defective, or otherwise improper, the County will notify the Contractor within ten (10) days of receiving the incorrect invoice. Upon receiving the corrected invoice from the Contractor, the County will make payment within thirty-five (35) days. f. The County will impose a 10% penalty for invoices received 30 days after the date that invoiced services were performed. The County will impose a 20% penalty for invoices received 60 days after the date that invoiced services were performed. The County will refuse payment on invoices received 90 days after the date that the invoiced services were performed. Exceptions: If the Contractor is billing MA or other third-party payers, the penalty on late billing does not apply until six months have passed from the end date of the service. If it is anticipated that a bill on a case will take longer than six months to resolve, the Contractor is to alert the County Deputy Director. All bills for a calendar year must be submitted to the County by February 15 of the following calendar year to receive reimbursement. Page 108 of 276 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: John Powell, Public Works Director Department: Engineering Subject: Professional Services Agreement with WSB for Staff Augmentation Meeting: Regular Council - Feb 17 2026 INTRODUCTION: Due to expected leave, the Water Resources Specialist position will not be staffed for about of variety wide a has position late February. in beginning weeks 20 This responsibilities, including the administration of the City's Municipal Separate Storm Sewer System (MS4) permit with the MPCA. Other Public Works Staff will be absorbing some of the position responsibilities, but additional assistance is needed in order to maintain regulatory compliance. Staff is recommending a contract for professional services with WSB to provide Staff Augmentation for environmental compliance services related to the City MS4 permit. DISCUSSION: The City does not have the internal staffing resources necessary to maintain compliance with MS4 permit requirements during the expected leave. You may recall that we have used consultants, including WSB, in the past to provide Staff augmentation for MS4 compliance and other services. On February 21, 2023, the City Council approved the Consultant Pool for 2023-2027. WSB is one of the firms in the Consultant Pool and has prepared the attached proposal based on discussions with City Staff regarding our MS4 related engineering needs. All of this support will be provided by WSB staff remotely. The lead staff will be Dan Perron, who has past experience in Farmington and all the necessary training. BUDGET IMPACT: Work under this contract will be billed hourly. We have assumed the services will be needed for 20 weeks, with an average of 20 hours per week. Using the stated hourly rate of $142, the total contract will not exceed $56,800. The services will be funded via a combination of any wage savings related to the proposed leave, supplemented by the City Stormwater Fund. Page 109 of 276 ACTION REQUESTED: Approve the Professional Services Agreement with WSB for Staff Augmentation. ATTACHMENTS: 021726 PSA WSB 2026 Staff Augmentation Page 110 of 276 224345v1 PROFESSIONAL SERVICES AGREEMENT This Professional Services Agreement (“Agreement”) is made this 17th day of February, 2026, by and between the CITY OF FARMINGTON, a Minnesota municipal corporation, whose business address is 430 3rd St, Farmington, MN 55024 (hereinafter "City") and WSB LLC, a Limited Liability Company, whose business address is 701 Xenia Avenue South, Suite 300, Minneapolis, MN 55416 (hereinafter "Engineer"). PRELIMINARY STATEMENT The City has adopted a policy regarding the selection and hiring of consultants to provide a variety of professional services for City projects. That policy requires that persons, firms or corporations providing such services enter into written agreements with the City. The purpose of this Agreement is to set forth the terms and conditions for the provision of professional services by Engineer for engineering services, hereinafter referred to as the "Work", and as outlined on Exhibit “A” attached hereto. IN CONSIDERATION OF THEIR MUTUAL COVENANTS, THE PARTIES AGREE AS FOLLOWS: 1. SCOPE OF SERVICES. The City retains Engineer to furnish the services set forth on the attached Exhibit “A”. The Engineer agrees to perform the services. Engineer shall provide all personnel, supervision, services, materials, tools, equipment and supplies and do all things necessary and ancillary thereto specified on Exhibit “A”. The Work to be performed under this Agreement shall be done under the review of a professional engineer licensed in the State of Minnesota, who shall attest that the Work will be performed in compliance with all applicable codes and engineering standards. The Work shall be performed in accordance with the Contract Documents, which includes this Agreement and the attached Exhibits: Exhibit “A” – Scope of Services, Exhibit “B” – Schedule of Payment and Fee Schedule. In the event any ambiguity or conflict between the Contract Documents listed above, the order of precedence shall be the following order: (i) this Agreement; (ii) Exhibit “A”, (iii) Exhibit “B”. 2. REPRESENTATIVES. City has designated John Powell, Public Works Director/City Engineer (the “City Representative”), and the Engineer has designated Mark Erichson, Director of Municipal Services (the “Engineer Representative”). The City Representative and the Engineer Representative shall be available as often as is reasonably necessary for reviewing the Services and Work to be performed. 3. COMPENSATION FOR SERVICES. Engineer shall be paid by the City for the services described in Exhibit “A” on an hourly basis in accordance with the attached fee schedule, Exhibit “B”, but not to exceed $56,800.00 inclusive of taxes and reimbursable costs. A. Any changes in the scope of the Work which may result in an increase to the compensation due the Engineer shall require prior written approval by the Page 111 of 276 224345v1 authorized representative of the City or by the City Council. The City will not pay additional compensation for services that do not have prior written authorization. B. Special Consultants may be utilized by the Engineer when required by the complex or specialized nature of the Project and when authorized in writing by the City. 4. COMPLETION DATE/TERM. The Engineer must complete the Services by August 31, 2026. This Agreement may be extended upon the written mutual consent of the parties for such additional period as they deem appropriate, and upon the terms and conditions as herein stated. 5. OWNERSHIP OF DOCUMENTS. All plans, diagrams, analyses, reports and information generated in connection with the performance of the Agreement (“Information”) shall become the property of the City, but Engineer may retain copies of such documents as records of the services provided. The City may use the Information for its purposes and the Engineer also may use the Information for its purposes. Use of the Information for the purposes of the project contemplated by this Agreement does not relieve any liability on the part of the Engineer, but any use of the Information by the City or the Engineer beyond the scope of the Project is without liability to the other, and the party using the Information agrees to defend and indemnify the other from any claims or liability resulting therefrom. 6. COMPLIANCE WITH LAWS AND REGULATIONS. In providing services hereunder, Engineer shall abide by all statutes, ordinances, rules, and regulations pertaining to the provisions of services to be provided. Any violation of statutes, ordinances, rules, and regulations pertaining to the Services to be provided shall constitute a material breach of this Agreement and entitle the City to immediately terminate this Agreement. Engineer’s books, records, documents, and accounting procedures and practices related to services provided to the City are subject to examination by the legislative auditor or the state auditor, as appropriate, for a minimum of six years. 7. STANDARD OF CARE. Engineer shall exercise the same degrees of care, skill, and diligence in the performance of the Services as is ordinarily possessed and exercised by a professional engineer under similar circumstances. Engineer shall be liable to the fullest extent permitted under applicable law, without limitation, for any injuries, loss, or damages proximately caused by Engineer’s breach of this standard of care. Engineer shall put forth reasonable efforts to complete its duties in a timely manner. Engineer shall not be responsible for delays caused by factors beyond its control or that could not be reasonably foreseen at the time of execution of this Agreement. Engineer shall be responsible for costs, delays, or damages arising from unreasonable delays in the performance of its duties. No other warranty, expressed or implied, is included in this Agreement. City shall not be responsible for discovering deficiencies in the accuracy of Engineer’s services. 8. INDEMNIFICATION. The Engineer shall defend, indemnify and hold harmless the City, its officers, agents, and employees, of and from any and all judgments, claims, damages, demands, actions, causes of action, including costs and attorney's fees paid or incurred resulting from any breach of this Agreement by Engineer, its agents, contractors and employees, or any Page 112 of 276 224345v1 negligent or intentional act or omission performed, taken or not performed or taken by Engineer, its agents, contractors and employees, relative to this Agreement. City will indemnify and hold Engineer harmless from and against any loss for injuries or damages arising out of the negligent acts of the City, its officers, agents, or employees. 9. INSURANCE. a. General Liability. Prior to starting the Work, Engineer shall procure, maintain, and pay for such insurance as will protect against claims or loss which may arise out of operations by Engineer or by any subcontractor or by anyone employed by any of them or by anyone for whose acts any of them may be liable. Such insurance shall include, but not be limited to, minimum coverages and limits of liability specified in this Paragraph, or required by law. b. Engineer shall procure and maintain the following minimum insurance coverages and limits of liability for the Work: Worker’s Compensation Statutory Limits Employer’s Liability $500,000 each accident $500,000 disease policy limit $500,000 disease each employee Commercial General Liability $2,000,000 property damage and bodily injury per occurrence $2,000,000 general aggregate Comprehensive Automobile Liability $1,000,000 combined single limit each accident (shall include coverage for all owned, hired and non-owed vehicles.) Commercial General Liability requirements may be met through a combination of umbrella or excess liability insurance. The City shall be named as an additional insured on the general liability and umbrella policies. c. Professional Liability Insurance. In addition to the coverages listed above, Engineer shall maintain a professional liability insurance policy in the amount of $2,000,000. Said policy need not name the City as an additional insured. Page 113 of 276 224345v1 d. Engineer shall maintain “stop gap” coverage if Engineer obtains Workers’ Compensation coverage from any state fund if Employer’s liability coverage is not available. e. All policies, except the Worker’s Compensation Policy, Automobile Policy, and Professional Liability Policy, shall name the “City of Farmington” as an additional insured. f. All policies, except the Professional Liability Policy, shall apply on a “per project” basis. g. All polices shall contain a waiver of subrogation in favor of the City. h. All policies, except for the Worker’s Compensation Policy and the Professional Liability Policy, shall be primary and non-contributory. i. All polices, except the Worker’s Compensation Policy, shall insure the defense and indemnity obligations assumed by Engineer under this Agreement. j. Engineer agrees to maintain all coverage required herein throughout the term of the Agreement and for a minimum of two (2) years following City’s written acceptance of the Work. k. It shall be Engineer’s responsibility to pay any retention or deductible for the coverages required herein. l. The Engineer’s policies and Certificate of Insurance shall contain a provision that coverage afforded under the policies shall not be cancelled without at least thirty (30) days advanced written notice to the City. m. Engineer shall maintain in effect all insurance coverages required under this Paragraph at Engineer’s sole expense and with insurance companies licensed to do business in the state in Minnesota and having a current A.M. Best rating of no less than A-, unless specifically accepted by City in writing and all insurance policies shall be on ISO forms acceptable to the City. n. A copy of the Engineer’s Certificate of Insurance which evidences the compliance with this Paragraph, must be filed with City prior to the start of Engineer’s Work. Upon request a copy of the Engineer’s insurance declaration page, rider and/or endorsement, as applicable shall be provided. Such documents evidencing insurance shall be in a form acceptable to City and shall provide satisfactory evidence that Engineer has complied with all insurance requirements. Renewal certificates shall be provided to City prior to the expiration date of any of the required policies. City will not be obligated, however, to review such Certificate of Insurance, declaration page, rider, endorsement, certificates, or other evidence of insurance, or to advise Engineer of any deficiencies in such documents and Page 114 of 276 224345v1 receipt thereof shall not relieve Engineer from, nor be deemed a waiver of, City’s right to enforce the terms of Engineer’s obligations hereunder. City reserves the right to examine any policy provided for under this Agreement. o. Effect of Engineer’s Failure to Provide Insurance. If Engineer fails to provide the specified insurance, then Engineer will defend, indemnify, and hold harmless the City, the City's officials, agents, and employees from any loss, claim, liability, and expense (including reasonable attorney's fees and expenses of litigation) to the extent necessary to afford the same protection as would have been provided by the specified insurance. Except to the extent prohibited by law, this indemnity applies regardless of any strict liability or negligence attributable to the City (including sole negligence) and regardless of the extent to which the underlying occurrence (i.e., the event giving rise to a claim which would have been covered by the specified insurance) is attributable to the negligent or otherwise wrongful act or omission (including breach of contract) of Engineer, its subcontractors, agents, employees or delegates. Engineer agrees that this indemnity shall be construed and applied in favor of indemnification. Engineer also agrees that if applicable law limits or precludes any aspect of this indemnity, then the indemnity will be considered limited only to the extent necessary to comply with that applicable law. The stated indemnity continues until all applicable statutes of limitation have run. If a claim arises within the scope of the stated indemnity in section o, the City may require Engineer to: i. Furnish and pay for a surety bond, satisfactory to the City, guaranteeing performance of the indemnity obligation; or ii. Furnish a written acceptance of tender of defense and indemnity from Engineer's insurance company. Engineer will take the action required by the City within fifteen (15) days of receiving notice from the City. 10. INDEPENDENT CONTRACTOR. The City hereby retains the Engineer as an independent contractor upon the terms and conditions set forth in this Agreement. The Engineer is not an employee of the City and is free to contract with other entities as provided herein. Engineer shall be responsible for selecting the means and methods of performing the work. Engineer shall furnish any and all supplies, equipment, and incidentals necessary for Engineer's performance under this Agreement. City and Engineer agree that Engineer shall not at any time or in any manner represent that Engineer or any of Engineer's agents or employees are in any manner agents or employees of the City. Engineer shall be exclusively responsible under this Agreement for Engineer's own FICA payments, workers compensation payments, unemployment compensation payments, withholding amounts, and/or self-employment taxes if any such payments, amounts, or taxes are required to be paid by law or regulation. 11. SUBCONTRACTORS. Engineer shall not enter into subcontracts for services provided under this Agreement without the express written consent of the City. Engineer shall comply with Minnesota Statute § 471.425. Engineer must pay subcontractor for all undisputed Page 115 of 276 224345v1 services provided by subcontractor within ten (10) days of Engineer’s receipt of payment from City. Engineer must pay interest of 1.5 percent per month or any part of a month to subcontractor on any undisputed amount not paid on time to subcontractor. The minimum monthly interest penalty payment for an unpaid balance of $100 or more is $10. 12. ASSIGNMENT AND THIRD PARTIES. Neither party shall assign this Agreement, nor any interest arising herein, without the written consent of the other party. Nothing under this Agreement shall be construed to give any rights or benefits in this Agreement to anyone other than the City and Engineer, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of the City and Engineer and not for the benefit of any other party. 13. WAIVER. Any waiver by either party of a breach of any provisions of this Agreement shall not affect, in any respect, the validity of the remainder of this Agreement. 14. ENTIRE AGREEMENT. The entire agreement of the parties is contained herein. This Agreement supersedes all oral agreements and negotiations between the parties relating to the subject matter hereof as well as any previous agreements presently in effect between the parties relating to the subject matter hereof. Any alterations, amendments, deletions, or waivers of the provisions of this Agreement shall be valid only when expressed in writing and duly signed by the parties, unless otherwise provided herein. 15. CONTROLLING LAW AND VENUE. This Agreement shall be governed by and construed in accordance with the laws of the State of Minnesota. All proceedings related to this contract shall be venued in the Dakota County District Court. 16. COPYRIGHT. Engineer shall defend actions or claims charging infringement of any copyright or patent by reason of the use or adoption of any designs, drawings, or specifications supplied by it, and it shall hold harmless the City from loss or damage resulting therefrom. 17. RECORDS. The Engineer shall maintain complete and accurate records of time and expense involved in the performance of services. 18. MINNESOTA GOVERNMENT DATA PRACTICES ACT. Engineer must comply with the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, as it applies to (1) all data provided by the City pursuant to this Agreement, and (2) all data, created, collected, received, stored, used, maintained, or disseminated by the Engineer pursuant to this Agreement. Engineer is subject to all the provisions of the Minnesota Government Data Practices Act, including but not limited to the civil remedies of Minnesota Statutes Section 13.08, as if it were a government entity. In the event Engineer receives a request to release data, Engineer must immediately notify City. City will give Engineer instructions concerning the release of the data to the requesting party before the data is released. Engineer agrees to defend, indemnify, and hold City, its officials, officers, agents, employees, and volunteers harmless from any claims resulting from Engineer’s officers’, agents’, partners’, employees’, volunteers’, assignees’, or subcontractors’ unlawful disclosure and/or use of protected data. The terms of this paragraph shall survive the cancellation or termination of this Agreement. Page 116 of 276 224345v1 19. TERMINATION. This Agreement may be terminated by City on thirty (30) days’ written notice delivered to Engineer at the address on file with the City. Upon termination under this provision if there is no fault of the Engineer, the Engineer shall be paid for services rendered and reimbursable expenses until the effective date of termination. If the City terminates the Agreement because the Engineer has failed to perform in accordance with this Agreement, no further payment shall be made to the Engineer, and the City may retain another engineer to undertake or complete the work identified in Paragraph 1. 20. NON-DISCRIMINATION. During the performance of this Agreement, the Engineer shall not discriminate against any employee or applicants for employment because of race, color, creed, religion, national origin, sex, marital status, status with regard to public assistance, disability, sexual orientation or age. The Engineer shall post in places available to employees and applicants for employment, notices setting forth the provision of this non- discrimination clause and stating that all qualified applicants will receive consideration for employment. The Engineer shall incorporate the foregoing requirements of this paragraph in all of its subcontracts for program work, and will require all of its subcontractors for such work to incorporate such requirements in all subcontracts for program work. The Engineer further agrees to comply with all aspects of the Minnesota Human Rights Act, Minnesota Statutes 363.01, et. seq., Title VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act of 1990. 21. SURVIVAL. All express representations, waivers, indemnifications, and limitations of liability included in this Agreement will survive its completion or termination for any reason. 22. SERVICES NOT PROVIDED FOR. Claims for services furnished by the Engineer not specifically provided for herein shall not be honored by the City. 23. SEVERABILITY. The provisions of this Agreement are severable. If any portion hereof is, for any reason, held by a court of competent jurisdiction to be contrary to law, such decision shall not affect the remaining provisions of this Agreement. 24. CONFLICTS. No officer or salaried employee of the City and no member of the Council of the City shall have a financial interest, direct or indirect, in this Agreement. The violation of this provision renders the Agreement void. 25. NOTICES. Any notice required under this Agreement will be in writing, addressed to the appropriate party at its address on the signature page and given personally, by facsimile, by registered or certified mail postage prepaid, or by a commercial courier service. All notices shall be effective upon the date of receipt. 26. WAIVER. A party’s non-enforcement of any provision shall not constitute a waiver of that provision, nor shall it affect the enforceability of that provision or of the remainder of this Agreement. Page 117 of 276 224345v1 27. COUNTERPARTS. This Agreement may be executed in multiple counterparts, each of which shall be considered an original. Dated: February 17, 2026 CITY: CITY OF FARMINGTON By: Nicholas Lien Acting Mayor By: Shirley R Buecksler City Clerk Dated:__________________, 20___ ENGINEER: WSB LLC By: [print name] Its: [title] Page 118 of 276 224345v1 EXHIBIT “A” SCOPE OF SERVICES AND EXHIBIT “B” SCHEDULE OF PAYMENT AND FEE SCHEDULE Page 119 of 276 7 0 1 X E N I A A V E N U E S | S U I T E 3 0 0 | M I N N E A P O L I S , M N | 55 4 1 6 | 7 6 3 . 5 4 1 . 4 8 0 0 | W S B E N G . C O M February 3, 2026 Mr. John Powell City of Farmington 430 Third Street Farmington, MN 55024 Re: Environmental Compliance Inspections for the City of Farmington Dear Mr. Powell: On behalf of WSB, I am pleased to submit this proposal to provide professional engineering services as they relate to environmental compliance inspections of the active construction projects in the City of Farmington, Minnesota. PROJECT UNDERSTANDING To ensure compliance with the City of Farmington’s City Code and their Municipal Separate Storm Sewer System (MS4) Permit, active construction projects with no owner or contractor obligation from the City of Farmington will be inspected based on the low priority and high priority designation timeline as defined by the City of Farmington’s Procedures for Construction Site Inspections. Once projects begin in which the City of Farmington has an owner obligation, sites will be inspected at least once every seven (7) days and within 24 hours after a rain event greater than 0.5 inches in 24 hours. In addition, with this type of observation, it is possible to communicate items of concern and needs for correction in a timely manner to the project owners. WSB is pleased to provide this proposal to complete the following scope of services: Items Supplied by WSB All necessary inspection equipment, including turbidity and pH meters. In addition, the inspections will be documented with digital photography equipment aiding in the communication of items to the project owner. Personnel A professional Environmental Compliance Specialist certified in the State of Minnesota having successfully completed the comprehensive University of Minnesota construction site inspection training course and trained in the City of Farmington’s MS4 standard operating procedures. This Specialist will manage the inspection reports and forward any results to the project owners, and any pertinent construction professionals. Inspection The inspection will be both visual and documented for NPDES compliance purposes. Inspection will include checking for erosion, sediment accumulation, hazardous materials, and Stormwater Pollution Prevention Plan documentation compliance. In addition, the inspections will document perimeter controls, timeframes for grading and soil stabilization, along with secondary containment needs for all hazardous materials located on site. Page 120 of 276 Mr. Powell February 3, 2026 Page 2 Report WSB will prepare an inspection report detailing the inspection results , using the City of Farmington’s Survey 123 inspection application. The compliance deficiencies will be documented with photographs to indicate deficiencies. All reports will be provided to owners within 24 hours of inspection completion. Key Deliverables Original, signed and certified inspection reports in PDF format. PROPOSED FEE This proposal represents our complete understanding of the Municipal Separate Storm Sewer System (MS4) Permit for the City of Farmington and the work needed to complete the tasks associated with MS4 permit inspection and environmental compliance standards. The proposed fee to provide the support services is calculated at an hourly rate of $142.00 for the duration of 2026, plus mileage to and from the project sites. We appreciate the opportunity to share this proposal with you and look forward to working with you on the City of Farmington’s construction projects. If you agree with the above proposal, please sign below and return a copy of the proposal to me. Should you have any questions about this proposal, please contact me at 612-749-2799 or kbonnell@wsbeng.com. Sincerely, WSB Kory Bonnell Director of Environmental Compliance ACCEPTED BY: Mr. John Powell Name Title Date Page 121 of 276 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: John Powell, Public Works Director Department: Engineering Subject: Professional Services Agreement with WSB for a Storm Water Asset Management Program Meeting: Regular Council - Feb 17 2026 INTRODUCTION: With outstanding support from our GIS Specialist, Public Works has significantly expanded our use of electronic data tracking, mapping, asset management, etc. We have also implemented software, OpenGov the of and through management asset fleet use recently transferred all of our pavement management data to OpenGov. Over the past year or so, Public Works Staff have been considering options for tracking MS4 inspection and The system. conveyance and ponding stormwater for data maintenance the recommended tool for this purpose is the Storm Water Asset Management (SWAMP) software supported by WSB which builds on our current GIS capabilities. DISCUSSION: Staff is very familiar with the SWAMP system, and several metro area communities have used it for years to prioritize storm water pond maintenance and inspection activities. It can easily be implemented in Farmington, as it has been used for much larger municipal drainage systems. Once fully implemented, it will be a key tool in identifying projects for inclusion in the City Capital Improvement Program (CIP). As described in detail on the attached work scope, major tasks include:  Organizing and Formatting Input Parameters for SWAMP.  Developing and Launching a Version of SWAMP specific to Farmington's needs.  Inputting available As-builts, Grading Plans, and Bathymetric Surveys. SWAMP also has an annual software subscription of $2,600 beginning in September of 2026. The subscription includes web-based access to the application, server storage of City’s program, application maintenance, and future software updates. BUDGET IMPACT: Inputting the necessary data, launching the software, and all other tasks described in the work scope will be completed for a cost not to exceed $27,850. Included in this agreement Page 122 of 276 is the initial software subscription cost of $2,600 for a total of $30,450. These initial costs, as well as the future annual subscription fees will be funded via the Stormwater Fund. ACTION REQUESTED: Approve the Professional Services Agreement with WSB for a Storm Water Asset Management Program ATTACHMENTS: 021726 PSA WSB Stormwater Asset Management Page 123 of 276 224345v1 PROFESSIONAL SERVICES AGREEMENT This Professional Services Agreement (“Agreement”) is made this 17th day of February, 2026, by and between the CITY OF FARMINGTON, a Minnesota municipal corporation, whose business address is 430 3rd St, Farmington, MN 55024 (hereinafter "City") and WSB LLC, a Limited Liability Company, whose business address is 701 Xenia Avenue South, Suite 300, Minneapolis, MN 55416 (hereinafter "Engineer"). PRELIMINARY STATEMENT The City has adopted a policy regarding the selection and hiring of consultants to provide a variety of professional services for City projects. That policy requires that persons, firms or corporations providing such services enter into written agreements with the City. The purpose of this Agreement is to set forth the terms and conditions for the provision of professional services by Engineer for engineering services, hereinafter referred to as the "Work", and as outlined on Exhibit “A” attached hereto. IN CONSIDERATION OF THEIR MUTUAL COVENANTS, THE PARTIES AGREE AS FOLLOWS: 1. SCOPE OF SERVICES. The City retains Engineer to furnish the services set forth on the attached Exhibit “A”. The Engineer agrees to perform the services. Engineer shall provide all personnel, supervision, services, materials, tools, equipment and supplies and do all things necessary and ancillary thereto specified on Exhibit “A”. The Work to be performed under this Agreement shall be done under the review of a professional engineer licensed in the State of Minnesota, who shall attest that the Work will be performed in compliance with all applicable codes and engineering standards. The Work shall be performed in accordance with the Contract Documents, which includes this Agreement and the attached Exhibits: Exhibit “A” – Scope of Services, Exhibit “B” – Schedule of Payment and Fee Schedule. In the event any ambiguity or conflict between the Contract Documents listed above, the order of precedence shall be the following order: (i) this Agreement; (ii) Exhibit “A”, (iii) Exhibit “B”. 2. REPRESENTATIVES. City has designated John Powell, Public Works Director/City Engineer (the “City Representative”), and the Engineer has designated Mark Erichson, Director of Municipal Services (the “Engineer Representative”). The City Representative and the Engineer Representative shall be available as often as is reasonably necessary for reviewing the Services and Work to be performed. 3. COMPENSATION FOR SERVICES. Engineer shall be paid by the City for the services described in Exhibit “A” on an hourly basis in accordance with the attached fee schedule, Exhibit “B”, but not to exceed $30,450.00 inclusive of taxes and reimbursable costs. A. Any changes in the scope of the Work which may result in an increase to the compensation due the Engineer shall require prior written approval by the Page 124 of 276 224345v1 authorized representative of the City or by the City Council. The City will not pay additional compensation for services that do not have prior written authorization. B. Special Consultants may be utilized by the Engineer when required by the complex or specialized nature of the Project and when authorized in writing by the City. 4. COMPLETION DATE/TERM. The Engineer must complete the Services by December 31, 2026. This Agreement may be extended upon the written mutual consent of the parties for such additional period as they deem appropriate, and upon the terms and conditions as herein stated. 5. OWNERSHIP OF DOCUMENTS. All plans, diagrams, analyses, reports and information generated in connection with the performance of the Agreement (“Information”) shall become the property of the City, but Engineer may retain copies of such documents as records of the services provided. The City may use the Information for its purposes and the Engineer also may use the Information for its purposes. Use of the Information for the purposes of the project contemplated by this Agreement does not relieve any liability on the part of the Engineer, but any use of the Information by the City or the Engineer beyond the scope of the Project is without liability to the other, and the party using the Information agrees to defend and indemnify the other from any claims or liability resulting therefrom. 6. COMPLIANCE WITH LAWS AND REGULATIONS. In providing services hereunder, Engineer shall abide by all statutes, ordinances, rules, and regulations pertaining to the provisions of services to be provided. Any violation of statutes, ordinances, rules, and regulations pertaining to the Services to be provided shall constitute a material breach of this Agreement and entitle the City to immediately terminate this Agreement. Engineer’s books, records, documents, and accounting procedures and practices related to services provided to the City are subject to examination by the legislative auditor or the state auditor, as appropriate, for a minimum of six years. 7. STANDARD OF CARE. Engineer shall exercise the same degrees of care, skill, and diligence in the performance of the Services as is ordinarily possessed and exercised by a professional engineer under similar circumstances. Engineer shall be liable to the fullest extent permitted under applicable law, without limitation, for any injuries, loss, or damages proximately caused by Engineer’s breach of this standard of care. Engineer shall put forth reasonable efforts to complete its duties in a timely manner. Engineer shall not be responsible for delays caused by factors beyond its control or that could not be reasonably foreseen at the time of execution of this Agreement. Engineer shall be responsible for costs, delays, or damages arising from unreasonable delays in the performance of its duties. No other warranty, expressed or implied, is included in this Agreement. City shall not be responsible for discovering deficiencies in the accuracy of Engineer’s services. 8. INDEMNIFICATION. The Engineer shall defend, indemnify and hold harmless the City, its officers, agents, and employees, of and from any and all judgments, claims, damages, demands, actions, causes of action, including costs and attorney's fees paid or incurred resulting from any breach of this Agreement by Engineer, its agents, contractors and employees, or any Page 125 of 276 224345v1 negligent or intentional act or omission performed, taken or not performed or taken by Engineer, its agents, contractors and employees, relative to this Agreement. City will indemnify and hold Engineer harmless from and against any loss for injuries or damages arising out of the negligent acts of the City, its officers, agents, or employees. 9. INSURANCE. a. General Liability. Prior to starting the Work, Engineer shall procure, maintain, and pay for such insurance as will protect against claims or loss which may arise out of operations by Engineer or by any subcontractor or by anyone employed by any of them or by anyone for whose acts any of them may be liable. Such insurance shall include, but not be limited to, minimum coverages and limits of liability specified in this Paragraph, or required by law. b. Engineer shall procure and maintain the following minimum insurance coverages and limits of liability for the Work: Worker’s Compensation Statutory Limits Employer’s Liability $500,000 each accident $500,000 disease policy limit $500,000 disease each employee Commercial General Liability $2,000,000 property damage and bodily injury per occurrence $2,000,000 general aggregate Comprehensive Automobile Liability $1,000,000 combined single limit each accident (shall include coverage for all owned, hired and non-owed vehicles.) Commercial General Liability requirements may be met through a combination of umbrella or excess liability insurance. The City shall be named as an additional insured on the general liability and umbrella policies. c. Professional Liability Insurance. In addition to the coverages listed above, Engineer shall maintain a professional liability insurance policy in the amount of $2,000,000. Said policy need not name the City as an additional insured. Page 126 of 276 224345v1 d. Engineer shall maintain “stop gap” coverage if Engineer obtains Workers’ Compensation coverage from any state fund if Employer’s liability coverage is not available. e. All policies, except the Worker’s Compensation Policy, Automobile Policy, and Professional Liability Policy, shall name the “City of Farmington” as an additional insured. f. All policies, except the Professional Liability Policy, shall apply on a “per project” basis. g. All polices shall contain a waiver of subrogation in favor of the City. h. All policies, except for the Worker’s Compensation Policy and the Professional Liability Policy, shall be primary and non-contributory. i. All polices, except the Worker’s Compensation Policy, shall insure the defense and indemnity obligations assumed by Engineer under this Agreement. j. Engineer agrees to maintain all coverage required herein throughout the term of the Agreement and for a minimum of two (2) years following City’s written acceptance of the Work. k. It shall be Engineer’s responsibility to pay any retention or deductible for the coverages required herein. l. The Engineer’s policies and Certificate of Insurance shall contain a provision that coverage afforded under the policies shall not be cancelled without at least thirty (30) days advanced written notice to the City. m. Engineer shall maintain in effect all insurance coverages required under this Paragraph at Engineer’s sole expense and with insurance companies licensed to do business in the state in Minnesota and having a current A.M. Best rating of no less than A-, unless specifically accepted by City in writing and all insurance policies shall be on ISO forms acceptable to the City. n. A copy of the Engineer’s Certificate of Insurance which evidences the compliance with this Paragraph, must be filed with City prior to the start of Engineer’s Work. Upon request a copy of the Engineer’s insurance declaration page, rider and/or endorsement, as applicable shall be provided. Such documents evidencing insurance shall be in a form acceptable to City and shall provide satisfactory evidence that Engineer has complied with all insurance requirements. Renewal certificates shall be provided to City prior to the expiration date of any of the required policies. City will not be obligated, however, to review such Certificate of Insurance, declaration page, rider, endorsement, certificates, or other evidence of insurance, or to advise Engineer of any deficiencies in such documents and Page 127 of 276 224345v1 receipt thereof shall not relieve Engineer from, nor be deemed a waiver of, City’s right to enforce the terms of Engineer’s obligations hereunder. City reserves the right to examine any policy provided for under this Agreement. o. Effect of Engineer’s Failure to Provide Insurance. If Engineer fails to provide the specified insurance, then Engineer will defend, indemnify, and hold harmless the City, the City's officials, agents, and employees from any loss, claim, liability, and expense (including reasonable attorney's fees and expenses of litigation) to the extent necessary to afford the same protection as would have been provided by the specified insurance. Except to the extent prohibited by law, this indemnity applies regardless of any strict liability or negligence attributable to the City (including sole negligence) and regardless of the extent to which the underlying occurrence (i.e., the event giving rise to a claim which would have been covered by the specified insurance) is attributable to the negligent or otherwise wrongful act or omission (including breach of contract) of Engineer, its subcontractors, agents, employees or delegates. Engineer agrees that this indemnity shall be construed and applied in favor of indemnification. Engineer also agrees that if applicable law limits or precludes any aspect of this indemnity, then the indemnity will be considered limited only to the extent necessary to comply with that applicable law. The stated indemnity continues until all applicable statutes of limitation have run. If a claim arises within the scope of the stated indemnity in section o, the City may require Engineer to: i. Furnish and pay for a surety bond, satisfactory to the City, guaranteeing performance of the indemnity obligation; or ii. Furnish a written acceptance of tender of defense and indemnity from Engineer's insurance company. Engineer will take the action required by the City within fifteen (15) days of receiving notice from the City. 10. INDEPENDENT CONTRACTOR. The City hereby retains the Engineer as an independent contractor upon the terms and conditions set forth in this Agreement. The Engineer is not an employee of the City and is free to contract with other entities as provided herein. Engineer shall be responsible for selecting the means and methods of performing the work. Engineer shall furnish any and all supplies, equipment, and incidentals necessary for Engineer's performance under this Agreement. City and Engineer agree that Engineer shall not at any time or in any manner represent that Engineer or any of Engineer's agents or employees are in any manner agents or employees of the City. Engineer shall be exclusively responsible under this Agreement for Engineer's own FICA payments, workers compensation payments, unemployment compensation payments, withholding amounts, and/or self-employment taxes if any such payments, amounts, or taxes are required to be paid by law or regulation. 11. SUBCONTRACTORS. Engineer shall not enter into subcontracts for services provided under this Agreement without the express written consent of the City. Engineer shall comply with Minnesota Statute § 471.425. Engineer must pay subcontractor for all undisputed Page 128 of 276 224345v1 services provided by subcontractor within ten (10) days of Engineer’s receipt of payment from City. Engineer must pay interest of 1.5 percent per month or any part of a month to subcontractor on any undisputed amount not paid on time to subcontractor. The minimum monthly interest penalty payment for an unpaid balance of $100 or more is $10. 12. ASSIGNMENT AND THIRD PARTIES. Neither party shall assign this Agreement, nor any interest arising herein, without the written consent of the other party. Nothing under this Agreement shall be construed to give any rights or benefits in this Agreement to anyone other than the City and Engineer, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of the City and Engineer and not for the benefit of any other party. 13. WAIVER. Any waiver by either party of a breach of any provisions of this Agreement shall not affect, in any respect, the validity of the remainder of this Agreement. 14. ENTIRE AGREEMENT. The entire agreement of the parties is contained herein. This Agreement supersedes all oral agreements and negotiations between the parties relating to the subject matter hereof as well as any previous agreements presently in effect between the parties relating to the subject matter hereof. Any alterations, amendments, deletions, or waivers of the provisions of this Agreement shall be valid only when expressed in writing and duly signed by the parties, unless otherwise provided herein. 15. CONTROLLING LAW AND VENUE. This Agreement shall be governed by and construed in accordance with the laws of the State of Minnesota. All proceedings related to this contract shall be venued in the Dakota County District Court. 16. COPYRIGHT. Engineer shall defend actions or claims charging infringement of any copyright or patent by reason of the use or adoption of any designs, drawings, or specifications supplied by it, and it shall hold harmless the City from loss or damage resulting therefrom. 17. RECORDS. The Engineer shall maintain complete and accurate records of time and expense involved in the performance of services. 18. MINNESOTA GOVERNMENT DATA PRACTICES ACT. Engineer must comply with the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, as it applies to (1) all data provided by the City pursuant to this Agreement, and (2) all data, created, collected, received, stored, used, maintained, or disseminated by the Engineer pursuant to this Agreement. Engineer is subject to all the provisions of the Minnesota Government Data Practices Act, including but not limited to the civil remedies of Minnesota Statutes Section 13.08, as if it were a government entity. In the event Engineer receives a request to release data, Engineer must immediately notify City. City will give Engineer instructions concerning the release of the data to the requesting party before the data is released. Engineer agrees to defend, indemnify, and hold City, its officials, officers, agents, employees, and volunteers harmless from any claims resulting from Engineer’s officers’, agents’, partners’, employees’, volunteers’, assignees’, or subcontractors’ unlawful disclosure and/or use of protected data. The terms of this paragraph shall survive the cancellation or termination of this Agreement. Page 129 of 276 224345v1 19. TERMINATION. This Agreement may be terminated by City on thirty (30) days’ written notice delivered to Engineer at the address on file with the City. Upon termination under this provision if there is no fault of the Engineer, the Engineer shall be paid for services rendered and reimbursable expenses until the effective date of termination. If the City terminates the Agreement because the Engineer has failed to perform in accordance with this Agreement, no further payment shall be made to the Engineer, and the City may retain another engineer to undertake or complete the work identified in Paragraph 1. 20. NON-DISCRIMINATION. During the performance of this Agreement, the Engineer shall not discriminate against any employee or applicants for employment because of race, color, creed, religion, national origin, sex, marital status, status with regard to public assistance, disability, sexual orientation or age. The Engineer shall post in places available to employees and applicants for employment, notices setting forth the provision of this non- discrimination clause and stating that all qualified applicants will receive consideration for employment. The Engineer shall incorporate the foregoing requirements of this paragraph in all of its subcontracts for program work, and will require all of its subcontractors for such work to incorporate such requirements in all subcontracts for program work. The Engineer further agrees to comply with all aspects of the Minnesota Human Rights Act, Minnesota Statutes 363.01, et. seq., Title VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act of 1990. 21. SURVIVAL. All express representations, waivers, indemnifications, and limitations of liability included in this Agreement will survive its completion or termination for any reason. 22. SERVICES NOT PROVIDED FOR. Claims for services furnished by the Engineer not specifically provided for herein shall not be honored by the City. 23. SEVERABILITY. The provisions of this Agreement are severable. If any portion hereof is, for any reason, held by a court of competent jurisdiction to be contrary to law, such decision shall not affect the remaining provisions of this Agreement. 24. CONFLICTS. No officer or salaried employee of the City and no member of the Council of the City shall have a financial interest, direct or indirect, in this Agreement. The violation of this provision renders the Agreement void. 25. NOTICES. Any notice required under this Agreement will be in writing, addressed to the appropriate party at its address on the signature page and given personally, by facsimile, by registered or certified mail postage prepaid, or by a commercial courier service. All notices shall be effective upon the date of receipt. 26. WAIVER. A party’s non-enforcement of any provision shall not constitute a waiver of that provision, nor shall it affect the enforceability of that provision or of the remainder of this Agreement. Page 130 of 276 224345v1 27. COUNTERPARTS. This Agreement may be executed in multiple counterparts, each of which shall be considered an original. Dated: February 17, 2026 CITY: CITY OF FARMINGTON By: Nicholas Lien Acting Mayor By: Shirley R Buecksler City Clerk Dated:__________________, 20___ ENGINEER: WSB LLC By: [print name] Its: [title] Page 131 of 276 224345v1 EXHIBIT “A” SCOPE OF SERVICES AND EXHIBIT “B” SCHEDULE OF PAYMENT AND FEE SCHEDULE Page 132 of 276 K:\02210-030\Admin\Docs\SWAMP Docs\LTR PROP_SWAMP_Farmington_111725.docx 7 0 1 X E N I A A V E N U E S | S U I T E 3 0 0 | M I N N E A P O L I S , M N | 55 4 1 6 | 7 6 3 . 5 4 1 . 4 8 0 0 | W S B E N G . C O M November 17, 2025 Mr. John Powell, PE Public Works Director/City Engineer City of Farmington 430 Third St. Farmington, MN 55024 Re: Proposal to Provide a Storm Water Asset Management Program (SWAMP) for the City of Farmington Dear Mr. Powell We are pleased to present this work plan to develop and implement a Storm Water Asset Management Program (SWAMP) for the City of Farmington. The SWAMP will be a valuable asset in helping the City manage its storm water infrastructure. BACKGROUND INFORMATION Minimum Control Measures 5 and 6 of the MS4 permit require the City to complete the following: • Standard operating procedure for inspections and maintenance of the basins contained in the MS4 pond inventory. • Pond assessments to determine the treatment effectiveness of stormwater basins within the City. • Annual inspections of all structural pollution control devices, such as trap manholes, grit chambers, sumps, floatable skimmers and traps, separators, and other small settling or filtering devices. • Inspections of all MS4 outfalls, sediment basins, and ponds at a minimum once every permit cycle. WSB has met with the MPCA to review our approach (outlined below) to verify that it will meet the MPCA’s requirements outlined in the NPDES permit. MPCA staff has indicated that the SWAMP will satisfy the requirements listed above. The City of Farmington contains numerous storm water BMPs and storm sewer infrastructure. The task of inspecting and maintaining these items, as well as tracking the treatment efficiency of these BMPs, is a significant commitment of staff time and a financially daunting task. To allow the City to better manage its storm water system, annually allocate budget, and meet MS4 requirements, WSB proposes to develop a SWAMP by completing the following scope of services. Page 133 of 276 Mr. Powell November 17, 2025 Page 2 k:\02210-030\admin\docs\swamp docs\ltr prop_swamp_farmington_111725.docx Task 1 – Organize and Format Input Parameters for SWAMP WSB will work with City staff to complete the following steps needed for the SWAMP: • Identify the various stormwater basins and BMPs present within the City for incorporation into the SWAMP • Develop and define attributes for each basin which include: o Facility type (pond, infiltration basin, storm water wetland, etc.) o Storage volume of facility o Treatment expectations o Size of drainage area ▪ Drainage areas from the watershed districts will be utilized as a starting point for the SWAMP delineations o Imperviousness of drainage area o Receiving water classification/sensitivity o Impaired Waters and Waste Load Allocation status of approved TMDLs o Anti-Degradation considerations o BMP sensitivity analysis o Field investigation process and results o BMP age and historic maintenance activities completed o Ownership (private vs. public) o Access for maintenance o Previously completed bathymetric data • Identify Small BMP type (sumps, structural treatment devices, rain gardens, etc.) to be included from existing GIS shapefiles. o Maintenance cost o Sediment Volume o Inspection interval • Identify the MS4 inlets and outlets (including outfalls) to be included from existing GIS shapefiles. Task 2 – Develop and Launch a Customized Version of SWAMP WSB will utilize the information collected during Task 1 to develop an individually tailored SWAMP using ArcGIS Server. This web application will be hosted by WSB. The web-based SWAMP program will allow City employees to easily access information related to the City’s storm water basins, complete and store survey records, and update information as needed. Using the information stored in the database, SWAMP will allow the user to: • Create a composite SWAMP score for each storm water basin. Composite scores can be used by City staff to prioritize and budget inspection and maintenance activities. • Calculate estimated annual treatment efficiencies and annual load reduction provided by each stormwater basin for Total Phosphorus and Total Suspended Solids. • Calculate the life cycle cost-benefit to help the City determine the value of performing maintenance or improvement activities on any given storm water basin. • Provide calculated responses regarding storm water basin maintenance activities (similar to a pavement management program). • Meet MS4 requirements for stormwater basin management. • Track, schedule, and record MS4 visual pond (inlets/outlets) inspections, outfall inspections, and structural BMP inspections. Page 134 of 276 Mr. Powell November 17, 2025 Page 3 k:\02210-030\admin\docs\swamp docs\ltr prop_swamp_farmington_111725.docx Task 3 – As-builts, Grading Plans, and Bathymetric Surveys This task includes customizing the SWAMP application for the City by inputting as-built information, associated grading plans, and results from previously completed bathymetric surveys. This information is not necessary to set up or use the app but helps customize the application and avoid duplication of work and result in more accurate inspection and maintenance forecasting. Annual Subscription Fee The SWAMP Web Application has an annual software subscription of $2,600 beginning in September of 2026. This subscription includes access to the web application, cloud server storage of City’s program, application maintenance, and future software updates. WSB intends to keep the SWAMP current and relevant by providing program updates as necessary. WSB will notify you when updates are being completed. SUMMARY The cost to complete Tasks 1-3 will be billed at an hourly not to exceed cost of $27,850. The Web Application annual subscription cost of $2,600 will be billed at a lump sum cost, annually, starting in September of 2026. We will start work immediately upon authorization and anticipate the SWAMP application can be up and running within four (4) months of starting work. Thank you for this opportunity to develop a SWAMP Web Application for the City of Farmington. WSB is confident this assessment tool and inspection and maintenance prioritization program will help guide City staff on the best use of funds to achieve the desired storm water benefits. If you agree with the scope of services outlined above, please sign where indicated below and return one copy to our office. If you should have any questions regarding this proposal, please contact Bill at 952-388-4188. Sincerely, WSB William Alms, PE Principal of Water Resources ACCEPTED BY: City of Farmington I hereby authorize an hourly not to exceed cost of $27,850 to set up the City of Farmington SWAMP Web Application. In addition, I authorize an annual subscription fee of $2,600, starting in September of 2026. Name Title Date Page 135 of 276 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: John Powell, Public Works Director Department: Engineering Subject: Receive Bids and Award a Contract for the Devonshire Ave. & 206th Street Pond Maintenance Meeting: Regular Council - Feb 17 2026 INTRODUCTION: This project involves maintenance of the stormwater pond located at the Devonshire Avenue and 206th Street intersection. This includes inlet and outlet repairs, excavation of sediment, installation of a sump catch basin, and restoration. On January 20, 2026, the City Council authorized the advertisements for bids to complete this work. DISCUSSION: An advertisement for bids was posted in Finance & Commerce and the Dakota County Tribune on January 23 and January 30, 2026, as well as on the QuestCDN website. Bids were opened at 10 am on February 10, 2026. Seven (7) bids were received. The low bidder is JC Hallet Construction, in the amount of $110,878. The Engineer's Opinion of Probable Project complete A $157,735. was contingency, construction a including not Cost, tabulation of bids is attached and is summarized below: Contractor Bid Amount JC Hallet Construction $110,878.00 Nadeau Companies $111,958.00 Veit & Company $118,096.03 Winberg Companies $134,409.34 Krueger Excavating Inc. $146,520.00 McNamara Contracting $159,813.50 New Look Contracting $173,745.50 The consultant's recommendation of award to JC Hallet is also attached. BUDGET IMPACT: The 2026-2030 Capital Improvement Plan includes a yearly allocation of $400,000 out of the Stormwater Fund for Annual Storm Water Management Maintenance. The City's storm water ponds need to function properly in order to properly treat incoming runoff, and to Page 136 of 276 protect adjacent properties. Large storm water maintenance projects may occur over multiple years from the initial study to the construction closeout. Based the low bid received, the as contingency construction completing a assuming and $20,000 construction activity is highly weather dependent, the costs for this project are estimated as follows: Construction $110,878.00 Construction Contingency $ 20,000.00 Construction Total $130,878.00 Design $ 63,493.00 Construction administration, surveying, testing, permits, etc. $ 16,000.00 Total $210,371.00 For cost containment purposes, most of the on-site construction administration will be provided by City Staff. Construction surveying and a limited amount of construction support is planned to be provided by a consultant. The low bid is about 29.7 percent lower than the Engineer's Opinion of Probable Project Cost. In reviewing the bids, the primary reason was the estimated unit price for Muck Excavation (Landfill Disposal) was significantly higher than all of the bids. Public improvement contracts are based on estimated quantities of materials and work types; the final contract amount can vary (increase or decrease) from the original amount. Additionally, construction issues arise which require an immediate decision and cannot wait for the next City Council meeting for formal approval. For these reasons, Staff is also requesting approval the of 18% $20,000 of (about order change a of contingency contract) be established as an aggregate of all change order increases with a maximum amount of $20,000 allowed for any single change order increase without prior City Council approval. ACTION REQUESTED: Staff recommends acceptance of the bids and award of a contract for construction of the Devonshire Avenue & 206th Street Pond Maintenance to JC Hallet Construction in the amount of their bid of $110,878.00 and authorize the Mayor and City Clerk to execute the same. This includes approval of a change order contingency of $20,000 be established as an aggregate of all change order increases, with a maximum amount of $20,000 allowed for any single change order increase without prior City Council approval. ATTACHMENTS: 25-07 Devonshire & 206th Pond Maintenance Bid Tabulation FINAL 25-07 Recommendation of Award Page 137 of 276 BID TABULATION Devonshire Avenue & 206th Street Pond Maintenance City Project No. 25-07 Bid opening:2/10/2026 10:00 AM City of Farmington Item No.Item Description Unit Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension 1 Mobilization LS 1 14,500.00$ 14,500.00$ 10,000.00$ 10,000.00$ 12,000.00$ 12,000.00$ 23,280.00$ 23,280.00$ 11,451.00$ 11,451.00$ 23,573.00$ 23,573.00$ 10,000.00$ 10,000.00$ 23,500.00$ 23,500.00$ 2 Remove Catch Basin EA 1 1,500.00$ 1,500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 380.00$ 380.00$ 676.65$ 676.65$ 500.00$ 500.00$ 1,050.00$ 1,050.00$ 2,000.00$ 2,000.00$ 3 Remove Outlet Structure EA 1 1,500.00$ 1,500.00$ 1,000.00$ 1,000.00$ 500.00$ 500.00$ 380.00$ 380.00$ 884.85$ 884.85$ 750.00$ 750.00$ 975.00$ 975.00$ 1,850.00$ 1,850.00$ 4 Remove Wood Duck Houses and Posts EA 2 175.00$ 350.00$ 50.00$ 100.00$ 50.00$ 100.00$ 0.01$ 0.02$ 52.05$ 104.10$ 200.00$ 400.00$ 150.00$ 300.00$ 100.00$ 200.00$ 5 Remove Outlet Pipe LF 21 50.00$ 1,050.00$ 10.00$ 210.00$ 30.00$ 630.00$ 28.00$ 588.00$ 15.62$ 327.92$ 30.00$ 630.00$ 35.00$ 735.00$ 48.00$ 1,008.00$ 6 Remove Curb & Gutter LF 21 20.00$ 420.00$ 10.00$ 210.00$ 15.00$ 315.00$ 23.00$ 483.00$ 62.46$ 1,311.66$ 10.00$ 210.00$ 35.00$ 735.00$ 25.00$ 525.00$ 7 Remove Bituminous Pavement SY 23 20.00$ 460.00$ 6.00$ 138.00$ 10.00$ 230.00$ 50.00$ 1,150.00$ 52.05$ 1,197.15$ 9.00$ 207.00$ 16.00$ 368.00$ 30.00$ 690.00$ 8 Remove Trash Rack EA 1 75.00$ 75.00$ 200.00$ 200.00$ 50.00$ 50.00$ 166.00$ 166.00$ 520.50$ 520.50$ 500.00$ 500.00$ 275.00$ 275.00$ 250.00$ 250.00$ 9 Remove FES EA 1 75.00$ 75.00$ 400.00$ 400.00$ 200.00$ 200.00$ 330.00$ 330.00$ 624.60$ 624.60$ 500.00$ 500.00$ 650.00$ 650.00$ 975.00$ 975.00$ 10 Excavation - Common (Offsite) (EV) (P) CY 509 20.00$ 10,180.00$ 28.00$ 14,252.00$ 22.00$ 11,198.00$ 21.00$ 10,689.00$ 29.18$ 14,854.66$ 29.00$ 14,761.00$ 45.00$ 22,905.00$ 45.00$ 22,905.00$ 11 Muck Excavation (EV) (P) - Management Level 2 (Landfill Disposal) CY 712 80.00$ 56,960.00$ 35.00$ 24,920.00$ 46.00$ 32,752.00$ 43.00$ 30,616.00$ 57.26$ 40,765.56$ 53.00$ 37,736.00$ 73.00$ 51,976.00$ 55.00$ 39,160.00$ 12 Muck Excavation (EV) (P) - Management Level 1 (Offsite Disposal) CY 185 35.00$ 6,475.00$ 30.00$ 5,550.00$ 22.00$ 4,070.00$ 25.00$ 4,625.00$ 29.15$ 5,392.38$ 30.00$ 5,550.00$ 40.00$ 7,400.00$ 45.00$ 8,325.00$ 13 Dewatering LS 1 17,500.00$ 17,500.00$ 2,500.00$ 2,500.00$ 4,000.00$ 4,000.00$ 0.01$ 0.01$ 3,123.00$ 3,123.00$ 5,000.00$ 5,000.00$ 7,000.00$ 7,000.00$ 16,500.00$ 16,500.00$ 14 Bituminous Patching Mixture SY 23 100.00$ 2,300.00$ 220.00$ 5,060.00$ 152.00$ 3,496.00$ 83.00$ 1,909.00$ 145.74$ 3,352.02$ 435.00$ 10,005.00$ 210.00$ 4,830.00$ 290.00$ 6,670.00$ 15 Curb & Gutter Design Surmountable LF 21 60.00$ 1,260.00$ 100.00$ 2,100.00$ 92.00$ 1,932.00$ 180.00$ 3,780.00$ 88.49$ 1,858.19$ 190.00$ 3,990.00$ 225.00$ 4,725.00$ 182.00$ 3,822.00$ 16 15" RC Pipe Culvert Class V LF 15 150.00$ 2,250.00$ 80.00$ 1,200.00$ 100.00$ 1,500.00$ 165.00$ 2,475.00$ 109.31$ 1,639.58$ 74.00$ 1,110.00$ 250.00$ 3,750.00$ 150.00$ 2,250.00$ 17 15" RC Pipe Apron EA 1 750.00$ 750.00$ 1,500.00$ 1,500.00$ 1,600.00$ 1,600.00$ 1,845.00$ 1,845.00$ 1,691.63$ 1,691.63$ 1,695.00$ 1,695.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 18 Trash Guard for 15" Pipe Apron EA 1 300.00$ 300.00$ 1,000.00$ 1,000.00$ 1,300.00$ 1,300.00$ 990.00$ 990.00$ 1,582.32$ 1,582.32$ 1,210.00$ 1,210.00$ 1,400.00$ 1,400.00$ 1,025.00$ 1,025.00$ 19 Trash Guard for 33" Pipe Apron EA 1 850.00$ 850.00$ 2,000.00$ 2,000.00$ 3,000.00$ 3,000.00$ 3,335.00$ 3,335.00$ 3,560.22$ 3,560.22$ 2,072.00$ 2,072.00$ 1,900.00$ 1,900.00$ 3,115.00$ 3,115.00$ 20 Construct Drainage Structure Design: 72" Dia. Catch Basin w/ 4' Sump EA 1 12,500.00$ 12,500.00$ 16,000.00$ 16,000.00$ 9,300.00$ 9,300.00$ 10,800.00$ 10,800.00$ 13,413.29$ 13,413.29$ 13,013.00$ 13,013.00$ 11,000.00$ 11,000.00$ 13,895.00$ 13,895.00$ 21 Construct Drainage Structure Design: 48" Dia. Outlet Control Structure EA 1 6,500.00$ 6,500.00$ 12,000.00$ 12,000.00$ 9,500.00$ 9,500.00$ 8,785.00$ 8,785.00$ 9,290.93$ 9,290.93$ 7,824.00$ 7,824.00$ 11,200.00$ 11,200.00$ 8,000.00$ 8,000.00$ 22 Geotextile Filter Type IV SY 20 5.00$ 100.00$ 4.00$ 80.00$ 6.00$ 120.00$ 2.00$ 40.00$ 15.62$ 312.30$ 10.00$ 200.00$ 16.00$ 320.00$ 10.00$ 200.00$ 23 Random Riprap CL. III CY 33 120.00$ 3,960.00$ 115.00$ 3,795.00$ 140.00$ 4,620.00$ 85.00$ 2,805.00$ 147.82$ 4,878.13$ 135.00$ 4,455.00$ 110.00$ 3,630.00$ 175.00$ 5,775.00$ 24 Traffic Control LS 1 5,000.00$ 5,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 777.00$ 777.00$ 1,041.00$ 1,041.00$ 500.00$ 500.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 25 Install Sign Type- Wetland Buffer EA 2 250.00$ 500.00$ 250.00$ 500.00$ 400.00$ 800.00$ 99.00$ 198.00$ 208.20$ 416.40$ 400.00$ 800.00$ 150.00$ 300.00$ 350.00$ 700.00$ 26 Stabilized Construction Exit LS 1 2,000.00$ 2,000.00$ 500.00$ 500.00$ 1,500.00$ 1,500.00$ 2,035.00$ 2,035.00$ 957.72$ 957.72$ 4,000.00$ 4,000.00$ 1,500.00$ 1,500.00$ 1.00$ 1.00$ 27 Storm Drain Inlet Protection EA 5 150.00$ 750.00$ 200.00$ 1,000.00$ 100.00$ 500.00$ 230.00$ 1,150.00$ 156.15$ 780.75$ 300.00$ 1,500.00$ 200.00$ 1,000.00$ 165.00$ 825.00$ 28 Floatation Silt Curtain Type Still Water (Containment) LF 43 25.00$ 1,075.00$ 15.00$ 645.00$ 34.00$ 1,462.00$ 16.00$ 688.00$ 20.82$ 895.26$ 18.00$ 774.00$ 30.00$ 1,290.00$ 22.00$ 946.00$ 29 Sediment Control Log Type Wood Fiber LF 41 4.00$ 164.00$ 3.00$ 123.00$ 3.00$ 123.00$ 4.00$ 164.00$ 15.62$ 640.22$ 3.00$ 123.00$ 5.00$ 205.00$ 12.00$ 492.00$ 30 Rolled Erosion Prevention Category 20 SY 550 4.00$ 2,200.00$ 3.00$ 1,650.00$ 3.00$ 1,650.00$ 2.80$ 1,540.00$ 7.29$ 4,007.85$ 3.00$ 1,650.00$ 6.00$ 3,300.00$ 4.00$ 2,200.00$ 31 Rolled Erosion Prevention Category 35 (DeKoWe 700) SY 47 13.00$ 611.00$ 5.00$ 235.00$ 5.00$ 235.00$ 17.00$ 799.00$ 15.62$ 733.91$ 4.00$ 188.00$ 15.00$ 705.00$ 17.00$ 799.00$ 32 Seeding ACRE 0 8,000.00$ 2,000.00$ 1,500.00$ 375.00$ 1,700.00$ 425.00$ 2,800.00$ 700.00$ 6,246.00$ 1,561.50$ 2,000.00$ 500.00$ 2,750.00$ 687.50$ 4,250.00$ 1,062.50$ 33 Seed Mixture MnDOT Seed Mix (SSW) @ 35 lbs/acre LB 27 60.00$ 1,620.00$ 5.00$ 135.00$ 50.00$ 1,350.00$ 22.00$ 594.00$ 20.82$ 562.14$ 22.00$ 594.00$ 26.00$ 702.00$ 40.00$ 1,080.00$ 157,735.00$ 110,878.00$ 111,958.00$ 118,096.03$ 134,409.34$ 146,520.00$ 159,813.50$ 173,745.50$ $159,813.50 $173,745.50$110,878.00 $111,958.00 $118,096.03 $134,409.34 $146,520.00 TOTAL BID McNamara Contracting New Look ContractingVeit & Company Winberg CompaniesEngineer's Estimate Krueger ExcavatingNadeau CompaniesJC Hallet Construction Pa g e 1 3 8 o f 2 7 6 Emmons & Olivier Resources, Inc. is an Equal Opportunity Affirmative Action Employer 1919 University Avenue West, Suite 300 St. Paul, MN 55104 T/ 651.770.8448 F/ 651.770.2552 www.eorinc.com memo Project Name | 25-07 Devonshire & 206th Street Pond Maintenance Date | February 11, 2026 To / Contact info | City of Farmington; John Powell, PE, Public Works Director From / Contact info | Erik Megow, PE, EOR, Project Engineer Regarding | Recommendation for Award of Contract The purpose of this memorandum is to provide a recommendation for selecting a contractor to construct the 25-07 Devonshire & 206th Street Pond Maintenance project. Bid Summary The Request for Bids was posted on QuestCDN bidding platform on January 23, 2026. Bids were due on February 10, 2026 at 10:00 AM CST with the bids publicly open and read at City Hall at 430 Third Street. A total of seven bids were received and the low bidder is J C Hallet Construction, LLC’s, with a Total Bid of $110,878.00. Review of the submitted bid packages was performed by City Staff and Emmons & Olivier Resources, Inc. (EOR). CONTRACTOR TOTAL BID RANK Engineer’s Estimate 157,735.00 N/A J C Hallet Construction, LLC 110,878.00 1 Nadeau Companies 111,958.00 2 Veit & Company 118,096.03 3 Winberg Companies 134,409.34 4 Krueger Excavating 146,520.00 5 McNamara Contracting 159,813.50 6 New Look Contracting 173,745.50 7 EOR has reviewed J C Hallet Construction, LLC’s submitted bid and found that it complies in all respects with the submittal requirements. J C Hallet Construction, LLC, has extensive experience with pond infrastructure construction and recent experience with municipal pond dredging (City of Eden Prairie), which are both elements of this project. The engineer finds that J C Hallet Construction, LLC is the lowest-priced responsible, responsive bidder. Recommendation Following our review, we are recommending the City of Farmington award the contract to the low responsive, responsible bidder, J C Hallet Construction, LLC. Page 139 of 276 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: Tony Wippler, Planning Manager Department: Community Development Subject: Resolution 2026-010 Approving the Final Plat - Dakota Meadows Preserve 2nd Addition; and Development Contract - Dakota Meadows Preserve 2nd Addition Meeting: Regular Council - Feb 17 2026 INTRODUCTION: Distinctive Land Development, LLC has submitted an application for the final plat for Dakota Meadows Preserve 2nd Addition. The development is generally located near the southeast intersection of Denmark Avenue and 220th Street W and is adjacent to the Dakota Electric facility to the north and the Dakota County Fairgrounds to the east (see attached location map). The Dakota Meadows Preserve 2nd Addition final plat consists of 46 single-family lots on 18.96 acres (see attached final plat). Also attached for Council’s review is the Development Contract for the Dakota Meadows Preserve 2nd Addition. DISCUSSION: Final Plat The 46 single-family lots are part of the overall 134 single-family lots that were approved as part of the preliminary plat for this project (the first phase contained 42 single-family lots). The Dakota Meadows 2nd Addition final plat corresponds with the preliminary plat that was approved by the Planning Commission on April 8, 2025 and the City Council on April 21, 2025. Unit Planned a as approved was development Preserve Meadows Dakota The Development [PUD]. With approval of the PUD, certain deviations from City Code were allowed, including reducing the minimum lot width and area requirements to 40 feet and 4,261 square feet, respectively. The average lot area within the 2nd Addition is 5,219 square feet (lot sizes in the 2nd Addition range from 4,261 square feet up to 7,182 square feet in size). The setbacks for the Dakota Meadows Preserve development were established with the approval of the PUD and are as follows:  Front yard setback: 20 feet (25 feet on sidewalk side) Page 140 of 276  Rear yard setback: 6 feet  Side yard setback: 5 feet  Side yard setback street (corner): 15 feet The final plat contains five outlots (labeled A-E). A description of the outlots is as follows: Outlot A: Combination of stormwater ponding and trail corridor Outlot B: Remnant parcel and trail corridor Outlot C: Combination of stormwater ponding and trail corridor Outlot D: Future development phase Outlot E: Remnant parcel and trail corridor Outlots A and C will be deeded to the City with this final plat. Transportation and Access 223rd Street W will be extended to the east with this phase and will tie into Deepwater Path at a t-intersection. Deepwater Path will then extend north and south to provide future access to the adjoining property to the north and provide future access for additional phases of this development to the south. The rights-of-way for both 223rd Street W and Deepwater Path are 60 feet wide with a roadway width of 29 feet face of curb to face of curb. Parks, Trails and Sidewalks The City will take a combination of land (for trail corridor) and cash-in-lieu of park dedication with this final plat. A five-foot-wide sidewalk will be constructed on the north side of 223rd Street W and on the west side of Deepwater Path. An eight-foot-wide bituminous and 1 Block 9, and 8 between extend constructed be will path Lots northwesterly from the sidewalk in 223rd Street W. The trail will then follow the northern boundary of the plat to Ash Street (220th Street W). Engineering Review The Engineering Department has reviewed the Dakota Meadows Preserve 2nd Addition final plat and recommend approval upon satisfaction of all engineering comments related to the construction plans for grading and utilities, as well as the applicant entering into a Development Contract with the City and all security fees and costs paid. Planning Commission Review The Planning Commission reviewed the final plat at its January 13th meeting. The Planning Commission recommended approval of the final plat with a vote of 5-0. Development Contract Attached for Council’s consideration and approval is the Development Contract for Page 141 of 276 Dakota Meadows Preserve 2nd Addition. The attached contract is a standard development contract that spells out the requirements for development of the land, including timelines to complete the platting process, defining development charges and fees, the serve to required infrastructure addressing the of construction public development together with the associated sureties. The Developer has reviewed the attached contract and finds it acceptable. BUDGET IMPACT: Below are the fees that will be collected as part of the development contract:  Surface Water Quality Management Fee: $1,334  Surface Water Management Fee: $141,713  Watermain Trunk Area Charge: $55,489  Sanitary Sewer Trunk Area Charge: $29,746  Park Dedication (cash in lieu): $51,809  Sealcoating: $6,057 ACTION REQUESTED: By separate motion, approve the following actions: A. Adopt Resolution 2026-010 Approving and Authorizing the Signing of the Dakota Meadows Preserve 2nd Addition Final Plat, contingent upon the following: 1. The satisfaction of all engineering comments related to the construction plans for grading and utilities. 2. A Development Contract between the Developer and City of Farmington shall be executed other all of paid. be Submission costs and fees security and shall documents required under the Development Contract shall be required. B. Adopt the attached Development Contract and authorize its execution. ATTACHMENTS: Dakota Meadows Preserve 2nd Location Map 124153-Dakota Meadows Preserve 2nd Addition-plat 02-124153 - Dakota Meadows 2nd Addition Util-Rev 02 (01-20-2026) Resolution 2026-010 Dakota Meadows 2nd Addition Final Plat Development Contract, Distinctive Land Development, Final Page 142 of 276 r 1 r 1 im? rm ‘1 ‘ :,1! m m Page 143 of 276 CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS Pa g e 1 4 4 o f 2 7 6 CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS Pa g e 1 4 5 o f 2 7 6 CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS Pa g e 1 4 6 o f 2 7 6 CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS Pa g e 1 4 7 o f 2 7 6 1ST ADDITION 2ND ADDITION FUTURE ADDITION REGISTERED PROFESSIONAL CIVIL ENGINEER REGISTERED PROFESSIONAL LAND SURVEYOR DEVELOPER REG. NO. 42299 JOHN M. MOLINARO PETER J. HAWKINSON REG. NO. 45831 MATT ODENTHAL DISTINCTIVE LAND DEVELOPMENT, LLC 18466 KENYON AVENUE STE#100 LAKEVILLE, MN 55044 PREPARED BY PIONEER ENGINEERING, P.A. 2422 ENTERPRISE DRIVE MENDOTA HEIGHTS, MN 55120 02-ENG-124153-SHEET-COVR 1.00COVER SHEET I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OFDAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet LOCATION MAP INTERSECTION DETAILS STORM SEWER SCHEDULESTORM SEWER CONSTRUCTION LEGENDCOVER SHEET SHEET INDEX 1.00.1.01. 3.01-3.02.3.11. 4.11. DEWATERING PLAN2.00. SANITARY SEWER & WATERMAIN2.01-2.02. STREET CONSTRUCTION PLAN4.01-4.02. DAKOTA MEADOWS PRESERVE 2ND ADDITION UTILITY & STREET CONSTRUCTION PLAN FARMINGTON, MINNESOTA REMOVALS PLAN1.02. S1-S2 S3 S5 S4 MPCA MAP STORMWATER POLLUTION PREVENTIONPLAN PROPOSED HYDROLOGY PLANEXISTING HYDROLOGY PLAN Know what's below. before you dig.Call R CONSTRUCTION TRAIL CONSTRUCTION PLAN5.01.SIGNAGE & STREET LIGHTING PLAN6.01. SEEDING & BASIN RESTORATION8.01.DETAILS9.01-9.09.MNDOT PEDESTRIAN RAMP DETAILS10.01. L1.LANDSCAPE PLANT1.TREE PRESERVATION PLAN EROSION CONTROL PLAN7.01. TEMPORARY TURN AROUND PLAN4.21. Pa g e 1 4 8 o f 2 7 6 02-ENG-124153-SHEET-LGND 1.01LEGEND I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 4 9 o f 2 7 6 02-ENG-124153-SHEET-DEMO 1.02REMOVALS PLAN I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 5 0 o f 2 7 6 02-ENG-124153-SHEET-DWTR 2.00DEWATERING PLAN I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 5 1 o f 2 7 6 02-ENG-124153-SHEET-SSWR 2.01SANITARY SEWER AND WATERMAIN CONSTRUCTION 223RD STREET WEST I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 5 2 o f 2 7 6 02-ENG-124153-SHEET-SSWR 2.02SANITARY SEWER & WATERMAIN CONSTRUCTION DEEPWATER PATH I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 5 3 o f 2 7 6 02-ENG-124153-SHEET-STRM 3.01STORM SEWER CONSTRUCTION 223RD STREET WEST/DEEPWATER PATH I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 5 4 o f 2 7 6 02-ENG-124153-SHEET-STRM 3.02STORM SEWER CONSTRUCTION DEEPWATER PATH/BASIN-800/850 I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet BASIN-500 Pa g e 1 5 5 o f 2 7 6 02-ENG-124153-SHEET-STRM-SCHD 3.11STORM SEWER SCHEDULE I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 5 6 o f 2 7 6 ℄℄ 02-ENG-124153-SHEET-ROAD 4.01STREET CONSTRUCTION PLAN 223RD STREET WEST I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 5 7 o f 2 7 6 ℄℄ 02-ENG-124153-SHEET-ROAD 4.02STREET CONSTRUCTION PLAN DEEPWATER PATH I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 5 8 o f 2 7 6 02-ENG-124153-SHEET-ROAD 4.11INTERSECTION DETAILS 223RD STEET WEST & DEEPWATER PATH I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 5 9 o f 2 7 6 02-ENG-124153-SHEET-TEMP-TURN 4.21TEMPORARY TURN AROUND PLAN I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 6 0 o f 2 7 6 02-ENG-124153-SHEET-TRAIL 5.01TRAIL CONSTRUCTION PLAN TRAIL I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 6 1 o f 2 7 6 CITY NATURAL AREA PROTECTED WETLAND BUFFER This is a protected Natural Area. The native CONSERVATION AREAplantings in this area provide shoreline stabilization for the ponds, reduce erosion, improve water quality by filtering pollutants, and provide a natural habitat for wildlife. Under City Ordinance, property adjacent to ponds should be left in a natural state and no mowing or clearing of vegetation in this area may occur. Dead trees or branches and native grasses provide an excellent habitat for native wildlife adjacent to ponds and should not be removed from the natural area. No vehicular traffic of any kind is allowed. The native trees and plantings in this city-owned area provide a natural habitat for wildlife and prevent erosion of steep slopes. Under City Ordinance, existing plant material within this conservation area should be left in a natural state and no clearing or removal of vegetation in this area may occur. Dead trees or branches provide excellent habitat for native wildlife and should not be removed from the conservation area. The plantings in this area contain native trees, flowering plants, shrubs and grasses that provide food for birds, fish and other native wildlife. The plants also help to hold soil and prevent erosion, improve water quality and provide natural habitats for animals. Under City Ordinance, no clearing or removal of vegetation in the buffer area is allowed. Dead trees or branches provide excellent habitat for native wildlife and should not be removed from the wetland buffer. 02-ENG-124153-SHEET-SIGN 6.01SIGNAGE AND STREET LIGHTING PLAN I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 6 2 o f 2 7 6 LEGEND 02-ENG-124153-SHEET-EROS 7.01EROSION CONTROL PLAN I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 6 3 o f 2 7 6 · · · · · · · · 02-ENG-124153-SHEET-SEED 8.01SEEDING AND BASIN RESTORATION I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 6 4 o f 2 7 6 02-ENG-124153-SHEET-DTLS 9.01CITY DETAILS I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 6 5 o f 2 7 6 02-ENG-124153-SHEET-DTLS 9.02CITY DETAILS I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 6 6 o f 2 7 6 02-ENG-124153-SHEET-DTLS 9.03CITY DETAILS I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 6 7 o f 2 7 6 02-ENG-124153-SHEET-DTLS 9.04CITY DETAILS I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 6 8 o f 2 7 6 02-ENG-124153-SHEET-DTLS 9.05CITY DETAILS I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 6 9 o f 2 7 6 02-ENG-124153-SHEET-DTLS 9.06CITY DETAILS I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 7 0 o f 2 7 6 02-ENG-124153-SHEET-DTLS 9.07CITY DETAILS I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 7 1 o f 2 7 6 STOP 02-ENG-124153-SHEET-DTLS 9.08CITY DETAILS I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 7 2 o f 2 7 6 · · 02-ENG-124153-SHEET-DTLS 9.09CITY DETAILS I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 7 3 o f 2 7 6 02-ENG-124153-SHEET-DTLS 10.01MNDOT DETAILS I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c 27OF DAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 11-05-2025 JMM SHA/AJA Name Reg. No.Date Revisions 1. 12-02-2025 City Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 11-05-2025 John M. Molinaro LAKEVILLE, MN 55044 2ND ADDITION2. 01-20-2026 City Comments3. 07-30-2025 San. Serv. Risers/INV4. 09-25-2025 OCS-100 Inlet Pa g e 1 7 4 o f 2 7 6 · · · · · · · · · · · · · · · I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c S5OFDAKOTA MEADOWS PRESERVE FARMINGTON, MN 01-03-2025 JMM SHA Name Reg. No.Date Revisions 1. 02-10-2025 Carriage Change Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 01-03-2025 John M. Molinaro 2. 04-02-2025 City Comments DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 LAKEVILLE, MN 550443. 04-21-2025 Project Name Change 4. 06-02-2025 City Comments 5. 01-20-2026 City Comments 00-ENG-124153-SHEET-HYDR-SWPPP S1STORMWATER POLLUTION PREVENTION PLAN Pa g e 1 7 5 o f 2 7 6 00-ENG-124153-SHEET-HYDR-SWPPP S2STORMWATER POLLUTION PREVENTION PLAN I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c S5OFDAKOTA MEADOWS PRESERVE FARMINGTON, MN 01-03-2025 JMM SHA Name Reg. No.Date Revisions 1. 02-10-2025 Carriage Change Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 01-03-2025 John M. Molinaro 2. 04-02-2025 City Comments DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 LAKEVILLE, MN 550443. 04-21-2025 Project Name Change 4. 06-02-2025 City Comments 5. 01-20-2026 City Comments Pa g e 1 7 6 o f 2 7 6 I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c S5OFDAKOTA MEADOWS PRESERVE FARMINGTON, MN 01-03-2025 JMM SHA Name Reg. No.Date Revisions 1. 02-10-2025 Carriage Change Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 01-03-2025 John M. Molinaro 2. 04-02-2025 City Comments DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 LAKEVILLE, MN 550443. 04-21-2025 Project Name Change 4. 06-02-2025 City Comments 5. 01-20-2026 City Comments 00-ENG-124153-SHEET-HYDR-MPCA S3MPCA MAP Pa g e 1 7 7 o f 2 7 6 LEGEND I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c S5OFDAKOTA MEADOWS PRESERVE FARMINGTON, MN 01-03-2025 JMM SHA Name Reg. No.Date Revisions 1. 02-10-2025 Carriage Change Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 01-03-2025 John M. Molinaro 2. 04-02-2025 City Comments DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 LAKEVILLE, MN 550443. 04-21-2025 Project Name Change 4. 06-02-2025 City Comments 5. 01-20-2026 City Comments 00-ENG-124153-SHEET-HYDR-EXIS S4EXISTING HYDROLOGY MAP Pa g e 1 7 8 o f 2 7 6 LEGEND I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota c S5OFDAKOTA MEADOWS PRESERVE FARMINGTON, MN 01-03-2025 JMM SHA Name Reg. No.Date Revisions 1. 02-10-2025 Carriage Change Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 45831 01-03-2025 John M. Molinaro 2. 04-02-2025 City Comments DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 LAKEVILLE, MN 550443. 04-21-2025 Project Name Change 4. 06-02-2025 City Comments 5. 01-20-2026 City Comments 00-ENG-124153-SHEET-HYDR-PROP S5PROPOSED HYDROLOGY MAP Pa g e 1 7 9 o f 2 7 6 1OFJLT JLT L1LANDSCAPE PLAN c OFDAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 01-03-2025Name Reg. No.Date Revisions 1. 01-15-2025 Client Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS LAKEVILLE, MN 55044 I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota 44763 Jennifer L. Thompson 2. 02-10-2025 Carriage Change3. 04-02-2025 City Comments4. 06-02-2025 City Comments1-20-2026 1-20-2026-rem. linden, add. catalpa as req. by City Pa g e 1 8 0 o f 2 7 6 1OFJLT JLT Date Designed Drawn T1TREE PRESERVATION PLAN c OFDAKOTA MEADOWS PRESERVE FARMINGTON, MN DISTINCTIVE LAND DEV., LLC 18466 KENYON AVENUE #100 01-03-2025Name Reg. No.Date Revisions 1. 01-15-2025 Client Comments Date Designed Drawn 2025 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS LAKEVILLE, MN 55044 I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota 44763 Jennifer L. Thompson 2. 02-10-2025 Carriage Change3. 04-02-2025 City Comments4. 06-02-2025 City Comments TREE PROTECTION DETAILTREE PRESERVATION NOTES 1-20-2026 1-20-2026 Added removal timing note as per City Pa g e 1 8 1 o f 2 7 6 CITY OF FARMINGTON DAKOTA COUNTY, MINNESOTA RESOLUTION 2026-010 A RESOLUTION APPROVING AND AUTHORIZING SIGNING OF FINAL PLAT DAKOTA MEADOWS PRESERVE 2ND ADDITION WHEREAS, the final plat for Dakota Meadows Preserve 2nd Addition is now before the City Council for review and approval; and WHEREAS, a public hearing of the Planning Commission was held for the preliminary plat on April 8, 2025 after notice of the same was published in the official newspaper of the City and proper notice sent to surrounding owners; and WHEREAS, the Planning Commission reviewed the final plat on January 13, 2026 and recommended approval of the final plat; and WHEREAS, the City Council reviewed the final plat; and WHEREAS, the City Engineer has rendered an opinion that the proposed plat can be feasibly served by municipal services. NOW, THEREFORE, BE IT RESOLVED, the final plat for Dakota Meadows Preserve 2nd Addition be approved and that the requisite signatures are authorized to be affixed to the final plat subject to the following contingencies: 1. The satisfaction of all engineering comments related to the construction plans for grading and utilities. 2. A development contract between the developer and City of Farmington shall be executed and security fees and costs shall be paid. Submission of all other documents required under the development contract shall be required. Adopted by the City Council of the City of Farmington, Minnesota, this 17th day of February 2026. ATTEST: ____________________________ ______________________________ Nicholas Lien, Acting Mayor Shirley R Buecksler, City Clerk Page 182 of 276 a? ? ? g ? ' ? ' ? ? El ‘ —- — _ - I - - I — ' - I — I . — r —. - - ' "- _- ' - _. —- ' _ ' 7 - . '. : - . . _ I' . . i _ ' : | " . - E , ' . " - ? " . - -. . - ]. ' . ‘ E _ ? l ' . I I - | _ ' .- - _ "— - - . ' - ' _ - . . _ I _ I _ I. . . ‘_ J _ _ I J . - . -. I : ' -I . _ h '_ __ .- . I. *. -. .r _ _ _- . . . I- -: - -- ' l - " l - I— - - I : I - .- - I I ._ — I_ i- ! I I. I II .. 3 '- - ' .' - l" ' l: :. : :. .— .' '. - - -I P _ _ a - _ 1. lI. - DE V E L O P M E N T CO N T R A C T AG R E E M E N T da t e d th i s of 20 2 6 by , be t w e e n , an d am o n g th e CI T Y OF FA R M I N G T O N , a Mi n n e s o t a mu n i c i p a l co r p o r a t i o n (C I T Y ) an d DI S T I N C T I V E LA N D DE V E L O P M E N T , LL C , a Mi n n e s o t a Li m i t e d Li a b i l i t y Co m p a n y (DE V E L O P E R) . 1. Re g u e s t fo r Pl a t Ap p r o v a l . Th e De v e l o p e r ha s as k e d th e Ci t y to ap p r o v e a pl a t fo r DA K O T A ME A D O W S PR E S E R V E 2 AD D I T I O N (a l s o re f e r r e d to in th i s De v e l o p m e n t Co n t r a c t as th e PL A T ) . Th e la n d is si t u a t e d in th e Ci t y of Fa r m i n g t o n , Co u n t y of Da k o t a , St a t e of Mi n n e s o t a , an d is le g a l l y de s c r i b e d on th e at t a c h e d Ex h i b i t A (t h e ”D e v e l o p m e n t Pr o p e r t y " ) . Co n d i t i o n s of Ap p r o v a l . Th e Ci t y he r e b y ap p r o v e s th e Pl a t on th e co n d i t i o n s th a t : a)b)C) d)9) fl 3) Th e De v e l o p e r en t e r in t o th i s Ag r e e m e n t ; an d Th e De v e l o p e r pr o v i d e th e ne c e s s a r y se c u r i t y in ac c o r d a n c e wi t h th e te r m s of th i s Ag r e e m e n t ; an d Th e De v e l o p e r sa t i s f y th e Ca s h Re q u i r e m e n t s in ac c o r d a n c e wi t h th e te r m s of th i s Ag r e e m e n t ; an d Al l en g i n e e r i n g is s u e s mu s t be ad d r e s s e d an d en g i n e e r i n g de p a r t m e n t ap p r o v a l of th e co n s t r u c t i o n pl a n s ; an d Ou t l o t s A & C sh a l l be de e d e d to th e Ci t y . Th e de e d sh a l l be re c o r d e d wi t h Da k o t a Co u n t y Re c o r d e r wi t h th e pl at my l a r s ; an d A te m p o r a r y ro a d w a y , dr a i n a g e an d ut i l i t y ea s e m e n t mu s t be pr o v i d e d fo r Ou t l o t s D & E to co v e r th e te m p o r a r y tu r n a r o u n d , ut i l i t y st u b s an d pu b l i c dr a i n a g e ; an d Th e De v e l o p e r re c o r d th e Pl a t wi t h th e Co u n t y Re c o r d e r or Re g i s t r a r of Ti t l e s wi t h i n si x mo n t h s of si g n a t u r e on th e fi n a l pl a t by al l si g n a t o r i e s re q u i r e d by Mi n n e s o t a la w . Ri g h t to Pr o c e e d . Wi t h i n th e Pl a t or la n d to be pl a t t e d , th e De v e l o p e r ma y no t gr a d e or ot h e r w i s e di s t u r b th e ea r t h re m o v e tr e e s , un l e s s a gr a d i n g pe r m i t ha s be e n ap p r o v e d by th e Ci t y En g i n e e r fo l l o w i n g ap p r o v a l of a pr e l i m i n a r y pl a t th e Ci t y Co u n c i l , co n s t r u c t se w e r li n e s , wa t e r li n e s , st r e e t s , ut i l i t i e s pu b l i c or pr i v a t e im p r o v e m e n t s or an y bu i l d i n g un t i l of th e fo l l o w i n g co n d i t i o n s ha v e be e n sa t i s f i e d : 3)h) Th i s Ag r e e m e n t ha s be e n fu l l y ex e c u t e d by bo t h pa r t i e s an d su b m i t t e d fo r re c o r d i n g wi t h th e Da k o t a Co u n t y Re c o r d e r ’ s Of f i c e ; an d Th e ne c e s s a r y se c u r i t y ha s be e n re c e i v e d by th e Ci t y ; an d Th e ne c e s s a r y in s u r a n c e fo r th e De v e l o p e r an d it s co n s t r u c t i o n co n t r a c t o r s ha s be e n re c e i v e d by th e Ci t y ; an d Th e Pl a t ha s be e n su b m i t t e d fo r re c o r d i n g wi t h th e Da k o t a Co u n t y Re c o r d e r ’ s Of f i c e ; an d A de e d sh a l l be pr o v i d e d fo r Ou t l o t s A & C be su b m i t t e d fo r re c o r d i n g wi t h th e pl a t my l a r s ; an d A te m p o r a r y ro a d w a y , dr a i n a g e an d ut i l i t y ea s e m e n t mu s t be pr o v i d e d fo r Ou t l o t s D & E to co v e r th e pu b l i c dr a i n a g e , th e te m p o r a r y tu r n a r o u n d an d ut i l i t y st u b s ; an d A co p y of pe r m i t s re q u i r e d fo r co n s t r u c t i o n ha v e be e n pr o v i d e d ; an d Th e Ci t y Cl e r k or En g i n e e r ha s is s u e d a No t i c e to Pr o c e e d st a t i n g th a t al l co n d i t i o n s ha v e be e n sa t i s f i e d an d th a t th e De v e l o p e r ma y pr o c e e d , wh i c h sh a l l be pr o m p t l y de l i v e r e d to th e De v e l o p e r up o n sa t i s f a c t i o n of th e co n d i t i o n s . Ph a s e d De v e l o p m e n t . Th e Pl a t wi l l be de v e l o p e d in mu l t i p l e ph a s e s an d wi l l be de v e l o p e d in ac c o r d a n c e wi t h Pl a n s A C. Su b j e c t to th e te r m s of th i s Ag r e e m e n t , th i s De v e l o p m e n t Co n t r a c t co n s t i t u t e s ap p r o v a l to de v e l o p th e Pl a t . Pa ge 1of13 Page 183 of 276 .. ; : “ " ‘ E WE E ii ‘W f ? a ? i 21 : 5 1 . ; 1 ' H — ? — I f ': _ . E ' : . ' _ . ‘5 1 — ‘ 2 2 . -_ . "" "" 7 . - ." : I £1 4 . 1 5 . Ju n - - f. “ =. . - . ' ; ' I 1— ‘ - ‘l - h - l -l - l l - l : Ii . ‘l ? u h -l - 10 . Ch a n g e s in Of f i c i a l Co n t r o l s . Fo r fo u r (4 ) ye a r s fr o m th e da t e of th i s Ag r e e m e n t , no am e n d m e n t s to th e Ci t y ’ s Co m p r e h e n s i v e Pl a n , ex c e p t am e n d m e n t pl a c i n g th i s pl a t in th e cu r r e n t ur b a n se r v i c e ar e a , or re m o v i n g an y pa r t th e r e o f wh i c h ha s no t be e n fi n a l pl a t t e d , or of f i c i a l co n t r o l s , sh a l l ap p l y to of af f e c t th e us e , de v e l o p m e n t de n s i t y , lo t si z e , lo t la y o u t or de d i c a t i o n s or pl a t t i n g re q u i r e d or pe r m i t t e d by th e ap p r o v e d pr e l i m i n a r y pl a t un l e s s re q u i r e d by St a t e or Fe d e r a l la w or ag r e e d to in wr i t i n g by th e Ci t y an d De v e l o p e r . Th e r e a f t e r , no t w i t h s t a n d i n g an y t h i n g in th i s Ag r e e m e n t to th e co n t r a r y , to th e fu l l ex t e n t pe r m i t t e d by St a t e la w , th e Ci t y ma y re q u i r e co m p l i a n c e wi t h an y am e n d m e n t s to th e Ci t y ’ s Co m p r e h e n s i v e Pl a n (i n c l u d i n g re m o v i n g un p l a t t e d pr o p e r t y fr o m ur b a n se r v i c e ar e a ) , of f i c i a l co n t r o l s , pl a t t i n g or de d i c a t i o n re q u i r e m e n t s en a c t e d af t e r th e da t e of th i s Ag r e e m e n t an d ma y re q u i r e su b m i s s i o n of a ne w pl a t . Sa l e s Of f i c e Re q u i r e m e n t s . At an y lo c a t i o n wi t h i n th e pl a t wh e r e lo t s an d / o r ho m e s ar e so l d wh i c h ar e pa r t of th i s su b d i v i s i o n , th e De v e l o p e r ag r e e s to in s t a l l a sa l e s bo a r d on wh i c h a co p y of th e ap p r o v e d pl a t , fi n a l ut i l i t y pl a n an d a zo n i n g ma p or pl a n n e d un i t de v e l o p m e n t pl a n ar e di s p l a y e d , sh o w i n g th e re l a t i o n s h i p be t w e e n th i s su b d i v i s i o n an d th e ad j o i n i n g ne i g h b o r h o o d . Th e zo n i n g an d la n d us e cl a s s i f i c a t i o n of al l la n d an d ne t w o r k of ma j o r st r e e t s wi t h i n 35 0 fe e t of th e pl a t sh a l l be in c l u d e d . Zo n i n n g e v e l o p m e n t Ma p . Th e De v e l o p e r sh a l l pr o v i d e an 8 1/ 2 ” x 14 ” sc a l e d ma p of th e pl a t an d la n d wi t h i n 35 0 ’ of t h e Pl a t co n t a i n i n g th e fo l l o w i n g in f o r m a t i o n : a) pl a t t e d pr o p e r t y ; b) ex i s t i n g an d fu t u r e ro a d s ; c) ex i s t i n g an d pr o p o s e d la n d us e s ; an d d) an y po n d s . De v e l o p m e n t Pl a n s . Th e De v e l o p e r sh a l l de v e l o p th e Pl a t in ac c o r d a n c e wi t h th e fo l l o w i n g pl a n s (t h e ”P l a n s ” ) . Th e Pl a n s sh a l l no t be at t a c h e d to th i s Ag r e e m e n t . Th e Pl a n s ma y be pr e p a r e d by th e De v e l o p e r , su b j e c t to Ci t y ap p r o v a l , af t e r en t e r i n g in t o th i s Ag r e e m e n t bu t be f o r e co m m e n c e m e n t of an y wo r k in th e Pl a t . If th e Pl a n s va r y fr o m th e wr i t t e n te r m s of th i s Co n t r a c t th e Pl a n s sh a l l co n t r o l . Th e re q u i r e d Pl a n s ar e : Pl a n A— Fi n a l Pl a t (A p p r o v e d Fe b r u a r y 17 , 20 2 6 ) Pl a n B — Fi n a l Co n s t r u c t i o n Pl a n s an d Sp e c i f i c a t i o n s (I n c l u d i n g So i l Er o s i o n an d Se d i m e n t Co n t r o l , Gr a d i n g Pl a n s an d La n d s c a p e Pl a n s ) Pl a n C - Zo n i n g / D e v e l o p m e n t Ma p Th e De v e l o p e r sh a l l us e it s be s t ef f o r t s to as s u r e ti m e l y ap p l i c a t i o n to th e ut i l i t y co m p a n i e s fo r th e fo l l o w i n g ut i l i t i e s : un d e r g r o u n d na t u r a l ga s , el e c t r i c a l , ca b l e te l e v i s i o n , an d te l e p h o n e . Th e in s t a l l a t i o n of th e s e ut i l i t i e s sh a l l be co n s t r u c t e d wi t h i n pu b l i c ri g h t s - o f — w a y or pu b l i c dr a i n a g e an d ut i l i t y ea s e m e n t s co n s i s t e n t wi t h th e Ci t y ' s en g i n e e r i n g gu i d e l i n e s an d st a n d a r d de t a i l pl a t e s . Ea s e m e n t s . Th e De v e l o p e r sh a l l fu r n i s h th e Ci t y at th e ti m e of ex e c u t i o n of t h i s Ag r e e m e n t wi t h th e ea s e m e n t s de s i g n a t e d on th e Pl a t . A lo n g — t e r m ma i n t e n a n c e ag r e e m e n t wi l l be re q u i r e d fo r al l st r u c t u r a l st o r m w a t e r pr a c t i c e s th a t ar e no t ow n e d or op e r a t e d by th e ci t y bu t th a t ar e di r e c t l y co n n e c t e d to th e ci t y ' s mu n i c i p a l se p a r a t e st o r m se w e r sy s t e m (M 5 4 ) an d wi t h i n th e ci t y ' s ju r i s d i c t i o n . Re g u i r e d Im p r o v e m e n t s . pa y a) Sa n i t a r y Se w e r Sy s t e m (t r u n k an d la t e r a l ) b) Wa t e r Sy s t e m (t r u n k an d la t e r a l ) c) St o r m Se w e r Sy s t e m d) St r e e t s e) Co n c r e t e Cu r b an d Gu t t e r f) St r e e t Li g h t s g) Er o s i o n an d Se d i m e n t Co n t r o l , Si t e Gr a d i n g an d St o r m w a t e r Tr e a t m e n t h) Un d e r g r o u n d Ut i l i t i e s i) Se t t i n g Ir o n Mo n u m e n t s j) Su r v e y i n g an d St a k i n g k) Si d e w a l k s an d Tr a i l s Pa g e 2 of 13 Page 184 of 276 - I u u I w ' -I — —u ' —- - . "n I ‘? ? . ’ mw a a u ? ? ? :- _ _ ._ | . . . . . _ | . | . _ . _ I — J _ EH wm z m ? m L " -= = m = = : : § _ = ? ? : ? E I- 7 . .- _ '— I. r _| - . _ _' — 'I _ I I _ , I- H I . . r . , . -_ - . - ' r _ : : . r .r I - I r 5: F _ I l - ! II ' l — a — -r ' - I — I - — . -: . _ _ . - I - li r a - : 5 'I — f . l ' II : _ A .:I ' r 'i ' i ' . f ' 3 _ ' . i " . - . - r ' - - . _ .ii i “ . E. - I. :1 . r- _- ' . - I. . . — - - . -_ . . _ . . " .| . _ . 15 . .- i I. : ' _ - -_ ' _ ; , ' _ _' . . > _ .| . . _ - ‘. H ._ _ .I _ _ - . . . - _ I - - - _ _ _ - -. . _ _ 1- : I a. . . ” _- .. . . . I _. . - - -- . . . - _. __ :. - T . - _I _ I I . -. - - - . ' ' ll -| _u 8— - -- _ -- .3 ” . . . .' _' . l - J' L 'I - - F .- .- ”a I) La n d s c a p i n g an d Sc r e e n i n g co l l e c t i v e l y th e ”I m p r o v e m e n t s ” . Th e Im p r o v e m e n t s sh a l l be in s t a l l e d in ac c o r d a n c e wi t h th e Pl a n s , an d in ac c o r d a n c e wi t h al l ap p l i c a b l e la w s , Ci t y St a n d a r d s , En g i n e e r i n g Gu i d e l i n e s , Or d i n a n c e s an d Pl a n s (a n d sp e c i f i c a t i o n s ) wh i c h ha v e be e n pr e p a r e d by a co m p e t e n t re g i s t e r e d pr o f e s s i o n a l en g i n e e r fu r n i s h e d to th e Ci t y an d re v i e w e d by th e Ci t y En g i n e e r . Wo r k do n e no t in ac c o r d a n c e wi t h th e fi n a l Pl a n s (a n d sp e c i f i c a t i o n s ) , wi t h o u t pr i o r au t h o r i z a t i o n of th e Ci t y En g i n e e r , sh a l l be co n s i d e r e d a vi o l a t i o n of th i s Ag r e e m e n t an d a De f a u l t of th e Co n t r a c t . Th e De v e l o p e r sh a l l ob t a i n al l ne c e s s a r y pe r m i t s fr o m th e Me t r o p o l i t a n Co u n c i l an d ot h e r ag e n c i e s be f o r e pr o c e e d i n g wi t h co n s t r u c t i o n . Th e De v e l o p e r sh a l l in s t r u c t it s en g i n e e r to pr o v i d e ad e q u a t e fi e l d in s p e c t i o n pe r s o n n e l to as s u r e an ac c e p t a b l e le v e l of qu a l i t y co n t r o l to th e ex t e n t th a t th e De v e l o p e r ’ s en g i n e e r wi l l be ab l e to ce r t i f y th a t th e co n s t r u c t i o n wo r k is co n s i s t e n t wi t h th e ap p r o v e d Pl a n s an d me e t s th e ap p r o v e d Ci t y st a n d a r d s as a co n d i t i o n of Ci t y ac c e p t a n c e . In ad d i t i o n , th e Ci t y ma y , at th e Ci t y ’ s di s c r e t i o n an d at th e De v e l o p e r ’ s ex p e n s e , ha v e on e or mo r e Ci t y in s p e c t o r l s ) an d a so i l en g i n e e r in s p e c t th e Wo r k on an as - n e e d e d ba s i s . Th e De v e l o p e r , it s co n t r a c t o r s an d su b c o n t r a c t o r s , sh a l l fo l l o w al l in s t r u c t i o n s re c e i v e d fr o m th e Ci t y ' s in s p e c t o r s . Th e De v e l o p e r ’ s en g i n e e r sh a l l pr o v i d e fo r on — s i t e pr o j e c t ma n a g e m e n t . Th e De v e l o p e r ’ s en g i n e e r is re s p o n s i b l e fo r de s i g n ch a n g e s an d co n t r a c t ad m i n i s t r a t i o n be t w e e n th e De v e l o p e r an d th e De v e l o p e r ’ s co n t r a c t o r . Th e De v e l o p e r or it s en g i n e e r sh a l l sc h e d u l e a pr e — c o n s t r u c t i o n me e t i n g at a mu t u a l l y ag r e e a b l e ti m e at Ci t y Ha l l wi t h al l pa r t i e s co n c e r n e d , in c l u d i n g th e Ci t y st a f f , to re v i e w th e pr o g r a m fo r th e Im p r o v e m e n t s . Wi t h i n si x t y (6 0 ) da y s af t e r th e co m p l e t i o n of th e Im p r o v e m e n t s an d be f o r e th e se c u r i t y is re l e a s e d , th e De v e l o p e r sh a l l su p p l y th e Ci t y wi t h a co m p l e t e se t of ”A s Bu i l t " pl a n s in an Au t o C A D .D W G fi l e or a .D X F fi l e , al l pr e p a r e d in ac c o r d a n c e to th e Ci t y ’ s En g i n e e r i n g Gu i d e l i n e s . If th e De v e l o p e r do e s no t pr o v i d e su c h in f o r m a t i o n , th e Ci t y wi l l pr o d u c e th e as - b u i l t dr a w i n g s an d al l co s t s as s o c i a t e d wi t h pr o d u c i n g th e as - b u i l t dr a w i n g s wi l l be th e re s p o n s i b i l i t y of th e De v e l o p e r . Be f o r e th e se c u r i t y fo r th e co m p l e t i o n of th e ut i l i t i e s is re l e a s e d , ir o n mo n u m e n t s mu s t be in s t a l l e d in ac c o r d a n c e wi t h MS . 55 0 5 . 0 2 1 . Th e De v e l o p e r ’ s su r v e y o r sh a l l su b m i t a wr i t t e n no t i c e to th e Ci t y ce r t i f y i n g th a t th e mo n u m e n t s ha v e be e n in s t a l l e d . . Pe r m i t s . Th e De v e l o p e r sh a l l ob t a i n or re q u i r e it s co n t r a c t o r s an d su b c o n t r a c t o r s to ob t a i n al l ne c e s s a r y pe r m i t s , wh i c h ma y in c l u d e bu t ar e no t li m i t e d to : Da k o t a Co u n t y fo r Co u n t y Ro a d Ac c e s s an d Wo r k in Co u n t y Ri g h t s - o f — W a y Mi n n e s o t a De p a r t m e n t of He a l t h fo r Wa t e r m a i n s MP C A NP D E S Pe r m i t fo r Co n s t r u c t i o n Ac t i v i t y MP C A fo r Sa n i t a r y Se w e r an d Ha z a r d o u s Ma t e r i a l Re m o v a l an d Di s p o s a l Mn D N R fo r De w a t e r i n g Ci t y of Fa r m i n g t o n fo r Bu i l d i n g Pe r m i t s MC E S fo r Sa n i t a r y Se w e r Co n n e c t i o n s Ci t y of Fa r m i n g t o n fo r Re t a i n i n g Wa l l s :Q T W P O P ? ’ . De w a t e r i n g . Du e to th e va r i a b l e na t u r e of gr o u n d w a t e r le v e l s an d st o r m w a t e r fl o w s , it wi l l be th e De v e l o p e r ’ s an d th e De v e l o p e r ’ s co n t r a c t o r s ' an d su b c o n t r a c t o r s ’ re s p o n s i b i l i t y to sa t i s f y th e m s e l v e s wi t h re g a r d to th e el e v a t i o n of gr o u n d w a t e r in th e ar e a an d th e le v e l of ef f o r t ne e d e d to pe r f o r m de w a t e r i n g an d st o r m fl o w ro u t i n g op e r a t i o n s . Al l re g a r d i n g ap p r o p r i a t i o n s pe r m i t s sh a l l al s o be st r i c t l y fo l l o w e d . . Gr a d i n g Pl a n . Th e Pl a t sh a l l be gr a d e d an d dr a i n a g e pr o v i d e d by th e De v e l o p e r in ac c o r d a n c e wi t h th e ap p r o v e d Er o s i o n an d Se d i m e n t Co n t r o l Pl a n an d Gr a d i n g Pl a n , in c l u d e d in Pl a n B. Th e pl a n sh a l l co n f o r m to th e Ci t y of Fa r m i n g t o n En g i n e e r i n g Gu i d e l i n e s . Wi t h i n th i r t y (3 0 ) da y s af t e r co m p l e t i o n of th e gr a d i n g an d be f o r e th e Ci t y ap p r o v e s in d i v i d u a l bu i l d i n g pe r m i t s . Th e De v e l o p e r sh a l l pr o v i d e th e Ci t y wi t h an ”a s - b u i l t ” gr a d i n g pl a n ce r t i f i e d by a re g i s t e r e d la n d su r v e y o r or en g i n e e r th a t al l st o r m w a t e r tr e a t m e n t / i n f i l t r a t i o n ba s i n s , an d sw a l e s , ha v e be e n co n s t r u c t e d on pu b l i c ea s e m e n t s or la n d ow n e d by th e Ci t y . Th e ”a s — b u i l t ” pl a n sh a l l in c l u d e fi e l d ve r i f i e d el e v a t i o n s of th e fo l l o w i n g : A) cr o s s se c t i o n s of st o r m w a t e r tr e a t m e n t / i n f i l t r a t i o n ba s i n s ; b) lo c a t i o n an d el e v a t i o n s al o n g al l sw a l e s , we t l a n d s , we t l a n d mi t i g a t i o n ar e a s if an y , lo c a t i o n s an d di m e n s i o n s of bo r r o w ar e a s / s t o c k p i l e s , an d in s t a l l e d ”c o n s e r v a t i o n ar e a ” : po s t s ; an d c) lo t co r n e r el e v a t i o n s an d ho u s e pa d s , an d al l ot h e r it e m s li s t e d in Ci t y Co d e . Th e Ci t y wi l l wi t h h o l d is s u a n c e of bu i l d i n g pe r m i t s un t i l Pa ge 3of13 Page 185 of 276 _ .| . - . lu i * 1- _ - - | - ' — | ' :- 1 I. J = - 1 I |. a “F _' rl - I r l — r - I 'I ' '- _ g. an i m a l ! - "' - l_ " " " " ' : “- 1 1 . 4 - '= : ”E a - h . fl - n - I P I I ' I H - f F1 - q l l a f - 1 - -I ' I - — - _ - :I - ‘ I - H ' '- I. I I - r- — I — — ' f u II I — l I- I - u — I - H— - I - I— I — I — Ju l - H - - f I - I -. i i - i ' . " _ 33 % ; ; "w w w . 1 2 - -. ; . ' . 1 - . " "" i ' f .- . - - I . ' . ' - i i l " ' . " TA T “ . . . "" 5 " 1T " - - . ' - . ' 1 .- _ i -_ .l r .I - . 1' 1 " - r _ ' 1 -I . 1' - .- _ . . 11 : } . r r: - .3 -r a I _. _ I .- ' - : - . _ 4. 5 . 1 . r- - - -I 'l ' l ' — - 1- - I u r. - . - . . .. _ .- - - _. . . . . -. I I . .. I I . .- -- . - 'l ' — I - L3 . - _ _ - . .. - - -_ -. . - . . . . _. .. ' . " ' - " "' . - - . ;_ _ - _ "" ' . - 1 ' - ' _- . I. I I I ‘1 . - r J. :. - _ I th e ap p r o v e d ce r t i f i e d gr a d i n g pl a n is on fi l e wi t h th e Ci t y an d al l er o s i o n co n t r o l me a s u r e s ar e in pl a c e as de t e r m i n e d by th e Ci t y En g i n e e r . No t w i t h s t a n d i n g an y ot h e r pr o v i s i o n s of th i s Ag r e e m e n t , th e De v e l o p e r ma y st a r t ro u g h gr a d i n g th e pr o p e r t y su b j e c t to th e Pl a t wi t h i n th e st o c k p i l e an d ea s e m e n t ar e a s in co n f o r m a n c e wi t h Pl a n B be f o r e th e Pl a t is fi l e d if al l fe e s ha v e be e n pa i d , a MP C A Co n s t r u c t i o n St o r m Wa t e r Pe r m i t ha s be e n is s u e d , an d th e Ci t y ha s be e n fu r n i s h e d th e re q u i r e d se c u r i t y . Ad d i t i o n a l ro u g h gr a d i n g ma y be al l o w e d up o n ob t a i n i n g wr i t t e n au t h o r i z a t i o n fr o m th e Ci t y En g i n e e r . If th e De v e l o p e r ne e d s to ch a n g e gr a d i n g af f e c t i n g dr a i n a g e th e ch a n g e s ca n n o t ta k e pl a c e un t i l th e Ci t y En g i n e e r ha s ap p r o v e d th e pr o p o s e d gr a d i n g ch a n g e s . A MP C A Co n s t r u c t i o n St o r m Wa t e r Pe r m i t mu s t be ob t a i n e d be f o r e an y gr a d i n g ca n co m m e n c e on th e si t e . . Er o s i o n an d Se d i m e n t Co n t r o l . Pr i o r to in i t i a t i n g si t e gr a d i n g , th e er o s i o n an d se d i m e n t co n t r o l pl a n , in c l u d e d in Pl a n B, sh a l l be im p l e m e n t e d by th e De v e l o p e r an d in s p e c t e d an d ap p r o v e d by th e Ci t y . Th e Ci t y ma y im p o s e ad d i t i o n a l er o s i o n an d se d i m e n t co n t r o l re q u i r e m e n t s if it is de t e r m i n e d th a t th e me t h o d s im p l e m e n t e d ar e in s u f f i c i e n t to pr o p e r l y co n t r o l er o s i o n an d se d i m e n t a t i o n . Al l ar e a s di s t u r b e d by th e gr a d i n g op e r a t i o n s sh a l l be st a b i l i z e d pe r th e MP C A St o r m w a t e r Pe r m i t fo r Co n s t r u c t i o n Ac t i v i t y . Se e d sh a l l be in ac c o r d a n c e wi t h th e Ci t y ’ s cu r r e n t se e d i n g sp e c i f i c a t i o n wh i c h ma y in c l u d e te m p o r a r y se e d to pr o v i d e gr o u n d co v e r as ra p i d l y as po s s i b l e . Al l se e d e d ar e a s sh a l l be fe r t i l i z e d , mu l c h e d an d di s c an c h o r e d as ne c e s s a r y fo r se e d re t e n t i o n . Th e pa r t i e s re c o g n i z e th a t ti m e is of th e es s e n c e in co n t r o l l i n g er o s i o n an d se d i m e n t a t i o n . If th e De v e l o p e r do e s no t co m p l y wi t h th e MP C A St o r m w a t e r Pe r m i t fo r Co n s t r u c t i o n Ac t i v i t y or wi t h th e er o s i o n an d se d i m e n t co n t r o l pl a n an d sc h e d u l e , or su p p l e m e n t a r y in s t r u c t i o n s re c e i v e d fr o m th e Ci t y , or in an em e r g e n c y de t e r m i n e d at th e so l e di s c r e t i o n of th e Ci t y , th e Ci t y ma y ta k e su c h ac t i o n as it de e m s ap p r o p r i a t e to co n t r o l er o s i o n an d se d i m e n t a t i o n im m e d i a t e l y , wi t h o u t no t i c e to th e De v e l o p e r . Ch a r g e s fo r co r r e c t i v e ac t i o n s ta k e n by th e Ci t y or th e i r co n t r a c t o r , wi l l be ch a r g e d to th e SW P P P co m p l i a n c e es c r o w ; th e de v e l o p e r is re s p o n s i b l e fo r ma i n t a i n i n g a ba l a n c e of $2 5 , 0 0 0 in th i s es c r o w . Th i s ap p l i e s to al l pr o p e r t i e s wi t h i n th e de v e l o p m e n t , wh e t h e r ow n e d by th e de v e l o p e r or a bu i l d e r . Th e Ci t y wi l l en d e a v o r to no t i f y th e De v e l o p e r in ad v a n c e of an y pr o p o s e d ac t i o n , bu t fa i l u r e of th e Ci t y to do so wi l l no t af f e c t th e De v e l o p e r ' s an d th e Ci t y ’ s ri g h t s or ob l i g a t i o n s he r e u n d e r . If th e De v e l o p e r do e s no t re i m b u r s e th e Ci t y fo r an y co s t s th e Ci t y in c u r r e d fo r su c h wo r k wi t h i n th i r t y (3 0 ) da y s , th e Ci t y ma y dr a w do w n th e se c u r i t y to pa y su c h co s t s . No de v e l o p m e n t , ut i l i t y or st r e e t co n s t r u c t i o n wi l l be al l o w e d an d no bu i l d i n g pe r m i t s wi l l be is s u e d un l e s s th e Pl a t is in fu l l co m p l i a n c e wi t h th e er o s i o n an d se d i m e n t co n t r o l re q u i r e m e n t s . . We t l a n d Na t u r a l Ar e a Si g n s . Th e De v e l o p e r is re s p o n s i b l e fo r in s t a l l i n g Ci t y Na t u r a l Ar e a s si g n s ar o u n d al l we t l a n d an d pe n d i n g ar e a s , in ac c o r d a n c e wi t h th e Ci t y ’ s En g i n e e r i n g Gu i d e l i n e s an d Ci t y de t a i l pl a t e s . We t l a n d Bu f f e r li n e li m i t s an d Na t u r a l Ar e a si g n lo c a t i o n s mu s t be in d i c a t e d on in d i v i d u a l lo t su r v e y s pr i o r to th e is s u a n c e of a bu i l d i n g pe r m i t fo r th a t lo t . . Pa r k De d i c a t i o n , Si d e w a l k s an d Tr a i l s . Th e De v e l o p e r is re q u i r e d to de d i c a t e a to t a l of 4. 2 9 ac r e s of la n d or pa y $2 0 9 , 6 7 8 ca s h - i n - l i e u (o r a co m b i n a t i o n th e r e o f ) fo r pa r k pu r p o s e s fo r th e en t i r e de v e l o p m e n t in ac c o r d a n c e wi t h th e ap p r o v e d pr e l i m i n a r y pl a t . Th e Ci t y to o k ca s h - i n - l i e u of th e re q u i r e d 1. 3 4 ac r e s wi t h th e 1“ Ad d i t i o n . Wi t h th e 2" d Ad d i t i o n th e Ci t y wi l l ta k e a co m b i n a t i o n of ca s h — i n - l i e u an d la n d de d i c a t i o n in th e fo r m of a 10 — f o o t — w i d e tr a i l co r r i d o r . A to t a l of 1. 4 6 ac r e s of la n d is re q u i r e d to be de d i c a t e d wi t h th e 2" d Ad d i t i o n . Th e De v e l o p e r wi l l be de d i c a t i n g 0. 4 ac r e s in tr a i l co r r i d o r wi t h 1. 0 6 ac r e s ta k e n as ca s h - i n - l i e u in th e am o u n t of $5 1 , 8 0 9 as sh o w n in Ex h i b i t B fo r th e 2n d Ad d i t i o n . Th e re m a i n i n g 1. 4 9 Si d e w a l k an d tr a i l wi l l be pr o v i d e d wi t h th e 2n d Ad d i t i o n . 5- f o o t — w i d e si d e w a l k s wi l l be in s t a l l e d in th e bo u l e v a r d on th e no r t h si d e of 22 3 r d St r e e t W an d th e on th e we s t si d e of De e p w a t e r Pa t h . An 8- f o o t - w i d e bi t u m i n o u s tr a i l wi l l be in s t a l l e d be t w e e n Lo t s 8 an d 9, of Bl o c k 1 an d ex t e n d no r t h w e s t e r l y fr o m th e si d e w a l k in 22 3 r d St r e e t W. Th e tr a i l wi l l th e n fo l l o w th e no r t h e r n bo u n d a r y of th e pl a t to As h St r e e t (2 2 0 t h St r e e t W) . . St r e e t s . Th e de v e l o p e r wi l l be re s p o n s i b l e fo r th e in s t a l l a t i o n of al l st r e e t s wi t h i n th e pl a t an d as sh o w n on th e co n s t r u c t i o n pl a n s . . La n d s c a p i n g . Th e De v e l o p e r sh a l l la n d s c a p e th e Pl a t in ac c o r d a n c e wi t h Pl a n B. Th e la n d s c a p i n g sh a l l be ac c o m p l i s h e d in ac c o r d a n c e wi t h a ti m e sc h e d u l e ap p r o v e d by th e Ci t y . A. Th e De v e l o p e r sh a l l be so l e l y re s p o n s i b l e fo r th e in s t a l l a t i o n of al l pr o j e c t la n d s c a p i n g . Pa g e 4 of 13 Page 186 of 276 5" . “ .= T Ja n . . . 43 3 % ; .. . . . . . . ' _ - . ; . . . WW I — : 1 1 " ? _. u . | _ | . . _ ' —I - I — r I - ‘ r r l — I — - l - ' — ' - l - I 1 — - l — l — " - - ' *E E - E ? H - H - ;: ' ¥ ~ “ ’ - E E E ‘ £ ¢ +4 - ': : ~ ' _ ' . : ' — _ ‘ — ' : : ! : :: l' ; ' _ ; ' . ' l § . — _ _ : ; — _ " 'T _ _ ' '5 . "' 5 ’ II I — I f “ ." l + - ' M : . - . - . . "' - -. .' - I' E " . . 1 J' . = ' I ' . ‘ : ' _ . . . . " . ' _ " . . ' '- I- _. . _ I _ : .: I . - .I - 'I - ' . : I " = . ' '1 - ' "; . - - -- - - - . - .- . . - I J- . I - _ ' 19 . 20 . B. Al l gr a d e d ar e a s , in c l u d i n g fi n i s h gr a d e on lo t s , wi l l re q u i r e a mi n i m u m of 6” of bl a c k di r t / t o p s o i l . Cl e a n Up . Th e De v e l o p e r sh a l l , wi t h i n tw e n t y - f o u r (2 4 ) ho u r s , cl e a r fr o m th e pu b l i c st r e e t s an y so i l , ea r t h or de b r i s re s u l t i n g fr o m co n s t r u c t i o n wo r k by th e De v e l o p e r or it s ag e n t s or as s i g n s . An y so i l , ea r t h or de b r i s re s u l t i n g fr o m co n s t r u c t i o n wo r k by th e De v e l o p e r or it s ag e n t s or as s i g n s on ot h e r pr o p e r t y sh a l l be re m o v e d we e k l y or mo r e of t e n if re q u i r e d by th e Ci t y En g i n e e r . Al l de b r i s , in c l u d i n g br u s h , ve g e t a t i o n , tr e e s an d de m o l i t i o n ma t e r i a l s , sh a l l be di s p o s e d of of f si t e . Bu r n i n g of tr e e s an d st r u c t u r e s sh a l l be pr o h i b i t e d , ex c e p t fo r fi r e tr a i n i n g on l y . Th e Ci t y wi l l ha v e th e ri g h t to cl e a n th e st r e e t s as ou t l i n e d in cu r r e n t Ci t y po l i c y . Th e De v e l o p e r sh a l l pr o m p t l y re i m b u r s e th e Ci t y fo r st r e e t cl e a n i n g CO S t S . Li c e n s e . Th e De v e l o p e r he r e b y gr a n t s th e Ci t y , it s ag e n t s , em p l o y e e s , of f i c e r s an d co n t r a c t o r s , a li c e n s e to en t e r th e Pl a t to pe r f o r m al l ne c e s s a r y wo r k an d / o r in s p e c t i o n s de e m e d ap p r o p r i a t e by th e Ci t y du r i n g th e in s t a l l a t i o n of pu b l i c im p r o v e m e n t s by th e Ci t y . Th e li c e n s e sh a l l ex p i r e af t e r th e pu b l i c im p r o v e m e n t s in s t a l l e d pu r s u a n t to th e De v e l o p m e n t Co n t r a c t ha v e be e n in s t a l l e d an d ac c e p t e d by th e Ci t y . . Ti m e of Pe r f o r m a n c e . Th e De v e l o p e r sh a l l in s t a l l al l re q u i r e d pu b l i c ut i l i t i e s by Oc t o b e r 31 , 20 2 6 . Th e fi n a l we a r co u r s e on st r e e t s sh a l l be in s t a l l e d th e fi r s t su m m e r af t e r th e ba s e la y e r of as p h a l t ha s be e n in pl a c e on e fr e e z e th a w cy c l e . Th e De v e l o p e r ma y , ho w e v e r , re q u e s t an ex t e n s i o n of ti m e fr o m th e Ci t y , wh i c h th e Ci t y wi l l no t un r e a s o n a b l y wi t h h o l d . If an ex t e n s i o n is gr a n t e d , it sh a l l be co n d i t i o n e d up o n up d a t i n g th e se c u r i t y po s t e d by th e De v e l o p e r to re f l e c t co s t in c r e a s e s . An ex t e n s i o n of th e se c u r i t y sh a l l be co n s i d e r e d an ex t e n s i o n of th i s Co n t r a c t an d th e ex t e n s i o n of th e Co n t r a c t wi l l co i n c i d e wi t h th e da t e of th e ex t e n s i o n of th e se c u r i t y . . Ow n e r s h i p of Im p r o v e m e n t s . Up o n th e co m p l e t i o n of th e Im p r o v e m e n t s an d wr i t t e n ac c e p t a n c e by th e Ci t y En g i n e e r , th e Im p r o v e m e n t s ly i n g wi t h i n pu b l i c ea s e m e n t s sh a l l be c o m e Ci t y pr o p e r t y , ex c e p t fo r ca b l e TV , el e c t r i c a l , ga s , an d te l e p h o n e , wi t h o u t fu r t h e r no t i c e or ac t i o n . . Bu i l d i n g Pe r m i t s . Bu i l d i n g pe r m i t s sh a l l no t be is s u e d pr i o r to co m p l e t i o n of si t e gr a d i n g , su b m i t t a l of as - b u i l t gr a d i n g pl a n , pu b l i c an d pr i v a t e ut i l i t y in s t a l l a t i o n , cu r b an d gu t t e r , si d e w a l k , tr a i l s , in s t a l l a t i o n of er o s i o n co n t r o l de v i c e s , in s t a l l a t i o n of pe r m a n e n t st r e e t si g n s an d na t u r a l ar e a si g n s , pa v i n g wi t h a bi t u m i n o u s su r f a c e , re t a i n i n g wa l l s if an y , si t e se e d i n g , mu l c h i n g , di s k an c h o r i n g an d su b m i t t a l of a su r v e y o r ’ s ce r t i f i c a t e de n o t i n g al l ap p r o p r i a t e mo n u m e n t s ha v e be e n in s t a l l e d . A. Be f o r e a bu i l d i n g pe r m i t is is s u e d , a ca s h es c r o w of $3 , 0 0 0 . 0 0 pe r bu i l d i n g sh a l l be fu r n i s h e d to th e Ci t y to gu a r a n t e e co m p l i a n c e wi t h th e er o s i o n co n t r o l , gr a d i n g , an d la n d s c a p i n g re q u i r e m e n t s an d th e su b m i t t a l of an as - b u i l t ce r t i f i c a t e of su r v e y . Pr i o r to th e re l e a s e of th e re q u i r e d in d i v i d u a l lo t gr a d i n g an d er o s i o n co n t r o l se c u r i t y th a t is su b m i t t e d wi t h th e bu i l d i n g pe r m i t , an as — b u i l t ce r t i f i c a t e of su r v e y fo r si n g l e fa m i l y lo t s mu s t be su b m i t t e d to ve r i f y th a t th e fi n a l as - bu i l t gr a d e s an d el e v a t i o n s of th e sp e c i f i c lo t an d al l bu i l d i n g se t b a c k s ar e co n s i s t e n t wi t h th e ap p r o v e d gr a d i n g pl a n fo r th e de v e l o p m e n t , an d am e n d m e n t s th e r e t o as ap p r o v e d by th e Ci t y En g i n e e r , th e si t e ha s be e n st a b i l i z e d in c l u d i n g me e t i n g th e so d re q u i r e m e n t s of Ci t y Co d e se c t i o n 10 - 6 - 2 7 ( 1 1 ) an d th a t al l re q u i r e d la n d s c a p i n g an d pr o p e r t y mo n u m e n t s ar e in pl a c e . If th e fi n a l gr a d i n g , er o s i o n co n t r o l an d as — b u i l t su r v e y is no t ti m e l y co m p l e t e d , th e Ci t y ma y en t e r th e lo t , pe r f o r m th e wo r k , an d ap p l y th e ca s h es c r o w to w a r d th e co s t . Up o n sa t i s f a c t o r y co m p l e t i o n of th e gr a d i n g , er o s i o n co n t r o l an d as — b u i l t su r v e y , th e es c r o w fu n d s , wi t h o u t in t e r e s t , le s s an y dr a w ma d e by th e Ci t y , sh a l l be re t u r n e d to th e pe r s o n wh o de p o s i t e d th e fu n d s wi t h th e Ci t y . B. Th e De v e l o p e r ce r t i f i e s to th e Ci t y th a t al l lo t s wi t h ho u s e fo o t i n g s pl a c e on fi l l ha v e be e n mo n i t o r e d an d co n s t r u c t e d to me e t or ex c e e d FH A / H U D 79 6 sp e c i f i c a t i o n s . Th e so i l s ob s e r v a t i o n an d te s t i n g re p o r t , in c l u d i n g re f e r e n c e d de v e l o p m e n t ph a s e s an d lo t de s c r i p t i o n s , sh a l l be su b m i t t e d to th e Bu i l d i n g Of f i c i a l fo r re v i e w pr i o r to th e is s u a n c e of bu i l d i n g pe r m i t s . C. A li m i t e d nu m b e r of bu i l d i n g pe r m i t s we r e is s u e d fo r mo d e l ho m e s in th e Da k o t a Me a d o w s Pr e s e r v e 1“ Ad d i t i o n . No ad d i t i o n a l mo d e l ho m e s wi l l be co n s t r u c t e d in th e 2" “ Ad d i t i o n . D. No r m a l pr o c e d u r e re q u i r e s th a t st r e e t s ne e d e d fo r ac c e s s to ap p r o v e d us e s sh a l l be pa v e d wi t h a bi t u m i n o u s su r f a c e be f o r e bu i l d i n g pe r m i t s ma y be is s u e d . Ho w e v e r , th e Ci t y En g i n e e r is au t h o r i z e d to wa i v e th i s re q u i r e m e n t wh e n we a t h e r re l a t e d ci r c u m s t a n c e s pr e v e n t co m p l e t i o n of st r e e t pr o j e c t s be f o r e th e en d of th e co n s t r u c t i o n se a s o n . Th e P ag e 5of13 Page 187 of 276 'r _ _ - - _a . -' - — I - I __ . II ' I I . _. .- N I. '_ ‘ . ' _ . ' . ‘ : " ' . ' . ' " . . . ' . . - : _ . - t ' _ —— -- - l - | - - - - . -I ' . ' - -. De v e l o p e r is re s p o n s i b l e fo r ma i n t a i n i n g sa i d st r e e t s in a co n d i t i o n th a t wi l l as s u r e th e ac c e s s of em e r g e n c y ve h i c l e s at al l ti m e s wh e n su c h a wa i v e r is gr a n t e d . E. If pe r m i t s ar e is s u e d pr i o r to th e co m p l e t i o n an d ac c e p t a n c e of pu b l i c im p r o v e m e n t s , th e De v e l o p e r as s u m e s al l li a b i l i t y an d co s t s re s u l t i n g in de l a y s in co m p l e t i o n of pu b l i c im p r o v e m e n t s an d da m a g e to pu b l i c im p r o v e m e n t s ca u s e d by th e Ci t y , De v e l o p e r , it s co n t r a c t o r s , su b c o n t r a c t o r s , ma t e r i a l m e n , em p l o y e e s , ag e n t s or th i r d pa r t i e s . F. Re t a i n i n g wa l l s th a t re q u i r e a bu i l d i n g pe r m i t sh a l l be co n s t r u c t e d in ac c o r d a n c e wi t h pl a n s an d sp e c i f i c a t i o n s pr e p a r e d by a st r u c t u r a l or ge o t e c h n i c a l en g i n e e r li c e n s e d in th e St a t e of Mi n n e s o t a . Fo l l o w i n g co n s t r u c t i o n , a ce r t i f i c a t i o n si g n e d by th e de s i g n en g i n e e r sh a l l be fi l e d wi t h th e bu i l d i n g of f i c i a l ev i d e n c i n g th a t th e re t a i n i n g wa l l wa s co n s t r u c t e d in ac c o r d a n c e wi t h th e ap p r o v e d pl a n s an d sp e c i f i c a t i o n s . Al l re t a i n i n g wa l l s id e n t i f i e d on th e de v e l o p m e n t pl a n s an d by sp e c i a l co n d i t i o n s re f e r r e d to in th i s co n t r a c t sh a l l be co n s t r u c t e d be f o r e an y ot h e r bu i l d i n g pe r m i t is is s u e d fo r a lo t on wh i c h a re t a i n i n g wa l l is re q u i r e d to be bu i l t . 24 . In s u r a n c e . Pr i o r to ex e c u t i o n of th e fi n a l pl a t , De v e l o p e r an d it s ge n e r a l co n t r a c t o r sh a l l fu r n i s h to th e Ci t y a ce r t i f i c a t e of in s u r a n c e sh o w i n g pr o o f of th e re q u i r e d in s u r a n c e re q u i r e d un d e r th i s pa r a g r a p h . De v e l o p e r an d it s ge n e r a l co n t r a c t o r sh a l l ta k e ou t an d ma i n t a i n or ca u s e to be ta k e n ou t an d ma i n t a i n e d un t i l si x (6 ) mo n t h s af t e r th e Ci t y ha s ac c e p t e d th e pu b l i c im p r o v e m e n t s , su c h in s u r a n c e as sh a l l pr o t e c t De v e l o p e r an d it s ge n e r a l co n t r a c t o r an d th e Ci t y fo r wo r k co v e r e d by th e Co n t r a c t in c l u d i n g wo r k e r s ’ co m p e n s a t i o n cl a i m s an d pr o p e r t y da m a g e , bo d i l y an d pe r s o n a l in j u r y wh i c h ma y ar i s e fr o m op e r a t i o n s un d e r th i s Co n t r a c t , wh e t h e r su c h op e r a t i o n s ar e by De v e l o p e r an d it s ge n e r a l co n t r a c t o r or an y o n e di r e c t l y or in d i r e c t l y em p l o y e d by ei t h e r of th e m . Th e mi n i m u m am o u n t s of in s u r a n c e sh a l l be as fo l l o w s : Co m m e r c i a l Ge n e r a l Li a b i l i t y (o r in co m b i n a t i o n wi t h an um b r e l l a po l i c y ) $2 , 0 0 0 , 0 0 0 Ea c h Oc c u r r e n c e $2 , 0 0 0 , 0 0 0 Pr o d u c t s / C o m p l e t e d Op e r a t i o n s Ag g r e g a t e $2 , 0 0 0 , 0 0 0 An n u a l Ag g r e g a t e Th e fo l l o w i n g co v e r a g e s sh a l l be in c l u d e d : Pr e m i s e s an d Op e r a t i o n s Bo d i l y In j u r y an d Pr o p e r t y Da m a g e Pe r s o n a l an d Ad v e r t i s i n g In j u r y Bl a n k e t Co n t r a c t u a l Li a b i l i t y Pr o d u c t s an d Co m p l e t e d Op e r a t i o n s Li a b i l i t y Au t o m o b i l e Li a b i l i t y $2 , 0 0 0 , 0 0 0 Co m b i n e d Si n g l e Li m i t — Bo d i l y In j u r y & Pr o p e r t y Da m a g e In c l u d i n g Ow n e d , Hi r e d & No n - O w n e d Au t o m o b i l e s Wo r k e r s Co m p e n s a t i o n Wo r k e r s Co m p e n s a t i o n in s u r a n c e in ac c o r d a n c e wi t h th e st a t u t o r y re q u i r e m e n t s of th e St a t e of Mi n n e s o t a , in c l u d i n g Em p l o y e r ’ s Li a b i l i t y wi t h mi n i m u m li m i t s ar e as fo l l o w s : $5 0 0 , 0 0 0 — Bo d i l y In j u r y by Di s e a s e pe r em p l o y e e — $5 0 0 , 0 0 0 — Bo d i l y In j u r y by Ac c i d e n t Th e De v e l o p e r ’ s an d ge n e r a l co n t r a c t o r ’ s in s u r a n c e mu s t be ”P r i m a r y an d No n - C o n t r i b u t o r y . " Al l in s u r a n c e po l i c i e s (o r ri d e r s ) re q u i r e d by th i s Co n t r a c t sh a l l be (i ) ta k e n ou t by an d ma i n t a i n e d wi t h re s p o n s i b l e in s u r a n c e co m p a n i e s or g a n i z e d un d e r th e la w s of on e of th e st a t e s of th e Un i t e d St a t e s an d qu a l i f i e d to do bu s i n e s s in th e St a t e of Mi n n e s o t a , (i i ) sh a l l na m e th e Ci t y , it s em p l o y e e s an d ag e n t s as ad d i t i o n a l in s u r e d s (C G L an d um b r e l l a on l y ) by en d o r s e m e n t wh i c h sh a l l be fi l e d wi t h th e Ci t y . A co p y of th e en d o r s e m e n t mu s t be su b m i t t e d wi t h th e ce r t i f i c a t e of in s u r a n c e . Pa ge 6of13 Page 188 of 276 .g y a l .- -- - - - I - — . . - I _I _ I - — _ - I r l ', ' ”F a . . . “ '? E E - E ' h . . . ” -. ' - "m u - m '. . - I' M — I ‘ m f n — F - H ? ' l Hf - I ‘ H — ‘ I ‘ L ? H - L- - ' l - I J - r r. - . - - .u - _ _ u- I . I - - . . -. . t . .“ -. - -I - ' : " r " _ ‘ . . .- " ' -. I' I ' I : ' . . .2 In _ -I I - I _ _ I - I - r I - I . - —I - I - - - I - q — ' - I - — r HI . “ I. . — L u - ” T' f - l ' ? - I . -I . - m l ? - -I . I _ I . -, . I. - _ l _ - . - . I . . ‘_ _ . _ 1. 'I l_ I' I ' I _ -l l : Ii l ' . — :1 1 . Il l — - —" _ - " 3. 1 3 1 . : F .: . - H- "I I r- a - I L I I ._ . .I . -- . . I. I. I- - I . - I ._ _ _. _ I _ _- . J. _. —I - I — I - I - I .- F? r. —- I - n— i #- .. _ . _ _ . .E ' l : —I - I - — ' — I — I' I '? ” I- . - I I- II I “ J . II . _' I l : _ I - - . I. . 1" - " . ."- l .I . 1a . : -. - — 1 - I - - - I J — _ _ — I I j? a - _ I. - -- I; -_ I - I r I r E- r l - I - I .- -_ ' - * “ - . I ' " -: _I r - :. - .— 2- - " -. I - I _ . _. - i” ; r. I- . .- " - I l. - . -. . .- . _ - _ I. - . I. ‘ I - Ir I - - - 'l a - I- -I I . -_ - _ _. _ I .. - . . _ . _| - ' 25 . 26 . 27 . De v e l o p e r ’ s an d ge n e r a l co n t r a c t o r ’ s po l i c i e s an d Ce r t i f i c a t e of In s u r a n c e sh a l l co n t a i n a pr o v i s i o n th a t co v e r a g e af f o r d e d un d e r th e po l i c i e s sh a l l no t be ca n c e l l e d wi t h o u t at le a s t th i r t y (3 0 ) da y s ’ ad v a n c e d wr i t t e n no t i c e to th e Ci t y , or te n (1 0 ) da y s ' no t i c e fo r no n - p a y m e n t of pr e m i u m . An Um b r e l l a or Ex c e s s Li a b i l i t y in s u r a n c e po l i c y ma y be us e d to su p p l e m e n t De v e l o p e r ' s or ge n e r a l co n t r a c t o r ’ s po l i c y li m i t s on a fo l l o w — f o r m ba s i s to sa t i s f y th e fu l l po l i c y li m i t s re q u i r e d by th i s Co n t r a c t . Re s p o n s i b i l i t y fo r Co s t s . Th e De v e l o p e r sh a l l pa y al l co s t s in c u r r e d by it or th e Ci t y in co n j u n c t i o n wi t h th e de v e l o p m e n t of th e Pl a t , in c l u d i n g bu t no t li m i t e d to , So i l an d Wa t e r Co n s e r v a t i o n Di s t r i c t ch a r g e s , le g a l , pl a n n i n g , ad m i n i s t r a t i v e , co n s t r u c t i o n co s t s , en g i n e e r i n g , ea s e m e n t s , in s p e c t i o n an d ut i l i t y te s t i n g ex p e n s e s in c u r r e d in co n n e c t i o n wi t h ap p r o v a l , ac c e p t a n c e an d de v e l o p m e n t of th e Pl a t , th e pr e p a r a t i o n of th i s Ag r e e m e n t , an d al l re a s o n a b l e co s t s an d ex p e n s e s in c u r r e d by th e Ci t y in mo n i t o r i n g an d in s p e c t i n g th e co n s t r u c t i o n fo r th e de v e l o p m e n t of th e Pl a t . Th e De v e l o p e r sh a l l pa y in fu l l al l bi l l s su b m i t t e d to it by th e Ci t y wi t h i n th i r t y (3 0 ) da y s af t e r re c e i p t . If th e bi l l s ar e no t pa i d on ti m e , th e Ci t y ma y ha l t al l pl a t de v e l o p m e n t wo r k un t i l th e bi l l s ar e pa i d in fu l l . Bi l l s no t pa i d wi t h i n th i r t y (3 0 ) da y s sh a l l ac c r u e in t e r e s t at th e ra t e of fi v e pe r c e n t (5 % ) pe r an n u m . If th e bi l l s ar e no t pa i d wi t h i n si x t y (6 0 ) da y s , th e Ci t y ha s th e ri g h t to dr a w fr o m th e De v e l o p e r s Se c u r i t y to pa y th e bi l l s . De v e l o p m e n t Co n t r a c t Ad m i n i s t r a t i o n . Th e De v e l o p e r sh a l l pa y a fe e fo r in - h o u s e ad m i n i s t r a t i o n of th e de v e l o p m e n t co n t r a c t in c l u d i n g mo n i t o r i n g of co n s t r u c t i o n ob s e r v a t i o n , co n s u l t a t i o n wi t h th e De v e l o p e r an d it s en g i n e e r on th e st a t u s of or pr o b l e m s re g a r d i n g th e pr o j e c t , co o r d i n a t i o n fo r fi n a l in s p e c t i o n an d ac c e p t a n c e , pr o j e c t mo n i t o r i n g du r i n g th e wa r r a n t y pe r i o d , an d pr o c e s s i n g of re q u e s t s fo r re d u c t i o n in se c u r i t y . Th e fe e fo r th i s se r v i c e sh a l l be th r e e pe r c e n t (3 % ) of co n s t r u c t i o n co s t s an d pa i d at th e ti m e of th e ex e c u t i o n of th i s ag r e e m e n t . Co n s t r u c t i o n Ob s e r v a t i o n . Th e De v e l o p e r sh a l l in s t r u c t it s en g i n e e r to pr o v i d e ad e q u a t e fi e l d in s p e c t i o n pe r s o n n e l to as s u r e an ac c e p t a b l e le v e l of qu a l i t y co n t r o l to th e ex t e n t th a t th e De v e l o p e r ’ s en g i n e e r wi l l be ab l e to ce r t i f y th a t al l im p r o v e m e n t s ar e co n s i s t e n t wi t h th e ap p r o v e d Pl a n s an d me e t s th e ap p r o v e d Ci t y st a n d a r d s as a co n d i t i o n of Ci t y ac c e p t a n c e . Th e De v e l o p e r sh a l l pa y fo r co n s t r u c t i o n ob s e r v a t i o n pe r f o r m e d by th e Ci t y ' s in — h o u s e st a f f or co n s u l t a n t . As ne e d e d , co n s t r u c t i o n ob s e r v a t i o n sh a l l in c l u d e pa r t or fu l l ti m e in s p e c t i o n of th e Im p r o v e m e n t s , in c l u d i n g er o s i o n an d se d i m e n t co n t r o l in s p e c t i o n s an d wi l l be bi l l e d on ho u r l y ra t e s . Th e De v e l o p e r sh a l l pr o v i d e a ca s h es c r o w fo r th e s e se r v i c e s es t i m a t e d to be fi v e pe r c e n t (5 % ) of th e es t i m a t e d co n s t r u c t i o n co s t . Th e de v e l o p e r sh a l l al s o pr o v i d e a $2 5 , 0 0 0 es c r o w fo r SW P P P Co m p l i a n c e . . De v e l o p m e n t Fe e s . Th e De v e l o p e r sh a l l pa y ar e a ch a r g e s as de f i n e d on th e Ci t y ’ s mo s t cu r r e n t fe e sc h e d u l e th a t in c l u d e : a) Su r f a c e Wa t e r Qu a l i t y Ma n a g e m e n t Fe e b) Su r f a c e Wa t e r Ma n a g e m e n t Fe e c) Wa t e r m a i n Tr u n k Ar e a Ch a r g e d) Sa n i t a r y Se w e r Tr u n k Ar e a Ch a r g e e) Pa r k De d i c a t i o n f) Se a l c o a t i n g A su m m a r y of th e ca s h re q u i r e m e n t s un d e r th i s co n t r a c t wh i c h mu s t be fu r n i s h e d to th e Ci t y pr i o r to th e Ci t y Co u n c i l re q u i r e m e n t s in ef f e c t at th e ti m e th e De v e l o p m e n t Co n t r a c t s fo r th o s e ph a s e s ar e en t e r e d in t o . Pa r k De d i c a t i o n re q u i r e m e n t s ar e ca l c u l a t e d at th e ti m e of th e pr e l i m i n a r y pl a t fo r th e ov e r a l l de v e l o p m e n t an d co l l e c t e d wi t h th e De v e l o p m e n t Co n t r a c t . . Se c u r i t y . To gu a r a n t e e co m p l i a n c e wi t h th e te r m s of th i s Ag r e e m e n t , pa y m e n t of re a l es t a t e ta x e s in c l u d i n g in t e r e s t an d pe n a l t i e s , pa y m e n t of sp e c i a l as s e s s m e n t s , pa y m e n t of th e co s t s of al l pu b l i c im p r o v e m e n t s in th e Pl a t an d co n s t r u c t i o n of al l pu b l i c im p r o v e m e n t s in th e Pl a t , th e De v e l o p e r sh a l l fu r n i s h th e Ci t y wi t h a ca s h es c r o w , ir r e v o c a b l e le t t e r of cr e d i t , or al t e r n a t i v e se c u r i t y ac c e p t a b l e to th e Ci t y Ad m i n i s t r a t o r , fr o m a ba n k (t h e ”S e c u r i t y " ) fo r $2 , 2 3 9 , 2 4 0 . Th e am o u n t of th e se c u r i t y is ba s e d on 12 5 % of th e es t i m a t e d co n s t r u c t i o n co s t s as sh o w n in Ex h i b i t B. Th i s br e a k d o w n is fo r hi s t o r i c a l re f e r e n c e ; it is no t a re s t r i c t i o n on th e us e of th e Se c u r i t y . P ag e 7of13 Page 189 of 276 . . 'i ' ? ' T t " : - t ? . " ? l : -- . . . ' - : . "3 - . II I - l l - ? - t I— —I : - l m l " l : l : . “I : .I I - :4 1 . ” : -. - m -- . . -_ - - . _ _ ' . 1 , _ ' " T ' . I . —I - I - - I - 1 F - W? ' l l ' l ' l - ‘ H - ‘I _ . : - . -_ _ ' | . f 2- . #1 1 : : - _: _ -- _ - _ - —' — I . — I — J - . . I— —I .l ' I- : _u . _| . _ . . _ _. - _ __ | _ _ . _ . . _ I __ - _ . I; I- - I | - - - f- : - - . — - - u " GI T - ' 1 ' : 'I ' II I " I. I" i: E' I Ii " : I- - F . ' I 'r .' l - r '. r ' i 5. . -. - . .. . _ . - -- _ - I .. I. - -. | _ . . .. I I" : #5 : ” . - ‘F : ' + " JE T . —' 'r : :1 ' ' ' ' ' l 'I " .? I - I l ' k “ -. - - - .' :_ 'I _. ' I :1 2 ] II .. . .J ‘ .. . D ' 30 . 31 . 32 . Th e ba n k an d fo r m of th e se c u r i t y sh a l l be su b j e c t to th e ap p r o v a l of th e Ci t y Ad m i n i s t r a t o r . Le t t e r s of Cr e d i t sh a l l be in th e fo r m a t an d wo r d i n g ex a c t l y as sh o w n on th e at t a c h e d Le t t e r of Cr e d i t fo r m (E x h i b i t C) . Th e Se c u r i t y sh a l l be au t o m a t i c a l l y re n e w i n g . Th e te r m of th e Se c u r i t y ma y be ex t e n d e d fr o m ti m e to ti m e if th e ex t e n s i o n is fu r n i s h e d to th e Ci t y Ad m i n i s t r a t o r at le a s t fo r t y — f i v e (4 5 ) da y s pr i o r to th e st a t e d ex p i r a t i o n da t e of th e Se c u r i t y . If th e re q u i r e d pu b l i c im p r o v e m e n t s ar e no t co m p l e t e d , or te r m s of th e Ag r e e m e n t ar e no t sa t i s f i e d , at le a s t th i r t y (3 0 ) da y s pr i o r to th e ex p i r a t i o n of a le t t e r of cr e d i t , th e Ci t y ma y dr a w do w n th e le t t e r of cr e d i t . Th e Ci t y ma y dr a w do w n th e Se c u r i t y , wi t h o u t pr i o r no t i c e , fo r an y vi o l a t i o n of th i s Ag r e e m e n t or De f a u l t of th e Co n t r a c t fo l l o w i n g ap p l i c a b l e cu r e pe r i o d s . Up o n re c e i p t of pr o o f sa t i s f a c t o r y by th e De v e l o p e r ' s En g i n e e r , an En g i n e e r li c e n s e d in Mi n n e s o t a , to th e Ci t y En g i n e e r th a t wo r k ha s be e n co m p l e t e d in ac c o r d a n c e wi t h th e Pl a n s (a n d sp e c i f i c a t i o n s ) , an d te r m s of th i s Ag r e e m e n t , an d th a t al l fi n a n c i a l ob l i g a t i o n s to th e Ci t y , su b c o n t r a c t o r s , or ot h e r pe r s o n s ha v e be e n sa t i s f i e d , th e Ci t y En g i n e e r ma y ap p r o v e re d u c t i o n s in th e Se c u r i t y pr o v i d e d by th e De v e l o p e r un d e r th i s pa r a g r a p h fr o m ti m e to ti m e by ni n e t y pe r c e n t (9 0 % ) of th e fi n a n c i a l ob l i g a t i o n s th a t ha v e be e n sa t i s f i e d . Te n pe r c e n t (1 0 % ) of th e am o u n t s ce r t i f i e d by th e De v e l o p e r ' s en g i n e e r sh a l l be re t a i n e d as Se c u r i t y un t i l al l Im p r o v e m e n t s ha v e be e n co m p l e t e d , th e re q u i r e d "a s bu i l t " pl a n s ha v e be e n re c e i v e d by th e Ci t y , a wa r r a n t y se c u r i t y is pr o v i d e d , an d th e pu b l i c im p r o v e m e n t s ar e ac c e p t e d by th e Ci t y Co u n c i l . Wa r r a n t y . Th e De v e l o p e r an d th e De v e l o p e r s En g i n e e r re p r e s e n t an d wa r r a n t to th e Ci t y th a t th e de s i g n fo r th e pr o j e c t me e t s al l la w s , Ci t y St a n d a r d s , En g i n e e r i n g Gu i d e l i n e s an d Or d i n a n c e s . Th e De v e l o p e r wa r r a n t s al l im p r o v e m e n t s re q u i r e d to be co n s t r u c t e d by it pu r s u a n t to th i s Co n t r a c t ag a i n s t po o r ma t e r i a l an d fa u l t y wo r k m a n s h i p . Th e wa r r a n t y pe r i o d fo r st r e e t s is on e ye a r . Th e wa r r a n t y pe r i o d fo r th e st r e e t s sh a l l co m m e n c e af t e r th e fi n a l we a r co u r s e ha s be e n co m p l e t e d . It is th e re s p o n s i b i l i t y of th e De v e l o p e r to co m p l e t e al l st r e e t im p r o v e m e n t s . Fa i l u r e of th e De v e l o p e r to co m p l e t e al l st r e e t im p r o v e m e n t s in a ti m e l y ma n n e r sh a l l no t in an y wa y co n s t i t u t e ca u s e fo r th e wa r r a n t y pe r i o d to be mo d i f i e d fr o m th e st i p u l a t i o n s se t fo r t h ab o v e . Th e wa r r a n t y pe r i o d fo r un d e r g r o u n d ut i l i t i e s is tw o ye a r s . Th e wa r r a n t y pe r i o d on un d e r g r o u n d ut i l i t i e s sh a l l co m m e n c e fo l l o w i n g it s co m p l e t i o n an d ac c e p t a n c e by th e Ci t y En g i n e e r in wr i t i n g . It is th e re s p o n s i b i l i t y of t h e De v e l o p e r to co m p l e t e th e re q u i r e d te s t i n g of th e un d e r g r o u n d ut i l i t i e s an d re q u e s t , in wr i t i n g , Ci t y ac c e p t a n c e of th e ut i l i t i e s . Fa i l u r e of th e De v e l o p e r to co m p l e t e th e re q u i r e d te s t i n g or re q u e s t ac c e p t a n c e of th e ut i l i t i e s in a ti m e l y ma n n e r sh a l l no t in an y wa y co n s t i t u t e ca u s e fo r th e wa r r a n t y pe r i o d to be mo d i f i e d fr o m th e st i p u l a t i o n s se t fo r t h ab o v e . Al l tr e e s sh a l l be wa r r a n t e d to be al i v e , of go o d qu a l i t y , an d di s e a s e fr e e fo r 12 mo n t h s af t e r th e se c u r i t y fo r th e tr e e s is re l e a s e d . An y re p l a c e m e n t s sh a l l be wa r r a n t e d fo r 12 mo n t h s fr o m th e ti m e of pl a n t i n g . Th e De v e l o p e r sh a l l po s t ma i n t e n a n c e bo n d s in th e am o u n t of tw e n t y fi v e pe r c e n t (2 5 % ) of th e fi n a l ce r t i f i e d co n s t r u c t i o n co s t or ot h e r su r e t y ac c e p t a b l e to th e Ci t y to se c u r e th e wa r r a n t i e s . Th e Ci t y sh a l l re t a i n te n pe r c e n t (1 0 % ) of th e se c u r i t y po s t e d by th e De v e l o p e r un t i l th e bo n d s or ot h e r ac c e p t a b l e su r e t y ar e fu r n i s h e d to th e Ci t y or un t i l th e wa r r a n t y pe r i o d ha s be e n co m p l e t e d , wh i c h e v e r fi r s t oc c u r s . Th e re t a i n a g e ma y be us e d to pa y fo r wa r r a n t y wo r k . Th e Ci t y ’ s En g i n e e r i n g Gu i d e l i n e s id e n t i f y th e pr o c e d u r e s fo r fi n a l ac c e p t a n c e of st r e e t s an d ut i l i t i e s . De v e l o p e r ' s De f a u l t . In th e ev e n t of de f a u l t by th e De v e l o p e r as to an y of th e Im p r o v e m e n t s to be pe r f o r m e d by it he r e u n d e r , th e Ci t y ma y , at it s op t i o n , pe r f o r m th e wo r k an d th e De v e l o p e r sh a l l pr o m p t l y re i m b u r s e th e Ci t y fo r an y in Ag r e e m e n t , is gi v e n wr i t t e n no t i c e in no t se v e n t y - t w o in ad v a n c e . Th i s Ag r e e m e n t is a li c e n s e fo r th e Ci t y to ac t , an d it sh a l l no t be ne c e s s a r y fo r th e Ci t y to se e k a Co u r t or d e r fo r pe r m i s s i o n to en t e r th e la n d . Wh e n th e Ci t y do e s an y su c h wo r k , th e Ci t y ma y , in ad d i t i o n to it s ot h e r re m e d i e s , as s e s s th e co s t in wh o l e or in pa r t . Mi s c e l l a n e o u s . A. Th i s Ag r e e m e n t sh a l l be bi n d i n g up o n th e pa r t i e s , th e i r he i r s , su c c e s s o r s or as s i g n s , as th e ca s e ma y be . Th e De v e l o p e r ma y no t as s i g n th i s Ag r e e m e n t wi t h o u t th e wr i t t e n pe r m i s s i o n of th e Ci t y Co u n c i l . Th e De v e l o p e r ’ s ob l i g a t i o n he r e u n d e r sh a l l co n t i n u e in fu l l fo r c e an d ef f e c t ev e n if th e De v e l o p e r se l l s on e or mo r e lo t s , th e en t i r e Pl a t , or an y pa r t of it . Pa ge 8of13 Page 190 of 276 - I. II I - II I - l Th i r d pa r t i e s sh a l l ha v e no re c o u r s e ag a i n s t th e Ci t y un d e r th i s Ag r e e m e n t . Br e a c h of th e te r m s of th i s Ag r e e m e n t by th e De v e l o p e r sh a l l be gr o u n d s fo r de n i a l of bu i l d i n g pe r m i t s , in c l u d i n g lo t s so l d to th i r d pa r t i e s . If an y po r t i o n , se c t i o n , su b s e c t i o n , se n t e n c e , cl a u s e , pa r a g r a p h or ph r a s e of th i s Ag r e e m e n t is fo r an y re a s o n he l d in v a l i d , su c h de c i s i o n sh a l l no t af f e c t th e va l i d i t y of th e re m a i n i n g po r t i o n of th i s Ag r e e m e n t . Ea c h ri g h t , po w e r or re m e d y he r e i n co n f e r r e d up o n th e Ci t y is cu m u l a t i v e an d in ad d i t i o n to ev e r y ot h e r ri g h t , po w e r or re m e d y , ex p r e s s or im p l i e d , no w or he r e a f t e r ar i s i n g , av a i l a b l e to Ci t y at la w or in eq u i t y , or un d e r an y ot h e r ag r e e m e n t , an d ea c h an d ev e r y ri g h t , po w e r an d re m e d y he r e i n se t fo r t h or ot h e r w i s e so ex i s t i n g ma y be ex e r c i s e d fr o m ti m e to ti m e as of t e n an d in su c h or d e r as ma y be de e m e d ex p e d i e n t by th e Ci t y an d sh a l l no t be a wa i v e r of th e ri g h t to ex e r c i s e at an y ti m e th e r e a f t e r an y ot h e r ri g h t , po w e r or re m e d y . Th e ac t i o n or in a c t i o n of th e Ci t y sh a l l no t co n s t i t u t e a wa i v e r or am e n d m e n t to th e pr o v i s i o n s of th i s Ag r e e m e n t . To be bi n d i n g , am e n d m e n t s or wa i v e r s sh a l l be in wr i t i n g , si g n e d by th e pa r t i e s an d ap p r o v e d by wr i t t e n re s o l u t i o n of th e Ci t y Co u n c i l . Th e Ci t y ’ s fa i l u r e to pr o m p t l y ta k e le g a l ac t i o n to en f o r c e th i s Ag r e e m e n t sh a l l no t be a wa i v e r or re l e a s e . Co m p l i a n c e wi t h La w s an d Re g u l a t i o n s . Th e De v e l o p e r re p r e s e n t s to th e Ci t y th a t th e Pl a t co m p l i e s wi t h al l Ci t y , Co u n t y , Me t r o p o l i t a n , St a t e an d Fe d e r a l la w s an d re g u l a t i o n s , in c l u d i n g bu t no t li m i t e d to : su b d i v i s i o n or d i n a n c e s , zo n i n g or d i n a n c e s an d en v i r o n m e n t a l re g u l a t i o n s . If th e Ci t y de t e r m i n e s th a t th e Pl a t do e s no t co m p l y , th e Ci t y ma y , at it s op t i o n , re f u s e to al l o w an y co n s t r u c t i o n or de v e l o p m e n t wo r k in th e Pl a t un t i l th e De v e l o p e r do e s co m p l y . Up o n th e Ci t y ’ s de m a n d , th e De v e l o p e r sh a l l ce a s e wo r k un t i l th e r e is co m p l i a n c e . Th i s Ag r e e m e n t sh a l l ru n wi t h th e la n d an d sh a l l be re c o r d e d ag a i n s t th e ti t l e to th e pr o p e r t y be f o r e an y bu i l d i n g pe r m i t s ar e is s u e d . Th e De v e l o p e r co v e n a n t s wi t h th e Ci t y , it s su c c e s s o r s an d as s i g n s , th a t th e De v e l o p e r is we l l se i z e d in fe e ti t l e of th e pr o p e r t y be i n g fi n a l pl a t t e d an d / o r ha s ob t a i n e d Co n s e n t s to th i s Ag r e e m e n t , in th e fo r m at t a c h e d he r e t o , fr o m al l pa r t i e s wh o ha v e an in t e r e s t in th e pr o p e r t y ; th a t th e r e ar e no un r e c o r d e d in t e r e s t s in th e pr o p e r t y be i n g fi n a l pl a t t e d ; an d th a t th e De v e l o p e r wi l l in d e m n i f y an d ho l d th e Ci t y ha r m l e s s fo r an y br e a c h of th e of th e fo r e g o i n g co v e n a n t s . Af t e r th e De v e l o p e r ha s co m p l e t e d th e Im p r o v e m e n t s re q u i r e d of it un d e r th i s Ag r e e m e n t , at th e De v e l o p e r ’ s re q u e s t th e Ci t y wi l l ex e c u t e an d de l i v e r a te r m i n a t i o n of th i s Ag r e e m e n t (i n re c o r d a b l e fo r m ) an d a re l e a s e of th e De v e l o p e r . Up o n br e a c h of th e te r m s of th i s Ag r e e m e n t , th e Ci t y ma y , fo l l o w i n g th e pa s s i n g of al l ap p l i c a b l e no t i c e an d cu r e pe r i o d s , dr a w do w n th e De v e l o p e r ’ s Se c u r i t y as pr o v i d e d in Pa r a g r a p h 29 (S e c u r i t y ) of th i s Ag r e e m e n t . Th e Ci t y ma y dr a w do w n th i s Se c u r i t y in th e am o u n t of $5 0 0 . 0 0 pe r da y th a t th e De v e l o p e r is in vi o l a t i o n (f o l l o w i n g th e pa s s i n g of al l ap p l i c a b l e no t i c e an d cu r e pe r i o d s ) . Th e Ci t y , in it s so l e di s c r e t i o n , sh a l l de t e r m i n e wh e t h e r th e De v e l o p e r is in vi o l a t i o n of t h e Ag r e e m e n t . Su b j e c t to th e pr o v i s i o n s of Pa r a g r a p h 31 (D e v e l o p e r ’ s De f a u l t ) he r e o f , th i s de t e r m i n a t i o n ma y be ma d e wi t h o u t no t i c e to th e De v e l o p e r . It is st i p u l a t e d th a t th e vi o l a t i o n of an y te r m wi l l re s u l t in da m a g e s to th e Ci t y in an am o u n t , wh i c h wi l l be im p r a c t i c a l an d ex t r e m e l y di f f i c u l t to as c e r t a i n . It is ag r e e d th a t th e pe r da y su m Th e De v e l o p e r wi l l be re q u i r e d to co n d u c t al l ma j o r ac t i v i t i e s to co n s t r u c t th e Im p r o v e m e n t s du r i n g th e fo l l o w i n g ho u r s of op e r a t i o n : Mo n d a y — Fr i d a y 7: 0 0 AM . un t i l 7: 0 0 PM . Sa t u r d a y 8: 0 0 AM . un t i l 5: 0 0 PM . Su n d a y an d Ho l i d a y s No t Al l o w e d Th i s do e s no t ap p l y to ac t i v i t i e s th a t ar e re q u i r e d on a 24 - h o u r ba s i s su c h as de w a t e r i n g , et c . An y de v i a t i o n s fr o m th e ab o v e ho u r s ar e su b j e c t to ap p r o v a l of th e Ci t y En g i n e e r . Vi o l a t i o n s of th e wo r k i n g ho u r s wi l l re s u l t in a $5 0 0 fi n e pe r oc c u r r e n c e in ac c o r d a n c e wi t h Pa r a g r a p h l of th i s se c t i o n . Pa ge 9of13 Page 191 of 276 _- _ . _ . _ - I 5. . . ! — _. . . _ . . . . . _ . . . . . . . _ l . .. . . . . — -. - _ . . r . -. . i ‘ m . . _ - I a. " . Am i m. _ —I _ - I— _ 4— - - ”- E a- F E - I I w - F - I - r r l — l - I — l l r " -I - I -- - I . — . I - . - . I' I I .- -. .. . — h i . . . '. I li ' l i . _ - I _J " - _ I - l ' -_ " - I. ': ' I _. - _ TI “ : r I .- I 'L II ‘ F“ . r- _ ". I .- __ _ - -I . -. . ._ .- - r I" : - .5 . . . I" I - .9 : K. Th e De v e l o p e r sh a l l be re s p o n s i b l e fo r th e co n t r o l of we e d s in ex c e s s of tw e l v e in c h e s (1 2 ” ) on va c a n t lo t s o r bo u l e v a r d s wi t h i n th e i r de v e l o p m e n t as pe r Ci t y Co d e 6- 7 - 1 . Fa i l u r e to co n t r o l we e d s wi l l be co n s i d e r e d a De v e l o p er ’ s De f a u l t as ou t l i n e d in Pa r a g r a p h 31 (D e v e l o p e r ’ s De f a u l t ) of th i s Ag r e e m e n t an d th e De v e l o p e r wi l l re i m b u r s e th e as de f i n e d in sa i d Pa r a g r a p h 25 (R e s p o n s i b i l i t y fo r Co s t s ) . L. Th e Ci t y ag r e e s at an y ti m e , an d fr o m ti m e to ti m e , wi t h i n te n (1 0 ) da y s af t e r re c e i p t of wr i t t e n re q u e s t by De v e l o p e r , a le n d e r or a pa r t y pu r c h a s i n g th e pr o p e r t y , to ex e c u t e , ac k n o w l e d g e an d de l i v e r a ce r t i f i c a t i o n in wr i ti n g an d in su c h fo r m as wi l l en a b l e it to be re c o r d e d in th e pr o p e r of f i c e fo r th e re c o r d a t i o n of de e d s an d ot h e r in s t r u m e nt s ce r t i f y i n g : (a ) th a t th i s Ag r e e m e n t is un m o d i f i e d an d in fu l l fo r c e an d ef f e c t , or if th e r e ha v e be e n mo d i f i c a t i o n s , id e n t i f y of su c h mo d i f i c a t i o n s an d th a t th e sa m e ar e in fu l l fo r c e an d ef f e c t as mo d i f i e d ; (b ) th a t no pa r t y is in de f au l t un d e r an y pr o v i s i o n s of th i s Ag r e e m e n t or , if th e r e ha s be e n a de f a u l t , th e na t u r e of su c h de f a u l t ; (c ) th a t a ll Im p r o v e m e n t s to be pe r f o r m e d un d e r th i s Ag r e e m e n t ha v e be e n pe r f o r m e d , sp e c i f y i n g th e Im p r o v e m e n t s to pe r f o r m e d ; an d (d ) as to an y ot h e r ma t t e r th a t th e re q u e s t i n g pa r t y sh a l l re a s o n a b l y re q u e s t . It is in t e n d e d th a t su c h st a t e m e n t ma y be re l i e d up o n by an y pe r s o n , pr o s p e c t i v e mo r t g a g e e of , or as s i g n e e of an y mo r t g a g e , up o n s in t e r e s t . An y su c h st a t e m e n t on be h a l f of th e Ci t y ma y be ex e c u t e d by th e Ci t y Ad m i n i s t r a t o r wi t h o u t Ci t y Co un c il ap p r o v a l . M. in d e m n i f i c a t i o n . To th e fu l l e s t ex t e n t pe r m i t t e d by la w , De v e l o p e r ag r e e s to de f e n d , in d e m n i f y an d ho l d ha r m l e s s Ci t y , an d it s em p l o y e e s , of f i c i a l s , an d ag e n t s fr o m an d ag a i n s t al l cl a i m s , ac t i o n s , da m a g e s , lo s s e s an d ex p e n s es , in c l u d i n g re a s o n a b l e at t o r n e y fe e s , ar i s i n g ou t of De v e l o p e r ’ s ne g l i g e n c e or it s pe r f o r m a n c e or fa i l u r e to pe r f o r m i t s ob l i g a t i o n s un d e r th i s Co n t r a c t . De v e l o p e r ’ s in d e m n i f i c a t i o n ob l i g a t i o n sh a l l ap p l y to de v e l o p e r ’ s ge n e r a l co n t r a c t or , su b c o n t r a c t o r ( s ) , or an y o n e di r e c t l y or in d i r e c t l y em p l o y e d or hi r e d by De v e l o p e r , or an y o n e fo r wh o s e ac t s De v e l op e r ma y be li a b l e . De v e l o p e r ag r e e s th i s in d e m n i t y ob l i g a t i o n sh a l l su r v i v e th e co m p l e t i o n or te r m i n a t i o n of t h i s Co n t r ac t . ** * * * * * * * * * * * * * * * * 33 . No t i c e s . Re q u i r e d no t i c e s to th e De v e l o p e r sh a l l be in wr i t i n g , an d sh a l l be ei t h e r ha n d de l i v e r e d to th e De v e l o p e r , i t s em p l o y e e s or ag e n t s , or ma i l e d to th e De v e l o p e r by ce r t i f i e d or re g i s t e r e d ma i l at th e fo l l o w i n g ad d r e s s e s : Di s t i n c t i v e La n d De v e l o p m e n t , LL C At t n : Ma t t Od e n t h a l 18 4 6 6 Ke n y o n Av e n u e , Su i t e 10 0 La k e v i l l e , MN 55 0 4 4 No t i c e s to th e Ci t y sh a l l be in wr i t i n g an d sh a l l be ei t h e r ha n d de l i v e r e d to th e Ci t y Ad m i n i s t r a t o r , or ma i l e d to th e Ci t y ce r t i f i e d ma i l or re g i s t e r e d ma i l in ca r e of th e Ci t y Ad m i n i s t r a t o r at th e fo l l o w i n g ad d r e s s : Ly n n Go r s k i , Ci t y Ad m i n i s t r a t o r Ci t y of Fa r m i n g t o n 43 0 Th i r d St r e e t Fa r m i n g t o n , MN 55 0 2 Pa ge 10of13 Page 192 of 276 ST A T E OF MI N N E S OT A ))s s . CO U N T Y OF DA K O TA ) Th e fo r e g o i n g in s t r u me n t wa s ac k n o w l e d ge d be f o r e me th i s da y of ,20bySh i r l e y Bu e c k s l e r , Ci t y Cl e r k , of th e C it y ofFa r m i ng t o n ,aMi n n e s o t a mu n i c i p a l co r p o r a t i o n , onbe h a l f of th e co r p o r a t i o n an d pu r s u a n t toth e au t h o r i t y gr a n t e d b y t h eCi t y Co u n c i l . ST A T E OF MI N N E S O TA ))s s . CO U N T Y OF DA K O T A ) Th e fo r e g o i n g in s t r u me n t wa s ac k n o w l e d g edbe f o r e me th i s da y of ,20byNi c h o l a s Li e n , Ac t i n g Ma y o r , of th e ofFa r m i n g to n , aMi n n e s o t a mu n i c i p a l co r p o r a t i o n , onbe h a l f of th e co r p o r a t i o n an d pu r s u a n t toth e au t h o r i t y gr a n t e d b y tCi t y Co u n c i l . SI G NA T UR E PA G E F O R T H ECI T Y By : S hi rl e yRBu e c k s l e r , Ci t y Cl e r k By : Li e n , Ac t i n g Ma y o r CI T Y:CI T Y FA RM IN GT ON No ta r y Pu b l ic No ta r y Pu b l ic P ag e 11of13 Page 193 of 276 ST A T E OF )(ss . CO U N T Y OF ) Th e fo r e g o i n g in s t r u m e n t ac k n o wl e d ge d be f o r e me th i s da y of ,20 _ _ , by ,th e of ,a ,on it sbe h a l f . DR A F T E D BY : CI T Y OF FA R M I NG T O N 43 0 Th i r d St r e et Fa r m i n g t o n , 55 02 4 Te l e p h o n e : (6 5 1) 28 0 -68 0 0 SI GN AT UR E PA G E FO R DE V EL O PE R DE V EL O PE R : DI S T IN C TI V E LA N D DE V E L O P M E NT , LL C By : Ma t t No ta r y Pu b l ic Pa ge 12of13 Page 194 of 276 :‘ E ' I L : I II - . 1: : :I I - _I .l . . ' _ - : . _- . -“ l . ' . ' _ : - I' . - . . ' . - - . - 1' . ,e - it Ou t l ot B ,DA KO T AME A D O W S PR E S E R V E 1S T AD D I T I O N ac c o r d i n g toth e re c o r d e d pl a t th e r e o f , Da k o t a Co u n t y , Mi n ne s o ta . A Page 195 of 276 7 E 777 We t l an d / Fl o o dCo u n t y R Pa r k 0. 0 0 AC Cu r r e n t Ph a s e D ev el oE m en t Fe e Ac r e a g e : 11 . 1 2 ACE Nu m b e r of (Pr e l i m in a r y Pl a t ) 13 4 Nu m be r ofUn i t s (F i n a l Pl a t ) 46 ofne w bi t u m i n o u s 3, 7 1 6 Sq . Y d s . Al l St r e e t s To t a l Pl at t ed Ar e a :18 . 9 6 ACLa n d Us e Ty p e RO W wi t h i n pr o j e c t 1. 8 0 ACRO W Si n g l e F a Ar e a : 5. 5 3 ACR- L D St ee p Sl o p e:0. 0 0 AC St e e p Sl o p e O ut lo tA: 0. 4 3 AC St o r m Po n d O ut lo tB: 0. 4 0 AC Fu t u r e O ut lo tC: 3. 3 6 AC St o r m Po n d O ut lo tD: 7. 3 0 AC Fu t u r e O ut lo tE: 0. 1 4 AC Fu t u r e To t a l De v e l o p m e n t Fe e A cr ea ge *: 18 . 9 6 AC To t a l by La n d Ty pe5. 5 3 AC R-H D0. 0 0 AC 0. 0 0 AC R O W1. 8 0 AC Po nd3. 7 9 AC Ia i n 0. 0 0 AC OW 0. 0 0 AC Al l ot h e r De v e l o me n t Fe e s De v el o p me n t Co n t r a c t Ca l c u l a t i o n s Da k ot a Me ad o ws Pr e s e r v e 2n d Ad d i t i o n Ex h i b i t B De v el o p me n t Co n t r a c t Ac e ra g e s fo r Pl a t t i n g Ca l c u l a t i o n s E xh ib it BPa g e 1of3 Page 196 of 276 H' w - x . “M i a m i . ”I I - 1 1 1 H mi n i m u m - 1 - “‘ I J ' Lu a n n - « m Mm nt h mm ” Au g - w , sa w — t i m e ” “g l l i m n ‘ l “M H ‘ my nm n u u l ”m u m “ la i d - w u z ? Mu n g - m m . Ki m ‘ m n l ! E«I f ! ! ! Im m u n m m w m {4 1 1 3 3 3 5 1 “m a m a - M hu m ?w k m ? m mu m . um “ : km n r s ? m 93 h «q l L L M N ? M th e va u m w u m m x m m De v e l o p m e n t Co n t r a c t Ca l c u l a t i o n s Ex h i b i t Da k o t a Me a d o w s Pr e s e r v e 2n d Ad d i t i o n De v e l o p m e n t Co n t r a c t Su r f a c e Wa t e r Qu a l i t y Ma n a g e m e n t Fe e Re s i d e n t i a l , lo w de n s i t y $ 12 0 pe r ac r e $1 , 3 3 4 Co m m . / l n d u s t i a l / | n s t i t u t i o n a l $ 24 6 pe r ac r e $0 Su r f a c e Wa t e r Ma n a g e m e n t Fe e Re s i d e n t i a l . lo w de n s i t y $ 12 , 7 4 4 pe r ac r e $1 4 1 , 7 1 3 Re s i d e n t i a l , hi g h de n s i t y $ 21 , 1 6 9 pe r ac r e $0 Co m m . / | n d u s t i a l / l n s t i t u t i o n a l $ 25 , 4 8 4 pe r ac r e $0 _$ 1 4 1 , 7 1 3 Wa t e r m a i n Tr u n k Ar e a Ch a r g e Al l La n d Us e Ty p e s $4 , 9 9 0 pe r ac r e — Sa n i t a r y Se w e r Tr u n k Ar e a Ch a r g e Al l La n d Us e Ty p e s $ 2, 6 7 5 pe r ac r e Pa r k De d i c a t i o n Dw e l l i n g un i t s (F i n a l Pl a t ) 46 Ac r e of la n d de d i c a t e d pe r dw e l l i n g un i t 0. 0 3 2 Re q u i r e d Pa r k La n d w/ Fi n a l Pl a t 1. 4 6 AC De d i c a t e d Pa r k La n d (t r a i l co r r i d o r ) 0. 4 0 AC Ba l a n c e pa i d as Ca s h in Li e u 1. 0 6 AC Ap p r a i s a l Va l u e / A c r e $4 8 , 8 7 6 pe r ac r e Pa r k De v e l o p m e n t Fe e - NA Pa r k De v e l o p m e n t Fe e pe r ac r e of re q u i r e d pa r k l a n d $ - pe r ac r e To t a l Pa r k De v e l o p m e n t Fe e fo r pr e l i m i n a r y pl a t $ - — Se a l c o a t i n g Bi t u m i n o u s Se a l Co a t i n g $ 1. 6 3 pe r sq u a r e ya r d $6 , 0 5 7 De v e l o p m e n t Co n t r a c t Es c r o w Co n s t r u c t i o n Co s t $1 , 7 9 1 , 3 9 2 Co n t r a c t Ad m i n i s t r a t i o n 3% of Co n s t r u c t i o n Co s t $5 3 , 7 4 2 Co n s t r u c t i o n Ob s e r v a t i o n 5% of Co n s t r u c t i o n Co s t $8 9 , 5 7 0 SW P P P Co m p l i a n c e Es c r o w (i n l c u d e d in th e co n s t r u c t i o n ob s e r v a t i o n es c r o w ) To t a l of Fe e s Du e up o n Pl a t t i n g $4 2 9 , 4 6 0 lP la tt i n g Fe e Ca c l u a t i o n s Ba é é d on20 2 5 Fe e Sc h e d u l e i I O ve rs iz in g Re i m b u r s e me n t s /Co n s t r u c t i o n Es c r o w Re i m b u r s e m e n t s 7 Sa n i t a r y Se we r Tr un kOv e r s i z i n gN/ A Wa t e r m a i n Ov e r si z i n gN/ A To t a l Re i mb u rs e m en t s Pa i d up o n Pr o o f ofPl a t Re c o r d i n g NA E x hi bi t BPa g e 2of3 $ Page 197 of 276 C on st r uc ti o n Se c u r i t y Ca l c u l a t i o n s De v e l o p m e n t Co n t r a c t Ca l c u l a t i o n s Ex h i b i t B Da k o t a Me a d o w s Pr e s e r v e 2n d Ad d i t i o n De v e l o p m e n t Co n t r a c t Co n s t r u c t i o n Co s t $8 1 5 , 9 9 7 $2 3 4 , 3 8 4 $1 6 4 , 3 0 3 $2 0 0 , 4 6 9 $3 6 3 , 7 3 9 $1 2 , 5 0 0 N/ A T ot al Co n st r u ct i o nCo s t $1 , 7 9 1 , 3 9 2 To t a l Se c u r i t y Am o u n t Se c u r i t y Am o u n t $1 ,0 1 9 , 9 9 6 $2 9 2 , 9 8 0 $2 0 5 , 3 7 9 $2 5 0 , 5 8 7 $4 5 4 , 6 7 3 $1 5 , 6 2 5 N/ A $2 , 2 3 9 , 2 4 0 Gr a d i n g /E r o s i o n Co n t r o l Sa n i t a r y Se w e r Wa t e r Ma i n St o r m Se w e r St r e e t Co n s t r u c t i o n St r e e t Li g h t s E x hi bi t BPa g e 3of3 Page 198 of 276 u. I - - .. EF F ! - . '| ' . ' | . . " ' l ' . l i l " - ' - " : I ! ' F ? . i' . .I ’ I -- F- -- . - | — . - r- -- . - J - I - _ . I - . - "I _ ' "' . | .I . ' _ ' . ' . _ - ' l _ ' i ' - . -, if . -' I : '1 3 : ? I3 3 " . " .: I - " ' _ _ ' - I" -. .- | _- . ”' _ " . I . I . -_ Im . - r- _ . - 1" : I- _ -. £- ' - -" W l " " l ' " l u ? - ' I ' - ' - . ' . ' '. -. . ' .l ' . I . ' " ’- I- " . I .1 :1 ;" . I ' . _ . I -: | | , . h ' _ i . . . . - ' - ._ ' . ' - . .- . _ .J ' i. E? m - I mL - ‘ r r 1 31 7 : ! — “ -_ . . . _ | . Da t e . TO : Ci t y of Fa r m i n g t o n 43 0 Th i r d St r e e t Fa r m i n g t o n , MN 55 0 2 4 De a r Si r or Ma d a m : We he r e b y is s u e , fo r th e ac c o u n t of (N a m e of De v e l o g e r l an d in yo u r fa v o r , ou r Ir r e v o c a b l e Le t t e r of Cr e d i t in th e am o u n t of $ , av a i l a b l e to yo u by yo u r dr a f t dr a w n on si g h t on th e un d e r s i g n e d ba n k . Th e dr a f t mu s t : a) Be a r th e cl a u s e , "D r a w n un d e r Le t t e r of Cr e d i t No . , da t e d , 20 , of (N a m e of Ba n k ! "; b) Be si g n e d by th e Ci t y Ad m i n i s t r a t o r or Fi n a n c e Di r e c t o r of th e Ci t y of Fa r m i n g t o n . c) Be pr e s e n t e d fo r pa y m e n t at {A d d r e s s of Ba n k ) on or be f o r e 4: 0 0 pm . o n No v e m b e r 30 , 2 . Th i s Le t t e r of Cr e d i t sh a l l au t o m a t i c a l l y re n e w fo r su c c e s s i v e on e - y e a r te r m s un l e s s , at le a s t fo r t y - f i v e (4 5 ) da y s pr i o r to th e ne x t an n u a l re n e w a l da t e (w h i c h sh a l l be No v e m b e r 30 of ea c h ye a r ) , th e Ba n k de l i v e r s wr i t t e n no t i c e to th e Fa r m i n g t o n Ci ty Ad m i n i s t r a t o r th a t it in t e n d s to mo d i f y th e te r m s of , or ca n c e l , th i s Le t t e r of Cr e d i t . Wr i t t e n no t i c e is ef f e c t i v e if se n t by ce r t i f i e d ma i l , po s t a g e pr e p a i d , an d de p o s i t e d in th e US . Ma i l , at le a s t fo r t y - f i v e (4 5 ) da y s pr i o r to th e ne x t an n u a l re n e w a l da t e ad d r e s s e d as fo l l o w s : Fa r m i n g t o n Ci t y Ad m i n i s t r a t o r , 43 0 Th i r d St r e e t , Fa r m i n g t o n , MN 55 0 2 4 , an d is ac t u a l l y re c e i v e d by th e Ci t y Ad m i n i s t r a t o r at le a s t th i r t y (3 0 ) da y s pr i o r to th e re n e w a l da t e . Th i s Le t t e r of Cr e d i t se t s fo r t h in fu l l ou r un d e r s t a n d i n g wh i c h sh a l l no t in an y wa y be mo d i f i e d , am e n d e d , am p l i f i e d , or li m i t e d by re f e r e n c e to an y do c u m e n t , in s t r u m e n t , or ag r e e m e n t , wh e t h e r or no t re f e r r e d to he r e i n . Th i s Le t t e r of Cr e d i t is no t as s i g n a b l e . Th i s is no t a No t a t i o n Le t t e r of Cr e d i t . Mo r e th a n on e dr a w ma y be ma d e un d e r th i s Le t t e r of Cr e d i t . Th i s Le t t e r of Cr e d i t sh a l l be go v e r n e d by th e mo s t re c e n t re v i s i o n of th e Un i f o r m Cu s t o m s an d Pr a c t i c e fo r Do c u m e n t a r y Cr e d i t s , In t e r n a t i o n a l Ch a m b e r of Co m m e r c e Pu b l i c a t i o n No . 60 0 . We he r e b y ag r e e th a t a dr a f t dr a w n un d e r an d in co m p l i a n c e wi t h th i s Le t t e r of Cr e d i t sh a l l be du l y ho n o r e d up o n pr e s e n t a t i o n . [N A M E OF BA N K ] By : [n a m e ] It s : [i d e n t i f y of f i c i a l ] I R R E V O C A B L E LE T T E R OF CR E D I T No . Page 199 of 276 REGULAR COUNCIL AGENDA MEMO To: Mayor, Councilmembers and City Administrator From: John Powell, Public Works Director Department: Engineering Subject: Professional Services Agreement with WSB, LLC for the 2026 Street Improvements Meeting: Regular Council - Feb 17 2026 INTRODUCTION: At the July 7, 2025 City Council meeting, a Professional Services Agreement (PSA) was approved with WSB, LLC for preparation of a 30% design along with a feasibility report for the 2026 Street Improvements. The project area includes 2nd Street from Ash Street to Spruce Street. The attached Feasibility Report will be presented, which includes the project scope and estimated costs. The requested action will allow the consultant to continue with the design process. DISCUSSION: Early in 2023, the City Council approved the Consultant Pool for 2023-2027. WSB, LLC is one of the firms in the Consultant Pool and has prepared the attached scope and budget based on discussions with City Staff. Major scope tasks related to preparation of the final plans and specifications include the following:  Data Collection  Final Design & Plans  Meetings/Open House  Contract Documents/Specifications  Permitting  Constructability Review  Cost Estimate  Bidding Assistance The scope includes Bidding Assistance through contract award utilizing online bidding. With this process, the contractors make all bid submittals and pricing electronically and do not drop bid documents off in person. This process expedites creation of the bid tabulation and review of bid submittals. Page 200 of 276 Per the Feasibility Report, the expected schedule is as follows: April 6, 2026 City Council Receives Plans & Authorizes Advertisement for Bids May 4, 2026 City Council Awards Construction Contract May 12, 2026 Pre-Construction Meeting May 14, 2026 Neighborhood Meeting May 15, 2026 Begin Construction September 30, 2026 Substantial Completion October 15, 2026 Final Completion October 2028 Two-Year Warranty Inspection BUDGET IMPACT: Work under this contract will be billed hourly for a cost not to exceed $161,152. The 2026- 2030 Capital Improvement Plan (CIP) identified $2,600,000 in construction expenditures for this project in 2026. These expenditures are in addition to the $200,000 in expenditures that had been allocated for 2025; the total construction cost in the CIP is $2,800,000. In addition to the $1,500,000 in G.O. Bonds issued for this project in 2025; 2026 funding for the project in the CIP includes: Funding Source Amount Sewer Fund $ 200,000 Stormwater Fund $ 400,000 Water Fund $ 700,000 Total $1,300,000 The estimated project cost in the Feasibility Report of $3,230,320 exceeds the identified funding amount but also includes a 10% contingency and 18% for other costs such as engineering, surveying, soil borings, materials testing, sewer televising, permits, etc. As with many road reconstruction efforts within the city, a significant portion of the cost overage is related to removal and replacement of unsuitable soils beneath the existing roadway. ACTION REQUESTED: Approve the Professional Services Agreement with WSB, LLC for the 2026 Street Improvements Final Design and Bidding ATTACHMENTS: 2026 Street Improvement Feasibility Report 021726 021726 PSA WSB 2026 Street Improvement final design Page 201 of 276 17 8 E 9 T H S T R E E T | SU I T E 2 0 0 | SA I N T P A U L , M N | 55 1 0 1 | 65 1 . 2 8 6 . 8 4 5 0 | WS B E N G . C O M FEASIBILITY REPORT 2026 STREET IMPROVEMENTS PROJECT FARMINGTON | DAKOTA COUNTY | MINNESOTA February 17, 2026 Prepared for: City of Farmington 430 Third Street Farmington, MN 55024 CITY PROJECT NO. 26-01 WSB PROJECT NO. 0 31071-000 Page 202 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Table of Contents Table of Contents Table of Contents Certification 1. Executive Summary .................................................................................. 1 2. Project Location ....................................................................................... 2 2.1 Project History ..................................................................................... 2 2.2 Existing Conditions ............................................................................... 2 3. Proposed Improvements ............................................................................ 3 3.1 Surface and Street ............................................................................... 3 3.2 Storm Sewer ........................................................................................ 3 3.3 Watermain ........................................................................................... 3 3.4 Sanitary Sewer ..................................................................................... 3 4. Right-of-Way and Easements ..................................................................... 4 5. Private Utilities / Wetlands / Trees ............................................................. 5 5.1 Private Utilities .................................................................................... 5 5.2 Wetlands ............................................................................................. 5 5.3 Trees .................................................................................................. 5 6. Permits / Approvals .................................................................................. 6 7. Operational Issues and Costs .................................................................... 7 8. Opinion of Probable Cost .......................................................................... 8 9. Proposed Funding .................................................................................... 9 10. Project Schedule ..................................................................................... 10 11. Public Involvement .................................................................................. 11 12. Feasibility and Recommendation ............................................................... 12 Appendix A Project Location Map Appendix B Design Concepts Page 203 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Table of Contents Appendix C Preliminary Cost Estimate Appendix D Geotechnical Report Appendix E Tree Removal Map Page 204 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Certification Certification Sheet I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly licensed professional engineer under the laws of the State of Minnesota. Mark Erichson, PE _______________________________________________ Date: February 17, 2026 Lic. No. 40886 Quality Control Review Completed By: Nick Guilliams, PE _______________________________________________ Date: February 17, 2026 Lic. No. 5 2109 Page 205 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Page 1 1. Executive Summary The feasibility study and report for the 2026 Street Improvements Project has been prepared for the City of Farmington. The proposed improvements include the complete reconstruction of the street, replacement of the watermain, including services to the right-of-way, along with improvements to replace the storm sewer, and the installation of additional catch basins to improve area drainage on 2nd Street from Spruce Street to Ash Street (CSAH 74). The total project cost is estimated to be $3,230,320 . The project is proposed to be funded through a combination of General Obligation Bonds and municipal funds. The estimated costs for the proposed improvements are detailed in the table below. Those costs include a 10 % construction contingency and 18% allowance for indirect costs. This project is feasible, necessary, and cost-effective from an engineering standpoint and should be constructed as proposed herein. COST SUMMARY Construction Costs: Schedule A - Street Improvements $1,514,610.00 Schedule B - Sanitary Sewer Improvements $61,600.00 Schedule C - Watermain Improvements $798,620.00 Schedule D - Storm Sewer Improvements $362,730.00 Construction Total: $2,737,560.00 Engineering and Administration Costs (18%) $492,760.00 TOTAL ESTIMATED PROJECT COSTS: $3,230,320.00 Page 206 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Page 2 2. Project Location The project area (depicted on the map in Appendix A) is 2nd Street from its north intersection with Spurce Street to its south intersection with Ash Street (CSAH 74). 2.1 Project History The City Council authorized the preparation of a feasibility study and preliminary design on the 2026 Street Improvements Project on July 7, 2025. On July 21, 2025, the City Council approved the five-year street reconstruction plan and identified 2nd Street from Spruce Street to Ash Street for improvements in 2026. 2.2 Existing Conditions 2nd Street primarily serves as access for single-family residences, with a few commercial properties located at the northern end. It is classified as a two-lane, undivided urban section with on-street parking and no sidewalk. The existing roadway is approximately 36 feet wide, measured from the back of the curb, and is surfaced with bituminous asphalt pavement and B618 (vertical curb 6 inches, 18-inch gutter width) concrete curbs. A Pavement Condition Index (PCI) rating was completed along 2nd Street in May of 2023. The entire project area, from Spruce Street to Ash Street, had a PCI rating of 23 or below. The existing asphalt pavement and concrete curb have deteriorated to the extent that reconstruction is necessary, as indicated by visible distress. The existing pavement section varies from 2.5 inches to 4 inches, and aggregate depths range from 3 inches to 12 inches. This data was obtained using boring logs obtained in July 2025. Boring logs are shown in Appendix D . The existing asphalt pavement and concrete curb have deteriorated to the extent that reconstruction is necessary, as indicated by visible distress. There is an existing storm sewer system located at Ash Street, Maple Street, and Walnut Street; however, the current catch basins are not spaced adequately to convey drainage effectively. 2nd Street is generally flat, which leads to occasional standing water and contributes to pavement degradation. All homes within the project area are served by city-owned watermain and sanitary sewer systems. Existing watermain consists of 4- inch and 6-inch cast iron pipe, with original installation dating back to at least 1961. The sanitary sewer consists of 8-inch Vitrified Clay Pipe (VCP). Page 207 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Page 3 3. Proposed Improvements 3.1 Surface and Street The current City standard width for residential street section is 32 feet, per city standard detail STR-05, with parking on one side. 2nd Street measures 36 feet between the face of the curb for the majority of its length, but narrows to 32 feet at the northern end. The proposed plan is to reduce the road width by 4 feet, which will help comply with stormwater requirements outlined in the City’s Municipal Separate Storm Sewer (MS4) permit and allow for the continued parking on both sides of the roadway. This reduction in road width decreases the impervious area, which in turn reduces the volume of runoff entering the City’s Storm Sewer System. Additionally, narrowing the road provides the added benefit of traffic calming; studies have shown that reduced road widths correlate with slower vehicle speeds. The typical roadway section is outlined in Appendix B . The City’s 2019 Bike and Pedestrian Plan identifies a sidewalk connection between Walnut and Ash Streets. Feedback from the open house was generally against installing a sidewalk on 2nd Street. The installation of this sidewalk extension will be evaluated during final design. 3.2 Storm Sewer The corridor was evaluated for drainage improvements and upgrades to the storm sewer system. Reconstruction of the streets offers the opportunity to increase profile grades to better direct runoff to low points and through street intersections. Based on the analysis of the drainage system, additional storm sewer is proposed to improve street drainage. The new storm sewer system will be designed to handle a 10-year design storm, per the City standard, and will be laid out based on the final grade of the roadway. 3.3 Watermain Given the age, size, and condition of the existing water main along 2nd Street, it is recommended that the existing 4 -inch and 6 -inch CIP water mains be replaced with 8 -inch ductile-iron pipe (DIP). This is consistent with recent Water Board direction regarding watermain replacement in street reconstruction areas. Individual water services will be replaced between the new main and the right-of-way. 3.4 Sanitary Sewer The sanitary sewer system along 2nd Street was inspected by City staff to assess the condition, and it was determined that full replacement is not warranted at this time. There is a segment between Honeysuckle Avenue and Beech Street where a sag was identified. This segment is propoosed to be removed and replaced. Any sanitary sewer services encountered during the installation of watermain, or storm sewer, will be completely replaced between the main and the property line. Page 208 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Page 4 4. Right-of-Way and Easements The existing right-of-way is generally 80 feet throughout the project area. Like many older areas of the city, most lots do not have an additional drainage and utility easement abutting the road right-of-way. No permanent or temporary easements are required. If there is a need to access areas outside of the existing right-of-way, staff will work with the affected property owner to obtain a right of entry. Page 209 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Page 5 5. Private Utilities / Wetlands / Trees 5.1 Private Utilities Private utilities are located throughout the project corridor and have been mapped using the Gopher State One Call process. The most prominent are overhead utilities on the west side of the road. Utility locations were gathered during the topographic survey. Impacts on private utilities are expected to be minimal. A private utility coordination meeting will be held during the final design phase, before the commencement of construction. 5.2 Wetlands No wetlands exist in the project area. 5.3 Trees Tree locations were inventoried and mapped as part of the topographic survey process. The condition of the trees within the project area were reviewed by the City’s Natural Resource Specialist. Ash trees within the public right of way, as well as trees with declining health, poor structural stability, or trees that are replaceable with existing nursery stock, are candidates for removal prior to construction activities. In addition, large healthy trees growing too close to a project that involves major soil disturbance of any kind should be removed to avoid conflicts with the construction activity. Additional field review of trees by city staff, and discussions with residents as needed, will occur in spring 2026 ahead of anticipated construction. Trees identified for removal can be found in Appendix E. Page 210 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Page 6 6. Permits / Approvals The following permits are required for the proposed improvements: • An NPDES permit for construction activity will be required since more than one (1) acre will be disturbed by construction activities with the project. • Minnesota Department of Health (MDH) Permit – Replacement of w atermain. • Dakota County Permit – Work within Right-of-Way Page 211 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Page 7 7. Operational Issues and Costs Upon project completion, operational issues and costs will decrease due to reduced pavement surface, new pavement requiring less maintenance, improved drainage, and watermain upgrades. Page 212 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Page 8 8. Opinion of Probable Cost The total project cost is estimated to be $3,230,320 . A detailed breakdown of the cost opinion for the proposed project can be found in Appendix C of this report. The opinion of cost incorporates estimated 2026 construction costs and includes a 10% contingency factor. Indirect costs are projected at 18% of the estimated construction cost and include legal, engineering, administrative, and financing costs. COST SUMMARY Construction Costs: Schedule A - Street Improvements $1,514,610.00 Schedule B - Sanitary Sewer Improvements $61,600.00 Schedule C - Watermain Improvements $798,620.00 Schedule D - Storm Sewer Improvements $362,730.00 Construction Total: $2,737,560.00 Engineering and Administration Costs (18%) $492,760.00 TOTAL ESTIMATED PROJECT COSTS: $3,230,320.00 Page 213 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Page 9 9. Proposed Funding The 2026-2030 Capital Improvement Plan (CIP) identified $2,600,000 in construction expenditures for this project in 2026. These expenditures are in addition to the $200,000 in expenditures that had been allocated for 2025; the total construction cost in the CIP is $2,800,000. In addition to the $1,500,000 in G.O. Bonds issued for this project in 2025; 2026 funding for the project in the CIP includes: Funding Source Amount Sewer Fund $ 200,000 Stormwater Fund $ 400,000 Water Fund $ 700,000 Total $1,300,000 Based on the estimated project costs and scope, the recommended funding sources are as follows: Funding Source Amount General Obligation Bond Funds $1,787,2 4 0 Sewer Fund $ 7 2 ,690 Stormwater Fund $ 428,020 Water Fund $ 942,370 Total $3,230,320 Note that the above project costs distributed to these funding sources include a 10% construction contingency; and does not reflect final design detail or competitive bidding. Also, all project mobilization costs have been allocated to s treet i mprovements, these costs can be allocated to utility work based on the bid unit prices. This project will not be subject to the Chapter 429 Special Assessment process. Page 214 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Page 10 10. Project Schedule The proposed schedule for this improvement is as follows: Order Feasibility Report July 7, 2025 Neighborhood Meeting 1 (background, issues, etc.) September 17, 2025 City Council Receives Feasibility Report February 17, 2026 City Council Authorizes Preparation of Plans and Specifications and PSA February 17, 2026 Neighborhood Meeting 2 (review of design concepts) March 4, 2026 Council Receives Plans and Specifications and Authorizes Advertisement for Bids April 6, 2026 Ad for Bid to Finance and Commerce April 7, 2026 Publication Dates for Finance and Commerce April 10 and 17, 2026 Ad for Bid to Dakota County Tribune April 7, 2026 Publication Dates for Dakota County Tribune April 10 and 17, 2026 Receive Bids (10:00 am) April 28, 2026 Award Contract May 4, 2026 Pre -construction Meeting May 12, 2026 Neighborhood Meeting 3 (with contractor, pre - construction) May 14, 2026 Begin Construction May 15, 2026 Construction Substantially Complete September 30, 2026 Construction Final Completion October 15, 2026 Two Year Warranty Inspection (after final payment and acceptance) October 2028 Page 215 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Page 11 11. Public Involvement The Public involvement process included a mailed survey and two neighborhood open houses. Fourteen survey responses were received from the questionnaire that identified known infrastructure issues. Several responses noted problems with standing water and localized flooding. Open House Meeting #1 – September 17 , 2025 The purpose of this meeting was to introduce the project, discuss overall goals, and gather feedback on known issues that residents are experiencing. Seven households attended the meeting, with comments focused on the scope of the improvements, water and sanitary services, trees, speeding near the vicinity of Walnut Street, parking, consideration of a stop sign at Walnut Street, potential sidewalk installation concerns, construction impacts, and the timing of construction. Open House Meeting #2 – March 4, 2026 Open House Meeting #3 – May 14, 2026 Page 216 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Page 12 12. Feasibility and Recommendation The 20 2 6 Street Improvements Project includes roadway reconstruction, replacement of concrete curb and gutter, replacement of water main, minor sanitary sewer rehabilitation, and storm sewer improvements. The total estimated cost for the project, including roadway, storm sewer, minor sanitary sewer, and water main improvements, is $3,230,320 . The project is proposed to be funded through a combination of General Obligation Bonds and local funds. Construction costs are based on anticipated 2026 construction costs. This project is feasible, necessary, and cost-effective from an engineering standpoint. The project's feasibility is subject to financial review by the City. Based on the information contained in this report, it is recommended that the improvements outlined herein be implemented. Page 217 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Appendix Appendix A Project Location Map Page 218 of 276 2ND STREET 2ND STREET AS H S T R E E T HI C K O R Y S T R E E T HO N E Y S U C K L E L N BE E C H S T R E E T MA P L E S T R E E T MA P L E S T R E E T WA L N U T S T R E E T 2ND ST R E E T SP R U C E S T R E E T 2ND STREET C: \ A C C \ A C C D o c s \ W S B \ 0 3 1 0 7 1 - 0 0 0 \ P r o j e c t F i l e s \ 0 5 _ D i s c i p l i n e \ R o a d w a y \ E x h i b i t s \ 0 3 1 0 7 1 - 0 0 0 - X H B T - P L O T . d w g 2/ 6 / 2 0 2 6 1 1 : 3 8 : 4 8 A M 2026 STREET IMPROVEMENTS PROJECT LOCATION MAP CITY OF FARMINGTON EXHIBIT 1 NSCALE IN FEET 0 H: 200 400 WSB PROJECT NO.: 031071-000 FEBRUARY 2026 Pa g e 2 1 9 o f 2 7 6 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Appendix Appendix B Design Concepts Page 220 of 276 17' LANE 40' R/W40' R/W 17' LANE 34' F-F 16' LANE 40' R/W40' R/W 16' LANE 32' F-F C/L SECOND STREET (ASH STREET - WALNUT STREET) C/L SECOND STREET (WALNUT STREET - SPRUCE STREET) B618 CONCRETE CURB & GUTTER B618 CONCRETE CURB & GUTTER B618 CONCRETE CURB & GUTTER B618 CONCRETE CURB & GUTTER C: \ A C C \ A C C D o c s \ W S B \ 0 3 1 0 7 1 - 0 0 0 \ P r o j e c t F i l e s \ 0 5 _ D i s c i p l i n e \ R o a d w a y \ E x h i b i t s \ 0 3 1 0 7 1 - 0 0 0 - X H B T - P L O T . d w g 2/ 6 / 2 0 2 6 1 2 : 0 0 : 5 1 P M EXHIBIT 2 CITY OF FARMINGTON EXISTING STREET WSB PROJECT NO.: 031071-000 FEBRUARY 2026 Pa g e 2 2 1 o f 2 7 6 16' LANE 40' R/W40' R/W 5' BOULEVARD 5' BOULEVARD16' LANE 32' F-F INSET A 2.5" TYPE SP12.5 BITUMINOUS NON-WEARING COURSE MIXTURE SPNWB330C 1.5" TYPE SP9.5 BITUMINOUS WEARING COURSE MIXTURE SPWEA330C 2357 BITUMINOUS TACK COAT 8" AGGREGATE BASE CLASS 5 (OR RECYCLED EQUAL MEETING MNDOT 3138) 12" EXCAVATION SUBGRADE AND AGGREGATE BACKFILL (MNDOT 3149.2E) C/L SECOND STREET (ASH STREET - SPRUCE STREET) 1/2 1 4" TOPSOIL AND SOD 1/2 1 4" TOPSOIL AND SOD C/L PROFILE B618 CONCRETE CURB & GUTTER B618 CONCRETE CURB & GUTTER SEE INSET A 2.0%2.0%2.0%2.0% C: \ A C C \ A C C D o c s \ W S B \ 0 3 1 0 7 1 - 0 0 0 \ P r o j e c t F i l e s \ 0 5 _ D i s c i p l i n e \ R o a d w a y \ E x h i b i t s \ 0 3 1 0 7 1 - 0 0 0 - X H B T - P L O T . d w g 2/ 6 / 2 0 2 6 1 1 : 3 8 : 1 2 A M EXHIBIT 3 CITY OF FARMINGTON TYPICAL SECTIONS 2026 STREET IMPROVEMENTS PROJECT WSB PROJECT NO.: 031071-000 FEBRUARY 2026 Pa g e 2 2 2 o f 2 7 6 S S S 6"2" 2" 4" 32 " 20 " 28 " 36 " 4" 20 " 14 " 36 " 12" 12 " 1021 2ND ST 1017 2ND ST 1011 2ND ST 1009 2ND ST 1005 2ND ST 1001 2ND ST 921 2ND ST 121 ASH ST 1012 2ND ST 1008 2ND ST 1004 2ND ST 1002 2ND ST 1000 2ND STEX 6 " D I P 8" DIP DAKOTA COUNTY ROW 32' F-F 12 ' 10 ' S S EXISTING WATERMAIN PROPOSED WATERMAIN EXISTING SANITARY SEWER EXISTING SANITARY MANHOLE RECONSTRUCT SANITARY MANHOLE PROPOSED CURB AND GUTTER EXISTING STORM SEWER PIPE EXISTING STORM STRUCTURE PROPOSED STORM SEWER PIPE PROPOSED DRAINAGE STRUCTURE ST BITUMINOUS ROAD / DRIVEWAY CONCRETE DRIVEWAY / SIDEWALK GRAVEL DRIVE LEGEND EXISTING CONIFEROUS TREE EXISTING DECIDUOUS TREE PROPOSED SANITARY SEWER WSB PROJECT NO.: C: \ A C C \ A C C D o c s \ W S B \ 0 3 1 0 7 1 - 0 0 0 \ P r o j e c t F i l e s \ 0 5 _ D i s c i p l i n e \ R o a d w a y \ E x h i b i t s \ 0 3 1 0 7 1 - 0 0 0 - C P - F I G R - B A S E . d w g 2/ 6 / 2 0 2 6 1 1 : 3 9 : 2 7 A M 031071-000 2026 STREET IMPROVEMENT PROJECT PROPOSED IMPROVEMENTS FARMINGTON, MINNESOTA EXHIBIT 4N SCALE IN FEET 0 H: 50 100 FEBRUARY 05, 2026 AS H S T R E E T MA T C H L I N E S E E E X H I B I T 4 HI C K O R Y S T R E E T Pa g e 2 2 3 o f 2 7 6 S S S 36 " 32 " 20 " 28 " 40 " 12"12"12" 12 " 12 " 12 " 12" 917 2ND ST 913 2ND ST 909 2ND ST 905 2ND ST 901 2ND ST 815 2ND ST 813 2ND ST 811 2ND ST 809 2ND ST 200 MAPLE ST 108 MAPLE ST 110 MAPLE ST 1000 2ND ST 908 2ND ST 904 2ND ST S 8" DIP 8" DIP 32' F-F 11 ' 10 ' REPLACE SANITARY SEWER DUE TO MULTIPLE SAGS AND SHORT LINER FAILURE S S EXISTING WATERMAIN PROPOSED WATERMAIN EXISTING SANITARY SEWER EXISTING SANITARY MANHOLE RECONSTRUCT SANITARY MANHOLE PROPOSED CURB AND GUTTER EXISTING STORM SEWER PIPE EXISTING STORM STRUCTURE PROPOSED STORM SEWER PIPE PROPOSED DRAINAGE STRUCTURE ST BITUMINOUS ROAD / DRIVEWAY CONCRETE DRIVEWAY / SIDEWALK GRAVEL DRIVE LEGEND EXISTING CONIFEROUS TREE EXISTING DECIDUOUS TREE PROPOSED SANITARY SEWER C: \ A C C \ A C C D o c s \ W S B \ 0 3 1 0 7 1 - 0 0 0 \ P r o j e c t F i l e s \ 0 5 _ D i s c i p l i n e \ R o a d w a y \ E x h i b i t s \ 0 3 1 0 7 1 - 0 0 0 - C P - F I G R - B A S E . d w g 2/ 6 / 2 0 2 6 1 1 : 4 0 : 5 7 A M EXHIBIT 5 WSB PROJECT NO.: 031071-000 2026 STREET IMPROVEMENT PROJECT FARMINGTON, MINNESOTA HO N E Y S U C K L E L A N E PROPOSED IMPROVEMENTS MA T C H L I N E S E E E X H I B I T 5 SCALE IN FEET 0 H: 50 100 N BE E C H S T R E E T MA T C H L I N E S E E E X H I B I T 3 FEBRUARY 05, 2026 Pa g e 2 2 4 o f 2 7 6 S S 24 " 24 " 24 " 32 " 18 " 24 " 20 " 16 " 15 " 12"12" 1 2 " 12" 12 " EX 1 2 " R C P 200 MAPLE ST 201 MAPLE ST 713 2ND ST 709 2ND ST 705 2ND ST 701 2ND ST 625 2ND ST 623 2ND ST 617 2ND ST 613 2ND ST 612 2ND ST 616 2ND ST620 2ND ST622 2ND ST 704 2ND ST 706 2ND ST 708 2ND ST 720 2ND ST 108 MAPLE ST 110 MAPLE ST 8" DIP 32' F-F 19 ' 10 ' 8" DIP 8" DIP 10 " D I P S S EXISTING WATERMAIN PROPOSED WATERMAIN EXISTING SANITARY SEWER EXISTING SANITARY MANHOLE RECONSTRUCT SANITARY MANHOLE PROPOSED CURB AND GUTTER EXISTING STORM SEWER PIPE EXISTING STORM STRUCTURE PROPOSED STORM SEWER PIPE PROPOSED DRAINAGE STRUCTURE ST BITUMINOUS ROAD / DRIVEWAY CONCRETE DRIVEWAY / SIDEWALK GRAVEL DRIVE LEGEND EXISTING CONIFEROUS TREE EXISTING DECIDUOUS TREE PROPOSED SANITARY SEWER C: \ A C C \ A C C D o c s \ W S B \ 0 3 1 0 7 1 - 0 0 0 \ P r o j e c t F i l e s \ 0 5 _ D i s c i p l i n e \ R o a d w a y \ E x h i b i t s \ 0 3 1 0 7 1 - 0 0 0 - C P - F I G R - B A S E . d w g 2/ 6 / 2 0 2 6 1 1 : 4 1 : 3 2 A M EXHIBIT 6 WSB PROJECT NO.: 031071-000 2026 STREET IMPROVEMENT PROJECT FARMINGTON, MINNESOTA MA P L E S T R E E T PROPOSED IMPROVEMENTS MA T C H L I N E S E E E X H I B I T 4 SCALE IN FEET 0 H: 50 100 N MA T C H L I N E S E E E X H I B I T 6 FEBRUARY 05, 2026 Pa g e 2 2 5 o f 2 7 6 S 48 " 36 " 14 " 14 " 18 " ST 15" 48" 15"15" 15 " 15" 15 " EX 48" R C P 15" EX 48" RCP EX 8 " R C P 508 3RD ST 208 WALNUT ST 204 WALNUT ST 200 WALNUT ST 201 WALNUT ST 513 2ND ST 510 2ND ST 510 2ND ST 612 2ND ST612 2ND ST RAILRO A D R I G H T O F W A Y S 32' F-F 32' F-F 19 ' 10 ' 8" DIP EX 6 " D I P DAKOTA COUNTY ROW S S EXISTING WATERMAIN PROPOSED WATERMAIN EXISTING SANITARY SEWER EXISTING SANITARY MANHOLE RECONSTRUCT SANITARY MANHOLE PROPOSED CURB AND GUTTER EXISTING STORM SEWER PIPE EXISTING STORM STRUCTURE PROPOSED STORM SEWER PIPE PROPOSED DRAINAGE STRUCTURE ST BITUMINOUS ROAD / DRIVEWAY CONCRETE DRIVEWAY / SIDEWALK GRAVEL DRIVE LEGEND EXISTING CONIFEROUS TREE EXISTING DECIDUOUS TREE PROPOSED SANITARY SEWER C: \ A C C \ A C C D o c s \ W S B \ 0 3 1 0 7 1 - 0 0 0 \ P r o j e c t F i l e s \ 0 5 _ D i s c i p l i n e \ R o a d w a y \ E x h i b i t s \ 0 3 1 0 7 1 - 0 0 0 - C P - F I G R - B A S E . d w g 2/ 6 / 2 0 2 6 1 1 : 4 4 : 1 7 A M EXHIBIT 7 WSB PROJECT NO.: 031071-000 2026 STREET IMPROVEMENT PROJECT FARMINGTON, MINNESOTA WA L N U T S T R E E T PROPOSED IMPROVEMENTS MA T C H L I N E S E E E X H I B I T 5 SCALE IN FEET 0 H: 50 100 N SP R U C E S T R E E T FEBRUARY 05, 2026 Pa g e 2 2 6 o f 2 7 6 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Appendix Appendix C Preliminary Cost Estimate Page 227 of 276 WSB Project:2026 Street Improvement Project Design By:KAK Project Location:Farmington, MN Checked By:ME City Project No.:25-01 WSB Project No:031071-000 Date:2/6/2026 ITEM NO. MNDOT SPECIFICATION NO. DESCRIPTION UNIT ESTIMATED TOTAL QUANTITY ESTIMATED UNIT PRICE ESTIMATED TOTAL COST 1 2021.501 MOBILIZATION L S 1 $84,160.00 $84,160.00 2 2101.502 CLEARING EACH 30 $450.00 $13,500.00 3 2101.502 GRUBBING EACH 30 $150.00 $4,500.00 4 2104.502 REMOVE SIGN EACH 20 $100.00 $2,000.00 5 2104.502 SALVAGE MAIL BOX SUPPORT EACH 51 $35.00 $1,785.00 6 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH)L F 400 $6.00 $2,400.00 7 2104.503 SAWING BIT PAVEMENT (FULL DEPTH)L F 1000 $4.00 $4,000.00 8 2104.503 REMOVE CURB AND GUTTER L F 5300 $3.50 $18,550.00 9 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT S Y 600 $8.00 $4,800.00 10 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT S Y 400 $5.00 $2,000.00 11 2104.504 REMOVE BITUMINOUS PAVEMENT S Y 10000 $2.00 $20,000.00 12 2104.518 REMOVE CONCRETE WALK S F 1400 $6.00 $8,400.00 13 2104.601 SALVAGE AND REINSTALL LANDSCAPE STRUCTURES L S 1 $5,000.00 $5,000.00 14 2106.507 EXCAVATION - COMMON (P)C Y 4600 $28.00 $128,800.00 15 2106.507 EXCAVATION - SUBGRADE (P)C Y 3800 $28.00 $106,400.00 16 2106.507 SELECT GRANULAR EMBANKMENT (CV) (P)C Y 3800 $32.00 $121,600.00 17 2112.601 SUBGRADE PREPARATION ROAD STA 27 $200.00 $5,400.00 18 2123.610 STREET SWEEPER (WITH PICKUP BROOM)HOUR 100 $180.00 $18,000.00 19 2123.610 1.5 CU YD BACK HOE HOUR 40 $750.00 $30,000.00 20 2211.507 AGGREGATE BASE (CV) CLASS 5 (P)C Y 2400 $38.00 $91,200.00 21 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GALLON 510 $3.50 $1,785.00 22 2360.504 TYPE SP 9.5 WEAR CRS MIX (2,C) 3.0" THICK S Y 300 $45.00 $13,500.00 23 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (3,C)TON 900 $90.00 $81,000.00 24 2360.509 TYPE SP 12.5 WEARING COURSE MIXTURE (3,C)TON 1500 $85.00 $127,500.00 25 2411.601 PRECONDITION SURVEY L S 1 $15,000.00 $15,000.00 26 2502.503 4" PERF PVC PIPE DRAIN L F 400 $16.00 $6,400.00 27 2502.602 4" PVC PIPE DRAIN CLEANOUT EACH 16 $350.00 $5,600.00 28 2504.601 IRRIGATION SYSTEM REPAIR L S 1 $5,000.00 $5,000.00 29 2505.601 UTILITY COORDINATION L S 1 $2,500.00 $2,500.00 30 2521.518 4" CONCRETE WALK S F 200 $8.00 $1,600.00 31 2521.518 6" CONCRETE WALK S F 800 $12.00 $9,600.00 32 2531.503 CONCRETE CURB AND GUTTER DESIGN B618 L F 5300 $24.00 $127,200.00 33 2531.504 6" CONCRETE DRIVEWAY PAVEMENT S Y 700 $85.00 $59,500.00 34 2531.504 8" CONCRETE DRIVEWAY PAVEMENT S Y 100 $100.00 $10,000.00 35 2531.504 7" CONCRETE VALLEY GUTTER S Y 40 $120.00 $4,800.00 36 2531.618 TRUNCATED DOMES S F 90 $65.00 $5,850.00 37 2540.602 INSTALL MAIL BOX SUPPORT EACH 51 $185.00 $9,435.00 38 2540.602 TEMPORARY MAIL BOX EACH 51 $250.00 $12,750.00 39 2563.601 TRAFFIC CONTROL L S 1 $25,000.00 $25,000.00 40 2564.618 SIGN PANELS TYPE C S F 90 $65.00 $5,850.00 41 2564.618 SIGN PANELS TYPE SPECIAL S F 40 $65.00 $2,600.00 42 2573.502 STORM DRAIN INLET PROTECTION EACH 30 $250.00 $7,500.00 43 2573.503 SILT FENCE, TYPE MS L F 1000 $2.75 $2,750.00 44 2573.503 SEDIMENT CONTROL LOG TYPE STRAW L F 1000 $3.50 $3,500.00 45 2573.601 STABILIZED CONSTRUCTION EXIT L S 1 $5,000.00 $5,000.00 46 2574.507 BOULEVARD TOPSOIL BORROW C Y 1200 $42.00 $50,400.00 47 2575.523 WATER M GALLONS 100 $60.00 $6,000.00 48 2575.523 RAPID STABILIZATION METHOD 3 M GALLONS 10 $1,500.00 $15,000.00 49 2575.604 SODDING, TYPE LAWN S Y 6670 $12.00 $80,040.00 50 2582.518 CROSSWALK MULTI COMP S F 220 $8.00 $1,760.00 CONSTRUCTION TOTAL $1,376,915.00 CONTINGENCY TOTAL (10%)$137,691.50 SUBTOTAL $1,514,606.50 INDIRECT COST TOTAL (18%)$272,629.17 TOTAL $1,787,235.67 OPINION OF PROBABLE COST SCHEDULE A - STREET IMPROVEMENTS Page 228 of 276 WSB Project:2026 Street Improvement Project Design By:KAK Project Location:Farmington, MN Checked By:ME City Project No.:25-01 WSB Project No:031071-000 Date:2/6/2026 ITEM NO. MNDOT SPECIFICATION NO. DESCRIPTION UNIT ESTIMATED TOTAL QUANTITY ESTIMATED UNIT PRICE ESTIMATED TOTAL COST 51 2104.502 REMOVE SEWER PIPE (SANITARY)L F 280 $10.00 $2,800.00 52 2503.601 TEMPORARY BYPASS PUMPING L S 1 $1,500.00 $1,500.00 53 2503.602 CONNECT TO EXISTING MANHOLES (SAN)EACH 2 $2,000.00 $4,000.00 54 2503.602 8"X6" PVC WYE EACH 7 $500.00 $3,500.00 55 2503.602 CONNECT TO EXISTING SANITARY SEWER SER EACH 7 $500.00 $3,500.00 56 2503.603 8" PVC PIPE SEWER SDR 35 L F 280 $65.00 $18,200.00 57 2506.602 RECONSTRUCT MANHOLE (SANITARY)EACH 9 $2,500.00 $22,500.00 CONSTRUCTION TOTAL $56,000.00 CONTINGENCY TOTAL (10%)$5,600.00 SUBTOTAL $61,600.00 INDIRECT COST TOTAL (18%)$11,088.00 TOTAL $72,688.00 OPINION OF PROBABLE COST SCHEDULE B - SANITARY SEWER IMPROVEMENTS Page 229 of 276 WSB Project:2026 Street Improvement Project Design By:KAK Project Location:Farmington, MN Checked By:ME City Project No.:25-01 WSB Project No:031071-000 Date:2/6/2026 ITEM NO. MNDOT SPECIFICATION NO. DESCRIPTION UNIT ESTIMATED TOTAL QUANTITY ESTIMATED UNIT PRICE ESTIMATED TOTAL COST 58 2104.502 REMOVE GATE VALVE & BOX EACH 4 $350.00 $1,400.00 59 2104.502 REMOVE HYDRANT EACH 6 $1,500.00 $9,000.00 60 2104.503 REMOVE WATER MAIN L F 2400 $10.00 $24,000.00 61 2104.509 REMOVE WATER SERVICE AND CURB BOX EACH 51 $250.00 $12,750.00 62 2104.602 REMOVE SANITARY SERVICE PIPE EACH 10 $500.00 $5,000.00 63 2503.602 RECONNECT SANITARY SERVICE PIPE EACH 20 $500.00 $10,000.00 64 2503.603 4" PVC SANITARY SERVICE PIPE L F 200 $68.00 $13,600.00 65 2503.603 6" PVC SANITARY SERVICE PIPE L F 200 $72.00 $14,400.00 66 2504.601 TEMPORARY WATER SERVICE L S 1 $25,000.00 $25,000.00 67 2504.602 CONNECT TO EXISTING WATER MAIN EACH 7 $2,500.00 $17,500.00 68 2504.602 CONNECT TO EXISTING WATER SERVICE EACH 51 $350.00 $17,850.00 69 2504.602 HYDRANT EACH 7 $7,500.00 $52,500.00 70 2504.602 1" CORPORATION STOP EACH 51 $500.00 $25,500.00 71 2504.602 6" GATE VALVE AND BOX EACH 7 $3,500.00 $24,500.00 72 2504.602 8" GATE VALVE AND BOX EACH 12 $4,000.00 $48,000.00 73 2504.602 10" GATE VALVE AND BOX EACH 1 $7,500.00 $7,500.00 74 2504.602 1" CURB STOP AND BOX EACH 51 $650.00 $33,150.00 75 2504.603 1" TYPE K COPPER PIPE L F 2040 $52.00 $106,080.00 76 2504.603 6" WATER MAIN-DUCT IRON CL 52 L F 100 $72.00 $7,200.00 77 2504.603 8" WATER MAIN-DUCT IRON CL 52 L F 2800 $78.00 $218,400.00 78 2504.603 10" WATER MAIN-DUCT IRON CL 52 L F 40 $92.00 $3,680.00 79 2504.604 4" POLYSTYRENE INSULATION S Y 200 $65.00 $13,000.00 80 2504.608 DUCTILE IRON FITTINGS POUND 3000 $12.00 $36,000.00 CONSTRUCTION TOTAL $726,010.00 CONTINGENCY TOTAL (10%)$72,601.00 SUBTOTAL $798,611.00 INDIRECT COST TOTAL (18%)$143,749.98 TOTAL $942,360.98 OPINION OF PROBABLE COST SCHEDULE C - WATERMAIN IMPROVEMENTS Page 230 of 276 WSB Project:2026 Street Improvement Project Design By:KAK Project Location:Farmington, MN Checked By:ME City Project No.:25-01 WSB Project No:031071-000 Date:2/6/2026 ITEM NO. MNDOT SPECIFICATION NO. DESCRIPTION UNIT ESTIMATED TOTAL QUANTITY ESTIMATED UNIT PRICE ESTIMATED TOTAL COST 81 2104.502 REMOVE DRAINAGE STRUCTURE EACH 8 $500.00 $4,000.00 82 2104.502 REMOVE SEWER PIPE (STORM)L F 300 $10.00 $3,000.00 82 2503.503 12" RC PIPE SEWER DESIGN 3006 CLASS V L F 1600 $80.00 $128,000.00 83 2503.503 15" RC PIPE SEWER DESIGN 3006 CLASS V L F 800 $85.00 $68,000.00 83 2503.503 48" RC PIPE SEWER DESIGN 3006 CLASS III L F 50 $200.00 $10,000.00 84 2503.502 CONNECT INTO EXISTING DRAINAGE STRUCTURE EACH 2 $2,000.00 $4,000.00 85 2503.502 CONNECT TO EXISTING STORM SEWER EACH 2 $2,000.00 $4,000.00 86 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL (2'X3')EACH 10 $2,500.00 $25,000.00 87 2506.502 CASTING ASSEMBLY EACH 13 $1,200.00 $15,600.00 88 2506.502 CHIMNEY SEALS EACH 24 $350.00 $8,400.00 89 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 L F 60 $650.00 $39,000.00 90 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 96-4020 L F 10 $2,000.00 $20,000.00 91 2506.602 ADJUST FRAME AND RING CASTING (STORM)EACH 1 $750.00 $750.00 CONSTRUCTION TOTAL $329,750.00 CONTINGENCY TOTAL (10%)$32,975.00 SUBTOTAL $362,725.00 INDIRECT COST TOTAL (18%)$65,290.50 TOTAL $428,015.50 OPINION OF PROBABLE COST SCHEDULE D - STORM SEWER IMPROVEMENTS Page 231 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Appendix Appendix D Geotechnical Report Page 232 of 276 GEOTECHNICAL REPORT 2026 2ND STREET IMPROVEMENT PROJECT FARMINGTON, MINNESOTA September 25, 2025 Prepared for: City of Farmington 430 3rd Street Farmington, MN 55024 WSB PROJECT NO. 031071-000 Page 233 of 276 GEOTECHNICAL REPORT Geotechnical Report 2026 2nd Street Improvement Project Farmington, MN WSB Project No. 031071-000 2026 2ND STREET IMPROVEMENT PROJECT FOR CITY OF FARMINGTON September 25, 2025 Page 234 of 276 GEOTECHNICAL REPORT Geotechnical Report 2026 2nd Street Improvement Project Farmington, MN WSB Project No. 031071-000 CERTIFICATION I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Mark W. Osborn, PE Date: September 25, 2025 Lic. No. 41362 Page 235 of 276 54 0 G A T E W A Y B L V D | BU R N S V I L L E , M N | 55 3 3 7 | 95 2 . 7 3 7 . 4 6 6 0 | WS B E N G . C O M September 25, 2025 John Powell, PE Public Works Director/City Engineer City of Farmington 430 Third Street Farmington, MN 55024 Re: Geotechnical Report 2026 2nd Street Improvement Project WSB Project No.: 031071-000 We have conducted a geotechnical subsurface exploration program for the above-mentioned project. This report contains our soil boring logs, an evaluation of the conditions encountered in the borings and our recommendations for dewatering, subgrade improvements, underground utilities, pavement design, and other geotechnical related design and construction considerations. If you have questions concerning this report or our recommendations, or regarding construction material testing for this project, please call us at 952.737.4660. Sincerely, WSB Mark Osborn, PE Alex Wacek, EIT Senior Geotechnical Engineer Geotechnical Engineering Specialist Attachment: Geotechnical Report MWO/ams Page 236 of 276 TABLE OF CONTENTS Geotechnical Report 2026 2nd Street Improvement Project Farmington, MN WSB Project No. 031071-000 TITLE SHEET CERTIFICATION SHEET LETTER OF TRANSMITTAL TABLE OF CONTENTS 1. INTRODUCTION ................................................................................................................................... 1 Project Location ......................................................................................................................... 1 Project Description .................................................................................................................... 1 Purpose and Project Scope of Services .................................................................................... 1 2. PROCEDURES ..................................................................................................................................... 2 2.1 Boring Layout and Soil Sampling Procedures ........................................................................... 2 2.2 Groundwater Measurements and Borehole Abandonment ....................................................... 2 2.3 Boring Log Procedures and Qualifications ................................................................................ 2 3. EXPLORATION RESULTS .................................................................................................................. 3 3.1 Site and Geology ....................................................................................................................... 3 3.2 Subsurface Soil and Groundwater Conditions .......................................................................... 3 3.3 Strength Characteristics ............................................................................................................ 3 3.4 Groundwater Conditions ............................................................................................................ 4 4. ENGINEERING ANALYSIS AND RECOMMENDATIONS .................................................................. 5 4.1 Discussion ................................................................................................................................. 5 4.2 Backfill and Fill Selection and Compaction ............................................................................... 5 4.3 Pavement Subgrade Preparation and Stability ......................................................................... 6 4.4 Pavement Area .......................................................................................................................... 6 4.5 Corrosion Potential .................................................................................................................... 7 4.6 Utilities ....................................................................................................................................... 8 4.7 Dewatering................................................................................................................................. 8 4.8 Construction Considerations ..................................................................................................... 8 4.9 Construction Safety ................................................................................................................... 8 4.10 Cold Weather Construction ....................................................................................................... 9 4.11 Field Observation and Testing................................................................................................... 9 4.12 Plan Review and Remarks ........................................................................................................ 9 5. STANDARD OF CARE ....................................................................................................................... 11 Appendix A Soil Boring Exhibit Logs of Test Borings Symbols and Terminology on Test Boring Log Notice to Report Users Boring Log Information Unified Soil Classification System (USCS) Page 237 of 276 Geotechnical Report 2026 2nd Street Improvement Project Farmington, MN WSB Project No. 031071-000 Page 1 1. INTRODUCTION Project Location The site is located along 2nd Street, from Spruce Street to 220th Street West in Farmington, Minnesota. The approximate soil boring locations can be found on the Soil Boring Exhibit in Appendix A. Project Description It is proposed to reconstruct the existing roadway and improve the existing watermain with a limited storm sewer. Sanitary sewer needs will be determined based on televising by the City, though this is expected to be minimal. We understand that the vertical and horizontal alignment of the roadway will remain similar to existing conditions. WSB has developed recommendations for this project in consideration of the proposed layout and configurations as understood at this time. When the designer develops additional information about final design or other significant factors, the recommendations presented herein may no longer apply. WSB should be made aware of the revised or additional information in order to evaluate the recommendations for continued applicability. Purpose and Project Scope of Services The City of Farmington authorized this scope of service. In order to assist the design team in preparing plans and specifications, we have developed recommendations for designing utilities and pavements. As such, we have completed a subsurface exploration program and prepared a geotechnical report for the referenced site. This stated purpose was a significant factor in determining the scope and level of service provided. Should the purpose of the report change the report immediately ceases to be valid and use of it without WSB’s prior review and written authorization should be at the user’s sole risk. Our authorized scope of work has been limited to: 1. Clearing underground utilities utilizing Gopher State One Call. 2. Mobilization / demobilization of a truck mounted drill rig. 3. Drilling 6 standard penetration borings to depths of about 20-feet. 4. Sealing the borings per Minnesota Department of Health procedures. 5. Perform soil classification and analysis. 6. Review of available project information and geologic data. 7. Providing this geotechnical report containing: a. Summary of our findings. b. Discussion of subsurface soil and groundwater conditions and how they may affect the proposed utilities and pavements. c. Estimated R-value of the soils. d. Recommended pavement section. e. A discussion of soils for use as structural fill and site fill. Page 238 of 276 Geotechnical Report 2026 2nd Street Improvement Project Farmington, MN WSB Project No. 031071-000 Page 2 2. PROCEDURES 2.1 Boring Layout and Soil Sampling Procedures WSB completed 6 standard penetration soil borings at the project site. WSB recommended the boring depths and selected the desired locations. Our field crew staked the borings using the supplied site plan. approximate boring locations are shown on the Soil Boring Exhibit in Appendix A which is an aerial photo. The ground surface elevations at the borings were estimated by using LIDAR data with 2-foot contours. These maps should be accurate to within +/- one foot (1’) provided ground surface modifications at this site have not been completed since LIDAR data was obtained. We completed the borings between August 19 and 29, 2025, with a truck-mounted CME-55 drill rig operated by a two-person crew. The drill crew advanced the borings using continuous hollow stem augers. The drilling information is provided on the boring logs. The drill crew sampled the soil in advance of the auger tip at two and one-half (2 ½) foot intervals to a depth of 15 feet and then at five (5) foot intervals thereafter to the termination depth of the boring. The soil samples were obtained using a split-barrel sampler which was driven into the ground during standard penetration tests in accordance with ASTM D 1586, Standard Method of Penetration Test and Split-Barrel Sampling of Soils. The materials encountered were described on field logs and representative samples were containerized and transported to our laboratory for further observation and testing. The samples were visually observed to estimate the distribution of grain sizes, plasticity, consistency, moisture condition, color, presence of lenses and seams, and apparent geologic origin. We classified the soils according to type using the Unified Soil Classification System (USCS). A chart describing the USCS is included in Appendix A. 2.2 Groundwater Measurements and Borehole Abandonment The drill crew observed the borings for free groundwater while drilling and after completion of the borings. These observations and measurements are noted on the boring logs. The crew then backfilled the borings to comply with Minnesota Department of Health regulations. 2.3 Boring Log Procedures and Qualifications The subsurface conditions encountered by the borings are illustrated on the Logs of Test Borings in Appendix A. Similar soils were grouped into the strata shown on the boring logs, and the appropriate estimated USCS classification symbols were also added. The depths and thickness of the subsurface strata indicated on the boring logs were estimated from the drilling results. The transition between materials (horizontal and vertical) is approximate and is usually far more gradual than shown. Information on actual subsurface conditions exists only at the specific locations indicated and is relevant only to the time the exploration was performed. Subsurface conditions and groundwater levels at other locations may differ from conditions found at the indicated locations. The nature and extent of these conditions would not become evident until exposed by construction excavation. These stratification lines were used for our analytical purposes and due to the aforementioned limitations, should not be used as a basis of design or construction cost estimates. Page 239 of 276 Geotechnical Report 2026 2nd Street Improvement Project Farmington, MN WSB Project No. 031071-000 Page 3 3. EXPLORATION RESULTS 3.1 Site and Geology The borings were taken directly along 2nd Street. Boring elevations ranged from 906.0 to 910.0 feet. Geologic origins can be difficult to determine solely from boring samples. We referenced online geologic data of the area and used our experience to help determine geologic origin of the soils, however only a detailed geologic exploration would accurately determine the geologic history of the site. The Dakota County Geologic Atlas indicates the surficial geology of the area is mostly glacial deposits, consisting of fine to coarse grained sands. 3.2 Subsurface Soil and Groundwater Conditions The boring profile generally consisted of a pavement section overlying fill, followed by glacial deposits. Pavement Section The pavement section encountered in the borings generally consisted of 2 – 4 inches of bituminous overlying 3 – 12 inches of aggregate base. The aggregate base was classified as Sand with Gravel. Fills The fills encountered in the borings generally consisted of a mixture of clayey sands, sands, and lean clays that were 4 – 6 feet in thickness where encountered. Glacial The glacial deposits encountered in the borings consisted of sands and clayey sands. The sands were light brown and brown in color and were moist to waterbearing. The clayey sands were brown in color and were moist. Boring Profiles Table 1 below presents the existing roadway pavement section and subgrade profiles. Table 1: Existing Profiles Boring No. Bituminous Thickness (inches) Aggregate Base Thickness (inches) Subgrade Soils (Upper 4 feet) B-1 3 3 Sandy Lean Clay (fill) B-2 2.5 11 Clayey Sand (fill) B-3 2 8 Clayey Sand (fill) B-4 3 7 Clayey Sand (SC), Sand (SP) B-5 3 9 Clayey Sand (fill), Sand (fill) B-6 4 12 Clayey Sand (fill) 3.3 Strength Characteristics The penetration resistance N-values of the materials encountered were recorded during drilling and are indicated as blows per foot (BPF). Those values provide an indication of soil strength characteristics and are located on the boring log sheets. Also, visual-manual classification techniques and apparent moisture contents were also utilized to make an engineering judgment of the consistency of the materials. Page 240 of 276 Geotechnical Report 2026 2nd Street Improvement Project Farmington, MN WSB Project No. 031071-000 Page 4 Table 2 presents a summary of the penetration resistances (N-value which are indicated by Blows Per Foot BPF) in the soils for the borings completed and remarks regarding the material strengths of the soils. Table 2: Penetration Resistances Soil Type Classification Penetration Resistances Remarks Fill SP, SC, CL 5 – 13 BPF Poor to moderate compaction Glacial SP, SC 2 – 33 BPF Very loose to dense The preceding is a generalized description of soil conditions at this site. Variations from the generalized profile exist and should be assessed from the boring logs, the normal geologic character of the deposits, and the soils uncovered during site excavation. 3.4 Groundwater Conditions WSB took groundwater level readings in the exploratory borings, reviewed the data obtained, and discussed its interpretation of the data in the text of the report. Note that groundwater levels may fluctuate due to seasonal variations (e.g., precipitation, snowmelt, and rainfall) and/or other factors not evident at the time of measurement. Table 3 below is a summary of the estimated water levels at our borings. Table 3: Groundwater Measurements Boring No. Ground Surface Elevation Estimated Depth to Groundwater Estimated Groundwater Elevation B-1 906 8 898 B-2 906 9.5 896.5 B-3 906 10 896 B-4 907 10 897 B-5 909 9.5 899.5 B-6 910 10 900 n/a – indicates ground water was not encountered. Elevations are rounded to the highest ½ foot. Gray colored soils were not encountered. Gray colored soils can be an indication of long-term saturation conditions and could show potential groundwater elevations. The shallow groundwater could present an issue to excavations, subgrade placement, and for utility installation. It is our opinion that wet soils, waterbearing sand lenses, and perched groundwater could be encountered at this site and could affect construction of subgrade elements and utilities. The Vermillion River is located approximately ⅓ mile to the northwest of the project. According to online data from the Minnesota Department of Natural Resources, the Vermillion River has an ordinary high- water level of 896 feet. The bore holes were only left open for a short period of time, and groundwater levels may not have stabilized. Page 241 of 276 Geotechnical Report 2026 2nd Street Improvement Project Farmington, MN WSB Project No. 031071-000 Page 5 4. ENGINEERING ANALYSIS AND RECOMMENDATIONS 4.1 Discussion Organic soils and vegetated root zones are not suitable for structural support and should be removed from the construction area if encountered. We were informed that as-built drawings of the roadway indicated a concrete section below the bituminous pavement, however our borings did not encounter any concrete within the pavement area. No information was provided to us regarding density tests or excavation observations for the existing fills encountered at the boring locations. Generally, fills that are not documented are recommended for removal and replacement with an engineered fill. Construction on existing fills has a higher risk of differential settlement. The best option would be complete removal of the existing fill materials, and replacement with engineered fill. Our borings did not encounter deleterious materials within or beneath the fill. If the owner is willing to accept a higher risk of total and differential settlement and potentially higher maintenance costs, an alternate option would be a partial subcut of the soils. Surficial compaction of the exposed existing fills and observations and testing during construction would lessen the risks. Based on the results of our borings, the glacially deposited soils generally appear capable of supporting the roadway and utilities. General It is our opinion that groundwater could be encountered by excavations at this site and could affect construction of subgrade elements and utilities. It is possible that groundwater levels could rise above the planned utility elevations. Consideration should be given to adjusting the elevation of the proposed utilities to account for fluctuations in groundwater elevation. Generally, the soils in the upper 4 feet of the subgrade influence pavement performance the most. The soils within the pavement subgrade consist of clayey soils, which are frost susceptible soils. Consideration should be given to partially subcutting these soils and replacing them with a non-frost susceptible granular fill to reduce the potential frost heave below the pavement section. 4.2 Backfill and Fill Selection and Compaction The on-site non-organic soils may be reused as backfill and fill provided they are moisture conditioned and can be compacted to their specified densities. Wet soils that are excavated would need to be dried before being reused as an engineered fill. We recommend using a minimum of 2 feet of clean coarse sand with less than 50 percent passing the #40 sieve and less than 5 percent passing the #200 sieve when backfilling the bottom of a wet excavation. Gravel or cobbles larger than 2 inches in diameter should not be placed within 2 feet of grading grade or utilities. We recommend that clayey soils be moisture conditioned to within +/-2 percent of the optimum moisture content as determined from their standard Proctor tests (ASTM D-698). Granular fills should be moisture conditioned to between -4% and +2% of the optimum moisture content. Fill should be spread in lifts of 6 inches, depending on the size and type of compaction equipment used. Page 242 of 276 Geotechnical Report 2026 2nd Street Improvement Project Farmington, MN WSB Project No. 031071-000 Page 6 Table 4 provides the recommended compaction levels. Table 4: Recommended Level of Compaction for Backfill and Fill Area Percent of Standard Proctor Maximum Dry Density Pavement: Within 3 feet of bottom of aggregate base 100 Pavement: Greater than 3 feet below aggregate base 95 Utility Trench and Utility Structure Backfill 100 Landscaping (non-structural) 90 4.3 Pavement Subgrade Preparation and Stability We recommend excavation of organics below the pavement areas. The soils at the bottom of the excavation should be prepared in accordance with MnDOT Specification 2112, Subgrade Preparation. Before placement of the sand subbase, the final subgrade should have proper stability within three vertical feet of grading grade (grade which contacts the bottom of the aggregate base). This will generally be achieved in fill areas with proper compaction of embankment materials and in cut areas through proper subgrade preparation. The stability of the pavement subgrade should be evaluated prior to placement of the sand subbase using the test roll procedure (MnDOT 2111), except a fully loaded tandem axle dump truck or a full water truck should be utilized for the test roll. If unstable soils are found under the test roll, these soils should be improved by means of scarification, moisture conditioning, and re-compaction, or by subcutting and replacement. 4.4 Pavement Area Once the site has been prepared as recommended, we anticipate the prepared subgrade soils will consist mostly of sandy lean clays and clayey sands. Based on the MnDOT Flexible Pavement Guide from 2020, the R-values of the subgrade soils would range between 10 and 20. We used a design R-value of 12 for the roadway. No historical traffic data from the MnDOT Traffic Mapping Application was available for 2nd Street to determine the estimated Equivalent Single Axle Loads (ESAL’s) for roadway design, so a nearby street (3rd Street) was used. ESAL’s were estimated to be approximately 184,000. Our design is based on a standard twenty (20) year design life of the urban pavement section and a 10-ton road design. Based on MnDOT’s FlexPave excel design utilizing granular equivalent charts, we recommend the granular equivalent be a minimum of 15.78. Our recommended pavement section is indicated below in Table 5. Table 5: Recommended Flexible Pavement Section Section Thickness (inches) Granular Equivalent Bituminous Course, MnDOT 2360 SPWEA340C 2 4.5 Bituminous Course, MnDOT 2360 SPWEA340C 2 4.5 Aggregate Base, MnDOT 3138 (Class 5) 12 12 Subgrade Preparation, MnDOT 2112 Yes - TOTAL - 21 Page 243 of 276 Geotechnical Report 2026 2nd Street Improvement Project Farmington, MN WSB Project No. 031071-000 Page 7 Alternatively, if the clayey soils are removed from the upper 4-feet of the roadway and replaced with a clean sand (less than 5% fines), the R-value of the subgrade soils would increase to 70. Using a design R-value of 70 for the roadway, we recommend the granular equivalent would be a minimum of 10.19. Our recommended pavement section is indicated below in Table 6. Table 6: Recommended Flexible Pavement Section Section Thickness (inches) Granular Equivalent Bituminous Course, MnDOT 2360 SPWEA340C 2 4.5 Bituminous Course, MnDOT 2360 SPWEA340C 2 4.5 Aggregate Base, MnDOT 3138 (Class 5) 8 8 Subgrade Preparation, MnDOT 2112 Yes - TOTAL - 17 Aggregate base placement for pavement support should meet the gradation and quality requirements for Class 5 per MnDOT specification 3138. Aggregate base material should be compacted to 100 percent of its standard Proctor maximum dry density. Within several years after the initial paving, some thermal shrinkage cracks will develop. We recommend routine maintenance be performed to improve pavement performance and increase pavement life. Pavement should be sealed with a liquid bitumen sealer to retard water intrusion into the base course and subgrade. Localized failures may also develop where trucks or buses turn on the pavement. When these occur, they should be cut out and repaired with a full depth patch. The pavement sections above provide options to meet the ESAL requirements. Other pavement design options would be acceptable as well as long as they meet the minimum requirements for bituminous thickness, aggregate base thickness, and can meet the ESAL requirements. 4.5 Corrosion Potential Laboratory tests for corrosivity are presented in the table below. Table 7: Corrosion Tests Boring No. Sample Depth (feet) Resistivity* (Ohm-cm) Resistivity** (Ohm-cm) pH* pH** B-1 15 5,760 5,760 7.9 7.78 B-3 8 11,100 6,730 8.11 7.98 B-6 13 8,770 8,610 8.02 7.97 * Tested at received moisture content ** Tested at saturated moisture content Based on the above test results the soils would be considered mildly corrosive to non-corrosive to steel. Page 244 of 276 Geotechnical Report 2026 2nd Street Improvement Project Farmington, MN WSB Project No. 031071-000 Page 8 Soil Corrosivity charts from the NCHRP, 1978, are listed below: The above results for pH were within permissible levels of 5 to 9 as per the FHWA. 4.6 Utilities Invert elevations for the storm utilities are anticipated to be within 5 feet of existing grades, and invert elevations for the watermain and sanitary sewer (if applicable) are anticipated to be between 8 and 12 feet below grade. Based on the borings, the subgrade soils for the utilities will consist chiefly of sands. Underground utilities are expected to be installed by backhoes completing the excavations and placing fills. Soil compactors should be used to compact the backfilled material in even lifts to the specified densities. The borings encountered clayey soils, which are generally considered somewhat corrosive to metallic pipes. Where such soils exist along the utility alignment, we recommend mitigation measures to help reduce corrosion potential. A common option would be to utilize a granular bedding around the pipe. Another option would be for polyethylene encasement for the metal pipes in highly corrosive soils. Trench backfill above this point may consist of the non-organic excavated soils once moisture conditioned as recommended. 4.7 Dewatering Wet and saturated soils were encountered in the borings at shallow excavations. Groundwater could enter the excavations. Dewatering can likely be accomplished with sumps and pumps placed at low points in the utility trenches. 4.8 Construction Considerations Good surface drainage should be maintained throughout the work so that the site is not vulnerable to ponding during or after a rainfall. If water enters the excavations, it should be promptly removed prior to further construction activities. Under no circumstances should fill or concrete be placed into standing water. Soil corrections at this site for pavement subgrades may not be continuous. We recommend tapering the fills back to native soils at a ten to one (10H:1V) slope. It is important to review the fill limits and total depth of fill when placing utilities upon compacted materials and when filling the excavation. The location of the excavation should allow for at least a one to one (1:1) slope from the bottom of the excavation to the outside limits of the engineered fill. It is important to check this at the time of construction that during filling, unsuitable soils do not encroach within the one to one (1:1) slope limits and extend downward and outward from future roadway or utility expansions. 4.9 Construction Safety All excavations should comply with the requirements of OSHA 29 CFR, Part 1926, Subpart P “Excavations and Trenches”. This document states that excavation safety is the responsibility of the contractor. Reference to this OSHA requirement should be included in the job specifications. Page 245 of 276 Geotechnical Report 2026 2nd Street Improvement Project Farmington, MN WSB Project No. 031071-000 Page 9 The responsibility to provide safe working conditions on this site, for earthwork, building construction, or any associated operations is solely that of the contractor. This responsibility is not borne in any manner by WSB. 4.10 Cold Weather Construction It is our understanding that construction is unlikely to occur during the winter months. However, if the construction does continue into the winter months we recommend the following guidelines. Roadbeds should not be constructed during periods when the material freezes while being placed and compacted, nor should material be placed on soil that is frozen to a depth greater than 4 inches. When the soils are frozen to a depth exceeding 4 inches, at a time when weather conditions are such that construction could be continued without the material freezing as it is being placed and compacted, the contractor may be permitted to excavate the frozen soil and proceed with the construction for so long as the weather permits. The frozen soils should be replaced with other suitable soils. Only unfrozen material should be used. Placement of fill should not be permitted on frozen soil because excessive post-construction settlement could occur as the frozen soils thaw. 4.11 Field Observation and Testing The soil conditions illustrated on the Logs of Test Borings in Appendix A are indicative of the conditions only at the boring locations. For this reason, we recommend that excavations at this site be observed by a soil engineer or technician prior to fill or backfill placement or construction of subgrade elements to determine if the soils are capable of supporting the backfilled material. These observations are recommended to judge if the unsuitable materials have been removed from within the planned construction area and an appropriate degree of lateral oversize has been provided. WSB also recommends a representative number of field density tests be taken in engineered fill and backfill placed to aid in judging its suitability. Fill placement and compaction should be monitored and evaluated to determine that the resulting fill and backfill conforms to specified density, strength, or compressibility requirements. We recommend at least one compaction test for every 150 feet of utility trench at a vertical interval of two (2) feet. Prior to use, proposed fill and backfill material should be submitted to the WSB laboratory for testing to verify compliance with recommendations and project specifications. Dynamic Cone Penetrometer (DCP) tests can be completed on the aggregate base in lieu of density testing. We recommend following MnDOT Specification 2211.3.D.2.c. WSB would be pleased to provide the advised field observation, monitoring, and testing services during construction. 4.12 Plan Review and Remarks The observations, recommendations and conclusions described in this report are based primarily on information provided to WSB, obtained from our subsurface exploration, our experience, several assumptions, and the scopes of service developed for this project and are for the sole use of our client. We recommend that WSB be retained to perform a review of final design drawing and specifications to evaluate that the geotechnical engineering report has not been misinterpreted. Should there be changes in the design or location of the structures related to this project or if there are uncertainties in the report we should be notified. We would be pleased to review project changes and modify the recommendations in this report or provide clarification in writing. The entire report should be kept together; for example, boring logs should not be removed and placed in the specifications separately. Page 246 of 276 Geotechnical Report 2026 2nd Street Improvement Project Farmington, MN WSB Project No. 031071-000 Page 10 The boring logs and related information included in this report are indicators of the subsurface conditions only at the specific locations indicated on the Soil Boring Exhibit and times noted on the Logs of Test Boring sheets in Appendix A. The subsurface conditions, including groundwater levels, at other locations on the site may differ significantly from conditions that existed at the time of sampling and at the boring locations. The test borings were completed by WSB solely to obtain indications of subsurface conditions as part of a geotechnical exploration program. No services were performed to evaluate subsurface environmental conditions. WSB has not performed observations, investigations, explorations, studies or testing that are not specifically listed in the scope of service. WSB should not be liable for failing to discover any condition whose discovery required the performance of services not authorized by the Agreement. Page 247 of 276 Geotechnical Report 2026 2nd Street Improvement Project Farmington, MN WSB Project No. 031071-000 Page 11 5. STANDARD OF CARE The recommendations and opinions contained in this report are based on our professional judgment. The soil testing and geotechnical engineering services performed for this project have been performed with the level of skill and diligence ordinarily exercised by reputable members of the same profession under similar circumstances, at the same time and in the same or a similar locale. No warranty, either expressed or implied, is made. Page 248 of 276 Geotechnical Report Appendix A 2026 2nd Street Improvement Project Farmington, MN WSB Project No. 031071-000 APPENDIX A Soil Borings Exhibit Logs of Test Borings Symbols and Terminology on Test Boring Log Notice to Report Users Boring Log Information Unified Soil Classification Sheet (USCS) Page 249 of 276 1st St Walnut St 1st St Locust St Division St 1st St HoneysuckleLn Walnut St 3rd St 3rd St 4th St Maple St 2nd St 3rd St 4th St Hickory St W 2nd St Hickory St Beech St ! ! ! ! ! ! B-1 B-2 B-3 B-4 B-5 B-6 Do c u m e n t P a t h : M : \ 0 3 1 0 7 1 - 0 0 0 \ G E O \ F a r m i n g t o n 2 n d S t - 0 3 1 0 7 1 \ G e o t e c h S o i l B o r i n g E x h i b i t D a t e S a v e d : 9 / 5 / 2 0 2 5 ¯ 1 inch = 250 feet 0 250 Feet2nd Street Improvement Project Farmington, MN Soil Boring Exhibit !Soil Boring Page 250 of 276 3.25" HSA 0' - 19.5' 1 2 3 4 5 6 7 8 AU SB HSA SB HSA SB HSA SB HSA SB HSA SB HSA SB Pavement Section Fill Glacial Outwash 5 13 20 10 9 33 8 Fill SP SP SP SP 16 4 60 3" BITUMINOUS 3" AGG: Sand with Gravel, brown, moist SANDY LEAN CLAY, dark brown and brown, moist SAND, fine to coarse grained, light brown, moist, medium dense SAND, fine to coarse grained, brown, waterbearing, loose SAND WITH GRAVEL, fine to coarse grained, brown, waterbearing, dense SAND, fine to coarse grained, brown, waterbearing, loose End of Boring 21.0 ft. N-Value Plot 18.50 37 TIME CASING DEPTH CAVE-IN DEPTH WATER DEPTH WATER ELEVATION WATER LEVEL MEASUREMENTS SAMPLED DEPTHDATE 19.5 8218:15 am 12:00 pm 8/19/2025 8/19/2025 START: 8/19/2025 END: 8/19/2025 Logged By: A. WacekO. KitakyaMETHOD Notes: Crew Chief: 9.8 8.0 896.2 898 PROJECT NAME: Farmington 2nd Street LOG OF TEST BORING PROJECT LOCATION: Farmington, MN BORING NUMBER B-1 PAGE 1 OF 1SURFACE ELEVATION: 906 ftCLIENT/WSB #: 031071-000 No.TYPE GEOLOGIC ORIGIN WL N Dr i l l i n g Op e r a t i o n USCSDEPTH (ft) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 SAMPLE MC % %F i n e s GE O T E C H N I C A L N - P L O T - W S B . G D T - 9 / 3 / 2 5 1 3 : 3 3 - M : \ 0 3 1 0 7 1 - 0 0 0 \ G E O \ F A R M I N G T O N 2 N D S T R E E T - B O R I N G L O G . G P J ELEV. (ft) 905 904 903 902 901 900 899 898 897 896 895 894 893 892 891 890 889 888 887 886 885 ELEV. (ft) 905 904 903 902 901 900 899 898 897 896 895 894 893 892 891 890 889 888 887 886 885 DESCRIPTION OF MATERIAL 5 13 20 10 9 33 8 Page 251 of 276 3.25" HSA 0' - 19.5' 1 2 3 4 5 6 7 8 AU SB HSA SB HSA SB HSA SB HSA SB HSA SB HSA SB Pavement Section Fill Glacial Outwash 10 4 9 8 9 25 4 Fill SP SP SP SP SP 12 2 8 36 2.5" BITUMINOUS 11" AGG: Sand with Gravel, dark brown, moist CLAYEY SAND, brown and gray , moist SAND, fine to medium grained, brown, moist, very loose SAND WITH GRAVEL, fine to coarse grained, brown, moist, loose SAND WITH GRAVEL, fine to coarse grained, brown, waterbearing, loose SAND WITH GRAVEL, fine to coarse grained, brown, waterbearing, medium dense SAND WITH GRAVEL, fine to coarse grained, brown, waterbearing, very loose End of Boring 21.0 ft. N-Value Plot 14.50 29 TIME CASING DEPTH CAVE-IN DEPTH WATER DEPTH WATER ELEVATION WATER LEVEL MEASUREMENTS SAMPLED DEPTHDATE 19.5 4.4211:25 pm 4:30 pm 8/20/2025 8/20/2025 START: 8/20/2025 END: 8/20/2025 Logged By: A. HaagO. KitakyaMETHOD Notes: Crew Chief: 9.5 15.0 896.5 891 PROJECT NAME: Farmington 2nd Street LOG OF TEST BORING PROJECT LOCATION: Farmington, MN BORING NUMBER B-2 PAGE 1 OF 1SURFACE ELEVATION: 906 ftCLIENT/WSB #: 031071-000 No.TYPE GEOLOGIC ORIGIN WL N Dr i l l i n g Op e r a t i o n USCSDEPTH (ft) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 SAMPLE MC % %F i n e s GE O T E C H N I C A L N - P L O T - W S B . G D T - 9 / 3 / 2 5 1 3 : 3 3 - M : \ 0 3 1 0 7 1 - 0 0 0 \ G E O \ F A R M I N G T O N 2 N D S T R E E T - B O R I N G L O G . G P J ELEV. (ft) 905 904 903 902 901 900 899 898 897 896 895 894 893 892 891 890 889 888 887 886 885 ELEV. (ft) 905 904 903 902 901 900 899 898 897 896 895 894 893 892 891 890 889 888 887 886 885 DESCRIPTION OF MATERIAL 10 4 9 8 9 25 4 Page 252 of 276 3.25" HSA 0' - 19.5' 1 2 3 4 5 6 7 8 AU SB HSA SB HSA SB HSA SB HSA SB HSA SB HSA SB Pavement Section Fill Glacial Outwash 6 6 8 3 7 14 5 Fill SP SP SP SP SP SP 14 9 2" BITUMINOUS 8" AGG: Sand with Gravel, brown, moist CLAYEY SAND, brown, moist SAND, fine to medium grained, brown, moist, loose SAND WITH LITTLE GRAVEL, fine to coarse grained, brown, wet, loose SAND WITH GRAVEL, fine to coarse grained, brown, waterbearing, very loose SAND WITH GRAVEL, fine to coarse grained, brown, waterbearing, loose SAND WITH GRAVEL, fine to coarse grained, brown, waterbearing, medium dense SAND WITH GRAVEL, fine to coarse grained, brown, waterbearing, loose End of Boring 21.0 ft. N-Value Plot 90 18 TIME CASING DEPTH CAVE-IN DEPTH WATER DEPTH WATER ELEVATION WATER LEVEL MEASUREMENTS SAMPLED DEPTHDATE 19.5 7213:50 pm8/19/2025 START: 8/21/2025 END: 8/21/2025 Logged By: A. HaagO. KitakyaMETHOD Notes: Crew Chief: 10.0 896 PROJECT NAME: Farmington 2nd Street LOG OF TEST BORING PROJECT LOCATION: Farmington, MN BORING NUMBER B-3 PAGE 1 OF 1SURFACE ELEVATION: 906 ftCLIENT/WSB #: 031071-000 No.TYPE GEOLOGIC ORIGIN WL N Dr i l l i n g Op e r a t i o n USCSDEPTH (ft) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 SAMPLE MC % %F i n e s GE O T E C H N I C A L N - P L O T - W S B . G D T - 9 / 3 / 2 5 1 3 : 3 3 - M : \ 0 3 1 0 7 1 - 0 0 0 \ G E O \ F A R M I N G T O N 2 N D S T R E E T - B O R I N G L O G . G P J ELEV. (ft) 905 904 903 902 901 900 899 898 897 896 895 894 893 892 891 890 889 888 887 886 885 ELEV. (ft) 905 904 903 902 901 900 899 898 897 896 895 894 893 892 891 890 889 888 887 886 885 DESCRIPTION OF MATERIAL 6 6 8 3 7 14 5 Page 253 of 276 3.25" HSA 0' - 19.5' 1 2 3 4 5 6 7 8 AU SB HSA SB HSA SB HSA SB HSA SB HSA SB HSA SB Pavement Section Glacial Till Glacial Outwash 5 15 12 10 10 19 18 SC SP SP SP SP SP 15 7 4 46 3" BITUMINOUS 7" AGG: Sand with Gravel, brown, moist CLAYEY SAND, fine to medium grained, brown, moist, loose SAND, fine to medium grained, brown, moist, loose SAND WITH LITTLE GRAVEL, fine to coarse grained, light brown, moist, medium dense SAND WITH LITTLE GRAVEL, fine to coarse grained, light brown, wet, medium dense SAND, fine to coarse grained, brown, waterbearing, loose SAND WITH GRAVEL, fine to coarse grained, brown, waterbearing, medium dense End of Boring 21.0 ft. N-Value Plot 11.50 23 TIME CASING DEPTH CAVE-IN DEPTH WATER DEPTH WATER ELEVATION WATER LEVEL MEASUREMENTS SAMPLED DEPTHDATE 19.5 7213:50 pm8/19/2025 START: 8/19/2025 END: 8/19/2025 Logged By: A. WacekO. KitakyaMETHOD Notes: Crew Chief: 10.0 897 PROJECT NAME: Farmington 2nd Street LOG OF TEST BORING PROJECT LOCATION: Farmington, MN BORING NUMBER B-4 PAGE 1 OF 1SURFACE ELEVATION: 907 ftCLIENT/WSB #: 031071-000 No.TYPE GEOLOGIC ORIGIN WL N Dr i l l i n g Op e r a t i o n USCSDEPTH (ft) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 SAMPLE MC % %F i n e s GE O T E C H N I C A L N - P L O T - W S B . G D T - 9 / 3 / 2 5 1 3 : 3 3 - M : \ 0 3 1 0 7 1 - 0 0 0 \ G E O \ F A R M I N G T O N 2 N D S T R E E T - B O R I N G L O G . G P J ELEV. (ft) 906 905 904 903 902 901 900 899 898 897 896 895 894 893 892 891 890 889 888 887 886 ELEV. (ft) 906 905 904 903 902 901 900 899 898 897 896 895 894 893 892 891 890 889 888 887 886 DESCRIPTION OF MATERIAL 5 15 12 10 10 19 18 Page 254 of 276 3.25" HSA 0' - 22.5' 1 2 3 4 5 6 7 8 AU SB HSA SB HSA SB HSA SB HSA SB HSA SB HSA SB Pavement Section Fill Glacial Outwash 7 9 18 8 26 4 12 Fill Fill SP SP SP SP SP SP 12 4 3" BITUMINOUS 9" AGG: Sand with Gravel, brown, moist CLAYEY SAND, brown, moist SAND, brown, moist SAND, fine to medium grained, brown, moist, loose SAND WITH LITTLE GRAVEL, fine to coarse grained, light brown, moist, medium dense SAND WITH LITTLE GRAVEL, fine to coarse grained, brown, waterbearing, loose SAND WITH GRAVEL, fine to coarse grained, brown, waterbearing, medium dense SAND WITH GRAVEL, fine to coarse grained, brown, waterbearing, very loose SAND WITH GRAVEL, fine to coarse grained, brown, waterbearing, medium dense End of Boring 24.0 ft. N-Value Plot 150 30 TIME CASING DEPTH CAVE-IN DEPTH WATER DEPTH WATER ELEVATION WATER LEVEL MEASUREMENTS SAMPLED DEPTHDATE 22.5 7.52410:00 am8/28/2025 START: 8/28/2025 END: 8/28/2025 Logged By: A. WacekO. KitakyaMETHOD Notes: Crew Chief: 9.5 899.5 PROJECT NAME: Farmington 2nd Street LOG OF TEST BORING PROJECT LOCATION: Farmington, MN BORING NUMBER B-5 PAGE 1 OF 1SURFACE ELEVATION: 909 ftCLIENT/WSB #: 031071-000 No.TYPE GEOLOGIC ORIGIN WL N Dr i l l i n g Op e r a t i o n USCSDEPTH (ft) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 SAMPLE MC % %F i n e s GE O T E C H N I C A L N - P L O T - W S B . G D T - 9 / 3 / 2 5 1 3 : 3 4 - M : \ 0 3 1 0 7 1 - 0 0 0 \ G E O \ F A R M I N G T O N 2 N D S T R E E T - B O R I N G L O G . G P J ELEV. (ft) 908 907 906 905 904 903 902 901 900 899 898 897 896 895 894 893 892 891 890 889 888 887 886 885 ELEV. (ft) 908 907 906 905 904 903 902 901 900 899 898 897 896 895 894 893 892 891 890 889 888 887 886 885 DESCRIPTION OF MATERIAL 7 9 18 8 26 4 12 Page 255 of 276 3.25" HSA 0' - 19.5' 1 2 3 4 5 6 7 8 AU SB HSA SB HSA SB HSA SB HSA SB HSA SB HSA SB Pavement Section Fill Glacial Outwash 7 6 17 11 2 6 22 Fill SP SP SP SP SP SP 11 6 2 47 4" BITUMINOUS 12" AGG: Sand with Gravel, brown, moist CLAYEY SAND, brown with reddish brown, moist SAND, fine to coarse grained, brown, moist, loose SAND WITH LITTLE GRAVEL, fine to coarse grained, light brown, moist, medium dense SAND WITH LITTLE GRAVEL, fine to coarse grained, brown, waterbearing, medium dense SAND WITH GRAVEL, fine to coarse grained, brown, waterbearing, very loose SAND WITH GRAVEL, fine to coarse grained, brown, waterbearing, loose SAND WITH GRAVEL, fine to coarse grained, brown, waterbearing, medium dense End of Boring 21.0 ft. N-Value Plot 130 26 TIME CASING DEPTH CAVE-IN DEPTH WATER DEPTH WATER ELEVATION WATER LEVEL MEASUREMENTS SAMPLED DEPTHDATE 19.5 8.52110:15 am8/29/2025 START: 8/29/2025 END: 8/29/2025 Logged By: A. WacekO. KitakyaMETHOD Notes: Crew Chief: 10.0 900 PROJECT NAME: Farmington 2nd Street LOG OF TEST BORING PROJECT LOCATION: Farmington, MN BORING NUMBER B-6 PAGE 1 OF 1SURFACE ELEVATION: 910 ftCLIENT/WSB #: 031071-000 No.TYPE GEOLOGIC ORIGIN WL N Dr i l l i n g Op e r a t i o n USCSDEPTH (ft) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 SAMPLE MC % %F i n e s GE O T E C H N I C A L N - P L O T - W S B . G D T - 9 / 3 / 2 5 1 3 : 3 4 - M : \ 0 3 1 0 7 1 - 0 0 0 \ G E O \ F A R M I N G T O N 2 N D S T R E E T - B O R I N G L O G . G P J ELEV. (ft) 909 908 907 906 905 904 903 902 901 900 899 898 897 896 895 894 893 892 891 890 889 ELEV. (ft) 909 908 907 906 905 904 903 902 901 900 899 898 897 896 895 894 893 892 891 890 889 DESCRIPTION OF MATERIAL 7 6 17 11 2 6 22 Page 256 of 276 Page 257 of 276 Page 258 of 276 Page 259 of 276 Feasibility Report 2026 Street Improvements Project City Project No. 26-01 City of Farmington WSB Project No. 031071-000 Appendix Appendix E Tree Removal Map Page 260 of 276 S c h m i d t k e Fu e l s G r a n t H e a t i n g A n d A i r 1 s t S t W a l n u t S t L o c u s t S t D a k o t a W o o d D e s i g n U S A C r u s a d e s P r e s s l i n e I n d /B a s e S p e c i a l t i e sTowerviewApts D a k o t a W o o d D e s i g n 1 s t S t Fa m i n g to n H i g h S c h o o l -I S D 1 9 2 D a k o t a Wo o d D e s i g nFarmington C i t y S h o p Chicago Milwaukee Saint Paul and Pacific Railroad 1st StHickorySt Honeysuckle Ln 1st St Honeysuckle Ln D a k o t a /f a r m i n g t o n L i b r a r y M u d s l i n g e r s D r y w a l l & R e m o d e l i n g -F o r m R a i l r o a d R /W 3 r d S t W a l n u t S t H y d r o P r o s Wa l n u t A p t s R a i l r o a d R /W A c k e r m a n A c c o u n t i n g M a p l e S t 3r d S t 2 n d S t E Z A u t o R e p a i r E Z A u t o R e p a i r 3 r d S t H i c k o r y S t 2 n d S t E B e e c h S t Wh i t e F u n e r a l H o m e 2 nd S t F a i r v i e w A p t s L &G O r t h o d o n t i c s S p r u c e S t S p r u c e P l a c e A p ts 4 t h S t W a l n u t S t M a p l e S t 4 t h S t S a c k e t t P r o p e r t i e s 4 t h S t X XXX X 108 1021 102 420 510 1017 20 19 24 2315 18 26 1009 1005 1017 1021 624 709 616 308 623 316 616 717 700 804 612 716 617 625 612 1001 704 708709 317 620 713 613 624 809 200 700 617 713 620 720 625 719 1013 712 621 701 716 312 320 1002 1012 6 708 712 805 701 808 800 903 908 812 925 904 1020 912 14 613 704705 1000 1007 201 705 923 4 1008 1015 22 913 28 201 321 921 916 1008 1004 8 12 908 912 10 808 998 121 1011 18 804 1004 1012 900 912 1021 520 309 908 110 513 900 821 1000 901 117 1003 1011 512 916 920 10001001 517 208200 820 813 901 716 608 616 516 509 300 913 608 204 508 1016 1005 811 1009 97 917 600 600 812 904905 1010 710 720 312 601 620 1014 24 701 708 816 1020 1017 909 10061005 106 609 815 921 700 521 908 1006 612 616 213 313 317 1010 720 15 1014 1015 1009 27 27 620 316 508 1000911 30 1013 19 706 525 104 1011 1005 1012 704 105 107 513512 320 509 207 622 1016 1024 1002 10221020 1026 1018 32 1028 1030 1032 1004 900 808 824 820 1006 1020 1005 1016 1012 816 1001 90 1009 1013 Ash: 25" DBH HoneyLocust:14" DBH Red Maple:30" DBH Red Maple:30"DBH Honey Locust:24" DBH HoneyLocust:24" DBH Silver Maple: 32" DBH Silver Maple: 48" DBH Sugar Maple:14" DBH Colorado BlueSpruce:18" DBH SilverMaple:32" DBH Silver Maple: 28" DBH Silver Maple: 20" DBH Silver Maple:36" DBH Paper Birch:14" DBH SilverMaple:36" DBH SilverMaple:20" DBH SilverMaple:30" DBH SilverMaple: 32" DBH WhiteSpruce:14" DBH EasternCottonwood:40" DBH Ash: 21" DBH Ash: 16" DBH ± 0 150 300 US Feet 2nd Street Improvement Project Save Tree Remove Tree X Private Tree Page 261 of 276 224345v1 PROFESSIONAL SERVICES AGREEMENT This Professional Services Agreement (“Agreement”) is made this 17th day of February, 2026, by and between the CITY OF FARMINGTON, a Minnesota municipal corporation, whose business address is 430 3rd St, Farmington, MN 55024 (hereinafter "City") and WSB LLC, a Limited Liability Company, whose business address is 701 Xenia Avenue South, Suite 300, Minneapolis, MN 55416 (hereinafter "Engineer"). PRELIMINARY STATEMENT The City has adopted a policy regarding the selection and hiring of consultants to provide a variety of professional services for City projects. That policy requires that persons, firms or corporations providing such services enter into written agreements with the City. The purpose of this Agreement is to set forth the terms and conditions for the provision of professional services by Engineer for engineering services, hereinafter referred to as the "Work", and as outlined on Exhibit “A” attached hereto. IN CONSIDERATION OF THEIR MUTUAL COVENANTS, THE PARTIES AGREE AS FOLLOWS: 1. SCOPE OF SERVICES. The City retains Engineer to furnish the services set forth on the attached Exhibit “A”. The Engineer agrees to perform the services. Engineer shall provide all personnel, supervision, services, materials, tools, equipment and supplies and do all things necessary and ancillary thereto specified on Exhibit “A”. The Work to be performed under this Agreement shall be done under the review of a professional engineer licensed in the State of Minnesota, who shall attest that the Work will be performed in compliance with all applicable codes and engineering standards. The Work shall be performed in accordance with the Contract Documents, which includes this Agreement and the attached Exhibits: Exhibit “A” – Scope of Services, Exhibit “B” – Schedule of Payment and Fee Schedule. In the event any ambiguity or conflict between the Contract Documents listed above, the order of precedence shall be the following order: (i) this Agreement; (ii) Exhibit “A”, (iii) Exhibit “B”. 2. REPRESENTATIVES. City has designated John Powell, Public Works Director/City Engineer (the “City Representative”), and the Engineer has designated Mark Erichson, Director of Municipal Services (the “Engineer Representative”). The City Representative and the Engineer Representative shall be available as often as is reasonably necessary for reviewing the Services and Work to be performed. 3. COMPENSATION FOR SERVICES. Engineer shall be paid by the City for the services described in Exhibit “A” on an hourly basis in accordance with the attached fee schedule, Exhibit “B”, but not to exceed $161,152.00 inclusive of taxes and reimbursable costs. A. Any changes in the scope of the Work which may result in an increase to the compensation due the Engineer shall require prior written approval by the Page 262 of 276 224345v1 authorized representative of the City or by the City Council. The City will not pay additional compensation for services that do not have prior written authorization. B. Special Consultants may be utilized by the Engineer when required by the complex or specialized nature of the Project and when authorized in writing by the City. 4. COMPLETION DATE/TERM. The Engineer must complete the Services by June 15, 2026. This Agreement may be extended upon the written mutual consent of the parties for such additional period as they deem appropriate, and upon the terms and conditions as herein stated. 5. OWNERSHIP OF DOCUMENTS. All plans, diagrams, analyses, reports and information generated in connection with the performance of the Agreement (“Information”) shall become the property of the City, but Engineer may retain copies of such documents as records of the services provided. The City may use the Information for its purposes and the Engineer also may use the Information for its purposes. Use of the Information for the purposes of the project contemplated by this Agreement does not relieve any liability on the part of the Engineer, but any use of the Information by the City or the Engineer beyond the scope of the Project is without liability to the other, and the party using the Information agrees to defend and indemnify the other from any claims or liability resulting therefrom. 6. COMPLIANCE WITH LAWS AND REGULATIONS. In providing services hereunder, Engineer shall abide by all statutes, ordinances, rules, and regulations pertaining to the provisions of services to be provided. Any violation of statutes, ordinances, rules, and regulations pertaining to the Services to be provided shall constitute a material breach of this Agreement and entitle the City to immediately terminate this Agreement. Engineer’s books, records, documents, and accounting procedures and practices related to services provided to the City are subject to examination by the legislative auditor or the state auditor, as appropriate, for a minimum of six years. 7. STANDARD OF CARE. Engineer shall exercise the same degrees of care, skill, and diligence in the performance of the Services as is ordinarily possessed and exercised by a professional engineer under similar circumstances. Engineer shall be liable to the fullest extent permitted under applicable law, without limitation, for any injuries, loss, or damages proximately caused by Engineer’s breach of this standard of care. Engineer shall put forth reasonable efforts to complete its duties in a timely manner. Engineer shall not be responsible for delays caused by factors beyond its control or that could not be reasonably foreseen at the time of execution of this Agreement. Engineer shall be responsible for costs, delays, or damages arising from unreasonable delays in the performance of its duties. No other warranty, expressed or implied, is included in this Agreement. City shall not be responsible for discovering deficiencies in the accuracy of Engineer’s services. 8. INDEMNIFICATION. The Engineer shall defend, indemnify and hold harmless the City, its officers, agents, and employees, of and from any and all judgments, claims, damages, demands, actions, causes of action, including costs and attorney's fees paid or incurred resulting from any breach of this Agreement by Engineer, its agents, contractors and employees, or any Page 263 of 276 224345v1 negligent or intentional act or omission performed, taken or not performed or taken by Engineer, its agents, contractors and employees, relative to this Agreement. City will indemnify and hold Engineer harmless from and against any loss for injuries or damages arising out of the negligent acts of the City, its officers, agents, or employees. 9. INSURANCE. a. General Liability. Prior to starting the Work, Engineer shall procure, maintain, and pay for such insurance as will protect against claims or loss which may arise out of operations by Engineer or by any subcontractor or by anyone employed by any of them or by anyone for whose acts any of them may be liable. Such insurance shall include, but not be limited to, minimum coverages and limits of liability specified in this Paragraph, or required by law. b. Engineer shall procure and maintain the following minimum insurance coverages and limits of liability for the Work: Worker’s Compensation Statutory Limits Employer’s Liability $500,000 each accident $500,000 disease policy limit $500,000 disease each employee Commercial General Liability $2,000,000 property damage and bodily injury per occurrence $2,000,000 general aggregate Comprehensive Automobile Liability $1,000,000 combined single limit each accident (shall include coverage for all owned, hired and non-owed vehicles.) Commercial General Liability requirements may be met through a combination of umbrella or excess liability insurance. The City shall be named as an additional insured on the general liability and umbrella policies. c. Professional Liability Insurance. In addition to the coverages listed above, Engineer shall maintain a professional liability insurance policy in the amount of $2,000,000. Said policy need not name the City as an additional insured. Page 264 of 276 224345v1 d. Engineer shall maintain “stop gap” coverage if Engineer obtains Workers’ Compensation coverage from any state fund if Employer’s liability coverage is not available. e. All policies, except the Worker’s Compensation Policy, Automobile Policy, and Professional Liability Policy, shall name the “City of Farmington” as an additional insured. f. All policies, except the Professional Liability Policy, shall apply on a “per project” basis. g. All polices shall contain a waiver of subrogation in favor of the City. h. All policies, except for the Worker’s Compensation Policy and the Professional Liability Policy, shall be primary and non-contributory. i. All polices, except the Worker’s Compensation Policy, shall insure the defense and indemnity obligations assumed by Engineer under this Agreement. j. Engineer agrees to maintain all coverage required herein throughout the term of the Agreement and for a minimum of two (2) years following City’s written acceptance of the Work. k. It shall be Engineer’s responsibility to pay any retention or deductible for the coverages required herein. l. The Engineer’s policies and Certificate of Insurance shall contain a provision that coverage afforded under the policies shall not be cancelled without at least thirty (30) days advanced written notice to the City. m. Engineer shall maintain in effect all insurance coverages required under this Paragraph at Engineer’s sole expense and with insurance companies licensed to do business in the state in Minnesota and having a current A.M. Best rating of no less than A-, unless specifically accepted by City in writing and all insurance policies shall be on ISO forms acceptable to the City. n. A copy of the Engineer’s Certificate of Insurance which evidences the compliance with this Paragraph, must be filed with City prior to the start of Engineer’s Work. Upon request a copy of the Engineer’s insurance declaration page, rider and/or endorsement, as applicable shall be provided. Such documents evidencing insurance shall be in a form acceptable to City and shall provide satisfactory evidence that Engineer has complied with all insurance requirements. Renewal certificates shall be provided to City prior to the expiration date of any of the required policies. City will not be obligated, however, to review such Certificate of Insurance, declaration page, rider, endorsement, certificates, or other evidence of insurance, or to advise Engineer of any deficiencies in such documents and Page 265 of 276 224345v1 receipt thereof shall not relieve Engineer from, nor be deemed a waiver of, City’s right to enforce the terms of Engineer’s obligations hereunder. City reserves the right to examine any policy provided for under this Agreement. o. Effect of Engineer’s Failure to Provide Insurance. If Engineer fails to provide the specified insurance, then Engineer will defend, indemnify, and hold harmless the City, the City's officials, agents, and employees from any loss, claim, liability, and expense (including reasonable attorney's fees and expenses of litigation) to the extent necessary to afford the same protection as would have been provided by the specified insurance. Except to the extent prohibited by law, this indemnity applies regardless of any strict liability or negligence attributable to the City (including sole negligence) and regardless of the extent to which the underlying occurrence (i.e., the event giving rise to a claim which would have been covered by the specified insurance) is attributable to the negligent or otherwise wrongful act or omission (including breach of contract) of Engineer, its subcontractors, agents, employees or delegates. Engineer agrees that this indemnity shall be construed and applied in favor of indemnification. Engineer also agrees that if applicable law limits or precludes any aspect of this indemnity, then the indemnity will be considered limited only to the extent necessary to comply with that applicable law. The stated indemnity continues until all applicable statutes of limitation have run. If a claim arises within the scope of the stated indemnity in section o, the City may require Engineer to: i. Furnish and pay for a surety bond, satisfactory to the City, guaranteeing performance of the indemnity obligation; or ii. Furnish a written acceptance of tender of defense and indemnity from Engineer's insurance company. Engineer will take the action required by the City within fifteen (15) days of receiving notice from the City. 10. INDEPENDENT CONTRACTOR. The City hereby retains the Engineer as an independent contractor upon the terms and conditions set forth in this Agreement. The Engineer is not an employee of the City and is free to contract with other entities as provided herein. Engineer shall be responsible for selecting the means and methods of performing the work. Engineer shall furnish any and all supplies, equipment, and incidentals necessary for Engineer's performance under this Agreement. City and Engineer agree that Engineer shall not at any time or in any manner represent that Engineer or any of Engineer's agents or employees are in any manner agents or employees of the City. Engineer shall be exclusively responsible under this Agreement for Engineer's own FICA payments, workers compensation payments, unemployment compensation payments, withholding amounts, and/or self-employment taxes if any such payments, amounts, or taxes are required to be paid by law or regulation. 11. SUBCONTRACTORS. Engineer shall not enter into subcontracts for services provided under this Agreement without the express written consent of the City. Engineer shall comply with Minnesota Statute § 471.425. Engineer must pay subcontractor for all undisputed Page 266 of 276 224345v1 services provided by subcontractor within ten (10) days of Engineer’s receipt of payment from City. Engineer must pay interest of 1.5 percent per month or any part of a month to subcontractor on any undisputed amount not paid on time to subcontractor. The minimum monthly interest penalty payment for an unpaid balance of $100 or more is $10. 12. ASSIGNMENT AND THIRD PARTIES. Neither party shall assign this Agreement, nor any interest arising herein, without the written consent of the other party. Nothing under this Agreement shall be construed to give any rights or benefits in this Agreement to anyone other than the City and Engineer, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of the City and Engineer and not for the benefit of any other party. 13. WAIVER. Any waiver by either party of a breach of any provisions of this Agreement shall not affect, in any respect, the validity of the remainder of this Agreement. 14. ENTIRE AGREEMENT. The entire agreement of the parties is contained herein. This Agreement supersedes all oral agreements and negotiations between the parties relating to the subject matter hereof as well as any previous agreements presently in effect between the parties relating to the subject matter hereof. Any alterations, amendments, deletions, or waivers of the provisions of this Agreement shall be valid only when expressed in writing and duly signed by the parties, unless otherwise provided herein. 15. CONTROLLING LAW AND VENUE. This Agreement shall be governed by and construed in accordance with the laws of the State of Minnesota. All proceedings related to this contract shall be venued in the Dakota County District Court. 16. COPYRIGHT. Engineer shall defend actions or claims charging infringement of any copyright or patent by reason of the use or adoption of any designs, drawings, or specifications supplied by it, and it shall hold harmless the City from loss or damage resulting therefrom. 17. RECORDS. The Engineer shall maintain complete and accurate records of time and expense involved in the performance of services. 18. MINNESOTA GOVERNMENT DATA PRACTICES ACT. Engineer must comply with the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, as it applies to (1) all data provided by the City pursuant to this Agreement, and (2) all data, created, collected, received, stored, used, maintained, or disseminated by the Engineer pursuant to this Agreement. Engineer is subject to all the provisions of the Minnesota Government Data Practices Act, including but not limited to the civil remedies of Minnesota Statutes Section 13.08, as if it were a government entity. In the event Engineer receives a request to release data, Engineer must immediately notify City. City will give Engineer instructions concerning the release of the data to the requesting party before the data is released. Engineer agrees to defend, indemnify, and hold City, its officials, officers, agents, employees, and volunteers harmless from any claims resulting from Engineer’s officers’, agents’, partners’, employees’, volunteers’, assignees’, or subcontractors’ unlawful disclosure and/or use of protected data. The terms of this paragraph shall survive the cancellation or termination of this Agreement. Page 267 of 276 224345v1 19. TERMINATION. This Agreement may be terminated by City on thirty (30) days’ written notice delivered to Engineer at the address on file with the City. Upon termination under this provision if there is no fault of the Engineer, the Engineer shall be paid for services rendered and reimbursable expenses until the effective date of termination. If the City terminates the Agreement because the Engineer has failed to perform in accordance with this Agreement, no further payment shall be made to the Engineer, and the City may retain another engineer to undertake or complete the work identified in Paragraph 1. 20. NON-DISCRIMINATION. During the performance of this Agreement, the Engineer shall not discriminate against any employee or applicants for employment because of race, color, creed, religion, national origin, sex, marital status, status with regard to public assistance, disability, sexual orientation or age. The Engineer shall post in places available to employees and applicants for employment, notices setting forth the provision of this non- discrimination clause and stating that all qualified applicants will receive consideration for employment. The Engineer shall incorporate the foregoing requirements of this paragraph in all of its subcontracts for program work, and will require all of its subcontractors for such work to incorporate such requirements in all subcontracts for program work. The Engineer further agrees to comply with all aspects of the Minnesota Human Rights Act, Minnesota Statutes 363.01, et. seq., Title VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act of 1990. 21. SURVIVAL. All express representations, waivers, indemnifications, and limitations of liability included in this Agreement will survive its completion or termination for any reason. 22. SERVICES NOT PROVIDED FOR. Claims for services furnished by the Engineer not specifically provided for herein shall not be honored by the City. 23. SEVERABILITY. The provisions of this Agreement are severable. If any portion hereof is, for any reason, held by a court of competent jurisdiction to be contrary to law, such decision shall not affect the remaining provisions of this Agreement. 24. CONFLICTS. No officer or salaried employee of the City and no member of the Council of the City shall have a financial interest, direct or indirect, in this Agreement. The violation of this provision renders the Agreement void. 25. NOTICES. Any notice required under this Agreement will be in writing, addressed to the appropriate party at its address on the signature page and given personally, by facsimile, by registered or certified mail postage prepaid, or by a commercial courier service. All notices shall be effective upon the date of receipt. 26. WAIVER. A party’s non-enforcement of any provision shall not constitute a waiver of that provision, nor shall it affect the enforceability of that provision or of the remainder of this Agreement. Page 268 of 276 224345v1 27. COUNTERPARTS. This Agreement may be executed in multiple counterparts, each of which shall be considered an original. Dated: February 17, 2026 CITY: CITY OF FARMINGTON By: Nicholas Lien Acting Mayor By: Shirley R Buecksler City Clerk Dated:__________________, 20___ ENGINEER: WSB LLC By: [print name] Its: [title] Page 269 of 276 224345v1 EXHIBIT “A” SCOPE OF SERVICES AND EXHIBIT “B” SCHEDULE OF PAYMENT AND FEE SCHEDULE Page 270 of 276 Farmington 2026 Street Improvements Project 1 February 6, 2026 Mr. John Powell, PE Public Works Director / City Engineer City of Farmington 430 Third Street Farmington MN 55024 Re: Proposal to Provide Professional Engineering Services for the 2026 Street Improvements Project Dear Mr. Powell: WSB is pleased to submit the following proposal to provide professional engineering services for the 2026 Street Improvements Project. We have assembled a multidisciplinary team that can provide the City of Farmington with the necessary professional services to deliver a successful reconstruction project. WSB’s Approach | Our approach will deliver a project that conforms to the City of Farmington’s construction standards. The City will have access to an experienced team of WSB staff who have successfully delivered similar projects for surrounding communities throughout the Minneapolis and St. Paul metro area. Our proposed design team will partner with the City of Farmington to identify potential design challenges, discuss possible alternatives, and then communicate with City staff to develop solutions that all project stakeholders can stand behind. Experienced Team | Mark Erichson and Nick Guilliams have served as the primary design engineers and project managers for numerous urban infrastructure improvement projects. In addition to their comprehensive understanding of the project's technical aspects, the team recognizes the need to engage stakeholders early and often during design to ensure successful delivery during construction. Enclosed you will find a proposal to complete the tasks associated with the 2026 Street Improvements. The proposal includes an hourly breakdown to complete each of the tasks associated with the project. The terms of this proposal shall remain valid for the duration of the project. We are excited about the prospect of continuing a lasting, collaborative, and trusting relationship with the City of Farmington. If you have questions about the content of this proposal, please feel to reach out at merichson@wsbeng.com or 612.360.1278 Sincerely, WSB Mark Erichson, PE Director of Municipal Services Attachment - Project Budget Worksheets 7 0 1 X E N I A A V E N U E S | S U I T E 3 0 0 | M I N N E A P O L I S , M N | 5 5 4 1 6 | 7 6 3 . 5 4 1 . 4 8 0 0 | W S B E N G . C O M Page 271 of 276 Farmington 2026 Street Improvements Project 2 PROJECT UNDERSTANDING The City of Farmington is requesting proposals for engineering design services related to the improvement of 2nd Street from its north intersection with Spruce Street to its south intersection with Ash Street (CSAH 74). 2nd Street primarily serves as access to single-family residences, with a few commercial properties at its northern end. It is classified as a two-lane, undivided urban section with on-street parking and no sidewalk. The existing roadway is approximately 36 feet wide, measured from the back of the curb, and is surfaced with bituminous asphalt pavement and B618 (vertical curb 6 inches, 18-inch gutter width) concrete curbs The proposed project involves the reconstruction of 2nd Street, including upgrades to the water main and storm sewer systems. The proposed plan is to reduce the road width by 4 feet, which will help comply with stormwater requirements outlined in the City’s Municipal Separate Storm Sewer (MS4) permit and allow for the continued parking on both sides of the roadway. The existing asphalt pavement and concrete curbs have begun to show signs of deterioration. Although there is a storm sewer system along the corridor, additional storm sewer is proposed to improve street drainage and will be designed to handle a 10-year design storm, per the City standard. The proposed scope of services will also include attendance and figures at one (1) neighborhood meeting, development of construction documents, including final plans and project specifications, utility coordination, and bidding assistance. It is WSB’s understanding that this project will be exempt from following Minnesota State Statute Chapter 429 process and that the City does not intend to fund this project through special assessments. Through an investigation of the scope of work, preparation of preliminary design documents including a feasibility report, meetings with City Staff, and conducting a site visit, WSB is familiar with the vision, expectations, and goals for this project. Based on our extensive expertise with similar projects and our understanding of this project, we are confident we can successfully and professionally undertake it. PROJECT APPROACH/SCOPE OF SERVICES Our team possesses both the experience and expertise necessary to complete this project's design and construction seamlessly. WSB takes pride in delivering a high-quality design that reduces risk during construction, enabling the project to be completed on time and on budget. WSB utilizes the latest technology to complete designs cost-effectively and has a robust internal review process that involves a thorough review of construction documents at the 60%, 90%, and 100% levels. These reviews involve examining the construction documents from a contractor’s perspective to identify project-related risks, allowing solutions to be developed and incorporated into the construction documents. The following approach outlines the professional services required to fulfill the requested scope of work. Task 1 | Plans/Specifications WSB will provide design services for the 2026 Street Improvements Project. The project plans and specifications developed will adhere the City of Farmington’s Design Standards. This task will include: Subtask: 1.1: Data Collection · Private utility locates · Existing right-of-way · Site visits Subtask 1.2: Final Design & Plans WSB will prepare plans and specifications in accordance with the accepted feasibility report in collaboration with City Staff. WSB produced specifications shall supplement the City’s standard construction documents. Page 272 of 276 Farmington 2026 Street Improvements Project 3 · Alignment - Although this is not anticipated to change significantly with the reconstruction of the roadway, an alignment will be prepared due to the proposed change in road width. · Profiles - Profiles will be created working in collaboration with City Staff. · Cross Sections - WSB will also work collaboratively with City Staff to develop cross sections for the project. · Storm Drainage Design - Storm sewer collection and conveyance system improvements will be designed to accommodate the proposed surface improvements and handle a 10-year design storm, per the City Standard. Existing storm sewer infrastructure will be utilized where feasible. It is not anticipated that above-ground stormwater management will be required with the project. WSB will obtain the necessary permits. · Sanitary Sewer - Sanitary sewer has been evaluated by City Staff, and it has been determined that reconditioning is not necessary. · Water Main – Existing 4-inch and 6-inch cast iron watermain will be replaced with 8-inch ductile- iron pipe (DIP). · Stormwater Pollution Prevention Plan - A SWPPP will be developed for the project. · Traffic Control - Traffic control will be developed as a part of the final construction documents and will take into account the access needs of properties located within the project area. · Estimated Quantities - WSB will work with City Staff to produce separate quantity estimates for each of the project areas for ease of assessment rate calculation. Deliverables: · 95 percent Submittal: Draft plan set for review and comment by City Staff. · 100 percent Submittal: Final plan set, and specifications will be provided electronically in both drafting file and PDF in full and half sizes. Subtask 1.3: Community Open House Meeting WSB will attend one open house meeting as outlined in the schedule. In addition, WSB will provide necessary figures and drawings for communication support at meetings and presentations, to be prepared and led by City Staff. Subtask 1.4: Prepare Contract Documents/Specifications WSB will work with City Staff to prepare all contract documents in accordance with City Standards and City Specifications. Subtask 1.5: Obtain all Required Permits WSB will prepare and submit materials for necessary project permits. It is our understanding that the City of Farmington will be responsible for permit fees associated with the project. Subtask 1.6: Constructability Review WSB construction staff will perform a detailed review of the plans and specifications to identify any potential constructability issues. Subtask 1.7: Prepare Opinion of Probable Construction Costs WSB will prepare an Opinion of Probable Cost at the 95% and 100% plan submittals for the project. Task 2 | Bidding The WSB project team will complete all necessary work to bid the project, including: · The preparation of an advertisement for bids. · Publishing the advertisement for bids in both the City’s official newspaper and Quest CDN. · Uploading the project plans and specifications for electronic purchase. · Responding to contractor bidding questions. · Issuing addenda as needed. · Attendance at electronic bid opening. · Preparation of a bid tabulation and a bid summary. Page 273 of 276 Farmington 2026 Street Improvements Project 4 · Preparation of a letter of recommendation regarding the bid award. · Preparation of contract documents and the Notice of Award to the contractor once authorized by the City Council. SCHEDULE It is understood that the City desires the project to be completed during the 2026 summer construction season. To meet the desired project completion date, we propose the following schedule: Data collection .......................................................................................................................... February 2026 95% plan submittal to City ...................................................................................................... March 23, 2026 100% plan submittal ............................................................................................................... March 31, 2026 Bid Opening .............................................................................................................................. April 28, 2026 WSB will begin work immediately upon receiving your Notice to Proceed. PROPOSED FEE WSB will provide the services as outlined in Project Approach / Scope of Services. Our budget was developed based on our understanding of the scope and experience with similar types of projects. The following is a summary of the costs for each phase of the project: Task Description Fee 1 Plans/Specifications $156,592 2 Bidding $4,560 Total $161,152 We propose to conduct the work listed above on an hourly not-to-exceed fee of 161,152. If additional work outside of the above-described scope is determined necessary, we will proceed only after City approval. WSB will work with the City to define the scope of any additional work for City approval. If this proposal is acceptable, please execute the signature block below and return it as our authorization to proceed. Page 274 of 276 Farmington 2026 Street Improvements Project 5 I hereby authorize WSB to proceed with the above-referenced work under the terms and conditions of the Professional Services Agreement entered into between the City of Farmington and WSB on the 10th day of February 2023. ACCEPTED BY: CITY OF FARMINGTON, MN Signature: Name/Title: Date: Page 275 of 276 Mark Erichson Nick Guilliams Katie Koscielak Kate Achenbach Kendra Fallon Tim Cartony Paul Kyle Anne Sill 1 Plans /Specifications 1.1 Data Collection 6 10 4 20 4,264.00$ 1.2 Final Design & Plans 24 72 106 124 50 218 594 125,940.00$ 1.3 Meetings/Open House (1)4 4 4 2 14 3,472.00$ 1.4 Contract Documents/Specifications 4 8 16 12 40 7,648.00$ 1.5 Permitting 2 6 4 12 2,572.00$ 1.6 Constructability Review 12 12 2,736.00$ 1.7 Cost Estimates 2 8 24 16 50 9,960.00$ 742 156,592.00$ 2 Bidding 2.1 Bidding Administration 2 6 8 8 24 4,560.00$ 24 4,560.00$ 36 106 174 144 54 220 12 20 766 276.00$ 276.00$ 202.00$ 147.00$ 202.00$ 228.00$ 228.00$ 92.00$ 9,936.00$ 29,256.00$ 35,148.00$ 21,168.00$ 10,908.00$ 50,160.00$ 2,736.00$ 1,840.00$ 161,152.00$ Construction Project Manager Project Engineer Total Costs Hourly Cost Labor Costs Graduate Engineer Farmington 2026 Street Improvements Project Task Cost Total Hours Task Description Administrative Subtotal = Total Hours Subtotal = Engineering Technician Detailed Cost Breakdown of Tasks Principal Project Manager Water Resources Engineer Pa g e 2 7 6 o f 2 7 6