3. PUBLIC HEARINGS
3.1. Conditional Use Permit to Construct a Community Solar Garden on PID:
14-03400-87-010
Approve the requested conditional use permit subject to the following
conditions:
A preliminary and final plat application for the subject property is
submitted and approved by City Council.
All necessary building permits are obtained.
All engineering comments and requirements are met.
A copy of the encroachment agreement with the gas company is
submitted at the time of building permit submittal.
A copy of the signed lease agreement with Brian Murphy is
submitted at the time of building permit submittal.
The decommissioning plan is signed and executed with the city
prior to release of the building permit.
A tree replacement plan is submitted and approved by the city
prior to release of the building permit.
Access road must be paved.
Agenda Item: Conditional Use Permit to Construct a Community Solar
Garden on PID: 14-03400-87-010 - Pdf
9 - 46
3.2. Variance Request - Maximum Height Requirement for Fences - City of
Farmington
Approve the variance request of two (2') feet of additional fence height,
contingent upon the following:
47 - 54
Page 1 of 54
1. Submittal and approval of a building permit application for the
proposed fencing.
2. Obtaining an encroachment agreement with Northern Natural
Gas for locating the fence within their gas pipeline easement.
Agenda Item: Variance Request - Maximum Height Requirement for
Fences - City of Farmington - Pdf
4. DISCUSSION
5. ADJOURN
Page 2 of 54
PLANNING COMMISSION AGENDA MEMO
To: Planning Commission
From: Tony Wippler, Planning Manager
Department: Planning Commission
Subject: Approve Planning Commission Minutes
Meeting: Planning Commission - Jul 08 2025
INTRODUCTION:
Attached, are the minutes from the June 10, 2025 regular meeting.
DISCUSSION:
Not applicable
BUDGET IMPACT:
Not applicable
ACTION REQUESTED:
Approve the minutes from the June 10, 2025 regular meeting.
ATTACHMENTS:
June 10th PC Minutes
Page 3 of 54
CITY OF FARMINGTON
PLANNING COMMISSION MINUTES
REGULAR MEETING
JUNE 10TH, 2025
1. CALL TO ORDER
The meeting was called to order by Chair Rotty at 7:00pm
Members Present: Rotty, Snobeck, Baerg
Members Absent: Tesky, Windschitl
Staff Present: Tony Wippler, Planning Manager
Jared Johnson, Planning Coordinator
2. APPROVAL OF MINUTES
MOTION by Baerg, second by Snobeck to approve minutes of Planning
Commission for May 13th, 2025, regular meeting. APIF MOTION CARRIED
3. PUBLIC HEARINGS
None
4. DISCUSSION
4.1 Farmington Industrial Park 4th Addition Final Plat & Site Plan- R & L
Carriers -5260 208th St. W – Planning Manager Wippler presented the request for
site plan review for expansion of truck terminal within the I (Industrial) zoning
district along with final plat for Farmington Industrial Park 4th Addition. A CUP was
approved by the Planning Commission for proposed expansion on August 14th,
2024.
SITE PLAN-
• 72,017 sq. ft. terminal building expansion. (with 108 bay doors) to the south
end of existing building.
• Relocation of stormwater facilities to northwest corner of the site.
• 3,178 sq. ft. addition to maintenance building.
• Additional parking area to west of existing terminal building.
• Expansion area will match similarly to existing building height and façade.
• Site zoned I (Industrial) minimum setbacks allowed:
⃘⃘⃘⃘⃘⃘⃘⃘⃘Front yard 50ft ⃘⃘⃘Side yard 25ft ⃘⃘⃘Rear yard 25ft.
Proposed expansion exceeds setbacks. The closest setback being 124 feet to
the western property line.
• 317 off-street parking stalls will be provided on site. Per code 247 off-street
stalls are required.
• 272 trailer parking spots will be provided.
• Access to site will remain the same. Main entrance off 208th St. W and
secondary access off 210th St. W.
• Development site consists of 4 parcels. Replat of these parcels into singular
lot is necessary. This will be condition of approval of site plan.
Page 4 of 54
• Vacation of certain existing drainage and utility easements will be required.
Public hearing scheduled for the June 16th, 2025 City Council meeting.
• Dakota County Plat commission recommend approval upon plat being
revised to show restricted access along Pilot Knob Rd. A quit claim deed
must be provided at time of recording plat mylars.
Commissioner Baerg asked about the restrictions on Pilot Knob. Planning Manager
Wippler explained the county can restrict access and does not want it to change.
Chair Rotty asked if in the future is there enough room on the road for
improvements. Planning Manager Wippler stated it should be wide enough.
Mike Brandt with Kimley Horn explained that the amount of traffic won’t increase to
double just because size increased by double. The expansion is for freight and
unloading/loading.
MOTION by Snobeck, second by Baerg to approve site plans upon completion of
three contingencies. APIF MOTION CARRIED.
MOTION by Baerg, second by Snobeck for favorable recommendation to City
Council for approval of Farmington Industrial Park 4th Addition Final Plat upon
satisfaction of three contingencies. APIF MOTION CARRIED
4.2 Final Plats - Vita Attiva at South Creek Fourth and Fifth Additions –
Planning Manager Wippler presented the request for approval of Vita Attiva at
South Creek Fourth and Fifth Addition(s) Final Plat.
Vita Attiva at South Creek 4th Addtion Final Plat-
• Consists of platting Outlot A, Vita Attiva at South Creek Third Addition,
Outlots C & H, Vita Attiva at South Creek First Addition, and part of Tract B
Registered Land Survey No. 66.
• Final plat contains 54 single-family lots with right-of-way for Pilot Knob Rd.
and Spruce St.
• Property is zoned R-2 (Low/Medium Density Residential) and is part of
approved Planned Unit Development.
• Plat contains 17.5 acres and has net density of 3.9 dwelling units per acre.
• Lot sizes vary from 5,367 to 21,693 sq ft. average lot area of 8,600 sq. ft.
• Plat contains one outlot (Outlot A) to be used for storm water ponding. This
outlot will be deeded to the City of Farmington.
Transportation –
• 216th St. W & 217th St. W will be extended west and will connect to
Ellsworth Way.
• Ellsworth Way cul-de-sacs towards southern end of development.
• Eclipse St. will be extended to the north from 216th St. W to Spruce St.
• Eclipse St., Ellsworth Way, 216th St. W, and 217th St. W will be platted with
60-foot-wide right-of-way and constructed to a street width of 34.92 ft.
Page 5 of 54
• Pilot Knob Rd. will be extended south from CSAH 50 for secondary access.
Will require relocation and replacement of stop lights at intersection of
CSAH 50.
• Spruce St. will be constructed from Pilot Knob Rd. to Eclipse St.
Sidewalks & Trails -
• Five-foot-wide sidewalks are provided as follows:
⃘⃘⃘ North side of 217th St. W ⃘⃘⃘ South side of 216th St. W
⃘⃘⃘ East side of Ellsworth Way ⃘⃘⃘ East side of Eclipse St.
⃘⃘⃘ North side of Spruce St.
• A ten-foot-wide bituminous trail provided on east side of Pilot Knob Rd.
Vita Attiva at South Creek 5th Addition Final Plat-
• Consists of platting Outlot B, Vita Attiva at South Creek Third Addition into
16 townhome lots (4 townhome buildings) and two remnant lots.
• Property is zoned R-3 (Medium Density Residential) and is part of an
approved Planned Unit-townhomes are permitted use.
• Plat contains 2.23 acres and has a net density of 7.17 dwelling units per acre.
• Two remnant lots (Lot 9, Block 1 and Lot 9. Block 2) consist of common
areas around the townhomes that will be owned by Homeowners
Association. Driveways for townhome units will be located within these
remnant lots.
Transportation
• Plat will be split east to west with Eckert Way, which will connect 216th St. W
with 217th St. W
• Right-or-way for Eckert Way is shown at 60 feet in width with the roadway
constructed to 34.92 feet in width.
Sidewalks & Trails
• Five-foot-wide sidewalk will be provided on the west side of Eckert Way.
Will connect into existing sidewalk within 216th and 217th Streets.
MOTION by Snobeck, second by Baerg for favorable recommendation of Vita Attiva
Fourth Addition to City Council for approval upon satisfaction of two contingencies.
APIF MOTION CARRIED.
MOTION by Baerg, second by Snobeck for favorable recommendation of Vita Attiva
Fifth Addition to City Council for approval upon satisfaction of two contingencies.
APIF MOTION CARRIED
4.3 Final Plat & Final PUD Dakota Meadows Preserve 1st Addition – Planning
Manager Wippler presented the request for approval of Dakota Meadows Preserve
1st Addition final plat and final planned unit development.
Final Plat-
• 42 single-family lots part of the 134 overall single-family lots approved in
preliminary plat for this development.
• Dakota Meadows Preserve final plat corresponds with preliminary plat
approved by Planning Commission on April 8th, 2025, and City Council on
April 21st, 2025.
Page 6 of 54
• Minimum lot area: 4,261 sq. ft.
• Average lot arear in 1st Addition: 5,392 sq. ft.
• Minimum lot width: 40ft.
• Minimum setbacks:
⃘⃘⃘Front yard-20ft (25ft on sidewalk) ⃘⃘⃘Rear yard-6ft
⃘⃘⃘Side yard- 5ft ⃘⃘⃘Side yard corner- 15ft
• Contains four outlots (A-D)
o Outlot A- combination storm water ponding and wetland.
o Outlot B- combination of future development, storm water ponding,
and open space.
o Outlot C- open space
o Outlot D- combination of storm water ponding and wetland.
o Outlots A & D will be deeded to the City with final plat.
Transportation and Access
• Access to development will come from Denmark Ave.
• Secondary emergency access will be towards southern end of development
by wetland area.
o Emergency access will consist of 20-ft-wide trail section. It will be
gated and closed to motorized vehicles of public.
o Will extend with initial phase to eastern boundary of Outlot D
o Emergency access trail will be extended in future phases to
north/south road (labeled Street C on approved preliminary plat).
o Additional trail connection provided from end of cul-de-sac (labeled
Street B on final plat) to emergency access trail.
• Roadway right-of-way in development will be 60-ft-wide with width of 29ft
• Conditional approval upon street names being added to final plat:
o 223rd St. W instead of Street A
o Denmark Tr for portion of Street B north of intersection Street A
o Denmark Ct. for cul-de-sac portion of Street B south of
intersection with Street A
Parks, Trails and Sidewalks
• Cash-in-lieu of park dedication. Westview Acres Park will service this
development.
• Location of trail along northern boundary to be resolved with city staff and
developer prior to final plat.
• Parks & Recreation Commission reviewed trail and sidewalk locations and
have recommended changes on map presented. Vote 4-0
• Trail will also be provided along Denmark Ave.
Ordinance No. 2025-003
• Reducing the minimum lot area to 4,261 sq ft. (typical minimum is 6,000 sf)
• Reducing the minimum lot width to 40ft (typical minimum is 60 feet)
• Reducing the corner side yard setback to 15ft (typical minimum is 20 feet)
• Reducing the interior side yard setback to 5ft (typical is 6 feet)
• Increasing building coverage percentage for lots to 50% (typical is 35%)
Page 7 of 54
• The allowance for stormwater basins within development to exceed
maximum retention pond depth of 8 feet
MOTION by Snobeck, second by Baerg for favorable recommendation to City
Council for approval of Dakota Meadows Preserve 1st Addition Final Plat and
Final PUD upon satisfaction of two contingencies. APIF MOTION CARRIED.
4.4 Draft Beekeeping Ordinance - Planning Coordinator Jared Johnson presented
revised Draft Beekeeping Ordinance including some clarifying language and some
revised timelines. Planning Commission recommends proceeding to public hearing.
5. ADJOURN
MOTION by Snobeck second by Baerg to adjourn the meeting at 8:14pm. APIF
MOTION CARRIED
Respectfully submitted
Tony Wippler, Planning Manager
Page 8 of 54
PLANNING COMMISSION AGENDA MEMO
To: Planning Commission
From: Jared Johnson, Planning Coordinator
Department: Community Development
Subject: Conditional Use Permit to Construct a Community Solar Garden on PID: 14-
03400-87-010
Meeting: Planning Commission - Jul 08 2025
INTRODUCTION:
Dimension Energy has applied for a Conditional Use Permit (CUP) to construct a 4.95 mega-watt
community solar garden on PID: 14-03400-87-010 (subject property).
DISCUSSION:
Overview
Subject Property: PID: 14-03400-87-010
Applicant: Dimension Energy
Property Owner: Brian Murphy
Zoning: A-1 (Agriculture)
2040 Comp Plan Designation: Agriculture
Existing Use: Farmland
Surrounding Uses: Farmland to the north and south, single-family residence to the east, and vacant
industrial land (Lakeville) to the west.
Proposed Use: Ground mounted community solar garden and associated electrical appurtenances
across an 18.54-acre area of land on an approximately 30-acre parcel. Community solar gardens
are listed as a conditional use in the A-1 (Agriculture) zoning district.
Project Narrative: The purpose of the proposed project is to capitalize on the growing need to
provide clean and renewable energy as well supplement Xcel Energy's increasing requirements for
utility companies to obtain electrical power from renewable resources.
Review
Location
The subject property is located in the southwest corner of Farmington, generally located south of
County Road 50 and west of Flagstaff Avenue. There is no public access to the property. The only
access currently comes from a gravel driveway easement off Flagstaff Avenue that also serves the
single-family residence directly to the east.
Site Plan
Rows of ground mounted solar panels are proposed for a majority of the site. The panels are split
into two areas due to several property constraints:
Page 9 of 54
There are two delineated wetlands in the center of the property, with trees surrounding the
larger wetland.
There's a gas pipeline easement that runs from the southwest corner to the northwest corner
of the site.
Xcel Energy service territory ends along the southern portion of the site. The project must be
located within Xcel Energy service territory.
Future extension of County Road 70 is proposed to go through the southwestern portion of
the site.
The site plan accounts for these constraints and no solar panels are proposed in these areas with
the exception of trees being removed along the northern edge of the larger wetland.
The solar panels meet all required setbacks in the A-1 (Agriculture) zoning district. These setbacks
are 50 feet from the front property line and 20 feet from the side and rear yard property lines.
Solar Panels
The proposed project will utilize 8,559 solar modules. Each module will be 94 inches in length by 45
inches in width. The modules will either be configured on a single axis tilt or a fixed tilt system. The
panels will be no more than 10 feet height from grade to the top of the panel at maximum tilt.
Decommissioning Plan
The applicant submitted a decommissioning plan which is typical for solar garden projects. The
decommissioning plan outlines the process for removing the solar panels from the site after their
usable lifespan (20-30 years). The plan ensures the user will restore the site to its previous state.
As a condition of approval, the decommissioning plan must be signed with the City prior to building
permit issuance.
Access
Access to the site will come from an existing driveway easement at the southeastern corner of the
property. An 18-foot-wide access road will run along the eastern property line up into the site. It will
serve both areas of solar panels with gated entrances at each location. In order to reach the solar
panels on the north side, the access road must cross the gas pipeline easement. A copy of the
encroachment agreement with the gas company will be required to be submitted to the City as a
condition of approval. The access road is currently proposed to be gravel but will be required to be
paved per City Code and is also listed as a condition of approval.
As mentioned above, future County Road 70 is proposed to extend from Lakeville and go through
the southwest portion of the site. This is not anticipated to occur for many years, but Dakota County
still needs the dedicated right-of-way on the site for the future expansion. Therefore, the applicant
and property owner will be required to plat the property as a condition of approval showing the
dedicated right-of-way for the future expansion of County Road 70.
Fencing/Screening
The entire project will be enclosed by a 7-foot tall, steel electric fence with locked access gates. No
additional screening is proposed. There is an existing tree stand along the eastern property line that
currently screens the single-family residential property from the site.
Landscaping
Once construction is complete, the ground underneath the panels will be reseeded with low growth
grasses. No other landscaping is proposed; however, a tree replacement plan will be required as a
condition of approval due to trees being removed along the northern edge of the larger wetland.
Page 10 of 54
Utilities
No public utility infrastructure such as water and sewer is proposed for the project. The site will only
be served by private utilities including Xcel Energy.
There is no proposed stormwater management for the site. The applicant will work with Engineering
to ensure appropriate stormwater management will be in place. Meeting all Engineering comments
and requirements is listed as a condition of approval.
CUP Approval Criteria
Approval Criteria Per City Code Section 10-3-5(C), a conditional use shall be approved if it is found
to meet the following criteria:
1. The proposed use conforms to the district permitted and conditional use provisions and all
general regulations of this title.
2. The proposed use shall not involve any element or cause any conditions that may be dangerous,
injurious or noxious to any other property or persons and shall comply with the performance
standards listed below.
3. The proposed use shall be constructed, designed, sited, oriented and landscaped to produce
harmonious relationship of buildings and grounds to adjacent buildings and properties.
4. The proposed use shall produce a total visual impression and environment which is consistent
with the environment of the neighborhood.
5. The proposed use shall organize vehicular access and parking to minimize traffic congestion in
the neighborhood.
6. The proposed use shall preserve the objectives of this title and shall be consistent with the
comprehensive plan.
Staff believes the proposed solar garden meets all applicable approval criteria listed above.
BUDGET IMPACT:
Not applicable
ACTION REQUESTED:
Approve the requested conditional use permit subject to the following conditions:
A preliminary and final plat application for the subject property is submitted and approved by
City Council.
All necessary building permits are obtained.
All engineering comments and requirements are met.
A copy of the encroachment agreement with the gas company is submitted at the time of
building permit submittal.
A copy of the signed lease agreement with Brian Murphy is submitted at the time of building
permit submittal.
The decommissioning plan is signed and executed with the city prior to release of the
building permit.
A tree replacement plan is submitted and approved by the city prior to release of the building
permit.
Access road must be paved.
ATTACHMENTS:
Application
Project Narrative
Page 11 of 54
Location Map
Lot Survey
Site Plans
Decommissioning Plan
Page 12 of 54
6/3/25
Page 13 of 54
Farmington CSG 1 Solar Project
Cover Letter & Project Narrative
June 2025
Dimension Energy
June 5, 2025
Page 14 of 54
3050 Peachtree Road NE, 4th Floor, Suite 460, Atlanta, GA 30305 ■ 877-277-8506 ■ dimension-energy.com
June 5, 2025
Mr. Tony Wippler
Zoning Administrator – City of Farmington, MN
City of Farmington 430 Third Street
Farmington, MN 55024
Re: Farmington CSG 1LLC Solar Project - Conditional Use Permit Application
Hello Mr. Tony Wippler and City of Farmington Planning Commission,
Farmington CSG 1 LLC (Applicant) is submitting the enclosed materials in support of a Conditional Use
Permit application for a proposed ground-mounted Community Solar project (the Project) located in
Farmington, Minnesota.
The proposed Project involves the construction of a ground-mounted, single-axis tracker solar farm and
associated electrical appurtenances at property 140340087010 located on the western edge of
Farmington, bordering Lakeville. The solar photovoltaic (PV) system is proposed for installation within an
approximately 18.54-acre area on approximately 30-acre parcel. The Project has a rated capacity of 4.95
megawatts AC (MW-AC). The facility setbacks are designed by all applicable standards in the City of
Farmington Zoning Ordinance and will be constructed to meet and/or exceed all local, state and national
building codes. Once operational, the facility will be unoccupied other than by occasional maintenance
personnel. It will not cause any increase in vehicle traffic.
The Conditional Use Permit Application contains the following documents required by the City of
Farmington: CUP Application Form, Proof of Ownership, Application Fee (mailed), Boundary / Lot Survey,
Civil Site Plan, Zoning Site Plan, Abstract/Residential List within 350’ from the subject property, and
Torrens (Owner’s Duplicate Certificate of Title).
Additional supporting documents requested by planning staff include: Wetland No-Loss Application and
Notice, USACOE No Permit Required Letter, Planting and Restoration Plan (included on Sheet 06 of the
Site Plan), Decommissioning Plan, and Driveway Access Agreement (included in the Proof of Ownership
Page 6 Section 4a Right of Entry).
We look forward to continuing to work with the City of Farmington to bring this project through permitting,
construction and into operation to provide clean power to the State of Minnesota for decades to come.
Should the City have any questions or require additional information, please feel free to contact me directly
via the information provided below.
Sincerely,
Director of Development
Email: dsolorzano@dimension-energy.com | Phone: 630.281.0573
Page 15 of 54
3050 Peachtree Road NE, 4th Floor, Suite 460, Atlanta, GA 30305 ■ 877-277-8506 ■ dimension-energy.com
Community Solar Project Narrative
Farmington CSG 1 LLC (Applicant) proposes to construct and operate the Farmington CSG 1 Solar
Project (Project); a ground-mounted photovoltaic (PV) solar facility, 4.95 megawatts AC in capacity.
The Project is proposed to be located on a privately owned parcel, located in the City of Farmington,
Minnesota.
Purpose and Need
The purpose of the proposed Project is to construct and operate the PV solar facility, which will generate
clean and renewable solar energy. The Project was conceived in response to the growing need for
sustainable energy sources and Xcel Energy’s increasing requirements for utility companies to obtain
their electric power from renewable resources.
Based on its commitment to providing renewable energy, the Applicant proposes to develop the site
described below to maximize its solar energy potential. To best determine optimal location within the
site, the following factors have been analyzed:
• Significant solar radiation (insolation)
• Site accessibility
• Avoidance of environmentally sensitive areas
• Limited tree and vegetative clearing
Site Control
Applicant has executed a ground lease agreement with Brian P. Murphy and Tricia T. Murphy, jointly
the landlord. The lease pertains to a portion of land, approximately 30 acres, in Farmington,
Minnesota, where the applicant will develop and operate a solar electric generating facility. The lease's
execution date and development term begin on July 15, 2024, and lasts up to three years, with an
option to extend, followed by a 25-year operating term. The applicant will pay both development rent
and operating rent. Applicant is responsible for constructing, operating, and maintaining the facility,
while the landlord ensures access and cooperation throughout the lease term. Additionally, provisions
include easements for utility access, insurance requirements, and the applicant’s right to alter the
property as needed.
Site Setting
The Project site occupies 18.54 acres within a larger 30-acre parcel (PIN 140340087010) in Farmington,
MN. The site is bordered by industrial lands in the City of Lakeville to the west, farm fields to the north
and south, and a residential property to the east. The Project will be accessed via an upgraded farm
entrance from Flagstaff Avenue.
A wetland delineation was completed for the entire parcel. Two small, wetlands were identified, one is
a farmed wetland. Approval for the wetland boundary and type was granted by the Dakota County Soil
and Water Conservation District. The project was designed to completely avoid both wetlands. One of
the small, wetlands on the west side of the property has solar panels within the 25-foot buffer average
of the wetland, but is beyond the minimum 16.5-foot buffer requirement. This type of activity in a
wetland does not diminish its function and therefore qualifies for a “No-Loss” under the Wetland
Page 16 of 54
3050 Peachtree Road NE, 4th Floor, Suite 460, Atlanta, GA 30305 ■ 877-277-8506 ■ dimension-energy.com
Conservation Act and is not regulated by the US Army Corps of Engineers. An application for
approval from the Dakota County SWCD is in process.
This project will have “no effect” on state or federally listed species, their habitats or their designated
critical habitat. No further consultation with MN Department of Natural Resources nor the US Fish and
Wildlife Service is anticipated.
Design Standards
The Applicant has reviewed the Farmington Code of Ordinances and intends to comply with each
requirement listed for Conditional Use Permits (§10-3-5) and all referenced criteria therein, such as A-1
Agricultural District requirements (§10-5-5) and Shoreland Management Regulations (§10-6-18).
Transportation and Access
The site will be accessed via an existing, upgraded entrance off Flagstaff Avenue. The Applicant
intends to enter into a Driveway Access Agreement with landlord to facilitate access to the Project
Materials for the proposed Project (e.g., solar modules, supporting racks, foundation materials,
electrical gear) will be brought to the site by truck over the course of construction. It is not expected
that the additional vehicles associated with construction will have an impact on the overall traffic in
Farmington. Once construction is complete, vehicles will be on site sparingly for operations and
maintenance activities. The Project will not be continuously attended once operational.
The permanent facility access road will be installed using gravel substrate. The road will also be wide
enough to accommodate emergency vehicles and designed in compliance with applicable standards.
Screening and Ground Cover
The solar array and all balance of system equipment will be enclosed in a minimum seven-foot-tall
fence in compliance with the national electric code. The fence will have at least one vehicle access
gate at the boundary of the array, which will always remain locked, except during operations and
maintenance activities. Vegetative ground cover is to be established per the enclosed Planting and
Restoration Plan (Sheet 06 of the Site Plan).
Dense, well-established vegetation on the east side of the Project on the neighboring property owner’s
west side consisting of mature evergreen trees and low shrubs will screen views of this project from
this adjoining property owner’s view.
Project Signage
Visible project identification and warning signs shall be posted at each ingress/egress point
associated with the Project. The Project emergency contact information and 911 address will be
clearly posted on all warning signage.
Page 17 of 54
3050 Peachtree Road NE, 4th Floor, Suite 460, Atlanta, GA 30305 ■ 877-277-8506 ■ dimension-energy.com
Interconnection
The Applicant has submitted an interconnection application with Xcel Energy and the project is currently
progressing through the study process. The proposed facility is planned to interconnect to Xcel’s three-
phase line on the east side of the Project
Key Project Components
The proposed Project will consist of the following key components:
• Solar Modules
• Underground Electrical Conductors
• Balance of System Equipment
• Access Roads
• Fencing
Solar Modules
The proposed Project will utilize approximately 8,559 solar modules. The modules are manufactured
offsite and will be delivered to the site by truck in wooden crates or cardboard boxes. Each module
will measure approximately 94” in length by 45” in width and will be rated at 605 Watts each. Solar
modules will be configured on a single axis tracking racking system.
The frames of solar modules will be mounted on steel posts, which would be driven or screwed into the
ground to a depth between 10 and 15 feet. The posts will be made from galvanized or corrosion-resistant
metal to minimize the potential for corrosion over the lifespan of the project. Appropriate spacing will be
maintained between each row of solar modules for operations and maintenance access.
Underground Electrical Conductors
Underground electrical conductors will be installed in trenches at depth in compliance with the National
Electric Code. Conductors will either be buried in a polyvinylchloride (PVC) conduit or equivalent.
Balance of System Equipment
Balance of System Equipment including but not limited to AC combiner boxes, transformers, and/or
medium voltage switchgear may be installed near the solar array within the Project’s fence line.
Balance of System Equipment will be installed on concrete pads and in compliance with equipment
manufacturer instructions. Full details of Balance of System Equipment will be included as part of the
Project’s electrical design plan set submitted for ministerial permits.
Summary of Construction Activities and Components
Site preparation will consist of clearing the existing vegetation in those areas where construction will
be undertaken, grading, and establishing temporary staging areas (including stockpile and laydown
areas). Once the site is prepared, the installation of racking equipment, modules, and balance of
system equipment can begin.
Page 18 of 54
3050 Peachtree Road NE, 4th Floor, Suite 460, Atlanta, GA 30305 ■ 877-277-8506 ■ dimension-energy.com
Clearing and Grading
Selected vegetation located on the proposed Project site may be removed in order to accommodate
the construction of the array and its appurtenances, as well as to prevent shading on the array during
operation. Because the solar modules will be placed approximately 2-3 feet above grade, any
vegetation taller than 2 feet or expected to exceed 2 feet in height will be removed. Grass and
groundcover may remain between rows and under the solar modules. After construction, the ground
underneath the array will be reseeded with low growth grasses to promote soil stability. All cleared
vegetation will either be chipped and spread on site or disposed of responsibly.
Construction equipment such as tractors, backhoes, loaders, dozers, and graders may be needed to
clear vegetation from the site, and to grade roads and areas where structures currently stand. While
the racking equipment can tolerate some slope, grading of the array area may also be required to
even out the terrain. Due to the pre-existing grade of the site, minimal grading is anticipated.
Staging Areas
A temporary staging area will be used as a laydown area for equipment and materials such as solar
crates, electric cable, structural supports, and Balance of System Equipment, as well as the location
for sanitary facilities and a construction trailer. The portion of the staging area containing equipment
and materials will likely be enclosed with a temporary construction fence with a lockable gate.
Racking and Modules
The foundations securing the solar modules will be designed to withstand high winds and snow loads.
Galvanized or corrosion-resistant steel piles will be driven into the ground between 10 and 15 feet,
depending on soil conditions and depth to bedrock. Modules will be aggregated into frames and
mounted on each supporting pile.
Balance of System Equipment and Conductors
Balance of System electrical equipment will be located on concrete pads within the Project’s fence line.
Balance of System equipment may include cabinet style equipment such as AC combiner boxes,
transformers, and medium voltage switchgear, which will be anchored directly to the concrete pad, as
well as smaller metering and controls equipment, which would be mounted on H-frames or other
supporting structures. Structural analysis will be performed to determine the size and thickness of the
concrete pads.
The low-voltage conductors connecting solar modules to the Balance of System (BoS) Equipment will
be supported using an above-ground cable management system, specifically the CAB (Cable
Aboveground) system. The CAB hangers will securely suspend and organize the conductors,
ensuring compliance with applicable standards for above-ground installations. Since the conductors
will be elevated, trenching will not be required, and there will be no need for underground conduit
installation.
This system will simplify maintenance access and provide enhanced protection for the conductors.
Medium voltage conductors will mostly run underground in a similar fashion to low voltage wiring. A
portion of the medium voltage conductor will ultimately come above ground and strung along new
distribution poles, ultimately terminating at three three-phase lines that will be extended to Base Line
Road.
Page 19 of 54
3050 Peachtree Road NE, 4th Floor, Suite 460, Atlanta, GA 30305 ■ 877-277-8506 ■ dimension-energy.com
Employment
A typical construction workforce for a solar facility of this size consists of approximately 25 construction
workers during the construction period, which should last approximately 6 months. Construction
personnel will be divided between civil and electrical services and, based on the phasing of
construction, it is not anticipated that all workers will be present on site at the same time. Workers will
be transported to the site via construction trucks and will park in the established staging area.
Water Use, Sewer, and Solid Waste
No water will be required for construction activities, and no water infrastructure is proposed in
association with the Project. Sewer services are not anticipated. Temporary sanitary facilities will be
placed on site during construction.
Page 20 of 54
Old Do m in io n
Fr e ig ht Li ne
F
l
a
g
s
t
a
f
f
A
v
e212thStW
F
l
a
g
s
t
a
f
f
A
v
e
140340087010
Prepared on:6/26/2025
by:
0 250 500125 Feet ±PID 14-03400-87-010
Tax Parcels
Municipal Boundary
Farmington Community Solar
Garden Project Location Map
Page 21 of 54
THE 2020 EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD
SPECIFICATIONS FOR CONSTRUCTION" SHALL GOVERN.
CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO MAINTAIN OPERATION OF
EXISTING UTILITIES THROUGHOUT THE DURATION OF THE PROJECT. IN THE EVENT THAT AN
INTERRUPTION OF SERVICE IS UNAVOIDABLE IN ORDER TO COMPLETE THE WORK,
CONTRACTOR SHALL PROVIDE ADEQUATE NOTIFICATION TO ALL AFFECTED ENTITIES A
MINIMUM OF 3 WORKING DAYS IN ADVANCE OF ANY INTERRUPTION.
THE LOCATION OF UNDERGROUND FACILITIES AND/OR STRUCTURES AS SHOWN ON THE
PLANS ARE BASED ON AVAILABLE RECORDS AT THE TIME THE PLANS WERE PREPARED AND
ARE NOT GUARANTEED TO BE COMPLETE OR CORRECT.
EXISTING UTILITIES
IT IS THE LAW THAT ANYONE EXCAVATING AT ANY SITE MUST NOTIFY GOPHER STATE ONE
CALL (GSOC) SO THAT UNDERGROUND ELECTRIC, NATURAL GAS, TELEPHONE OR OTHER
UTILITY LINES CAN BE MARKED ON OR NEAR YOUR PROPERTY BEFORE ANY DIGGING
BEGINS. A 48-HOUR NOTICE, NOT INCLUDING WEEKENDS, IS REQUIRED. CALLS CAN BE MADE
TO GSOC AT 1-800-252-1166 OR (651) 454-0002, MONDAY THROUGH FRIDAY (EXCEPT
HOLIDAYS) FROM 7 A.M. TO 5 P.M.
GOPHER STATE ONE-CALL
GENERAL NOTES
CONSTRUCTION NOTE
GOVERNING SPECIFICATIONS
ALL TRAFFIC CONTROL DEVICES AND SIGNING SHALL CONFORM TO MINNESOTA MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES, INCLUDING FIELD MANUAL FOR TEMPORARY CONTROL
ZONE LAYOUTS.
THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL UTILITIES 72 HOURS PRIOR TO
CONSTRUCTION TO DETERMINE THE EXACT LOCATION OF ALL FACILITIES AND TO PROVIDE
ADEQUATE PROTECTION OF SAID UTILITIES DURING THE COURSE OF WORK.
THE SUBSURFACE UTILITY INFORMATION SHOWN IS UTILITY QUALITY LEVEL D, AS
DETERMINED USING THE GUIDELINES OF "CI/ASCE 38-02 STANDARD GUIDELINES FOR THE
COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA."
DIMENSION ENERGY
FARMINGTON CSG
FARMINGTON, DAKOTA COUNTY, MINNESOTA
30% DRAFT PLANS - NOT FOR CONSTRUCTION
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM
A DULY LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA.
FARMINGTON, DAKOTA COUNTY, MINNESOTA
DIMENSION ENERGY ATLANTA , GA, 30305 SHEET 01 OF 13
DESIGNED BY: EOR
CHECKED BY:MLR
FARMINGTON CSG
EOR JOB #1617-0015
COVER
MICHAEL L. RUPIPER DATE: 06/23/2025 LICENSE #50129
DRAWN BY: IJA
DESCRIPTION
2
3
4
5
6
06/23/2025 1 30% DRAFT PLANS - NOT FOR CONSTRUCTION
NO. DATE
DAKOTA COUNTY
MINNESOTA, USA
PROJECT LOCATION, REFERENCE MAP
N
EMMONS & OLIVIER RESOURCES, INC.
1919 UNIV. AVE. W. #300 ST. PAUL, MN
TEL: 651.770.8448 WWW.EORINC.COM
w a t e r
e c o l o g y
c o m m u n i t y
Pl
o
t
D
a
t
e
:
0
6
/
2
3
/
2
0
2
5
Dr
a
w
i
n
g
n
a
m
e
:
P
:
\
0
1
6
1
7
-
D
i
m
e
n
s
i
o
n
E
n
e
r
g
y
\
0
0
1
5
_
M
u
r
p
h
y
_
M
N
_
2
0
2
4
\
0
9
_
G
I
M
S
\
d
w
g
\
S
h
e
e
t
s
\
1
6
1
7
-
0
0
1
5
T
i
t
l
e
&
S
E
Q
.
d
w
g
Xr
e
f
s
:
4
1
6
1
7
-
0
0
1
5
B
a
s
e
D
a
t
a
42
4
0
9
6
4
g
a
s
l
i
n
e
a
s
b
u
i
l
t
4C
S
A
H
7
0
F
u
t
u
r
e
A
l
i
g
n
m
e
n
t
_
9
6
a
d
j
_
u
p
d
a
t
e
d
;
I
m
a
g
e
s
:
J
:
\
7
_
I
m
a
g
e
s
\
8
1
1
G
:
\
C
A
D
D
\
B
l
o
c
k
s
\
8
1
1
l
o
g
o
.
.
\
.
.
\
.
.
\
.
.
\
M
A
R
K
E
T
I
N
G
\
0
0
1
0
_
M
N
_
2
0
2
4
_
P
o
r
t
f
o
l
i
o
\
1
0
_
I
m
a
g
e
s
\
D
i
m
e
n
s
i
o
n
L
o
g
o
J
:
\
7
_
I
m
a
g
e
s
\
G
S
O
C
L
o
g
o
_
2
0
1
9
.
\
i
m
a
g
e
x
r
e
f
s
\
i
o
w
a
-
o
n
e
-
c
a
l
l
PROJECT LOCATION
LEGEND
FEATURE EXISTING PROPOSED
MAJOR CONTOUR
MINOR CONTOUR
SETBACKS
PROPERTY BOUNDARY
WETLAND BOUNDARY
EASEMENT
GAS LINE
SANITARY SEWER LINE
OVERHEAD ELECTRIC LINES
UNDERHEAD ELECTRIC LINES
FENCE
SILT FENCE
SEDIMENT LOGS
CONSTRUCTION ENTRANCE
PANELS
ROAD
25 FT WETLANDS
BUFFER
TREELINE
SF
974
975
OHO
OHU
G
E-O
E-U
Sheet List Table
Sheet Number Sheet Title
01 COVER
02 NOTES
03 EXISTING CONDITIONS
04 SITE PLAN
05 SEDIMENT AND EROSION CONTROL
06 PLANTING & RESTORATION PLAN
07 CONSTRUCTION DETAILS
08 EROSION CONTROL DETAILS
09 DETAILS 1
10 DETAILS 2
11 DETAILS 3
12 DETAILS 4
13 DETAILS 5
Pa
g
e
2
3
o
f
5
4
EMMONS & OLIVIER RESOURCES, INC.
1919 UNIV. AVE. W. #300 ST. PAUL, MN
TEL: 651.770.8448 WWW.EORINC.COM
w a t e r
e c o l o g y
c o m m u n i t y
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM
A DULY LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA.
FARMINGTON, DAKOTA COUNTY, MINNESOTA
DIMENSION ENERGY ATLANTA , GA, 30305 SHEET 02 OF 13
DESIGNED BY: EOR
CHECKED BY:MLR
FARMINGTON CSG
EOR JOB #1617-0015
NOTES
MICHAEL L. RUPIPER DATE: 06/23/2025 LICENSE #50129
DRAWN BY: IJA
DESCRIPTION
2
3
4
5
6
06/23/2025 1 30% DRAFT PLANS - NOT FOR CONSTRUCTION
NO. DATE
Pl
o
t
D
a
t
e
:
0
6
/
2
3
/
2
0
2
5
Dr
a
w
i
n
g
n
a
m
e
:
P
:
\
0
1
6
1
7
-
D
i
m
e
n
s
i
o
n
E
n
e
r
g
y
\
0
0
1
5
_
M
u
r
p
h
y
_
M
N
_
2
0
2
4
\
0
9
_
G
I
M
S
\
d
w
g
\
S
h
e
e
t
s
\
1
6
1
7
-
0
0
1
5
T
i
t
l
e
&
S
E
Q
.
d
w
g
Xr
e
f
s
:
4
1
6
1
7
-
0
0
1
5
B
a
s
e
D
a
t
a
42
4
0
9
6
4
g
a
s
l
i
n
e
a
s
b
u
i
l
t
4C
S
A
H
7
0
F
u
t
u
r
e
A
l
i
g
n
m
e
n
t
_
9
6
a
d
j
_
u
p
d
a
t
e
d
;
I
m
a
g
e
s
:
J
:
\
7
_
I
m
a
g
e
s
\
8
1
1
G
:
\
C
A
D
D
\
B
l
o
c
k
s
\
8
1
1
l
o
g
o
.
.
\
.
.
\
.
.
\
.
.
\
M
A
R
K
E
T
I
N
G
\
0
0
1
0
_
M
N
_
2
0
2
4
_
P
o
r
t
f
o
l
i
o
\
1
0
_
I
m
a
g
e
s
\
D
i
m
e
n
s
i
o
n
L
o
g
o
J
:
\
7
_
I
m
a
g
e
s
\
G
S
O
C
L
o
g
o
_
2
0
1
9
.
\
i
m
a
g
e
x
r
e
f
s
\
i
o
w
a
-
o
n
e
-
c
a
l
l
GENERAL SITE WORK NOTES
1. CONTRACTOR TO VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO BEGINNING ANY CONSTRUCTION BY CALLING GOPHER STATE ONE-CALL (1-651-454-0002 METRO AREA, 1-800-252-1166
OUT STATE)
2. VERIFY HORIZONTAL LOCATION AND ELEVATION WHERE A CONNECTION TO EXISTING PAVEMENT, STRUCTURE, PIPE OR OTHER SITE FEATURE IS TO BE MADE. THE CONTRACTOR SHALL IMMEDIATELY
NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM THE PLANS.
3. REFERENCE TO MNDOT SPECIFICATIONS SHALL MEAN DIVISIONS II AND III OF THE 2020 SPECIFICATIONS FOR CONSTRUCTION.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY APPROPRIATE ADDITIONAL PERMITS. THIS MAY INCLUDE FOR DEWATERING, BURNING, OR OTHER GRADING ACTIVITIES.
GENERAL UTILITY NOTES
1.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING UTILITY LOCATIONS AND INVERTS, SHOWN OR NOT SHOWN. ANY DISCREPANCY BETWEEN PLANS AND FIELD
CONDITIONS SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY.
2.ALL UTILITY WORK SHALL BE PERFORMED IN ACCORDANCE WITH DAKOTA COUNTY AND FARMINGTON CITY REQUIREMENTS.
3.UTILITY TRENCHES SHALL BE COMPACTED TO 95% STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D698.78 OR AASHTO T-99) FROM THE PIPE ZONE TO WITHIN THREE FEET OF THE
GROUND SURFACE AND 100% STANDARD PROCTOR IN THE UPPER THREE FEET UNDER WALKS AND PAVEMENTS, AND 90% STANDARD PROCTOR IN LANDSCAPE AREAS.
4.FIELD ADJUST ALL CASTINGS TO MATCH FINAL GRADES.
STORM SEWER NOTES
1.STORM SEWER CONSTRUCTION SHALL BE IN ACCORDANCE WITH MNDOT 2501-2511 SPECIFICATIONS.
2.APPROXIMATE PIPE LENGTHS ON THE PLAN INCLUDE THE APRON SECTION.
STORMWATER POLLUTION PREVENTION NOTES
1.THE CONTRACTOR SHALL IMPLEMENT EROSION CONTROL IN ACCORDANCE WITH COUNTY AND STATE REQUIREMENTS AND AS SHOWN ON PLANS.
2.THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES, INCLUDING THE REMOVAL OF ACCUMULATED SEDIMENT AT ½ CAPACITY FROM BMPS DURING THE DURATION OF
CONSTRUCTION UNTIL FINAL STABILIZATION IS ACHIEVED.
3.CONTRACTOR TO ADHERE TO ALL TOWNSHIP AND COUNTY PERMIT REQUIREMENTS, INCLUDING THE REQUIREMENT TO MINIMIZE THE AREA DISTURBED BY GRADING AT ANY GIVEN TIME AND
TO COMPLETE TURF RESTORATION WITHIN THE TIME REQUIRED BY THE PERMIT AFTER COMPLETION OF GRADING OF AN AREA.
4.ALL EXPOSED SOIL AREAS WITHIN 200 FEET OF A WATER OF THE STATE OR ANY STORMWATER CONVEYANCE SYSTEM WHICH IS CONNECTED TO A WATER OF THE STATE MUST BE
STABILIZED WITHIN 24 HOURS.
5.ALL CONSTRUCTION ENTRANCES SHALL BE SURFACED WITH CRUSHED ROCK (OR APPROVED EQUAL) ACROSS FULL WIDTH FROM ENTRANCE POINT TO 50 FEET INTO THE CONSTRUCTION
ZONE.
6.ALL EROSION CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH TOWNSHIP, COUNTY, AND STATE REQUIREMENTS.
7.THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES, INCLUDING THE REMOVAL OF ACCUMULATED SILT IN FRONT OF SILT FENCES, SEDIMENT CONTROL LOGS, ETC.
DURING THE DURATION OF THE CONSTRUCTION.
8.MAINTAIN EXISTING EROSION CONTROL. RE-ESTABLISH ANY EXISTING EROSION CONTROL DISTURBED BY CONSTRUCTION.
9.CONTRACTOR SHALL PROVIDE ADDITIONAL TEMPORARY EROSION CONTROL MEASURES AS REQUIRED FOR CONSTRUCTION.
10.REMOVE ALL EROSION CONTROL MEASURES AFTER THE WORK HAS BEEN ACCEPTED BY THE COUNTY, STATE, AND PROJECT ENGINEER.
11.THE CONTRACTOR SHALL REMOVE ALL SOILS AND SEDIMENT TRACKED ONTO EXISTING STREETS AND PAVED AREAS WITHIN 24 HOURS OF NOTICE IN ACCORDANCE WITH COUNTY AND
STATE REQUIREMENTS.
12.STOCKPILED SOIL IS ONLY PERMITTED IN APPROVED LOCATION(S) AT SLOPES EQUAL TO OR FLATTER THAN 2h:1v. ALL STOCKPILED SOILS SHALL BE PROTECTED WITH TWO ≥ 6” DIAMETER
COMPOST/ROCK LOGS AND DAILY SURFACE PROTECTION.
13.NO RE-FUELING OF TRUCK AND CONSTRUCTION EQUIPMENT IS PERMITTED ANYWHERE ON SITE EXCEPT IN THE VICINITY OF FIELD APPROVED STAGING AREA(S). A CONSPICUOUSLY LABELED
SPILL KIT MUST BE ON SITE AND BE KEPT IN THE VICINITY OF THE STAGING AREA(S).
14.TRUCK AND CONSTRUCTION VEHICLE WASHING AND DEGREASING IS PROHIBITED ON SITE. CONSTRUCTION EQUIPMENT MUST BE THOROUGHLY CLEANED PRIOR TO ACCESSING THE SITE TO
LIMIT THE SPREAD OF INVASIVE SPECIES.
15.NO HAZARDOUS MATERIALS (OIL, GAS, FLUIDS, PAINTS, LUBRICANTS, ETC.) ARE TO BE STORED ON SITE.
16.CONCRETE AND OTHER WASHOUT LIQUIDS SHALL BE CONTAINED IN A LABELED FACILITY. NO WASHOUT MATERIAL SHALL DISCHARGE TO GROUND OR PAVEMENT SURFACES.
17.ANY SEDIMENT REMAINING IN PLACE AFTER THE EROSION CONTROL DEVICE IS NO LONGER REQUIRED SHALL BE GRADED TO CONFORM WITH THE EXISTING GRADE, PREPARED, AND
SEEDED WITH THE APPROPRIATE SEED MIX AS NOTED ON THE PLANS.
18.SUITABLE GRADING MATERIAL SHALL CONSIST OF ALL SOIL ENCOUNTERED ON THE SITE WITH EXCEPTION OF TOPSOIL, DEBRIS, ORGANIC MATERIAL AND OTHER UNSTABLE MATERIAL.
CONTRACTOR SHALL STOCKPILE TOPSOIL AND GRANULAR FILL AT SUITABLE LOCATIONS AS DETERMINED BY CONTRACTOR.
19.EXISTING GRANULAR MATERIALS SHALL BE SEGREGATED AND STOCKPILED FOR REUSE ON-SITE.
20.CONTRACTOR SHALL STRIP, STOCKPILE AND RE-SPREAD EXISTING ON-SITE TOPSOIL TO PROVIDE A UNIFORM THICKNESS OF AT LEAST 6 INCHES ON ALL GRADED AREAS.
21.SUBGRADE EXCAVATION SHALL BE BACKFILLED IMMEDIATELY AFTER EXCAVATION TO HELP OFFSET ANY STABILITY PROBLEMS DUE TO WATER SEEPAGE OR STEEP SLOPES. WHEN PLACING
NEW SURFACE MATERIAL ADJACENT TO EXISTING PAVEMENT, THE EXCAVATION SHALL BE BACKFILLED PROMPTLY TO AVOID UNDERMINING OF THE EXISTING PAVEMENT.
22.GRADES SHOWN ARE FINISHED GRADES, CONTRACTOR SHALL ROUGH GRADE TO SUBGRADE ELEVATION, LEAVE SITE READY FOR SUBBASE.
23.FINAL GRADING TOLERANCES ARE ±0.1 FEET OF PLAN GRADES. OVERFLOW SPILLWAYS ARE TO BE GRADED TO WITHIN ±0.05 FEET OF GRADE PLANS, UNLESS NOTED OTHERWISE.
24.ALL EXCESS MATERIAL, BITUMINOUS SURFACING, CONCRETE ITEMS, ANY ABANDONED UTILITY ITEMS, AND OTHER UNSTABLE MATERIALS SHALL BECOME THE PROPERTY OF THE
CONTRACTOR AND SHALL BE DISPOSED OFF THE CONSTRUCTION SITE. DISPOSAL SHALL BE DONE IN A MANNER THAT MEETS ALL APPLICABLE REGULATIONS.
25.CONTRACTOR IS RESPONSIBLE FOR GRADING AND SLOPING THE FINISHED GROUND SURFACE TO PROVIDE SMOOTH & UNIFORM SLOPES, WHICH PROVIDE POSITIVE GRADE AND PREVENT
PONDING IN LOWER AREAS.
26.SLOPES AT 3:1 OR STEEPER, AND/OR WHERE INDICATED ON THE PLANS SHALL BE SEEDED AND HAVE AN EROSION CONTROL BLANKET INSTALLED OR MAY BE HYDROSEEDED WITH BONDED
FIBER MATRIX (BFM).
GENERAL LANDSCAPE NOTES
1.CONTRACTOR SHALL INSPECT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS RELATING TO THE NATURE AND SCOPE OF WORK.
2.CONTRACTOR SHALL VERIFY PLAN LAYOUT AND BRING TO THE ATTENTION OF THE ENGINEER DISCREPANCIES WHICH MAY COMPROMISE THE DESIGN OR INTENT OF THE LAYOUT.
3.CONTRACTOR SHALL ASSURE COMPLIANCE WITH APPLICABLE CODES AND REGULATIONS GOVERNING THE WORK AND MATERIALS SUPPLIED.
4.CONTRACTOR SHALL PROTECT EXISTING ROADS, CURBS/GUTTERS, TRAILS, TREES, IRRIGATION SYSTEM, LAWNS AND SITE ELEMENTS DURING CONSTRUCTION OPERATIONS.
5.CONTRACTOR SHALL REVIEW THE SITE FOR DEFICIENCIES IN SITE CONDITIONS WHICH MIGHT NEGATIVELY AFFECT PLANT ESTABLISHMENT, SURVIVAL OR WARRANTY. UNDESIRABLE SITE
CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO BEGINNING OF WORK.
GENERAL EARTHWORK NOTES
1.EARTHWORK ASSUMPTIONS:
1.1.SEE CONTRACT DOCUMENTS FOR INCLUSIONS, INCLUDING BUT NOT LIMITED TO MEASUREMENT & PAYMENT.
1.2.ALL ON-SITE TOPSOIL INCLUDES ARE PLAN (P) QUANTITIES.
1.3.TOPSOIL, ON-SITE INCLUDES A SUBCUT OF 6" DEEP FOR SOIL HANDLING IN ADDITION TO CUT TO FILL, AND AS SUCH IS INCLUDED IN QUANTITY FOR
COMMON EXCAVATION.
TOPSOIL RESPREAD SHALL BE A MINIMUM OF 6".
2.EARTHWORK QUANTITIES DO NOT BALANCE ON SITE.
3.AGGREGATE QUANTITY DOES NOT INCLUDE ADDITIONAL VOLUME OF MATERIAL TO ACHIEVE COMPACTION.
Pa
g
e
2
4
o
f
5
4
G
G
G
G
G
936
935
9
3
4
933
932
93
1
930
931
93
1
9
3
0
9
3
2
9
3
3
93
4
93
5
935
932
933
934935
936
937
938
939
938
9
3
7
9
3
6
9
3
5
9
3
4
9
3
3
932
933
9
3
4
939
933
9
2
8
9
3
1
9
3
2
93
3
93
4
935
2
0
'
4
0
'
N
EMMONS & OLIVIER RESOURCES, INC.
1919 UNIV. AVE. W. #300 ST. PAUL, MN
TEL: 651.770.8448 WWW.EORINC.COM
w a t e r
e c o l o g y
c o m m u n i t y
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM
A DULY LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA.
FARMINGTON, DAKOTA COUNTY, MINNESOTA
DIMENSION ENERGY ATLANTA , GA, 30305 SHEET 03 OF 13
DESIGNED BY: EOR
CHECKED BY:MLR
FARMINGTON CSG
EOR JOB #1617-0015
EXISTING CONDITIONS
MICHAEL L. RUPIPER DATE: 06/23/2025 LICENSE #50129
DRAWN BY: IJA
DESCRIPTION
2
3
4
5
6
06/23/2025 1 30% DRAFT PLANS - NOT FOR CONSTRUCTION
NO. DATE
Pl
o
t
D
a
t
e
:
0
6
/
2
3
/
2
0
2
5
Dr
a
w
i
n
g
n
a
m
e
:
P
:
\
0
1
6
1
7
-
D
i
m
e
n
s
i
o
n
E
n
e
r
g
y
\
0
0
1
5
_
M
u
r
p
h
y
_
M
N
_
2
0
2
4
\
0
9
_
G
I
M
S
\
d
w
g
\
S
h
e
e
t
s
\
1
6
1
7
-
0
0
1
5
E
x
i
s
t
i
n
g
C
o
n
d
i
t
i
o
n
s
.
d
w
g
Xr
e
f
s
:
4
1
6
1
7
-
0
0
1
5
B
a
s
e
D
a
t
a
42
4
0
9
6
4
g
a
s
l
i
n
e
a
s
b
u
i
l
t
4C
S
A
H
7
0
F
u
t
u
r
e
A
l
i
g
n
m
e
n
t
_
9
6
a
d
j
_
u
p
d
a
t
e
d
41
6
1
7
-
0
0
1
5
E
x
i
s
t
i
n
g
S
u
r
f
a
c
e
;
I
m
a
g
e
s
:
.
\
i
m
a
g
e
x
r
e
f
s
\
8
1
1
G
:
\
C
A
D
D
\
B
l
o
c
k
s
\
8
1
1
l
o
g
o
.
.
\
.
.
\
.
.
\
.
.
\
M
A
R
K
E
T
I
N
G
\
0
0
1
0
_
M
N
_
2
0
2
4
_
P
o
r
t
f
o
l
i
o
\
1
0
_
I
m
a
g
e
s
\
D
i
m
e
n
s
i
o
n
L
o
g
o
.
\
i
m
a
g
e
x
r
e
f
s
\
G
S
O
C
L
o
g
o
_
2
0
1
9
.
\
i
m
a
g
e
x
r
e
f
s
\
i
o
w
a
-
o
n
e
-
c
a
l
l
SCALE IN FEET
0'400'100'200'
DELINEATED WETLAND
AREA: 8,222 SF
DELINEATED WETLAND
PROPERTY BOUNDARY
EXISTING GAS LINE
XCEL TERRITORY BOUNDARY
EXISTING SANITARY LINE
PID: 140340087010
OWNER: BRIAN P MURPHY
AREA: 30 ACRES
PID: 140340005014
OWNER: DARLENE TSTE PEDERSEN
AREA: 35.59 ACRES
PID: 221050001010
OWNER: MN LAKEVILLE CEDAR LLC
AREA: 28.11 ACRES
PID: 140340086011
OWNER: JOAQUIN SEGURA
AREA: 10.22 ACRES
PID: 221050000010
OWNER: CITY OF LAKEVILLE
AREA: 7.69 ACRES
EXISTING SANITARY MANHOLE
DELINEATED WETLAND
AREA: 26,542 SF
EXISTING FENCELINE (TYP.)
EXISTING TREELINE (TYP.)
EXISTING ACCESS DRIVE
FEMA ZONE A
Pa
g
e
2
5
o
f
5
4
G
G
G
G
G
936
935
9
3
4
933
932
93
1
930
931
93
1
9
3
0
9
3
2
9
3
3
93
4
93
5
935
932
933
934935
936
937
938
939
938
9
3
7
9
3
6
9
3
5
9
3
4
9
3
3
932
933
9
3
4
939
933
9
2
8
9
3
1
9
3
2
93
3
93
4
935
E-
U
20'
20'
G
G
G
932
933
E-
U
E
-
O
6
0
'
G
A
S
LI
N
E
E
A
S
E
.
N
EMMONS & OLIVIER RESOURCES, INC.
1919 UNIV. AVE. W. #300 ST. PAUL, MN
TEL: 651.770.8448 WWW.EORINC.COM
w a t e r
e c o l o g y
c o m m u n i t y
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM
A DULY LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA.
FARMINGTON, DAKOTA COUNTY, MINNESOTA
DIMENSION ENERGY ATLANTA , GA, 30305 SHEET 04 OF 13
DESIGNED BY: EOR
CHECKED BY:MLR
FARMINGTON CSG
EOR JOB #1617-0015
SITE PLAN
MICHAEL L. RUPIPER DATE: 06/23/2025 LICENSE #50129
DRAWN BY: IJA
DESCRIPTION
2
3
4
5
6
06/23/2025 1 30% DRAFT PLANS - NOT FOR CONSTRUCTION
NO. DATE
Pl
o
t
D
a
t
e
:
0
6
/
2
3
/
2
0
2
5
Dr
a
w
i
n
g
n
a
m
e
:
P
:
\
0
1
6
1
7
-
D
i
m
e
n
s
i
o
n
E
n
e
r
g
y
\
0
0
1
5
_
M
u
r
p
h
y
_
M
N
_
2
0
2
4
\
0
9
_
G
I
M
S
\
d
w
g
\
S
h
e
e
t
s
\
1
6
1
7
-
0
0
1
5
S
i
t
e
P
l
a
n
.
d
w
g
Xr
e
f
s
:
4
1
6
1
7
-
0
0
1
5
B
a
s
e
D
a
t
a
42
4
0
9
6
4
g
a
s
l
i
n
e
a
s
b
u
i
l
t
4C
S
A
H
7
0
F
u
t
u
r
e
A
l
i
g
n
m
e
n
t
_
9
6
a
d
j
_
u
p
d
a
t
e
d
41
6
1
7
-
0
0
1
5
E
x
i
s
t
i
n
g
S
u
r
f
a
c
e
41
6
1
7
-
0
0
1
5
E
d
g
e
l
i
n
e
s
;
I
m
a
g
e
s
:
.
\
i
m
a
g
e
x
r
e
f
s
\
8
1
1
G
:
\
C
A
D
D
\
B
l
o
c
k
s
\
8
1
1
l
o
g
o
.
.
\
.
.
\
.
.
\
.
.
\
M
A
R
K
E
T
I
N
G
\
0
0
1
0
_
M
N
_
2
0
2
4
_
P
o
r
t
f
o
l
i
o
\
1
0
_
I
m
a
g
e
s
\
D
i
m
e
n
s
i
o
n
L
o
g
o
.
\
i
m
a
g
e
x
r
e
f
s
\
G
S
O
C
L
o
g
o
_
2
0
1
9
.
\
i
m
a
g
e
x
r
e
f
s
\
i
o
w
a
-
o
n
e
-
c
a
l
l
SCALE IN FEET
0'300'75'150'
PROPOSED ACCESS DRIVE
PERIMETER FENCE
PERIMETER FENCE
FUTURE ROAD EXTENSION
01
07
03
07
03
07
ACCESS GATE 02
07
ACCESS GATE
02
07
50' YARD SETBACK
DELINEATED WETLAND
AREA: 26,542 SF
DELINEATED WETLAND
AREA: 8,222 SF
FARMINGTON SETBACK REQUIREMENTS
FRONT YARD
SIDE YARD
50 FEET
20 FEET
REAR YARD 20 FEET
25' WETLAND BUFFER
MIN. 16.5' WETLAND BUFFER
E
-
O
NOTES:
1.MINIMUM 16.5' WETLAND BUFFER IS PROVIDED.
BUFFER AVERAGING EXCEEDS 25' FOR BOTH
WETLANDS ON SITE.
2.GAS PIPELINE CROSSINGS SHALL MEET THE
REQUIREMENTS OF ENTERPRISE PRODUCT'S
ENCROACHMENT APPLICATION TECHNICAL
GUIDELINES.
PROPOSED ACCESS DRIVE
PROPOSED OVERHEAD
ELECTRIC LINE
PROPOSED UNDERGROUND
ELECTRIC LINE
PROPOSED UNDERGROUND
ELECTRIC LINE
GAS LINE CROSSING DETAIL
SCALE IN FEET
0'120'30'60'
Pa
g
e
2
6
o
f
5
4
G
G
G
G
G
936
935
9
3
4
933
932
93
1
930
931
93
1
9
3
0
9
3
2
9
3
3
93
4
93
5
935
932
933
934935
936
937
938
939
938
9
3
7
9
3
6
9
3
5
9
3
4
9
3
3
932
933
9
3
4
939
933
9
2
8
9
3
1
9
3
2
93
3
93
4
93
5
E-
U
SF
SF
20'
20'
N
EMMONS & OLIVIER RESOURCES, INC.
1919 UNIV. AVE. W. #300 ST. PAUL, MN
TEL: 651.770.8448 WWW.EORINC.COM
w a t e r
e c o l o g y
c o m m u n i t y
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM
A DULY LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA.
FARMINGTON, DAKOTA COUNTY, MINNESOTA
DIMENSION ENERGY ATLANTA , GA, 30305 SHEET 05 OF 13
DESIGNED BY: EOR
CHECKED BY:MLR
FARMINGTON CSG
EOR JOB #1617-0015
SEDIMENT AND
EROSION CONTROL
MICHAEL L. RUPIPER DATE: 06/23/2025 LICENSE #50129
DRAWN BY: IJA
DESCRIPTION
2
3
4
5
6
06/23/2025 1 30% DRAFT PLANS - NOT FOR CONSTRUCTION
NO. DATE
Pl
o
t
D
a
t
e
:
0
6
/
2
3
/
2
0
2
5
Dr
a
w
i
n
g
n
a
m
e
:
P
:
\
0
1
6
1
7
-
D
i
m
e
n
s
i
o
n
E
n
e
r
g
y
\
0
0
1
5
_
M
u
r
p
h
y
_
M
N
_
2
0
2
4
\
0
9
_
G
I
M
S
\
d
w
g
\
S
h
e
e
t
s
\
1
6
1
7
-
0
0
1
5
E
S
C
.
d
w
g
Xr
e
f
s
:
4
1
6
1
7
-
0
0
1
5
B
a
s
e
D
a
t
a
42
4
0
9
6
4
g
a
s
l
i
n
e
a
s
b
u
i
l
t
4C
S
A
H
7
0
F
u
t
u
r
e
A
l
i
g
n
m
e
n
t
_
9
6
a
d
j
_
u
p
d
a
t
e
d
41
6
1
7
-
0
0
1
5
E
x
i
s
t
i
n
g
S
u
r
f
a
c
e
41
6
1
7
-
0
0
1
5
E
d
g
e
l
i
n
e
s
;
I
m
a
g
e
s
:
.
\
i
m
a
g
e
x
r
e
f
s
\
8
1
1
G
:
\
C
A
D
D
\
B
l
o
c
k
s
\
8
1
1
l
o
g
o
.
.
\
.
.
\
.
.
\
.
.
\
M
A
R
K
E
T
I
N
G
\
0
0
1
0
_
M
N
_
2
0
2
4
_
P
o
r
t
f
o
l
i
o
\
1
0
_
I
m
a
g
e
s
\
D
i
m
e
n
s
i
o
n
L
o
g
o
.
\
i
m
a
g
e
x
r
e
f
s
\
G
S
O
C
L
o
g
o
_
2
0
1
9
.
\
i
m
a
g
e
x
r
e
f
s
\
i
o
w
a
-
o
n
e
-
c
a
l
l
SCALE IN FEET
0'400'100'200'
CONSTRUCTION ENTRANCE
SEDIMENT LOG
DELINEATED WETLAND
02
08
01
08
SILT FENCE
SILT FENCE
03
08
03
08
Pa
g
e
2
7
o
f
5
4
G
G
G
G
G
936
935
9
3
4
933
932
93
1
930
931
93
1
9
3
0
9
3
2
9
3
3
93
4
93
5
935
932
933
934935
936
937
938
939
938
9
3
7
9
3
6
9
3
5
9
3
4
9
3
3
932
933
9
3
4
939
933
9
2
8
9
3
1
9
3
2
93
3
93
4
935
E-
U
N
EMMONS & OLIVIER RESOURCES, INC.
1919 UNIV. AVE. W. #300 ST. PAUL, MN
TEL: 651.770.8448 WWW.EORINC.COM
w a t e r
e c o l o g y
c o m m u n i t y
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM
A DULY LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA.
FARMINGTON, DAKOTA COUNTY, MINNESOTA
DIMENSION ENERGY ATLANTA , GA, 30305 SHEET 06 OF 13
DESIGNED BY: EOR
CHECKED BY:MLR
FARMINGTON CSG
EOR JOB #1617-0015
PLANTING &
RESTORATION PLAN
MICHAEL L. RUPIPER DATE: 06/23/2025 LICENSE #50129
DRAWN BY: IJA
DESCRIPTION
2
3
4
5
6
06/23/2025 1 30% DRAFT PLANS - NOT FOR CONSTRUCTION
NO. DATE
Pl
o
t
D
a
t
e
:
0
6
/
2
3
/
2
0
2
5
Dr
a
w
i
n
g
n
a
m
e
:
P
:
\
0
1
6
1
7
-
D
i
m
e
n
s
i
o
n
E
n
e
r
g
y
\
0
0
1
5
_
M
u
r
p
h
y
_
M
N
_
2
0
2
4
\
0
9
_
G
I
M
S
\
d
w
g
\
S
h
e
e
t
s
\
1
6
1
7
-
0
0
1
5
P
l
a
n
t
i
n
g
&
R
e
s
t
o
r
a
t
i
o
n
P
l
a
n
.
d
w
g
Xr
e
f
s
:
4
1
6
1
7
-
0
0
1
5
B
a
s
e
D
a
t
a
42
4
0
9
6
4
g
a
s
l
i
n
e
a
s
b
u
i
l
t
4C
S
A
H
7
0
F
u
t
u
r
e
A
l
i
g
n
m
e
n
t
_
9
6
a
d
j
_
u
p
d
a
t
e
d
41
6
1
7
-
0
0
1
5
E
x
i
s
t
i
n
g
S
u
r
f
a
c
e
41
6
1
7
-
0
0
1
5
E
d
g
e
l
i
n
e
s
;
I
m
a
g
e
s
:
.
\
i
m
a
g
e
x
r
e
f
s
\
8
1
1
G
:
\
C
A
D
D
\
B
l
o
c
k
s
\
8
1
1
l
o
g
o
.
.
\
.
.
\
.
.
\
.
.
\
M
A
R
K
E
T
I
N
G
\
0
0
1
0
_
M
N
_
2
0
2
4
_
P
o
r
t
f
o
l
i
o
\
1
0
_
I
m
a
g
e
s
\
D
i
m
e
n
s
i
o
n
L
o
g
o
.
\
i
m
a
g
e
x
r
e
f
s
\
G
S
O
C
L
o
g
o
_
2
0
1
9
.
\
i
m
a
g
e
x
r
e
f
s
\
i
o
w
a
-
o
n
e
-
c
a
l
l
SCALE IN FEET
0'400'100'200'
SEED MIX CODE SEED MIX NAME RATE AREA
S1 SOLAR SITE SEED MIX 23.1 LB / AC 740,612 SF
39-241 (17.00 AC)
NOTE: SEED MIXES SHALL BE APPLIED WITH CRIMPED WEED-FREE
STRAW MULCH @ 2.25 TONS / ACRE
TREE AND SEED SCHEDULE
GENERAL NOTES
1.LANDSCAPE CONTRACTOR SHALL INSPECT THE SITE AND BECOME FAMILIAR WITH
EXISTING CONDITIONS RELATING TO THE NATURE AND SCOPE OF WORK.
2.LANDSCAPE CONTRACTOR SHALL VERIFY PLAN LAYOUT AND BRING TO THE ATTENTION
OF THE LANDSCAPE ARCHITECT DISCREPANCIES WHICH MAY COMPROMISE THE
DESIGN OR INTENT OF THE LAYOUT.
3.LANDSCAPE CONTRACTOR SHALL ASSURE COMPLIANCE WITH APPLICABLE CODES AND
REGULATIONS GOVERNING THE WORK AND MATERIALS SUPPLIED.
4.LANDSCAPE CONTRACTOR SHALL VERIFY ALIGNMENT AND LOCATION OF
UNDERGROUND AND ABOVE GRADE UTILITIES AND PROVIDE THE NECESSARY
PROTECTION FOR SAME BEFORE CONSTRUCTION BEGINS.
5.LANDSCAPE CONTRACTOR SHALL REVIEW THE SITE FOR DEFICIENCIES IN SITE
CONDITIONS WHICH MIGHT NEGATIVELY AFFECT PLANT ESTABLISHMENT, SURVIVAL OR
WARRANTY. UNDESIRABLE SITE CONDITIONS SHALL BE BROUGHT TO THE ATTENTION
OF THE LANDSCAPE ARCHITECT PRIOR TO BEGINNING OF WORK.
6.LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR ONGOING MAINTENANCE OF NEWLY
INSTALLED MATERIALS UNTIL TIME OF FINAL ACCEPTANCE BY LANDSCAPE ARCHITECT.
REPAIR OF ACTS OF VANDALISM OR DAMAGE WHICH MAY OCCUR PRIOR TO FINAL
ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR.
SEEDING NOTES
7.SEEDING SHALL FOLLOW MNDOT SEEDING MANUAL 2023 EDITION.
8.SEED SHALL BE LOCAL ORIGIN AND WILD ECOTYPE. SEED ORIGIN SHALL BE CERTIFIED
BY THE MN CROP IMPROVEMENT ASSOCIATION. LOCAL ORIGIN SHALL MEAN WITHIN 175
MILES OF PROJECT SITE. PROVIDE MCIA DOCUMENTATION TO LANDSCAPE ARCHITECT
PRIOR TO SEEDING.
9.SOW SEED MIXES ON ALL DISTURBED AREAS AFTER ALL GRADING ACTIVITIES HAVE
BEEN COMPLETED. SEEDING MAY TAKE PLACE PRIOR TO PILE DRIVING AND SOLAR
ARRAY INSTALLATION, HOWEVER ANY DISTURBED AREAS WILL HAVE TO BE RE-SEEDED.
10.ACCEPTABLE SEEDING DATES ARE APRIL 15 - JULY 20 IN THE SPRING, OR SEPTEMBER
20 - OCTOBER 20 IN THE FALL. WRITTEN PERMISSION MUST BE GRANTED BY THE
LANDSCAPE ARCHITECT TO PERFORM SEEDING OPERATIONS ON ANY OTHER DATES OF
THE YEAR.
11.SEEDING METHODS 1-3 ARE ANTICIPATED ACROSS THE SITE IN RESPONSE TO SITE
CONDITIONS. CONTRACTOR WILL PREPARE SEEDING PLAN IN CONJUNCTION WITH
PROJECT LANDSCAPE ARCHITECT, APPROVAL IS NECESSARY TO EXECUTE.
12.SOW NATIVE SEEDS WITH A MULTI-BOX BROADCAST SEEDER SUCH AS THE TRILLION BY
TRUAX, WHERE POSSIBLE.
13.PREPARE SEED BED PRIOR TO SEEDING PER MNDOT SPEC. 2574.3.A.4.
14.SOLAR ARRAYS MUST BE PROTECTED FROM HYDRO-MULCH OVERSPRAY OR CLEANED
AFTER APPLICATION PER MNDOT SPEC. 2575.3.E.
15.COVER NATIVE SEED MIXES WITH CLEAN STRAW MULCH (TYPE 3), AND DISC ANCHOR,
EXCEPT WHERE EROSION CONTROL BLANKET IS INDICATED ON PLANS.
20.USE TEMPORARY EROSION CONTROL DEVICES (SEDIMENT LOGS, SILT FENCE) AS
NEEDED TO PREVENT EROSION PRIOR TO AND DURING SEED ESTABLISHMENT.
21.INCLUDE A COVER CROP OF OATS WITHIN NATIVE GRASS SEED MIX (@ RATE OF 32
LB/ACRE) IF SEEDING BETWEEN OCTOBER 15TH AND AUGUST 1ST. IF SEEDING
BETWEEN AUGUST 1ST AND OCTOBER 15TH, SUBSTITUTE WINTER WHEAT FOR OATS AT
THE SAME RATE.
SEED ESTABLISHMENT NOTES
22.ESTABLISHMENT PERIOD COMMENCES UPON ACCEPTANCE OF SEEDING (ADEQUATE
COVER CROP GERMINATION AND COVERAGE) AND RUNS FOR THREE YEARS FROM
THIS DATE.
23.MONITOR THE SITE MONTHLY DURING THIS PERIOD TO DETECT AREAS OF WEED
COLONIZATION. CUT OR TREAT ALL NOXIOUS WEEDS (AS CURRENTLY DEFINED BY MN
DEPARTMENT OF AGRICULTURE) WITH GLYPHOSATE HERBICIDE AS SOON AS
DETECTED.
24.DURING THE FIRST GROWING SEASON MOW OR CUT THE ENTIRE SEEDED AREA EVERY
30 DAYS UNTIL SEPTEMBER 30TH AT A HEIGHT OF 5-8".
25.DURING THE SECOND GROWING SEASON MOW OR CUT THE ENTIRE SEEDED AREA
ONCE IN MID-JUNE AND ONCE IN MID-AUGUST AT A HEIGHT OF 5-8".
26.IF AREAS OF BARE GROUND PERSIST AFTER FIRST GROWING SEASON RESEED PER
PLAN.
27.AFTER THE FIRST TWO GROWING SEASONS MOW OR CUT NATIVE SEED AREAS IN LATE
FALL OR EARLY SPRING. RAKE OUT AND REMOVE DOWNED VEGETATION.
Pa
g
e
2
8
o
f
5
4
EMMONS & OLIVIER RESOURCES, INC.
1919 UNIV. AVE. W. #300 ST. PAUL, MN
TEL: 651.770.8448 WWW.EORINC.COM
w a t e r
e c o l o g y
c o m m u n i t y
CONSTRUCTION
DETAILS
DESCRIPTION
2
3
4
5
6
06/23/2025 1 30% DRAFT PLANS - NOT FOR CONSTRUCTION
NO. DATE
Pl
o
t
D
a
t
e
:
0
6
/
2
3
/
2
0
2
5
Dr
a
w
i
n
g
n
a
m
e
:
P
:
\
0
1
6
1
7
-
D
i
m
e
n
s
i
o
n
E
n
e
r
g
y
\
0
0
1
5
_
M
u
r
p
h
y
_
M
N
_
2
0
2
4
\
0
9
_
G
I
M
S
\
d
w
g
\
S
h
e
e
t
s
\
1
6
1
7
-
0
0
1
5
C
o
n
s
t
r
u
c
t
i
o
n
D
e
t
a
i
l
s
.
d
w
g
Xr
e
f
s
:
;
I
m
a
g
e
s
:
G
:
\
C
A
D
D
\
B
l
o
c
k
s
\
8
1
1
l
o
g
o
.
.
\
.
.
\
.
.
\
.
.
\
0
0
1
1
_
G
n
i
f
f
k
e
M
N
2
0
2
4
\
0
9
_
G
I
M
S
\
I
m
a
g
e
s
\
D
A
N
G
E
R
H
I
G
H
V
O
L
T
A
G
E
.
.
\
.
.
\
.
.
\
.
.
\
M
A
R
K
E
T
I
N
G
\
0
0
1
0
_
M
N
_
2
0
2
4
_
P
o
r
t
f
o
l
i
o
\
1
0
_
I
m
a
g
e
s
\
d
i
m
e
n
s
i
o
n
_
e
n
e
r
g
y
_
l
o
c
k
u
p
_
h
o
r
i
z
_
1
c
_
R
G
B
.
.
\
.
.
\
.
.
\
.
.
\
0
0
1
1
_
G
n
i
f
f
k
e
M
N
2
0
2
4
\
0
9
_
G
I
M
S
\
I
m
a
g
e
s
\
N
e
w
o
r
M
o
d
i
f
i
e
d
D
r
i
v
e
w
a
y
o
r
E
n
t
r
a
n
c
e
P
e
r
m
i
t
-
4
FARMINGTON, DAKOTA COUNTY, MINNESOTA
DIMENSION ENERGY ATLANTA , GA, 30305
DESIGNED BY: EOR
CHECKED BY:MLR
FARMINGTON CSG
EOR JOB #1617-0015
DRAWN BY: IJA
SHEET 07 OF 13
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT
WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA.
MICHAEL L. RUPIPER DATE: 06/23/2025 LICENSE # 50129
2% MAX CROSS SLOPE
18'
GRAVEL ACCESS ROAD
NATIVE SUBSOILS
MIN 12" SUBGRADE COMPACTED TO 95% STANDARD PROCTOR
6" SURFACE AGGREGATE SHALL BE MNDOT CLASS 5
PER MNDOT SPEC TABLE 3138-1
COMPACTION PER MNDOT SPEC 2211.3
TENSAR BX 1100 GEOGRID
3' 0''
14'' DIA.
VEHICULAR GATE
6''
BRACE BAR BRACE BAR
PLUNGER ROD OR OTHER SECURE
METAL DEVICE FOR CLOSURE
20' 0'' MAX.
3/8'' DIA.
TRUSS RODS
3' 0''
14'' DIA.
3''
DOUBLE GATE
SINGLE GATE
6''
TIES
AT 12''
CENTERS
8' 0''
GATE SHALL HAVE LOCKING AND HOLDING MECHANISM
11.5 GAUGE STEEL
CONFORM TO MNDOT 3376.2
NOTES:
1.POSTS FOR VEHICULAR GATES SHALL BE NPS 3-1/2" NOM. I.D. AASHTO M181, 9.12 LBS./FT., 6'-0" LENGTH.
2.FRAMES FOR VEHICULAR GATES SHALL BE: NPS 1-1/2" NOM. I.D. AASHTO M181, 2.72 LBS./FT.
3.CONTRACTOR TO PROVIDE KNOX BOX FOR KEY ACCESS BY MAINTENANCE PERSONNEL AND FIRST
RESPONDERS.
4.GATE TO OPEN OUT AND HAVE POSTS FOR SECURING FENCE GATES IN OPEN POSITION.
5.MOTION-ACTIVATED EXTERIOR LIGHTING PRESENT AT ACCESS GATES.
NOTES:
1.DEPENDING ON SOILS,
UTILIZE TREATED
WOODEN POSTS DRIVEN
INTO THE SOIL
(NARROWER END INTO
GROUND), AVOID THE USE
OF CONCRETE FOOTINGS
2.CONCRETE TO BE USED
ONLY ON CORNER, GATES,
AND TERMINAL POSTS
UNDISTURBED
EARTH
POST SPACING UP TO
10' APART
MIN. 4" DIAMETER TREATED
WOODEN POSTS,
W/ NARROW END
HI-TENSILE STEEL
FIXED KNOT WOVEN WIRE
MIN. 12.5 GAUGE STEEL
(3)
6" VERT. SPACING
6" HORIZONTAL WIRE
SPACING
(2)
4" VERT. SPACING
(2)
5" VERT. SPACING
7'
BOTTOM WIRE OF
FENCE SHALL BE AT
GROUND ELEVATION
OR SLIGHTLY BURIED
(3)
6" VERT. SPACING
(2)
7" VERT. SPACING
(2)
8" VERT. SPACING
SIGNAGE NOTES:
1.AT A MINIMUM, SIGNS SHALL BE 10 INCHES WIDE BY 7 INCHES HIGH.
2.TOP OF SIGH SHALL BE PLACED AT 5 FEET HIGH.
3.SIGNS SHALL BE SPACED AT NO MORE THAN 100 FOOT INTERVALS ON THE PERIMETER.
4.SIGNS SHALL BE MOUNTED TO FENCE THROUGH PRE-PUNCHED HOLES USING SUNBUNDLER PV TIES.
3
07 No Scale
PERIMETER FENCE 4
07 No Scale
FENCE SIGNAGE
1
07 No Scale
ACCESS DRIVE CROSS SECTION 2
07 No Scale
ACCESS GATE
Pa
g
e
2
9
o
f
5
4
DESCRIPTION
2
3
4
5
6
06/23/2025 1 30% DRAFT PLANS - NOT FOR CONSTRUCTION
NO. DATE
Pl
o
t
D
a
t
e
:
0
6
/
2
3
/
2
0
2
5
Dr
a
w
i
n
g
n
a
m
e
:
P
:
\
0
1
6
1
7
-
D
i
m
e
n
s
i
o
n
E
n
e
r
g
y
\
0
0
1
5
_
M
u
r
p
h
y
_
M
N
_
2
0
2
4
\
0
9
_
G
I
M
S
\
d
w
g
\
S
h
e
e
t
s
\
1
6
1
7
-
0
0
1
5
C
o
n
s
t
r
u
c
t
i
o
n
D
e
t
a
i
l
s
.
d
w
g
Xr
e
f
s
:
;
I
m
a
g
e
s
:
G
:
\
C
A
D
D
\
B
l
o
c
k
s
\
8
1
1
l
o
g
o
.
.
\
.
.
\
.
.
\
.
.
\
0
0
1
1
_
G
n
i
f
f
k
e
M
N
2
0
2
4
\
0
9
_
G
I
M
S
\
I
m
a
g
e
s
\
D
A
N
G
E
R
H
I
G
H
V
O
L
T
A
G
E
.
.
\
.
.
\
.
.
\
.
.
\
M
A
R
K
E
T
I
N
G
\
0
0
1
0
_
M
N
_
2
0
2
4
_
P
o
r
t
f
o
l
i
o
\
1
0
_
I
m
a
g
e
s
\
d
i
m
e
n
s
i
o
n
_
e
n
e
r
g
y
_
l
o
c
k
u
p
_
h
o
r
i
z
_
1
c
_
R
G
B
.
.
\
.
.
\
.
.
\
.
.
\
0
0
1
1
_
G
n
i
f
f
k
e
M
N
2
0
2
4
\
0
9
_
G
I
M
S
\
I
m
a
g
e
s
\
N
e
w
o
r
M
o
d
i
f
i
e
d
D
r
i
v
e
w
a
y
o
r
E
n
t
r
a
n
c
e
P
e
r
m
i
t
-
4
FARMINGTON, DAKOTA COUNTY, MINNESOTA
DIMENSION ENERGY ATLANTA , GA, 30305
DESIGNED BY: EOR
CHECKED BY:MLR
FARMINGTON CSG
EOR JOB #1617-0015
DRAWN BY: IJA
SHEET 08 OF 13
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT
WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA.
MICHAEL L. RUPIPER DATE: 06/23/2025 LICENSE # 50129
HAR
D
S
U
R
F
A
C
E
PUB
L
I
C
R
O
A
D
6-12"
50'
M
I
N
18'
3" CLEAR ROCK
NOTE :
1.STABILIZED CONSTRUCTION ENTRANCE SHALL
BE MAINTAINED FOR THE DURATION OF THE
CONSTRUCTION PROCESS.
2.ROCK SHALL BE UNDERLINED WITH MNDOT
TYPE 3 GEOTEXTILE FABRIC.
MNDOT TYPE 3
GEOTEXTILE
DIRECTION OF
R
U
N
O
F
F
LAY FABRIC IN THE TRENCH
OVERLAP GEOTEXTILE FABRIC
6" AND FASTEN AT 2' INTERVALS
`BEST' T-POST WITH
ATTACHMENT TO
POST
WIRE OR
CABLE
TIES GEOTEXTILE
FABRIC-OVERLAP FABRIC 6"
AND FASTEN AT 2'
INTERVALS
SUPPORT POST
ANCHORAGE IN-SITU SOIL
WOOD FENCE POST,
5' MAX. SPACING
NOTE:
1. ATTACH FABRIC TO WIRE MESH AND SUPPORT POSTS
WITH RINGS OR WIRE TIES
24
"
6"
MI
N
.
6"
MIN.
30
"
M
I
N
.
H
E
I
G
H
T
FABRIC ANCHORAGE TRENCH BACKFILL
TRENCH WITH TAMPED NATURAL SOIL
STD. FIELD FENCE, MIN.
30" HIGH
FABRIC TO MEET MNDOT
SPEC 3886.1
EMMONS & OLIVIER RESOURCES, INC.
1919 UNIV. AVE. W. #300 ST. PAUL, MN
TEL: 651.770.8448 WWW.EORINC.COM
w a t e r
e c o l o g y
c o m m u n i t y
EROSION CONTROL
DETAILS
1
08 No Scale
CONSTRUCTION ENTRANCE
3
08 No Scale
SILT FENCE
2
08 No Scale
SEDIMENT LOG
2
12" MIN
1.SPACE STAKES AS FOLLOWS:
FILTER SOCKS: 2"X2" NOMINAL WOOD STAKES AT 8
FOOT MAXIMUM STAKING.
WOOD EXCELSIOR LOGS: 1"X1" NOMINAL WOOD
STAKES AT 8 FOOT MAXIMUM SPACING.
2.INSTALL SLOPE PROTECTION PERPENDICULAR TO
SLOPE (PARALLEL TO CONTOURS). OVERLAP
JOINTS PER DETAIL 'A'. RUN THE LAST 10 FEET OF
EACH DEVICE UP THE SLOPE TO PREVENT FLOW
RUNAROUND.
3. STAKES ARE NOT TO PROTRUDE THROUGH LOGS,
BUT RATHER PLACED ON THE DOWNSTREAM SIDE
AT A 45 DEGREE ANGLE SO AS TO "PINCH" THE LOG
TIGHT TO THE GROUND SURFACE
4. COMPOST LOGS 9" DIA. ROLL ENCLOSED IN
PLASTIC OR POLYESTER NETTING W/ MAXIMUM OF
3
8" NET OPINING
TOP OF SLOPE OR
UNDISTURBED AREA
INSET
3
INSET
Pa
g
e
3
0
o
f
5
4
EMMONS & OLIVIER RESOURCES, INC.
1919 UNIV. AVE. W. #300 ST. PAUL, MN
TEL: 651.770.8448 WWW.EORINC.COM
w a t e r
e c o l o g y
c o m m u n i t y DETAILS 1
DESCRIPTION
2
3
4
5
6
06/23/2025 1 30% DRAFT PLANS - NOT FOR CONSTRUCTION
NO. DATE
Pl
o
t
D
a
t
e
:
0
6
/
2
3
/
2
0
2
5
Dr
a
w
i
n
g
n
a
m
e
:
P
:
\
0
1
6
1
7
-
D
i
m
e
n
s
i
o
n
E
n
e
r
g
y
\
0
0
1
5
_
M
u
r
p
h
y
_
M
N
_
2
0
2
4
\
0
9
_
G
I
M
S
\
d
w
g
\
S
h
e
e
t
s
\
1
6
1
7
-
0
0
1
5
D
e
t
a
i
l
s
.
d
w
g
Xr
e
f
s
:
;
I
m
a
g
e
s
:
G
:
\
C
A
D
D
\
B
l
o
c
k
s
\
8
1
1
l
o
g
o
.
.
\
.
.
\
.
.
\
.
.
\
0
0
1
1
_
G
n
i
f
f
k
e
M
N
2
0
2
4
\
0
9
_
G
I
M
S
\
I
m
a
g
e
s
\
D
A
N
G
E
R
H
I
G
H
V
O
L
T
A
G
E
.
.
\
.
.
\
.
.
\
.
.
\
M
A
R
K
E
T
I
N
G
\
0
0
1
0
_
M
N
_
2
0
2
4
_
P
o
r
t
f
o
l
i
o
\
1
0
_
I
m
a
g
e
s
\
d
i
m
e
n
s
i
o
n
_
e
n
e
r
g
y
_
l
o
c
k
u
p
_
h
o
r
i
z
_
1
c
_
R
G
B
.
.
\
.
.
\
.
.
\
.
.
\
0
0
1
1
_
G
n
i
f
f
k
e
M
N
2
0
2
4
\
0
9
_
G
I
M
S
\
I
m
a
g
e
s
\
N
e
w
o
r
M
o
d
i
f
i
e
d
D
r
i
v
e
w
a
y
o
r
E
n
t
r
a
n
c
e
P
e
r
m
i
t
-
4
FARMINGTON, DAKOTA COUNTY, MINNESOTA
DIMENSION ENERGY ATLANTA , GA, 30305
DESIGNED BY: EOR
CHECKED BY:MLR
FARMINGTON CSG
EOR JOB #1617-0015
DRAWN BY: IJA
SHEET 09 OF 13
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT
WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA.
MICHAEL L. RUPIPER DATE: 06/23/2025 LICENSE # 50129
01
09 No Scale
DETAIL VIEWS
Pa
g
e
3
1
o
f
5
4
EMMONS & OLIVIER RESOURCES, INC.
1919 UNIV. AVE. W. #300 ST. PAUL, MN
TEL: 651.770.8448 WWW.EORINC.COM
w a t e r
e c o l o g y
c o m m u n i t y DETAILS 2
DESCRIPTION
2
3
4
5
6
06/23/2025 1 30% DRAFT PLANS - NOT FOR CONSTRUCTION
NO. DATE
Pl
o
t
D
a
t
e
:
0
6
/
2
3
/
2
0
2
5
Dr
a
w
i
n
g
n
a
m
e
:
P
:
\
0
1
6
1
7
-
D
i
m
e
n
s
i
o
n
E
n
e
r
g
y
\
0
0
1
5
_
M
u
r
p
h
y
_
M
N
_
2
0
2
4
\
0
9
_
G
I
M
S
\
d
w
g
\
S
h
e
e
t
s
\
1
6
1
7
-
0
0
1
5
D
e
t
a
i
l
s
.
d
w
g
Xr
e
f
s
:
;
I
m
a
g
e
s
:
G
:
\
C
A
D
D
\
B
l
o
c
k
s
\
8
1
1
l
o
g
o
.
.
\
.
.
\
.
.
\
.
.
\
0
0
1
1
_
G
n
i
f
f
k
e
M
N
2
0
2
4
\
0
9
_
G
I
M
S
\
I
m
a
g
e
s
\
D
A
N
G
E
R
H
I
G
H
V
O
L
T
A
G
E
.
.
\
.
.
\
.
.
\
.
.
\
M
A
R
K
E
T
I
N
G
\
0
0
1
0
_
M
N
_
2
0
2
4
_
P
o
r
t
f
o
l
i
o
\
1
0
_
I
m
a
g
e
s
\
d
i
m
e
n
s
i
o
n
_
e
n
e
r
g
y
_
l
o
c
k
u
p
_
h
o
r
i
z
_
1
c
_
R
G
B
.
.
\
.
.
\
.
.
\
.
.
\
0
0
1
1
_
G
n
i
f
f
k
e
M
N
2
0
2
4
\
0
9
_
G
I
M
S
\
I
m
a
g
e
s
\
N
e
w
o
r
M
o
d
i
f
i
e
d
D
r
i
v
e
w
a
y
o
r
E
n
t
r
a
n
c
e
P
e
r
m
i
t
-
4
FARMINGTON, DAKOTA COUNTY, MINNESOTA
DIMENSION ENERGY ATLANTA , GA, 30305
DESIGNED BY: EOR
CHECKED BY:MLR
FARMINGTON CSG
EOR JOB #1617-0015
DRAWN BY: IJA
SHEET 10 OF 13
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT
WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA.
MICHAEL L. RUPIPER DATE: 06/23/2025 LICENSE # 50129
01
10 No Scale
ELECTRICAL DETAILS - CAB SYSTEM
Pa
g
e
3
2
o
f
5
4
EMMONS & OLIVIER RESOURCES, INC.
1919 UNIV. AVE. W. #300 ST. PAUL, MN
TEL: 651.770.8448 WWW.EORINC.COM
w a t e r
e c o l o g y
c o m m u n i t y DETAILS 3
DESCRIPTION
2
3
4
5
6
06/23/2025 1 30% DRAFT PLANS - NOT FOR CONSTRUCTION
NO. DATE
Pl
o
t
D
a
t
e
:
0
6
/
2
3
/
2
0
2
5
Dr
a
w
i
n
g
n
a
m
e
:
P
:
\
0
1
6
1
7
-
D
i
m
e
n
s
i
o
n
E
n
e
r
g
y
\
0
0
1
5
_
M
u
r
p
h
y
_
M
N
_
2
0
2
4
\
0
9
_
G
I
M
S
\
d
w
g
\
S
h
e
e
t
s
\
1
6
1
7
-
0
0
1
5
D
e
t
a
i
l
s
.
d
w
g
Xr
e
f
s
:
;
I
m
a
g
e
s
:
G
:
\
C
A
D
D
\
B
l
o
c
k
s
\
8
1
1
l
o
g
o
.
.
\
.
.
\
.
.
\
.
.
\
0
0
1
1
_
G
n
i
f
f
k
e
M
N
2
0
2
4
\
0
9
_
G
I
M
S
\
I
m
a
g
e
s
\
D
A
N
G
E
R
H
I
G
H
V
O
L
T
A
G
E
.
.
\
.
.
\
.
.
\
.
.
\
M
A
R
K
E
T
I
N
G
\
0
0
1
0
_
M
N
_
2
0
2
4
_
P
o
r
t
f
o
l
i
o
\
1
0
_
I
m
a
g
e
s
\
d
i
m
e
n
s
i
o
n
_
e
n
e
r
g
y
_
l
o
c
k
u
p
_
h
o
r
i
z
_
1
c
_
R
G
B
.
.
\
.
.
\
.
.
\
.
.
\
0
0
1
1
_
G
n
i
f
f
k
e
M
N
2
0
2
4
\
0
9
_
G
I
M
S
\
I
m
a
g
e
s
\
N
e
w
o
r
M
o
d
i
f
i
e
d
D
r
i
v
e
w
a
y
o
r
E
n
t
r
a
n
c
e
P
e
r
m
i
t
-
4
FARMINGTON, DAKOTA COUNTY, MINNESOTA
DIMENSION ENERGY ATLANTA , GA, 30305
DESIGNED BY: EOR
CHECKED BY:MLR
FARMINGTON CSG
EOR JOB #1617-0015
DRAWN BY: IJA
SHEET 11 OF 13
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT
WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA.
MICHAEL L. RUPIPER DATE: 06/23/2025 LICENSE # 50129
01
11 No Scale
EQUIPMENT MOUNTING DETAILS IN ARRAY
Pa
g
e
3
3
o
f
5
4
EMMONS & OLIVIER RESOURCES, INC.
1919 UNIV. AVE. W. #300 ST. PAUL, MN
TEL: 651.770.8448 WWW.EORINC.COM
w a t e r
e c o l o g y
c o m m u n i t y DETAILS 4
DESCRIPTION
2
3
4
5
6
06/23/2025 1 30% DRAFT PLANS - NOT FOR CONSTRUCTION
NO. DATE
Pl
o
t
D
a
t
e
:
0
6
/
2
3
/
2
0
2
5
Dr
a
w
i
n
g
n
a
m
e
:
P
:
\
0
1
6
1
7
-
D
i
m
e
n
s
i
o
n
E
n
e
r
g
y
\
0
0
1
5
_
M
u
r
p
h
y
_
M
N
_
2
0
2
4
\
0
9
_
G
I
M
S
\
d
w
g
\
S
h
e
e
t
s
\
1
6
1
7
-
0
0
1
5
D
e
t
a
i
l
s
.
d
w
g
Xr
e
f
s
:
;
I
m
a
g
e
s
:
G
:
\
C
A
D
D
\
B
l
o
c
k
s
\
8
1
1
l
o
g
o
.
.
\
.
.
\
.
.
\
.
.
\
0
0
1
1
_
G
n
i
f
f
k
e
M
N
2
0
2
4
\
0
9
_
G
I
M
S
\
I
m
a
g
e
s
\
D
A
N
G
E
R
H
I
G
H
V
O
L
T
A
G
E
.
.
\
.
.
\
.
.
\
.
.
\
M
A
R
K
E
T
I
N
G
\
0
0
1
0
_
M
N
_
2
0
2
4
_
P
o
r
t
f
o
l
i
o
\
1
0
_
I
m
a
g
e
s
\
d
i
m
e
n
s
i
o
n
_
e
n
e
r
g
y
_
l
o
c
k
u
p
_
h
o
r
i
z
_
1
c
_
R
G
B
.
.
\
.
.
\
.
.
\
.
.
\
0
0
1
1
_
G
n
i
f
f
k
e
M
N
2
0
2
4
\
0
9
_
G
I
M
S
\
I
m
a
g
e
s
\
N
e
w
o
r
M
o
d
i
f
i
e
d
D
r
i
v
e
w
a
y
o
r
E
n
t
r
a
n
c
e
P
e
r
m
i
t
-
4
FARMINGTON, DAKOTA COUNTY, MINNESOTA
DIMENSION ENERGY ATLANTA , GA, 30305
DESIGNED BY: EOR
CHECKED BY:MLR
FARMINGTON CSG
EOR JOB #1617-0015
DRAWN BY: IJA
SHEET 12 OF 13
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT
WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA.
MICHAEL L. RUPIPER DATE: 06/23/2025 LICENSE # 50129
01
12 No Scale
EQUIPMENT ELEVATION DETAIL
Pa
g
e
3
4
o
f
5
4
EMMONS & OLIVIER RESOURCES, INC.
1919 UNIV. AVE. W. #300 ST. PAUL, MN
TEL: 651.770.8448 WWW.EORINC.COM
w a t e r
e c o l o g y
c o m m u n i t y DETAILS 5
DESCRIPTION
2
3
4
5
6
06/23/2025 1 30% DRAFT PLANS - NOT FOR CONSTRUCTION
NO. DATE
Pl
o
t
D
a
t
e
:
0
6
/
2
3
/
2
0
2
5
Dr
a
w
i
n
g
n
a
m
e
:
P
:
\
0
1
6
1
7
-
D
i
m
e
n
s
i
o
n
E
n
e
r
g
y
\
0
0
1
5
_
M
u
r
p
h
y
_
M
N
_
2
0
2
4
\
0
9
_
G
I
M
S
\
d
w
g
\
S
h
e
e
t
s
\
1
6
1
7
-
0
0
1
5
D
e
t
a
i
l
s
.
d
w
g
Xr
e
f
s
:
;
I
m
a
g
e
s
:
G
:
\
C
A
D
D
\
B
l
o
c
k
s
\
8
1
1
l
o
g
o
.
.
\
.
.
\
.
.
\
.
.
\
0
0
1
1
_
G
n
i
f
f
k
e
M
N
2
0
2
4
\
0
9
_
G
I
M
S
\
I
m
a
g
e
s
\
D
A
N
G
E
R
H
I
G
H
V
O
L
T
A
G
E
.
.
\
.
.
\
.
.
\
.
.
\
M
A
R
K
E
T
I
N
G
\
0
0
1
0
_
M
N
_
2
0
2
4
_
P
o
r
t
f
o
l
i
o
\
1
0
_
I
m
a
g
e
s
\
d
i
m
e
n
s
i
o
n
_
e
n
e
r
g
y
_
l
o
c
k
u
p
_
h
o
r
i
z
_
1
c
_
R
G
B
.
.
\
.
.
\
.
.
\
.
.
\
0
0
1
1
_
G
n
i
f
f
k
e
M
N
2
0
2
4
\
0
9
_
G
I
M
S
\
I
m
a
g
e
s
\
N
e
w
o
r
M
o
d
i
f
i
e
d
D
r
i
v
e
w
a
y
o
r
E
n
t
r
a
n
c
e
P
e
r
m
i
t
-
4
FARMINGTON, DAKOTA COUNTY, MINNESOTA
DIMENSION ENERGY ATLANTA , GA, 30305
DESIGNED BY: EOR
CHECKED BY:MLR
FARMINGTON CSG
EOR JOB #1617-0015
DRAWN BY: IJA
SHEET 13 OF 13
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT
WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA.
MICHAEL L. RUPIPER DATE: 06/23/2025 LICENSE # 50129
01
13 No Scale
POLE LINE UP - SIDE VIEW 1
Pa
g
e
3
5
o
f
5
4
Farmington CSG 1 Solar Project
Decommissioning Plan
June 2025
Dimension Energy
Page 36 of 54
3050 Peachtree Road, 4th Floor, Suite 460, Atlanta, GA 30305 ■ 877-277-8506 ■ dimension-energy.com
Contents
Introduction .................................................................................................................................................... 1
System Decommissioning .............................................................................................................................. 1
Abandonment Definitions ............................................................................................................................... 1
Timing Requirements ..................................................................................................................................... 1
Equipment and Material Removal .................................................................................................................. 2
Disposal and Recycling of Materials ............................................................................................................... 3
Site Restoration ............................................................................................................................................. 3
Stakeholder Notification and Construction ...................................................................................................... 3
Decommissioning Bond Estimate and Abandonment ..................................................................................... 3
Change of Ownership .................................................................................................................................... 4
Acknowledgement and Approval .................................................................................................................... 4
Exhibit A: Decommissioning Estimate
Exhibit B: Form Decommissioning Bond
Page 37 of 54
Introduction
Farmington CSG 1 proposes to construct and operate a ground-mounted fixed tilt photovoltaic (“PV”) solar
system, 4.95 MW (AC) in capacity. The Farmington CSG 1 Solar Project (“Project”) is proposed to be located
on a privately owned parcel, in City of Farmington, Minnesota (PIN: 140340087010).
Ground-mounted solar facilities are designed, engineered, and constructed to operate for at least 20 years and
can operate up to 30 years or more. During construction, portions of the site may be compacted, excavated,
and graded for optimal installation and operation. This decommissioning plan outlines the steps that will be
taken to remove the solar system and its associated appurtenances from the Project site and return the parcel
to conditions similar to pre-installation.
This Decommissioning Plan will be updated as necessary in the future to ensure that changes in technology
and site restoration methods are taken into consideration.
System Decommissioning
Farmington CSG 1 is responsible for decommissioning activities, as outlined in the conditions of permit
approval by the local regulatory agencies and pursuant to the guidelines provided in local county ordinance.
Decommissioning and restoration activities will align with current regulations at the time of decommissioning
and will be conducted in accordance with state and local regulations. At the end of its operational life, or if the
system is abandoned or upon cessation of activity, the entire system will be disconnected from the grid,
disassembled, and removed, and all materials will either be recycled or disposed of appropriately within a
period of 12 months and at the expense of the Facility Owner. Any necessary permits will be obtained from the
local AHJ and/or relevant State authorities prior to decommissioning activity.
During City of Farmington’s permitting process, or if none, then prior to the commencement of project
construction, Farmington CSG 1 shall file with City of Farmington a Deconstruction Plan. Farmington CSG 1
shall additionally file an updated Deconstruction Plan with City of Farmington on or before the end of the tenth
year of commercial operation.
Abandonment Definitions
Written notice will be provided to the AHJ’s Code Enforcement Officer within 30 days in the event the operation
of the system is discontinued. The Applicant acknowledges that the system must be decommissioned if the
Project has not been verified to be active or in continuous service for the prior year, and that decommissioning
notification will be provided by the Code Enforcement Officer.
Timing Requirements
Decommissioning and removal of the Project will be completed within a period of 12 months from the time at
which the Facility is determined to be abandoned or has reached the end of its useful life. Or, as noted above,
if the Code Enforcement Officer has deemed the Project to be inoperative or abandoned for the prior year, the
equipment both above and below ground, structures, and foundations will be removed. The soil and surface
grade will be restored and revegetated with native seed mixes and/or plant species, excluding invasive
species.
Page 38 of 54
3050 Peachtree Road, 4th Floor, Suite 460, Atlanta, GA 30305 ■ 877-277-8506 ■ dimension-energy.com
Equipment and Material Removal
Farmington CSG 1 will remove all above-ground equipment (solar modules, racking and support structures,
inverters, transformers, switchgear and other ancillary electrical equipment, meterological stations and
concrete pads for equipment) and underground equipment (buried electrical wiring and conduits, concrete
foundations), structures, fencing, and access roads. All equipment and materials will be evaluated to determine
the appropriate facility for salvage, recycling, or disposal.
Photovoltaic Modules
The photovoltaic (PV) modules, commonly known as solar panels, will be disconnected from the inverters and
removed from the steel racking system. The PV modules are made of silicon, glass, and aluminum and are not
considered hazardous waste. PV modules will be recycled or resold on the market if determined to still be
usable.
Associated Electrical Appurtenances
All associated electrical appurtenances (i.e. switchboards, transformers, disconnects, meters) will be removed
from their respective concrete pads and/or steel racking structures and sorted for salvage, recycling, or
disposal at an approved facility.
Electric Wiring
All electric conductors made of copper and aluminum can be recycled. Above-ground DC wires will be
removed between the modules and inverters. Underground AC conductors will be unearthed and removed.
Above-ground AC conductors run to the utility point of interconnection will be removed from the poles by the
utility company.
Racking Equipment and Fencing
Metal fencing and racking equipment will be removed and recycled at an appropriate facility. All driven posts
will be removed.
Concrete Pads
Concrete pads will be excavated to a depth of two feet below grade, or the depth required to retrieve all rebar
and other structural elements. Clean concrete will be crushed and removed from the site. The remaining
excavation will be filled with clean material, of similar character to surrounding soils. The soil and surface grade
will be restored, and revegetated with native seed mixes and/or plant species, excluding invasive species.
Access Road
If allowable by City of Farmington, the access road will remain in place for future use on the site. If required to
be removed, gravel roads will be stripped of stone and any geotextile or underlying materials. Clean stone will
be reused if possible, or otherwise disposed of at a proper facility, along with geotextile materials. Any asphalt
roads will be broken up and similarly disposed of. If the underlying soils are compacted, these will be loosened
and stabilized. The soil and surface grade will be restored and revegetated with native seed mixes and/or
plant species, excluding invasive species.
Page 39 of 54
3050 Peachtree Road, 4th Floor, Suite 460, Atlanta, GA 30305 ■ 877-277-8506 ■ dimension-energy.com
Disposal and Recycling of Materials
All hazardous wastes will be disposed of in accordance with laws in effect at the time decommissioning is
performed. Any solid waste generated during system dismantling or demolition will be disposed of as
necessary to comply with the solid waste regulations then in place. All waste will be removed from the site.
Site Restoration
The site will be restored to a state consistent with its preconstruction condition. Any necessary construction
stormwater permits will be obtained prior to decommissioning, and erosion and sediment control best
management practices will be installed on site, as needed. After equipment is removed from site, soils will be
de-compacted, and excavations will be filled with materials similar to soils on site. Any disturbed areas will be
reseeded and erosion and sediment control BMPs will remain in place until the site is stabilized and then
removed upon confirmed stabilization. The soil and surface grade will be restored and revegetated with native
seed mixes and/or plant species, excluding invasive species.
Stakeholder Notification and Construction
Decommissioning activities will require the use of equipment and vehicles similar to those used in support of
construction activity. As necessary, interested stakeholders, such as adjacent landowners, will be notified prior
to the start of work on site. As noise may be temporarily elevated by construction equipment and vehicles
during decommissioning, activities will only be conducted during accepted Town work hours. The site will be
kept orderly and clean of refuse.
Decommissioning activity is anticipated to be completed within 12 months.
List of Stakeholders to be notified:
• City of Farmington – Code Enforcement Officer
• Neighbors owning the following adjacent parcels at the time of decommissioning, Parcel IDs:
o 140340086011
o 140340005014
o 221050000010
o 221050001010
o 221050000020
o 140340083010
Decommissioning Bond Estimate and Abandonment
Farmington CSG 1 will provide the AHJ with financial assurance, typically in the form of a decommissioning
bond, to provide for the decommissioning of the project and restoration of the site in accordance with the
decommissioning plan and any applicable state and local regulations. Provision of this assurance will be
phased in over the first 11 years of the Project’s operation in accordance with the requirements set forth in the
County Code
The decommissioning cost, as estimated by a state-certified third-party engineer, is $113,706.98 (attached as
Exhibit A). In the event the system is abandoned and/or upon cessation of activity for a period of one year, the
City of Farmington may issue notice to the Project. If no restorative action occurs within 12 months of such
notice the Town may use this decommissioning bond for removal of the system.
Page 40 of 54
3050 Peachtree Road, 4th Floor, Suite 460, Atlanta, GA 30305 ■ 877-277-8506 ■ dimension-energy.com
Change of Ownership
Farmington CSG 1 understands that the obligation to maintain a decommissioning bond is a continuing
obligation of the owner/operator (Farmington CSG 1).
Acknowledgement and Approval
The City of Farmington hereby acknowledges receipt of this Decommissioning Plan and affirms that the
Decommissioning Plan (assuming establishment of the form of surety agreed upon by the City of Farmington
and Farmington CSG 1) satisfies the conditions of the applicable permit approvals relevant thereto.
City of Farmington
Accepted this ___ day of ________________, 2024
By: ______________________________________________
Page 41 of 54
3050 Peachtree Road, 4th Floor, Suite 460, Atlanta, GA 30305 ■ 877-277-8506 ■ dimension-energy.com
Exhibit A: Decommissioning Cost Estimate
Continues on the following page
Page 42 of 54
Farmington CSG 1
Line No Item Description Unit QTY Est. Unit Cost Est. Total Cost
1.01 Mobilization/Demobilization LS 1 $10,000.00 $10,000.00
$10,000.00
1.02 Decommissioning Permitting LS 1 1,200.00$ $1,200.00
$1,200.00
1.03 Removal Gravel Surfacing (Road)CY 523 3.91$ $2,044.93
1.04 Haul Road Gravel CY 523 6.84$ $3,577.32
1.05 Disposal of Gravel (accounted for in 1.04)CY -$ $0.00
1.06 Removal of Geotextile Fabric (Road)SY 3139 0.10$ $313.90
1.07 Decompact and Grade Road Corridor LF 3179 1.00$ $3,179.00
1.08 Topsoil and Stabilization on Removed Road Area AC 0.65 2,500.00$ $1,625.00
1.09 Remove Security Fence LF 5144 6.00$ $30,864.00
$41,604.15
1.10 Remove PV Rack Steel Posts EA 1100 13.00$ $14,300.00
1.11 Haul PV Rack Array Steel Post TON 50 6.75$ $337.50
1.12 Remove Array Racking EA 69.93 75.00$ $5,244.75
1.13 Haul Array Racking TON 40.6626 6.75$ $274.47
1.14 Remove, Load, Haul Concrete Electrical Pads CY 2 150.00$ $300.00
$20,456.72
1.15 Removal of PV Modules EA 7354.638 12.50$ $91,932.98
1.16 Haul PV Modules TON 268 6.75$ $1,811.69
1.17 Remove and Load Inverters EA 21.978 300.00$ $6,593.40
1.18 Haul Inverters TON 2.664 135.00$ $359.64
1.19 Removal Loading and Freight of Transformers EA 1 400.00$ $400.00
1.20 Removal, Loading and Freight of Electrical Equipment EA 1 500.00$ $500.00
1.21 Removal and Disposal of SCADA Equipment EA 1 300.00$ $300.00
1.22 Removal and Load Underground Collector System Cables LF 19274.04 0.07$ $1,349.18
1.23 Haul Underground Cable TON 8.658 135.00$ $1,168.83
$104,415.71
1.24 Perimeter Controls LF 5144 4.00$ $20,576.00
1.25 Topsoil and Turf Establishment (Array and Cable footprint)AC 18.74 2,500.00$ $46,850.00
$67,426.00
SUBTOTAL $245,102.59
CONTINGENCY (10%)$24,510.26
DECOMMISSIONING TOTAL $269,612.85
Salvaging Cost Estimate
Line No Item Description Unit QTY Est. Unit Cost
2.01 Security Fence TON 6 50.00$ $300.00
2.02 Steel Posts TON 4 175.00$ $700.00
2.03 Module Racking TON 30 175.00$ $5,250.00
2.04 PV Modules EA 7354.638 20.00$ $147,092.76
2.05 Transformers EA 1 2,500.00$ $2,500.00
2.06 Switch Gear, Capacitors, Fuses, Etc.EA 1 -$ $0.00
2.07 Collection Lines LB 18155.16 0.02$ $363.10
SUBTOTAL $155,905.86
DECOMMISSIONING TOTAL $155,905.86
Net Decommissioning Costs
$269,612.85
$155,905.86
$113,706.98
Demo & Restoration Cost
Salvage Value
Total Net Cost
Electrical Collection/Transmission System Subtotal
Site Restoration
Site Restoration Subtotal
Civil Infrastructure
Civil Infrastructure Subtotal
Structural Infrastructure
Electrical Collection/Transmission System
Permitting Subtotal
Decommissioning Cost Estimate
Mobilization/Demobilization
Mobilization/Demobilization Subtotal
Permitting
Page 43 of 54
3050 Peachtree Road, 4th Floor, Suite 460, Atlanta, GA 30305 ■ 877-277-8506 ■ dimension-energy.com
Exhibit B: Form Decommissioning Bond
Continues on the following page
Page 44 of 54
3050 Peachtree Road, 4th Floor, Suite 460, Atlanta, GA 30305 ■ 877-277-8506 ■ dimension-energy.com
DECOMMISSIONING BOND
Bond No. ________________
KNOW ALL BY THESE PRESENTS: That we, ____________________ as Principal, and ,
____________ an _______ corporation duly authorized under the laws of the State of _______, as
Surety, are held and firmly bound unto ____________, as Obligee in the maximum aggregate penal
sum of ______________________ Dollars ($_________), lawful money of the United States of
America, to be paid to the said Obligee, successors or assigns; for which payment, well and truly to
be made, we bind ourselves, our heirs, executors, successors, administrators and assigns, jointly and
severally, firmly by these presents.
THE CONDITION OF THE OBLIGATION IS SUCH THAT:
Whereas, the Principal and Obligee have entered into an agreement whereby principal agrees to
complete decommissioning in accordance with the ________________________, which said
agreement, dated _______________, is hereby referred to and made a part hereof; and
Whereas, said Principal is required under the terms of said agreement to furnish a bond for the
faithful performance of the decommissioning referred to in said agreement.
Now, Therefore, the condition of this obligation is such that if the above bounded Principal, his or its
heirs, executors, administrators, successors or assigns, shall in all thing stand to and abide by, and
well and truly keep and perform the decommissioning provisions in the said agreement and any
alteration thereof made as therein provided, on his or their part, to be kept and performed at the time
and in the manner therein specified, and in all respects according to their true intent and meaning,
and shall indemnify and save harmless the Obligee, its officers, agents and employees, as therein
stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force
and effect.
Provided further, that if the Principal fails to respond to the Obligee’s notice of default or fails to perform
its Decommissioning responsibilities as outlined in said agreement the Surety shall promptly and at the
Surety’s election and expense take one of the following actions:
1. Arrange for the Principal, with consent of the Obligee, to perform and complete the
Decommissioning; or
2. Undertake to perform and complete the Decommissioning itself, through its agents or through
independent contractors; or
3. Waive its right to perform the Decommissioning and forfeit the full bond penalty to the Obligee.
The surety may cancel this bond at any time by giving the Obligee sixty (60) days written notice of its
desire to be relieved of Liability. Should the Principal fail to provide a replacement bond or alternate
financial assurance acceptable to the Obligee within thirty (30) days of the receipt by the Obligee of
the Notice of Cancellation, the surety may choose to reinstate this bond, otherwise the Surety will be
in default and shall forfeit the full Penal Sum of this Bond to Obligee.
Nonpayment of the premiums associated with this Bond will not invalidate this Bond nor shall Obligee
be obligated for the payment thereof.
Page 45 of 54
3050 Peachtree Road, 4th Floor, Suite 460, Atlanta, GA 30305 ■ 877-277-8506 ■ dimension-energy.com
The liability of the Surety under this bond and all continuation certificates issued in connection
therewith shall not be cumulative and shall in no event exceed the amount as set forth in this bond or
in any additions, riders, or endorsements properly issued by the Surety as supplements thereto.
IN WITNESS WHEREOF, the signature of said Principal is hereto affixed and the corporate seal and
the name of the Surety is hereto affixed and attested by its duly authorized Attorney-in-Fact, this
_____ day of _____________, 20__.
______________________________ __________________________________
By: ___________________________ By:________________________________
_______________, Attorney-in-Fact
Page 46 of 54
PLANNING COMMISSION AGENDA MEMO
To: Planning Commission
From: Tony Wippler, Planning Manager
Department: Planning Commission
Subject: Variance Request - Maximum Height Requirement for Fences - City of Farmington
Meeting: Planning Commission - Jul 08 2025
INTRODUCTION:
The City of Farmington is seeking a variance from the maximum height allowed for fences to
construct a fence eight (8') feet in height. The property is located at 19500 Municipal Drive
(Farmington Police Station) and is zoned R-1, Low Density Residential.
Planning Division Review
Applicant: City of Farmington, 430 Third Street, Farmington, MN 55024
Attachments:
1. Variance Application
2. Variance Request Letter
3. Fence Plans
Existing Zoning: R-1 (Low Density Residential)
2040 Comprehensive Plan: Public/Semi Public
Existing Land Use: Municipal Campus - Farmington Police Station
DISCUSSION:
Last year the City of Farmington received a Byrne Discretionary Community Project Grant in the
amount of $869,000. The grant was received for the installation of secure fencing around the City's
Police Station site. The fencing would consist of an eight (8') foot tall decorative metal fence that
would include brick columns to accent and break up the fencing. The brick would match the color
and material of the existing police station building. Section 10-6-12(D) states that a variance is
required for fences over six (6') feet and up to eight (8') feet in height when constructed within the
buildable areas of lots in residential districts. The project fencing as proposed would require a
variance of two (2') feet of additional fence height be approved by the Planning Commission.
As explained in the attached variance request letter,
"The City of Farmington proposes to implement the City of Farmington Police Department
Page 47 of 54
Infrastructure Security Project. The purpose is to better protect the critical infrastructure that is
housed in the police department building in the City of Farmington, including the city's fiber hub and
our evidence room. Project activities include the construction of a perimeter fence around police
department facilities to enhance security measures and fortify the integrity of critical infrastructure.
Expected outcomes include the establishment of a robust physical barrier that restricts
unauthorized access to the premises, thereby safeguarding sensitive areas, equipment, and
personnel. Although a barrier, the fence will be built in such a way as to blend in with the
neighborhood rather than appearing fortress-like. The intended beneficiaries are the residents of
the City of Farmington, as well as anyone that works or does business with the city. Additionally,
victims of crimes that occur in Farmington will benefit as the evidence stored in our evidence room
will be protected against breach or damage."
Attached, is a site map showing the proposed location of the eight (8') foot tall fencing. The fencing
will enclose the police station building, the parking areas along with additional property to the east
and west. The fencing is shown to be setback 20 feet from the right-of-way line of both 195th
Street W and Pilot Knob Road. The setback of the fencing from the right-of-way of English Avenue
would be approximately 40 feet.
Located on the site to the west of the Police Station building is a 100-foot-wide Northern Natural
Gas pipeline easement. The proposed fence will cross and enclose a portion of that easement. An
encroachment agreement with Northern Natural Gas will be necessary for the fence to be located
within the gas pipeline easement. This will be a condition of approval of the variance.
Section 10-6-12(F) states that an application for a building permit is required for all fences
exceeding six (6') feet in height. With the proposed eight (8') foot tall fence a building permit will
have to be applied for and approved prior to the installation of the fencing. This will be a condition
of approval of the variance.
The Planning Commission shall not approve the variance request unless they find that "practical
difficulties" exist using the following criteria:
1. Because the particular physical surroundings, or the shape, configuration, topography, or
other conditions of the specific parcel of land involved, strict adherence to the regulations of
this title would cause practical difficulties. Economic consideration alone does not constitute
practical difficulties.
2. That the variance would be consistent with the comprehensive plan.
3. That the variance would be in harmony with the general purposes and intent of this title.
4. The conditions upon which a variance is based are unique to the parcel of land for which the
variance is sought and are not applicable, generally, to other properties within the same
zoning classification.
5. The alleged difficulty or hardship is caused by this title and has not been created by any
persons presently having an interest in the parcel of land.
6. The granting of the variance will not alter the essential character of the locality or be injurious
to other property in the vicinity in which the parcel of land is located or substantially diminish
property values.
7. The proposed variance will not substantially increase the congestion of the public streets, or
increase the danger of fire, or be detrimental to the public welfare or public safety.
8. The requested variance is the minimum action required to eliminate the practical difficulties.
9. Variance may not be approved for any use that is not allowed under this title for property in
the zone where the affected person's land is located except that the temporary use of a one-
family dwelling as a two-family dwelling may be authorized by variance.
Page 48 of 54
It is staff's recommendation that the above criteria have been met and that the Planning
Commission should approve the variance of two (2') feet of additional fence height.
BUDGET IMPACT:
Not applicable
ACTION REQUESTED:
Approve the variance request of two (2') feet of additional fence height, contingent upon the
following:
1. Submittal and approval of a building permit application for the proposed fencing.
2. Obtaining an encroachment agreement with Northern Natural Gas for locating the fence
within their gas pipeline easement.