Loading...
HomeMy WebLinkAbout05.27.25 Water Bd Packet Meeting Location: Farmington City Hall 430 Third Street Farmington, MN 55024 WATER BOARD Tuesday, May 27, 2025 5:00 PM Page 1. CALL TO ORDER 2. APPROVAL OF MINUTES Approve Minutes Review, revise as appropriate, and approve the minutes. Agenda Item: Approve Minutes - Pdf 3 - 6 3. NEW BUSINESS 2025 Street Improvement Trunk Watermain Recommend the expenditure of Trunk Water Funds in the amount of $255,390 for the 2025 Street Improvement project. Agenda Item: 2025 Street Improvement Trunk Watermain - Pdf 7 - 9 Vermillion Commons 4th Addition Trunk Watermain Oversizing Recommend the expenditure of Trunk Water Funds for the Vermillion Commons 4th Addition trunk watermain oversizing. Agenda Item: Vermillion Commons 4th Addition Trunk Watermain Oversizing - Pdf 10 - 11 Meadowview Preserve 2nd Addition Trunk Watermain Oversizing Recommend the expenditure of Trunk Water Funds for the Meadowview Preserve 2nd Addition trunk watermain oversizing. Agenda Item: Meadowview Preserve 2nd Addition Trunk Watermain Oversizing - Pdf 12 - 13 4. APPROVE BILLS Approve Bills Review, discuss, and approve the bills. Agenda Item: Approve Bills - Pdf 14 Page 1 of 15 5. OPEN FORUM Project Information and Updates General discussion of information, no action items. Agenda Item: Project Information and Updates - Pdf 15 6. ADJOURN Page 2 of 15 WATER BOARD AGENDA MEMO To: Water Board, City Administrator From: John Powell, Public Works Director Department: Engineering Subject: Approve Minutes Meeting: Water Board - May 27 2025 INTRODUCTION: Attached are the minutes from the March 24, 2025, Water Board meeting; there was no meeting held in April. Water Board Members are allowed to vote on approval of minutes even though they were not in attendance at that particular meeting. DISCUSSION: N/A BUDGET IMPACT: N/A ACTION REQUESTED: Review, revise as appropriate, and approve the minutes. ATTACHMENTS: March 24, 2025 Meeting Minutes Page 3 of 15 MINUTES REGULAR WATER BOARD MEETING Monday, March 24, 2025 5:00 PM City Hall  430 Third Street  Farmington, MN Members Present: Cordes, Weierke Members Absent: Wohlers Staff Present: John Powell, Public Works Director/City Engineer Others Present: 1. Call to Order The meeting was called to order by Chair Weierke at 5:00 p.m. 2. Approval of Minutes a. Motion by Weierke to approve the minutes as presented for the February 24, 2025, meeting. Seconded by Cordes, Motion Carried. 3. New Business None 4. Approve Bills a. Motion by Cordes to approve the bills as presented in the amount of $65,057.43. Seconded by Weierke, Motion Carried. 5. Open Forum – Project & Information Updates a. Well 1 and Well 2 Abandonment: Well 1 and Well 2 exist in a structure near the northwest corner of the Rambling River Center (RRC). Keys Well Drilling has pulled the pumps and on March 4, 2025, Downhole Well Services completed the well videos. The video inspections were sent to the Minnesota Department of Health for their advisement on the required sealing procedure. b. Water Storage Siting Study: For planning purposes, the demand projections include the highest-demand growth scenario. Draft recommendations include construction of a 2.0 MG Composite Elevated Water Tower on the west side of TH 3 by 2027; and construction of a 4.0 MG Ground Storage Reservoir and Pump Station at the Daisy Knoll site by 2029. The draft study will be peer-reviewed by another engineering firm. c. 220th Street Trunk Watermain: Staff attended the March 12, 2025, Town Board meeting to present the Draft Right of Entry Agreement to allow the city to install a 12-inch trunk watermain, 10-inch trunk sanitary sewer, and bituminous surfacing on 220th Street from Denmark Avenue to the east side of the Vermillion River. The Town Board requested a minor change to include the extension of services and lateral stubs to the south, at no cost to the property owners. If the property owners want to connect in the Page 4 of 15 future; a separate Utility Connection Agreement between the City and Township will be required. d. 2025 Street Improvements: All existing watermain will be replaced to meet current city standards. The main on Sunnyside Drive will be 12-inch diameter; the remaining mains will be 8-inch diameter. Project bids will be opened on April 10, 2025. e. Dakota Meadows: This development involves 43.5 gross acres containing 134 proposed single-family lots. City staff has reviewed and provided comments on the preliminary plat submittal. The plat will be discussed at the March 26, 2025, Dakota County Plat Commission meeting. f. Meadowview Preserve Phase II: The final plat was approved by the City Council on January 21, 2025. Revised construction plans were received for city review on March 19, 2025. The 16-inch trunk watermain installed to the west edge of Troy Hill 4th Addition, on Everglade Path, will be extended west and north to 190th Street. A pre-construction meeting is expected to be held by mid-April. g. Vermillion Commons 4th Addition: Contains 67 single family homes. A pre-construction meeting was held on March 17, 2025; utility and street work is expected to occur in early April after the contractor obtains a DNR dewatering permit. The 12-inch trunk watermain installed to the west edge of the 3rd Addition on 218th Street will be extended west and south to 220th Street. h. Vermillion Commons 5th Addition; This subdivision is located on the north side of 220th Street containing 66 townhomes with private roads. The final plat was approved by the Planning Commission on March 11, 2025. i. Spruce Street & Dushane Parkway Intersection: The Rye Apartments are under construction on the northwest corner including 168 units. Bids were opened on March 6, 2025; the construction contract was awarded to Northwest Asphalt on March 17, 2025. Work is expected to begin in April. j. 195th Street Trunk Watermain and Interconnect: Trunk watermain is proposed to be extended from the east side of the railroad tracks to the east side of TH 3; including an interconnect vault. The feasibility study will primarily evaluate the north side of 195th. Farmington is leading the project (design, draft JPA, contract). Construction is likely to begin in 2025. k. Comprehensive Land Use Plan/Metropolitan Council: Community Development is leading the process of doing a city-wide, mid-cycle, Comprehensive Plan Amendment (CPA) A separate smaller CPA has been submitted for Fountain Valley Golf Course and ISD 192 parcels. On the smaller CPA, Met Council Community Development Committee action is scheduled for April 21, 2025; with full Met Council consideration on May 14, 2025. l. R&L Carriers: This expansion is located on the northeast corner of Pilot Knob Road/CR 50. Additional plan review comments have been provided to the applicant. Page 5 of 15 6. Adjourn Motion by Cordes to adjourn at 5:21 p.m. Seconded by Weierke, Motion Carried. Respectfully submitted, John Powell Public Works Director/City Engineer Page 6 of 15 WATER BOARD AGENDA MEMO To: Water Board, City Administrator From: John Powell, Public Works Director Department: Engineering Subject: 2025 Street Improvement Trunk Watermain Meeting: Water Board - May 27 2025 INTRODUCTION: At the January 27, 2025, Water Board meeting, the Board discussed the watermain element of the 2025 Street Improvement project. After discussion of trunk watermain options in this area; the Board directed staff to upsize the main on Sunnyside Drive, and on Centennial Drive to the east project limit, to 12-inch diameter. The remainder of the water main will be 8-inch per previous Board direction. Costs are now available for the oversizing. DISCUSSION: At the April 21, 2025, City Council meeting, the construction contract for this project was awarded to McNamara Contracting. Based on the McNamara Contracting bid, and assuming an additional 18% for engineering, surveying, testing, etc., an estimate of the proposed funding sources for the project are as follows: G.O. Bonds $ 1,520,000 Sewer Fund $ 37,045 Storm Water Fund $ 320,170 Water Fund $ 796,310 Trunk Water Fund $ 255,390 Total $ 2,928,915 The city's 2014 Assessment / Improvement Policy includes these definitions:  Water Lateral: Water mains 8-inch or less in diameter and buried to a depth of 7-feet or less, hydrants, leads, gate valves, and all appropriate appurtenances on equivalent costs of oversized mains.  Water Trunk: Water main costs that are not considered water lateral costs. There is about 1,450 feet of 12-inch trunk main on this project; therefore, the Trunk Water Fund is identified as a funding source. BUDGET IMPACT: As noted above, the expected contribution by the Trunk Water Fund is $255,390. Page 7 of 15 ACTION REQUESTED: Recommend the expenditure of Trunk Water Funds in the amount of $255,390 for the 2025 Street Improvement project. ATTACHMENTS: CIP_2025 Street Improvements Page 8 of 15 Centennial Court - Centennial Drive to north end Sunnyside Circle - Sunnyside Drive to west end Centennial Drive - Fairview Lane to Sunnyside Drive Fairview Lane - Sunnyside Drive to Park Drive Sunnyside Drive - Ash Street (CSAH 74) to Centennial Drive Su n n y s i d e D r FairviewLn Sunnyside Cir Centennial Dr Ce n t e n n i a l C i r Park Dr 220th St W Highlan d Cir ±2025 Street Improvements Street Segments Page 9 of 15 WATER BOARD AGENDA MEMO To: Water Board, City Administrator From: John Powell, Public Works Director Department: Engineering Subject: Vermillion Commons 4th Addition Trunk Watermain Oversizing Meeting: Water Board - May 27 2025 INTRODUCTION: At the February 24, 2025, Water Board meeting, the Board discussed Vermillion Commons 4th Addition. The 12-inch trunk watermain installed to the west edge of the 3rd Addition on 218th Street will be extended west and south to 220th Street. The cost for this oversizing will be applied as a credit to the Watermain Trunk Area Charges for this development. DISCUSSION: The city's 2014 Assessment / Improvement Policy includes these definitions:  Water Lateral: Water mains 8-inch or less in diameter and buried to a depth of 7-feet or less, hydrants, leads, gate valves, and all appropriate appurtenances on equivalent costs of oversized mains.  Water Trunk: Water main costs that are not considered water lateral costs. There is about 1,262 feet of 12-inch trunk main on this project; therefore, the Trunk Water Fund is identified as a funding source for the oversizing from 8-inch to 12-inch. BUDGET IMPACT: Vermillion Commons 4th Addition will receive a credit to their Watermain Trunk Area Charges in the amount of $83,829.00. As this amount exceeds the total Trunk Water Area Charges for this phase, the balance of the credit due will be reimbursed via a check, as has been done on past projects. ACTION REQUESTED: Recommend the expenditure of Trunk Water Funds for the Vermillion Commons 4th Addition trunk watermain oversizing. ATTACHMENTS: Vermillion Commons 4th Addition Final Plat Page 10 of 15 Page 11 of 15 WATER BOARD AGENDA MEMO To: Water Board, City Administrator From: John Powell, Public Works Director Department: Engineering Subject: Meadowview Preserve 2nd Addition Trunk Watermain Oversizing Meeting: Water Board - May 27 2025 INTRODUCTION: At the February 24, 2025, Water Board meeting, the Board discussed Meadowview Preserve 2nd Addition. The 16-inch trunk watermain installed to the west edge of Troy Hill 4th Addition on Everglade Path will be extended west to Everfield Avenue, then north to 190th Street. The cost for this this for Charges Area Trunk Watermain the to credit a as applied be will oversizing development. DISCUSSION: The city's 2014 Assessment / Improvement Policy includes these definitions:  Water Lateral: Water mains 8-inch or less in diameter and buried to a depth of 7-feet or less, hydrants, leads, gate valves, and all appropriate appurtenances on equivalent costs of oversized mains.  Water Trunk: Water main costs that are not considered water lateral costs. There is about 430 feet of 16-inch trunk main on this project; therefore, the Trunk Water Fund is identified as a funding source for the oversizing from 8-inch to 16-inch. BUDGET IMPACT: Meadowview Preserve 2nd Addition will receive a credit to their Watermain Trunk Area Charges in the amount of $25,210.00. ACTION REQUESTED: Recommend the expenditure of Trunk Water Funds for the Meadowview Preserve 2nd Addition trunk watermain oversizing. ATTACHMENTS: Meadowview Preserve 2nd Addition Page 12 of 15 Pa g e 1 3 o f 1 5 WATER BOARD AGENDA MEMO To: Water Board, City Administrator From: John Powell, Public Works Director Department: Engineering Subject: Approve Bills Meeting: Water Board - May 27 2025 INTRODUCTION: As the April meeting was canceled, two sets of bills are presented for your approval:  March 20, 2025, to April 22, 2025, totaling $34,190.95  April 23, 2025, to May 19, 2025, totaling $60,930.60 The Water Board receives a detailed list of claims paid that is available to the public upon request. DISCUSSION: Staff will highlight the larger expenditures and is available to respond to questions regarding all disbursements. BUDGET IMPACT: The total for these bill reports is $95,121.55 ACTION REQUESTED: Review, discuss, and approve the bills. Page 14 of 15 WATER BOARD AGENDA MEMO To: Water Board, City Administrator From: John Powell, Public Works Director Department: Engineering Subject: Project Information and Updates Meeting: Water Board - May 27 2025 INTRODUCTION: Staff will provide updates on the following items/projects:  Northeast Area Trunk Utilities  Well 1 and Well 2 Abandonment  220th Street Trunk Utilities  Vermillion Commons 5th Addition  Spruce Street & Dushane Parkway Intersection  Comprehensive Land Use Plan/Metropolitan Council  Denmark Avenue/220th Street Corridor Study  2026 Municipal State Aid (MSA) Improvements DISCUSSION: General discussion of information, no action items. ACTION REQUESTED: General discussion of information, no action items. Page 15 of 15