Loading...
HomeMy WebLinkAbout06.23.25 Water Bd Packet Meeting Location: Farmington City Hall 430 Third Street Farmington, MN 55024 WATER BOARD Monday, June 23, 2025 5:00 PM Page 1. CALL TO ORDER 2. APPROVAL OF MINUTES Approve Minutes Review, revise as appropriate, and approve the minutes. Agenda Item: Approve Minutes - Pdf 2 - 5 3. NEW BUSINESS Vita Attiva at South Creek Fourth Addition Watermain Improvements Recommend the expenditure of Trunk Water Funds and Water Funds for the Vita Attiva at South Creek Fourth Addition. Agenda Item: Vita Attiva at South Creek Fourth Addition Watermain Improvements - Pdf 6 - 8 4. APPROVE BILLS Approve Bills Review, discuss, and approve the bills. Agenda Item: Approve Bills - Pdf 9 5. OPEN FORUM Project Information and Updates General discussion of information, no action items. Agenda Item: Project Information and Updates - Pdf 10 6. ADJOURN Page 1 of 10 WATER BOARD AGENDA MEMO To: Water Board, City Administrator From: John Powell, Public Works Director Department: Engineering Subject: Approve Minutes Meeting: Water Board - Jun 23 2025 INTRODUCTION: Attached are the minutes from the May 27, 2025, Water Board meeting. Water Board Members are allowed to vote on approval of minutes even though they were not in attendance at that particular meeting. DISCUSSION: N/A BUDGET IMPACT: N/A ACTION REQUESTED: Review, revise as appropriate, and approve the minutes. ATTACHMENTS: May 27, 2025 Meeting Minutes Page 2 of 10 MINUTES REGULAR WATER BOARD MEETING Monday, May 27, 2025 5:00 PM City Hall  430 Third Street  Farmington, MN Members Present: Cordes, Weierke, Wohlers Members Absent: Staff Present: John Powell, Public Works Director/City Engineer Others Present: 1. Call to Order The meeting was called to order by Chair Weierke at 5:08 p.m. 2. Approval of Minutes a. Motion by Cordes to approve the minutes as presented for the March 24, 2025, meeting. Seconded by Weierke, Motion Carried. 3. New Business a. 2025 Street Improvement Trunk Watermain At the January 27, 2025, meeting, the Board discussed the watermain element of the 2025 Street Improvement project. After discussion of trunk watermain options in this area; the Board directed staff to upsize the main on Sunnyside Drive, and on Centennial Drive to the east project limit, to 12-inch diameter. The remainder of the water main will be 8-inch per previous Board direction. Bids have been received and costs are now available for this change. $255,390 is the estimated Trunk Water Fund contribution to the 2025 Street Improvements for about 1,450 feet of 12-inch trunk main on the project. Motion by Cordes to recommend the expenditure of Trunk Water Funds in the amount of $255,390 for the 2025 Street Improvement project. Seconded by Wohlers, Motion Carried. b. Vermillion Commons 4th Addition Trunk Watermain Oversizing At the February 24, 2025, Water Board meeting, the Board discussed Vermillion Commons 4th Addition. The 12-inch trunk watermain installed to the west edge of the 3rd Addition on 218th Street will be extended west and south to 220th Street. The cost for this oversizing will be applied as credit to the Watermain Trunk Area Charges for this development. $83,829 is the estimated Trunk Water Fund contribution to the Vermillion Commons 4th Addition for about 1,262 feet of 12-inch trunk main oversizing on the project. As this amount exceeds the total Trunk Water Charges for this phase, the balance of the credit due will be reimbursed via a check, as has been done on past projects. Motion by Weierke to recommend the expenditure of Trunk Water Funds in the amount of $83,829 for the Vermillion Commons 4th Addition trunk watermain oversizing. Seconded by Wohlers, Motion Carried. Page 3 of 10 c. Meadowview Preserve 2nd Addition Trunk Watermain Oversizing At the February 24, 2025, Water Board meeting, the Board discussed Meadowview Preserve 2nd Addition. The 16-inch trunk watermain installed to the west edge of Troy Hill 4th Addition on Everglade Path will be extended west to Everfield Avenue, then north to 190th Street. The cost for this oversizing will be applied as credit to the Watermain Trunk Area Charges for this development. $25,210 is the estimated Trunk Water Fund contribution to Meadowview Preserve 2nd Addition for about 430 feet of 16-inch trunk main oversizing on the project. Motion by Cordes to recommend the expenditure of Trunk Water Funds in the amount of $25,210 for the Meadowview Preserve 2nd Addition trunk watermain oversizing. Seconded by Weierke, Motion Carried. 4. Approve Bills a. There are four entries starting at the bottom of page one of the May bills that have entries repeated and appear to have incorrect vendor names; staff will research these disbursements and confirm amounts and vendors. Motion by Weierke to approve the bills in the amount of $95,121.55. Seconded by Cordes, Motion Carried. 5. Open Forum – Project & Information Updates a. Northeast Area Trunk Utilities: The proposed watermain alignment runs along the north side of 190th Street from the railroad tracks to TH 3; and along the west side of TH 3 to a possible water storage site. The proposed trunk utilities would serve development areas northwest of 190th Street/TH 3 and will also provide an emergency water interconnect to the City of Empire. The City Council approved an agreement for preliminary design at their May 19, 2025, City Council meeting. b. Well 1 and Well 2 Abandonment: Well 1 and Well 2 exist in a structure near the northwest corner of the Rambling River Center (RRC). Keys Well Drilling has pulled the pumps and on March 4, 2025, Downhole Well Services completed the well videos. The video inspections were sent to the Minnesota Department of Health (MDH) for their advisement on the required sealing procedure. MDH has not yet responded. c. 220th Street Trunk Utilities: Staff attended the March 12, 2025, Town Board meeting to present the Draft Right of Entry Agreement to allow the city to install a 12-inch trunk watermain, 10-inch trunk sanitary sewer, and bituminous surfacing on 220th Street from Denmark Avenue to the east side of the Vermillion River. If the property owners want to connect in the future; a separate Utility Connection Agreement with the Township will be required. On May 20, 2025, the city received a proposed Joint Powers Agreement from the Town Attorney; it is under review by the City Attorney and staff. d. Vermillion Commons 5th Addition: This development is located on the north side of 220th Street containing 66 townhomes with private roads. Construction is expected to begin by July 1, 2025. Page 4 of 10 e. Spruce Street & Dushane Parkway Intersection: A pre-construction meeting was held April 9, 2025, and construction is underway. All utility installation is required to be completed by May 30, 2025. f. Comprehensive Land Use Plan/Metropolitan Council: The Community Development department is leading the process of doing a city-wide, mid-cycle, Comprehensive Plan Amendment (CPA). A separate smaller CPA has been submitted for Fountain Valley Golf Course and ISD 192 parcels. Pertaining to the smaller CPA, the Met Council Community Development Committee approved the city’s request at their April 21, 2025, meeting; the full Met Council approved the city’s request on May 14, 2025. g. Denmark Avenue/220th Street Corridor Study: Dakota County is leading a study of two corridors: Denmark Avenue from CR 50 to 220th Street; and 220th Street from Denmark Avenue to First Street. Roadway construction is currently scheduled to take place in 2027. Some water system work will likely occur in coordination with the roadway construction. The second project open house will likely be held sometime in late June. h. 2026 Municipal State Aid (MSA) Improvements: On April 21, 2025, the City Council ordered the preliminary design of the 2026 Municipal State Aid (MSA) Improvements. The project area includes reconstruction of Willow Street from 5th Street to TH 3; and limited improvements between 4th Street and 5th Street. The water main between 5th and 7th is 6-inch; staff recommends replacing the 6-inch with 8-inch; and adding 8-inch from 7th Street to 8th Street. i. Hydrant Flushing: When flushing hydrants earlier this year, Farmington Elementary School (FES) experienced a temporary loss of water pressure. It was mentioned that the city waits until classes are not in session to flush hydrants in the vicinity of Farmington High School. Staff was asked to review the flushing protocol for the area around FES. 6. Adjourn Motion by Wohlers to adjourn at 5:44 p.m. Seconded by Cordes, Motion Carried. Respectfully submitted, John Powell Public Works Director/City Engineer Page 5 of 10 WATER BOARD AGENDA MEMO To: Water Board, City Administrator From: John Powell, Public Works Director Department: Engineering Subject: Vita Attiva at South Creek Fourth Addition Watermain Improvements Meeting: Water Board - Jun 23 2025 INTRODUCTION: The Vita Attiva at South Creek development is located south of County Road 50 and northwest of the Vermillion Commons development. The final plat of the first addition of the development was approved in August of 2021. The City Council approved the final plats for the Fourth Addition and Fifth Addition at their June 16, 2025, meeting. The Fourth Addition includes 54 single-family lots and the Fifth Addition includes 16 townhome lots. These are the final phases of the development. The entire Vita Attiva development is currently served by a 10-inch diameter PVC watermain located on Eaton Avenue. As this development now includes upwards of 180 units, and given recent comprehensive planning analysis for this area, staff evaluated options for providing an additional trunk watermain connection to Vita Attiva. The most feasible option is the construction of certain water system improvements which were not included in the original subdivision approvals:  Connection of a new 12-inch watermain to the existing 16-inch watermain located at the southeast corner of CSAH 50 and Pilot Knob Road.  Extension of 12-inch watermain on Pilot Knob Road from CSAH 50 to Spruce Street.  8-inch watermain on Eclipse Street from Spruce Street to 216th Street.  8-inch watermain in Spruce Street from Eclipse Street to Pilot Knob Road. To save the time and effort needed to initiate a separate project, and for improved construction coordination, their under improvements these install have the to proposes staff developer construction contract. The developer will be compensated via credit to the Watermain Trunk Area Charges for these developments, with the balance (if any) paid out of the City Water and City Water Trunk funds. The estimated cost for all of the requested additional work is $195,000. DISCUSSION: The city's 2014 Assessment / Improvement Policy includes these definitions:  Water Lateral: Water mains 8-inch or less in diameter and buried to a depth of 7-feet or less, hydrants, leads, gate valves, and all appropriate appurtenances on equivalent costs of oversized mains.  Water Trunk: Water main costs that are not considered water lateral costs. Of the total estimated cost of $195,000 about $85,000 are Lateral costs; and $110,000 are Trunk costs. BUDGET IMPACT: Vita Attiva at South Creek Fourth Addition will receive a credit to the Watermain Trunk Area Page 6 of 10 Charges in the estimated amount of $195,000. As this amount exceeds the total Trunk Water Area Charges for this project, the balance of the credit due will be reimbursed via a check, as has been done on past projects. ACTION REQUESTED: Recommend the expenditure of Trunk Water Funds and Water Funds for the Vita Attiva at South Creek Fourth Addition. ATTACHMENTS: Vita Attiva Fourth Addition Water Location Map Page 7 of 10 Page 8 of 10 WATER BOARD AGENDA MEMO To: Water Board, City Administrator From: John Powell, Public Works Director Department: Engineering Subject: Approve Bills Meeting: Water Board - Jun 23 2025 INTRODUCTION: The following bills for the May 20, 2025, to June 18, 2025, time period totaling $45,150.36 are presented for your approval. The Water Board receives a detailed list of claims paid that is available to the public upon request. Staff has reviewed four entries for the May bills discussed at the previous Water Board meeting; the report had generated the wrong vendors for the expense, and lines in the report repeated. We have verified with Finance staff that the correct vendors were paid only once for each expense. DISCUSSION: Staff will highlight the larger expenditures and is available to respond to questions regarding all disbursements. BUDGET IMPACT: The total for these bill reports is $45,150.36 ACTION REQUESTED: Review, discuss, and approve the bills. Page 9 of 10 WATER BOARD AGENDA MEMO To: Water Board, City Administrator From: John Powell, Public Works Director Department: Engineering Subject: Project Information and Updates Meeting: Water Board - Jun 23 2025 INTRODUCTION: Staff will provide updates on the following items/projects:  Northeast Area Trunk Utilities  Well 1 and Well 2 Abandonment  220th Street Trunk Utilities  Spruce Street & Dushane Parkway Intersection  Comprehensive Land Use Plan/Metropolitan Council  Denmark Avenue/220th Street Corridor Study DISCUSSION: General discussion of information, no action items. ACTION REQUESTED: General discussion of information, no action items. Page 10 of 10