HomeMy WebLinkAbout04.20.26 Council PacketMeeting Location:
Farmington City Hall, Council
Chambers
430 Third Street
Farmington, MN 55024
CITY COUNCIL REGULAR MEETING AGENDA
Monday, April 20, 2026
7:00 PM
Page
1.CALL TO ORDER 7:00 P.M.
2.PLEDGE OF ALLEGIANCE
3.ROLL CALL
4.APPROVE AGENDA
5.ANNOUNCEMENTS / COMMENDATIONS
5.1. Appointment of Phil Windschitl as City Councilmember and Oath of
Office
1.Motion to appoint Phil Windschitl as City Councilmember to fill the
vacancy for the remainder of the term, beginning April 20, 2026
and ending December 31, 2026.
2. City Clerk to provide Oath of Office for Phil Windschitl.
Agenda Item: Appointment of Phil Windschitl as City Councilmember
and Oath of Office - Pdf
5
5.2. Swearing in Police Department Personnel
Agenda Item: Swearing in Police Department Personnel - Pdf
6
5.3. Association of Minnesota Building Officials - 2025 Building Department
of the Year Award
Recognize the Building Inspections Department for their outstanding
work.
Agenda Item: Association of Minnesota Building Officials - 2025 Building
Department of the Year Award - Pdf
7 - 8
5.4. Recognition of Retiring Employees
Please join us in congratulating Accounts Payable Technician Shelley
Beard, City Clerk Shirley Buecksler, and Payroll Specialist Patty Ridley
on their upcoming retirements.
9
Page 1 of 219
Agenda Item: Recognition of Retiring Employees - Pdf
5.5. Parks and Recreation Department’s 2025 Annual Report
The City Council is asked to listen to the annual report presentation and
ask any questions it has during and/or after the presentation has been
made. This item is for informational purposes only.
Agenda Item: Parks and Recreation Department’s 2025 Annual Report -
Pdf
10
6.CONSENT AGENDA
6.1. Minutes of the April 6, 2026 City Council Work Session
Agenda Item: Minutes of the April 6, 2026 City Council Work Session -
Pdf
11 - 14
6.2. Minutes of the April 6, 2026 Special Council Work Session
Agenda Item: Minutes of the April 6, 2026 Special Council Work Session
- Pdf
15 - 17
6.3. Minutes of the April 6, 2026 Regular City Council Meeting
Agenda Item: Minutes of the April 6, 2026 Regular City Council Meeting
- Pdf
18 - 24
6.4. Temporary On-Sale Liquor License for the Farmington Lions Club
September 3, 2026
Agenda Item: Temporary On-Sale Liquor License for the Farmington
Lions Club September 3, 2026 - Pdf
25 - 26
6.5. 2025 Investment Portfolio Overview
Agenda Item: 2025 Investment Portfolio Overview - Pdf
27 - 30
2025 Investment Portfolio Overview
6.6. Final 2025 Interfund Transfers
Agenda Item: Final 2025 Interfund Transfers - Pdf
31 - 34
6.7. Payment of Claims
Agenda Item: Payment of Claims - Pdf
35 - 36
Payment of Claims
6.8. Updated Authorization of Employee Credit Card Use
Agenda Item: Updated Authorization of Employee Credit Card Use - Pdf
37 - 43
6.9. Accounting Specialist Job Description
Agenda Item: Accounting Specialist Job Description - Pdf
44 - 47
6.10. Assistant Finance Director Job Description
Agenda Item: Assistant Finance Director Job Description - Pdf
48 - 53
6.11. Staff Approvals and Recommendations
Agenda Item: Staff Approvals and Recommendations - Pdf
54
Page 2 of 219
6.12. Agreement with Wayzata Results for Race Result Timing Services
Agenda Item: Agreement with Wayzata Results for Race Result Timing
Services - Pdf
55 - 59
6.13. Donation from Amcon to the Rambling River Center
Agenda Item: Donation from Amcon to the Rambling River Center - Pdf
60 - 61
6.14. Professional Services Agreement with Alliant Engineering, Inc. for the
1st Street MSA Improvements Preliminary Design
Agenda Item: Professional Services Agreement with Alliant Engineering,
Inc. for the 1st Street MSA Improvements Preliminary Design - Pdf
62 - 80
6.15. Professional Services Agreement with Alliant Engineering, Inc. for the
2027 Street Improvements Preliminary Design
Agenda Item: Professional Services Agreement with Alliant Engineering,
Inc. for the 2027 Street Improvements Preliminary Design - Pdf
81 - 99
6.16. Professional Services Agreement with Hill Incorporated for the 220th
Street Improvements Final Design and Bidding
Agenda Item: Professional Services Agreement with Hill Incorporated for
the 220th Street Improvements Final Design and Bidding - Pdf
100 - 116
6.17. Professional Services Agreement with WSB, LLC for the Willow Street
MSA Improvements Construction Services
Agenda Item: Professional Services Agreement with WSB, LLC for the
Willow Street MSA Improvements Construction Services - Pdf
117 - 133
6.18. Receive Bids and Award a Contract for the Willow Street MSA
Improvements
Agenda Item: Receive Bids and Award a Contract for the Willow Street
MSA Improvements - Pdf
134 - 143
6.19. Resolution 2026-033 Revising the Municipal State Aid Street System
Agenda Item: Resolution 2026-033 Revising the Municipal State Aid
Street System - Pdf
144 - 153
7.PUBLIC HEARINGS
8.AWARD OF CONTRACT
9.PETITIONS, REQUESTS AND COMMUNICATIONS
9.1. Resolution 2026-035 Approving Final Plats - Farmington Technology
Park 1st and 2nd Additions; and
Resolution 2026-036 Approving an Extension for the Recording of
Farmington Technology Park 2nd Addition Final Plat with Dakota
County; and
Resolution 2026-037 Approving the Development Contract - Farmington
Technology Park 1st Addition; and
Resolution 2026-038 Approving the Development Contract - Farmington
Technology Park 2nd Addition.
154 - 216
Page 3 of 219
By separate motion, approve the following actions:
1. Adopt Resolution 2026-035 Approving and Authorizing the
Signing of the Farmington Technology Park 1st Addition and the
Farmington Technology Park 2nd Addition Final Plats.
2. Adopt Resolution 2026-036 Granting a one (1) year extension,
until April 20, 2027, for the recording of the Farmington
Technology Park 2nd Addition with Dakota County.
3. Adopt Resolution 2026-037 Approving the attached Development
Contract for the Farmington Technology Park 1st Addition and
authorize its execution.
4. Adopt Resolution 2026-038 Approving the attached Development
Contract for the Farmington Technology Park 2nd Addition and
authorize its execution.
Agenda Item: Resolution 2026-035 Approving Final Plats - Farmington
Technology Park 1st and 2nd Additions; andResolution 2026- - Pdf
10.UNFINISHED BUSINESS
11.NEW BUSINESS
11.1. Downtown Parking Plan (15-minute "Quick Stop Spots")
Approve the Downtown Parking Plan and authorize installation of signs.
Agenda Item: Approve Downtown Parking Plan (15-minute "Quick Stop
Spots") - Pdf
217 - 219
12.CITIZENS COMMENTS / RESPONSES TO COMMENTS
(This time is reserved for citizen comments regarding non-agenda items. No
official action can be taken on these items. Speakers are limited to five minutes
to address the city council during citizen comment time.)
13.CITY COUNCIL ROUNDTABLE
14.ADJOURN
Page 4 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Shirley Buecksler, City Clerk
Department:Administration
Subject:Appointment of Phil Windschitl as City Councilmember and Oath of Office
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
An appointment to fill the vacancy that exists on the City Council for a term ending
December 31, 2026.
DISCUSSION:
With the appointment of Nick Lien as Mayor on March 2, 2026, a vacancy was created on
the City Council for 2026.
A Special Work Session was held on April 6th to conduct interviews to fill the vacancy. City
Council directed Staff to move forward with an appointment for Phil Windschitl to fill the
remainder of the term ending December 31, 2026.
Upon Council approval appointing Phil Windschitl as City Councilmember, the City Clerk
will provide the Oath of Office, and Phil Windschitl will take his seat at the Council dais as
City Councilmember, effective April 20, 2026.
ACTION REQUESTED:
1.Motion to appoint Phil Windschitl as City Councilmember to fill the vacancy for the
remainder of the term, beginning April 20, 2026 and ending December 31, 2026.
2. City Clerk to provide Oath of Office for Phil Windschitl.
Page 5 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Nate Siem, Police Chief
Department:Police
Subject:Swearing in Police Department Personnel
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
Police Chief Siem will present the following personnel to be sworn in:
Police Officers Tyler Wood and Kelly Huntington
Police Sergeants Matt Hendrickson and Keaton Reuben
The Police Chief will administer the Oath of Office in groups by rank.
Page 6 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Deanna Kuennen, Community & Economic Development Director
Department:Community Development
Subject:Association of Minnesota Building Officials - 2025 Building Department of
the Year Award
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
The City of Farmington's Building Inspections Department has been nominated and
awarded the Association of Minnesota Building Officials (AMBO) Building Department of
the Year Award for 2025.
DISCUSSION:
At the ICC Region III Upper Great Plains Educational Institute on February 9, 2026 - Joshua
Lawrenz, Building Official, was presented the 2025 Building Department of the Year Award
from the Association of Minnesota Building Officials. This award recognizes the hard work,
professionalism, and commitment to excellence demonstrated every day in the field and
in the office by our Team. It also recognizes the dedication from the department to further
building code education for building code officials and contractors, and for leading and
mentoring the next generation of code officials.
The following was provided when asked to share a brief summary of accomplishments
since Joshua Lawrenz became Building Official:
In a short amount of time, the Farmington Building Department, under the leadership of Building Official
Joshua have that changes external and meaningful streamlined implemented hasLawrenz, internal
operations and enhanced customer service and contractor interactions. Joshua has embraced a “how do
we get to yes” philosophy while maintaining a strong commitment to administering building codes equitably
and consistently. This sometimes means addressing an issue directly and doing the right thing, rather than
taking shortcuts or opting for the easy route but always looking for a path forward. The department has
introduced systems to better balance workflow/workloads and strives to ensure uniformity in the way
inspection staff complete tasks. This has reduced plan review times and reduced confusion in the field,
ultimately building renewed confidence with our contractor community. Additional accomplishments
include updating public-facing handouts, reviewing and repealing outdated ordinances, maximizing website
functionality, adding key staff, strengthening collaboration with other city departments for the betterment of
the city, successfully issuing COs for the first new apartments in over 30 years, and intentionally investing in
professional development opportunities for our inspection team. By actively listening to contractors and
customers and prioritizing helpful, solution-focused service, that department has improved both external
relationships and internal morale. It has been great watching the entire department take on new challenges
and grow. - D. Kuennen, Community & Economic Development Director
Page 7 of 219
ACTION REQUESTED:
Recognize the Building Inspections Department for their outstanding work.
Page 8 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:David Chanski, Asst City Admin/HR Director
Department:Administration
Subject:Recognition of Retiring Employees
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
Staff will recognize three members of Team Farmington who will be retiring at the end of
April.
ACTION REQUESTED:
Please join us in congratulating Accounts Payable Technician Shelley Beard, City Clerk
Shirley Buecksler, and Payroll Specialist Patty Ridley on their upcoming retirements.
Page 9 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Kellee Omlid, Parks & Recreation Director
Department:Parks & Recreation
Subject:Parks and Recreation Department’s 2025 Annual Report
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
The Parks and Recreation Department (Department) Staff members have compiled an
annual report identifying the Department’s accomplishments in 2025 and looking forward
to 2026. This is the 23rd consecutive year the Department has created an annual report.
DISCUSSION:
Each year, the Department creates an annual report about the following:
•Programs and events offered
•Parks, trails, and facilities projects completed
•Maintenance work performed in parks, on trails, and in facilities
Parks and Facilities Supervisor Jeremy Pire, Recreation Supervisor Missie Kohlbeck, and
Recreation Supervisor Emilee Shearer will be in attendance to help present the annual
report.
the took who Kohlbeck Supervisor Recreation and recognize to likewould I thank
responsibility of acquiring the information from other Department Staff members and then
developing this information into the annual report. Appreciation is also given to Recreation
Supervisor Shearer for her role in editing the report.
ACTION REQUESTED:
The City Council is asked to listen to the annual report presentation and ask any questions it
has during and/or after the presentation has been made. This item is for informational
purposes only.
Page 10 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Shirley Buecksler, City Clerk
Department:Administration
Subject:Minutes of the April 6, 2026 City Council Work Session
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
For approval are the minutes of the April 6, 2026 City Council Work Session.
ACTION REQUESTED:
Approve the minutes of the April 6, 2026 City Council Work Session.
ATTACHMENTS:
04.06.26 Work Session Minutes
Page 11 of 219
Page 12 of 219
Page 13 of 219
Page 14 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Shirley Buecksler, City Clerk
Department:Administration
Subject:Minutes of the April 6, 2026 Special Council Work Session
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
For approval are the minutes of the April 6, 2026 Special Council Work Session.
ACTION REQUESTED:
Approve the minutes of the April 6, 2026 Special Council Work Session.
ATTACHMENTS:
04.06.26 Special Work Session Minutes
Page 15 of 219
Page 16 of 219
Page 17 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Shirley Buecksler, City Clerk
Department:Administration
Subject:Minutes of the April 6, 2026 Regular City Council Meeting
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
For approval are the minutes of the April 6, 2026 Regular City Council meeting.
ACTION REQUESTED:
Approve the minutes of the April 6, 2026 Regular City Council meeting.
ATTACHMENTS:
04.06.26 Council Minutes
Page 18 of 219
City of Farmington
Regular Council Meeting Minutes
Monday, April 6, 2026
The City Council met in regular session on Monday, April 6, 2026, at Farmington City
Hall, 430 Third Street, Farmington, Minnesota.
1. CALL TO ORDER
Mayor Lien called the meeting to order at 7 pm.
2. PLEDGE OF ALLEGIANCE
Mayor Lien led everyone in the Pledge of Allegiance.
3. ROLL CALL
Members Present: Mayor Lien
Councilmembers Holly Bernatz, Jake Cordes,
and Steve Wilson
Members Absent: None
Staff Present: Lynn Gorski, City Administrator
David Chanski, Assistant City Administrator
Amy Schmidt, City Attorney
Deanna Kuennen, Economic & Community Development
Director
Samantha Hazelrigg, Human Resources Manager
Joshua Solinger, Liquor Operations Manager
Kellee Omlid, Parks & Recreation Director
Nate Siem, Police Chief
John Powell, Public Works Director
Shirley Buecksler, City Clerk
4. APPROVE AGENDA
Councilmember Bernatz requested that Item 6.9 Payment of Claims be pulled
from the Consent Agenda and moved to New Business for a vote. The claims
list includes a payment of $12 to her company, and she would like to abstain
from voting on it.
Motion was made by Councilmember Wilson and seconded by
Councilmember Cordes to move Item 6.9 from the Consent Agenda to New
Business Item 11.4 and approve the agenda as amended.
Motion carried: 4 ayes / 0 nays
Page 19 of 219
5. ANNOUNCEMENTS / COMMENDATIONS
5.1 Legislative Update Representative Drew Roach
State Representative Drew Roach provided the City Council with an
update on the 2026 Legislative Session and answered questions from the
Council.
5.2 Update from Dakota County Chamber of Commerce President Jon Altoff
Dakota County Chamber of Commerce President Jon Altoff provided an
update for the City Council and answered questions.
5.3
The City Council recognized Schawn Scovill for his contributions and
commitment to public safety and his 26 years of dedicated service in law
enforcement.
5.4 Arbor Day Proclamation
The City Council proclaimed Friday, April 24, 2026 as Arbor Day in
Farmington and the month of May 2026 as Arbor Month in Farmington.
6. CONSENT AGENDA
6.1 Amendment to the City Council By-Laws, Section I Meetings, Subdivision 3
6.2 Donation from the Farmington Firefighters Relief Association to the City of
Farmington
6.3 Election Judge Appointments for the 2026 Election Cycle
6.4 Farmington Municipal Liquor Downtown Store Lease Extension
6.5 Gambling Exempt Permit Application for Northfield Ducks Unlimited
Chapter MN-0113 May 3, 2026
6.6 Minutes of the March 16, 2026 Regular City Council Meeting
6.7 Minutes of the March 19, 2026 Joint Planning Commission and City Council
Work Session
6.8 Liquor Operations Fund Balance Policy
6.9 Payment of Claims This item was moved to 11.4
6.9 Staff Approvals and Recommendations
6.10 Contract with Xcel Energy to Relocate Primary Electrical Line at Feely Fields
6.11 Donation from Carol Sprute to the Rambling River Center
6.12 Donation from the Farmington Sons of the American Legion to the
Rambling River Center
6.13 Donation from the Farmington VFW to the Rambling River Center
6.14
Page 20 of 219
6.15
Department
6.16 Declaring Surplus Property-Police
6.17 Final Acceptance of Public Utilities for Denmark Housing Addition
6.18 Institution Community Work Crew Contract
6.19 Plans and Specifications and Authorize the Advertisement for Bids for the
2026 Street Improvements
Motion was made by Councilmember Wilson and seconded by
Councilmember Cordes to approve the Consent Agenda, as amended.
Motion carried: 4 ayes / 0 nays
7. PUBLIC HEARINGS
8. AWARD OF CONTRACT
9. PETITIONS, REQUESTS AND COMMUNICATIONS
10. UNFINISHED BUSINESS
11. NEW BUSINESS
11.1 Compensation & Classification Study
Motion was made by Councilmember Bernatz and seconded by
Councilmember Cordes to approve the agreement with MRA to conduct
a comprehensive compensation and classification study and amend the
budget accordingly.
Motion carried: 4 ayes / 0 nays
11.2 Creation of Communications & Public Affairs Manager
Motion as made by Councilmember Cordes and seconded by
Councilmember Wilson to approve the Communications & Public Affairs
Manager job description and authorize Staff to conduct the recruitment
process.
Motion carried: 4 ayes / 0 nays
Page 21 of 219
11.3 Hiring of Full-Time Liquor Store Clerks
Motion was made by Councilmember Bernatz and seconded by
Councilmember Wilson to approve the addition of two full-time Liquor
Store Clerks to Municipal Liquor Operations, authorize Staff to conduct the
recruitment process, and amend the budget accordingly.
Motion carried: 4 ayes / 0 nays
11.4 Payment of Claims moved from Item 6.9
Motion was made by Councilmember Cordes and seconded by
Councilmember Wilson to approve the payment of claims.
Motion carried: 3 ayes / 0 nays Councilmember Bernatz abstained
12. CITIZENS COMMENTS / RESPONSES TO COMMENTS
The following citizen(s) addressed the Council:
Beth Moore, Empire
Dave Akin, Castle Rock Township
Nate Ryan, Farmington
Sarah Fry, Farmington
Nikita Klochan, Farmington
Nancy Aarestad, Castle Rock Township
Terrie Pearson, Castle Rock Township
Denise May, Castle Rock Township
Mark Pearson, Castle Rock Township
Carolyn Kiefer, Castle Rock Township
Jeff Schottler, Farmington
Dove Mitchell, Farmington
Tiffany Ryan, Farmington
13. CITY COUNCIL ROUNDTABLE
Councilmember Cordes thanked the 13 applicants who interviewed for the
vacant Council seat.
City Administrator Gorski congratulated Shawn Scovill on his retirement and
wished him well.
City Administrator Gorski also thanked the City Council for adding the
Communications & Public Affairs Manager position. She also thanked Assistant
City Administrator Chanski for taking on these duties until the position is filled.
Page 22 of 219
City Administrator Gorski shared a letter from Tract and read portions of it in
hopes that it will answer some of the questions received during public
comments tonight. The letter is in regard to release of City employees from the
October 2023 non-disclosure agreement. This letter will be on the City of
Farmington and included with the Project Information. It important
for people to read it in its entirety. Also, in spirit of transparency, Tract stated in
the letter that they have created a website containing information describing
project plans, which can be found at:
Farmington Technology Park (https://www.mnlcofarmington.com). She
strongly encourages everyone to go out and look at it. If anyone has questions
about information on Tract s website, you can email Connect@Tract.com.
Assistant Administrator Chanski thanked Shawn Scovill for a career well done
and his service to Farmington and wished him the best in retirement. On
April 20th there will be more retirements from Team Farmington to celebrate. City
Clerk Shirley Buecksler will be officially retiring April 23rd, with Melissa Geis taking
over as City Clerk on April 20th. And Payroll Specialist Patti Ridley will be retiring
on May 1st, with Cory Blauvelt taking over as our new Payroll Specialist on
April 27th.
Director Powell said we started our spring hydrant flushing today, which will
continue this week and through next week. The dates for which various
geographic areas are flushed is on the City s website at Hydrant Flushing |
Farmington, MN.
Director Omlid thanked various individuals and businesses for their very
generous donations to the Rambling River Center and the Parks & Recreation
Department.
Director Omlid mentioned that April is National Volunteer Month and she
thanked all of the volunteers who make the Parks and Recreation Department
go. We couldn t do it without our volunteers at the Rambling River Center,
volunteers who adopt and clean up our parks, and our volunteer coaches.
Thank you to all those volunteers who contribute their time to the great park
system we have.
Police Chief Siem thanked everyone for their words for Detective Scovill. He also
thanked Council for the approval of CSO Claire Kennedy s promotion to
Officer. She starts next Monday.
Police Chief Siem said the application is still open for the Police Officer position.
We haven t had an open position since May of 2025. As of this afternoon, we
are up to 30 applicants for this posting, so the market is improving and we re
doing good.
Page 23 of 219
Mayor Lien thanked Chief Siem for his touching speech about Detective Scovill
and said he couldn t be happier for people making it all the way to the finish
line.
Mayor Lien said the information shared by City Administrator Gorski is hopefully
big news and provides information on what the next step looks like and start
seeing, with a little more clarity, what might be coming in the future. He said he
hopes people will continue to come up and speak I ll listen to you all day long.
I ll come to you, talk to you, I ll listen to you as best I can, as best as my
schedule can. The one thing I want to try and strive to do is at least hear you
and feel listened to even if we do continue to disagree, I want you to feel
listened to and feel heard. That s one thing I do have in my power to change
through all of this. I ll keep doing my best.
Mayor Lien thanked the 13 applicants who did want to raise their hand and
step forward. We have to say no to 12 people and yes to only one. I hope the
other 12 people realize the impact that they make by at least making their
opinion known, showing up as champions for their community, and saying, I
want to help, I want to be part of this, I want to help guide the decisions.
Whether you re up here or not, you can do that to the best of your ability. You
don t have to be up here to be a champion for Farmington. Keep talking, being
present, and being involved. I appreciate everything you re doing.
14. ADJOURNMENT
Motion was made by Councilmember Wilson and seconded by
Councilmember Bernatz to adjourn the meeting at 9:33 pm.
Motion carried: 4 ayes / 0 nays
Respectfully submitted,
Shirley R Buecksler
City Clerk
Page 24 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Shirley Buecksler, City Clerk
Department:Administration
Subject:Temporary On-Sale Liquor License for the Farmington Lions Club September
3, 2026
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
For approval is a Temporary On-Sale Liquor License application from the Farmington Lions
Club for an event to be held on September 3, 2026.
DISCUSSION:
The Farmington Lions Club will be hosting an event on September 3, 2026 and are
requesting approval of a Temporary On-Sale Liquor License. This event will be held at the
Church of St. Michael, 22120 Denmark Avenue, Farmington.
ACTION REQUESTED:
Approve the Temporary On-Sale Liquor License for the Farmington Lions Club for an event
to be held on September 3, 2026 at the Church of St. Michael, 22120 Denmark Avenue,
Farmington.
ATTACHMENTS:
09.03.26 Lions Club Temp On-Sale
Page 25 of 219
Page 26 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Kim Sommerland, Finance Director
Department:Finance
Subject:2025 Investment Portfolio Overview
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
In accordance with the City’s investment policy, Staff annually provides City Council with
an overview of the City’s cash and investment portfolio.
DISCUSSION:
As of December 31, 2025, the City’s investment portfolio had a market value of $71.7
million with deposits held at Old National Bank, and investments with Oppenheimer & Co.,
Moreton Capital Markets, and RBC Capital Markets.
One of the challenges to investing City funds is balancing the short-term cash flow needs
of daily operations with the needs to cash flow infrastructure projects and long-term needs
such as semi-annual debt service. At all times, the three primary objectives of the City’s
investment policy must be considered when investing City funds. These objectives in order
of importance are safety, liquidity, and yield/return.
Minnesota Cities may invest in a variety of investment instruments as defined in Minnesota
State Statute Section 118A.04 which include options such as U.S. government securities,
Page 27 of 219
state and local securities, commercial paper, and time deposits. At year end, municipal
securities accounted for the largest percentage, 43%, of the City’s portfolio. U.S. agencies,
which accounted for 14% of the total portfolio at the end of 2025, included Fannie Mae
(FNMA), Federal Farm Credit Bank (FFCB), Federal Home Loan Bank (FHLB), and Farmer
Mac (FAMC). In addition, certificates of deposit (CDs) accounted for 13% of the portfolio,
while U.S. treasuries represented 7%. Rounding out the City’s portfolio were deposits with
Old National Bank, and money market funds with Oppenheimer & Co., Moreton Capital
Markets and RBC Capital Markets.
The City intentionally ladders its investment maturities so that each month an investment or
investments matures to meet the cash flow needs for that period. The City’s longest
investment maturity as of December 31, 2025 was just short of six years, maturing in 2031.
The portfolio's maturity breakdown is as follows: approximately 35% of investments mature
within 12 months, 62% mature between one and five years, and 3% mature in more than
five years. According to the City’s investment policy, no more than 30% of the total
investments can have maturities exceeding five years, and no investment can have a
maturity longer than 15 years.
The total yield of the City’s investment portfolio as of December 31, 2025 was 3.707
percent, which is a slight increase from 3.603 percent in 2024.
Page 28 of 219
Mark-To-Market
Governmental Accounting Standards Board (GASB) standards require that entities adjust
and report in their financial statements the value of investments as determined by current
market conditions as of December 31 each year. The market value represents the amount
that the City would receive for the investment if it was sold at that time. However, since the
City purchases investments with the intention of holding investments to maturity, reported
mark-to-market gains or losses are not typically realized.
BUDGET IMPACT:
The City had an investment income budget of $491,900 for 2025. Actual investment
income for the year, prior to any mark-to-market adjustments, was $2,367,857. This is an
increase of $320,282 from the actual investment income for 2024, which was $2,047,575.
ACTION REQUESTED:
Accept the annual investment report.
ATTACHMENTS:
2026-04-20 2025 Investment Portfolio Overview
Page 29 of 219
Page 30 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Kim Sommerland, Finance Director
Department:Finance
Subject:Final 2025 Interfund Transfers
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
Interfund transfers support several City financial needs, including long-term funding
reimbursing equipment major for purchases, fund building strategies, balances
administrative costs, and closing inactive funds. After year-end, Staff provides the Council
with a summary of the actual transfers completed for review and approval.
DISCUSSION:
The attached spreadsheet outlines the 2025 interfund transfers, totaling $7,629,531.
Transfers are grouped by color as follows:
Blue: $3,670,306 – Transfers included in the 2025 budget with no changes.
Purple: $1,403,725 – Budgeted transfers adjusted to reflect actual expenses.
Green: $411,916 – Transfers approved through the amended budget.
Yellow: $49,000 – Budgeted as a transfer but recorded as an interfund loan.
Orange: $2,064,532 – Transfers completed during the year that were not included in
the 2025 budget. These include actions to:
o Reverse a prior transfer between the Closed Bond Fund and 2005C GO Bonds
to correct temporary negative cash.
o Separate the previously combined 2022A debt service funds.
o Increase the original budgeted transfer to Building Maintenance by moving
USDA lease revenue into the fund. This revenue must be recorded in the
General Fund for accounting purposes but is intended to support major
building maintenance needs.
o Increase the amended budgeted transfer from Public Safety Aid to fund a fire
department generator that was inadvertently omitted from earlier budget
amendments.
o Reconcile various street projects based on actual work completed, including
adjustments between trunk and utility funds.
o Move funds to align the City's contribution for retiree benefits with the
Employee Expense fund.
Gray: $30,052– Transfers to close inactive funds. With the closure of the Dakota
Page 31 of 219
Broadband Fund, the residual balance was transferred to the General Fund to be
used for staff development.
No additional transfers are expected for 2025; however, minor adjustments may occur as
the audit is finalized.
BUDGET IMPACT:
Any variances to the adopted budget have been addressed in the discussion above.
ACTION REQUESTED:
Approve the final list of 2025 interfund transfers.
ATTACHMENTS:
2025 Transfers Original & Final
Page 32 of 219
TRANSFERS OUT Page 33 of 219
TRANSFERS OUT Page 34 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Kim Sommerland, Finance Director
Department:Finance
Subject:Payment of Claims
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
Minnesota Statutes require that all claims for payment be presented to the City Council for
review and approval.
DISCUSSION:
The City Council has established a process to review and approve claims for payment at
each regular meeting. The list of claims for the period of 04/01/2026 to 04/14/2026 is being
presented for consideration, ensuring compliance with State law and maintaining proper
financial oversight.
BUDGET IMPACT:
The claims paid will reduce the available budget for the accounts listed in the detailed
report provided to the Council.
ACTION REQUESTED:
Approve payment of claims.
ATTACHMENTS:
2026-04-20 City Claims
Page 35 of 219
CLAIMS FOR APPROVAL 04/01/2026-04/14/2026
CHECK PAYMENTS 301,132.71$
ELECTRONIC PAYMENTS 409,736.74$
TOTAL 710,869.45$
The City Council receives a detail list of claims paid that is available to
the public upon request.
CITY OF FARMINGTON
SUMMARY PAYMENT OF CLAIMS
April 20, 2026
Page 36 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Kim Sommerland, Finance Director
Department:Finance
Subject:Updated Authorization of Employee Credit Card Use
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
Minnesota Statutes Section 471.385 authorizes City Council to approve the use of credit
cards by City employees who are permitted to make purchases on behalf of the
municipality. With recent organizational changes and new positions added since the last
approval, staff is providing an updated list of recommended eligible positions to ensure
accuracy and compliance. The list reflects eligibility only and does not automatically result
in the issuance of a card.
DISCUSSION:
The City's Purchasing Policy permits the use of credit cards as an authorized payment
method, with usage subject to all procurement thresholds, approval requirements, and
internal control procedures.
In addition, all cardholders are required to sign an agreement which details responsibilities
for security, proper usage, documentation, reconciliation timelines and consequences for
misuse. Cardholders acknowledge they have read and understand both the employee
agreement and the City's purchasing policy.
To maintain consistent internal controls and ensure credit cards are issued only to positions
that require them, the City follows these general guidelines:
Cards may be issued only when there is a demonstrated operational need.
Cards are issued to supervisors, managers, or department heads with regular
purchasing responsibilities.
Issuance requires Department Head approval prior to Finance review and issuance.
Cardholders must sign the City's credit/purchasing card agreement acknowledging
their responsibilities, security requirements, and accountability.
Since the previous authorization in January 2024, a few position titles have changed, and
additional supervisory or managerial roles have been added. To maintain an accurate
and transparent record of authorized positions, staff recommends approving an updated
list replacing the one previously approved.
Page 37 of 219
Positions allowed include:
City Administrator
Police Chief
Public Works Director/City Engineer
Assistant City Administrator
Community & Economic Development Director
Finance Director
Fire Chief
Parks & Recreation Director
IT Director
Police Captain
Assistant Finance Director
Building Official
Deputy Fire Chief
Human Resources Manager
Liquor Operations Manager
Public Works Superintendent
Communications & Public Affairs Manager
Parks & Facilities Supervisor
City Clerk
Fire Marshal
Parks & Recreation Supervisor
Recreation Supervisor
Skate School Supervisor
District Fire Chief
Inclusion on this list establishes eligibility only and does not guarantee card issuance. Final
issuance and assignment of an appropriate credit limit are at the discretion of the Finance
Director, who will evaluate whether a true operational need exists.
BUDGET IMPACT:
Credit/purchasing card usage remains governed by the City's Purchasing Policy,
departmental budgets, and individual credit limits set by the Finance Director.
ACTION REQUESTED:
Approve the updated list of positions that may be considered eligible for a City-issued
credit/purchasing card.
ATTACHMENTS:
POLICY - Purchasing
Purchasing Card Employee Agreement v2.0
Page 38 of 219
Page 39 of 219
Page 40 of 219
Page 41 of 219
Page 42 of 219
Page 43 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:David Chanski, Asst City Admin/HR Director
Department:HR
Subject:Accounting Specialist Job Description
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
Staff is seeking approval for the revised Accounting Specialist job description.
DISCUSSION:
With the City's current Accounts Payable Technician retiring at the end of the April, Staff
took the time to review the position's job description prior to posting the position. Upon
review, Staff updated some of the position's essential duties to better align with the work
that the position actually does. Additionally, Staff is recommending changing the position's
title to Accounting Specialist to better differentiate it from the two Accounting Technician
roles within the Finance Department.
Lastly, Staff had the position regraded, and it came back with an increase from B-22 to B-
24. Staff agrees with this new grade as it much better aligns with the required education,
experience, and essential functions, as well as with similar roles within the organization.
BUDGET IMPACT:
Position is an existing position that is included in the 2026 Budget.
ACTION REQUESTED:
Approve the updated Accounting Specialist job description and salary grade.
ATTACHMENTS:
Accounting Specialist Job Description
Page 44 of 219
CITY OF FARMINGTON, MN
CLASS SPECIFICATION
CLASS SPECIFICATION TITLE: ACCOUNTING SPECIALIST
1
BAND GRADE SUBGRADE FLSA STATUS:
B 2 4 Non-exempt
CLASS SUMMARY:
The Accounting Specialist supports accurate, timely finance operations by independently applying
basic accounting fundamentals to complete daily tasks. Primary responsibilities include accounts
payable, accounts receivable, vehicle licensing/insurance, providing backup for sales and use tax
reporting, and filing unclaimed property.
TYPICAL CLASS ESSENTIAL DUTIES: (These duties are a representative sample; position
assignments may vary.)
1. Review supplier invoices by confirming required invoice details, vendor master accuracy (e.g.,
W-9 on file and current remit/ACH information), due dates, and proper sales/use tax treatment;
ad/OCR or manual entry and
attach required documentation. Route invoices through the established workflow to the
designated coders and approvers, resolve routine exceptions independently.
2. Process payment runs by generating checks or initiating electronic payments, clearing
automatic-pay items, and ensuring distribution and documentation are completed in accordance
with City procedures. Independently research and resolve routine payment exceptions, such as
credits, bill backs, and duplicate payments, retaining required supporting records consistent
with retention standards.
3. Prepare and issue Form 1099 in accordance with IRS procedures by verifying vendor
classifications, compiling and reconciling reportable payments, maintaining supporting
documentation and ensuring timely annual filing.
5. Process and file
requirements by monitoring outstanding checks throughout the year, performing due-diligence
outreach, updating records as items are resolved, and ensuring all documentation is retained
according to policy.
6. Create and issue accounts receivable invoices in accordane with City contracts, policies, and
bill-back requirements; apply and code payments accurately in the financial system; monitor
aging and follow up on delinquent accounts in line with established procedures; and maintain
complete records.
7. Maintain City vehicle records, including registratrions, licensing, insurance, and fuel cards;
enter new vehicle and equipment acquisitions into the fixed asset module with required
documentation. Follow up on asset disposals, such as sales or retirements, to ensure records
are updated and supporting documentation is collected and retained.
8. Reconcile the accounts payable and accounts receivable modules to the general ledger on a
monthly basis; research and resolve discrepancies; independently prepare necessary
adjustments.
9. Assist with and serve as backup for preparing, reconciling, and filing sales and use
tax reports; ensure proper tax coding, documentation, and compliance with state requirements.
Research and resolve routine discrepancies and support timely submission of all filings.
10. Assist senior Finance staff with preparation of basic audit workpapers, assembling
documentation, reconciling assigned accounts, and responding to routine auditor requests to
support an efficient annual audit process.
11. Perform other duties of a similar nature or level as assigned.
Page 45 of 219
CITY OF FARMINGTON, MN
CLASS SPECIFICATION
CLASS SPECIFICATION TITLE: ACCOUNTING SPECIALIST
2
Training and Experience (positions in this class typically require):
Minimum Qualifications:
High school diploma or GED and 2 years of accounts payable, accounts receivable or related
experience; or, an equivalent combination of education and experience sufficient to successfully
perform the duties listed above.
General working knowledge of accounting principles
Preferred Qualifications:
Experience with BS&A Cloud
Experience in municipal government or public-sector accounting
Proficiency with Microsoft Office products, including advanced proficiency with Excel
Knowledge (position requirements at entry):
Knowledge of:
Accounting principles, practices, and procedures
Experience with accounting software and systems
Sales and use tax experience, preferred
Proficiency with computers; Microsoft Office preferred
Government filing regulations and related regulations.
General business practices and procedures.
Skills (position requirements at entry):
Skill in:
Typing and data entry
Providing customer service including the ability to maintain composure under pressure.
Filing, scanning, and document management
Organization and time management including the ability to balance multiple priorities.
Mathetical reasoning and basic accounting skills.
Clear communication and strong interpersonal skills including effectively interacting with coworkers,
supervisors, and the public to exchange information and receive work direction
Building positive working relationships and maintaining a respectful work environment
Attention to detail and accuracy
Ability to handle stress and/or stressful situations.
Abillity to maintain confidentiality and sensitive information.
Ability to research discrepancies, assess root causes, and determine corrective actions.
Sound decision-making skills, with the ability to use judgement and follow established procedures
and policies.
Physical Requirements:
Positions in this class typically require: climbing, balancing, stooping, kneeling, crouching, crawling,
reaching, standing, walking, pushing, pulling, lifting, fingering, grasping, feeling, talking, hearing,
seeing and repetitive motions.
Sedentary Work: Exerting up to 10 pounds of force occasionally and/or a negligible amount of force
frequently or constantly to lift, carry, push, pull or otherwise move objects, including the human body.
Sedentary work involves sitting most of the time. Jobs are sedentary if walking and standing are
required only occasionally and all other sedentary criteria are met.
Page 46 of 219
CITY OF FARMINGTON, MN
CLASS SPECIFICATION
CLASS SPECIFICATION TITLE: ACCOUNTING SPECIALIST
3
NOTE:
The above job description is intended to represent only the key areas of responsibilities; specific
position assignments will vary depending on the business needs of the department.
Classification History:
Draft prepared by City of Farmington
Date: 4/2026
Page 47 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:David Chanski, Asst City Admin/HR Director
Department:HR
Subject:Assistant Finance Director Job Description
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
Staff is seeking approval for the job description of the Assistant Finance Director position.
This new position was included in the 2026 Budget.
DISCUSSION:
During the 2026 Budget development process, the need for an Assistant Finance Director
was identified. The Finance Department is currently comprised of the Finance Director,
Accountant, Accounts Payable Technician, and two Accounting Technicians that handle
Utility Billing and other finance tasks. However, as City operations continue to grow and
accounting and audit standards increase, the bandwidth within the department has been
stretched to its limit. Additionally, it has been identified that 3/5 members within the
department will likely retire within the next 5 years.
The creation of the Assistant Finance Director position will increase the bandwidth within
the Finance Department, allowing the department to take steps to create more financial
transparency, develop better processes to maintain compliance with accounting and
audit succession future and operationsof for more allow and standards, continuity
planning.
As a result, the City Council approved the addition of the Assistant Finance Director in the
2026 Budget.
BUDGET IMPACT:
The Assistant Finance Director position was fully funded in the 2026 Budget.
ACTION REQUESTED:
Approve the job description for the Assistant Finance Director position and authorize Staff
to conduct the recruitment process.
Page 48 of 219
ATTACHMENTS:
Assistant Finance Director Job Description
Page 49 of 219
Job Summary
Page 50 of 219
Page 51 of 219
Page 52 of 219
Page 53 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Samantha Hazelrigg, Human Resources Manager
Department:HR
Subject:Staff Approvals and Recommendations
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
Staff recommends the following appointments:
Benjamin Harten as Engineering Technician
Jadyn Nye as Building Permit Technician
Drew Conrad, Alex Haggerty, and Carson Spelman as Seasonal Park Maintenance
Sawyer Hoffman as Seasonal Public Works Maintenance
DISCUSSION:
Council for appointmentsemployeefollowing pleased recommend to isStaff the
approval. We are welcoming: Benjamin Harten as Engineering Technician; Jadyn Nye as
Building Permit Technician; Drew Conrad, Alex Haggerty, and Carson Spelman as Seasonal
Park Maintenance; and Sawyer Hoffman as Seasonal Public Works Maintenance.
We appreciate the contributions each of these individuals will bring to their respective roles
and look forward to their service to the City of Farmington and its community members.
BUDGET IMPACT:
Included in the 2026 budget.
ACTION REQUESTED:
Approve the appointments of Benjamin Harten, Jadyn Nye, Drew Conrad, Alex Haggerty,
Carson Spelman, and Sawyer Hoffman.
Page 54 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Kellee Omlid, Parks & Recreation Director
Department:Parks & Recreation
Subject:Agreement with Wayzata Results for Race Result Timing Services
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
The 46th Annual Tater Trot (formerly Dew Run) is scheduled for Saturday, June 27, 2026.
DISCUSSION:
The Tater Trot includes 1 Mile, 4 Mile, and ½ Mile Jr. Jog races. Wayzata Results will be
providing race result timing services for the 1 Mile and 4 Mile races. The services include
timing, results, generic bibs, display clock, and chips. The agreement is attached. Wayzata
Results has successfully provided race result timing services for the Tater Trot in the past
including last year and are great to work with.
The City Attorney reviewed the attached agreement and found it acceptable.
BUDGET IMPACT:
The cost for the services Wayzata Results will be providing is $600 plus $2.50 per entry and
$0.72 per mile for travel. The cost for race result timing services will be funded through the
Parks and Recreation Department approved operational budget for contractual services
monies in the recreation program services budget.
ACTION REQUESTED:
Approve the attached agreement with Wayzata Results for race result timing services for
the 46th Annual Tater Trot on June 27, 2026.
ATTACHMENTS:
Wayzata Results 2026 Agreement
Page 55 of 219
1998 Schoolmaster Dr
Chaska, MN 55318
612-849-0713
www.wayzataresults.com
Service Contract Road Races
For:
City of Farmington
Date of Service: 6/27
Venue:
Event Name:
Event Type: Road Race
Timing Option: Chip Timing
Services Included:
Timing, Results, Generic Bibs, Display Clock, Chips
Customer
Responsibilities:
Payment Terms: Within 30 days of Invoice Received
Deposit Required: $0
Hotel: N/A
Travel: $0.72/per mile
Price(s) (estimate):
Bib Chips (Do not need to be returned):
$600 + $2.50/entry
Finish mat only
This contract between the customer listed above and Wayzata Results, Inc. agree to the
following service package detailed on the second page, including responsibilities of both the
customer and Wayzata Results, Inc..
PLEASE SIGN AND EMAIL (or mail) THIS AGREEMENT TO WAYZATA RESULTS, INC. AS
SOON AS POSSIBLE. WHEN WE RECEIVE THIS AGREEMENT, IT OFFICIALLY ENTERS
YOUR MEET INTO OUR SERVICE CALENDAR.
THANK YOU!
Page 56 of 219
x Josh Gerber x
Josh Gerber Nicholas Lien, Mayor
Owner/Event Operations Director
x Melissa Geis, City Clerk
1
Page 57 of 219
Service Agreement
1. SERVICES:
The Provider will perform the services agreed upon and indicated on the first page of this
document.
Generic Bibs: Generic bibs (if agreed upon & listed in the services above) are bibs that may have
other logos and events on them. We will however, try to limit the use of other event bibs for use
with your event. We will use (in order) bibs with Athletic.net logos first, RoadId (or other non-event
specific bibs), Cross Country Event bibs, other road race bibs (last resort)
We will make every effort to use only generic Athletic.net bibs or RoadId bibs.
2. TIME OF COMPLETION:
The services described above shall be completed in a timely manner on the date of
the event. Any post-event services will be completed in a timely manner consistent
with the abilities of the Provider to perform those services.
3. PAYMENT/FEES:
The Customer shall pay the Provider for the services to be performed under the
Agreement the sum listed on the first page of this document.
There is a $300 non-refundable fee for holding the date see deposit required field
Once the pre-registration deadline passes there will be an additional $75 fee or
$0.50/entry fee if the event is cancelled (whichever is higher)
If the event is canceled after we leave for the event there is 75% charge plus mileage
(or the $300 holding fee plus mileage whichever is greater).
If the event is canceled once we arrive on site there is 100% charge.
Payments must be received within 30 days of completion of the event in full. If payment is
not made within 30 days there will be a 10% charge added on to the timing fee for each 30
days the payment is delinquent.
4. GENERAL PROVISIONS:
All work shall be completed in a workmanship like manner, and if applicable, in
compliance with all building codes and other applicable laws.
Provider shall not be liable for any delay due to circumstance beyond its control.
The full balance of the agreement will be paid if the event is canceled after the Provider arrives at
the event.
If the event is postponed or the date is changed from that listed on the first page of this
agreement, the Provider will make every attempt to accommodate the new date.
Provider is not to be held liable for inability to perform services based on the
detailed on the first page of this agreement.
Any changes to this document must be set forth in writing by both Customer and Provider.
Customer is responsible for any damage to equipment due to participants, officials, coaches,
spectators, et all.
Customer is NOT responsible for damage due by acts of God (example: weather)
It is expressly understood that the Provider is an " independent contractor" and not an employee
of the City. The Provider shall have control over the manner in which the services are performed
under this Agreement. The Provider shall supply, at its own expense, all materials, supplies,
equipment and tools required to accomplish the services contemplated by this Agreement. The
Provider shall not be entitled to any benefits from the City, including, without limitation, insurance
benefits, sick and vacation leave, Earned Sick and Safe Time, workers' compensation benefits,
unemployment compensation, disability, severance pay, or retirement benefits. Nothing in this Page 58 of 219
Agreement shall be deemed to constitute a partnership, joint venture or agency relationship
between the parties.
Provider warrants that it is adequately insured for injury to its employees and others incurring loss
or injury as a result of the acts of Provider or its employees, including Commercial General Liability
in a minimum of$ 1, 000, 000 per occurrence/$ 2, 000, 000 annual aggregate, with the City named
as an additional insured. Provider will provide a Certificate of Insurance upon request of the City.
Page 59 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Kellee Omlid, Parks & Recreation Director
Department:Parks & Recreation
Subject:Donation from Amcon to the Rambling River Center
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
Amcon recently donated two “10 Works Plus” car wash cards to the Rambling River Center
(RRC).
DISCUSSION:
RRC member Vicki Pepera recently visited Amcon to purchase two “10 Works Plus” car
wash cards to be used as Bingo prizes. In a generous gesture, Amcon chose to donate the
cards instead! The two car wash cards, with a combined value of $192, will be used over
the next month as prizes for Bingo participants at the RRC.
Staff will communicate the City’s appreciation on behalf of the City Council to both Vicki
Pepera and Amcon for this very thoughtful and generous donation.
ACTION REQUESTED:
Adopt Resolution 2026-034 accepting the donation of two “10 Works Plus” car wash cards,
valued at $192, from Amcon to the Rambling River Center.
ATTACHMENTS:
2026-034 Accepting Car Wash Cards from Amcon
Page 60 of 219
CITY OF FARMINGTON
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2026-034
A RESOLUTION ACCEPTING
A DONATION OF TWO FROM AMCON
TO THE RAMBLING RIVER CENTER
WHEREAS, the City of Farmington is generally authorized to accept donations of real
and personal property pursuant to Minnesota Statutes Section 465.03 for the benefit of its citizens
and is specifically authorized to accept gifts, as allowed by law; and
WHEREAS, the following persons and entities have offered to contribute to the City:
Amcon has donated to the Rambling River
Center valued at $192; and
WHEREAS, it is in the best interest of the City to accept this donation.
NOW, THEREFORE, BE IT RESOLVED that Mayor Lien and the Farmington City
Council hereby accept with gratitude the generous donation of two
cards to the Rambling River Center valued at $192 from Amcon.
Adopted by the City Council of the City of Farmington, Minnesota, this 20th day of April 2026.
ATTEST:
____________________________ ______________________________
Nicholas Lien, Mayor Melissa Geis, City Clerk
Page 61 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:John Powell, Public Works Director
Department:Engineering
Subject:Professional Services Agreement with Alliant Engineering, Inc. for the 1st
Street MSA Improvements Preliminary Design
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
At the December 15, 2025, City Council meeting, the City Council approved the 2026-2030
Capital Improvement Plan (CIP). The approved CIP includes the 1st Street Municipal State
Aid (MSA) Improvement project which includes the reconstruction of 1st Street from 220th
Street to Spruce Street. This project involves the complete replacement of the roadway
section, replacement of the water main in certain areas, and expansion of the storm sewer
system.
We are initiating the preliminary design at this time in order to have the bid documents
completed and issued early in the 2027 project bidding season.
DISCUSSION:
Alliant 2023-2027. for Pool Consultant approved the City the2023, in Early Council
Engineering is one of the firms in the Consultant Pool and has prepared the attached
scope and budget based on discussions with City Staff. A map of the project area is
included in the attached PSA document. Major tasks included in the scope are the
following:
Project Management
Data Collection and Base Mapping
Public Engagement
Feasibility Report
Geotechnical Evaluation
30% Design plans and Cost Estimate
Among other items, the detailed proposed scope includes:
Periodic check in meetings with the city.
Full topographic surveys of the project area.
Preparation of a base map that includes private utilities.
Two open houses for the public.
Page 62 of 219
Project communication including open house invites.
Soil borings
Draft and final geotechnical reports.
Preparation of draft and final feasibility reports.
30% design plans.
Staff anticipates that the first open house will be scheduled for late May with completion of
the feasibility report and 30% design plans by the end of September.
BUDGET IMPACT:
Work under this contract will be billed hourly for a cost not to exceed $90,620. As identified
in the approved 2026-2030 Capital Improvement Plan, the funding sources for this project
area are as follows:
Funding Source Amount
State Aid (MSA Construction
Funds)$ 1,300,000
Sewer Fund $ 150,000
Water Fund $ 150,000
Total $ 1,600,000
The Stormwater Fund has not been included as a funding source as the State Aid
Construction funding may be used for both the pavement and drainage (storm sewer)
systems.
as suchcostsother as well includes costs, construction allocation funding The as
engineering, surveying, soil borings, materials testing, sewer televising, permits, etc. Once
the City enters into a construction contract for the project, engineering costs will be
reimbursed via the City's MSA Construction Fund.
ACTION REQUESTED:
Approve a Professional Services Agreement with Alliant Engineering, Inc. for the 1st Street
MSA Improvements Preliminary Design.
ATTACHMENTS:
042026 alliant PSA 1st street MSA Imp preliminary design
Page 63 of 219
224345v1
PROFESSIONAL SERVICES AGREEMENT
This Professional Services Agreement made this 20th day of April,
2026, by and between the CITY OF FARMINGTON, a Minnesota municipal corporation, whose
business address is 430 3rd St, Farmington, MN 55024 (hereinafter "City") and Alliant
Engineering, Inc., a Minnesota Corporation, whose business address is 733 Marquette Avenue,
Suite 700, Minneapolis, MN 55402 (hereinafter "Engineer").
PRELIMINARY STATEMENT
The City has adopted a policy regarding the selection and hiring of consultants to provide
a variety of professional services for City projects. That policy requires that persons, firms or
corporations providing such services enter into written agreements with the City. The purpose of
this Agreement is to set forth the terms and conditions for the provision of professional services
by Engineer for engineering services, hereinafter referred to as the "Work", and as outlined on
IN CONSIDERATION OF THEIR MUTUAL COVENANTS, THE PARTIES
AGREE AS FOLLOWS:
1. SCOPE OF SERVICES. The City retains Engineer to furnish the services set
provide all personnel, supervision, services, materials, tools, equipment and supplies and do all
thing Work to be performed under
this Agreement shall be done under the review of a professional engineer licensed in the State of
Minnesota, who shall attest that the Work will be performed in compliance with all applicable
codes and engineering standards. The Work shall be performed in accordance with the Contract
Documents, which includes this Agreement and the attached Exhibits: Scope of
Schedule of Payment and Fee Schedule. In the event any ambiguity or
conflict between the Contract Documents listed above, the order of precedence shall be the
following order: (i) this Agreement; (ii) Exhib
2. REPRESENTATIVES. City has designated John Powell, Public Works
Director/City Engineer Eric Nelson,
Client Services Manager
Engineer Representative shall be available as often as is reasonably necessary for reviewing the
Services and Work to be performed.
3. COMPENSATION FOR SERVICES. Engineer shall be paid by the City for the
services described in on an hourly basis in accordance with the attached fee schedule,
90,620 inclusive of taxes and reimbursable costs.
A. Any changes in the scope of the Work which may result in an increase to the
compensation due the Engineer shall require prior written approval by the
Page 64 of 219
224345v1
authorized representative of the City or by the City Council. The City will not pay
additional compensation for services that do not have prior written authorization.
B. Special Consultants may be utilized by the Engineer when required by the complex
or specialized nature of the Project and when authorized in writing by the City.
4. COMPLETION DATE/TERM. The Engineer must complete the Services by
September 30, 2026. This Agreement may be extended upon the written mutual consent of the
parties for such additional period as they deem appropriate, and upon the terms and conditions as
herein stated.
5. OWNERSHIP OF DOCUMENTS. All plans, diagrams, analyses, reports and
become the property of the City, but Engineer may retain copies of such documents as records of
the services provided. The City may use the Information for its purposes and the Engineer also
may use the Information for its purposes. Use of the Information for the purposes of the project
contemplated by this Agreement does not relieve any liability on the part of the Engineer, but any
use of the Information by the City or the Engineer beyond the scope of the Project is without
liability to the other, and the party using the Information agrees to defend and indemnify the other
from any claims or liability resulting therefrom.
6. COMPLIANCE WITH LAWS AND REGULATIONS. In providing services
hereunder, Engineer shall abide by all statutes, ordinances, rules, and regulations pertaining to the
provisions of services to be provided. Any violation of statutes, ordinances, rules, and regulations
pertaining to the Services to be provided shall constitute a material breach of this Agreement and
entitle the City to immediately terminate this Agreement.
and accounting procedures and practices related to services provided to the City are subject to
examination by the legislative auditor or the state auditor, as appropriate, for a minimum of six
years.
7. STANDARD OF CARE. Engineer shall exercise the same degrees of care, skill,
and diligence in the performance of the Services as is ordinarily possessed and exercised by a
professional engineer under similar circumstances. Engineer shall be liable to the fullest extent
permitted under applicable law, without limitation, for any injuries, loss, or damages proximately
to complete its duties in a timely manner. Engineer shall not be responsible for delays caused by
factors beyond its control or that could not be reasonably foreseen at the time of execution of this
Agreement. Engineer shall be responsible for costs, delays, or damages arising from unreasonable
delays in the performance of its duties. No other warranty, expressed or implied, is included in
this Agreement. City shall not be responsible for discovering deficiencies in the accuracy of
8. INDEMNIFICATION. The Engineer shall defend, indemnify and hold harmless
the City, its officers, agents, and employees, of and from any and all judgments, claims, damages,
demands, actions, causes of action, including costs and attorney's fees paid or incurred resulting
from any breach of this Agreement by Engineer, its agents, contractors and employees, or any
Page 65 of 219
224345v1
negligent or intentional act or omission performed, taken or not performed or taken by Engineer,
its agents, contractors and employees, relative to this Agreement. City will indemnify and hold
Engineer harmless from and against any loss for injuries or damages arising out of the negligent
acts of the City, its officers, agents, or employees.
9. INSURANCE.
a. General Liability. Prior to starting the Work, Engineer shall procure,
maintain, and pay for such insurance as will protect against claims or loss
which may arise out of operations by Engineer or by any subcontractor or
by anyone employed by any of them or by anyone for whose acts any of
them may be liable. Such insurance shall include, but not be limited to,
minimum coverages and limits of liability specified in this Paragraph, or
required by law.
b. Engineer shall procure and maintain the following minimum insurance
coverages and limits of liability for the Work:
Statutory Limits
$500,000 each accident
$500,000 disease policy limit
$500,000 disease each employee
Commercial General Liability $2,000,000 property damage and bodily
injury per occurrence
$2,000,000 general aggregate
Comprehensive Automobile
Liability $1,000,000 combined single limit each
accident (shall include coverage for all
owned, hired and non-owed vehicles.)
Commercial General Liability requirements may be met through a combination of
umbrella or excess liability insurance.
The City shall be named as an additional insured on the general liability and
umbrella policies.
c. Professional Liability Insurance. In addition to the coverages listed above,
Engineer shall maintain a professional liability insurance policy in the amount of
$2,000,000. Said policy need not name the City as an additional insured.
Page 66 of 219
224345v1
d. Engineer Engineer
available.
e.
Farmington
insured.
f.
basis.
g. All polices shall contain a waiver of subrogation in favor of the City.
h.
Liability Policy, shall be primary and non-contributory.
i.
indemnity obligations assumed by Engineer under this Agreement.
j. Engineer agrees to maintain all coverage required herein throughout the term of the
of the Work.
k. It shall be Engineer
coverages required herein.
l. The policies and Certificate of Insurance shall contain a provision that
coverage afforded under the policies shall not be cancelled without at least thirty
(30) days advanced written notice to the City.
m. Engineer shall maintain in effect all insurance coverages required under this
Paragraph at Engineer
business in the state in Minnesota and having a current A.M. Best rating of no less
than A-, unless specifically accepted by City in writing and all insurance policies
shall be on ISO forms acceptable to the City.
n. A copy of the Engineer
compliance with this Paragraph, must be filed with City prior to the start of
Engineer Upon request a copy of the Engineer
page, rider and/or endorsement, as applicable shall be provided. Such documents
evidencing insurance shall be in a form acceptable to City and shall provide
satisfactory evidence that Engineer has complied with all insurance requirements.
Renewal certificates shall be provided to City prior to the expiration date of any of
the required policies. City will not be obligated, however, to review such Certificate
of Insurance, declaration page, rider, endorsement, certificates, or other evidence
of insurance, or to advise Engineer of any deficiencies in such documents and
Page 67 of 219
224345v1
receipt thereof shall not relieve Engineer
right to enforce the terms of Engineer
right to examine any policy provided for under this Agreement.
o. Effect of Engineer If Engineer fails to provide the
specified insurance, then Engineer will defend, indemnify, and hold harmless the
City, the City's officials, agents, and employees from any loss, claim, liability, and
expense (including reasonable attorney's fees and expenses of litigation) to the
extent necessary to afford the same protection as would have been provided by the
specified insurance. Except to the extent prohibited by law, this indemnity applies
regardless of any strict liability or negligence attributable to the City (including sole
negligence) and regardless of the extent to which the underlying occurrence (i.e.,
the event giving rise to a claim which would have been covered by the specified
insurance) is attributable to the negligent or otherwise wrongful act or omission
(including breach of contract) of Engineer, its subcontractors, agents, employees or
delegates. Engineer agrees that this indemnity shall be construed and applied in
favor of indemnification. Engineer also agrees that if applicable law limits or
precludes any aspect of this indemnity, then the indemnity will be considered
limited only to the extent necessary to comply with that applicable law. The stated
indemnity continues until all applicable statutes of limitation have run.
If a claim arises within the scope of the stated indemnity in section o, the City may require
Engineer to:
i. Furnish and pay for a surety bond, satisfactory to the City, guaranteeing
performance of the indemnity obligation; or
ii. Furnish a written acceptance of tender of defense and indemnity from Engineer's
insurance company.
Engineer will take the action required by the City within fifteen (15) days of receiving
notice from the City.
10. INDEPENDENT CONTRACTOR. The City hereby retains the Engineer as an
independent contractor upon the terms and conditions set forth in this Agreement. The Engineer
is not an employee of the City and is free to contract with other entities as provided herein.
Engineer shall be responsible for selecting the means and methods of performing the work.
Engineer shall furnish any and all supplies, equipment, and incidentals necessary for Engineer's
performance under this Agreement. City and Engineer agree that Engineer shall not at any time
or in any manner represent that Engineer or any of Engineer's agents or employees are in any
manner agents or employees of the City. Engineer shall be exclusively responsible under this
Agreement for Engineer's own FICA payments, workers compensation payments, unemployment
compensation payments, withholding amounts, and/or self-employment taxes if any such
payments, amounts, or taxes are required to be paid by law or regulation.
11. SUBCONTRACTORS. Engineer shall not enter into subcontracts for services
provided under this Agreement without the express written consent of the City. Engineer shall
comply with Minnesota Statute § 471.425. Engineer must pay subcontractor for all undisputed
Page 68 of 219
224345v1
services provided by subcontractor within ten (10)
City. Engineer must pay interest of 1.5 percent per month or any part of a month to subcontractor
on any undisputed amount not paid on time to subcontractor. The minimum monthly interest
penalty payment for an unpaid balance of $100 or more is $10.
12. ASSIGNMENT AND THIRD PARTIES. Neither party shall assign this
Agreement, nor any interest arising herein, without the written consent of the other party. Nothing
under this Agreement shall be construed to give any rights or benefits in this Agreement to anyone
other than the City and Engineer, and all duties and responsibilities undertaken pursuant to this
Agreement will be for the sole and exclusive benefit of the City and Engineer and not for the
benefit of any other party.
13. WAIVER. Any waiver by either party of a breach of any provisions of this
Agreement shall not affect, in any respect, the validity of the remainder of this Agreement.
14. ENTIRE AGREEMENT. The entire agreement of the parties is contained herein.
This Agreement supersedes all oral agreements and negotiations between the parties relating to the
subject matter hereof as well as any previous agreements presently in effect between the parties
relating to the subject matter hereof. Any alterations, amendments, deletions, or waivers of the
provisions of this Agreement shall be valid only when expressed in writing and duly signed by the
parties, unless otherwise provided herein.
15. CONTROLLING LAW AND VENUE. This Agreement shall be governed by
and construed in accordance with the laws of the State of Minnesota. All proceedings related to
this contract shall be venued in the Dakota County District Court.
16. COPYRIGHT. Engineer shall defend actions or claims charging infringement of
any copyright or patent by reason of the use or adoption of any designs, drawings, or specifications
supplied by it, and it shall hold harmless the City from loss or damage resulting therefrom.
17. RECORDS. The Engineer shall maintain complete and accurate records of time
and expense involved in the performance of services.
18. MINNESOTA GOVERNMENT DATA PRACTICES ACT. Engineer must
comply with the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, as it
applies to (1) all data provided by the City pursuant to this Agreement, and (2) all data, created,
collected, received, stored, used, maintained, or disseminated by the Engineer pursuant to this
Agreement. Engineer is subject to all the provisions of the Minnesota Government Data Practices
Act, including but not limited to the civil remedies of Minnesota Statutes Section 13.08, as if it
were a government entity. In the event Engineer receives a request to release data, Engineer must
immediately notify City. City will give Engineer instructions concerning the release of the data to
the requesting party before the data is released. Engineer agrees to defend, indemnify, and hold
City, its officials, officers, agents, employees, and volunteers harmless from any claims resulting
, or
nd/or use of protected data. The terms of this paragraph shall
survive the cancellation or termination of this Agreement.
Page 69 of 219
224345v1
19. TERMINATION. This Agreement may be terminated by City on thirty (30
written notice delivered to Engineer at the address on file with the City. Upon termination under
this provision if there is no fault of the Engineer, the Engineer shall be paid for services rendered
and reimbursable expenses until the effective date of termination. If the City terminates the
Agreement because the Engineer has failed to perform in accordance with this Agreement, no
further payment shall be made to the Engineer, and the City may retain another engineer to
undertake or complete the work identified in Paragraph 1.
20. NON-DISCRIMINATION. During the performance of this Agreement, the
Engineer shall not discriminate against any employee or applicants for employment because of
race, color, creed, religion, national origin, sex, marital status, status with regard to public
assistance, disability, sexual orientation or age. The Engineer shall post in places available to
employees and applicants for employment, notices setting forth the provision of this non-
discrimination clause and stating that all qualified applicants will receive consideration for
employment. The Engineer shall incorporate the foregoing requirements of this paragraph in all
of its subcontracts for program work, and will require all of its subcontractors for such work to
incorporate such requirements in all subcontracts for program work. The Engineer further agrees
to comply with all aspects of the Minnesota Human Rights Act, Minnesota Statutes 363.01, et.
seq., Title VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act of 1990.
21. SURVIVAL. All express representations, waivers, indemnifications, and
limitations of liability included in this Agreement will survive its completion or termination for
any reason.
22. SERVICES NOT PROVIDED FOR. Claims for services furnished by the
Engineer not specifically provided for herein shall not be honored by the City.
23. SEVERABILITY. The provisions of this Agreement are severable. If any portion
hereof is, for any reason, held by a court of competent jurisdiction to be contrary to law, such
decision shall not affect the remaining provisions of this Agreement.
24. CONFLICTS. No officer or salaried employee of the City and no member of the
Council of the City shall have a financial interest, direct or indirect, in this Agreement. The
violation of this provision renders the Agreement void.
25. NOTICES. Any notice required under this Agreement will be in writing, addressed
to the appropriate party at its address on the signature page and given personally, by facsimile, by
registered or certified mail postage prepaid, or by a commercial courier service. All notices shall
be effective upon the date of receipt.
26. WAIVER -enforcement of any provision shall not constitute a
waiver of that provision, nor shall it affect the enforceability of that provision or of the remainder
of this Agreement.
Page 70 of 219
224345v1
27. COUNTERPARTS. This Agreement may be executed in multiple counterparts,
each of which shall be considered an original.
Dated: April 20, 2026 CITY: CITY OF FARMINGTON
By:
Nicholas Lien
Mayor
By:
Melissa Geis
City Clerk
Dated:__________________, 20___ ENGINEER: ALLIANT ENGINEERING, INC.
By:
[print name]
Its:
[title]
Page 71 of 219
224345v1
SCOPE OF SERVICES
AND
B
SCHEDULE OF PAYMENT AND FEE SCHEDULE
Page 72 of 219
Page 73 of 219
Page 74 of 219
Page 75 of 219
Page 76 of 219
Page 77 of 219
Page 78 of 219
Professional Services Order
Professional Services Order
Date: February 10, 2026
Agreement to Perform Consulting Services to Alliant Engineering for Farmington First Street
Reconstruction.
Consultant Client
WSB LLC
540 Gateway Boulevard
Burnsville, MN 55337
952.737.4660.
Alliant Engineering
733 South Marquette Avenue Unit 700
Minneapolis, MN 55402
612.758.3080
Schedule
Consultant shall perform services according to the following schedule if provided.
No schedule requirement was provided. WSB currently has the capacity to drill borings within a
few weeks of approval.
Scope of Services
Consultant shall provide the Service(s) and/or Deliverable(s) as follows:
6 Standard Penetration Test soil borings to depths of about 15-feet.
Project setup, equipment mobilization, public utility clearance (Gopher State One Call).
Preparation of boring logs and lab testing.
Geotechnical report with recommendations.
Fee
This engagement will be conducted on a lump sum Basis. The total value for the Service(s)
pursuant to the Professional Services Order (PSO) is $9,900.00. Hourly rates are to be billed per
the attached rate schedule, or if no rate schedule is attached at the then current rate schedule.
Item Description Amount
6 SPT borings to 15-feet, Project setup, GSOC (utility clearance)
Mobilization, lab testing, boring logs
Geotechnical report with recommendations
TOTAL $9,900.00
Page 79 of 219
Professional Services Order
Billing Information
Client Contact/Project Manager Name: Eric Nelson
Billing Address: 733 South Marquette Avenue Unit 700
Minneapolis, MN 55402
Email Address: ENelson@alliant-inc.com
Phone Number: 612.758.3080
Assumptions or Details
• This scope of work is expected to be completed in general accordance with the Terms
and Conditions discussed within this proposal and the Professional Services Order (PSO)
attached to this proposal. Variations in the Terms and Conditions and/or PSO attached
will result in modifications to WSB’s scope and fee.
• We assume the client has secured any and all required right-of-entry approvals to
perform the work and will provide us access approval prior to mobilization of the field
crew.
• We have assumed all boring locations will be accessible with truck mounted drilling
equipment in a single mobilization and clearing of vegetation or trees will not be required
to access the borings.
• We have assumed all boring locations will be accessible with truck mounted drilling
equipment in a single mobilization and clearing of snow will be performed by others.
• Drilling can be completed between 7AM and 7PM during normal weekdays. Drilling on
nights, weekends, or holidays will not be required.
• The client will designate an area on site where any excess spoils can be disposed of.
Site restoration is not included beyond backfilling the borings with soil cuttings. Call-
backs to repair or restore settlement of boring backfill is not included in the scope of
services presented herein.
• The scope of work included within our fee estimate does not include any services in
connection with the discovery of potential contamination during our drilling and sampling
operations. This study is not designed to detect or identify such materials. In the event
that such material is suspected, we will notify the designated Client personnel
immediately for direction before proceeding on any out-of-scope services. The field
investigation could be resumed only after the appropriate health and safety issues are
addressed and the scope and fee are modified to address this change in condition.
• Preparation of supplemental reports, addendum letters, and/or review of plans and
specifications are not included in our base geotechnical study fee; and responses to the
project design team, review agencies or additional work that may be requested are also
not included.
• Preparation of supplemental reports, addendum letters, and/or review of plans and
specifications are not included in our base geotechnical study fee; and responses to the
project design team, review agencies or additional work that may be requested are also
not included.
Page 80 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:John Powell, Public Works Director
Department:Engineering
Subject:Professional Services Agreement with Alliant Engineering, Inc. for the 2027
Street Improvements Preliminary Design
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
At the July 21, 2025, City Council meeting, a public hearing was conducted, after which
the City Council approved the Five-Year Street Reconstruction Plan and the issuance of
General Obligation Street Reconstruction Bonds for same. The approved 2027 Street
Improvement project area includes the following roadways:
7th Street - Ash Street (CSAH 74) to 180' south of Walnut Street
Beech Street - 6th Street to 7th Street
We are initiating the preliminary design at this time in order to have the bid documents
completed and issued early in the 2027 project bidding season.
DISCUSSION:
Alliant 2023-2027. for Pool Consultant the Council City the2023, in Early approved
Engineering is one of the firms in the Consultant Pool and has prepared the attached
scope and budget based on discussions with City Staff. A map of the project area is
included in the scope and budget document. Major tasks included in the scope are the
following:
Project Management
Data Collection and Base Mapping
Public Engagement
Feasibility Report
Geotechnical Evaluation
30% Design Plans and Cost Estimate
Among other items, the detailed proposed scope includes:
Periodic check in meetings with the city.
Full topographic surveys of the project area.
Preparation of a base map that includes private utilities.
Page 81 of 219
Two open houses for the public.
Project communication including open house invites.
Soil borings
Draft and final geotechnical reports.
Preparation of draft and final feasibility reports.
30% design plans.
Staff anticipates that the first open house will be scheduled for late May with completion of
the feasibility report and 30% design plans by the end of September.
BUDGET IMPACT:
Work under this contract will be billed hourly for a cost not to exceed $85,480. As identified
in the approved 2026-2030 Capital Improvement Plan, the funding sources for this project
area are as follows:
Funding Source Amount
G.O. Bonds $ 1,500,000
Sewer Fund $ 500,000
Stormwater Fund $ 400,000
Water Fund $ 600,000
Total $ 3,000,000
as suchcostsother as well construction costs, includes allocation funding The as
engineering, surveying, soil borings, materials testing, sewer televising, permits, etc. The
G.O. Bond amount noted above is the same as the amount presented at the Five-Year
Street Reconstruction Plan public hearing.
ACTION REQUESTED:
Approve a Professional Services Agreement with Alliant Engineering, Inc. for the 2027 Street
Improvements Preliminary Design
ATTACHMENTS:
042026 alliant PSA 2027 street Imp preliminary design
Page 82 of 219
224345v1
PROFESSIONAL SERVICES AGREEMENT
This Professional Services Agreement made this 20th day of April,
2026, by and between the CITY OF FARMINGTON, a Minnesota municipal corporation, whose
business address is 430 3rd St, Farmington, MN 55024 (hereinafter "City") and Alliant
Engineering, Inc., a Minnesota Corporation, whose business address is 733 Marquette Avenue,
Suite 700, Minneapolis, MN 55402 (hereinafter "Engineer").
PRELIMINARY STATEMENT
The City has adopted a policy regarding the selection and hiring of consultants to provide
a variety of professional services for City projects. That policy requires that persons, firms or
corporations providing such services enter into written agreements with the City. The purpose of
this Agreement is to set forth the terms and conditions for the provision of professional services
by Engineer for engineering services, hereinafter referred to as the "Work", and as outlined on
IN CONSIDERATION OF THEIR MUTUAL COVENANTS, THE PARTIES
AGREE AS FOLLOWS:
1. SCOPE OF SERVICES. The City retains Engineer to furnish the services set
provide all personnel, supervision, services, materials, tools, equipment and supplies and do all
thing Work to be performed under
this Agreement shall be done under the review of a professional engineer licensed in the State of
Minnesota, who shall attest that the Work will be performed in compliance with all applicable
codes and engineering standards. The Work shall be performed in accordance with the Contract
Documents, which includes this Agreement and the attached Exhibits: Scope of
Schedule of Payment and Fee Schedule. In the event any ambiguity or
conflict between the Contract Documents listed above, the order of precedence shall be the
following order: (i) this Agreement; (ii) Exhib
2. REPRESENTATIVES. City has designated John Powell, Public Works
Director/City Engineer Eric Nelson,
Client Services Manager
Engineer Representative shall be available as often as is reasonably necessary for reviewing the
Services and Work to be performed.
3. COMPENSATION FOR SERVICES. Engineer shall be paid by the City for the
services described in on an hourly basis in accordance with the attached fee schedule,
85,480 inclusive of taxes and reimbursable costs.
A. Any changes in the scope of the Work which may result in an increase to the
compensation due the Engineer shall require prior written approval by the
Page 83 of 219
224345v1
authorized representative of the City or by the City Council. The City will not pay
additional compensation for services that do not have prior written authorization.
B. Special Consultants may be utilized by the Engineer when required by the complex
or specialized nature of the Project and when authorized in writing by the City.
4. COMPLETION DATE/TERM. The Engineer must complete the Services by
September 30, 2026. This Agreement may be extended upon the written mutual consent of the
parties for such additional period as they deem appropriate, and upon the terms and conditions as
herein stated.
5. OWNERSHIP OF DOCUMENTS. All plans, diagrams, analyses, reports and
become the property of the City, but Engineer may retain copies of such documents as records of
the services provided. The City may use the Information for its purposes and the Engineer also
may use the Information for its purposes. Use of the Information for the purposes of the project
contemplated by this Agreement does not relieve any liability on the part of the Engineer, but any
use of the Information by the City or the Engineer beyond the scope of the Project is without
liability to the other, and the party using the Information agrees to defend and indemnify the other
from any claims or liability resulting therefrom.
6. COMPLIANCE WITH LAWS AND REGULATIONS. In providing services
hereunder, Engineer shall abide by all statutes, ordinances, rules, and regulations pertaining to the
provisions of services to be provided. Any violation of statutes, ordinances, rules, and regulations
pertaining to the Services to be provided shall constitute a material breach of this Agreement and
entitle the City to immediately terminate this Agreement.
and accounting procedures and practices related to services provided to the City are subject to
examination by the legislative auditor or the state auditor, as appropriate, for a minimum of six
years.
7. STANDARD OF CARE. Engineer shall exercise the same degrees of care, skill,
and diligence in the performance of the Services as is ordinarily possessed and exercised by a
professional engineer under similar circumstances. Engineer shall be liable to the fullest extent
permitted under applicable law, without limitation, for any injuries, loss, or damages proximately
to complete its duties in a timely manner. Engineer shall not be responsible for delays caused by
factors beyond its control or that could not be reasonably foreseen at the time of execution of this
Agreement. Engineer shall be responsible for costs, delays, or damages arising from unreasonable
delays in the performance of its duties. No other warranty, expressed or implied, is included in
this Agreement. City shall not be responsible for discovering deficiencies in the accuracy of
8. INDEMNIFICATION. The Engineer shall defend, indemnify and hold harmless
the City, its officers, agents, and employees, of and from any and all judgments, claims, damages,
demands, actions, causes of action, including costs and attorney's fees paid or incurred resulting
from any breach of this Agreement by Engineer, its agents, contractors and employees, or any
Page 84 of 219
224345v1
negligent or intentional act or omission performed, taken or not performed or taken by Engineer,
its agents, contractors and employees, relative to this Agreement. City will indemnify and hold
Engineer harmless from and against any loss for injuries or damages arising out of the negligent
acts of the City, its officers, agents, or employees.
9. INSURANCE.
a. General Liability. Prior to starting the Work, Engineer shall procure,
maintain, and pay for such insurance as will protect against claims or loss
which may arise out of operations by Engineer or by any subcontractor or
by anyone employed by any of them or by anyone for whose acts any of
them may be liable. Such insurance shall include, but not be limited to,
minimum coverages and limits of liability specified in this Paragraph, or
required by law.
b. Engineer shall procure and maintain the following minimum insurance
coverages and limits of liability for the Work:
Statutory Limits
$500,000 each accident
$500,000 disease policy limit
$500,000 disease each employee
Commercial General Liability $2,000,000 property damage and bodily
injury per occurrence
$2,000,000 general aggregate
Comprehensive Automobile
Liability $1,000,000 combined single limit each
accident (shall include coverage for all
owned, hired and non-owed vehicles.)
Commercial General Liability requirements may be met through a combination of
umbrella or excess liability insurance.
The City shall be named as an additional insured on the general liability and
umbrella policies.
c. Professional Liability Insurance. In addition to the coverages listed above,
Engineer shall maintain a professional liability insurance policy in the amount of
$2,000,000. Said policy need not name the City as an additional insured.
Page 85 of 219
224345v1
d. Engineer Engineer
available.
e.
Farmington
insured.
f.
basis.
g. All polices shall contain a waiver of subrogation in favor of the City.
h.
Liability Policy, shall be primary and non-contributory.
i.
indemnity obligations assumed by Engineer under this Agreement.
j. Engineer agrees to maintain all coverage required herein throughout the term of the
of the Work.
k. It shall be Engineer
coverages required herein.
l. The policies and Certificate of Insurance shall contain a provision that
coverage afforded under the policies shall not be cancelled without at least thirty
(30) days advanced written notice to the City.
m. Engineer shall maintain in effect all insurance coverages required under this
Paragraph at Engineer
business in the state in Minnesota and having a current A.M. Best rating of no less
than A-, unless specifically accepted by City in writing and all insurance policies
shall be on ISO forms acceptable to the City.
n. A copy of the Engineer
compliance with this Paragraph, must be filed with City prior to the start of
Engineer Upon request a copy of the Engineer
page, rider and/or endorsement, as applicable shall be provided. Such documents
evidencing insurance shall be in a form acceptable to City and shall provide
satisfactory evidence that Engineer has complied with all insurance requirements.
Renewal certificates shall be provided to City prior to the expiration date of any of
the required policies. City will not be obligated, however, to review such Certificate
of Insurance, declaration page, rider, endorsement, certificates, or other evidence
of insurance, or to advise Engineer of any deficiencies in such documents and
Page 86 of 219
224345v1
receipt thereof shall not relieve Engineer
right to enforce the terms of Engineer
right to examine any policy provided for under this Agreement.
o. Effect of Engineer If Engineer fails to provide the
specified insurance, then Engineer will defend, indemnify, and hold harmless the
City, the City's officials, agents, and employees from any loss, claim, liability, and
expense (including reasonable attorney's fees and expenses of litigation) to the
extent necessary to afford the same protection as would have been provided by the
specified insurance. Except to the extent prohibited by law, this indemnity applies
regardless of any strict liability or negligence attributable to the City (including sole
negligence) and regardless of the extent to which the underlying occurrence (i.e.,
the event giving rise to a claim which would have been covered by the specified
insurance) is attributable to the negligent or otherwise wrongful act or omission
(including breach of contract) of Engineer, its subcontractors, agents, employees or
delegates. Engineer agrees that this indemnity shall be construed and applied in
favor of indemnification. Engineer also agrees that if applicable law limits or
precludes any aspect of this indemnity, then the indemnity will be considered
limited only to the extent necessary to comply with that applicable law. The stated
indemnity continues until all applicable statutes of limitation have run.
If a claim arises within the scope of the stated indemnity in section o, the City may require
Engineer to:
i. Furnish and pay for a surety bond, satisfactory to the City, guaranteeing
performance of the indemnity obligation; or
ii. Furnish a written acceptance of tender of defense and indemnity from Engineer's
insurance company.
Engineer will take the action required by the City within fifteen (15) days of receiving
notice from the City.
10. INDEPENDENT CONTRACTOR. The City hereby retains the Engineer as an
independent contractor upon the terms and conditions set forth in this Agreement. The Engineer
is not an employee of the City and is free to contract with other entities as provided herein.
Engineer shall be responsible for selecting the means and methods of performing the work.
Engineer shall furnish any and all supplies, equipment, and incidentals necessary for Engineer's
performance under this Agreement. City and Engineer agree that Engineer shall not at any time
or in any manner represent that Engineer or any of Engineer's agents or employees are in any
manner agents or employees of the City. Engineer shall be exclusively responsible under this
Agreement for Engineer's own FICA payments, workers compensation payments, unemployment
compensation payments, withholding amounts, and/or self-employment taxes if any such
payments, amounts, or taxes are required to be paid by law or regulation.
11. SUBCONTRACTORS. Engineer shall not enter into subcontracts for services
provided under this Agreement without the express written consent of the City. Engineer shall
comply with Minnesota Statute § 471.425. Engineer must pay subcontractor for all undisputed
Page 87 of 219
224345v1
services provided by subcontractor within ten (10)
City. Engineer must pay interest of 1.5 percent per month or any part of a month to subcontractor
on any undisputed amount not paid on time to subcontractor. The minimum monthly interest
penalty payment for an unpaid balance of $100 or more is $10.
12. ASSIGNMENT AND THIRD PARTIES. Neither party shall assign this
Agreement, nor any interest arising herein, without the written consent of the other party. Nothing
under this Agreement shall be construed to give any rights or benefits in this Agreement to anyone
other than the City and Engineer, and all duties and responsibilities undertaken pursuant to this
Agreement will be for the sole and exclusive benefit of the City and Engineer and not for the
benefit of any other party.
13. WAIVER. Any waiver by either party of a breach of any provisions of this
Agreement shall not affect, in any respect, the validity of the remainder of this Agreement.
14. ENTIRE AGREEMENT. The entire agreement of the parties is contained herein.
This Agreement supersedes all oral agreements and negotiations between the parties relating to the
subject matter hereof as well as any previous agreements presently in effect between the parties
relating to the subject matter hereof. Any alterations, amendments, deletions, or waivers of the
provisions of this Agreement shall be valid only when expressed in writing and duly signed by the
parties, unless otherwise provided herein.
15. CONTROLLING LAW AND VENUE. This Agreement shall be governed by
and construed in accordance with the laws of the State of Minnesota. All proceedings related to
this contract shall be venued in the Dakota County District Court.
16. COPYRIGHT. Engineer shall defend actions or claims charging infringement of
any copyright or patent by reason of the use or adoption of any designs, drawings, or specifications
supplied by it, and it shall hold harmless the City from loss or damage resulting therefrom.
17. RECORDS. The Engineer shall maintain complete and accurate records of time
and expense involved in the performance of services.
18. MINNESOTA GOVERNMENT DATA PRACTICES ACT. Engineer must
comply with the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, as it
applies to (1) all data provided by the City pursuant to this Agreement, and (2) all data, created,
collected, received, stored, used, maintained, or disseminated by the Engineer pursuant to this
Agreement. Engineer is subject to all the provisions of the Minnesota Government Data Practices
Act, including but not limited to the civil remedies of Minnesota Statutes Section 13.08, as if it
were a government entity. In the event Engineer receives a request to release data, Engineer must
immediately notify City. City will give Engineer instructions concerning the release of the data to
the requesting party before the data is released. Engineer agrees to defend, indemnify, and hold
City, its officials, officers, agents, employees, and volunteers harmless from any claims resulting
, or
nd/or use of protected data. The terms of this paragraph shall
survive the cancellation or termination of this Agreement.
Page 88 of 219
224345v1
19. TERMINATION. This Agreement may be terminated by City on thirty (30
written notice delivered to Engineer at the address on file with the City. Upon termination under
this provision if there is no fault of the Engineer, the Engineer shall be paid for services rendered
and reimbursable expenses until the effective date of termination. If the City terminates the
Agreement because the Engineer has failed to perform in accordance with this Agreement, no
further payment shall be made to the Engineer, and the City may retain another engineer to
undertake or complete the work identified in Paragraph 1.
20. NON-DISCRIMINATION. During the performance of this Agreement, the
Engineer shall not discriminate against any employee or applicants for employment because of
race, color, creed, religion, national origin, sex, marital status, status with regard to public
assistance, disability, sexual orientation or age. The Engineer shall post in places available to
employees and applicants for employment, notices setting forth the provision of this non-
discrimination clause and stating that all qualified applicants will receive consideration for
employment. The Engineer shall incorporate the foregoing requirements of this paragraph in all
of its subcontracts for program work, and will require all of its subcontractors for such work to
incorporate such requirements in all subcontracts for program work. The Engineer further agrees
to comply with all aspects of the Minnesota Human Rights Act, Minnesota Statutes 363.01, et.
seq., Title VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act of 1990.
21. SURVIVAL. All express representations, waivers, indemnifications, and
limitations of liability included in this Agreement will survive its completion or termination for
any reason.
22. SERVICES NOT PROVIDED FOR. Claims for services furnished by the
Engineer not specifically provided for herein shall not be honored by the City.
23. SEVERABILITY. The provisions of this Agreement are severable. If any portion
hereof is, for any reason, held by a court of competent jurisdiction to be contrary to law, such
decision shall not affect the remaining provisions of this Agreement.
24. CONFLICTS. No officer or salaried employee of the City and no member of the
Council of the City shall have a financial interest, direct or indirect, in this Agreement. The
violation of this provision renders the Agreement void.
25. NOTICES. Any notice required under this Agreement will be in writing, addressed
to the appropriate party at its address on the signature page and given personally, by facsimile, by
registered or certified mail postage prepaid, or by a commercial courier service. All notices shall
be effective upon the date of receipt.
26. WAIVER -enforcement of any provision shall not constitute a
waiver of that provision, nor shall it affect the enforceability of that provision or of the remainder
of this Agreement.
Page 89 of 219
224345v1
27. COUNTERPARTS. This Agreement may be executed in multiple counterparts,
each of which shall be considered an original.
Dated: April 20, 2026 CITY: CITY OF FARMINGTON
By:
Nicholas Lien
Mayor
By:
Melissa Geis
City Clerk
Dated:__________________, 20___ ENGINEER: ALLIANT ENGINEERING, INC.
By:
[print name]
Its:
[title]
Page 90 of 219
224345v1
SCOPE OF SERVICES
AND
B
SCHEDULE OF PAYMENT AND FEE SCHEDULE
Page 91 of 219
Page 92 of 219
Page 93 of 219
Page 94 of 219
Page 95 of 219
Page 96 of 219
Page 97 of 219
Professional Services Order
Professional Services Order
Date: February 10, 2026
Agreement to Perform Consulting Services to Alliant Engineering for Farmington Seventh and
Beech Street Reconstruction.
Consultant Client
WSB LLC
540 Gateway Boulevard
Burnsville, MN 55337
952.737.4660.
Alliant Engineering
733 South Marquette Avenue Unit 700
Minneapolis, MN 55402
612.758.3080
Schedule
Consultant shall perform services according to the following schedule if provided.
No set deadline was required. WSB currently has capacity to drill these borings within a few
weeks of approval to proceed.
Scope of Services
Consultant shall provide the Service(s) and/or Deliverable(s) as follows:
5 Standard Penetration Test soil borings to depths of about 15-feet.
Project setup, equipment mobilization, public utility clearance (Gopher State One Call).
Preparation of boring logs and lab testing.
Geotechnical report with recommendations.
Fee
This engagement will be conducted on a lump sum Basis. The total value for the Service(s)
pursuant to the Professional Services Order (PSO) is $9,200.00. Hourly rates are to be billed per
the attached rate schedule, or if no rate schedule is attached at the then current rate schedule.
Item Description Amount
5 SPT borings to 15-feet, Project setup, GSOC (utility clearance)
Mobilization, lab testing, boring logs
Geotechnical report with recommendations
TOTAL $9,200.00
Page 98 of 219
Professional Services Order
Billing Information
Client Contact/Project Manager Name: Eric Nelson
Billing Address: 733 South Marquette Avenue Unit 700
Minneapolis, MN 55402
Email Address: ENelson@alliant-inc.com
Phone Number: 612.758.3080
Assumptions or Details
• This scope of work is expected to be completed in general accordance with the Terms
and Conditions discussed within this proposal and the Professional Services Order (PSO)
attached to this proposal. Variations in the Terms and Conditions and/or PSO attached
will result in modifications to WSB’s scope and fee.
• We assume the client has secured any and all required right-of-entry approvals to
perform the work and will provide us access approval prior to mobilization of the field
crew.
• We have assumed all boring locations will be accessible with truck mounted drilling
equipment in a single mobilization and clearing of vegetation or trees will not be required
to access the borings.
• We have assumed all boring locations will be accessible with truck mounted drilling
equipment in a single mobilization and clearing of snow will be performed by others.
• Drilling can be completed between 7AM and 7PM during normal weekdays. Drilling on
nights, weekends, or holidays will not be required.
• The client will designate an area on site where any excess spoils can be disposed of.
Site restoration is not included beyond backfilling the borings with soil cuttings. Call-
backs to repair or restore settlement of boring backfill is not included in the scope of
services presented herein.
• The scope of work included within our fee estimate does not include any services in
connection with the discovery of potential contamination during our drilling and sampling
operations. This study is not designed to detect or identify such materials. In the event
that such material is suspected, we will notify the designated Client personnel
immediately for direction before proceeding on any out-of-scope services. The field
investigation could be resumed only after the appropriate health and safety issues are
addressed and the scope and fee are modified to address this change in condition.
• Preparation of supplemental reports, addendum letters, and/or review of plans and
specifications are not included in our base geotechnical study fee; and responses to the
project design team, review agencies or additional work that may be requested are also
not included.
• Preparation of supplemental reports, addendum letters, and/or review of plans and
specifications are not included in our base geotechnical study fee; and responses to the
project design team, review agencies or additional work that may be requested are also
not included.
Page 99 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:John Powell, Public Works Director
Department:Engineering
Subject:Professional Services Agreement with Hill Incorporated for the 220th Street
Improvements Final Design and Bidding
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
Consideration of a trunk sanitary sewer and water extension on 220th Street, west of
Denmark Avenue, was initiated last fall. The Vermillion Commons developments are
currently served by a single 12-inch trunk watermain connection at 218th Street/Denmark
Avenue. To provide a "looped" trunk water system through Vermillion Commons, and to
serve future water needs, the extension of 12-inch trunk watermain from Denmark Avenue
to just east of the Vermillion River is recommended. This would facilitate looped water
connections at Denton Avenue and 218th Street.
Since last fall, much of the property south of 220th in this area has been annexed into the
City of Farmington and the city has received a preliminary plat submittal for this new
neighborhood, Vermillion Reserve. The initial phases of Vermillion Reserve will be served via
the proposed sanitary sewer and water on 220th Street.
Initially, after completion of the trunk utility installation, the City planned to pave 220th
Street with bituminous but leave it as a "rural" section, meaning no curb and gutter and
storm and side, south the ondevelopment is as However, sewer. proceeding
reconstruction of Denmark Avenue by Dakota County is expected in 2028, now is the time
to upgrade 220th Street.
While there is much new development in this area, there are also three existing lots on the
north side of 220th Street. The improvement of 220th Street will be a major change directly
impacting these properties and their utility service. Pending approval of this action by the
City Council, Staff will be meeting with these property owners to update them on the
scope of the street and utility work.
The requested action will allow the City to move forward with the final design and bidding
process for this project.
DISCUSSION:
Page 100 of 219
Staff is recommending use of an engineering consultant outside of the Consultant Pool for
this project. Hill Incorporated is already working on the developments north and south of
220th Street and has extensive knowledge of the area. Using this firm will also enhance
coordination of the infrastructure development and phasing with Vermillion Reserve. The
proposed project scope includes trunk sanitary sewer, trunk watermain, road
reconstruction including curb and gutter, and storm sewer improvements.
Major scope tasks related to preparation of the final plans and specifications include the
following:
Topographic Survey
Final Design & Plans
Contract Documents/Specifications
Cost Estimate
Bidding Assistance
It is expected to have the bid documents prepared by the end of May with bidding to
follow. Dewatering will likely be necessary for the utility installation. As the proposed
dewatering appropriation may be within 250 feet of the Vermillion River, which is a
designated trout stream, the dewatering cannot occur during the trout stream exclusion
season that runs from September 1 to April 1. This may impact the constructions schedule.
BUDGET IMPACT:
Work under this contract will be billed hourly for a cost not to exceed $32,350. For 2026, the
approved 2026-2030 Capital Improvement Plan (CIP) includes funding sources for the
Farmington West-Trunk Sanitary Sewer and Water area:
Funding Source Amount
Sanitary Sewer Trunk Fund $ 725,000
Water Trunk Fund $ 725,000
Total $ 1,450,000
The improvements along 220th Street would use a portion of the allocated funding. As
storm sewer is being added to the project, use of Storm Water Funds may be considered
for this portion of the work scope. The funding allocation includes construction costs, as
well as other costs such as engineering, surveying, soil borings, materials testing, sewer
televising, permits, etc.
ACTION REQUESTED:
Approve the Professional Services Agreement with Hill Incorporated for the 220th Street
Improvements Final Design and Bidding
ATTACHMENTS:
042026 hill PSA 220th street final design
Location Map 220th Street 042026
220th trunk utility aerial
Page 101 of 219
224345v1
PROFESSIONAL SERVICES AGREEMENT
This Professional Services Agreement made this 20th day of April,
2026, by and between the CITY OF FARMINGTON, a Minnesota municipal corporation, whose
business address is 430 3rd St, Farmington, MN 55024 (hereinafter "City") and Hill Incorporated,
a Minnesota Corporation, whose business address is 2999 County Road 42 West, Suite 100,
Burnsville, MN 55306 (hereinafter "Engineer").
PRELIMINARY STATEMENT
The City has adopted a policy regarding the selection and hiring of consultants to provide
a variety of professional services for City projects. That policy requires that persons, firms or
corporations providing such services enter into written agreements with the City. The purpose of
this Agreement is to set forth the terms and conditions for the provision of professional services
by Engineer for engineering services, hereinafter referred to as the "Work", and as outlined on
IN CONSIDERATION OF THEIR MUTUAL COVENANTS, THE PARTIES
AGREE AS FOLLOWS:
1. SCOPE OF SERVICES. The City retains Engineer to furnish the services set
provide all personnel, supervision, services, materials, tools, equipment and supplies and do all
thing Work to be performed under
this Agreement shall be done under the review of a professional engineer licensed in the State of
Minnesota, who shall attest that the Work will be performed in compliance with all applicable
codes and engineering standards. The Work shall be performed in accordance with the Contract
Documents, which includes this Agreement and the attached Exhibits: Scope of
Schedule of Payment and Fee Schedule. In the event any ambiguity or
conflict between the Contract Documents listed above, the order of precedence shall be the
following order: (i) this Agreement; (ii) Exhib
2. REPRESENTATIVES. City has designated John Powell, Public Works
Director/City Engineer John Bender,
Vice President
Representative shall be available as often as is reasonably necessary for reviewing the Services
and Work to be performed.
3. COMPENSATION FOR SERVICES. Engineer shall be paid by the City for the
services described in on an hourly basis in accordance with the attached fee schedule,
32,350 inclusive of taxes and reimbursable costs.
A. Any changes in the scope of the Work which may result in an increase to the
compensation due the Engineer shall require prior written approval by the
Page 102 of 219
224345v1
authorized representative of the City or by the City Council. The City will not pay
additional compensation for services that do not have prior written authorization.
B. Special Consultants may be utilized by the Engineer when required by the complex
or specialized nature of the Project and when authorized in writing by the City.
4. COMPLETION DATE/TERM. The Engineer must complete the Services by
, 2026. This Agreement may be extended upon the written mutual consent of the parties for
such additional period as they deem appropriate, and upon the terms and conditions as herein
stated.
5. OWNERSHIP OF DOCUMENTS. All plans, diagrams, analyses, reports and
become the property of the City, but Engineer may retain copies of such documents as records of
the services provided. The City may use the Information for its purposes and the Engineer also
may use the Information for its purposes. Use of the Information for the purposes of the project
contemplated by this Agreement does not relieve any liability on the part of the Engineer, but any
use of the Information by the City or the Engineer beyond the scope of the Project is without
liability to the other, and the party using the Information agrees to defend and indemnify the other
from any claims or liability resulting therefrom.
6. COMPLIANCE WITH LAWS AND REGULATIONS. In providing services
hereunder, Engineer shall abide by all statutes, ordinances, rules , and regulations pertaining to the
provisions of services to be provided. Any violation of statutes, ordinances, rules, and regulations
pertaining to the Services to be provided shall constitute a material breach of this Agreement and
entitle the City to immediately terminate this Agreement.
and accounting procedures and practices related to services provided to the City are subject to
examination by the legislative auditor or the state auditor, as appropriate, for a minimum of six
years.
7. STANDARD OF CARE. Engineer shall exercise the same degrees of care, skill,
and diligence in the performance of the Services as is ordinarily possessed and exercised by a
professional engineer under similar circumstances. Engineer shall be liable to the fullest extent
permitted under applicable law, without limitation, for any injuries, loss, or damages proximately
to complete its duties in a timely manner. Engineer shall not be responsible for delays caused by
factors beyond its control or that could not be reasonably foreseen at the time of execution of this
Agreement. Engineer shall be responsible for costs, delays, or damages arising from unreasonable
delays in the performance of its duties. No other warranty, expressed or implied, is included in
this Agreement. City shall not be responsible for discovering deficiencies in the accuracy of
8. INDEMNIFICATION. The Engineer shall defend, indemnify and hold harmless
the City, its officers, agents, and employees, of and from any and all judgments, claims, damages,
demands, actions, causes of action, including costs and attorney's fees paid or incurred resulting
from any breach of this Agreement by Engineer, its agents, contractors and employees, or any
Page 103 of 219
224345v1
negligent or intentional act or omission performed, taken or not performed or taken by Engineer,
its agents, contractors and employees, relative to this Agreement. City will indemnify and hold
Engineer harmless from and against any loss for injuries or damages arising out of the negligent
acts of the City, its officers, agents, or employees.
9. INSURANCE.
a. General Liability. Prior to starting the Work, Engineer shall procure,
maintain, and pay for such insurance as will protect against claims or loss
which may arise out of operations by Engineer or by any subcontractor or
by anyone employed by any of them or by anyone for whose acts any of
them may be liable. Such insurance shall include, but not be limited to,
minimum coverages and limits of liability specified in this Paragraph, or
required by law.
b. Engineer shall procure and maintain the following minimum insurance
coverages and limits of liability for the Work:
Statutory Limits
$500,000 each accident
$500,000 disease policy limit
$500,000 disease each employee
Commercial General Liability $2,000,000 property damage and bodily
injury per occurrence
$2,000,000 general aggregate
Comprehensive Automobile
Liability $1,000,000 combined single limit each
accident (shall include coverage for all
owned, hired and non-owed vehicles.)
Commercial General Liability requirements may be met through a combination of
umbrella or excess liability insurance.
The City shall be named as an additional insured on the general liability and
umbrella policies.
c. Professional Liability Insurance. In addition to the coverages listed above,
Engineer shall maintain a professional liability insurance policy in the amount of
$2,000,000. Said policy need not name the City as an additional insured.
Page 104 of 219
224345v1
d. Engineer Engineer
available.
e.
Farmington
insured.
f.
basis.
g. All polices shall contain a waiver of subrogation in favor of the City.
h.
Liability Policy, shall be primary and non-contributory.
i.
indemnity obligations assumed by Engineer under this Agreement.
j. Engineer agrees to maintain all coverage required herein throughout the term of the
of the Work.
k. It shall be Engineer
coverages required herein.
l. The policies and Certificate of Insurance shall contain a provision that
coverage afforded under the policies shall not be cancelled without at least thirty
(30) days advanced written notice to the City.
m. Engineer shall maintain in effect all insurance coverages required under this
Paragraph at Engineer
business in the state in Minnesota and having a current A.M. Best rating of no less
than A-, unless specifically accepted by City in writing and all insurance policies
shall be on ISO forms acceptable to the City.
n. A copy of the Engineer
compliance with this Paragraph, must be filed with City prior to the start of
Engineer Upon request a copy of the Engineer
page, rider and/or endorsement, as applicable shall be provided. Such documents
evidencing insurance shall be in a form acceptable to City and shall provide
satisfactory evidence that Engineer has complied with all insurance requirements.
Renewal certificates shall be provided to City prior to the expiration date of any of
the required policies. City will not be obligated, however, to review such Certificate
of Insurance, declaration page, rider, endorsement, certificates, or other evidence
of insurance, or to advise Engineer of any deficiencies in such documents and
Page 105 of 219
224345v1
receipt thereof shall not relieve Engineer
right to enforce the terms of Engineer
right to examine any policy provided for under this Agreement.
o. Effect of Engineer If Engineer fails to provide the
specified insurance, then Engineer will defend, indemnify, and hold harmless the
City, the City's officials, agents, and employees from any loss, claim, liability, and
expense (including reasonable attorney's fees and expenses of litigation) to the
extent necessary to afford the same protection as would have been provided by the
specified insurance. Except to the extent prohibited by law, this indemnity applies
regardless of any strict liability or negligence attributable to the City (including sole
negligence) and regardless of the extent to which the underlying occurrence (i.e.,
the event giving rise to a claim which would have been covered by the specified
insurance) is attributable to the negligent or otherwise wrongful act or omission
(including breach of contract) of Engineer, its subcontractors, agents, employees or
delegates. Engineer agrees that this indemnity shall be construed and applied in
favor of indemnification. Engineer also agrees that if applicable law limits or
precludes any aspect of this indemnity, then the indemnity will be considered
limited only to the extent necessary to comply with that applicable law. The stated
indemnity continues until all applicable statutes of limitation have run.
If a claim arises within the scope of the stated indemnity in section o, the City may require
Engineer to:
i. Furnish and pay for a surety bond, satisfactory to the City, guaranteeing
performance of the indemnity obligation; or
ii. Furnish a written acceptance of tender of defense and indemnity from Engineer's
insurance company.
Engineer will take the action required by the City within fifteen (15) days of receiving
notice from the City.
10. INDEPENDENT CONTRACTOR. The City hereby retains the Engineer as an
independent contractor upon the terms and conditions set forth in this Agreement. The Engineer
is not an employee of the City and is free to contract with other entities as provided herein.
Engineer shall be responsible for selecting the means and methods of performing the work.
Engineer shall furnish any and all supplies, equipment, and incidentals necessary for Engineer's
performance under this Agreement. City and Engineer agree that Engineer shall not at any time
or in any manner represent that Engineer or any of Engineer's agents or employees are in any
manner agents or employees of the City. Engineer shall be exclusively responsible under this
Agreement for Engineer's own FICA payments, workers compensation payments, unemployment
compensation payments, withholding amounts, and/or self-employment taxes if any such
payments, amounts, or taxes are required to be paid by law or regulation.
11. SUBCONTRACTORS. Engineer shall not enter into subcontracts for services
provided under this Agreement without the express written consent of the City. Engineer shall
comply with Minnesota Statute § 471.425. Engineer must pay subcontractor for all undisputed
Page 106 of 219
224345v1
services provided by subcontractor within ten (10)
City. Engineer must pay interest of 1.5 percent per month or any part of a month to subcontractor
on any undisputed amount not paid on time to subcontractor. The minimum monthly interest
penalty payment for an unpaid balance of $100 or more is $10.
12. ASSIGNMENT AND THIRD PARTIES. Neither party shall assign this
Agreement, nor any interest arising herein, without the written consent of the other party. Nothing
under this Agreement shall be construed to give any rights or benefits in this Agreement to anyone
other than the City and Engineer, and all duties and responsibilities undertaken pursuant to this
Agreement will be for the sole and exclusive benefit of the City and Engineer and not for the
benefit of any other party.
13. WAIVER. Any waiver by either party of a breach of any provisions of this
Agreement shall not affect, in any respect, the validity of the remainder of this Agreement.
14. ENTIRE AGREEMENT. The entire agreement of the parties is contained herein.
This Agreement supersedes all oral agreements and negotiations between the parties relating to the
subject matter hereof as well as any previous agreements presently in effect between the parties
relating to the subject matter hereof. Any alterations, amendments, deletions, or waivers of the
provisions of this Agreement shall be valid only when expressed in writing and duly signed by the
parties, unless otherwise provided herein.
15. CONTROLLING LAW AND VENUE. This Agreement shall be governed by
and construed in accordance with the laws of the State of Minnesota. All proceedings related to
this contract shall be venued in the Dakota County District Court.
16. COPYRIGHT. Engineer shall defend actions or claims charging infringement of
any copyright or patent by reason of the use or adoption of any designs, drawings, or specifications
supplied by it, and it shall hold harmless the City from loss or damage resulting therefrom.
17. RECORDS. The Engineer shall maintain complete and accurate records of time
and expense involved in the performance of services.
18. MINNESOTA GOVERNMENT DATA PRACTICES ACT. Engineer must
comply with the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, as it
applies to (1) all data provided by the City pursuant to this Agreement, and (2) all data, created,
collected, received, stored, used, maintained, or disseminated by the Engineer pursuant to this
Agreement. Engineer is subject to all the provisions of the Minnesota Government Data Practices
Act, including but not limited to the civil remedies of Minnesota Statutes Section 13.08, as if it
were a government entity. In the event Engineer receives a request to release data, Engineer must
immediately notify City. City will give Engineer instructions concerning the release of the data to
the requesting party before the data is released. Engineer agrees to defend, indemnify, and hold
City, its officials, officers, agents, employees, and volunteers harmless from any claims resulting
, or
of protected data. The terms of this paragraph shall
survive the cancellation or termination of this Agreement.
Page 107 of 219
224345v1
19. TERMINATION. This Agreement may be terminated by City on thirty (30
written notice delivered to Engineer at the address on file with the City. Upon termination under
this provision if there is no fault of the Engineer, the Engineer shall be paid for services rendered
and reimbursable expenses until the effective date of termination. If the City terminates the
Agreement because the Engineer has failed to perform in accordance with this Agreement, no
further payment shall be made to the Engineer, and the City may retain another engineer to
undertake or complete the work identified in Paragraph 1.
20. NON-DISCRIMINATION. During the performance of this Agreement, the
Engineer shall not discriminate against any employee or applicants for employment because of
race, color, creed, religion, national origin, sex, marital status, status with regard to public
assistance, disability, sexual orientation or age. The Engineer shall post in places available to
employees and applicants for employment, notices setting forth the provision of this non-
discrimination clause and stating that all qualified applicants will receive consideration for
employment. The Engineer shall incorporate the foregoing requirements of this paragraph in all
of its subcontracts for program work, and will require all of its subcontractors for such work to
incorporate such requirements in all subcontracts for program work. The Engineer further agrees
to comply with all aspects of the Minnesota Human Rights Act, Minnesota Statutes 363.01, et.
seq., Title VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act of 1990.
21. SURVIVAL. All express representations, waivers, indemnifications, and
limitations of liability included in this Agreement will survive its completion or termination for
any reason.
22. SERVICES NOT PROVIDED FOR. Claims for services furnished by the
Engineer not specifically provided for herein shall not be honored by the City.
23. SEVERABILITY. The provisions of this Agreement are severable. If any portion
hereof is, for any reason, held by a court of competent jurisdiction to be contrary to law, such
decision shall not affect the remaining provisions of this Agreement.
24. CONFLICTS. No officer or salaried employee of the City and no member of the
Council of the City shall have a financial interest, direct or indirect, in this Agreement. The
violation of this provision renders the Agreement void.
25. NOTICES. Any notice required under this Agreement will be in writing, addressed
to the appropriate party at its address on the signature page and given personally, by facsimile, by
registered or certified mail postage prepaid, or by a commercial courier service. All notices shall
be effective upon the date of receipt.
26. WAIVER -enforcement of any provision shall not constitute a
waiver of that provision, nor shall it affect the enforceability of that provision or of the remainder
of this Agreement.
Page 108 of 219
224345v1
27. COUNTERPARTS. This Agreement may be executed in multiple counterparts,
each of which shall be considered an original.
Dated: April 20, 2026 CITY: CITY OF FARMINGTON
By:
Nicholas Lien
Mayor
By:
Melissa Geis
City Clerk
Dated:__________________, 20___ ENGINEER: HILL INCORPORATED
By:
[print name]
Its:
[title]
Page 109 of 219
224345v1
SCOPE OF SERVICES
AND
B
SCHEDULE OF PAYMENT AND FEE SCHEDULE
Page 110 of 219
Page 111 of 219
Page 112 of 219
Page 113 of 219
Page 114 of 219
Page 115 of 219
Page 116 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:John Powell, Public Works Director
Department:Engineering
Subject:Professional Services Agreement with WSB, LLC for the Willow Street MSA
Improvements Construction Services
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
The City intends to use Municipal State Aid (MSA) Construction funds for the construction of
roadway and storm sewer on the Willow Street MSA Improvements project. Using MSA
funds requires a much higher level of engineering administration than typical public
improvement projects. Examples of this include review of labor submittals, performing labor
compliance reviews, strict adherence to Minnesota Department of Transportation
materials testing protocols, and submittal of contract and pay documents to State Aid.
Staff is recommending use of an engineering consultant for this project.
DISCUSSION:
On February 21, 2023, the City Council approved the Consultant Pool for 2023-2027. WSB,
LLC is one of the firms in the Consultant Pool and has prepared the attached scope and
budget based on meetings and discussions with City Staff regarding this project. The scope
includes the following major tasks:
A. Project Management
B. Contract Administration
C. Construction Observation and Inspection
D. Construction Surveying and Staking (including Record Plans)
E. Materials Testing and Coordination
The attached Professional Services Agreement (PSA) includes materials testing services to
be completed per the State Aid testing protocol. The construction inspection hours assume
an inspector on site for 12 weeks at 50 hours per week. The three most significant cost items
are a full-time inspector, survey crew construction staking, and materials testing; these
items along constitute over 77% of the Construction Services costs.
BUDGET IMPACT:
Work under this contract will be billed hourly for an cost not to exceed $178,153. Similar to
the construction costs, the related engineering costs will be reimbursed via the City's
Page 117 of 219
Municipal State Aid Construction account.
ACTION REQUESTED:
Approve a Professional Services Agreement with WSB, LLC for the Willow Street MSA
Improvements Construction Services.
ATTACHMENTS:
042026 wsb willow street MSA construction services
Page 118 of 219
224345v1
PROFESSIONAL SERVICES AGREEMENT
This Professional Services Agreement made this 20th day of April,
2026, by and between the CITY OF FARMINGTON, a Minnesota municipal corporation, whose
business address is 430 3rd St, Farmington, MN 55024 (hereinafter "City") and WSB LLC, a
Limited Liability Company, whose business address is 701 Xenia Avenue South, Suite 300,
Minneapolis, MN 55416 (hereinafter "Engineer").
PRELIMINARY STATEMENT
The City has adopted a policy regarding the selection and hiring of consultants to provide
a variety of professional services for City projects. That policy requires that persons, firms or
corporations providing such services enter into written agreements with the City. The purpose of
this Agreement is to set forth the terms and conditions for the provision of professional services
by Engineer for engineering services, hereinafter referred to as the "Work", and as outlined on
IN CONSIDERATION OF THEIR MUTUAL COVENANTS, THE PARTIES
AGREE AS FOLLOWS:
1. SCOPE OF SERVICES. The City retains Engineer to furnish the services set
provide all personnel, supervision, services, materials, tools, equipment and supplies and do all
thing Work to be performed under
this Agreement shall be done under the review of a professional engineer licensed in the State of
Minnesota, who shall attest that the Work will be performed in compliance with all applicable
codes and engineering standards. The Work shall be performed in accordance with the Contract
Documents, which includes this Agreement and the attached Exhibits: Scope of
Schedule of Payment and Fee Schedule. In the event any ambiguity or
conflict between the Contract Documents listed above, the order of precedence shall be the
following order: (i) this Agreement; (ii) Exhib
2. REPRESENTATIVES. City has designated John Powell, Public Works
Director/City Engineer Mark
Erichson, Director of Municipal Services
Representative and the Engineer Representative shall be available as often as is reasonably
necessary for reviewing the Services and Work to be performed.
3. COMPENSATION FOR SERVICES. Engineer shall be paid by the City for the
services described in on an hourly basis in accordance with the attached fee schedule,
178,153 inclusive of taxes and reimbursable costs.
A. Any changes in the scope of the Work which may result in an increase to the
compensation due the Engineer shall require prior written approval by the
Page 119 of 219
224345v1
authorized representative of the City or by the City Council. The City will not pay
additional compensation for services that do not have prior written authorization.
B. Special Consultants may be utilized by the Engineer when required by the complex
or specialized nature of the Project and when authorized in writing by the City.
4. COMPLETION DATE/TERM. The Engineer must complete the Services by
June 15, 2027. This Agreement may be extended upon the written mutual consent of the parties
for such additional period as they deem appropriate, and upon the terms and conditions as herein
stated.
5. OWNERSHIP OF DOCUMENTS. All plans, diagrams, analyses, reports and
become the property of the City, but Engineer may retain copies of such documents as records of
the services provided. The City may use the Information for its purposes and the Engineer also
may use the Information for its purposes. Use of the Information for the purposes of the project
contemplated by this Agreement does not relieve any liability on the part of the Engineer, but any
use of the Information by the City or the Engineer beyond the scope of the Project is without
liability to the other, and the party using the Information agrees to defend and indemnify the other
from any claims or liability resulting therefrom.
6. COMPLIANCE WITH LAWS AND REGULATIONS. In providing services
hereunder, Engineer shall abide by all statutes, ordinances, rules, and regulations pertaining to the
provisions of services to be provided. Any violation of statutes, ordinances, rules, and regulations
pertaining to the Services to be provided shall constitute a material breach of this Agreement and
entitle the City to immediately terminate this Agreement.
and accounting procedures and practices related to services provided to the City are subject to
examination by the legislative auditor or the state auditor, as appropriate, for a minimum of six
years.
7. STANDARD OF CARE. Engineer shall exercise the same degrees of care, skill,
and diligence in the performance of the Services as is ordinarily possessed and exercised by a
professional engineer under similar circumstances. Engineer shall be liable to the fullest extent
permitted under applicable law, without limitation, for any injuries, loss, or damages proximately
to complete its duties in a timely manner. Engineer shall not be responsible for delays caused by
factors beyond its control or that could not be reasonably foreseen at the time of execution of this
Agreement. Engineer shall be responsible for costs, delays, or damages arising from unreasonable
delays in the performance of its duties. No other warranty, expressed or implied, is included in
this Agreement. City shall not be responsible for discovering deficiencies in the accuracy of
8. INDEMNIFICATION. The Engineer shall defend, indemnify and hold harmless
the City, its officers, agents, and employees, of and from any and all judgments, claims, damages,
demands, actions, causes of action, including costs and attorney's fees paid or incurred resulting
from any breach of this Agreement by Engineer, its agents, contractors and employees, or any
Page 120 of 219
224345v1
negligent or intentional act or omission performed, taken or not performed or taken by Engineer,
its agents, contractors and employees, relative to this Agreement. City will indemnify and hold
Engineer harmless from and against any loss for injuries or damages arising out of the negligent
acts of the City, its officers, agents, or employees.
9. INSURANCE.
a. General Liability. Prior to starting the Work, Engineer shall procure,
maintain, and pay for such insurance as will protect against claims or loss
which may arise out of operations by Engineer or by any subcontractor or
by anyone employed by any of them or by anyone for whose acts any of
them may be liable. Such insurance shall include, but not be limited to,
minimum coverages and limits of liability specified in this Paragraph, or
required by law.
b. Engineer shall procure and maintain the following minimum insurance
coverages and limits of liability for the Work:
Statutory Limits
$500,000 each accident
$500,000 disease policy limit
$500,000 disease each employee
Commercial General Liability $2,000,000 property damage and bodily
injury per occurrence
$2,000,000 general aggregate
Comprehensive Automobile
Liability $1,000,000 combined single limit each
accident (shall include coverage for all
owned, hired and non-owed vehicles.)
Commercial General Liability requirements may be met through a combination of
umbrella or excess liability insurance.
The City shall be named as an additional insured on the general liability and
umbrella policies.
c. Professional Liability Insurance. In addition to the coverages listed above,
Engineer shall maintain a professional liability insurance policy in the amount of
$2,000,000. Said policy need not name the City as an additional insured.
Page 121 of 219
224345v1
d. Engineer Engineer
available.
e.
Farmington
insured.
f.
basis.
g. All polices shall contain a waiver of subrogation in favor of the City.
h.
Liability Policy, shall be primary and non-contributory.
i.
indemnity obligations assumed by Engineer under this Agreement.
j. Engineer agrees to maintain all coverage required herein throughout the term of the
of the Work.
k. It shall be Engineer
coverages required herein.
l. The policies and Certificate of Insurance shall contain a provision that
coverage afforded under the policies shall not be cancelled without at least thirty
(30) days advanced written notice to the City.
m. Engineer shall maintain in effect all insurance coverages required under this
Paragraph at Engineer
business in the state in Minnesota and having a current A.M. Best rating of no less
than A-, unless specifically accepted by City in writing and all insurance policies
shall be on ISO forms acceptable to the City.
n. A copy of the Engineer
compliance with this Paragraph, must be filed with City prior to the start of
Engineer Upon request a copy of the Engineer
page, rider and/or endorsement, as applicable shall be provided. Such documents
evidencing insurance shall be in a form acceptable to City and shall provide
satisfactory evidence that Engineer has complied with all insurance requirements.
Renewal certificates shall be provided to City prior to the expiration date of any of
the required policies. City will not be obligated, however, to review such Certificate
of Insurance, declaration page, rider, endorsement, certificates, or other evidence
of insurance, or to advise Engineer of any deficiencies in such documents and
Page 122 of 219
224345v1
receipt thereof shall not relieve Engineer
right to enforce the terms of Engineer
right to examine any policy provided for under this Agreement.
o. Effect of Engineer If Engineer fails to provide the
specified insurance, then Engineer will defend, indemnify, and hold harmless the
City, the City's officials, agents, and employees from any loss, claim, liability, and
expense (including reasonable attorney's fees and expenses of litigation) to the
extent necessary to afford the same protection as would have been provided by the
specified insurance. Except to the extent prohibited by law, this indemnity applies
regardless of any strict liability or negligence attributable to the City (including sole
negligence) and regardless of the extent to which the underlying occurrence (i.e.,
the event giving rise to a claim which would have been covered by the specified
insurance) is attributable to the negligent or otherwise wrongful act or omission
(including breach of contract) of Engineer, its subcontractors, agents, employees or
delegates. Engineer agrees that this indemnity shall be construed and applied in
favor of indemnification. Engineer also agrees that if applicable law limits or
precludes any aspect of this indemnity, then the indemnity will be considered
limited only to the extent necessary to comply with that applicable law. The stated
indemnity continues until all applicable statutes of limitation have run.
If a claim arises within the scope of the stated indemnity in section o, the City may require
Engineer to:
i. Furnish and pay for a surety bond, satisfactory to the City, guaranteeing
performance of the indemnity obligation; or
ii. Furnish a written acceptance of tender of defense and indemnity from Engineer's
insurance company.
Engineer will take the action required by the City within fifteen (15) days of receiving
notice from the City.
10. INDEPENDENT CONTRACTOR. The City hereby retains the Engineer as an
independent contractor upon the terms and conditions set forth in this Agreement. The Engineer
is not an employee of the City and is free to contract with other entities as provided herein.
Engineer shall be responsible for selecting the means and methods of performing the work.
Engineer shall furnish any and all supplies, equipment, and incidentals necessary for Engineer's
performance under this Agreement. City and Engineer agree that Engineer shall not at any time
or in any manner represent that Engineer or any of Engineer's agents or employees are in any
manner agents or employees of the City. Engineer shall be exclusively responsible under this
Agreement for Engineer's own FICA payments, workers compensation payments, unemployment
compensation payments, withholding amounts, and/or self-employment taxes if any such
payments, amounts, or taxes are required to be paid by law or regulation.
11. SUBCONTRACTORS. Engineer shall not enter into subcontracts for services
provided under this Agreement without the express written consent of the City. Engineer shall
comply with Minnesota Statute § 471.425. Engineer must pay subcontractor for all undisputed
Page 123 of 219
224345v1
services provided by subcontractor within ten (10)
City. Engineer must pay interest of 1.5 percent per month or any part of a month to subcontractor
on any undisputed amount not paid on time to subcontractor. The minimum monthly interest
penalty payment for an unpaid balance of $100 or more is $10.
12. ASSIGNMENT AND THIRD PARTIES. Neither party shall assign this
Agreement, nor any interest arising herein, without the written consent of the other party. Nothing
under this Agreement shall be construed to give any rights or benefits in this Agreement to anyone
other than the City and Engineer, and all duties and responsibilities undertaken pursuant to this
Agreement will be for the sole and exclusive benefit of the City and Engineer and not for the
benefit of any other party.
13. WAIVER. Any waiver by either party of a breach of any provisions of this
Agreement shall not affect, in any respect, the validity of the remainder of this Agreement.
14. ENTIRE AGREEMENT. The entire agreement of the parties is contained herein.
This Agreement supersedes all oral agreements and negotiations between the parties relating to the
subject matter hereof as well as any previous agreements presently in effect between the parties
relating to the subject matter hereof. Any alterations, amendments, deletions, or waivers of the
provisions of this Agreement shall be valid only when expressed in writing and duly signed by the
parties, unless otherwise provided herein.
15. CONTROLLING LAW AND VENUE. This Agreement shall be governed by
and construed in accordance with the laws of the State of Minnesota. All proceedings related to
this contract shall be venued in the Dakota County District Court.
16. COPYRIGHT. Engineer shall defend actions or claims charging infringement of
any copyright or patent by reason of the use or adoption of any designs, drawings, or specifications
supplied by it, and it shall hold harmless the City from loss or damage resulting therefrom.
17. RECORDS. The Engineer shall maintain complete and accurate records of time
and expense involved in the performance of services.
18. MINNESOTA GOVERNMENT DATA PRACTICES ACT. Engineer must
comply with the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, as it
applies to (1) all data provided by the City pursuant to this Agreement, and (2) all data, created,
collected, received, stored, used, maintained, or disseminated by the Engineer pursuant to this
Agreement. Engineer is subject to all the provisions of the Minnesota Government Data Practices
Act, including but not limited to the civil remedies of Minnesota Statutes Section 13.08, as if it
were a government entity. In the event Engineer receives a request to release data, Engineer must
immediately notify City. City will give Engineer instructions concerning the release of the data to
the requesting party before the data is released. Engineer agrees to defend, indemnify, and hold
City, its officials, officers, agents, employees, and volunteers harmless from any claims resulting
, or
survive the cancellation or termination of this Agreement.
Page 124 of 219
224345v1
19. TERMINATION. This Agreement may be terminated by City on thirty (30
written notice delivered to Engineer at the address on file with the City. Upon termination under
this provision if there is no fault of the Engineer, the Engineer shall be paid for services rendered
and reimbursable expenses until the effective date of termination. If the City terminates the
Agreement because the Engineer has failed to perform in accordance with this Agreement, no
further payment shall be made to the Engineer, and the City may retain another engineer to
undertake or complete the work identified in Paragraph 1.
20. NON-DISCRIMINATION. During the performance of this Agreement, the
Engineer shall not discriminate against any employee or applicants for employment because of
race, color, creed, religion, national origin, sex, marital status, status with regard to public
assistance, disability, sexual orientation or age. The Engineer shall post in places available to
employees and applicants for employment, notices setting forth the provision of this non-
discrimination clause and stating that all qualified applicants will receive consideration for
employment. The Engineer shall incorporate the foregoing requirements of this paragraph in all
of its subcontracts for program work, and will require all of its subcontractors for such work to
incorporate such requirements in all subcontracts for program work. The Engineer further agrees
to comply with all aspects of the Minnesota Human Rights Act, Minnesota Statutes 363.01, et.
seq., Title VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act of 1990.
21. SURVIVAL. All express representations, waivers, indemnifications, and
limitations of liability included in this Agreement will survive its completion or termination for
any reason.
22. SERVICES NOT PROVIDED FOR. Claims for services furnished by the
Engineer not specifically provided for herein shall not be honored by the City.
23. SEVERABILITY. The provisions of this Agreement are severable. If any portion
hereof is, for any reason, held by a court of competent jurisdiction to be contrary to law, such
decision shall not affect the remaining provisions of this Agreement.
24. CONFLICTS. No officer or salaried employee of the City and no member of the
Council of the City shall have a financial interest, direct or indirect, in this Agreement. The
violation of this provision renders the Agreement void.
25. NOTICES. Any notice required under this Agreement will be in writing, addressed
to the appropriate party at its address on the signature page and given personally, by facsimile, by
registered or certified mail postage prepaid, or by a commercial courier service. All notices shall
be effective upon the date of receipt.
26. WAIVER -enforcement of any provision shall not constitute a
waiver of that provision, nor shall it affect the enforceability of that provision or of the remainder
of this Agreement.
Page 125 of 219
224345v1
27. COUNTERPARTS. This Agreement may be executed in multiple counterparts,
each of which shall be considered an original.
Dated: April 20, 2026 CITY: CITY OF FARMINGTON
By:
Nicholas Lien
Mayor
By:
Melissa Geis
City Clerk
Dated:__________________, 20___ ENGINEER: WSB LLC
By:
[print name]
Its:
[title]
Page 126 of 219
224345v1
SCOPE OF SERVICES
AND
B
SCHEDULE OF PAYMENT AND FEE SCHEDULE
Page 127 of 219
Page 128 of 219
Page 129 of 219
Page 130 of 219
Page 131 of 219
WSB Unit Test Type/Material Minimum Required Testing Rate Quantity of Material Minimum Tests Probable
Tests
Cost Per
Test
Minimum
Cost
Probable
Cost
3025 Aggregate Base CL 5: 2339 CY 4 5 $165.00 $660.00 $825.00
3025 Select Granular Embankment 1 / 40,000 CY (CV)2446 CY 1 2 $165.00 $165.00 $330.00
WSB Unit Test Type/Material Minimum Required Testing Rate Major Soil Types Minimum Tests Probable
Tests
Cost Per
Test
Minimum
Cost
Probable
Cost
3260 Proctor Test 1 / Major soil type. Additionally, one for each granular material, if
using specified density.
Embankment
Trench Backfill
Subgrade
3 4 $250.00 $750.00 $1,000.00
WSB Unit Test Type/Material Minimum Required Testing Rate Quantity of Material Minimum Tests Probable
Tests
Cost Per
Test
Minimum
Cost
Probable
Cost
3500 Aggregate Base
1 DCP tests per 500 CY (CV) or 1 per 1000 Tons.
If test rolled, 1 test / 1,500 CY (CV) or 3000 Tons.CL 5: 2339 CY 5 6 $55.00 $275.00 $330.00
3510 Roadway Embankment: 1 test per 2,000 CY (CV) or
if test rolled, 1 test per 4,000 CY (CV), SGE: 2446 CY 2 3 $40.00 $80.00 $120.00
3510
Structures and Longitudinal Trenches
(Sidewalk/Trails/Watermain/Storm Sewer/Sanitary
Sewer/Retaining Walls): 1 test per 300 feet of each structure
length per every 2 feet of fill.
Watermain: 1237 LF (8)
Storm: 778 LF (4)12 14 $40.00 $480.00 $560.00
3510 Subgrade Preparation: 1 test per 25 road stations.
100% proctor density 13 RDST 1 2 $40.00 $40.00 $80.00
WSB Unit Test Type/Material Minimum Required Testing Rate Quantity of Material Minimum Tests Probable
Tests
Cost Per
Test
Minimum
Cost
Probable
Cost
3250 Aggregate Base 1 / 1,000 CY up to 10 maximum.
For Quality Compaction: Test as directed by Engineer.Cl 5: 2339 CY 3 3 $20.00 $60.00 $60.00
3250 All Embankment Materials 1 / 10,000 CY up to 10 maximum.
For Quality Compaction: Test as directed by Engineer.SGE: 2446 CY 1 1 $20.00 $20.00 $20.00
3250 Subgrade Preparation 1 per 25 Road Stations
For Quality Compaction: Test as directed by Engineer.13 RDST 1 1 $20.00 $20.00 $20.00
WSB Unit Test Type/Material Minimum Required Testing Rate Sources Minimum Tests Probable
Tests
Cost Per
Test
Minimum
Cost
Probable
Cost
4030
Aggregate Base
Recycled/Salvaged/Reclaimed
Bitumen content
At the discretion of the Engineer.Imported 0 1 $190.00 $0.00 $190.00
WSB Unit Test Type/Material Minimum Required Testing Rate Quantity of Material Minimum Tests Probable
Tests
Cost Per
Test
Minimum
Cost
Probable
Cost
2040 Concrete Testing
1 / 100 CY / mix type / day
(1 set of 4 cylinders)
*Field Cure Cylinders = Additional. Casted Upon Request*
4" Walk: 2 CY
6" Walk: 5 CY
B618 C&G: 150 CY
6" Driveway: 35 CY
8" Driveway: 74 CY
6 8 $160.00 $960.00 $1,280.00
Total Minimum Cost for Section
$190.00
Total Probable Cost for Section
Total Minimum Cost for Section
$0.00
Aggregate Quality
Non-Granular Materials
$825.00
$1,155.00
Granular Materials
$1,000.00
Total Probable Cost for Section $1,090.00
$875.00
$100.00
$100.00
Compaction Testing - Nuclear Density Gauge and Dynamic Cone Penetrometer
Proctor Test
Moisture Content Test
$750.00
Willow Drive MSA
Random Sampling:
> 2000 CY (CV) or 4000 Tons. Divide into lots with lot size no
greater than 2000 CY (CV) or 4000 Tons. Test two random
samples from each lot and average.
Gradation Testing
Total Minimum Cost for Section
Total Probable Cost for Section
City of Farmington
SAP 212-116-001 / CP 26-03 / WSB R-030716-000
Construction Materials Testing Estimate of Costs (2024 SALT)
Total Probable Cost for Section
Total Minimum Cost for Section
$960.00
Total Minimum Cost for Section
Total Probable Cost for Section
Concrete Testing
Total Minimum Cost for Section
Total Probable Cost for Section $1,280.00
Page 132 of 219
WSB Unit Test Type/Material Minimum Required Testing Rate Quantity of Material Minimum Tests Probable
Tests
Cost Per
Test
Minimum
Cost
Probable
Cost
4090 Verification Testing - MnDOT Gyratory Mix
Properties 1 / mix type / day 2 3 $650.00 $1,300.00 $1,950.00
4080 Compaction / Density Testing Per Project Special Provisions 4 4 $65.00 $260.00 $260.00
WSB Unit Project Charges Rate ($) Quantity
CMT02 Field Technician Time 115 30
2130 Trip Charge 60 26
$5,070.00 $7,025.00 CMT01 Sample Pick-Up Time 100 16.5
CMT90 Project Administration 95 1
CMT70 Project Assistant 175 8
CMT80 Project Engineer 215 2
$430.00
$3,450.00
$1,650.00
$95.00
Subtotal
Bituminous Testing
Total Minimum Cost for Section $1,560.00
9.5W(3,C): 600 T
12.5W(3,C): 1200 T
Small Quantity:
3," 9.5W(2,C): 35 T
Total Estimated Minimum Cost $13,655.00
Total Estimated Probable Cost $15,610.00
$1,400.00
Total Probable Cost for Section $2,210.00
Field and Overhead Subtotal $8,585.00
Testing Subtotal
(minimum-probable)$5,070.00 - $7,025.00
$1,560.00
Page 133 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:John Powell, Public Works Director
Department:Engineering
Subject:Receive Bids and Award a Contract for the Willow Street MSA
Improvements
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
Plans and specifications for this project were prepared consistent with the City Council
direction regarding design options presented at the January 20, City Council meeting and
State Aid design standards. This includes replacing the roadway at its current width, with no
dedicated bike lanes, and the closure of 8th Street on the south side of Willow Street. If for
any reason Dakota County Lumber decides the closure of 8th Street does not meet their
needs, then 8th Street will be left connected at no additional construction cost. The City
expects a decision on this option in the near future.
DISCUSSION:
An advertisement for bids was posted in the Dakota County Tribune and in Finance &
Commerce on March 20 and 27, 2026. Notice was also posted on the QuestCDN website.
Bids were publicly read at an online bid opening at 10 am on April 14, 2026.
Six (6) bids were received. The low bidder is BCM Construction of Faribault in the amount of
$1,143,900.55. The Engineer's Estimate of Construction Costs for the project based on final
quantities was $1,271,667.50. BCM Construction has successfully completed similar
projects for Farmington in the past. A complete tabulation of bids is attached and is
summarized below. A recommendation of award letter is also attached.
Contractor Bid Amount
BCM Construction, Inc. $ 1,143,900.55
McNamara Contracting $ 1,148,420.95
Fitzgerald Excavating $ 1,251,457.64
Pember Companies $ 1,253,613.75
A-1 Excavating $ 1,269,782.00
Northwest $ 1,526,156.22
Page 134 of 219
BUDGET IMPACT:
Funding for this project, as identified in the approved 2026-2030 Capital Improvement Plan,
included the following:
State Aid (MSA Construction Funds) $ 875,000
Sewer Fund $ 75,000
Water Fund $ 150,000
Total $1,025,000
MSA Construction Funds can be used by the City for construction of roadway and storm
sewer improvements, as well as for engineering design. The State Aid Hydraulics staff have
determined that 100% of the storm sewer costs are eligible for State Aid funding. The work
scope includes extensive soil correction as well water main and water service replacement
as recommended by the Water Board.
Based on the low bid, and assuming an additional 20% for engineering, surveying, testing,
etc., an estimate of the proposed funding sources and amounts are as follows:
State Aid (MSA Construction Funds) $ 1,092,257
Sanitary Sewer Fund $ 9,270
Water Fund $ 271,154
Total $ 1,372,681
Very competitive bids were received, with the low bid being about 10 percent below the
Engineer's Estimate of Construction Costs. As of April 13, 2026, the balance available in the
City's Municipal State Aid (MSA) Construction Fund is $2,226,407.98, so adequate MSA
Construction Funds are available.
Public improvement contracts are based on estimated quantities of materials and work
types. The final contract amount can vary (increase or decrease) from the original
amount. Additionally, construction issues arise which require an immediate decision and
cannot wait for the next City Council meeting for formal approval. For these reasons, Staff
is also requesting approval of a change order contingency of $114,000 (about 10% of the
contract) be established as an aggregate of all change order increases, with a maximum
amount of $50,000 allowed for any single change order increase without prior City Council
approval.
ACTION REQUESTED:
Staff recommends acceptance of the bids and award of a contract for construction of
the Willow Street MSA Improvements project to BCM Construction of Faribault in the
amount of their bid $1,143,900.55 and authorize the Mayor and City Clerk to execute the
same. This includes approval of a change order contingency of $114,000 (about 10% of the
contract) be established as an aggregate of all change order increases, with a maximum
amount of $50,000 allowed for any single change order increase without prior City Council
approval.
Page 135 of 219
ATTACHMENTS:
030716-000 Willow St Bid Tabulation 041426
030716-000 Willow St LOR 041426
Page 136 of 219
Page 137 of 219
Page 138 of 219
Page 139 of 219
Page 140 of 219
Page 141 of 219
Page 142 of 219
April 14, 2026
Honorable Mayor and City Council
City of Farmington
430 Third Street
Farmington, MN 55024
Re: Willow Street MSA Improvements
City Project No. 26-03
SAP 212-116-001
City of Farmington
WSB Project No. 030716-000
Dear Mayor and Council Members:
Bids were received for the above-referenced project on Tuesday, April 14, 2026, and were
opened and read aloud. Six bids were received. The bids were checked for mathematical
accuracy. Please find enclosed the bid summary indicating the low bid as submitted by BCM
Construction, Inc., Faribault, Minnesota in the amount of $1,143,900.55. The Engineer’s
Estimate was $1,271,667.50.
We recommend that the City Council consider these bids and award a contract in the amount of
$1,143,900.55 to BCM Construction, Inc. based on the results of the bids received.
Sincerely,
WSB
Mark Erichson, PE
Director, Municipal Services
Attachments
ams
Page 143 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:John Powell, Public Works Director
Department:Engineering
Subject:Resolution 2026-033 Revising the Municipal State Aid Street System
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
Staff is requesting a revision to the Municipal State Aid System (MSAS) to receive the
maximum benefit from the State Aid system.
DISCUSSION:
The City submits an Annual Certification of Mileage, which declares the total miles of
streets within the city. The maximum allowable total length of designated State Aid streets
is twenty percent (20%) of the total local road mileage.
This year, the city has 94.14 miles of local road mileage due to the construction of new
roads in 2025. Twenty percent of the total available for State Aid funding is 18.83 miles.
Currently, 16.71 miles are included in the State Aid system; 2.12 miles can be added to the
system.
Further, there are four roadway segments designated as MSAS routes which are no longer
viable or needed; these segments total 1.44 miles. Staff is recommending the following
revisions be made to the system to take full advantage of the State Aid funding:
Proposed revocations
Segment Length Location
212-106-035 0.39 miles 208th Street from Akin Road to First Street
212-105-040 0.46 miles First Street from CSAH 50 (Elm Street) to 208th Street
212-114-010 0.24 miles Fairgreen Avenue from CSAH 50 (Elm Street) to 210th
Street
212-114-020 0.35 miles Fairgreen Avenue from 210th Street to 208th Street
1.44 miles
Proposed New Segments
Length Location
0.48 miles Diamond Path Road from CSAH 64 (195th Street) to 675 feet south of
199th St.
Page 144 of 219
0.67 miles Diamond Path Road from 675 feet south of 199th Street to Devonport
Drive
0.11 miles Devonport Drive from Akin Road (212-112-020) to Diamond Path
1.25 miles Biscayne Avenue from TH 50 (220th Steet) to 208th Street
0.50 miles 208th Street from Cambodia Avenue to Biscayne Avenue
0.38 miles Cambodia Avenue from 208th Street to CSAH 66 (Vermillion River Trail)
3.39 miles
Attached is a copy of the letter forwarded to the Metro District State Aid Engineer
describing proposed revocation and new segments in detail, including a map of the
locations. Minnesota Department of Transportation State Aid office has reviewed these
proposed changes and indicated they will be approved upon receipt of the City Council
resolution.
BUDGET IMPACT:
By maximizing the miles of streets designated as State Aid streets, the City will maximize the
needs, or funding, from State Aid to maintain these streets within the city.
ACTION REQUESTED:
Adopt Resolution 2026-033 Revising the Municipal State Aid Street System.
ATTACHMENTS:
2026-033 Revising the Municipal State Aid Street System
Farmington MSA System Revisions 022726
Farmington Municipal Map 2025 proposed system changes 022726
Page 145 of 219
CITY OF FARMINGTON
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2026-033
A RESOLUTION REVISING THE MUNICIPAL STATE AID STREET SYSTEM
WHEREAS, the City Council of the City of Farmington, Minnesota
, has determined that streets hereinafter described should be revoked
as Municipal State Aid Streets under the provisions of Minnesota law; and
WHEREAS, the City Council has determined that other streets hereinafter
described should be designated as Municipal State Aid Streets under the
provisions of Minnesota law.
NOW, THEREFORE, BE IT RESOLVED by the Farmington City Council that the
streets described as follows are hereby revoked as Municipal State Aid Streets of
said City, subject to the approval of the Commissioner of Transportation of the
State of Minnesota:
212-106-035 208th Street - 0.39 miles
From Akin Road to First Street
212-105-040 First Street - 0.46 miles
From CSAH 50 (Elm Street) to 208th Street
212-114-010 Fairgreen Avenue - 0.24 miles
From CSAH 50 (Elm Street) to 210th Street
212-114-020 Fairgreen Avenue - 0.35 miles
From 210th Street to 208th Street
BE IT FURTHER RESOLVED by the Farmington City Council that the streets
described as follows are hereby established, located and designated as
Municipal State Aid Streets of said City, subject to the approval of the
Commissioner of Transportation of the State of Minnesota:
Diamond Path Road 0.48 miles
From CSAH 64 (195th Street) to 675 feet south of 199th Street
Diamond Path Road - 0.67 miles
From 675 feet south of 199th Street to Devonport Drive
Devonport Drive - 0.11 miles
From Akin Road (212-112-020) to Diamond Path
Page 146 of 219
Resolution 2026-033
Page 2 of 2
Biscayne Avenue - 1.25 miles
From TH 50 (220th Steet) to 208th Street
208th Street - 0.50 miles
From Cambodia Avenue to Biscayne Avenue
Cambodia Avenue - 0.38 miles
From 208th Street to CSAH 66 (Vermillion River Trail)
BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and
directed to forward two certified copies of this resolution to the Commissioner of
Transportation for consideration and, upon approval of the designation of said
roads or portions thereof, that same be constructed, improved and maintained
as Municipal State Aid Streets.
Adopted by the City Council of the City of Farmington, Minnesota, this 20th day of
April 2026.
ATTEST:
____________________________ ______________________________
Nicholas Lien, Mayor Melissa Geis, City Clerk
Page 147 of 219
430 Third Street | Farmington, Minnesota | 651-280-6800 | FarmingtonMN.gov
February 27, 2026
Dan Erickson, Metro District State Aid Engineer
Waters Edge Building
1500 West County Road B-2
Roseville, Minnesota 55113
Re: Municipal State Aid System (MSAS) Proposed Revisions
City of Farmington
Dear Mr. Erickson,
The City of Farmington has reviewed our existing MSAS designations within the context of our ongoing
Comprehensive Plan update citywide transportation needs. As you may know, the Vermillion River and
multiple tributaries flow through Farmington, and we have a very active rail line which passes through
the city. Our transportation planning and requested system changes reflect the technical and financial
challenges that these amenities present to roadway connectivity. We are presenting the following
proposed changes to you for review and comment. The proposed system revisions are identified
graphically on the attached Attachment A.
Proposed Revocations:
212-106-035 0.39 miles 208
th Street from Akin Road to First Street
212-105-040 0.46 miles First Street from CSAH 50 (Elm Street) to 208
th Street
212-114-010 0.24 miles Fairgreen Avenue from CSAH 50 (Elm Street) to 210
th Street
212-114-020 0.35 miles Fairgreen Avenue from 210
th Street to 208th Street
1.44 miles
Proposed New Segments:
0.48 miles Diamond Path Road from CSAH 64 (195
th Street) to 675 feet south of 199th Street
0.67 miles Diamond Path Road from 675 feet south of 199th Street to Devonport Drive
0.11 miles Devonport Drive from Akin Road (212-112-020) to Diamond Path
1.25 miles Biscayne Avenue from TH 50 (220
th Steet) to 208th Street
0.50 miles 208
th Street from Cambodia Avenue to Biscayne Avenue
0.38 miles Cambodia Avenue from 208
th Street to CSAH 66 (Vermillion River Trail)
3.39 miles
The city has 2.12 miles available to designate with our existing system. After the proposed changes, we
will have about .17 miles remaining for designation.
Page 148 of 219
430 Third Street | Farmington, Minnesota | 651-280-6800 | FarmingtonMN.gov
Following is a discussion of the proposed changes and compliance with State Aid Rules 8820.0700 and
8820.0800.
Revocations
212-106-035 208th Street from Akin Road to First Street
Discussion:
a. This segment was partially constructed using MSAS funds in 1992; a preliminary review of this
indicates payback would likely not be required for either of these segments.
b. This segment provides access to Riverview Elementary School and Dodge Middle School.
Originally, it was expected that the roadway would be extended east and connected toTH 3/CSAH
66. However, the need to cross a railroad very actively used by UP and the Vermillion River made
this connection cost prohibitive.
212-105-040 First Street from CSAH 50 (Elm Street) to 208th Street
Discussion:
a. This is an unimproved segment.
b. Dodge Middle School and related amenities have been constructed in the path of this route.
c. Constructing this segment would also be very costly as it would need to cross a very wide portion
of the Vermillion River and adjoining floodplain.
212-114-010 Fairgreen Avenue from CSAH 50 (Elm Street) to 210th Street
212-114-020 Fairgreen Avenue from 210th Street to 208th Street
Discussion:
a. This is an unimproved segment north of 210
th Street and a gravel roadway from 210th Street to
CSAH 50.
b. The city no longer anticipates the need for a north-south roadway segment in this area. No
connecting roadway is currently planned south of CSAH 50.
New Segments
As the new segments cannot stand alone without through connectivity; the connected segments are
discussed together.
Diamond Path Road from CSAH 64 (195th Street) to 675 feet south of 199th Street; Diamond Path Road
from 675 feet south of 199th Street to Devonport Drive; and Devonport Drive from Akin Road (212-112-
020) to Diamond Path
Discussion:
a. Devonport Drive is an improved roadway that currently serves Farmington Lutheran Church and
terminates at the east end with farmed fields.
Page 149 of 219
430 Third Street | Farmington, Minnesota | 651-280-6800 | FarmingtonMN.gov
b. Diamond Path Road is identified 2040 comprehensive plan as a future Major
Collector. The northern segment is a partially improved roadway located between two residential
developments and occupies the eastern half of the existing dedicated right of way. The southern
segment would pass through existing farmed fields.
c. This route is functionally classified as a Major Collector and is projected to carry a relatively
heavier traffic volume, particularly from the existing and anticipated residential development
which is adjacent.
d. The proposed route is also consistent with the Farmington Area Transportation Study prepared
by Dakota County in 2009 calling for a Major Collector along the proposed alignment.
e.2040 comprehensive plan indicates that a future Community Park will be located east
of Diamond Path Road, and that a trail corridor is planned along this route. The north end of this
route will provide a direct connection to Jim Bell Park and Reserve. This new segment will connect
points of major traffic interest, parks, parkways, or recreational areas within the city.
f. Diamond Path Road will provide an integrated street system of state-aid routes and local roads
consistent with projected traffic demands.
Biscayne Avenue from TH 50 (220th Steet) to 208th Street; 208th Street from Cambodia Avenue to
Biscayne Avenue; Cambodia Avenue from 208th Street to CSAH 66 (Vermillion River Trail)
Discussion:
a. No half-streets are proposed; all routes and improvements will be completely located within the
City of Farmington.
b. Biscayne Avenue is an unimproved route passing through farmed fields aside from the north end
where north of 210th Street, it is a gravel roadway. Biscayne Avenue runs along the border of
Farmington and Empire but is proposed to be located completely within Farmington.
c. 208
th Street is an unimproved route passing through farmed fields, and adjacent to a large
residential parcel at the west end.
d. Cambodia Avenue is currently a gravel roadway.
e. Recently, Empire Township was incorporated as a city. As part of that process, through prior
agreements, hundreds of acres adjacent to the Biscayne Avenue corridor were brought into the
City of Farmington. East of TH 3, there is currently no north-south corridor that runs from TH 50
on the south end to CSAH 66 at the north end; this new MSAS route would serve that purpose.
f. The Rosemount/Empire/UMORE Area Transportation System Study also identifies the need for a
future regional road located along Biscayne Avenue in this area.
g. Biscayne Avenue is not identified as a Major Collector in the existing 2040 comprehensive plan as
a portion would have been outside of the city. As part of the plan update currently underway, a
collector route will be identified along Biscayne Avenue. The proposed roadway is projected to
carry a relatively heavier traffic volume, providing a connection between TH 50 and CSAH 66.
h. This proposed new MSAS route connects points of major traffic interest including the Prairie
Waterway Greenway and other recreational areas within and adjacent to the City of Farmington.
Page 150 of 219
Page 151 of 219
Page 152 of 219
Page 153 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Tony Wippler, Planning Manager
Department:Community Development
Subject:Resolution 2026-035 Approving Final Plats - Farmington Technology Park 1st
and 2nd Additions; and
Resolution 2026-036 Approving an Extension for the Recording of
Farmington Technology Park 2nd Addition Final Plat with Dakota County;
and
Resolution 2026-037 Approving the Development Contract - Farmington
Technology Park 1st Addition; and
Resolution 2026-038 Approving the Development Contract - Farmington
Technology Park 2nd Addition.
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
Kimley - Horn, on behalf of MNLCO Farmington, LLC; MNLCO Farmington Two, LLC; and
Independent forplats final the for has submitted 192, District School applications
Farmington Technology Park 1st Addition and Farmington Technology Park 2nd Addition
(see attached final plats).
DISCUSSION:
Background
The Farmington Technology Park final plat (attached as Exhibit A) was originally approved
by the City Council on November 18, 2024 and included the subdivision/platting of the
Fountain Valley Golf Course and the Independent School District 192 properties into 3 lots
within one final plat. Due to ongoing litigation, the approved Farmington Technology Park
final plat has not been recorded. Per Section 11-2-3(E) of the City Code, the Farmington
Technology Park final plat was to be recorded with Dakota County by May 18, 2025. On
April 7, 2025, the City Council approved an extension for the recording of that plat until
May 18, 2026.
Current Request
As indicated in the attached cover letter, the applications before you are requesting to
bifurcate or divide the original Farmington Technology Park final plat into a 1st Addition,
which includes the former Fountain Valley Golf Course, and a 2nd Addition, which includes
Page 154 of 219
the Independent School District 192 property. The 1st and 2nd Addition final plats are
substantially the same to the plat that was approved in 2024, with the only change being
dividing the parcels into two phases which would be recorded separately due to current
ownership status. The lots and right-of-way to be dedicated will remain the same as
originally approved with the final plat in 2024. The City Council approved the preliminary
plat for this development on November 4, 2024. The Farmington Technology Park 1st
Addition and Farmington Technology Park 2nd Addition final plats are consistent with the
approved preliminary plat. Descriptions of the proposed lots are as follows:
Lot 1, Block 1 Farmington Technology Park 1st Addition - 150.74 acres, northern
portion of the data center campus.
Lot 2, Block 1 Farmington Technology Park 1st Addition - 2.07 acres, to be deeded to
the city for utility purposes.
Lot 1, Block 1 Farmington Technology Park 2nd Addition - 185.54 acres, southern
portion of data center campus. This lot is also encumbered by floodplain that will be
contained in a conservation easement.
The bifurcation of the plat into two additions will allow for the recording of the First Addition
plat along with the development contract and allow for some preliminary site work to
commence.
Additionally, due to delays from the ongoing litigation, the applicant is requesting City
Council approval of a one (1) year extension of the recording deadline for the Farmington
Technology Park 2nd Addition. If approved, the deadline to record the 2nd Addition final
plat with Dakota County would be April 20, 2027.
Planning Commission Review
The Planning Commission reviewed the final plats at its regular meeting on April 14, 2026.
The Commission recommended approval of the plats with a vote of 2-1-1 (Baerg voted no;
Rotty abstained).
Development Contracts
On December 2, 2024 the City Council approved the Development Contract for the
original Farmington Technology Park final plat. Similar to the plat, the Development
Contract was never recorded. Amendments to the Development Contract are necessary
to accommodate the bifurcation of the plat and to reflect delays which were caused by
the ongoing litigation. These amendments largely consist of splitting the contract into
separate 1st Addition and 2nd Addition contracts and modifying obligations to align with
the timeframe of a phased development.
ACTION REQUESTED:
By separate motion, approve the following actions:
1.Adopt Resolution 2026-035 Approving and Authorizing the Signing of the Farmington
Technology Park 1st Addition and the Farmington Technology Park 2nd Addition
Page 155 of 219
Final Plats.
2.Adopt Resolution 2026-036 Granting a one (1) year extension, until April 20, 2027, for
the recording of the Farmington Technology Park 2nd Addition with Dakota County.
3.Adopt Resolution 2026-037 Approving the attached Development Contract for the
Farmington Technology Park 1st Addition and authorize its execution.
4.Adopt Resolution 2026-038 Approving the attached Development Contract for the
Farmington Technology Park 2nd Addition and authorize its execution.
ATTACHMENTS:
Exhibit A Farmington Technology Park Final Plat
Farmington Technology Park Final Plat Application FPS
Farmington Technology Park Final Plat Application MNLCO
Farmington Technology Park Final Plat Cover Letter
41808 FARMINGTON TECHNOLOGY PARK 1ST ADDITION 2026-03-25
41808 FARMINGTON TECHNOLOGY PARK 2ND ADDITION 2026-03-25
Farmington Technology Park Update
2026-035 Farmington Technology Park 1st and 2nd Addition Final Plat Resolution
2026-036 Extension for Recording Farmington Technology Park 2nd Addition Final Plat
2026-037 Approving Development Contract Farmington Tech Park 1st Addition
2026-038 Approving Development Contract Farmington Tech Park 2nd Addition
DOCS-#238900-v5-Tract_-_Farmington_DA_-_Farmington_Techology_Park_1st_Addition
DOCS-#238899-v3-Tract_-_Farmington_DA_-_Farmington_Techology_Park_2nd Addition
Page 156 of 219
Page 157 of 219
Page 158 of 219
Applicant__________________________________ Telephone: _______________ Fax: ____________
Address: ____________________________________________________________________________
Street City State Zip Code
Owner: ___________________________________ Telephone: _______________ Fax: ___________
Address: ____________________________________________________________________________
Street City State Zip Code
Location of Property:
_____________________________________________________________________________________
Address
Current Zoning District ___________________________ Current Land Use _______________________
Description of Project:
_________________________________________________________________________________
____________________________________________ _____________________________________
Signature of Property Owner Date Signature of Applicant Date
SUBMITTAL REQUIREMENTS (please attach)
_____Names, Addresses and Phone numbers of all
Owners
_____Names, Addresses and Phone numbers of
Land Surveyor/Engineer
_____Area Bounded By Description
_____Total Gross Area
PLAT REVIEW OPTION
Preliminary & Final Plat:
_____Together
_____In Sequence
Pre Plat Administrative Fee $______ ____Paid
Pre Plat Surety $____________Paid
Final Plat Fee $____________Paid
PLAT REVIEW APPLICATION
Request Submitted to Planning staff on_________________For Office Use
Public Hearing Set for: ___________________ Advertised in Local Newspaper: _____________________
Planning Commission Action: ______Approved ______Denied
Comments:
______________________________________________________________________________________
______________________________________________________________________________________
Conditions Set:
______________________________________________________________________________________
______________________________________________________________________________________
Planning division: ____________________________ Date: __________________ 9/19
Page 159 of 219
Applicant__________________________________ Telephone: _______________ Fax: ____________
Address: ____________________________________________________________________________
Street City State Zip Code
Owner: ___________________________________ Telephone: _______________ Fax: ___________
Address: ____________________________________________________________________________
Street City State Zip Code
Location of Property:
_____________________________________________________________________________________
Address
Current Zoning District ___________________________ Current Land Use _______________________
Description of Project:
_________________________________________________________________________________
____________________________________________ _____________________________________
Signature of Property Owner Date Signature of Applicant Date
SUBMITTAL REQUIREMENTS (please attach)
_____Names, Addresses and Phone numbers of all
Owners
_____Names, Addresses and Phone numbers of
Land Surveyor/Engineer
_____Area Bounded By Description
_____Total Gross Area
PLAT REVIEW OPTION
Preliminary & Final Plat:
_____Together
_____In Sequence
Pre Plat Administrative Fee $______ ____Paid
Pre Plat Surety $________ ____Paid
Final Plat Fee $________ ____Paid
PLAT REVIEW APPLICATION
Request Submitted to Planning staff on_________________For Office Use
Public Hearing Set for: ___________________ Advertised in Local Newspaper: _____________________
Planning Commission Action: ______Approved ______Denied
Comments:
______________________________________________________________________________________
______________________________________________________________________________________
Conditions Set:
______________________________________________________________________________________
______________________________________________________________________________________
Planning division: ____________________________ Date: __________________ 9/19
Page 160 of 219
March 30, 2026
City of Farmington
Attn: Tony Wippler
Planning Manager
430 Third Street
Farmington, MN 55024
Via Email
TWippler@FarmingtonMN.gov
Re: MNLCO Farmington, LLC and MNLCO Farmington Two, LLC – Final Plat Extension
Dear Mr. Wippler:
We represent MNLCO Farmington, LLC and MNLCO Farmington Two, LLC (“Tract”) regarding the
Final Plat of Farmington Technology Park (“Plat”) approved by the City of Farmington (“City”) on
November 18, 2024.
Due to the intended phasing of the Tract project ("Project") and the ongoing litigation against the City
and Tract, Tract is requesting to bifurcate the original Final Plat into a 1st Addition, which includes the
former Fountain Valley Golf Course, and a 2nd Addition, which includes the Farmington Public Schools
property. This bifurcated approach will allow Tract to record the Development Agreement against the
Fountain Valley Golf Course property and commence preliminary site work.
In order to accommodate these delays and in accordance with the Farmington Code of Ordinances,
section 11-2-3(E), Tract is requesting approval of a one (1) year Final Plat recording deadline extension
for the 2nd Addition to April 20, 2027.
In coordination with City staff, Tract is also seeking minor amendments to the Development Agreement
to accommodate the bifurcation of the Plat and to reflect the delays caused by the current litigation.
Please contact me with any questions about this request.
Sincerely,
Jacob W. Steen, for
Larkin Hoffman
Direct Dial: 952-896-3239
Direct Fax: 952-842-1738
Email: jsteen@larkinhoffman.com
cc: Client
4928-3538-1915, v. 1
Page 161 of 219
Page 162 of 219
Page 163 of 219
Page 164 of 219
Page 165 of 219
3200 Cherry Creek S Drive, Suite 700
Denver, CO 80209
www.tract.com 1
March 30, 2026
VIA EMAIL
Re: Farmington Technology Park
Dear Mayor Lien and Councilmembers:
Tract is pleased to provide an update on the development of the Farmington Technology Park and
our work toward bringing new jobs and an expanded tax base to the City.
On February 10, 2026, we closed on the purchase of the former Fountain Valley Golf Course
located at 2830 220th Street W. We are contracted to close on the adjacent former Angus
Properties, owned by Farmington Area Public Schools (“FPS”), Independent School District 192
school property, all as described under the Final Plat approved by City Council on November 18,
2024. In November and December of 2024, the City Council approved the Final Plat and the
Development Agreement outlining Tract’s horizontal development plans for the Farmington
Technology Park. The Development Agreement, which contemplates phased development upon
rezoning, was approved by the City on November 4, 2024, following environmental reviews
completed months earlier. On April 7, 2025, City Council approved a request allowing for an
extension to the recording of the Final Plat to May 18, 2026.
The phased acquisition and preparation of these two properties has always been our plan. In order
to accommodate the phased recording of the plat and Development Agreement, we have submitted
the enclosed amended Final Plat that separates the Fountain Valley Golf Course property and the
School District’s property. In consultation with the City Attorney, we also have requested minor
amendments to the Development Agreement to accelerate our financial obligations to the City and
simultaneously relieve the City of some of its obligations in order to align fully with the timeline
for phased development. Tract’s plans for the Farmington Technology Park have not changed, and
neither has Tract’s commitment to be a good neighbor to the Farmington community.
Tract appreciates its partnership with the City and commends the City Councilmembers for their
continued faith in Tract and the Council’s principled approach to this project. As the City knows,
Tract is a Denver-based land acquisition and development company that employs a highly
experienced team of experts knowledgeable about the construction and operation of data centers.
Although not itself a data center builder or operator, our focus is on hyper-scalers whose data
centers use state of the art technology. Tract acquires and prepares property for the physical
development of data centers by these end-users, and we are committed to bearing the additional
Page 166 of 219
3200 Cherry Creek S Drive, Suite 700
Denver, CO 80209
www.tract.com 2
costs of infrastructure to service these end-users and to ensure these costs do not fall to the
community to bear. Tract designs, funds, and constructs all on-site development improvements
i.e., utilities, infrastructure, stormwater, roads, etc. in preparation for the needs of end-users who
will build and operate the data center. For its part, the City is taking on the work planning major
wet utility improvements near the Farmington Technology Park, and Tract will be paying our fair
share of the improvements based on estimated usage through the City’s SAC and WAC fees. Tract
is equally committed to ensuring all applicable environmental regulations are followed and to
using renewable energy sources as specified under utility contracts, as well as partnering with local
schools and other civic organizations to provide monetary contributions and other support.
Through the Farmington Technology Park project, the Council has supported Tract’s planned
purchase and development of three parcels: (1) PID No. 14-00500-01-012, addressed as 2830
220th Street W. (the “Golf Course Property”); (2) PID Nos. 07-00500-76-012 and 07-00500-76-
011, collectively addressed as 2806 225th Street W. (the “School District Property”). Those three
parcels were previously annexed from Castle Rock into the City’s boundaries. We are cognizant
of the uses to which these properties were committed, the resources and burdens they used, and
how we can improve the water, power and chemical impact they imposed—particularly with
respect to the Golf Course property. The Farmington Technology Park will create hundreds of
high-wage permanent jobs and construction jobs, increase the local tax base by millions of dollars,
and catalyze regional economic growth.
Consistent with the City’s adoption of the 2040 Comprehensive Plan, and the Metropolitan
Council’s approval of that Comprehensive Plan, the three parcels that make up the Farmington
Technology Park have been rezoned Mixed Use Commercial/Industrial (“MUCI”). The City has
completed an Alternative Urban Areawide Review (“AUAR”) environmental study that confirms
the Farmington Technology Park is aligned with Minnesota’s environmental conservation goals.
Contrary to the misinformation spread by a few on social media, the process for approval of the
Farmington Technology Park was conducted under the sunshine of public scrutiny. Over the
course of several open and public meetings, Tract shared its development plans with the Council
who then cast votes that reflected the will of the majority of Farmington residents and the best
interests of the community. As a show of its continued support of the City, Tract completed the
purchase of the Golf Course Property on February 6, 2026. Tract’s purchase allows the Olsons to
begin their retirement, an outcome for which the Olsons have loudly pleaded since at least 2015
when a prior sale of their land was blocked by the same handful of vocal citizens who stand in
opposition to the Farmington Technology Park.
At the time the Development Agreement was negotiated and approved by the Council, neither
Tract nor the City had anticipated that this handful of vocal citizens would bring meritless legal
action seeking to undo the City’s democratic processes—legal action which is based entirely on
Page 167 of 219
3200 Cherry Creek S Drive, Suite 700
Denver, CO 80209
www.tract.com 3
social media misinformation spread by a loud minority. In public service to their constituents, the
Council has consistently recognized the Farmington Technology Park as a catalyst for billions of
dollars of investment in the City. Tract is confident that the City will prevail in the lawsuit brought
by Castle Rock Township, and the Court will affirm the City’s land use planning authority over
the Golf Course Property—a property that was annexed two decades ago—and the School District
Property, which was annexed in 2024 without objection by Castle Rock. Tract stands behind the
City of Farmington in its legal fight and empathizes with the Castle Rock taxpayers who are being
required to foot the bill of this meritless action.
Sadly, the vocal few are intent on holding that stimulus hostage. The Coalition’s preconditions
demonstrate their intent to turn Tract’s willingness to compromise into a theater for public
spectacle—a tactic with which the Council is unfortunately familiar. The Council undoubtedly
recognizes the actors who purport to lead the Coalition as those same actors who have spent more
than two decades opposing various development opportunities on these very same properties—
opportunities that would provide significant benefits to both the Farmington and Castle Rock
communities.
The amendments before the City Council split the Development Agreement and the Final Plat into
two self-contained packages that reflect the “1st Addition” development on the Golf Course
Property and the “2nd Addition” developments on the School District Property. To be clear, the
amended Development Agreement and Final Plat are substantively identical to the contract and
plat that the Council has already reviewed and approved, only dividing the parcels into the two
phases that we will separately record. The Council’s approval of those minor, non-substantive
amendments will facilitate “Phase One” of development with respect to the 1st Addition on the
Golf Course Property. Specifically, the Council’s approval will allow Tract to record the
Development Agreement and the Final Plat against the Golf Course Property immediately, while
allowing Tract to later record the same Development Agreement and Plat against the School
District Property after it has acquired title to that parcel. In conjunction with recording the 1
st
Addition Plat, Tract will pay the City $315,158.87 for the Public Land Dedication Fee, dedicate
Right of Way for a future extension of Biscayne Ave., and dedicate a 2-acre property for a future
municipal water storage tank. When the 2nd Addition Plat is recorded at a future date, Tract will
pay $254,559.75 for the Public Land Dedication Fee commensurate with that property and also
record a conservation easement over the Vermillion River, which includes the floodplain and
wetlands associated with that portion of the riverine system.
Tract is eager to proceed with development of the Golf Course Property, and Tract’s amendments
to the Development Agreement and the Final Plat seek to expedite an already approved project
that will inject billions of dollars into the Farmington community. Tract also remains open to a
path that would resolve the litigation, the daily costs of which are being borne by the taxpayers. In
Page 168 of 219
3200 Cherry Creek S Drive, Suite 700
Denver, CO 80209
www.tract.com 4
the meantime, Tract is dedicated to educating the community on the benefits of this project,
working with the community to address any concerns before construction begins, and dispelling
the myths that continue to swirl on social media. To aid in this effort, Tract launched a Farmington
Technology Park website (www.mnlcoFarmington.com) with information about the project. The
website, which Tract will update as the development proceeds, will provide a forum for the
Farmington community to respectfully engage directly with Tract representatives on the
Farmington Technology Park project. Importantly, this website, along with the proposed phased
approach, will allow Tract to work directly with the Farmington community to address potential
concerns about the Technology Park before construction begins. Tract looks forward to closing on
the School District Property and begin development of the “Phase Two” 2nd Addition in earnest.
Tract’s $18 million purchase of the School District Property, once completed, will inject
approximately $3,000 per student into the school district that serves the children of both
Farmington and Castle Rock.
The crucial next step in development is approval of the Final Plats reflecting the acquisition of the
Golf Course Property to set the stage for closing on the School District Property. Staff has reviewed
and recommended that the project proceed and we ask the Council to approve the phased Plats for
the Farmington Technology Park 1st Addition and Farmington Technology Park 2nd Addition as
well as the amendments to the Development Agreement to allow Tract’s early payment to the City
of the dedication fees and relief from the City’s immediate development costs. We also request
that Council allow one year to record the Farmington Technology Park 2
nd Addition Plat, by which
time we all will have more certainty on the litigation. This will bring the Farmington Technology
Park to the Farmington community and provide the Farmington community with the benefits that
have justified the Council’s support throughout this process.
Sincerely,
Graham Williams
President – Tract
Page 169 of 219
CITY OF FARMINGTON
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2026-035
A RESOLUTION APPROVING AND AUTHORIZING
SIGNING OF THE FARMINGTON TECHNOLOGY PARK
1ST AND 2ND ADDITION FINAL PLATS
WHEREAS, the final plats for Farmington Technology Park 1st and 2nd
Additions are now before the City Council for review and approval; and
WHEREAS, a public hearing of the Planning Commission was held for the
preliminary plat on September 10, 2024 after notice of the same was published in
the official newspaper of the City and proper notice sent to surrounding owners;
and
WHEREAS, the Planning Commission reviewed the Farmington Technology
Park 1st and 2nd Addition final plats on April 14, 2026 and recommended approval
of the final plats; and
WHEREAS, the City Council reviewed the final plats; and
WHEREAS, the City Engineer has rendered an opinion that the proposed
plat can be feasibly served by municipal services.
NOW, THEREFORE, BE IT RESOLVED, that the final plats for Farmington
Technology Park 1st Addition and Farmington Technology Park 2nd Addition be
approved and that the requisite signatures are authorized to be affixed to the
final plats.
Adopted by the City Council of the City of Farmington, Minnesota, this 20th day of
April 2026.
ATTEST:
____________________________ ______________________________
Nicholas Lien, Mayor Melissa Geis, City Clerk
Page 170 of 219
CITY OF FARMINGTON
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2026-036
A RESOLUTION ALLOWING AN EXTENSION FOR
THE RECORDING OF THE FINAL PLAT
FARMINGTON TECHNOLOGY PARK 2ND ADDITION
WHEREAS, pursuant to Resolution 2026-035, the City Council approved the
Final Plat of Farmington Technology Park 2nd Addition; and
WHEREAS, the Developer of Farmington Technology Park 2nd Addition has
requested the City Council approve an extension for filing a final plat at Dakota
County.
NOW, THEREFORE, BE IT RESOLVED, that after due consideration, the
requested extension for filing of the Farmington Technology Park 2nd Addition final
plat with Dakota County to April 20, 2027 is hereby approved.
Adopted by the City Council of the City of Farmington, Minnesota, this 20th day of
April 2026.
ATTEST:
____________________________ ______________________________
Nicholas Lien, Mayor Melissa Geis, City Clerk
Page 171 of 219
CITY OF FARMINGTON
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2026-037
A RESOLUTION APPROVING DEVELOPMENT CONTRACT
FARMINGTON TECHNOLOGY PARK 1ST ADDITION
WHEREAS, pursuant to Resolution 2024-99, the City Council approved the
Preliminary Plat of Farmington Technology Park; and
WHEREAS, pursuant to Resolution 2026-035, the City Council approved the
Final Plat of Farmington Technology Park 1st Addition; and
NOW, THEREFORE, BE IT RESOLVED, that Farmington Mayor and City Council
hereby:
1. Approve the Development Contract for the Farmington Technology
Park 1st Addition in substantially the form submitted.
2. The Mayor and City Clerk are hereby authorized and directed to
execute the Development Contract on behalf of the Council.
3. Staff is permitted to execute other relevant documents to effectuate
this approval.
Adopted by the City Council of the City of Farmington, Minnesota, this 20th day of
April 2026.
ATTEST:
____________________________ ______________________________
Nicholas Lien, Mayor Melissa Geis, City Clerk
Page 172 of 219
CITY OF FARMINGTON
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2026-038
A RESOLUTION APPROVING DEVELOPMENT CONTRACT
FARMINGTON TECHNOLOGY PARK 2nd ADDITION
WHEREAS, pursuant to Resolution 2024-99, the City Council approved the
Preliminary Plat of Farmington Technology Park; and
WHEREAS, pursuant to Resolution 2026-035, the City Council approved the
Final Plat of Farmington Technology Park 2nd Addition; and
NOW, THEREFORE, BE IT RESOLVED, that Farmington Mayor and City Council
hereby:
1. Approve the Development Contract for the Farmington Technology
Park 2nd Addition in substantially the form submitted.
2. The Mayor and City Clerk are hereby authorized and directed to
execute the Development Contract on behalf of the Council.
3. Staff is permitted to execute other relevant documents to effectuate
this approval.
Adopted by the City Council of the City of Farmington, Minnesota, this 20th day of
April 2026.
ATTEST:
____________________________ ______________________________
Nicholas Lien, Mayor Melissa Geis, City Clerk
Page 173 of 219
1
238900v5
DEVELOPMENT CONTRACT
DEVELOPMENT CONTRACT dated this _____ of 20
between the CITY OF FARMINGTON
1. Request for Plat and Planned Unit Development Approval. The Developer has asked the City to approve a
on November 18, 2024 under Ordinance No. 2024- a revised plat for FARMINGTON
TECHNOLOGY PARK 1ST ADDITION (also referred to in this Agreement as the ). The land is situated in the
City of Farmington, County of Dakota, State of Minnesota, and is legally described on the attached Exhibit A (the
as FARMINGTON TECHNOLOGY PARK 1ST ADDITION and FARMINGTON TECHNOLOGY PARK 2ND ADDITION.
2. Conditions of Approval. The City hereby approves the Plat on the conditions that:
a) The Developer enter into this Agreement; and
b) The Developer provide the necessary Security, as described hereafter, in accordance with the terms of this
Agreement; and
c) The Developer satisfy the Development Fees, as described hereafter, in accordance with the terms of this
Agreement; and
d) All engineering issues must be reviewed and approved by the engineering department prior to
commencement of construction; and
e) Lot 2, Block 1, Farmington Technology Park 1st Addition, shall be conveyed to the City by warranty deed.
The deed shall be recorded with Dakota County Recorder with the plat mylars; and
f) The Developer records the Plat with the County Recorder or Registrar of Titles within six months of all
signatories' signatures on the final plat, as required by Minnesota law.
3. Right to Proceed. Within the Plat, the Developer may not grade or otherwise disturb the earth or remove trees,
unless a grading permit has been authorized in writing by the City Engineer. In addition to the requirements for
Phase 1 Preliminary Grading, as is defined and set forth more fully in this Agreement, the Developer must satisfy
the following conditions:
a) This Agreement has been fully executed by both parties and submitted for recording with the Dakota
Page 174 of 219
2
238900v5
b) The necessary Security has been received by the City; and
c) The necessary insurance for the Developer and its construction contractors has been received by the City;
and
d)
e) A deed shall be provided for Lot 2, Block 1, Farmington Technology Park 1st Addition, which shall be
submitted for recording with the plat mylars; and
f) A copy of permits required for Phase 1 Preliminary Grading have been provided.
Except for the Phase 1 Preliminary Grading, the construction of private improvements or any building in any future
Phase, as defined below, shall not commence until all of the requirements of a Development/Site Plan and a Site
Improvement/Performance Agreement for such Phase have been satisfied.
4. Phased Development. The Developer may develop the Project and, specifically, any Private Improvements
(defined below) including, without limitation, any buildings within the Project, in multiple phases (each a
.
performed in conformance with City Code Chapter 3-
of development shall be subject to all of the requirements set forth in
Sections 6 and 7 of this Agreement. Except for the Public Improvements (defined below) and Phase 1
Preliminary Grading, and any work related to utility extensions, no construction of Private Improvements, or
other development may occur until a Site Plan for such Phase has been approved by the Planning Commission
and a Site Improvement/Performance Agreement has been approved by the City Council, executed and
recorded.
5. Changes in Official Controls. For eight (8) years from the Effective Date of this Agreement, no amendments to
the Comprehensive Plan or official controls shall apply to or affect the use, development density, lot size, lot
layout or dedications or platting required or permitted by the approved Plat and PUD unless required by State
or Federal law or agreed to in writing by the Parties and except amendments placing this Plat in the current
urban service area. Thereafter, notwithstanding anything in this Agreement to the contrary, to the full extent
permitted by City, State, and Federal law, the City may require compliance with any applicable amendments to
controls,
platting or dedication requirements therein, enacted after the Effective Date. Notwithstanding the foregoing or
anything to the contrary herein, and notwithstanding any such subsequent amendments, the Parties agree that
upon commencement of any
rights under the PUD and this Agreement, including but not limited to, land use, building area, design standards,
shall vest to the entirety of the Property, including any platted or unplatted land. The City and Developer
recognize and agree that due to the phased nature of the Project, the entire Property shall be a single use under
Minnesota law and any non-use of any portion of the Property shall not constitute a discontinuance of any
portion of the Project. This provision shall survive the expiration of this Agreement.
6. Development/Site Plans. Except for Phase 1, each Phase shall be developed subject to an approved Site Plan,
under City Code Section 10-6-23, which shall be reviewed and approved by the Planning Commission for
consistency with the PUD. The Planning Commission shall approve the Site Plan in accordance with the adopted
PUD conditions. Prior to approval of a Site Plan for a Phase, the Developer must prepare the following plans for
review and approval by the City for the requisite Phase:
a) Site Plan
b) Final Grading Plan
c) Erosion and Sediment Control Plan
d) Utility Plan
e) Private Roadway Paving, Signage, and Striping Plan
f) Landscape Plan
g) Building Elevations
Page 175 of 219
3
238900v5
7. Site Improvement/Performance Agreement. Except for Phase 1, each Phase shall be subject to a Site
Improvement/Performance Agreement detailing the details of such Phase including, but not limited to,
calculation and payment of fees, installation of public and private improvements, and timing of construction,
and each of which shall include, at a minimum, the terms and provisions set forth on Exhibit E attached hereto.
The Site Improvement/Performance Agreement shall be executed and recorded against the Property which is
subject to such Phase.
8. Easements. The Developer shall furnish to the City a long-term maintenance agreement, delivered to the City
municipal
separate storm sewer system or not, for purposes of ensuring maintenance and inspection of the facilities and
allowing the City to enter the property to maintain, inspect, and/or repair any such systems if not adequately
maintained and repaired by Developer.
9. Required Public Improvements.
a) The Developer shall install and pay for the improvements to 220th Street West shown on sheet R1 of the Final
PUD Plan Set and improvements to Chippendale Avenue West shown on sheet R2 of the approved Final PUD
the Public Improvements set forth in the Final PUD Plan Set are preliminary and the final scope, design and plans
for the Public Improvements shall be set forth in public roadway construction plans and drawings for such Public
b) The Public Improvements shall be installed in accordance with the Construction Plans, and in accordance with
all applicable laws, City Standards, Engineering Guidelines, Ordinances and Construction Plans, which have been
or will be prepared by a competent registered professional engineer furnished to the City and reviewed by the
City Engineer. Work done not in accordance with the Construction Plans, without prior authorization of the City
Engineer, shall be considered a violation of this Agreement and a Default of the Agreement and, subject to
applicable notice and cure periods in Section 31, an Event of Default. The Developer shall obtain all necessary
permits from the Metropolitan Council and other agencies before proceeding with construction of the Public
Improvements. The Developer shall instruct its engineer to provide adequate field inspection personnel to
that the construction work is consistent with the approved Plans and meets the approved City standards as a
have one or more City inspector(s) and a soil engineer inspect the work on an as-needed basis. The Developer,
in accordance
with the Plans, and all applicable laws and City Standards -site
project management.
-
construction meeting at a mutually agreeable time at City Hall with all parties concerned, including the City staff,
to review the program for the Public Improvements. Within sixty (60) days after the completion of the Public
Improvements and before the Security is released, the Developer shall supply the City with a complete set of
-with
Guidelines. If the Developer does not provide such information, the City will produce the As-Built drawings and
all costs associated with producing the As-Built drawings will be the responsibility of the Developer.
c) Before the Security for the completion of any Public Improvements is released, iron monuments must be
City certifying that the monuments have been installed. Each Site Performance/Improvement Agreement shall
require the same language regarding release.
d). Security may be required as part of future Site Improvement/Performance Agreements pursuant to
applicable City laws, rules and regulations and Section 7 and Exhibit E of this Agreement.
Page 176 of 219
4
238900v5
10. Ownership of Public Improvements. Upon the completion of the Public Improvements constructed by
Developer and written acceptance by the City Engineer, the Public Improvements lying within city easements
shall become City property, except for cable TV, electrical, gas, and telephone, without further notice or action.
11. Private Improvements for Phased Development.
a) Private Improvements Defined. The Parties agree and acknowledge that all other improvements
constructed on the Property that are not Public Improvements shall be considered private improvements
d constructed
in accordance with the Site Improvement/Performance Agreement that is applicable to each Phase. Private
Improvements do not include the Phase 1 Preliminary Grading.
b) Phase 1 of Development. As provided in Section 4 of this Agreement, Phase 1 Preliminary Grading for the
Property may be allowed in accordance with this paragraph, which shall satisfy City Code Chapter 3-24.
Prior to the commencement of any Phase 1 Preliminary Grading, the Developer must obtain written
authorization from the City Engineer to proceed with such preliminary grading activity. To obtain such
written authorization, the Developer shall submit all of the following for review by the City Engineer:
1)
preliminary grading work, and contact information for the contractor(s);
2) For property not owned by the Developer in fee title, the written consent of the fee owner of the
property for preliminary grading to occur on their property;
3) A tree survey indicating the location of all trees over six caliper inches and a plan for protecting and
preserving as many trees as is feasible;
4) A narrative description of the purpose of the preliminary grading; the type and quantity of any material
that will be brought onto the property, if any; the estimated time required to complete the preliminary
grading; and an acknowledgment by the Developer that any preliminary grading may be subject to
removal or modification, at Developer's sole cost and expense, as part of a future Phase of
development;
5) Full engineering plans for all preliminary grading work which shall conform to the City of Farmington
Engineering Guidelines, including, but not limited to, SWPPP plans, and plans for drainage and erosion
control, sedimentation and dust control;
6) Drawings depicting the contour of the land prior to the preliminary grading and depicting the proposed
contour after the completion of the of the preliminary grading, and any proposed landscaping or
berming;
7) Maps or drawings depicting any existing wetlands as defined by federal or state law;
8) Copies of applicable permits, if any;
9) Any other plans and/or information reasonably required by the City Engineer to ensure protection of
the health, safety, and welfare of the community during Phase 1;
10)
11) Deposit of funds to be escrowed for the cost of engineering review and administration in an amount
equivalent to 3% of the value of the preliminary grading project;
12) Deposit of funds to be escrowed for the cost of construction observation in an amount equivalent to
5% of the value of the preliminary grading project; and
13) Security in the form of a letter of credit in an amount equivalent to 125% of the value of the preliminary
grading project.
All work related to the Phase 1 Preliminary Grading shall comply with the time limitations set forth in Section
32.e) of this Agreement. Except as otherwise approved in conjunction with the Phase 1 Preliminary Grading, no
roads; curbing; impervious surfaces for parking or other purposes, except construction parking is allowed on the
Property during Phase 1.
Page 177 of 219
5
238900v5
Within 30 days of receipt of the foregoing, the City Engineer will notify the Developer of any incomplete or
missing information that is necessary to complete the technical review of the request. Upon receipt of all
information that is necessary to complete the technical review of the request, the City Engineer will transmit
written authorization to proceed to the Developer. No Phase 1 Preliminary Grading may proceed until such
written authorization to proceed is sent to the Developer by the City Engineer.
c) Subsequent Phases of Development. All Phases of development after Phase 1 shall be subject to the review
requirements of Sections 6 and 7 of this Agreement, and in compliance with all other requirements set forth
in this Agreement and all applicable City Code provisions and state or federal law.
Notwithstanding any other provisions of this Agreement, as part of the Phase 1 Preliminary Grading, the
Developer may install landscaping, berming, and construct private roads to make the Property accessible, and
preliminary utility work to make the Property construction-ready. Developer agrees and acknowledges that all
final approval to the extent that such Phase 1 Preliminary Grading is modified by any subsequent Phase.
12. City Infrastructure.
a) The Parties acknowledge that the proposed development of this Property requires critical water and
Minnesota Department of Health, Minnesota Pollution Control Agency, the Minnesota Department of
State Agencies, the City is committed to providing water and sewer services as development progresses.
b) [Reserved.]
c) In addition to any other improvements, infrastructure, or work required under this Section 12, pending
state agency approvals, including approvals from the Metropolitan Council, the City shall provide items 1)
4) below, in order to service the Property and the anticipated demands set forth in Exhibit B by the
deadlines in Exhibit B. In the event of delays caused by litigation and subject to Force Majeure Items
(defined below), any deadlines in this Section 12 and Exhibit B may be extended by mutual agreement of
the City and Developer. Unless extended as provided in this Section 12.c), the schedule shall be as follows:
1) Sanitary Sewer stubbed to the Property line in a mutually agreeable location, approved in writing by
City and Developer by January 1, 2029, for construction purposes.
2) Water Main extension stubbed to the Property line in a mutually agreeable location, approved in
writing by City and Developer by January 1, 2029, for construction purposes.
3) Sanitary Sewer Trunk Improvements located within Biscayne Avenue right-of-way adjacent to the
Property by the Initial Capacity Request date of December 31, 2030, as shown in Exhibit B.
4) Water Trunk Main adjacent located in the 220th Street West, 225th Street West and Biscayne Avenue
rights-of-way adjacent to Lot 1, Block 1, Farmington Technology Park 1st Addition by the Initial Capacity
Request date of December 31, 2030, as shown in Exhibit B.
d) The Developer shall timely update the City in writing regarding any changes to capacity needs that may
c)1) 12.c)4) above.
e) City shall not be liable to Developer for nonperformance or delay of construction of the infrastructure
required under this Section 12 by Acts of God; casualty; insurrection; strikes; war; terrorism; lockouts;
pandemic; public utility interruptions; governmental order (including health orders); delayed approvals or
denials of State Agencies, including the Metropolitan Council and
Section 12; labor disputes; adverse weather conditions which could not reasonably be anticipated; or any
Page 178 of 219
6
238900v5
f)
Project shall not exceed the allowed water usage set forth in Exhibit B and, in any event, shall not exceed
fifty million (50,000,000) gallons in any calendar year. Nothing in this Agreement shall be construed as a
or liability is created beyond that required by applicable Minnesota law and as may be limited by the terms
.
13. Permits. For all Phases of development, including Phase 1, the Developer shall obtain or require its contractors
and subcontractors to obtain all applicable necessary permits, which may include but are not limited to:
a) Dakota County for County Road Access and Work in County Rights-of-Way
b) MnDOT for State Highway Access and Work in State Rights-of-Way
c) Minnesota Department of Health for Watermains
d) MPCA NPDES Permit for Construction Activity
e) MPCA for Sanitary Sewer and Hazardous Material Removal and Disposal
f) MnDNR for Dewatering and well appropriation permitting
g) City of Farmington for Building Permits
h) MCES for Sanitary Sewer Connections
i) City of Farmington for Retaining Walls
j) City of Farmington for Road and Utility Work in City Rights-of-Way
14. Right-of-Way Utility Connections. The City acknowledges that Developer will require underground utility
connections across the right-of-way for 225th Street West to accommodate private utilities including, but not
limited to, water, sewer, fiber, and electric. The Parties agree to coordinate construction and permitting of any
such utility installation to minimize the duration of road closures.
15. Grading Plan. The Site Plan for each Phase after Phase 1 shall be graded, and drainage provided in accordance
with the approved Erosion and Sediment Control Plan and Grading Plan for such Phase. The Plan shall conform
to the City of Farmington Engineering Guidelines. Before the City approves the certificate of occupancy for
individual buildings the Developer shall provide the City with an As-Built grading plan certified by a registered
land surveyor or engineer. The As-Built plan shall include field verified elevations of the following: a) cross
sections of stormwater treatment/infiltration basins; b) location and elevations along all swales, wetlands,
wetland mitigation areas, if any; c) locations and dimensions of borrow areas/stockpiles, and installed
posts; and e) lot corner elevations and building pads; and f) all other applicable items
listed in City Code. The City will withhold issuance of a certificate of occupancy until the approved certified
grading plan is on file with the City and all erosion control measures are in place as determined by the City
Engineer, as otherwise agreed to by City and Developer.
If the Developer needs to modify the grading in a manner that would significantly impact the drainage plan, the
grading changes cannot take place until the City Engineer has approved the proposed changes. A MPCA
Construction Storm Water Permit must be obtained before any grading can commence on the site.
16. Erosion and Sediment Control. Prior to initiating site grading for each Phase after Phase 1, the Erosion and
Sediment Control Plan for such Phase shall be implemented by the Developer and inspected and approved by
the City. The City may impose additional erosion and sediment control requirements if it is determined that the
methods implemented are insufficient to properly control erosion and sedimentation. All areas disturbed by
the grading operations shall be stabilized per the MPCA Stormwater Permit for Construction Activity. Seed shall
be installed , which may include temporary seed to
provide ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched and disc anchored as
necessary for seed retention. The parties recognize that time is of the essence in controlling erosion and
sedimentation. If the Developer does not comply with the MPCA Stormwater Permit for Construction Activity
or with the erosion and sediment control plan and schedule, or supplementary instructions received from the
City, or in an emergency determined at the sole discretion of the City, the City may take such action as it deems
Page 179 of 219
7
238900v5
appropriate to control erosion and sedimentation immediately, without notice to the Developer. Charges for
corrective actions taken by the City or their contractor, will be charged to the SWPPP compliance escrow; the
Developer is responsible for maintaining a balance of $25,000 in this escrow. This applies to all properties
within the development, whether owned by the Developer. The City will endeavor to notify the Developer in
advance of any proposed action, but failure of the City to do so will not aff
rights or obligations hereunder. If the Developer does not reimburse the City for any costs the City incurred for
such work within forty-five (45) days, the City may draw down the security to pay such costs. No development,
utility or street construction will be allowed, and no building permits will be issued unless the Plat or applicable
portion thereof is in full compliance with the applicable erosion and sediment control requirements.
17. Wetland Natural Area Signs. The Developer is responsible for installing City natural areas signs around all
buffer line limits and natural area sign locations must be indicated on individual lot surveys prior to the issuance
of a building permit for that Phase.
18. Development Fees. The Project shall be subject to the cash-in-lieu park dedication fee set forth in this Section
18 below, and the following fees that would otherwise be collected as a part of this Agreement but for the
Phasing: Surface Water Quality Management Fee, Surface Water Management Fee, Watermain Trunk Area
Charge, and Sanitary Sewer Trunk Area Charge (collectively, ), which shall be calculated for
each Phase rather than included in this Agreement. Except the cash-in-lieu park dedication fee, which shall be
paid prior to recording of the Plat, the Development Fees shall be paid prior to the recording of each Site
Improvement/Performance Agreement. The Development Fees for each Phase shall be calculated based on the
gross acreage developed in such Phase if acreage is material to the calculation. The Development Fees for the
Project and, specifically, each particular Phase, shall be the fees applicable to and required for such Phase under
applicable City and State of Minnesota codes, laws, rules and regulations, and specifically the Development Fees
as defined and listed in the first sentence above. In the event the City reduces any of the Development Fees
prior to approval of any Phase, the lesser fee shall apply, and provided further that the City and Developer may
agree to lesser Development Fees in the Site Improvement/Performance Agreement. The Developer is required
to dedicate a total of 13.115 acres of land for park purposes for and for Farmington Technology Park 2nd
Addition, collectively , but will pay cash-in-lieu in satisfaction of the park dedication requirement for the entire
Project. The cash-in-lieu amount for the entire Project is $569,718.62, based on the appraised value of the land,
with $315,158.87 for Farmington Technology Park 1st Addition and $254,559.75 for Farmington Technology
Park 2nd Addition. The entire cash-in-lieu amount for each Addition shall be paid in full prior to the release
for recording of the plat mylars for each Addition, respectively.
19. Biscayne Right-of-Way Easement. The Developer shall convey by dedication the 75-foot-wide Biscayne right-
of-ROW along the eastern property boundary of Lot 1, Block 1, Farmington Technology Park
1st Addition, pursuant to and as depicted on the Plat, to the City. Developer shall also dedicate to the City the
conservation easement as depicted on the Plat pursuant to a separate easement agreement in a form and with
such contents agreed to and approved by each of the City and Developer.
20. Water Storage Dedication; Substation Parcels.
a) Concurrent with recording of the Plat, Developer shall convey by deed Lot 2, Block 1, Farmington
the Plat, by Warranty Deed to the
City, free and clear of all encumbrances except for matters of record, any other exception noted in the title
commitment for the applicable portion of the Property and the covenant and restriction that the Water
Storage Parcel shall be used exclusively for water utility purposes. Subject to any required approvals from
DNR under applicable laws, rules or regulations, Developer shall have the right to utilize water from on-site
production wells for construction purposes. At the time new water mains are installed and charged, on-site
wells will be decommissioned and capped per Minnesota statutes.
b)
to approval by the utility authority and any other permits and approvals required by the City for the
construction of a substation. The City acknowled
Page 180 of 219
8
238900v5
electricity, power and utility services to the Project. The Parties acknowledge and agree that, for the
avoidance of doubt, and notwithstanding that a substation is an accessory use as set forth in the PUD, a
substation may be permitted, approved and constructed prior to the permitting, approval and/or
construction of the Project Phase of which the substation is a part so long as the substation is not in
commercial operation until Site Plan approval for such Phase.
21. Clean Up. The Developer shall, within twenty-four (24) hours, clear from the public streets any soil, earth or
debris resulting from construction work by the Developer or its agents or assigns. Any soil, earth or debris
resulting from construction work by the Developer or its agents or assigns on other property shall be removed
weekly or more often if required by the City Engineer and managed in accordance with the approved Erosion
and Sediment Control Plan. All debris, including brush, vegetation, trees and demolition materials, shall be
disposed of off-site. Burning of trees and structures shall be prohibited, except for fire training only. If
Developer fails to clear public streets as required in this Section and such failure is not cured within twenty-four
(24) hours of written notice to Developer, the City will have the right to clean the public streets as outlined in
current City policy and the Developer shall promptly reimburse the City for street cleaning costs.
22. License. The Developer hereby grants the City, its agents, employees, officers and contractors, a license to enter
the Property to perform all necessary inspections deemed appropriate by the City during the installation of
erosion control and grading on the Property or the installations of improvements listed in Exhibit E in connection
with a Phase by the City with at least forty-eight (48) hours prior notice to Developer, if the inspection is a non-
emergency. Whether or not an inspection is an emergency is determined at the sole discretion of the City. The
license shall be limited to those Phases that require any such erosion control and grading and improvements
listed in Exhibit E. The license shall be limited to only those portions of the Property on which such
improvements listed in Exhibit E are being installed and any adjacent portions of the Property reasonably
necessary for purposes of accessing the same and shall expire after the improvements listed in Exhibit E are
installed pursuant to the applicable Site Improvement/Performance Agreement are accepted by the City.
23. Time of Performance. Subject to Developer Force Majeure Items (defined below), the Developer shall: (a)
commence the final design and permitting of Public Improvements within 90 days of the Effective Date, and; (b)
install all required Public Improvements prior to the earlier of November 30, 2029, or the issuance of the first
final grading permit, with the exception of the final wear course of asphalt on streets. The final wear course on
streets shall be installed between August 15th and October 15th the first summer after the base layer of asphalt
has been in place one freeze thaw cycle. The Developer may, however, request an extension of time from the
City. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to
reflect cost increases and the extended completion date. Final wear course placement outside of this time
frame must have the written approval of the City Engineer. Developer shall not be liable to City for
nonperformance or delay of construction of the Public Improvements by Acts of God, casualty, insurrection,
strikes, war, terrorism, lockouts, pandemic, public utility interruptions, governmental order (including health
orders), approvals of any City, State or Federal agencies, bodies or authorities, labor disputes, adverse weather
prohibited from drawing down the Security in the event that the City is notified of the intent to modify or cancel
the Security, unless such a modification or cancellation is agreed to by the parties.
24. Building Permits. Except where otherwise addressed under a Site Improvement/Performance Agreement,
which shall set forth a phasing plan for phased construction of multiple structures in a single Phase, or as set
forth in this Section 24 below, a certificate of occupancy shall not be issued prior to submittal of As-Built grading
plans, public and private utility installation, curb and gutter, installation of erosion control devices, installation
of permanent street signs and natural area signs, paving with a bituminous surface, retaining walls if any, site
agree that ongoing Site Work may occur within a Phase containing multiple structures, and that nothing in this
Page 181 of 219
9
238900v5
Agreement shall prohibit the issuance of a permanent or temporary certificate of occupancy for an individual
structure while ongoing Site Work is occurring in the Phase, so long as the structure can be occupied safely in
accordance with the Minnesota Building Code. In addition, notwithstanding anything to the contrary herein,
nothing in this Agreement including, without limitation, this Section 24 shall modify, amend, limit, alter or waive
the right of Developer to request and obtain, and the right of the C
a temporary certificate of occupancy under the Minnesota Building Code. Valuation for said buildings will be in
conformity with the Minnesota Building Code including M.S. 326B.148.
25. Insurance. Prior to construction of the Public Improvements by Developer, Developer and its general contractor
shall furnish to the City a certificate of insurance showing proof of the required insurance required under this
paragraph. Developer and its general contractor shall take out and maintain or cause to be taken out and
maintained until six (6) months after the City has accepted the Public Improvements, such insurance as shall
protect Developer and its general contractor and the City for work covered by the Agreement in the categories
and amounts described below. The minimum amounts of insurance shall be as follows:
Commercial General Liability (or in combination with an umbrella policy)
$2,000,000 Each Occurrence
$2,000,000 Products/Completed Operations Aggregate
$2,000,000 Annual Aggregate
The following coverages shall be included:
Premises and Operations Bodily Injury and Property Damage
Personal and Advertising Injury
Blanket Contractual Liability
Products and Completed Operations Liability
Automobile Liability
$2,000,000 Combined Single Limit Bodily Injury & Property Damage
Including Owned, Hired & Non-Owned Automobiles
Workers Compensation
Workers Compensation insurance in accordance with the statutory requirements of the State of Minnesota,
$500,000 Bodily Injury by Disease per employee
$500,000 Bodily Injury by Disease aggregate
$500,000 Bodily Injury by Accident
-
All insurance policies (or riders) required by this Contract shall be (i) taken out by and maintained with
responsible insurance companies organized under the laws of one of the states of the United States and
qualified to do business in the State of Minnesota, (ii) shall name the City, its employees and agents as additional
insureds (CGL and umbrella only) by endorsement which shall be filed with the City. A copy of the endorsement
must be submitted with the certificate of insurance.
notice for non-payment of premium.
policy limits on a follow-form basis to satisfy the full policy limits required by this Contract.
Page 182 of 219
10
238900v5
26. Responsibility for Costs. The Developer shall pay all actual costs incurred by it or the City in conjunction with
the development of the Plat, including but not limited to, Soil and Water Conservation District charges, legal,
planning, administrative, construction costs, engineering, easements, inspection and utility testing expenses
incurred in connection with approval, acceptance and development of the Plat, the preparation of this
Agreement, and all reasonable costs and expenses incurred by the City in monitoring and inspecting the
construction for the development of the Plat
Any such Reimbursement Costs shall be paid as follows: (a) Reimbursement Costs eligible to be charged to the
SWPPP compliance escrow pursuant to Section 16 above shall be paid using the SWPPP compliance escrow; (b)
Reimbursement Costs described in Section 27 below shall be paid using the Contract Administration fee under
Section 27; (c) and Reimbursement Costs described in Section 28 below, if eligible, shall be paid using the
Construction Observation escrow under Section 28, and; (d) with respect to any other Reimbursement Costs, or
any Reimbursement Costs described in the foregoing Sections 26(a), (b) or (c) which exceed or are not eligible
for the amounts of the SWPPP compliance escrow, Contract Administration fee under Section 27, or the
Construction Observation escrow under Section 28, as applicable shall be paid for by the Developer within forty-
five (45) days after receipt; (ii) if the bills are not paid on time, the City may halt all Plat development work until
the bills are paid in full; (iii) bills not paid within forty-five (45) days shall accrue interest at the rate of five
percent (5%) per annum, and; (iv) if the bills are not paid within sixty (60) days, the City has the right to draw
27. Development Contract Administration. The Developer shall pay a fee for in-house administration of this
Agreement including monitoring of construction observation, consultation with the Developer and its engineer
on the status of or problems regarding the Project, coordination for final inspection and acceptance, project
monitoring during the warranty period, and processing of requests for reduction in Security. The fee for this
service shall be three percent (3%) of estimated construction costs of the Public Improvements and paid prior
to commencement of construction of the Public Improvements.
28. Construction Observation. The Developer shall instruct its engineer to provide adequate field inspection
able to certify that all Public Improvements are consistent with the approved Plans and meets the approved City
standards as a condition of City acceptance. The Developer shall pay for construction observation performed by
-house staff or consultant. As needed, construction observation shall include part- or full -time
inspection of the Public Improvements, including erosion and sediment control inspections and will be billed on
hourly rates. Developer will provide a cash escrow for these services in the amount of 5% of estimated
construction costs of the Public Improvements prior to commencement of construction of the Public
Improvements. Developer shall also provide a $25,000 escrow for SWPPP compliance in accordance with
Sections 11 and 16 above and applicable City laws, rules and regulations. On or before the 10th day of each
month following the initial deposit of the Construction Observation escrow and/or SWPPP compliance escrow,
the City shall provide the Developer with a written description of all utilization of such escrow(s) and funds
therein during the preceding month, including amounts deducted from such escrow(s), City costs such amounts
were used to pay and total amount in each escrow at the beginning and at the end of such month.
29. Security. To guarantee compliance with the terms of this Agreement and payment of the costs of all Public
Improvements and all costs payable by Developer to the City under this Agreement and construction of all Public
Improvements, prior to recording of the Plat, the Developer shall furnish the City with a cash escrow, irrevocable
letter of credit, or alternative security acceptable to the City Administrator, from a bank
$2,297,375. The amount of the Security is based on 125% of the estimated construction costs as shown in Exhibit
C Developer and City may agree to update the Security amount based on construction bids accepted for the
Public Improvements. This breakdown is for historical reference; it is not a restriction on the use of the Security.
The bank and form of the Security, shall be subject to the approval of the City Administrator. Letters of Credit
shall be in the format and wording exactly as shown on the attached Letter of Credit form (Exhibit D). The
Security shall be automatically renewing. The term of the Security may be extended from time to time if the
Page 183 of 219
11
238900v5
extension is furnished to the City Administrator at least forty-five (45) days prior to the stated expiration date
of the Security. If the required Public Improvements are not completed, or terms of the Agreement are not
satisfied, at least thirty (30) days prior to the expiration of a letter of credit, the City may draw down the letter
of credit. The City may draw down the Security, without prior notice, for any violation of this Agreement or
Event of Default, in each event following applicable cure periods.
Engineer that Public Improvements have been completed in accordance with the Construction Plans, and terms
of this Agreement, that all payments, costs, fees, charges, expenses or other amounts for such completed Public
Improvements and any work in connection with the same have been paid in full, and that all outstanding
financial obligations to the City, subcontractors, or other persons have been satisfied, the City Engineer may
approve reductions in the Security provided by the Developer under this paragraph from time to time by ninety
percent (90%) of the cost of such Public Improvements that have been completed. Ten percent (10%) of the
amounts c
been completed, the required As-Built plans have been received by the City, a warranty security is provided,
and the Public Improvements are accepted by the City Council.
If there is an Event of a Default under this Agreement with respect to the completion of any Public
Improvements or any cost reimbursements, the City may notify the Developer in writing of such breach. If the
Developer fails to cure the breach within 30 da
ts to enforce this Agreement or seek
alternative remedies.
30. Warranty.
the Public Improvements will meet all laws, City standards, Engineering Guidelines, and Ordinances. The
Developer warrants all Public Improvements required to be constructed by it pursuant to this Agreementagainst
poor material and faulty workmanship.
The warranty period for the Public Improvements is one year. The warranty period for the Public Improvements
shall commence upon final acceptance of the Public Improvements by the City Council and expire one year
thereafter. It is the responsibility of the Developer to complete all Public Improvements as set forth in this
Agreement.
All trees shall be warranted to be alive, of good quality, and disease free for 12 months after the security for the
trees is released, if applicable and required under, and pursuant to, the Site Improvement/Performance
Agreement for such Phase, which, if applicable and required, shall require that any replacements shall be
warranted for 12 months from the time of planting.
The Developer shall post maintenance bonds in the amount of fifteen percent (15%) of the final certified
construction cost of the Public Improvements as agreed to in writing by the City and Developer, or other surety
acceptable to the City to secure the warranties. The City shall retain ten percent (10%) of the Security posted
by the Developer until the bonds or other acceptable surety are furnished to the City or until the warranty period
has been completed, whichever first occurs. The retainage may be u
Engineering Guidelines identify the procedures for final acceptance of the Public Improvements.
31. .
a)
1) Failure by the Developer to timely furnish any Security, or pay to the City any monetary costs or
amounts, required to be furnished or paid, as applicable, by Developer under this Agreement
2) Failure by the Developer to observe or substantially perform any other covenant, condition, obligation,
or agreement to be observed or performed by it under the terms of this Agreement which is not cured
written notice thereof from the City, provided that,
Page 184 of 219
12
238900v5
if such breach cannot reasonably be cured within such thirty (30) day period, then such cure period
shall be extended if and for so long as is reasonably necessary to cure such breach and Developer is
taking reasonable, diligent actions to complete such cure, not to exceed ninety (90) days.
3) If the Developer makes an assignment for the benefit of its creditors, or consents to the appointment
of a receiver of itself or of the whole or any substantial part of the Property or files a petition under the
federal bankruptcy laws or is adjudicated a debtor in an involuntary proceeding and such appointment
is not revoked, or such petition is not withdrawn, respectively, within sixty (60) days.
b) In the Event of Default by the Developer with respect to any of the
Public Improvements to be performed by it hereunder, the City may provide written notice of the Event of
Default to the Developer. If the Developer fails to cure the Event of Default within thirty (30) days of receipt
of such written notice, the City may, at its option, perform the work and the City may draw upon the Security
to reimburse the City for any expense incurred by the City, if such Security is not sufficient to reimburse the
the City for such
costs within forty-five (45) days after receipt of a written invoice of the work. If the City does any such work,
the City may, in addition to its other remedies, assess any such costs in whole or in part against the Property,
if and as permitted under Minnesota Statutes.
32. Miscellaneous.
a) For the purpose of this Agreement, the obligations of the Developer shall run with the land and be binding
upon its heirs, successors or permitted assigns, as the case may be.
1) The Developer may not assign this Agreement without the written permission of the City Administrator,
which approval shall not be unreasonably withheld or delayed. To request an assignment the Developer
must: provide the City Administrator with written notice of such assignment that includes: (i) the name
of the Assignee; (ii) a legal description of the portion of the Property being acquired, ground leased
and/or developed by the Assignee, and (iii) the form of the written assignment and assumption
agreement to be entered into by Developer, the City, and Assignee and (iv) assurances requested by
and interests under this
Agreement are not adversely affected, (iv) proof that all escrows, Certificates of Insurance, and Security
cover the Affiliate as if it was the original Developer named above, if applicable and; (v) such consent
from the City Admin
information provided complies with this Section, and also may be withheld if Developer fails to comply
with this Section. The Developer's obligation hereunder shall continue in full force and effect even if
Certificate of Completion and Release.
2) Notwithstanding the foregoing, Developer may assign this Agreement, to any Affiliate (defined below),
without any consent from the City including, without limitation, City Council or the City Administrator,
provided that, no later than ten (10) business days prior to any such assignment, Developer shall
provide the City written notice of such assignment, which shall include (i) the name of the Affiliate, (ii)
a legal description of the portion of the Property being acquired, ground leased and/or developed by
Affiliate, if and as applicable, and (iii) the form of the written assignment and assumption agreement
to be entered into by Developer and Affiliate, and (iv) proof that all escrows, Certificates of Insurance,
and Security cover the Affiliate as if it was the original Developer named above. Promptly after any
such assignment to an Affiliate, Developer shall provide the City written notice which includes an
that is, directly or indirectly, controlled by, controlling or under common control with Developer, and
or cause the direction of the management of the subject entity.
b) This Agreement constitutes the entire agreement of the Parties as to the matters set forth herein and
supersedes and replaces any prior or contemporaneous written or oral agreements. This Agreement shall
be binding upon the parties, their heirs, successors or assigns, as the case may be.
Page 185 of 219
13
238900v5
1) Third parties shall have no recourse against either Party under this Agreement.
2) An Event of Default under this Agreement by the Developer shall be grounds for denial of building
permits applied for by such Developer.
3) If any portion, section, subsection, sentence, clause, paragraph or phrase of this Agreement is for any
reason held invalid, such decision shall not affect the validity of the remaining portion of this
Agreement.
4) Each right, power or remedy herein conferred upon any Party is cumulative and in addition to every
other right, power or remedy, express or implied, now or hereafter arising, available to such Party at
law or in equity, or under any other agreement, and each and every right, power and remedy herein
set forth or otherwise so existing may be exercised from time to time as often and in such order as may
be deemed expedient by such Party and shall not be a waiver of the right to exercise at any time
thereafter any other right, power or remedy. In no event shall either Party be liable for any special,
exemplary, punitive, or consequential damages.
5) The action or inaction of either Party shall not constitute a waiver or amendment to the provisions of
this Agreement. To be binding, amendments or waivers shall be in writing, signed by the parties and
approved by written resolution of the City Council.
enforce this Agreement shall not be a waiver or release.
c)
and development of the Plat complies with all applicable City, County, Metropolitan, State and Federal laws
and regulations, including but not limited to: subdivision ordinances, zoning ordinances and environmental
regulations. If the City determines that such use, construction and/or development of the Plat does not so
comply, and such non-compliance is not cured within the applicable notice and cure period pursuant to
Section 31 above and constitutes an Event of Default, then the City may, at its option, refuse to allow any
construction or development work in the applicable portion of the Plat until the Developer does comply.
After such an Event of De
compliance.
d) This Agreement shall run with the land and shall be recorded against the title to the Property concurrent
with the Plat and prior to any building permit issuance. The Developer covenants with the City that the
Developer is the owner of fee simple title to the Property, subject only to taxes, assessments, matters of
record, a farm lease, and any other exception noted in the title commitments for the Property, and that the
Developer will indemnify and hold the City harmless for any breach of the of the foregoing covenants. Upon
request by Developer, the City covenants to provide a recordable Certificate of Completion within a
reasonable period of time following the request, upon the completion of the Public Improvements required
herein, payment of all costs and fees required hereunder with respect to the Public Improvements and
compliance with all terms of the Agreement with respect to the Public Improvements. A release of this
Contract may be provided in the same manner and subject to the same conditions as a Certificate of
Completion provided that a final certificate of occupancy for the last Phase has been issued and there are
no outstanding obligations of Developer under the terms of this Agreement. The Developer covenants with
the City, its successors and assigns, that the Developer is the owner in fee title of the property being final
platted and no consents from any tenants of the Property are required to enter into this Agreement; that
there are no unrecorded interests in the property being final platted except for taxes and assessments, a
farm lease and any survey exceptions or matters noted in the title commitments for the Property; and that
the Developer will indemnify and hold the City harmless for any breach of the foregoing covenants.
e) The Developer will be required to conduct all major activities construction activities during the following
hours of operation:
Monday - Friday 7:00 A.M. until 7:00 P.M.
Saturday 8:00 A.M. until 5:00 P.M.
Sunday and Holidays Not Allowed
Page 186 of 219
14
238900v5
This does not apply to activities that are required on a 24-hour basis such as dewatering, etc. Any deviations
from the above hours are subject to approval of the City Engineer. Violations of the working hours will
result in a $500 fine per occurrence.
f)
or boulevards within their development as per City Code 6-7-1. Failure to control weeds and to cure such
failure after applicable notice and cure periods will be considered an Event of Default as outlined in
costs incurred by the City in correcting such failure pursuant to Paragraph 26 (Responsibility for Costs).
g) The City agrees at any time, and from time to time, within ten (10) days after receipt of written request by
the Developer, a lender or a party purchasing any portion of the Property, to execute, acknowledge and
deliver a certification in writing and in such form as will enable it to be recorded in the proper office for the
recordation of deeds and other instruments certifying: (a) that this Agreement is unmodified and in full
force and effect, or if there have been modifications, the identify of such modifications and that the same
are in full force and effect as modified; (b) that no party is in default under any provisions of this Agreement
or, if there has been a default, the nature of such default; (c) that all Improvements to be performed under
this Agreement have been performed, specifying the Improvements to be performed; and (d) as to any
other matter that the requesting party shall reasonably request. It is intended that any such statement may
be relied upon by any person, prospective mortgagee of, or assignee of any mortgage, upon such interest.
Any such statement on behalf of the City may be executed by the City Administrator without City Council
approval.
h) Indemnification. To the fullest extent permitted by law, Developer agrees to defend, indemnify and hold
harmless City, and its employees, officials, and agents from and against all claims, actions, damages, losses
and expenses, including reasonable attorney fees, arising out of negligence, default, its
performance or failure to perform its obligations or an Event of Default under this
indemnification obligation shall apply to general contractor, subcontractor(s), or anyone
directly or indirectly employed or hired by Developer, or anyone for whose acts Developer may be liable.
Developer agrees this indemnity obligation shall survive the completion or termination of this Agreement.
******************
33. Notices. Required notices to the Developer shall be in writing, and shall be either hand delivered to the
Developer, its employees or agents, or mailed to the Developer by certified or registered mail at the following
addresses. However, any Party may change its contact information for the purpose of this notice paragraph by
giving written notice of the change to the other Party as provided above in this paragraph:
MNLCO Farmington, LLC
3200 Cherry Creek South Drive, Suite 700
Denver, Colorado 80209
(Attn: General Counsel, Senior Vice
President of Land Development)
Notices to the City shall be in writing and shall be either hand delivered to the City Administrator, or mailed to
the City by certified mail or registered mail in care of the City Administrator at the following address:
Lynn Gorski, City Administrator
City of Farmington
430 Third Street
Farmington, MN 55024
Page 187 of 219
15
238900v5
[Remainder of page left blank intentionally. Signature pages follow.]
Page 188 of 219
16
238900v5
SIGNATURE PAGE
FOR THE CITY
CITY:
CITY OF FARMINGTON
By: _________________________________________
Nicholas Lien, Mayor
By: _________________________________________
Lynn Gorski, City Administrator
STATE OF MINNESOTA )
)ss.
COUNTY OF DAKOTA )
The foregoing instrument was acknowledged before me this _____ day of __________________, 20____ by Nicholas
Lien, Mayor, and by Lynn Gorski, City Administrator, of the City of Farmington, a Minnesota municipal corporation,
on behalf of the corporation and pursuant to the authority granted by the City Council.
________________________________________
Notary Public
Page 189 of 219
17
238900v5
SIGNATURE PAGE
FOR THE DEVELOPER
DEVELOPER:
MNLCO Farmington, LLC,
a Delaware limited liability company
By: _________________________________
Name: Jessica Bennett
Its: Chief Legal Officer
STATE OF COLORADO )
( ss.
CITY AND COUNTY OF DENVER )
The foregoing instrument was acknowledged before me this _____ day of ____________, 20___, by Jessica
Bennett, the Chief Legal Officer of MNLCO Farmington, LLC, a Delaware limited liability company, on its behalf.
________________________________
Notary Public
Page 190 of 219
18
238900v5
EXHIBIT A
LEGAL DESCRIPTION
Lot 1, Block 1, and Lot 2, Block 1, as shown on the Final Plat for Farmington Technology Park 1st Addition
Page 191 of 219
19
238900v5
EXHIBIT B
Initial Capacity Requests by December 31, 2030:
Water Peak Daily Flow - 0.49 MGD
Sanitary Peak Daily Flow - 0.39 MGD
Annual Municipal Water Usage Not to Exceed 20 million gallons per year (MGY)
Full Buildout Capacity Requests by December 31, 2032:
Water Peak Daily Flow - 2.93 MGD
Sanitary Peak Daily Flow - 2.34 MGD
Annual Municipal Water Usage Not to Exceed 50 MGY
Page 192 of 219
20
238900v5
EXHIBIT C
ESTIMATED CONSTRUCTION COSTS OF PUBLIC IMPROVEMENTS
FOR FARMINGTON TECHNOLOGY PARK 1ST ADDITION AND 2ND ADDITION
Page 193 of 219
21
238900v5
EXHIBIT D
IRREVOCABLE LETTER OF CREDIT
No. ___________________
Date: _________________
TO: City of Farmington
430 Third Street
Farmington, MN 55024
Dear Sir or Madam:
We hereby issue, for the account of (Name of Developer) and in your favor, our Irrevocable Letter of Credit in the
amount of $_______________________, available to you by your draft drawn on sight on the undersigned bank.
The draft must:
a) Bear the clause, "Drawn under Letter of Credit No. __________, dated ________________, 20___,
of (Name of Bank) ";
b) Be signed by the City Administrator or Finance Director of the City of Farmington.
c) Be presented for payment at _______________(Address of Bank)____________ on or before 4:00 p.m. on
November 30, 2____.
This Letter of Credit shall automatically renew for successive one-year terms unless, at least ninety (90) days prior to the next
annual renewal date (which shall be November 30 of each year), the Bank delivers written notice to the Farmington City
Administrator that it intends to modify the terms of, or cancel, this Letter of Credit. Written notice is effective if sent by certified
mail, postage prepaid, and deposited in the U.S. Mail, at least sixty (60) days prior to the next annual renewal date addressed
as follows: Farmington City Administrator, 430 Third Street, Farmington, MN 55024, and is actually received by the City
Administrator at least thirty (30) days prior to the renewal date.
This Letter of Credit sets forth in full our understanding which shall not in any way be modified, amended, amplified, or limited
by reference to any document, instrument, or agreement, whether or not referred to herein.
This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw may be made under this
Letter of Credit.
This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and Practice for Documentary
Credits, International Chamber of Commerce Publication No. 600.
We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly honored upon presentation.
[NAME OF BANK]
By: ____________________________________
_______________________________ [name]
Its: _____________________ [identify official]
Page 194 of 219
22
238900v5
EXHIBIT E SITE IMPROVEMENT/PERFORMANCE AGREEMENT TERMS The following terms and provisions shall be included in a Site Improvement/Performance Agreement. In no event shall any Site Improvement/Performance Agreement include a more onerous term that one that is already in this Agreement unless approved by Developer in writing, not to be unreasonably withheld, conditioned or delayed: 1. Section 5, 8, 9(A) and 9(B) (revised pursuant to Section 2 of this Exhibit E below), 12 (as it relates to water and wastewater capacity, improvements and infrastructure with respect to the particular Phase), 13, 15, 16, 17 (if there are wetlands, ponding or other applicable natural areas in applicable Phase), the second sentence of 20(A), 21, 22, 24, and 25 2. Improvement work which Developer shall be required to install, pay for and complete shall be limited to the following, if required for a particular Phase, provided that, unless otherwise elected and agreed to by Developer, neither such work nor any Site Improvement/Performance Agreement shall include any Public Improvements and/or any obligations regarding the same: a. Sanitary Sewer System (trunk and lateral) b. Water System (trunk and lateral) c. Storm Sewer System d. Streets e. Concrete Curb and Gutter f. Street Lights g. Erosion and Sediment Control, Site Grading and Stormwater Treatment h. Underground Utilities i. Setting Iron Monuments j. Surveying and Staking k. Sidewalks and Trails l. Landscaping and Screening 3. If the Phase will include utility connections across 225th Street West, Section 14. 4. The Development Fees applicable to such Phase pursuant to Section 18. 5. If required for the particular Phase, Sections 26, 27 and/or 28, limited to Reimbursement Costs and other fees, costs and escrows described therein for and applicable to the particular Phase 6. If security is required for any of the improvements under Section 2 of this Exhibit E above pursuant to applicable City laws, rules and regulations, Section 29 and/or, if applicable, Section 9(C), provided that (i) for the avoidance of doubt, the security shall be to guarantee compliance with the terms of the Site Improvement/Performance Agreement with respect to payment and construction of the improvements required under Section 2 of this Exhibit E above, and (ii) Developer may elect (x) to submit a separate financial guarantee for any such required landscaping improvements, if any, pursuant to City Code Section 10-6-23(I)(3)(e), and/or (y) for the release, inspection and completion requirements in City Code Section 10-6-23(I)(3)(f) and (g), to apply in lieu of the applicable respective requirements in the Agreement 7. If applicable and required under the applicable City Code and/or City rules and regulations provisions, the warranty, warranty period, trees warranty and/or maintenance bonds requirements in Section 30, if applicable and required. 8. All other Site Improvement/Performance Agreement topics not covered in the Development Agreement, if and as agreed to by City and Developer.
4925-8096-8610, v. 2
Page 195 of 219
1
238899v3
DEVELOPMENT CONTRACT
DEVELOPMENT CONTRACT dated this _____ of 20
between the CITY OF FARMINGTON
Farmington Two
1. Request for Plat and Planned Unit Development Approval. The Developer has asked the City to approve a
on November 18, 2024 under Ordinance No. 2024- a revised plat for FARMINGTON
TECHNOLOGY PARK 2ND ADDITION (also referred to in this Agreement as the ). The land is situated in
the City of Farmington, County of Dakota, State of Minnesota, and is legally described on the attached Exhibit A
The Project shall be developed in phases, as provided in this Agreement, within the lands
platted as FARMINGTON TECHNOLOGY PARK 1ST ADDITION and FARMINGTON TECHNOLOGY PARK 2ND
ADDITION.
2. Conditions of Approval. The City hereby approves the Plat on the conditions that:
a) The Developer enter into this Agreement; and
b) The Developer provide the necessary Security, as described hereafter, in accordance with the terms of this
Agreement; and
c) The Developer satisfy the Development Fees, as described hereafter, in accordance with the terms of this
Agreement; and
d) All engineering issues must be reviewed and approved by the engineering department prior to
commencement of construction; and
e) The Developer records the Plat with the County Recorder or Registrar of Titles within six months of all
signatories' signatures on the final plat, as required by Minnesota law.
3. Right to Proceed. Within the Plat, the Developer may not grade or otherwise disturb the earth or remove trees,
unless a grading permit has been authorized in writing by the City Engineer. In addition to the requirements for
Phase 1 Preliminary Grading, as is defined and set forth more fully in this Agreement, the Developer must satisfy
the following conditions:
a) This Agreement has been fully executed by both parties and submitted for recording with the Dakota
b) The necessary Security has been received by the City; and
Page 196 of 219
2
238899v3
c) The necessary insurance for the Developer and its construction contractors has been received by the City;
and
d)
e) A deed shall be provided for Lot 2, Block 1, Farmington Technology Park 1st Addition, which shall be
submitted for recording with the plat mylars; and
f) A copy of permits required for Phase 1 Preliminary Grading have been provided.
Except for the Phase 1 Preliminary Grading, the construction of private improvements or any building in any future
Phase, as defined below, shall not commence until all of the requirements of a Development/Site Plan and a Site
Improvement/Performance Agreement for such Phase have been satisfied.
4. Phased Development. The Developer may develop the Project and, specifically, any Private Improvements
(defined below) including, without limitation, any buildings within the Project, in multiple phases (each a
.
performed in conformance with City Code Chapter 3-
of development shall be subject to all of the requirements set forth in
Sections 6 and 7 of this Agreement. Except for the Public Improvements (defined below) and Phase 1
Preliminary Grading, and any work related to utility extensions, no construction of Private Improvements, or
other development may occur until a Site Plan for such Phase has been approved by the Planning Commission
and a Site Improvement/Performance Agreement has been approved by the City Council, executed and
recorded.
5. Changes in Official Controls. For eight (8) years from the Effective Date of this Agreement, no amendments to
the Comprehensive Plan or official controls shall apply to or affect the use, development density, lot size, lot
layout or dedications or platting required or permitted by the approved Plat and PUD unless required by State
or Federal law or agreed to in writing by the Parties and except amendments placing this Plat in the current
urban service area. Thereafter, notwithstanding anything in this Agreement to the contrary, to the full extent
permitted by City, State, and Federal law, the City may require compliance with any applicable amendments to
platting or dedication requirements therein, enacted after the Effective Date. Notwithstanding the foregoing or
anything to the contrary herein, and notwithstanding any such subsequent amendments, the Parties agree that
upon commencement of any improvements or grading to the Property under this Agreement, the Dev
rights under the PUD and this Agreement, including but not limited to, land use, building area, design standards,
shall vest to the entirety of the Property, including any platted or unplatted land. The City and Developer
recognize and agree that due to the phased nature of the Project, the entire Property shall be a single use under
Minnesota law and any non-use of any portion of the Property shall not constitute a discontinuance of any
portion of the Project. This provision shall survive the expiration of this Agreement.
6. Development/Site Plans. Except for Phase 1, each Phase shall be developed subject to an approved Site Plan,
under City Code Section 10-6-23, which shall be reviewed and approved by the Planning Commission for
consistency with the PUD. The Planning Commission shall approve the Site Plan in accordance with the adopted
PUD conditions. Prior to approval of a Site Plan for a Phase, the Developer must prepare the following plans for
review and approval by the City for the requisite Phase:
a) Site Plan
b) Final Grading Plan
c) Erosion and Sediment Control Plan
d) Utility Plan
e) Private Roadway Paving, Signage, and Striping Plan
f) Landscape Plan
g) Building Elevations
Page 197 of 219
3
238899v3
7. Site Improvement/Performance Agreement. Except for Phase 1, each Phase shall be subject to a Site
Improvement/Performance Agreement detailing the details of such Phase including, but not limited to,
calculation and payment of fees, installation of public and private improvements, and timing of construction,
and each of which shall include, at a minimum, the terms and provisions set forth on Exhibit E attached hereto.
The Site Improvement/Performance Agreement shall be executed and recorded against the Property which is
subject to such Phase.
8. Easements. The Developer shall furnish to the City a long-term maintenance agreement, delivered to the City
municipal
separate storm sewer system or not, for purposes of ensuring maintenance and inspection of the facilities and
allowing the City to enter the property to maintain, inspect, and/or repair any such systems if not adequately
maintained and repaired by Developer.
9. Required Public Improvements.
a) The Developer shall install and pay for the improvements to 220th Street West shown on sheet R1 of the Final
PUD Plan Set and improvements to Chippendale Avenue West shown on sheet R2 of the approved Final PUD
the Public Improvements set forth in the Final PUD Plan Set are preliminary and the final scope, design and plans
for the Public Improvements shall be set forth in public roadway construction plans and drawings for such Public
b) The Public Improvements shall be installed in accordance with the Construction Plans, and in accordance with
all applicable laws, City Standards, Engineering Guidelines, Ordinances and Construction Plans, which have been
or will be prepared by a competent registered professional engineer furnished to the City and reviewed by the
City Engineer. Work done not in accordance with the Construction Plans, without prior authorization of the City
Engineer, shall be considered a violation of this Agreement and a Default of the Agreement and, subject to
applicable notice and cure periods in Section 31, an Event of Default. The Developer shall obtain all necessary
permits from the Metropolitan Council and other agencies before proceeding with construction of the Public
Improvements. The Developer shall instruct its engineer to provide adequate field inspection personnel to
that the construction work is consistent with the approved Plans and meets the approved City standards as a
co
have one or more City inspector(s) and a soil engineer inspect the work on an as-needed basis. The Developer,
in accordance
with the Plans, and all applicable laws and City Standards -site
project management. for design changes and contract administration
-
construction meeting at a mutually agreeable time at City Hall with all parties concerned, including the City staff,
to review the program for the Public Improvements. Within sixty (60) days after the completion of the Public
Improvements and before the Security is released, the Developer shall supply the City with a complete set of
-AutoCAD .DWG file or a .DXF file, all prepared in accordance with
Guidelines. If the Developer does not provide such information, the City will produce the As-Built drawings and
all costs associated with producing the As-Built drawings will be the responsibility of the Developer.
c) Before the Security for the completion of any Public Improvements is released, iron monuments must be
City certifying that the monuments have been installed. Each Site Performance/Improvement Agreement shall
require the same language regarding release.
d). Security may be required as part of future Site Improvement/Performance Agreements pursuant to
applicable City laws, rules and regulations and Section 7 and Exhibit E of this Agreement.
Page 198 of 219
4
238899v3
10. Ownership of Public Improvements. Upon the completion of the Public Improvements constructed by
Developer and written acceptance by the City Engineer, the Public Improvements lying within city easements
shall become City property, except for cable TV, electrical, gas, and telephone, without further notice or action.
11. Private Improvements for Phased Development.
a) Private Improvements Defined. The Parties agree and acknowledge that all other improvements
constructed on the Property that are not Public Improvements shall be considered private improvements
d constructed
in accordance with the Site Improvement/Performance Agreement that is applicable to each Phase. Private
Improvements do not include the Phase 1 Preliminary Grading.
b) Phase 1 of Development. As provided in Section 4 of this Agreement, Phase 1 Preliminary Grading for the
Property may be allowed in accordance with this paragraph, which shall satisfy City Code Chapter 3-24.
Prior to the commencement of any Phase 1 Preliminary Grading, the Developer must obtain written
authorization from the City Engineer to proceed with such preliminary grading activity. To obtain such
written authorization, the Developer shall submit all of the following for review by the City Engineer:
1)
preliminary grading work, and contact information for the contractor(s);
2) For property not owned by the Developer in fee title, the written consent of the fee owner of the
property for preliminary grading to occur on their property;
3) A tree survey indicating the location of all trees over six caliper inches and a plan for protecting and
preserving as many trees as is feasible;
4) A narrative description of the purpose of the preliminary grading; the type and quantity of any material
that will be brought onto the property, if any; the estimated time required to complete the preliminary
grading; and an acknowledgment by the Developer that any preliminary grading may be subject to
removal or modification, at Developer's sole cost and expense, as part of a future Phase of
development;
5) Full engineering plans for all preliminary grading work which shall conform to the City of Farmington
Engineering Guidelines, including, but not limited to, SWPPP plans, and plans for drainage and erosion
control, sedimentation and dust control;
6) Drawings depicting the contour of the land prior to the preliminary grading and depicting the proposed
contour after the completion of the of the preliminary grading, and any proposed landscaping or
berming;
7) Maps or drawings depicting any existing wetlands as defined by federal or state law;
8) Copies of applicable permits, if any;
9) Any other plans and/or information reasonably required by the City Engineer to ensure protection of
the health, safety, and welfare of the community during Phase 1;
10)
11) Deposit of funds to be escrowed for the cost of engineering review and administration in an amount
equivalent to 3% of the value of the preliminary grading project;
12) Deposit of funds to be escrowed for the cost of construction observation in an amount equivalent to
5% of the value of the preliminary grading project; and
13) Security in the form of a letter of credit in an amount equivalent to 125% of the value of the preliminary
grading project.
All work related to the Phase 1 Preliminary Grading shall comply with the time limitations set forth in Section
32.e) of this Agreement. Except as otherwise approved in conjunction with the Phase 1 Preliminary Grading, no
roads; curbing; impervious surfaces for parking or other purposes, except construction parking is allowed on the
Property during Phase 1.
Within 30 days of receipt of the foregoing, the City Engineer will notify the Developer of any incomplete or
missing information that is necessary to complete the technical review of the request. Upon receipt of all
Page 199 of 219
5
238899v3
information that is necessary to complete the technical review of the request, the City Engineer will transmit
written authorization to proceed to the Developer. No Phase 1 Preliminary Grading may proceed until such
written authorization to proceed is sent to the Developer by the City Engineer.
c) Subsequent Phases of Development. All Phases of development after Phase 1 shall be subject to the review
requirements of Sections 6 and 7 of this Agreement, and in compliance with all other requirements set forth
in this Agreement and all applicable City Code provisions and state or federal law.
Notwithstanding any other provisions of this Agreement, as part of the Phase 1 Preliminary Grading, the
Developer may install landscaping, berming, and construct private roads to make the Property accessible, and
preliminary utility work to make the Property construction-ready. Developer agrees and acknowledges that all
final approval to the extent that such Phase 1 Preliminary Grading is modified by any subsequent Phase.
12. City Infrastructure.
a) The Parties acknowledge that the proposed development of this Property requires critical water and
Minnesota Department of Health, Minnesota Pollution Control Agency, the Minnesota Department of
State Agencies, the City is committed to providing water and sewer services as development progresses.
b) [Reserved.]
c) In addition to any other improvements, infrastructure, or work required under this Section 12, pending
state agency approvals, including approvals from the Metropolitan Council, the City shall provide items 1)
4) below, in order to service the Property and the anticipated demands set forth in Exhibit B by the
deadlines in Exhibit B. In the event of delays caused by litigation and subject to Force Majeure Items
(defined below), any deadlines in this Section 12 and Exhibit B may be extended by mutual agreement of
the City and Developer. Unless extended as provided in this Section 12.c), the schedule shall be as follows:
1) Sanitary Sewer stubbed to the Property line in a mutually agreeable location, approved in writing by
City and Developer by January 1, 2029, for construction purposes.
2) Water Main extension stubbed to the Property line in a mutually agreeable location, approved in
writing by City and Developer by January 1, 2029, for construction purposes.
3) Sanitary Sewer Trunk Improvements located within Biscayne Avenue right-of-way adjacent to the
Property by the Initial Capacity Request date of December 31, 2030, as shown in Exhibit B.
4) Water Trunk Main adjacent located in the 220th Street West, 225th Street West and Biscayne Avenue
rights-of-way adjacent to Lot 1, Block 1, Farmington Technology Park 1st Addition by the Initial Capacity
Request date of December 31, 2030, as shown in Exhibit B.
d) The Developer shall timely update the City in writing regarding any changes to capacity needs that may
c)1) 12.c)4) above.
e) City shall not be liable to Developer for nonperformance or delay of construction of the infrastructure
required under this Section 12 by Acts of God; casualty; insurrection; strikes; war; terrorism; lockouts;
pandemic; public utility interruptions; governmental order (including health orders); delayed approvals or
denials of State Agencies, including the Metropolitan Council and
Section 12; labor disputes; adverse weather conditions which could not reasonably be anticipated; or any
f)
Project shall not exceed the allowed water usage set forth in Exhibit B and, in any event, shall not exceed
Page 200 of 219
6
238899v3
fifty million (50,000,000) gallons in any calendar year. Nothing in this Agreement shall be construed as a
or liability is created beyond that required by applicable Minnesota law and as may be limited by the terms
.
13. Permits. For all Phases of development, including Phase 1, the Developer shall obtain or require its contractors
and subcontractors to obtain all applicable necessary permits, which may include but are not limited to:
a) Dakota County for County Road Access and Work in County Rights-of-Way
b) MnDOT for State Highway Access and Work in State Rights-of-Way
c) Minnesota Department of Health for Watermains
d) MPCA NPDES Permit for Construction Activity
e) MPCA for Sanitary Sewer and Hazardous Material Removal and Disposal
f) MnDNR for Dewatering and well appropriation permitting
g) City of Farmington for Building Permits
h) MCES for Sanitary Sewer Connections
i) City of Farmington for Retaining Walls
j) City of Farmington for Road and Utility Work in City Rights-of-Way
14. Right-of-Way Utility Connections. The City acknowledges that Developer will require underground utility
connections across the right-of-way for 225th Street West to accommodate private utilities including, but not
limited to, water, sewer, fiber, and electric. The Parties agree to coordinate construction and permitting of any
such utility installation to minimize the duration of road closures.
15. Grading Plan. The Site Plan for each Phase after Phase 1 shall be graded, and drainage provided in accordance
with the approved Erosion and Sediment Control Plan and Grading Plan for such Phase. The Plan shall conform
to the City of Farmington Engineering Guidelines. Before the City approves the certificate of occupancy for
individual buildings the Developer shall provide the City with an As-Built grading plan certified by a registered
land surveyor or engineer. The As-Built plan shall include field verified elevations of the following: a) cross
sections of stormwater treatment/infiltration basins; b) location and elevations along all swales, wetlands,
wetland mitigation areas, if any; c) locations and dimensions of borrow areas/stockpiles, and installed
posts; and e) lot corner elevations and building pads; and f) all other applicable items
listed in City Code. The City will withhold issuance of a certificate of occupancy until the approved certified
grading plan is on file with the City and all erosion control measures are in place as determined by the City
Engineer, as otherwise agreed to by City and Developer.
If the Developer needs to modify the grading in a manner that would significantly impact the drainage plan, the
grading changes cannot take place until the City Engineer has approved the proposed changes. A MPCA
Construction Storm Water Permit must be obtained before any grading can commence on the site.
16. Erosion and Sediment Control. Prior to initiating site grading for each Phase after Phase 1, the Erosion and
Sediment Control Plan for such Phase shall be implemented by the Developer and inspected and approved by
the City. The City may impose additional erosion and sediment control requirements if it is determined that the
methods implemented are insufficient to properly control erosion and sedimentation. All areas disturbed by
the grading operations shall be stabilized per the MPCA Stormwater Permit for Construction Activity. Seed shall
be installed , which may include temporary seed to
provide ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched and disc anchored as
necessary for seed retention. The parties recognize that time is of the essence in controlling erosion and
sedimentation. If the Developer does not comply with the MPCA Stormwater Permit for Construction Activity
or with the erosion and sediment control plan and schedule, or supplementary instructions received from the
City, or in an emergency determined at the sole discretion of the City, the City may take such action as it deems
appropriate to control erosion and sedimentation immediately, without notice to the Developer. Charges for
corrective actions taken by the City or their contractor, will be charged to the SWPPP compliance escrow; the
Page 201 of 219
7
238899v3
Developer is responsible for maintaining a balance of $25,000 in this escrow. This applies to all properties
within the development, whether owned by the Developer. The City will endeavor to notify the Developer in
rights or obligations hereunder. If the Developer does not reimburse the City for any costs the City incurred for
such work within forty-five (45) days, the City may draw down the security to pay such costs. No development,
utility or street construction will be allowed, and no building permits will be issued unless the Plat or applicable
portion thereof is in full compliance with the applicable erosion and sediment control requirements.
17. Wetland Natural Area Signs. The Developer is responsible for installing City natural areas signs around all
buffer line limits and natural area sign locations must be indicated on individual lot surveys prior to the issuance
of a building permit for that Phase.
18. Development Fees. The Project shall be subject to the cash-in-lieu park dedication fee set forth in this Section
18 below, and the following fees that would otherwise be collected as a part of this Agreement but for the
Phasing: Surface Water Quality Management Fee, Surface Water Management Fee, Watermain Trunk Area
Charge, and Sanitary Sewer Trunk Area Charge (collectively, ), which shall be calculated for
each Phase rather than included in this Agreement. Except the cash-in-lieu park dedication fee, which shall be
paid prior to recording of the Plat, the Development Fees shall be paid prior to the recording of each Site
Improvement/Performance Agreement. The Development Fees for each Phase shall be calculated based on the
gross acreage developed in such Phase if acreage is material to the calculation. The Development Fees for the
Project and, specifically, each particular Phase, shall be the fees applicable to and required for such Phase under
applicable City and State of Minnesota codes, laws, rules and regulations, and specifically the Development Fees
as defined and listed in the first sentence above. In the event the City reduces any of the Development Fees
prior to approval of any Phase, the lesser fee shall apply, and provided further that the City and Developer may
agree to lesser Development Fees in the Site Improvement/Performance Agreement. The Developer is required
to dedicate a total of 13.115 acres of land for park purposes for and for Farmington Technology Park 2nd
Addition, collectively , but will pay cash-in-lieu in satisfaction of the park dedication requirement for the entire
Project. The cash-in-lieu amount for the entire Project is $569,718.62, based on the appraised value of the land,
with $315,158.87 for Farmington Technology Park 1st Addition and $254,559.75 for Farmington Technology
Park 2nd Addition. The entire cash-in-lieu amount for each Addition shall be paid in full prior to the release for
recording of the plat mylars for each Addition, respectively.
19. Conservation Easement. Developer shall dedicate to the City the conservation easement as depictedon the Plat
pursuant to a separate easement agreement in a form and with such contents agreed to and approved by each
of the City and Developer.
20. Water Storage Dedication; Substation Parcels.
a) Subject to any required approvals from DNR under applicable laws, rules or regulations, Developer shall
have the right to utilize water from on-site production wells for construction purposes. At the time new
water mains are installed and charged, on-site wells will be decommissioned and capped per Minnesota
statutes.
b)
to approval by the utility authority and any other permits and approvals required by the City for the
construction of a substation. The City acknowled
electricity, power and utility services to the Project. The Parties acknowledge and agree that, for the
avoidance of doubt, and notwithstanding that a substation is an accessory use as set forth in the PUD, a
substation may be permitted, approved and constructed prior to the permitting, approval and/or
construction of the Project Phase of which the substation is a part so long as the substation is not in
commercial operation until Site Plan approval for such Phase.
Page 202 of 219
8
238899v3
21. Clean Up. The Developer shall, within twenty-four (24) hours, clear from the public streets any soil, earth or
debris resulting from construction work by the Developer or its agents or assigns. Any soil, earth or debris
resulting from construction work by the Developer or its agents or assigns on other property shall be removed
weekly or more often if required by the City Engineer and managed in accordance with the approved Erosion
and Sediment Control Plan. All debris, including brush, vegetation, trees and demolition materials, shall be
disposed of off-site. Burning of trees and structures shall be prohibited, except for fire training only. If
Developer fails to clear public streets as required in this Section and such failure is not cured within twenty-four
(24) hours of written notice to Developer, the City will have the right to clean the public streets as outlined in
current City policy and the Developer shall promptly reimburse the City for street cleaning costs.
22. License. The Developer hereby grants the City, its agents, employees, officers and contractors, a license to enter
the Property to perform all necessary inspections deemed appropriate by the City during the installation of
erosion control and grading on the Property or the installations of improvements listed in Exhibit E in connection
with a Phase by the City with at least forty-eight (48) hours prior notice to Developer, if the inspection is a non-
emergency. Whether or not an inspection is an emergency is determined at the sole discretion of the City. The
license shall be limited to those Phases that require any such erosion control and grading and improvements
listed in Exhibit E. The license shall be limited to only those portions of the Property on which such
improvements listed in Exhibit E are being installed and any adjacent portions of the Property reasonably
necessary for purposes of accessing the same and shall expire after the improvements listed in Exhibit E are
installed pursuant to the applicable Site Improvement/Performance Agreement are accepted by the City.
23. Time of Performance. Subject to Developer Force Majeure Items (defined below), the Developer shall: (a)
commence the final design and permitting of Public Improvements within 90 days of the Effective Date, and; (b)
install all required Public Improvements prior to the earlier of November 30, 2029, or the issuance of the first
final grading permit, with the exception of the final wear course of asphalt on streets. The final wear course on
streets shall be installed between August 15th and October 15th the first summer after the base layer of asphalt
has been in place one freeze thaw cycle. The Developer may, however, request an extension of time from the
City. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to
reflect cost increases and the extended completion date. Final wear course placement outside of this time
frame must have the written approval of the City Engineer. Developer shall not be liable to City for
nonperformance or delay of construction of the Public Improvements by Acts of God, casualty, insurrection,
strikes, war, terrorism, lockouts, pandemic, public utility interruptions, governmental order (including health
orders), approvals of any City, State or Federal agencies, bodies or authorities, labor disputes, adverse weather
prohibited from drawing down the Security in the event that the City is notified of the intent to modify or cancel
the Security, unless such a modification or cancellation is agreed to by the parties.
24. Building Permits. Except where otherwise addressed under a Site Improvement/Performance Agreement,
which shall set forth a phasing plan for phased construction of multiple structures in a single Phase, or as set
forth in this Section 24 below, a certificate of occupancy shall not be issued prior to submittal of As-Built grading
plans, public and private utility installation, curb and gutter, installation of erosion control devices, installation
of permanent street signs and natural area signs, paving with a bituminous surface, retaining walls if any, site
agree that ongoing Site Work may occur within a Phase containing multiple structures, and that nothing in this
Agreement shall prohibit the issuance of a permanent or temporary certificate of occupancy for an individual
structure while ongoing Site Work is occurring in the Phase, so long as the structure can be occupied safely in
accordance with the Minnesota Building Code. In addition, notwithstanding anything to the contrary herein,
nothing in this Agreement including, without limitation, this Section 24 shall modify, amend, limit, alter or waive
a temporary certificate of occupancy under the Minnesota Building Code. Valuation for said buildings will be in
conformity with the Minnesota Building Code including M.S. 326B.148.
Page 203 of 219
9
238899v3
25. Insurance. Prior to construction of the Public Improvements by Developer, Developer and its general contractor
shall furnish to the City a certificate of insurance showing proof of the required insurance required under this
paragraph. Developer and its general contractor shall take out and maintain or cause to be taken out and
maintained until six (6) months after the City has accepted the Public Improvements, such insurance as shall
protect Developer and its general contractor and the City for work covered by the Agreement in the categories
and amounts described below. The minimum amounts of insurance shall be as follows:
Commercial General Liability (or in combination with an umbrella policy)
$2,000,000 Each Occurrence
$2,000,000 Products/Completed Operations Aggregate
$2,000,000 Annual Aggregate
The following coverages shall be included:
Premises and Operations Bodily Injury and Property Damage
Personal and Advertising Injury
Blanket Contractual Liability
Products and Completed Operations Liability
Automobile Liability
$2,000,000 Combined Single Limit Bodily Injury & Property Damage
Including Owned, Hired & Non-Owned Automobiles
Workers Compensation
Workers Compensation insurance in accordance with the statutory requirements of the State of Minnesota,
$500,000 Bodily Injury by Disease per employee
$500,000 Bodily Injury by Disease aggregate
$500,000 Bodily Injury by Accident
-
All insurance policies (or riders) required by this Contract shall be (i) taken out by and maintained with
responsible insurance companies organized under the laws of one of the states of the United States and
qualified to do business in the State of Minnesota, (ii) shall name the City, its employees and agents as additional
insureds (CGL and umbrella only) by endorsement which shall be filed with the City. A copy of the endorsement
must be submitted with the certificate of insurance.
notice for non-payment of premium.
policy limits on a follow-form basis to satisfy the full policy limits required by this Contract.
26. Responsibility for Costs. The Developer shall pay all actual costs incurred by it or the City in conjunction with
the development of the Plat, including but not limited to, Soil and Water Conservation District charges, legal,
planning, administrative, construction costs, engineering, easements, inspection and utility testing expenses
incurred in connection with approval, acceptance and development of the Plat, the preparation of this
Agreement, and all reasonable costs and expenses incurred by the City in monitoring and inspecting the
construction for the development of the Plat
Page 204 of 219
10
238899v3
Any such Reimbursement Costs shall be paid as follows: (a) Reimbursement Costs eligible to be charged to the
SWPPP compliance escrow pursuant to Section 16 above shall be paid using the SWPPP compliance escrow; (b)
Reimbursement Costs described in Section 27 below shall be paid using the Contract Administration fee under
Section 27; (c) and Reimbursement Costs described in Section 28 below, if eligible, shall be paid using the
Construction Observation escrow under Section 28, and; (d) with respect to any other Reimbursement Costs, or
any Reimbursement Costs described in the foregoing Sections 26(a), (b) or (c) which exceed or are not eligible
for the amounts of the SWPPP compliance escrow, Contract Administration fee under Section 27, or the
Construction Observation escrow under Section 28, as applicable shall be paid for by the Developer within forty-
five (45) days after receipt; (ii) if the bills are not paid on time, the City may halt all Plat development work until
the bills are paid in full; (iii) bills not paid within forty-five (45) days shall accrue interest at the rate of five
percent (5%) per annum, and; (iv) if the bills are not paid within sixty (60) days, the City has the right to draw
27. Development Contract Administration. The Developer shall pay a fee for in-house administration of this
Agreement including monitoring of construction observation, consultation with the Developer and its engineer
on the status of or problems regarding the Project, coordination for final inspection and acceptance, project
monitoring during the warranty period, and processing of requests for reduction in Security. The fee for this
service shall be three percent (3%) of estimated construction costs of the Public Improvements and paid prior
to commencement of construction of the Public Improvements.
28. Construction Observation. The Developer shall instruct its engineer to provide adequate field inspection
able to certify that all Public Improvements are consistent with the approved Plans and meets the approved City
standards as a condition of City acceptance. The Developer shall pay for construction observation performed by
-house staff or consultant. As needed, construction observation shall include part- or full -time
inspection of the Public Improvements, including erosion and sediment control inspections and will be billed on
hourly rates. Developer will provide a cash escrow for these services in the amount of 5% of estimated
construction costs of the Public Improvements prior to commencement of construction of the Public
Improvements. Developer shall also provide a $25,000 escrow for SWPPP compliance in accordance with
Sections 11 and 16 above and applicable City laws, rules and regulations. On or before the 10th day of each
month following the initial deposit of the Construction Observation escrow and/or SWPPP compliance escrow,
the City shall provide the Developer with a written description of all utilization of such escrow(s) and funds
therein during the preceding month, including amounts deducted from such escrow(s), City costs such amounts
were used to pay and total amount in each escrow at the beginning and at the end of such month.
29. Security. To guarantee compliance with the terms of this Agreement and payment of the costs of all Public
Improvements and all costs payable by Developer to the City under this Agreement and construction of all Public
Improvements, prior to recording of the Plat, the Developer shall furnish the City with a cash escrow, irrevocable
letter of credit, or alternative security acceptable to the City Administrator, from a bank
$2,297,375. The amount of the Security is based on 125% of the estimated construction costs as shown in Exhibit
C Developer and City may agree to update the Security amount based on construction bids accepted for the
Public Improvements. This breakdown is for historical reference; it is not a restriction on the use of the Security.
The bank and form of the Security, shall be subject to the approval of the City Administrator. Letters of Credit
shall be in the format and wording exactly as shown on the attached Letter of Credit form (Exhibit D). The
Security shall be automatically renewing. The term of the Security may be extended from time to time if the
extension is furnished to the City Administrator at least forty-five (45) days prior to the stated expiration date
of the Security. If the required Public Improvements are not completed, or terms of the Agreement are not
satisfied, at least thirty (30) days prior to the expiration of a letter of credit, the City may draw down the letter
of credit. The City may draw down the Security, without prior notice, for any violation of this Agreement or
Event of Default, in each event following applicable cure periods.
Page 205 of 219
11
238899v3
Engineer that Public Improvements have been completed in accordance with the Construction Plans, and terms
of this Agreement, that all payments, costs, fees, charges, expenses or other amounts for such completed Public
Improvements and any work in connection with the same have been paid in full, and that all outstanding
financial obligations to the City, subcontractors, or other persons have been satisfied, the City Engineer may
approve reductions in the Security provided by the Developer under this paragraph from time to time by ninety
percent (90%) of the cost of such Public Improvements that have been completed. Ten percent (10%) of the
amounts c
been completed, the required As-Built plans have been received by the City, a warranty security is provided,
and the Public Improvements are accepted by the City Council.
If there is an Event of a Default under this Agreement with respect to the completion of any Public
Improvements or any cost reimbursements, the City may notify the Developer in writing of such breach. If the
Developer fails to cure the breach within 30 da
ts to enforce this Agreement or seek
alternative remedies.
30. Warranty.
the Public Improvements will meet all laws, City standards, Engineering Guidelines, and Ordinances. The
Developer warrants all Public Improvements required to be constructed by it pursuant to this Agreementagainst
poor material and faulty workmanship.
The warranty period for the Public Improvements is one year. The warranty period for the Public Improvements
shall commence upon final acceptance of the Public Improvements by the City Council and expire one year
thereafter. It is the responsibility of the Developer to complete all Public Improvements as set forth in this
Agreement.
All trees shall be warranted to be alive, of good quality, and disease free for 12 months after the security for the
trees is released, if applicable and required under, and pursuant to, the Site Improvement/Performance
Agreement for such Phase, which, if applicable and required, shall require that any replacements shall be
warranted for 12 months from the time of planting.
The Developer shall post maintenance bonds in the amount of fifteen percent (15%) of the final certified
construction cost of the Public Improvements as agreed to in writing by the City and Developer, or other surety
acceptable to the City to secure the warranties. The City shall retain ten percent (10%) of the Security posted
by the Developer until the bonds or other acceptable surety are furnished to the City or until the warranty period
has been completed, whichever first occurs. The retainage may be u
Engineering Guidelines identify the procedures for final acceptance of the Public Improvements.
31. .
a)
1) Failure by the Developer to timely furnish any Security, or pay to the City any monetary costs or
amounts, required to be furnished or paid, as applicable, by Developer under this Agreement
2) Failure by the Developer to observe or substantially perform any other covenant, condition, obligation,
or agreement to be observed or performed by it under the terms of this Agreement which is not cured
written notice thereof from the City, provided that,
if such breach cannot reasonably be cured within such thirty (30) day period, then such cure period
shall be extended if and for so long as is reasonably necessary to cure such breach and Developer is
taking reasonable, diligent actions to complete such cure, not to exceed ninety (90) days.
3) If the Developer makes an assignment for the benefit of its creditors, or consents to the appointment
of a receiver of itself or of the whole or any substantial part of the Property or files a petition under the
Page 206 of 219
12
238899v3
federal bankruptcy laws or is adjudicated a debtor in an involuntary proceeding and such appointment
is not revoked, or such petition is not withdrawn, respectively, within sixty (60) days.
b) In the Event of Default by the Developer with respect to any of the
Public Improvements to be performed by it hereunder, the City may provide written notice of the Event of
Default to the Developer. If the Developer fails to cure the Event of Default within thirty (30) days of receipt
of such written notice, the City may, at its option, perform the work and the City may draw upon the Security
to reimburse the City for any expense incurred by the City, if such Security is not sufficient to reimburse the
ll reimburse the City for such
costs within forty-five (45) days after receipt of a written invoice of the work. If the City does any such work,
the City may, in addition to its other remedies, assess any such costs in whole or in part against the Property,
if and as permitted under Minnesota Statutes.
32. Miscellaneous.
a) For the purpose of this Agreement, the obligations of the Developer shall run with the land and be binding
upon its heirs, successors or permitted assigns, as the case may be.
1) The Developer may not assign this Agreement without the written permission of the City Administrator,
which approval shall not be unreasonably withheld or delayed. To request an assignment the Developer
must: provide the City Administrator with written notice of such assignment that includes: (i) the name
of the Assignee; (ii) a legal description of the portion of the Property being acquired, ground leased
and/or developed by the Assignee, and (iii) the form of the written assignment and assumption
agreement to be entered into by Developer, the City, and Assignee and (iv) assurances requested by
and interests under this
Agreement are not adversely affected, (iv) proof that all escrows, Certificates of Insurance, and Security
cover the Affiliate as if it was the original Developer named above, if applicable and; (v) such consent
from the City Admin
information provided complies with this Section, and also may be withheld if Developer fails to comply
with this Section. The Developer's obligation hereunder shall continue in full force and effect even if
Certificate of Completion and Release.
2) Notwithstanding the foregoing, Developer may assign this Agreement, to any Affiliate (defined below),
without any consent from the City including, without limitation, City Council or the City Administrator,
provided that, no later than ten (10) business days prior to any such assignment, Developer shall
provide the City written notice of such assignment, which shall include (i) the name of the Affiliate, (ii)
a legal description of the portion of the Property being acquired, ground leased and/or developed by
Affiliate, if and as applicable, and (iii) the form of the written assignment and assumption agreement
to be entered into by Developer and Affiliate, and (iv) proof that all escrows, Certificates of Insurance,
and Security cover the Affiliate as if it was the original Developer named above. Promptly after any
such assignment to an Affiliate, Developer shall provide the City written notice which includes an
that is, directly or indirectly, controlled by, controlling or under common control with Developer, and
or cause the direction of the management of the subject entity.
b) This Agreement constitutes the entire agreement of the Parties as to the matters set forth herein and
supersedes and replaces any prior or contemporaneous written or oral agreements. This Agreement shall
be binding upon the parties, their heirs, successors or assigns, as the case may be.
1) Third parties shall have no recourse against either Party under this Agreement.
2) An Event of Default under this Agreement by the Developer shall be grounds for denial of building
permits applied for by such Developer.
Page 207 of 219
13
238899v3
3) If any portion, section, subsection, sentence, clause, paragraph or phrase of this Agreement is for any
reason held invalid, such decision shall not affect the validity of the remaining portion of this
Agreement.
4) Each right, power or remedy herein conferred upon any Party is cumulative and in addition to every
other right, power or remedy, express or implied, now or hereafter arising, available to such Party at
law or in equity, or under any other agreement, and each and every right, power and remedy herein
set forth or otherwise so existing may be exercised from time to time as often and in such order as may
be deemed expedient by such Party and shall not be a waiver of the right to exercise at any time
thereafter any other right, power or remedy. In no event shall either Party be liable for any special,
exemplary, punitive, or consequential damages.
5) The action or inaction of either Party shall not constitute a waiver or amendment to the provisions of
this Agreement. To be binding, amendments or waivers shall be in writing, signed by the parties and
approved by written resolution of the City Council.
enforce this Agreement shall not be a waiver or release.
c)
and development of the Plat complies with all applicable City, County, Metropolitan, State and Federal laws
and regulations, including but not limited to: subdivision ordinances, zoning ordinances and environmental
regulations. If the City determines that such use, construction and/or development of the Plat does not so
comply, and such non-compliance is not cured within the applicable notice and cure period pursuant to
Section 31 above and constitutes an Event of Default, then the City may, at its option, refuse to allow any
construction or development work in the applicable portion of the Plat until the Developer does comply.
After such an Event of De
compliance.
d) This Agreement shall run with the land and shall be recorded against the title to the Property concurrent
with the Plat and prior to any building permit issuance. The Developer covenants with the City that the
Developer is the owner of fee simple title to the Property, subject only to taxes, assessments, matters of
record, a farm lease, and any other exception noted in the title commitments for the Property, and that the
Developer will indemnify and hold the City harmless for any breach of the of the foregoing covenants. Upon
request by Developer, the City covenants to provide a recordable Certificate of Completion within a
reasonable period of time following the request, upon the completion of the Public Improvements required
herein, payment of all costs and fees required hereunder with respect to the Public Improvements and
compliance with all terms of the Agreement with respect to the Public Improvements. A release of this
Contract may be provided in the same manner and subject to the same conditions as a Certificate of
Completion provided that a final certificate of occupancy for the last Phase has been issued and there are
no outstanding obligations of Developer under the terms of this Agreement. The Developer covenants with
the City, its successors and assigns, that the Developer is the owner in fee title of the property being final
platted and no consents from any tenants of the Property are required to enter into this Agreement; that
there are no unrecorded interests in the property being final platted except for taxes and assessments, a
farm lease and any survey exceptions or matters noted in the title commitments for the Property; and that
the Developer will indemnify and hold the City harmless for any breach of the foregoing covenants.
e) The Developer will be required to conduct all major activities construction activities during the following
hours of operation:
Monday - Friday 7:00 A.M. until 7:00 P.M.
Saturday 8:00 A.M. until 5:00 P.M.
Sunday and Holidays Not Allowed
This does not apply to activities that are required on a 24-hour basis such as dewatering, etc. Any deviations
from the above hours are subject to approval of the City Engineer. Violations of the working hours will
result in a $500 fine per occurrence.
Page 208 of 219
14
238899v3
f)
or boulevards within their development as per City Code 6-7-1. Failure to control weeds and to cure such
failure after applicable notice and cure periods will be considered an Event of Default as outlined in
costs incurred by the City in correcting such failure pursuant to Paragraph 26 (Responsibility for Costs).
g) The City agrees at any time, and from time to time, within ten (10) days after receipt of written request by
the Developer, a lender or a party purchasing any portion of the Property, to execute, acknowledge and
deliver a certification in writing and in such form as will enable it to be recorded in the proper office for the
recordation of deeds and other instruments certifying: (a) that this Agreement is unmodified and in full
force and effect, or if there have been modifications, the identify of such modifications and that the same
are in full force and effect as modified; (b) that no party is in default under any provisions of this Agreement
or, if there has been a default, the nature of such default; (c) that all Improvements to be performed under
this Agreement have been performed, specifying the Improvements to be performed; and (d) as to any
other matter that the requesting party shall reasonably request. It is intended that any such statement may
be relied upon by any person, prospective mortgagee of, or assignee of any mortgage, upon such interest.
Any such statement on behalf of the City may be executed by the City Administrator without City Council
approval.
h) Indemnification. To the fullest extent permitted by law, Developer agrees to defend, indemnify and hold
harmless City, and its employees, officials, and agents from and against all claims, actions, damages, losses
and expenses, including reasonable attorney fees, arising out of negligence, default, its
performance or failure to perform its obligations or an Event of Default under this
indemnification obligation shall apply to general contractor, subcontractor(s), or anyone
directly or indirectly employed or hired by Developer, or anyone for whose acts Developer may be liable.
Developer agrees this indemnity obligation shall survive the completion or termination of this Agreement.
******************
33. Notices. Required notices to the Developer shall be in writing, and shall be either hand delivered to the
Developer, its employees or agents, or mailed to the Developer by certified or registered mail at the following
addresses. However, any Party may change its contact information for the purpose of this notice paragraph by
giving written notice of the change to the other Party as provided above in this paragraph:
MNLCO Farmington Two, LLC
3200 Cherry Creek South Drive, Suite 700
Denver, Colorado 80209
(Attn: General Counsel, Senior Vice
President of Land Development)
Notices to the City shall be in writing and shall be either hand delivered to the City Administrator, or mailed to
the City by certified mail or registered mail in care of the City Administrator at the following address:
Lynn Gorski, City Administrator
City of Farmington
430 Third Street
Farmington, MN 55024
[Remainder of page left blank intentionally. Signature pages follow.]
Page 209 of 219
15
238899v3
SIGNATURE PAGE
FOR THE CITY
CITY:
CITY OF FARMINGTON
By: _________________________________________
Nicholas Lien, Mayor
By: _________________________________________
Lynn Gorski, City Administrator
STATE OF MINNESOTA )
)ss.
COUNTY OF DAKOTA )
The foregoing instrument was acknowledged before me this _____ day of __________________, 20____ by Nicholas
Lien, Mayor, and by Lynn Gorski, City Administrator, of the City of Farmington, a Minnesota municipal corporation,
on behalf of the corporation and pursuant to the authority granted by the City Council.
________________________________________
Notary Public
Page 210 of 219
16
238899v3
SIGNATURE PAGE
FOR THE DEVELOPER
DEVELOPER:
MNLCO Farmington Two, LLC,
a Delaware limited liability company
By: _________________________________
Name: Jessica Bennett
Its: Chief Legal Officer
STATE OF COLORADO )
( ss.
CITY AND COUNTY OF DENVER )
The foregoing instrument was acknowledged before me this _____ day of ____________, 20___, by Jessica
Bennett, the Chief Legal Officer of MNLCO Farmington Two, LLC, a Delaware limited liability company, on its
behalf.
________________________________
Notary Public
Page 211 of 219
17
238899v3
EXHIBIT A
LEGAL DESCRIPTION
Lot 1, Block 1 as shown on the Final Plat for Farmington Technology Park 2nd Addition
Page 212 of 219
18
238899v3
EXHIBIT B
Initial Capacity Requests by December 31, 2030:
Water Peak Daily Flow - 0.49 MGD
Sanitary Peak Daily Flow - 0.39 MGD
Annual Municipal Water Usage Not to Exceed 20 million gallons per year (MGY)
Full Buildout Capacity Requests by December 31, 2032:
Water Peak Daily Flow - 2.93 MGD
Sanitary Peak Daily Flow - 2.34 MGD
Annual Municipal Water Usage Not to Exceed 50 MGY
Page 213 of 219
19
238899v3
EXHIBIT C
ESTIMATED CONSTRUCTION COSTS OF PUBLIC IMPROVEMENTS
FOR FARMINGTON TECHNOLOGY PARK 1ST ADDITION AND 2ND ADDITION
Page 214 of 219
20
238899v3
EXHIBIT D
IRREVOCABLE LETTER OF CREDIT
No. ___________________
Date: _________________
TO: City of Farmington
430 Third Street
Farmington, MN 55024
Dear Sir or Madam:
We hereby issue, for the account of (Name of Developer) and in your favor, our Irrevocable Letter of Credit in the
amount of $_______________________, available to you by your draft drawn on sight on the undersigned bank.
The draft must:
a) Bear the clause, "Drawn under Letter of Credit No. __________, dated ________________, 20___,
of (Name of Bank) ";
b) Be signed by the City Administrator or Finance Director of the City of Farmington.
c) Be presented for payment at _______________(Address of Bank)____________ on or before 4:00 p.m. on
November 30, 2____.
This Letter of Credit shall automatically renew for successive one-year terms unless, at least ninety (90) days prior to the next
annual renewal date (which shall be November 30 of each year), the Bank delivers written notice to the Farmington City
Administrator that it intends to modify the terms of, or cancel, this Letter of Credit. Written notice is effective if sent by certified
mail, postage prepaid, and deposited in the U.S. Mail, at least sixty (60) days prior to the next annual renewal date addressed
as follows: Farmington City Administrator, 430 Third Street, Farmington, MN 55024, and is actually received by the City
Administrator at least thirty (30) days prior to the renewal date.
This Letter of Credit sets forth in full our understanding which shall not in any way be modified, amended, amplified, or limited
by reference to any document, instrument, or agreement, whether or not referred to herein.
This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw may be made under this
Letter of Credit.
This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and Practice for Documentary
Credits, International Chamber of Commerce Publication No. 600.
We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly honored upon presentation.
[NAME OF BANK]
By: ____________________________________
_______________________________ [name]
Its: _____________________ [identify official]
Page 215 of 219
21
238899v3
EXHIBIT E SITE IMPROVEMENT/PERFORMANCE AGREEMENT TERMS The following terms and provisions shall be included in a Site Improvement/Performance Agreement. In no event shall any Site Improvement/Performance Agreement include a more onerous term that one that is already in this Agreement unless approved by Developer in writing, not to be unreasonably withheld, conditioned or delayed: 1. Section 5, 8, 9(A) and 9(B) (revised pursuant to Section 2 of this Exhibit E below), 12 (as it relates to water and wastewater capacity, improvements and infrastructure with respect to the particular Phase), 13, 15, 16, 17 (if there are wetlands, ponding or other applicable natural areas in applicable Phase), the second sentence of 20(A), 21, 22, 24, and 25 2. Improvement work which Developer shall be required to install, pay for and complete shall be limited to the following, if required for a particular Phase, provided that, unless otherwise elected and agreed to by Developer, neither such work nor any Site Improvement/Performance Agreement shall include any Public Improvements and/or any obligations regarding the same: a. Sanitary Sewer System (trunk and lateral) b. Water System (trunk and lateral) c. Storm Sewer System d. Streets e. Concrete Curb and Gutter f. Street Lights g. Erosion and Sediment Control, Site Grading and Stormwater Treatment h. Underground Utilities i. Setting Iron Monuments j. Surveying and Staking k. Sidewalks and Trails l. Landscaping and Screening 3. If the Phase will include utility connections across 225th Street West, Section 14. 4. The Development Fees applicable to such Phase pursuant to Section 18. 5. If required for the particular Phase, Sections 26, 27 and/or 28, limited to Reimbursement Costs and other fees, costs and escrows described therein for and applicable to the particular Phase 6. If security is required for any of the improvements under Section 2 of this Exhibit E above pursuant to applicable City laws, rules and regulations, Section 29 and/or, if applicable, Section 9(C), provided that (i) for the avoidance of doubt, the security shall be to guarantee compliance with the terms of the Site Improvement/Performance Agreement with respect to payment and construction of the improvements required under Section 2 of this Exhibit E above, and (ii) Developer may elect (x) to submit a separate financial guarantee for any such required landscaping improvements, if any, pursuant to City Code Section 10-6-23(I)(3)(e), and/or (y) for the release, inspection and completion requirements in City Code Section 10-6-23(I)(3)(f) and (g), to apply in lieu of the applicable respective requirements in the Agreement 7. If applicable and required under the applicable City Code and/or City rules and regulations provisions, the warranty, warranty period, trees warranty and/or maintenance bonds requirements in Section 30, if applicable and required. 8. All other Site Improvement/Performance Agreement topics not covered in the Development Agreement, if and as agreed to by City and Developer.
4925-8096-8610, v. 1
Page 216 of 219
REGULAR COUNCIL AGENDA MEMO
To: Mayor, Councilmembers and City Administrator
From:Deanna Kuennen, Community & Economic Development Director
Department:Community Development
Subject:Downtown Parking Plan (15-minute "Quick Stop Spots")
Meeting:Regular Council - Apr 20 2026
INTRODUCTION:
With the increased activity in downtown, there is also a greater demand for convenient
parking options that support quick visits to local businesses. Several businesses/property
owners have expressed interest in seeing the City add short-term parking spots in the
downtown. These spaces could be used for drop-off/pick-ups, would be courtesy spaces
(meaning no Police enforcement), and collectively would encourage parking turnover
that would support businesses. The EDA discussed this concept in detail at both their
August 2025 meeting and then again at their March 2026 meeting. At both meetings, the
EDA expressed support of adding short-term parking spots and are recommending to the
City Council the implementation of a 15-Minute Parking Plan for the downtown - focusing
on consistently placing 15-minute spots in locations that support all businesses versus places
spaces only in locations in response to specific requests from individual businesses.
DISCUSSION:
As a way to encourage parking turnover in the downtown area to support quick visits to
local businesses, the City Council is asked to approve a Downtown Parking Plan that
includes 15-Minute "Quick Stop Spots." The plan responds to the needs expressed by
businesses and provides for consistent locations of short-term parking spots per block. The
plan also aims to support the downtown as a whole versus responding to specific requests
from individual businesses. As shown on the attached map, a total of 10 "Quick Stop Spots"
are included at the following locations:
One spot per block on each side of the street along 3rd Street between Spruce and
Elm (total of 4 spots) - These spots would be located at the corner and/or the space
adjacent to the existing ADA spaces on the block.
One spot on the north and south sides of Oak Street east of 3rd Street (total of 2
spots) - These spots would be located at the corner.
This plan recognizes the existing 15-minutes spaces that already exist on Elm Street,
west of 3rd Street (total of 4 spots). Sign faces will be replaced for consistency.
Page 217 of 219
The signs will be installed this spring by the Public Works Department and will remain in
place all year. Based on feedback, if the program is a success, the spots can remain
permanently and/or be revisited in the future as the composition of downtown changes. If
the program does not have the intended outcome, the signs program will be revisited in
2027 for the potential removal of the signs.
Prior to the signs being installed, Staff will notify all of the businesses and work with the city's
communication team to share information about the downtown parking plan on the city's
website and on the social media platforms.
BUDGET IMPACT:
Not applicable; parking signs are funded by the Economic Development Authority.
ACTION REQUESTED:
Approve the Downtown Parking Plan and authorize installation of signs.
ATTACHMENTS:
15 Minute Parking
Page 218 of 219
Page 219 of 219